ENGINEERING department ORGANISATION OF ENGINEERING DEPARTMENT

THE ENGINEERING DEPARTMENT IS HEADED BY SR. DEN (CO.).THERE ARE TWO SR. DEN, TWO DEN AND SIX SECTIONAL ADENs, THREE ADEN (HQ) AND ONE ADEN (TRACK)

1. Sr. DEN (Co.) - SHRI U.V.SINGH ADEN TRACK - SHRI R.C.PREMI DIVISIONAL ENGG. OFFICE SSE( DRAWING ) - SHRI KULDIP SINGH COS(WORKS) - SHRI ROOP SINGH MEENA SSE (ESTIMATE) - SHRI C.L. KHANDEKAR COS (WA) - SHRI PRITAM SINGH SSE (PLG.) - SHRI P.T.VARGHESE OS (STORE) - SMT.KRISHNA KANTA SSE (CONTROL) - SHRI SANDEEP JAIN OS (BUDGET) - SHRI RAM CHANDRA SSE (LAND ) -SMT GYAN SINGH SSE(USFD) - SHRI KAPTAN SINGH SSE (P.WAY) DEPOT/FL - SHRI ABHAY SINGH

Sr .DEN (HQ) - SHRI A.K.SAXENA 2. SECTION;- BAI(Excl) – JP (BG), CKS(Excl.) – JP & JP MG Yard. ADEN (HQ-I) – SHRI SANJAY KANSAL ADEN (HQ-III) – SHRI TARA CHAND KUMAWAT 1 SSE/(SPL) - SHRI R.B.GUPTA 1. SSE(WORKS) – S-II/JP - SHRI RAJVEER 2.SSE (WORKS) –SPL/JP - SHRI R.G.GARG 3.SSE(P.WAY) – S/JP - SHRI A.K.SHISHBAL ADEN (HQ-II) – SHRI S.K.JOSHI 1. SSE(WORKS – S-I/JP – SHRI RAKESH SHRIVASTAV

3. DEN (SOUTH) - SHRI P.K.AGNIHOTRI SWM(Excl)-JP (BG),RNW-FL(BG) ADEN (LINE -JP) – SHRI S.B.B SINGH ADEN (FL) – SHRI SHARVAN CHAUDHARY 1.SSE(P.WAY) – N/JP - SHRI S.K.SHRIVASTAV 1.SSE(P.WAY) – FL - SHRI K.C.BANVEER 2.SSE(P.WAY) – BNLW - SHRI R.S.MEENA 2.SSE(P.WAY) –KSG - SHRI SURESH KUMAR 3.SSE(WORKS) – JP - SHRI RAJ KUMAR 3.SSE(WORKS) – FL - SHRI VINAY KUMAR

4 Sr. DEN (EAST) – SMT. JOYTI SINGHAL SECTION;- RE(Incl)-KUT(Excl.) (BG) ADEN (AWR) – SHRI SATISH MEENA ADEN (BKI) -SHRI KUNAL SONI 1.SSE(P.WAY) -RE - SHRI R.K.BHARADWAJ 1.SSE(P.WAY) –I / BKI - SHRI A.N.VERMA 2.SSE(P.WAY) –AWR - SHRI A.K.CHOUDHRY 2.SSE(P.WAY) –II / BKI - SHRI K.L.MEENA 3.SSE(WORKS)/RE - SHRI MANJAY KUMAR 3.SSE(DETS) – BKI - SHRI PRITAM SINGH 4.SSE(WORKS)-AWR - SHRI D.N.MISHRA 4.SSE(WORKS) –I / BKI - SHRI CHOTE LAL 5.SSE(WORKS) –II / BKI - SHRI VISHNU KUMAR DEN (NORTH) - SHRI SUNIL KUMAR 5. SECTION;- RE (Excl), RNW(Excl) (BG), JP(Excl)-LHU(Excl)(MG),SIKR-CUR(Excl)(MG) ADEN (RPC) – SHRI M.L.SHARMA ADEN (SIKR) – SHRI K.K.DEWEDI 1.SSE(P.WAY) – RGS - SHRI S.C.TRIPATI 1.SSE(P.WAY) – SIKR - SHRI PURAN CHAND 2.SSE (P.WAY) -NMK - SHRI SHAYAM SINGH 2.SSE(P.WAY) –JJN - SHRI TRILOK SINGH 3.SSE(P.WAY)-AEL - SHRI NRIANJAN SINGH 3.SSE(P.WAY) –FPS - SHRI GOPAL SINGH 4.SSE(WORKS) – RGS - SHRI V.K.KURAL 4.SSE(WORKS) – SIKR - SHRI NAND KISHOR 5.SSE (WORKS) NNL -SHRI DHARAM PAL DIVISION BRIEF HISTORY

Jaipur division was constituted by combining Jaipur State Railway, part of RajputanaMalwa Railway (RMR) and part of Bombay, Baroda and Central Railway (BB&CIR) which was entirely MG system. The section from Bandikui – Jaipur ( M.G) was constructed by RMR and was opened for passenger traffic from BKI-DO on 20.04.1874 and to Jaipur on 12.10.1874. The section from Rewari -Bandikui( M.G) was constructed by RMR and was opened for passenger traffic from RE-AWR on 15.9.1874 and AWR-BKI on 07.12.1874. The section from Jaipur to ( M.G) was constructed by RMR was opened for passenger traffic from JP-FL on 01.03.1875 and FL-AII on 01.08.1975.RPC section ( M.G) was constructed by BBCI Rly. was opened for passenger traffic on 18.5.1905 .The section from Jaipur to SawiMadhupur ( M.G) was constructed by JS Rly. and was opened for passenger traffic on 17.10.1907. The section from Jaipur to Luharu& to Churu( M.G) was constructed by JS Rly. and was opened for passenger traffic from JP-RGS during 1916 and RGS-PLSN during 1918 and PLSN-SIKR during 1922 and SIKR to CUR during 1924. The section’s was merged in Western Railway on 5.11.1951. Foundation stone of the present Jaipur station, the most important Station of Jaipur division was laid by Maharaja SawaiMansingh of Jaipur in the year 1956. Doubling of the MG section between JP-FL was done during 1982 and FL-MD was done during 1986 by Western Railway. The sections was converted into B.G and opened for traffic from JP-SWM on 30.01.1993 JP-FL on 08.12.1993 , FL-MD on 01.04.1995 , RE-BKI on 16.06.1994 & BKI-JP on 19.08.1994 & RPC on 30.03.2009. The Section between JP –MD was having both BG & MG line. Later for doubling of JP-MD section the MG line between JP-FL was converted into BG in Jan-2009 & FL-GLTA was converted into BG on 8.12.2009 & GLTA-MD was converted into BG on May-2010. Doubling of the section between JP-BKI was done and commissioned in phases DO-BAI (UP Line) opened on 24.6.2010. ARNA-DO Section (Up Line) opened in July-2010. BKI-ARNA (Up Line) Opened on 12.10.2010. KWP-JP (Up Line) Section opened on 28.10.2010. BAI-KWP on 28.1.11. Doubling of the section between AWR to RE was undertaken and AWR- HSI was commissioned on 15.5.11 and HSI-BWL was commissioned on 16.6.12, BWL-AMRI was commissioned on 17.4.12 the MG section between JP-LHU & SIKR-CUR is sanctioned for Gauge conversion & work is in progress. SIKR-LHU MG section is closed in conversion since 1.9.12. Jaipur Division is spread over mostly in the state of and partly in Haryana.