“Expansion of Angle, Flat, Bar Channel"
Total Page:16
File Type:pdf, Size:1020Kb
PROPOSAL FOR OBTAINING TERMS OF REFERENCE FOR “Expansion of Angle, Flat, Bar Channel" {Category A (Due to presence of Nahargarh Wildlife Sanctuary at a distance of 0.84 Km and Eco Sensitive Zone boundary at a distance of 0.76 km) under Item ‘3(a)’-Metallurgical industries (Ferrous &Non-Ferrous) of Schedule of EIA Notification, 2006 and its subsequent amendments } Location:- A-241, A 242 (b) & (c) A-242 (A), Vishwakarma Industrial Area, Road No.6 D, Jaipur, Rajasthan Project Capacity:-Existing: 75,000 TPA; Proposed: 75,000 TPA; Total: 1,50,000 TPA; Area: -21,017.5 Sq. m Baseline Data Generation : March’2021 to May’2021(Summer) Project Cost : Rs.72.0Crores (Existing–Rs. 59.0 Crore, Proposed- Rs. 13 Crore) PROMOTER ENVIRONMENTAL CONSULTANT R.S. Infra-Transmission Limited Gaurang Environmental Solutions Pvt. Ltd. A-241 (242-B), Vishwakarma Industrial Area, #102, SNG Shree Ratna Apartment, Peetal Factory, Road No.6 D, Jaipur Rajasthan 302013 Jhotwara Road, Bani Park, Jaipur-302016 Project In charge:- Devendra Gupta (Executive E-mail: [email protected] Director) NABET Accreditation: NABET/EIA/2023/RA 0192 E-mail:- [email protected] dated 01.02.2021 valid up to 19.01.2023. August’2021 Project : Expansion of Angle, Flat, Bar Channel, Jaipur Promoter : R.S. Infra-Transmission Limited INDEMNIFICATION Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipur Promoter : R.S. Infra-Transmission Limited INDEMNIFICATION Utmost care has been taken in preparation of this Report vis a vis proposed expansion of Angle, Flat, Bar Channel from 75,000 TPA to 1,50,000 TPA at VKI Area, Jaipur promoted by R.S. Infra-Transmission Limited. The data incorporated in the report is generated through information received from clients in form of their project report received through e-mail, secondary information, besides stakeholder’s interaction and inputs. Due care has been taken to represent facts and figures and sources acknowledged. The purpose of this document is to facilitate environmental appraisal of the proposal and as such the exercise has been scientifically carried out. The Consultant stand indemnified against any consequences arising out of any inadvertent omissions. REVISION HISTORY Report No. GESPL_397/2021 /ToR/87 Type of report Proposal for obtaining Terms of Reference Revision No. 01 Issue to R.S. Infra-Transmission Limited Issue Date 10.08.2021 ************ Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipur Details of Studies Promoter :R.S.Infra-Transmission Limited Conducted for the Project DETAILS OF STUDIES CONDUCTED FOR THE PROJECT Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipur Details of Studies Promoter :R.S.Infra-Transmission Limited Conducted for the Project DETAILS OF STUDIES CONDUCTED FOR THE PROJECT Name of the Project:-Expansion of Angle, Flat, Bar Channel from 75,000 TPA to 1,50,000 TPA at VKI Area, Jaipur Location:-A-241, A 242 (b) & (c) A-242 (A), Vishwakarma Industrial Area, Road No.6 D, Jaipur, Rajasthan Nature of Name and address of the Approvals, if any from consultancy Consultant/Expert (NABL/DGMS/IBM/ NRBPT/MOEF/CPCB/others etc)*, give reference EIA/ EMP Gaurang Environmental Solutions Pvt. Ltd. NABET/EIA/2023/RA 0192 Organization #102SNG Shri Ratna Apartment, Peetal dated 01.02.2021 valid up to Factory, Jhotwara Road, Jaipur-302016 19.01.2023. E-mail:- [email protected] EIA Coordinator Sanagapati C. Babu FAE-LU Vinod Kumar Verma FAE-AP Sanjay Palnitkar Nidhi Bhardwaj FAE-AQ MallikarjunaGuttula Neha Bhargava FAE-WP Sanjay Palnitkar Pooja Yadav FAE-SC Ratnakumar V Mudliar FAE-EB Dr. Yati Kachhawa Ginni Barotia FAE-NV Sanagapati C. Babu Mallikarjuna Guttula FAE-SE Gajendra Singh Rathore FAE-HG Mukesh Suroliya Vidya Bhushan Trivedi FAE-GEO Mukesh Suroliya Vidya Bhushan Trivedi Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipur Details of Studies Promoter :R.S.Infra-Transmission Limited Conducted for the Project FAE-RH Sanjay Palnitkar Ginni Barotia FAE-SHW Sanjay Palnitkar Nidhi Bhardwaj (BMW & HW) Environmental Nakshatra Enviro Services NABL certificate no. – TC – Monitoring & 66/ 40, Heera Path, Mansarovar, 7334 dated 28.08.2020 valid up analysis Jaipur, Rajasthan, India, 302020 to 08.12.2021. Hydro geological Gaurang Environmental Solutions Pvt. Ltd. NABET/EIA/2023/RA 0192 study #102 SNG Shri Ratna Apartment, Peetal dated 01.02.2021 valid up to Factory, Jhotwara Road, Jaipur-302016 19.01.2023. Soil Investigation Not Applicable -- Mining Plan Not Applicable -- Rainwater Gaurang Environmental Solutions Pvt. Ltd. NABET/EIA/2023/RA 0192 Harvesting #102 SNG Shri Ratna Apartment, Peetal dated 01.02.2021 valid up to Factory, Jhotwara Road, Jaipur-302016 19.01.2023. Risk Assessment Gaurang Environmental Solutions Pvt. Ltd. NABET/EIA/2023/RA 0192 #102 SNG Shri Ratna Apartment, Peetal dated 01.02.2021 valid up to Factory, Jhotwara Road, Jaipur-302016 19.01.2023. Architectural Plan Not Applicable Ground Vibration Not Applicable Study Subsidence Study Not Applicable Services (STP/ETP Not Applicable design) etc. Others, such as Not Applicable project consultants etc. * Only Govt. /Statutory Approvals to be mentioned. Put NA where not applicable. ** Team Member *************** Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipu r Promoter : R.S. Infra-Transmission Limited S. No Particular Page No. PRE-FEASIBILITY REPORT 1 SECTION 1 - EXECUTIVE SUMMARY 1 1.1 Executive Summary 2 2 SECTION-II INTRODUCTION TO THE PROJECT/ 6 BACKGROUND INFORMATION 2.1 Identification Of Project And Project Proponent 7 2.1.1 Identification Of Project 7 2.1.2 Project Proponent 7 2.2 Brief Description Of Nature Of The Project 8 2.3 Need for the project and its importance to the Country and or region 8 2.4 Demand And Supply Gap 9 2.5 Imports Versus Indigenous Production 10 2.6 Export Possibility 10 2.7 Domestic/Export Market 10 2.8 Employment Generation (Direct And Indirect) Due To The Project 10 3 SECTION-III PROJECT DESCRIPTION 12 3.1 Type of project including interlinked and Interdependent projects, if 13 any 3.2 Location (map showing general location, specificLocation, and project 13 boundary and project siteLayout) with coordinates 3.3 Details Of Alternate Sites Considered And The Basis Of Selecting The 17 Proposed Site, Particularly The Environmental Considerations Gone Into Should Be Highlighted 3.4 Size / Magnitude Of Operation 18 3.5 Project description with process details (aSchematic diagram/flow 18 chart showing theProject layout, components of the project etc.Should be given) 3.6 Raw material required along with estimatedQuantity, likely source, 29 marketing area of finalProduct/s, mode of transport of raw material Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipu r Promoter : R.S. Infra-Transmission Limited andfinished product 3.6.1 Raw Material 29 3.6.2 Product 30 3.7 Resource optimization/recycling and reuseEnvisaged in the project, if 31 any, should be brieflyOutlined 3.8 Availability of water, its source, energy / powerRequirement and 31 sourceshould be given 3.8.1 Water Availability & Its Source 31 3.8.2 Energy / Power Requirement& Its Source 34 3.9 Quantity of wastes to be generated (liquid andSolid) and scheme for 34 their management / disposal 3.9.1 Quantity of liquid waste to be generated & itsManagement / disposal 34 3.9.1.1 Domestic Waste Water 34 3.9.1.2 Industrial Waste Water 35 3.9.2 Quantity of solid waste to be generated & itsManagement / disposal 35 3.10 Schematic representations of the feasibilityDrawing which give 36 information of EIA purpose 4 SECTION-IV SITE ANALYSIS 37 4.1 Connectivity 38 4.2 Land Form, Land Use And Land Ownership 38 4.3 Topography (Along With Map) 39 4.4 Existing land use pattern (agriculture, non-Agriculture, forest, water 40 bodies (including areaUnder crz)), shortest distances from the peripheryof the project to periphery of the forest, NationalPark, Wild life sanctuary, Eco sensitive area, waterbodies (distance from the HFL of the river), CRZ. 4.5 Existing Infrastructure 41 4.5.1 Basic Amenities 42 4.5.2 Industries 42 4.6 Soil Classification 43 Gaurang Environmental Solutions Pvt. Ltd. Page Report Ref: GESPL_397/2021 /ToR/87 Rev. No. 00 Project : Expansion of Angle, Flat, Bar Channel, Jaipu r Promoter : R.S. Infra-Transmission Limited 4.7 Climatic Data From Secondary Sources 44 4.8 Social Infrastructure Available 44 5 SECTION –V PLANNING BRIEF 45 5.1 Planning concept (type of industries, facilities, Transportation etc) 46 town and country planning/Development authority classification 5.2 Population Projection 46 5.3 Land Use Planning (Breakup Along With Green Belt (Etc.) 46 5.4 Assessment Of Infrastructure Demand (Physical &Social) 48 5.5 Amenities / Facilities 48 6 SECTION-VI PROPOSED INFRASTRUCTURE 49 6.1 Proposed Infrastructure 50 7 SECTION –VII REHABILITATION AND RESETTLEMENT (R 52 & R) PLAN 7.1 Policy to be adopted (central/ state) in respect of the project affected 53 persons including home oustees, land oustees and landless laborers (a brief outline to be given). 8 SECTION –VIII PROJECT SCHEDULE & COST ESTIMATES 54 8.1 Likely date of start of construction and likelyDate of completion 55 8.2 Project Cost Estimation 56 9 SECTION-IX ANALYSIS OF PROPOSAL 57 9.1 Financial And Social Benefits With Special Emphasis On The benefit 58 To The Local People Including Tribal population, If Any, In The Area *************** Gaurang Environmental Solutions Pvt.