CSHP) DOLE-Regional Office No

Total Page:16

File Type:pdf, Size:1020Kb

CSHP) DOLE-Regional Office No REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 February 2017 No. Project Owner/General Contractor Project Name and Location Date Approved DPWH - 4TH DEO/ GGMU CONSTRUCTION AND 1 16GI0073 - Construction of Dawis BHS, Brgy. Dawis Zarraga, Iloilo February 1, 2017 SUPPLY 16GF0053 - Regionwide/Nationwide - Roads - Sustainability Program on 2 DPWH - 1ST DEO/ JHJ CONSTRUCTION Road Maintenance after Completin of TCP II, Guimbal - Igbaras - February 2, 2017 Tubungan - Leon Road (Km. 0044+176 - Km. 0044 + 260), Igbaras, Iloilo 17GG0006 - Rehab./Reconst./Upgrading of Damaged Paved National Roads, including Drainage Based on Pavement Management 3 DPWH 2ND DEO/ G. UY CONSTRUCTION System/Highway Development Management - 4 (HDM - 4), Barotac February 6, 2017 Nuevo - Dumangas - Dacutan Wharf Road, Brgy. Dacutan Section, Dumangas, Iloilo 16GG0137 - Rehabilitation of Damaged Paved Roads along Polot-an- DPWH 2ND DEO / VANNIE CONSTRUCTION AND 4 Pototan-Poblacion Road, Pototan, Iloilo, K0280+664 - K0280+686.50 February 6, 2017 SUPPLY (Net Length = 0.0225 K.M. 5 DPWH 1ST DEO/ GALENO CONSTRUCTION, INC.. 16GF0066 - Construction of Tiolas River Control, San Joaquin, Iloilo. January 7, 2017 DPWH 1ST DEO/ PITONG BUILDERS & 16GF0077 - Rehabilitation/Improvement of Cabubugan-Bangkiling Road, 6 January 7, 2017 CONSTRUCTION SUPPLY Guimbal, Iloilo DPWH 1ST DEO/ PITONG BUILDERS & 16GF0071 - Rehabilitation/Improvement of Nalundan-Sulbod Road, 7 January 7, 2017 CONSTRUCTION SUPPLY Guimbal, Iloilo DEPARTMENT OF EDUCATION DIVISION OF 8 ILOILO/ RISM BUILDERS AND CONSTRUCTION Repair of Classrooms in Naborot ES, Carles, Iloilo 7-Jan-17 SERVICES, INC. DEPARTMENT OF EDUCATION DIVISION OF 9 ILOILO/ RISM BUILDERS AND CONSTRUCTION Repair of Classrooms in Malbog ES, Estancia, Iloilo 7-Jan-17 SERVICES, INC. 16GF0050 - Concreting of Bagacay-Danao Local Road, Bagacay, 10 DPWH - 1ST DEO/ JHJ CONSTRUCTION February 8, 2017 Tigbauan, Iloilo 17GI0017 - Construction of Multi-Purpose Building, Balabag, Sta. 11 DPWH 4TH DEO/ J.J.S. CONSTRUCTION February 8, 2017 Barbara, Iloilo 17GI0009 - Construction of Multi-Purpose Building, Jibao-an, Sta. 12 DPWH 4TH DEO/ J.J.S. CONSTRUCTION 8-Feb-17 Barbara, Iloilo 16GJ0095 - Concreting of Farm to Market Road Projects for Coconut 13 DPWH ILOILO CITY DEO/ J.S. LAYSON & CO., INC. February 9, 2017 Lands, Brgy. Ticud, La Paz, Iloilo City 14 DPWH 2ND DEO/ OTING CONSTRUCTION AND 16GG0141 - Jelicuon Montinala BHS - Improvement/Expansion of BHS, February 10, Page 1 of 8 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 February 2017 No. Project Owner/General Contractor Project Name and Location Date Approved SUPPLY Cabatuan, Iloilo 2017 DPWH 1ST DEO/KIT'Z CONSTRUCTION AND 16GF0059 - Provision of TechVoc Workshop Buildings/Laboratories for February 15, 15 SUPPLY Senior High School - Tubungan NHS, Tubungan, Iloilo 2017 17GI0003 - Construction of Multi-Purpose Building, San Sebastian, Sta. February 15, 16 DPWH 4th DEO/ MAKANA BUILDERS & SUPPLY Barbara, Iloilo 2017 17GI0004 - Construction of Multi-Purpose Building, Brgy. Zone IV, Sta. 17 DPWH 4th DEO/ MAKANA BUILDERS & SUPPLY 15-Feb-17 Barbara, Iloilo 17GI0006 - Rehabilitation/Reconstruction/Upgrading of Damaged Paved DPWH 4TH DEO/ EAST ASIA CONSTRUCTION, National Roads including Drainage of Iloilo-Capiz Road (New Route) February 16, 18 INC. K0010+000-K0010+300, K0010+300- K0010+707, K0010+707- 2017 K0011+000, Leganes, Iloilo NATIONAL HOUSING AUTHORITY/ EDDMARI Procurement of Fully Developed Lots and Completed Housing Units 19 CONSTRUCTION AND TRADING/ KIT PROPERTIES under the NHA's Yolanda Permanent Housing Program located at Brgy. 16-Feb-17 INC. JOINT VENTURE Bolilao, Dumangas, Iloilo - 93 Housing Units NATIONAL HOUSING AUTHORITY/ EDDMARI Procurement of Fully Developed Lots and Completed Housing Units 20 CONSTRUCTION AND TRADING/ KIT PROPERTIES under the NHA's Yolanda Permanent Housing Program located at Brgy. 16-Feb-17 INC. JOINT VENTURE Barasan, Dumangas, Iloilo - 407 Housing Units 16GJ0085 - Expansion/Renovation of PHHC Block 17 (BHS) Brgy. February 16, 21 DPWH ILOILO CITY DEO/ NOE'S BUILDERS PHHC Block 17, Mandurriao, Iloilo City 2017 16GH0091 - Construction of 2 Units 3STY9CL Balasan CES, Balasan, February 17, 22 DPWH 3RD DEO/ KIRSKAT VENTURE Iloilo 2017 17GI0008 - Construction of Multi-Purpose Building, Leganes National February 17, 23 DPWH 4TH DEO/ H.F. ENTERPRISES HS, Guinobatan, Leganes, Iloilo 2017 17GI0018 - Construction of Multi-Purpose Building Dawis ES, Dawis February 17, 24 DPWH 4TH DEO/ CLY-ABC BUILDERS Zarraga, Iloilo 2017 17GI0016 - Construction of Multi-Purpose Building (Liga Hall) Poblacion, February 17, 25 DPWH 4TH DEO/ CLY-ABC BUILDERS San Miguel, Iloilo 2017 February 20, 26 DPWH 3RD DEO/ UNITEC BUILDER, INC. 16GH0100 - Construction of 2 Units 2STY8CL Sara NHS, Sara, Iloilo 2017 DPWH - 4TH DEO/ GGMU CONSTRUCTION AND 16GG0149 - Construction of One (1) Unit - Two (2) Storey Six (6) February 22, 27 SUPPLY Classrooms, Pototan, NCHS, Brgy. Cau-ayan, Pototan, Iloilo 2017 DPWH 4TH DEO/ EAST ASIA CONSTRUCTION, 17GI0002 - Rehabilitation/Reconstruction/Upgrading of Damaged Paved February 22, 28 INC. National Roads including DrainageCabatuan-New Lucena-Banga-Bante 2017 Page 2 of 8 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 February 2017 No. Project Owner/General Contractor Project Name and Location Date Approved Rd. K0044+496 - K0044+900, New Lucena, Iloilo DPWH 2ND DEO/ SUPREME ABF CONSTRUCTION 16GG0146 - Construction of Two (2) Units - Two (2) Storey Four February 23, 29 & CONSTRUCTION SUPPLY COMPANY, INC. Classrooms, Mina National High School, Brgy. Bangac, Mina, Iloilo 2017 DPWH 2ND DEO/ SUPREME ABF CONSTRUCTION 16GG0148 - Construction of One (1) Unit - Two (2) Storey Six (6) February 23, 30 & CONSTRUCTION SUPPLY COMPANY, INC. Classrooms, Mina National High School, Brgy. Bangac, Mina, Iloilo 2017 17GJ0003 - Asphalt Overlay of Muelle Loney Marginal Wharf Road DPWH ILOILO CITY DEO /IBC INTERNATIONAL February 24, 31 (K0001+144.4 - K0001+504.4, K0001+1032.4, K0001+1032.4 - BUILDERS CORP. 2017 K0001+1796, Muelle Loney, Iloilo City 17GG0002 – Construction/Improvements of Access Roads leading to Airports, Seaports & Declared Tourism Destination – Seaport, Junction DPWH 2ND DEO/ A.D. PENDON CONSTRUCTION & Cayos National Road – Bantud Fabrica-Junction Coastal Road leading to February 27, 32 SUPPLY, INC. Dumangas Port, Dumangas, Iloilo 4th LD, Barangay Bantud Fabrica, 2017 Dumangas, Iloilo Sta. 001+251 – Sta. 001+498 (Net Length = 247.00 L.M.) February 27, 33 DPWH 3RD DEO/ PATRILA BUILDERS, INC. 16GH0094 - Construction of 1 Unit 3STY9CL Bancal ES, Carles, Iloilo 2017 17GI0007 - Construction/Improvement of Access Roads leading to DPWH ILOILO CITY DEO /IBC INTERNATIONAL February 28, 34 Airports Seaports and declared Tourism Destinations to Seaports Access BUILDERS CORP. 2017 Road leading to Leganes Port, Leganes, Iloilo DPWH ILOILO CITY DEO/ ALLENCON 17GJ0007 - Asphalt Overlay Iznart-Ledesma-Molo Road K0000+000 - February 28, 35 DEVELOPMENT CORPORATION K0000+236, K0000+513 - K0000+545, Iloilo City Proper 2017 Proposed Two (2) Storey Residential Building/New Road, Brgy. Banica, 36 Mrs. Jocelyn L. Reichersammer/By Administration 2-Feb-17 Roxas City 37 Mary Ann S. Diones/By Administration One Storey Residential Building/Brgy. Cagay, Roxas City 2-Feb-17 SPS. Romeo Buncalan & Leonila Buncalan/By Proposed 2 Storey Residential Building/Lot 20 Blk. 8, Costa Verde Subd., 38 2-Feb-17 Administration Brgy. Cagay, Roxas City 39 Fatima B. Alcazaren/By Administration Proposed Studio Type Apartment Brgy. Punta tabuc, Roxas City 8-Feb-17 Proposed Two Storey Residential Building/Villa Alegria Subd., Brgy. 40 Mr. & Mrs. Anthony Perez/By Administration 8-Feb-17 Punta tabuc, Roxas City Two Storey Residential Building/Blk. 12, Lot 2 Puente Acuna, Dayao, 41 Noel Laurino/By Administration 8-Feb-17 Roxas City Tilos Mikhail Arcenas & Travis Wilfred Arcenas/By Proposed One Storey Commercial Building/Warehouse/Punta Tabuc, 42 13-Feb-17 Administration Roxas City Page 3 of 8 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 February 2017 No. Project Owner/General Contractor Project Name and Location Date Approved Proposed One Storey Residential/Commercial Building/Brgy. Lawaan, 43 Ricky Gascon/By Administration 16-Feb-17 Roxas City 44 Lelanie Basco/By Administration Proposed Two Storey Residential Building/Cabugao, Roxas City 17-Feb-17 A Proposed Residential Building/Blk. 34 Lot 26 Westlake 3 Subd., Brgy. 45 Christian D. Hizuka/By Administration 22-Feb-17 Tanque, Roxas City Proposed Two Storey Residential/Commercial Building/Barangay VIII, 46 Ronnie B. Diosaban/By Administration 22-Feb-17 Roxas City Ceresa L. Yap & Myla B. Muyco/ABC-CLY Proposed Two Storey Residential Building/Orchard Lane Pueblo de 47 24-Feb-17 Construction Panay, Brgy. Dulunan, Roxas City SPS. Jose P. Alovera & Julilia Alovera/By 48 Proposed Two Storey Residential Building/Brgy. Tiza, Roxas City 28-Feb-17 Administration 49 Julito A. Albaladejo/By Administration Proposed Two Storey Residential House/St. Ignatious Subd., Roxas City 28-Feb-17 Construction of 15 MB Vertical Storage Tank (VCR) and 2x5 MB Water 50 Petron Corporation/EEI Corporation 28-Feb-17 Tank Project/Petron Roxas Depot, Brgy. Culasi, Roxas City 16GD0080-Construction/Maintenance of Flood Mitigation Structures and DPWH-1st DEO/Legacy Construction/MBM 51 Drainage System/Construction/Rehabilitation
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • Metro Iloilo Development Council: in Pursuit of Managed Urban Growth
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Cuenca, Janet S.; Villanueva-Ruiz, Eden C. Working Paper Metro Iloilo Development Council: In Pursuit of Managed Urban Growth PIDS Discussion Paper Series, No. 2004-52 Provided in Cooperation with: Philippine Institute for Development Studies (PIDS), Philippines Suggested Citation: Cuenca, Janet S.; Villanueva-Ruiz, Eden C. (2004) : Metro Iloilo Development Council: In Pursuit of Managed Urban Growth, PIDS Discussion Paper Series, No. 2004-52, Philippine Institute for Development Studies (PIDS), Makati City This Version is available at: http://hdl.handle.net/10419/127880 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. www.econstor.eu Philippine Institute for Development Studies Surian sa mga Pag-aaral Pangkaunlaran ng Pilipinas Metro Iloilo Development Council: In Pursuit of Managed Urban Growth Eden C.
    [Show full text]
  • Landslides and Flooding
    2017/11/17 Welcome Delegates to the 53rd CCOP Annual Session!!! October 16 – 19, 2017 “The Role of Geosciences in Safeguarding Our Environment” 1 2017/11/17 Cebu City 2 2017/11/17 Geohazard Information: An Indispensable Tool for Land Use Planning and Disaster Risk Resiliency Implementation RD LEO VAN V. JUGUAN Mines and Geosciences Bureau 6 53rd CCOP Annual Session October 2017 Philippine Setting Prone to GEOHAZARDS 3 2017/11/17 Porphyry Cu belts Philippines Porphyry Cu belts • Within the Ring of Fire • Within the Earthquake Belt • Within the Pacific belt of tropical cyclone (average of 20 TYPHOONS A YEAR) 4 2017/11/17 Tectonic Map of the Philippines Source: PHIVOLCS Negros Oriental Earthquake 5 2017/11/17 1:50,000 SCALE GEOHAZARD MAPPING AND ASSESSMENT (2005-2010) The National Geohazard Assessment and Geohazard Mapping Program of the DENR Mines and Geosciences Bureau mandated the conduct of a geohazard mapping for the country as included in the Medium Term Philippine Development Plan of 2004-2010. HIGHHIGH LANDSLIDEFLOOD SUSCEPTIBILITY SUSCEPTIBILITYAreas likely to experience flood heights Unstableof 1.0 to areas,2.0 meters highly and/or susceptible flood to duration mass movementof more than. 3 days. These areas are immediately flooded during heavy rains of several hours. MODERATE LANDSLIDE SUSCEPTIBILITYMODERATE FLOOD SUSCEPTIBILITY StableAreas likelyareas to with experience occasional flood or localizedheights of to mass0.5 to movement. 1.0 meters and/or flood duration of 1 to 3 days. LOWLOW FLOODLANDSLIDE SUSCEPTIBILITY SUSCEPTIBILITYAreas likely to experience flood heights of <0.5 meter and/or flood duration of less Stable areas with no identified than 1 day.
    [Show full text]
  • Cost of Doing Business in the Province of Iloilo 2017 1
    COST OF DOING BUSINESS IN THE PROVINCE OF ILOILO 2017 Cost of Doing Business in the Province of Iloilo 2017 1 2 Cost of Doing Business in the Province of Iloilo 2017 F O R E W O R D The COST OF DOING BUSINESS is Iloilo Provincial Government’s initiative that provides pertinent information to investors, researchers, and development planners on business opportunities and investment requirements of different trade and business sectors in the Province This material features rates of utilities, such as water, power and communication rates, minimum wage rates, government regulations and licenses, taxes on businesses, transportation and freight rates, directories of hotels or pension houses, and financial institutions. With this publication, we hope that investors and development planners as well as other interested individuals and groups will be able to come up with appropriate investment approaches and development strategies for their respective undertakings and as a whole for a sustainable economic growth of the Province of Iloilo. Cost of Doing Business in the Province of Iloilo 2017 3 4 Cost of Doing Business in the Province of Iloilo 2017 TABLE OF CONTENTS Foreword I. Business and Investment Opportunities 7 II. Requirements in Starting a Business 19 III. Business Taxes and Licenses 25 IV. Minimum Daily Wage Rates 45 V. Real Property 47 VI. Utilities 57 A. Power Rates 58 B. Water Rates 58 C. Communication 59 1. Communication Facilities 59 2. Land Line Rates 59 3. Cellular Phone Rates 60 4. Advertising Rates 61 5. Postal Rates 66 6. Letter/Cargo Forwarders Freight Rates 68 VII.
    [Show full text]
  • Philippines: Typhoon Fengshen
    Emergency appeal n° MDRPH004 Philippines: GLIDE n° TC-2008-000093-PHL Operations update n° 4 31 December 2008 Typhoon Fengshen Period covered by this Ops Update: 24 September to 15 December 2008 Appeal target (current): CHF 8,310,213 (USD 8 million or EUR 5.1 million); with this Operations Update, the appeal has been revised to CHF 1,996,287 (USD 1,878,149 or EUR 1,343,281) <click here to view the attached Revised Emergency Appeal Budget> Appeal coverage: To date, the appeal is 87%. Funds are urgently needed to enable the Philippine National Red Cross to provide assistance to those affected by the typhoon.; <click here to go directly to the updated donor response A transitional shelter house in the midst of being built in the municipality of report, or here to link to contact Santa Barbara, Ilo Ilo province. Photo: Philippine National Red Cross. details > Appeal history: • A preliminary emergency appeal was launched on 24 June 2008 for CHF 8,310,213 (USD 8 million or EUR 5.1 million) for 12 months to assist 6,000 families. • Disaster Relief Emergency Fund (DREF): CHF 200,000 was allocated from the International Federation’s DREF. Summary: The onslaught of typhoon Fengshen which hit the Philippines on 18 June 2008, followed by floods and landslides, have left in its wake urgent needs among poverty-stricken communities. According to the National Disaster Coordinating Council (NDCC), approximately four million people have been affected through out the country by typhoon Fengshen. More than 81,000 houses were totally destroyed and a further 326,321 seriously damaged.
    [Show full text]
  • Consolidated List of Learning Sites As of September 2019 EXACT LOCATION DATE BRIEF DESCRIPTION REMARKS NAME of SITE/ NO
    Republic of the Philippines Department of Agriculture AGRICULTURAL TRAINING INSTITUTE REGIONAL TRAINING CENTER VI ASU Compound, Banga 5601, Aklan Tel No. (36) 267-5951 or 267-6785 Telefax: (36) 267-6786 Consolidated List of Learning Sites As of September 2019 EXACT LOCATION DATE BRIEF DESCRIPTION REMARKS NAME OF SITE/ NO. LS Control No. TYPE OF SITE APPROVED/ FUND SOURCE (include specific commodities or technologies (indicate if Upscaled as SPA or Farm STATUS Farmer Cooperator PROVINCE MUNICIPALITY BARANGAY ESTABLISHED added/established in the farm with ATI's assistance) Tourism Site) ATI - RTC VI DEMONSTRATION ORGANIC IDOFS – Organic Vegetable, Darag Native Chicken, FARM 1 Learning Site Aklan Banga Poblacion May 2012 AGRICULTURE Herbal Garden, Vermicomposting and organic Level up to SPA (Florepe M. Mortalla) PROGRAM concoctions production area 036-267-5951 ORGANIC Garilao Farm Negros Rainfed rice-based farm 2 Learning Site Kabankalan City Daan Banwa 9/10/2012 AGRICULTURE (Hermilando G. Garilao) Occidental (year round rice-fish production) PROGRAM IDOFS – production of various organic inputs, organic ORGANIC vegetable production, native chicken and egg Charity Farm 3 Learning Site Capiz Dao Matagnop 01/09/2013 AGRICULTURE production, organic livestock production, organic hito Level up to SPA (Genes F. Estialbo) PROGRAM & tilapia production, nursery for vegetables, concoctions, fruit & forest trees IDOFS ORGANIC Kisses Farm 1. Organic Vegetable, Rice and Banana Production, 4 Learning Site Antique Barbaza Gua 02/16/2013 AGRICULTURE (Steward E. Fransisco) 2. Organic fish, livestock and Poultry Production PROGRAM 3. Organic Fertilizer production ORGANIC Reontoy Farm IDOFS with focus on Sloping Agricultural Land 5 Learning Site Aklan Banga Sibalew June 2013 AGRICULTURE Level up to SPA (Ramon V.
    [Show full text]
  • Iloilo Provincial Profile 2012
    PROVINCE OF ILOILO 2012 Annual Provincial Profile TIUY Research and Statistics Section i Provincial Planning and Development Office PROVINCE OF ILOILO 2012 Annual Provincial Profile P R E F A C E The Annual Iloilo Provincial Profile is one of the endeavors of the Provincial Planning and Development Office. This publication provides a description of the geography, the population, and economy of the province and is designed to principally provide basic reference material as a backdrop for assessing future developments and is specifically intended to guide and provide data/information to development planners, policy makers, researchers, private individuals as well as potential investors. This publication is a compendium of secondary socio-economic indicators yearly collected and gathered from various National Government Agencies, Iloilo Provincial Government Offices and other private institutions. Emphasis is also given on providing data from a standard set of indicators which has been publish on past profiles. This is to ensure compatibility in the comparison and analysis of information found therewith. The data references contained herewith are in the form of tables, charts, graphs and maps based on the latest data gathered from different agencies. For more information, please contact the Research and Statistics Section, Provincial Planning & Development Office of the Province of Iloilo at 3rd Floor, Iloilo Provincial Capitol, and Iloilo City with telephone nos. (033) 335-1884 to 85, (033) 509-5091, (Fax) 335-8008 or e-mail us at [email protected] or [email protected]. You can also visit our website at www.iloilo.gov.ph. Research and Statistics Section ii Provincial Planning and Development Office PROVINCE OF ILOILO 2012 Annual Provincial Profile Republic of the Philippines Province of Iloilo Message of the Governor am proud to say that reform and change has become a reality in the Iloilo Provincial Government.
    [Show full text]
  • Point to Point Pick Up/Drop Off Rates Roxas to Any
    POINT TO POINT PICK UP/DROP OFF RATES ROXAS TO ANY POINT OF PANAY (POINT TO POINT) RATE ORIGIN DESTINATION (VISE VERSA) KILOMETERS AUV/VAN CAR Roxas Ajuy 3,500.00 3,100.00 Roxas Alimodian 4,000.00 3,500.00 Roxas Anilao 3,700.00 3,200.00 Roxas Badiangan 3,500.00 2,900.00 Roxas Balasan 3,300.00 2,900.00 Roxas Banate 3,700.00 3,200.00 Roxas Barotac Nuevo 3,700.00 3,200.00 Roxas Barotac Viejo 3,700.00 3,200.00 Roxas Batad 3,200.00 2,900.00 Roxas Bingawan 3,000.00 2,700.00 Roxas Cabatuan 3,900.00 3,400.00 Roxas Calinog 3,200.00 2,900.00 Roxas Carles 3,600.00 3,200.00 Roxas Concepcion 3,400.00 2,900.00 Roxas Dingle 3,200.00 2,800.00 Roxas Duenas 3,200.00 2,800.00 Roxas Dumangas 3,300.00 2,800.00 Roxas Estancia 3,300.00 3,000.00 Roxas Guimbal 4,400.00 3,700.00 Roxas Igbaras 4,700.00 3,900.00 Roxas Janiuay 3,400.00 2,900.00 Roxas Lambunao 3,800.00 3,300.00 Roxas Leganes 3,500.00 3,100.00 Roxas Lemery 3,100.00 2,800.00 Roxas Leon 4,300.00 3,600.00 Roxas Maasin 3,600.00 3,100.00 Roxas Miagao 4,800.00 4,000.00 Roxas Mina 3,700.00 3,200.00 Roxas New Lucena 3,300.00 2,800.00 Roxas Oton 3,900.00 3,300.00 Roxas Pavia 3,600.00 3,000.00 Roxas Pototan 3,500.00 3,000.00 Roxas San Dionisio 3,700.00 3,200.00 Roxas San Enrique 3,100.00 2,700.00 Roxas San Joaquin 5,000.00 4,100.00 Roxas San Miguel 3,800.00 3,200.00 Roxas San Rafael 3,300.00 3,000.00 Roxas Santa Barbara 3,700.00 3,200.00 Roxas Sara 3,400.00 3,000.00 Roxas Tigbauan 4,300.00 3,600.00 Roxas Tubungan 4,600.00 3,900.00 Roxas Zarraga 3,200.00 2,700.00 Roxas Anini-y, Antique 4,900.00 4,500.00 Roxas
    [Show full text]
  • ANALYSIS of the CHARCOAL VALUE CHAIN in ILOILO CITY (Final Report)
    ANALYSIS OF THE CHARCOAL VALUE CHAIN IN ILOILO CITY (Final Report) BUILDING LOW EMISSION ALTERNATIVES TO DEVELOP ECONOMIC RESILIENCE AND SUSTAINABILITY PROJECT (B-LEADERS) September 2017 This document was produced for review by the United States Agency for International Development (USAID). It was prepared by the Building Low Emission Alternatives to Develop Economic Resilience and Sustainability (B- LEADERS) Project implemented by RTI International for USAID Philippines. ANALYSIS OF THE CHARCOAL VALUE CHAIN IN ILOILO CITY (Final Report) BUILDING LOW EMISSION ALTERNATIVES TO DEVELOP ECONOMIC RESILIENCE AND SUSTAINABILITY PROJECT (B-LEADERS) September 2017 DISCLAIMER The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. TABLE OF CONTENTS TABLE OF CONTENTS ··································································· I LIST OF TABLES ········································································ III LIST OF FIGURES ······································································ III ACRONYMS ················································································ IV EXECUTIVE SUMMARY ································································· 1 I. INTRODUCTION ································································ 4 1.1. Objectives ............................................................................................................ 6 1.2. Scope and Limitations .......................................................................................
    [Show full text]
  • REGION 6 Address: Quintin Salas, Jaro, Iloilo City Office Number: (033) 329-6307 Email: [email protected] Regional Director: Dianne A
    REGION 6 Address: Quintin Salas, Jaro, Iloilo City Office Number: (033) 329-6307 Email: [email protected] Regional Director: Dianne A. Silva Mobile Number: 0917 311 5085 Asst. Regional Director: Lolita V. Paz Mobile Number: 0917 179 9234 Provincial Office : Aklan Provincial Office Address : Linabuan sur, Banga, Aklan Office Number : (036) 267 6614 Email Address : [email protected] Provincial Manager : Benilda T. Fidel Mobile Number : 0915 295 7665 Buying Station : Aklan Grains Center Location : Linabuan Sur, Banga, Aklan Warehouse Supervisor : Ruben Gerard T. Tubao Mobile Number : 0929 816 4564 Service Areas : Municipalities of New Washington, Banga, Malinao, Makato, Lezo, Kalibo Buying Station : Oliveros Warehouse Location : Makato, Aklan Warehouse Supervisor : Iris Gail S. Lauz Mobile Number : 0906 042 8833 Service Areas : Municipalities of Makato and Lezo Buying Station : Magdael Warehouse Location : Lezo, Aklan Warehouse Supervisor : Ruben Gerard T. Tubao Mobile Number : 0929 816 4564 Service Areas : Municipalities of Malinao and Lezo Buying Station : Ibajay Buying Station Location : Ibajay, Aklan Warehouse Supervisor : Iris Gail S. Laus Mobile Number : 0906 042 8833 Service Areas : Municipality of Ibajay Buying Station : Mobile Procurement Team - 5 Location : Team Leader : Cristine B. Penuela Mobile Number : 0929 530 3103 Service Areas : Municipalities of Malinao and Ibajay Provincial Office : Antique Provincial Office Address : San Fernando, San Jose, antique Office Number : (036) 540-3697 / 0927 255 8191 Email Address : [email protected] Provincial Manager : Ma. Theresa O. Alarcon Mobile Number : 0917 596 1732 Buying Station : GID Camp Fullon Location : San Fernando, San Jose, Antique Warehouse Supervisor : Judy F. Devera Mobile Number : 0916 719 8151 Service Areas : Municipalities in Cental and Southern Antique Buying Station : GID Culasi Location : Caridad, Culasi Warehouse Supervisor : Ma.
    [Show full text]
  • I I I I I I I I I I I I I I I
    I PfV- A:Cr~qq0 :D;J b3 9 I I I FACTORS AFFECTING THE ACCEPTANCE AND CONTINUATION I OFIUD A COMPARATIVE STUDY I PHILIPPINES I FmalReport I I ASIA & NEAR EAST OPERATIONS RESEARCH AND TECHNICAL ASSISTANCE PROJECT I FAMILY PLANNING OPERATIONS RESEARCH I AND TRAINING (FPORT) PROGRAM PopulatIOn CouncIl, ManIla I m collaboratIOn with the Department of Health I USAID Contract No DPE-C-OO-90-0002-10 I StrategIes for Improvmg FamIly Plannmg ServIce DelIvery I July 1998 I I I I I I ACKNOWLEDGMENT I Tills project was conducted by Populatlon CouncIl-Mamla, m collaboratIOn wIth the Department of Health under the ANE ORiTA Project wIth support from the Office of I PopulatIOn Health and NutntIOn (OPHN), US Agency for International Development, Contract No DPE-3030-C-OO-90-0002-1 0 I PopulatIOn CouncIl, ManIla would hke to acknowledge the mdIvIduals and I mstltutIOns who helped m carrymg out thIS project • Dr Magdalena C Cab arab an, the head of the research team and the overall I coordmator ofthe study m ItS two study SItes, Mlsamls On ental and IloIlo • Dr Jayantl Tuladhar, PopulatIOn CouncIl, New Delln for ills techmcal aSSIstance m I the questIOnnaire deSIgn and data analYSIS for the modified SA used m tills study • Dr Josefina Cablgon for her asSIstance m data analYSIS and Mr FIono Argmllas ills I work m the data management and programmmg • The Research InstItute ofMmdanao Culture, as represented by Mrs Manlou Tabor, Operatlons Manager, who handled the admmlstratlve aspects of the project and the I recruItment of project staff • The SOCIal SCIence
    [Show full text]
  • Typhoon Fengshen
    Emergency appeal n° MDRPH004 Philippines: GLIDE n° TC-2008-000093-PHL Operations update n° 5 27 March 2009 Typhoon Fengshen Period covered by this operations update: 16 December 2008 to 28 February 2009 Appeal target (current): CHF 1,996,287 (USD 1.88 million or EUR 1.34 million) Appeal coverage: To date, the revised appeal is 99% covered. <Go directly to interim financial report, donor response report, or contact details > Appeal history: • 24 June 2008: A preliminary emergency appeal was launched for CHF 8,310,213 (USD 8 million or EUR 5.1 million) for 12 months to assist 6,000 families. • 31 December 2008: This emergency appeal was revised down to CHF On Panay Island in Iloilo province’s municipality of Oton, 25 of the 40 1,996,287 (USD 1.88 million or EUR 1.34 houses have been completed by beneficiaries themselves, with a million) for 12 months to assist 1,000 further 15 currently under construction. With the help of PNRC and the Federation, entire families have come together under the shelter families. programme to build their own homes and help neighbours build theirs • Disaster Relief Emergency Fund (DREF): as well. (Photo: International Federation of Red Cross and Red CHF 200,000 was allocated from the Crescent Societies) International Federation’s DREF. Summary: The emergency shelter and relief, water and sanitation, and health components of the operation are now closed, having achieved their respective objectives. Following this phase, emphasis is now focused on the Philippine National Red Cross’s capacity building components, especially in disaster management and logistics.
    [Show full text]