Current Residential Electricity & Gas Tariffs

Current Residential Electricity & Gas Tariffs

1 Current residential electricity & gas tariffs Price sheets for: Victoria South Australia Queensland Australian Capital Territory New South Wales Effective September 2021 2 Origin Energy 3 Thanks for choosing us Contents These are the Price Sheets which include Victoria fees and charges for sites supplied under our Origin Basic – Electricity Tariffs 4 Multiple Site Agreement. These Price Sheets form part of that Agreement. Origin Basic – Gas Tariffs 8 Connection Fees – Electricity 12 Connection Fees – Gas 12 South Australia Origin Basic – no exit fees – Electricity Tariffs 14 Origin Basic – no exit fees – Gas Tariffs 16 Connection Fees – Electricity 16 Queensland Origin Basic – Electricity Tariffs 18 Origin Basic – Gas Tariffs 20 Connection Fees – Electricity 20 Connection Fees – Gas 21 Australian Capital Territory Origin Basic – Electricity Tariffs 22 Connection Fees – Electricity 24 Connection Fees – Gas 24 Origin Basic – Gas Tariffs 25 New South Wales Origin Basic – Electricity Tariffs 26 Origin Basic – Gas Tariffs 32 Connection Fees – Electricity 32 Connection Fees – Gas 33 Other Fees 34 Disconnection Fees – All Zones 35 Victoria 4 Origin Energy 5 Origin Basic – Electricity Tariffs Victoria Zone Tariff Description Price List Units Rate (incl. GST) Powercor Residential Peak Supply Charge c/day 123.79 Anytime (GD/GR) Peak Usage c/kWh 24.04 Powercor Residential Peak Supply Charge c/day 123.79 Plus Dedicated Peak Usage c/kWh 24.04 Circuit Off-Peak (Dedicated Circuit) c/kWh 17.33 Powercor Residential Two Supply Charge c/day 126.78 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 33.05 Off Peak - All other Usage c/kWh 19.16 Citipower Residential Peak Supply Charge c/day 111.05 Anytime (GD/GR) Peak Usage c/kWh 23.24 Citipower Residential Peak Supply Charge c/day 111.05 Plus Dedicated Peak Usage c/kWh 23.24 Circuit Off-Peak (Dedicated Circuit) c/kWh 16.73 Citipower Residential Two Supply Charge c/day 111.26 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 32.44 Off Peak - All other Usage c/kWh 18.49 Jemena Residential Peak Supply Charge c/day 104.65 Anytime (GD/GR) Peak Usage c/kWh 24.90 Jemena Residential Peak Supply Charge c/day 104.65 Plus Dedicated Peak Usage c/kWh 24.90 Circuit Off-Peak (Dedicated Circuit) c/kWh 18.98 Jemena Residential Two Supply Charge c/day 107.10 Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 30.53 Off Peak - All other Usage c/kWh 19.33 Victoria 6 Origin Energy 7 Origin Basic – Electricity Tariffs continued Zone Tariff Description Price List Units Rate (incl. GST) United Residential Peak Supply Charge c/day 96.90 Energy Anytime (GD/GR) Peak Usage c/kWh 24.37 United Residential Peak Supply Charge c/day 96.90 Energy Plus Dedicated Peak Usage c/kWh 24.37 Circuit Off-Peak (Dedicated Circuit) c/kWh 17.58 United Residential Two Supply Charge c/day 102.79 Energy Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 33.47 Off Peak - All other Usage c/kWh 19.66 Ausnet Residential Peak Supply Charge c/day 117.01 Services Anytime (GD/GR) Peak Usage first 11.1781 kWh per day c/kWh 28.09 Remaining Usage c/kWh 29.71 Ausnet Residential Peak Supply Charge c/day 117.01 Services Plus Dedicated Peak Usage first 11.1781 kWh per day c/kWh 28.09 Circuit Remaining Usage c/kWh 29.71 Off-Peak (Dedicated Circuit) c/kWh 19.71 Ausnet Residential Two Supply Charge c/day 119.37 Services Period Time of Use Peak Usage (3pm to 9pm local time, all days) c/kWh 39.06 Off Peak - All other Usage c/kWh 19.81 Victoria 8 Origin Energy 9 Origin Basic – Gas Tariffs Victoria Zone Price List Units Rate (incl. GST) Season Dates Australian Gas Networks North Supply Charge c/day 75.700 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Australian Gas Networks Supply Charge c/day 75.700 Central 1 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Multinet Main 1 Supply Charge c/day 76.800 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Australian Gas Supply Charge c/day 71.500 Networks Cardinia All Consumption c/MJ 2.3500 Australian Gas Networks Supply Charge c/day 75.900 Murray (Vic) All Consumption c/MJ 2.8300 Australian Gas Networks Supply Charge c/day 81.400 Mildura Usage first 50 MJ per day c/MJ 4.0500 Remaining Usage c/MJ 2.7300 Ausnet Services Central 2 Supply Charge c/day 88.110 Peak Period 1 June to 30 September Peak Usage c/MJ 2.3600 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.3600 Australian Gas Networks Supply Charge c/day 75.700 Central 2 Usage first 100 MJ per day c/MJ 2.5000 Usage next 100 MJ per day c/MJ 2.3800 Remaining Usage c/MJ 2.0600 Ausnet Services West Supply Charge c/day 89.100 Peak Period 1 June to 30 September Peak Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.2000 Ausnet Services Central 1 Supply Charge c/day 88.110 Peak Period 1 June to 30 September Peak Usage c/MJ 2.3600 Off-Peak Period 1 October to 31 May Off-Peak Usage c/MJ 2.3600 Victoria 10 Origin Energy 11 Origin Basic – Gas Tariffs continued Zone Price List Units Rate (incl. GST) Season Dates Multinet Main 2 Supply Charge c/day 76.800 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 2.6500 Remaining Usage c/MJ 1.7600 Australian Gas Networks Supply Charge c/day 75.900 Bairnsdale All Consumption c/MJ 2.8300 Multinet Yarra Valley Supply Charge c/day 75.900 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Ausnet Services Adjoining Supply Charge c/day 91.300 Central Peak Period 1 June to 30 September Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Ausnet Services Adjoining Supply Charge c/day 91.300 West Peak Period 1 June to 30 September Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 October to 31 May Usage first 100 MJ per day c/MJ 2.8600 Remaining Usage c/MJ 2.2000 Multinet Gippsland Supply Charge c/day 75.900 Peak Period 1 May to 31 October Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Off-Peak Period 1 November to 30 April Usage first 100 MJ per day c/MJ 3.0800 Remaining Usage c/MJ 2.2000 Victoria 12 Origin Energy 13 Connection Fees – Electricity Victoria Powercor AusNet Jemena Citipower United Services Energy Single Phase BTS Pole – (coincidental disc) $562.23 $543.52 $620.39 $558.69 $556.05 Single Phase BTS Pole – (independent disc) $562.23 N/A $620.39 $558.69 N/A Multi Phase BTS Pole (coincidental disc) $696.31 $951.16 $763.25 $667.76 $556.05 Multi Phase BTS Pole (independent disc) $696.31 N/A $763.25 $667.76 N/A Single Phase Builders Supply in Perm Position $562.23 $246.76 $620.39 $558.69 $556.05 Overhead – Single Phase NON off peak $562.23 $548.19 $744.04 $558.69 $556.05 Overhead – Single Phase off peak $562.23 $548.19 $744.04 $558.69 $556.05 Underground – Single Phase NON off peak $562.23 $240.91 $620.39 $558.69 $556.05 Underground – Single Phase off peak $562.23 $240.91 $620.39 $558.69 $556.05 Overhead – Multi Phase $696.31 $622.97 $825.79 $667.76 $556.05 Underground – Multi Phase $696.31 $381.82 $897.34 $667.76 $556.05 De-Energisation Charge (Final Read charge) $62.47 $38.28 $78.07 $42.32 $55.07 Wasted Service Truck Visit $404.15 $232.14 $519.28 $397.84 $338.49 Service Truck Visit $734.73 $624.15 $525.64 $634.71 $390.25* * $390.25 applies to first 30 mins and $80.70 for each additional The above table includes the most commonly incurred fees that may apply. 15 minutes. NOTE: These charges are “pass through” charges from the relevant For a full list of fees that may apply, please visit the relevant Distributor’s website. distribution company. Connection Fees – Gas Victoria Connection Fee $0.00* Account Establishment Fee $0.00* Incomplete Meter Fix (Wasted Site Visit) $102.30 * Charges may apply and are subject to network site inspection.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us