Current Residential Electricity & Gas Tariffs
Total Page:16
File Type:pdf, Size:1020Kb
1 Current residential electricity & gas tariffs Price sheets for: Victoria South Australia Queensland Australian Capital Territory New South Wales Effective September 2021 2 Origin Energy 3 Thanks for choosing us Contents These are the Price Sheets which include Victoria fees and charges for sites supplied under our Origin Basic – Electricity Tariffs 4 Multiple Site Agreement. These Price Sheets form part of that Agreement. Origin Basic – Gas Tariffs 8 Connection Fees – Electricity 12 Connection Fees – Gas 12 South Australia Origin Basic – no exit fees – Electricity Tariffs 14 Origin Basic – no exit fees – Gas Tariffs 16 Connection Fees – Electricity 16 Queensland Origin Basic – Electricity Tariffs 18 Origin Basic – Gas Tariffs 20 Connection Fees – Electricity 20 Connection Fees – Gas 21 Australian Capital Territory Origin Basic – Electricity Tariffs 22 Connection Fees – Electricity 24 Connection Fees – Gas 24 Origin Basic – Gas Tariffs 25 New South Wales Origin Basic – Electricity Tariffs 26 Origin Basic – Gas Tariffs 32 Connection Fees – Electricity 32 Connection Fees – Gas 33 Other Fees 34 Disconnection Fees – All Zones 35 Victoria 4 Origin Energy 5 Origin Basic – Electricity Tariffs Victoria Zone Tariff Description Price List Units Rate (incl. GST) Powercor Residential Peak Supply Charge c/day 123.79 Anytime (GD/GR) Peak Usage c/kWh 24.04 Powercor Residential Peak Supply Charge c/day 123.79 Plus Dedicated Peak Usage c/kWh 24.04 Circuit Off-Peak (Dedicated Circuit) c/kWh 17.33 Powercor Residential Two Supply Charge c/day 126.78 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 33.05 Off Peak - All other Usage c/kWh 19.16 Citipower Residential Peak Supply Charge c/day 111.05 Anytime (GD/GR) Peak Usage c/kWh 23.24 Citipower Residential Peak Supply Charge c/day 111.05 Plus Dedicated Peak Usage c/kWh 23.24 Circuit Off-Peak (Dedicated Circuit) c/kWh 16.73 Citipower Residential Two Supply Charge c/day 111.26 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 32.44 Off Peak - All other Usage c/kWh 18.49 Jemena Residential Peak Supply Charge c/day 104.65 Anytime (GD/GR) Peak Usage c/kWh 24.90 Jemena Residential Peak Supply Charge c/day 104.65 Plus Dedicated Peak Usage c/kWh 24.90 Circuit Off-Peak (Dedicated Circuit) c/kWh 18.98 Jemena Residential Two Supply Charge c/day 107.10 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 30.53 Off Peak - All other Usage c/kWh 19.33 Victoria 6 Origin Energy 7 Origin Basic – Electricity Tariffs continued Zone Tariff Description Price List Units Rate (incl. GST) United Residential Peak Supply Charge c/day 96.90 Energy Anytime (GD/GR) Peak Usage c/kWh 24.37 United Residential Peak Supply Charge c/day 96.90 Energy Plus Dedicated Peak Usage c/kWh 24.37 Circuit Off-Peak (Dedicated Circuit) c/kWh 17.58 United Residential Two Supply Charge c/day 102.79 Energy Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 33.47 Off Peak - All other Usage c/kWh 19.66 Ausnet Residential Peak Supply Charge c/day 117.01 Services Anytime (GD/GR) Peak Usage first 11.1781 kWh per day c/kWh 28.09 Remaining Usage c/kWh 29.71 Ausnet Residential Peak Supply Charge c/day 117.01 Services Plus Dedicated Peak Usage first 11.1781 kWh per day c/kWh 28.09 Circuit Remaining Usage c/kWh 29.71 Off-Peak (Dedicated Circuit) c/kWh 19.71 Ausnet Residential Two Supply Charge c/day 119.37 Services Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 39.06 Off Peak - All other Usage c/kWh 19.81 Victoria 8 Origin Energy 9 Origin Basic – Gas Tariffs Victoria Zone Price List Units Rate (incl. GST) Season Dates Australian Gas Networks North Supply Charge c/day 75.700 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Australian Gas Networks Supply Charge c/day 75.700 Central 1 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Multinet Main 1 Supply Charge c/day 76.800 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Australian Gas Supply Charge c/day 71.500 Networks Cardinia All Consumption c/MJ 2.3500 Australian Gas Networks Supply Charge c/day 75.900 Murray (Vic) All Consumption c/MJ 2.8300 Australian Gas Networks Supply Charge c/day 81.400 Mildura Usage first 50 MJ per day c/MJ 4.0500 Remaining Usage c/MJ 2.7300 Ausnet Services Central 2 Supply Charge c/day 88.110 Peak Period 1 June to 30 September Peak Usage c/MJ 2.3600 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.3600 Australian Gas Networks Supply Charge c/day 75.700 Central 2 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Ausnet Services West Supply Charge c/day 89.100 Peak Period 1 June to 30 September Peak Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.2000 Ausnet Services Central 1 Supply Charge c/day 88.110 Peak Period 1 June to 30 September Peak Usage c/MJ 2.3600 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.3600 Victoria 10 Origin Energy 11 Origin Basic – Gas Tariffs continued Zone Price List Units Rate (incl. GST) Season Dates Multinet Main 2 Supply Charge c/day 76.800 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Australian Gas Networks Supply Charge c/day 75.900 Bairnsdale All Consumption c/MJ 2.8300 Multinet Yarra Valley Supply Charge c/day 75.900 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Ausnet Services Adjoining Supply Charge c/day 91.300 Central Peak Period 1 June to 30 September Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Ausnet Services Adjoining Supply Charge c/day 91.300 West Peak Period 1 June to 30 September Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Multinet Gippsland Supply Charge c/day 75.900 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Victoria 12 Origin Energy 13 Connection Fees – Electricity Victoria Powercor AusNet Jemena Citipower United Services Energy Single Phase BTS Pole – (coincidental disc) $562.23 $543.52 $620.39 $558.69 $556.05 Single Phase BTS Pole – (independent disc) $562.23 N/A $620.39 $558.69 N/A Multi Phase BTS Pole (coincidental disc) $696.31 $951.16 $763.25 $667.76 $556.05 Multi Phase BTS Pole (independent disc) $696.31 N/A $763.25 $667.76 N/A Single Phase Builders Supply in Perm Position $562.23 $246.76 $620.39 $558.69 $556.05 Overhead – Single Phase NON off peak $562.23 $548.19 $744.04 $558.69 $556.05 Overhead – Single Phase off peak $562.23 $548.19 $744.04 $558.69 $556.05 Underground – Single Phase NON off peak $562.23 $240.91 $620.39 $558.69 $556.05 Underground – Single Phase off peak $562.23 $240.91 $620.39 $558.69 $556.05 Overhead – Multi Phase $696.31 $622.97 $825.79 $667.76 $556.05 Underground – Multi Phase $696.31 $381.82 $897.34 $667.76 $556.05 De-Energisation Charge (Final Read charge) $62.47 $38.28 $78.07 $42.32 $55.07 Wasted Service Truck Visit $404.15 $232.14 $519.28 $397.84 $338.49 Service Truck Visit $734.73 $624.15 $525.64 $634.71 $390.25* * $390.25 applies to first 30 mins and $80.70 for each additional The above table includes the most commonly incurred fees that may apply. 15 minutes. NOTE: These charges are “pass through” charges from the relevant For a full list of fees that may apply, please visit the relevant Distributor’s website. distribution company. Connection Fees – Gas Victoria Connection Fee $0.00* Account Establishment Fee $0.00* Incomplete Meter Fix (Wasted Site Visit) $102.30 * Charges may apply and are subject to network site inspection.