Featured pages Living off the land Mining in Holly geared toward Fenton area couple Local mine helped build I-75, live self-sufficient life Ambassador Bridge project and Builders & on 14-acre farm new Powers High School Realtors sociation Michigan Press As 1B 3A 7B tctimes.com % VIDEO SUNDAY EDITION 10 TRANSFERS ONLINE OFF AT BILLMEIER The COMMENTS CAMERA coupons.tctimes.com Weekend CORNERSTONE $ The problem I VOL. 20 NO. XXII SUNDAY, JUNE 2, 2013 1.00 have‘‘ with the new Cornerstone build- ing is that it is not Fenton will receive $1.4 million to replace bridge part of a master uCity to pay 5 percent of Summary will pick up 95 percent plan. The uThe City of Fenton will of the $1.4 million con- entire plan construction costs to build new receive a large amount struction costs. This should be of funding from MDOT’s funding will be avail- mapped out before bridge over Shiawassee River Local Bridge Program to the first brick is laid. replace the Silver Lake able in 2015. The city Any good builder By Ryan Tackabury Road bridge that spans will be responsible knows that.”
[email protected]; 810-629-8282 the Shiawassee River. for roughly $73,000 The Silver Lake Road bridge over the Shia- in construction costs. THEATER STORY wassee River is in disrepair and needs to be “The city will have to pay 5 percent of the Regarding the replaced. Doing so is very expensive however. construction costs. The city is also responsible for TRI-COUNTY TIMES | FILE PHOTO theater‘‘ story, it’s a good thing the Fortunately, the city will not have to pick up the all of the design engineering, and the construction In 2015 funds will be available which the City popcorn bill on its own and will be able to build a new bridge engineering work,” said Daniel Czarnecki, direc- of Fenton can use to replace the Silver Lake is good with minimal costs.