Annexure-A

S.No. Item Details 1. Online Proposal No. 2. Name and Location of the Super Mega Mixed Use Integrated Industrial Park Project project Phase-1 located at Villages Nagla, Bhankarpur, Shatabpur, Tehsil Derabassi, District SAS Nagar (), Punjab by M/s Shipra Estates Limited. 3. Latitude & Longitude Corners coordinates of project location are: A: 30°37'27.47"N and 76°49'47.96"E; B: 30°37'17.74"N and 76°50'6.12"E; C: 30°37'49.04"N and 76°50'20.52"E ; D: 30°37'53.81"N and 76°50'9.03"E. 4. Project/activity covered under The project falls under S.No. 8(b) - ‘Township and Area item of scheduled to the EIA Development’. Notification, 14.09.2006

5. Whether the project is in No. critical polluted area or not.

6. If the project involves No. Project does not involve any diversion of forest land. diversion of forest land. If yes, a. Extent of the forest land. b. Status of the forest clearance.

7. a. Is the project covered under Project is not covered under PLPA, 1900. Also, NOC PLPA, 1900, if No but has been obtained from DFO, S.A.S Nagar for complete located near to PLPA area project. Copy of the NOC is enclosed as Annexure-8. then the project proponent is required to submit NOC from the concerned DFO to the effect that project area does not fall under the provision of PLPA Act, 1900.

b. Is the project covered under PLPA, 1900, if yes then Status of the NOC w.r.t PLPA, 1900.

2 8. If the project falls within 10 No. The project does not fall within 10 km of eco- km of eco-sensitive area/ sensitive area/ National park/Wild Life Sanctuary. National park/Wild Life Sanctuary. If yes, a. Name of eco-sensitive area/ National park/Wild Life Sanctuary and distance from the project site. b. Status of clearance from National Board for Wild Life (NBWL). 9. Classification / Land use Mixed land use as per Master plan of . Master pattern as per Master Plan plan showing project location is enclosed as Annexure 11.

10. Cost of the project Rs. 885.85 Crores

11. Total Plot area, Built- up Area and Green S.No. Description Area area 1. Plot area 4,45,639.82 m2 (Total scheme area) (or 110.12 acres) 2. Built-up area 7,98,272 m2 3. Green area 27,587.42 m2

12. Population (when fully Estimated population: 21,487 Persons. operational)

13. Water Requirements & 20 KLD of water will be required during construction source in Construction Phase phase which will be met by Private water tankers.

3

14. Break up of Water Requirements & source in Operation Phase (Summer, Rainy, Winter): S. Season Fresh water Reuse water Total No Domestic Others Flushing Green HVAC (KLD) . (KLD) (KLD) (KLD) area (KLD) (KLD) 1. Summer 1812 - 654 152 1150 3768 2. Winter 1732 - 654 50 1150 3586 3. Rainy 1732 - 654 14 1150 3550

S.No. Description Source of water 1. Domestic Ground water 2. Others (Pl define) - 3. Flushing purposes Treated wastewater 4. Green area Treated wastewater 5. HVAC Treated wastewater

15. Treatment & Disposal Sewage generation during construction phase will be arrangements of waste water in treated in mobile STP. Construction Phase

16. Disposal Arrangement of 1,944 KLD of sewage will be generated from the Waste water in Operation project after full occupancy; out of which; 982 KLD of Phase black water will be treated in STP of 1500 KLD capacity based on MBBR technology and remaining 962 KLD of grey water will be treated in WWTP of 1500 KLD capacity. Treated water will be recycled for flushing, landscaping & HVAC cooling and remaining will be discharged to GMADA sewer. Apart from this, Manav Mangal Smart World School has already installed its STP of 75 KLD. Season Flushing Green area GMADA (KLD) (KLD) Sewer (KLD) Summer 654 152 0 Winter 654 50 22 Monsoon 654 14 77

4

17. Rain water recharging Total 68 no. of Rain water recharging pits with dual bore detail will be provided to recharge the rooftop rainwater of buildings after treatment through oil & Grease traps.

18. Solid waste generation and its a) 7.559 MT/ day disposal b) Solid waste will be appropriately segregated (at source. by providing bins) into recyclable, Bio-degradable Components, and non-bio-degradable. c) 3.40 MT/day Bio-degradable will be converted into manure using Mechanical Composters d) 4.0 MT/day recyclable waste will be sold to authorized recyclers e) Inert waste will be dumped to designated Municipal Council dumping site or in the low lying area for land filling inside the project premises. 19. Hazardous Waste & E- Waste Used oil from DG sets will be sold to registered recyclers and E-waste will be disposed off as per the E-waste (Management) Amendment Rules 2018.

20. Energy Requirements a) 12,000 KVA from PSPCL. & Saving b) Commercial- 4×1250 KVA, 2× 1000 KVA, 1×500 KVA Industrial- 8×1000 KVA Residential-3×500 KVA & 1× 320 KVA (silent DG sets) Energy Saving measures: a) LEDs will be used in place of CFL

21. Environment Management During construction & operation phase, Mr. Deepak Garg Plan along with Budgetary (Director) will be responsible for implementation of the break up phase wise EMP. After the lapse of period for which project and responsibility to proponent is responsible, association of residents or MC or implement GMADA who so ever takes over the project.

Description Capital Recurring Monitoring of cost cost Air, Noise, (lakhs) (lakhs) water (per annum) Rs. Construction 945 148 Rs. 1 lakh Operation - 150 Rs. 2 lakhs

5 22. CER activities along with budgetary break up and responsibility to implement. Mr. Deepak Garg (Director) will be responsible for implementation of the CSR activities. The estimated cost of project is Rs. 285.85 Crores. Rs. 2.14 Crores (@ 0.75% of cost) is required for C.E.R activities as per Office Memorandum vide F. No. 22-65/ 2017-IA.III dated 01.05.2018. The following activities have been proposed to be covered under CER.

S.No. CER Activities Fund Time schedule allocated Start Completed

1. Maintenance of School Building, Construction Rs. 1 Crore After 7 of Toilets, Installation of RO system and water Grant of cooler in Government Senior Secondary EC School, Ramgarh Bhudda 2. Health Facilities like provision of ambulance, Rs. 65 After 7 wheel chairs, new equipments and health Lakhs Grant of checkup camps in nearby villages EC 3. Pond Adoption in nearby Village Rs. 50 After 7 Lakhs Grant of EC Total Rs. 2.15 Crores

6 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

Application for Environmental Clearance Form – I (I) Basic Information: S. Item No. Details No. 1 Name of the Project/s Super Mega Mixed Use Integrated Industrial Park Project Phase-I at Village Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab being developed by M/s. Shipra Estates Limited. 2 S. No. in the schedule The project falls under S.No. 8(b) - ‘Township and Area Development’ 3 Proposed capacity / area / length/ EC Accorded: tonnage to be handled / command area / Total scheme area = 110.12 acres

lease area / number of wells to drilled Net Planned area = 93.40 acres Built-up area = 5,68,150.02 m2 As per revised layout plan:

Total scheme area = 110.12 acres Net Planned area = 98.63 acres

Built-up area = 7,98,272 m2

Comparison of the details between EC Accorded and as per revised layout plan is mentioned in Table 1 of Conceptual Plan.

The following documents are enclosed: Annexure-1: Change in land use Annexure-2: Copy of earlier Environmental Clearance Annexure-3: Copy of Extension of Environmental Clearance Annexure-4: Conceptual Layout Plan

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

26 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

Annexure-5: Board of Resolution Annexure-6: Undertaking regarding no litigation Annexure-7: Memorandum & Articles of Association Annexure-8: Forest NOC Annexure-9: Site Photographs Annexure-10: Google Earth Image showing project site & surroundings within 500 m Annexure-11: Master Plan of Zirakpur showing project site Annexure-12: Accreditated consultant certificate 4 New / Expansion / Modernization New 5 Existing capacity / Area etc Proposed Built-up area = 7,98,272 m2

6 Category of the project ‘ A’ or‘B’ Category ‘B1’ 7 Does it attract the general conditions? If No Yes, Please Specify. 8 Does it attract the specific conditions? If No Yes, Please Specify 9 Location Topographic sheet showing location of the project site is enclosed with the application. Plot/ Survey/Khasra No. Land details showing khasra nos. are given in Change in land use which is attached as Annexure-1. Village Villages Nagla, Bhankarpur, Shatabpur, Tehsil Derabassi Tehsil Derabassi District S.A.S. Nagar (Mohali) State Punjab 10. Nearest railway station / Airport along Ghaggar Railway Station: Approx. 1 km (E) with Distance in kilometers. Dappar Railway Station: Approx. 2 km (SE) Sahibzada Ajit Singh Nagar Railway Station: Approx. 10 km (NW)

Chandigarh International Airport: Approx. 6.5 km (NW)

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

27 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

11 Nearest town/District headquarters The project site lies within District SAS Nagar. along with distance in kilometers Nearest Town : Zirakpur (2 Km) 12 Village Panchayat, Zilla Parishads, GMADA Municipal corporation, local Bodies PUDA Bhawan, Sector-62 (Complete Postal address with telephone SAS Nagar, Mohali. No. to be given) 13 Name of the applicant Mr. Rajinder Sharma (Authorized Signatory) Board of resolution for authorization is enclosed as Annexure-5. 14 Registered address Village Nagla, In front of Manav Mangal School, Tehsil Derabassi, District SAS Nagar, Punjab-140603 15 Address for correspondence : Village Nagla, In front of Manav Mangal School, Tehsil Derabassi, District SAS Nagar, Punjab-140603 Name : Mr. Rajinder Sharma Designation (owner / Partner / CEO) Authorized Signatory Address Village Nagla, In front of Manav Mangal School, Tehsil Derabassi, District SAS Nagar, Punjab-140603 Pin Code 140603 E- Mail [email protected] Telephone No. 91-9855088803 Fax No. - 16 Details of alternative Sites examined, if No any. Location of these sites should be shown on the topo Sheets. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If Yes, date of submission. Not Applicable 20 If No, reason Not Applicable

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

28 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

21 Whether the Proposal involves approval Forest NOC is enclosed as Annexure-8. The project does / Clearance under : If Yes, details of the not involve approval under Wildlife & CRZ Clearance. same and their to be given . Undertaking regarding the same is enclosed as Annexure- (a) The Forest Conservation, Act,1980 6. (b) The wild life Protection Act, 1972 (c) The C.R.Z Notification, 1991. 22 Either their is any government Order / No. policy relevant / relating to the site? 23. Forest land Involved (hectare) No 24. Whether there is any litigation pending No. There is no litigation pending against the project. against the project and /or land in which Undertaking regarding the same is enclosed as Annexure- the Projects is proposed to be set up? 6. (a) Name of the court Therefore, Information required against point a, b & c is (b) Case no. not applicable (c) Orders / Directions of the Courts , if any and its relevance with the Project.

(II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes CLU has been obtained for 277.43 acres of use, land cover or topography including land vide Memo no. 161 CTP(Pb)/ SP- increase in intensity of land use (with 432(m) dated 11.01.2010. Copy of CLU respect to local land use plan) document is enclosed as Annexure-1. 1.2 Clearance of existing land, vegetation and Yes The construction of project requires only buildings? clearance of existing vegetation.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

29 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

1.3 Creation of new land uses? No The proposed construction will conform to approved land use. 1.4 Pre-construction investigations e.g. bore Yes Pre-construction investigations have houses, soil testing? already been done prior to the earlier EC. 1.5 Construction works? Yes The construction of the project shall be as per revised layout plan and details of the same are mentioned in Conceptual Plan. Copy of revised layout plan is enclosed as Annexure-4. 1.6 Demolition works? No No Demolition work will be carried out. 1.7 Temporary sites used for construction Yes All the construction activity including works or housing of construction stocking of raw materials will be confined workers? within the project only. Sanitation facilities shall be provided for these workers within the project only. 1.8 Above ground buildings, structures or Yes Excavation will be carried out for the earthworks including linear structures, cut laying of the foundation of building, lying and fill or excavations of services such as plumbing, roads, etc. Soil excavated will be stored within the project & will be used for cutting & filling as well as landscaping. 1.9 Underground works including mining or No No underground works including mining or tunneling? tunneling is required except excavation of earth. 1.10 Reclamation works? No No reclamation work is required. 1.11 Dredging? No No dredging is required. 1.12 Offshore structures? No No off shore structure is required. 1.13 Production and manufacturing processes? No No production and manufacturing process is involved as project is a township project. 1.14 Facilities for storage of goods or Yes Raw materials will be stored at site in a materials? covered area. Cement will be separately

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

30 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 1.15 Facilities for treatment or disposal of solid Yes Solid waste waste or liquid effluents? Construction phase Construction activities will cause generation of debris, brick bats, plaster falls, battered stone mixture, aggregate leftovers, sand leftovers, empty cement bags, cartons, etc. Most of the construction waste generated will be reused in road construction and filling.

Operation phase Solid waste of about 7.559 MT/day (@ 0.40 kg/capita/day for residential and @ 0.2 kg/capita/day for floating) will be generated from project after full occupancy. A separate area will be earmarked for segregation of solid waste. Biodegradable waste will be composted by use of Mechanical Composters. Inert waste will be dumped to authorized dumping site. All the solid waste generated during construction and operational phase will be treated and disposed off as per MSW (Management & Handling) Rules, 2000 and amended Rules, 2016.

Liquid effluent: Construction phase

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

31 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

Sewage generation during construction phase will be treated in mobile STP.

Operational phase 1,944 KLD of wastewater will be generated from the project after full occupancy; out of which; 982 KLD of black water will be treated in STP of 1500 KLD capacity based on MBBR technolgy and remaining 962 KLD of wastewater/grey water will be treated in WWTP of 1500 KLD capacity. Treated water will be recycled for flushing, landscaping & HVAC cooling and remaining will be discharged to GMADA sewer. Apart from this, Manav Mangal Smart World School has already installed its STP of 75 KLD. 1.16 Facilities for long term housing of No Local labourers will be hired from nearby operational workers? areas during construction phase. Therefore, there is no need to create permanent facilities for long term housing of operational workers. 1.17 New road, rail or sea traffic during Yes The site has good connectivity to sector construction or operation? roads by road network. The project site is approx. 1 km from NH-22. Only internal roads; paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

32 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

phase. During operation, the gestation period for occupation will be 5-8 years. The vehicles as four/two wheelers shall be used by the occupants. 1.18 New road, rail, air waterborne or other No No new infrastructure for this purpose shall transport infrastructure including new or be required. The site has well connected altered routes and stations, ports, airports roads. etc 1.19 Closure or diversion of existing transport No There is no need of diversion of existing routes or infrastructure leading to changes transport routes. in traffic movements? 1.20 New or diverted transmission lines or No There are no new or diverted transmission pipelines? lines. 1.21 Impoundment, damming, culverting, No No Impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the hydrology of watercourses or aquifers? hydrology of watercourses or aquifers is proposed. 1.22 Stream crossings? No There is no stream running across the site. 1.23 Abstraction or transfers of water form Yes Construction phase ground or surface waters? Water required during the construction period, is being supplied through private water tanker.

Operation phase During operation phase, total fresh water requirement will be 1812 KLD which will be abstracted from borewells. Ground water recharging will be done so as to compensate the abstraction of ground water. 1.24 Changes in water bodies or the land No Run off will increase due to increased

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

33 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

surface affecting drainage or run-off? paved surface. However, increased run off will be managed by well designed rain water recharging system and storm water management plan. 1.25 Transport of personnel or materials for Yes Transport of personnel/material during construction, operation or construction and operation phase are decommissioning? envisaged. During operation phase, Individual plot owners will be responsible for the provision of parking within their plot itself. 1.26 Long-term dismantling or No No long-term dismantling or decommissioning or restoration works? decommissioning or restoration work is involved. 1.27 Ongoing activity during decommissioning No Not Applicable which could have an impact on the environment? 1.28 Influx of people to an area in either No Local laborers from nearby area will be temporarily or permanently? employed during the construction phase. In the operation phase, most of the expected occupants will be from the surrounding areas. Hence, the project will lead to a redistribution of occupants within the city. Thus, no significant influx of people is envisaged. 1.29 Introduction of alien species? No The landscaping is being carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions like Acacia leucophloea (White babul), Citrus lemon (Lime of ). 1.30 Loss of native species or genetic No There will be no significant impact on the

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

34 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

diversity? loss of native species or genetic diversity. 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S.No Yes/ Information/Checklist confirmation quantities /rates, wherever possible) with . No source of information data 2.1 Land especially undeveloped or No Total scheme area of the project is 110.12 agricultural land (ha) acres. CLU has been obtained for 277.43 acres of land. Copy of CLU is enclosed as Annexure-1. 2.2 Water (expected source & competing Yes During operation phase, water supply will users) unit: KLD be provided from bore wells. The total water requirement will be 2386 KLD out of which Fresh water requirement will be 1,812 KLD. 2.3 Minerals (MT) Yes Minerals such as sand & aggregates will be required during the construction phase. 2.4 Construction material – stone, aggregates, Yes These materials shall be procured from sand/s oil (expected source – MT) authorized outlets in and around Mohali. 2.5 Forests and timber (source – MT) Yes The Project involves minimum use of timber during construction purpose. All materials required for shuttering purpose shall be that of mild steel. At the most chowkets may be of wood. 2.6 Energy including electricity and fuels Yes Total power requirement is estimated to be (source, competing users) Unit: fuel (MT), 12000 KVA which is being provided by energy (MW) Punjab State Power Corporation Limited. Total 19 nos. of DG Sets (4×1250 KVA,

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

35 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

2×1000 KVA, 1×500 KVA for commercial purpose, 8×1000 KVA for industrial, 3×500 KVA & 1× 320 KVA for residential) will be provided equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist confirmation Yes/ Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No The project will not use any hazardous hazardous (as per MSIHC rules) to human substances/ chemicals except for the used health or the environment (flora, fauna, Oil from DG set (Hazardous Waste category and water supplies) 5.1). The same shall be stored in HDPE tanks and will be sold to the authorized recyclers in the region. It shall be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet. 3.2 Changes in occurrence of disease or affect No Suitable drainage and waste management disease vectors (e.g. insect or water borne measures will be adopted in the construction diseases) phase such that there is no stagnation of water or accumulation of waste. This effectively restricts the reproduction and

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

36 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

growth of disease vectors.

3.3 Affect the welfare of people e.g. by Yes The project shall provide improved living changing living conditions? facility to local people. It will also provide employment during construction period as well as later in activities like security, operation and maintenance of pollution control equipments, landscaping etc. 3.4 Vulnerable groups of people who could be No Impacts of this type are not expected. affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other cause No Not Applicable 4. Production of Solid Wastes during construction or operation or decommissioning (MT/month) S.No Information/Checklist confirmation Yes/ Details thereof (with approximate . No quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not much spoil, overburden or mine wastes will be generated. 4.2 Municipal waste (domestic and or Yes Construction phase commercial wastes) Construction activities causes generation of debris, brick bats, plaster falls, battered stone mixture, aggregate leftovers, sand leftovers, empty cement bags, cartons, etc. Most of the construction waste generated will be reused in road construction and filling. Operation phase Solid waste of about 7.559 MT/day (@ 0.4 kg/capita/day for residential and @ 0.2 kg/capita/day for floating) will be generated from the project site after full occupancy. A

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

37 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

separate area has been earmarked for segregation of solid waste. Biodegradable waste will be composted by use of Mechanical Composters. Inert waste will be dumped to authorized dumping site. All the solid waste generated during construction and operational phase will be treated and disposed off as per MSW (Management & Handling) Rules, 2000 and Amended Rules, 2016. 4.3 Hazardous wastes (as per Hazardous Yes The only hazardous waste in the project will Waste Management Rules) be used/spent oil from standby DG set, which is classified as Hazardous waste category 5.1 as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. The spent oil will be carefully stored in HDPE drums under isolated storages and will be sold to authorized vendors. 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from Yes STP sludge will be generated from proposed effluent treatment STP to be installed within the project premises. 4.7 Construction or demolition wastes Yes The construction waste consists of excess earth & construction debris along with cement bags, steel in bits & pieces, including insulating & packaging materials, etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

38 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

at designated places in tune with the local norms. 4.8 Redundant machinery or equipment No Redundant machinery will not be generated.

4.9 Contaminated soils or other materials No Contaminated soils or other materials will not be generated. 4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist confirmation Yes/ Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels Yes The unit shall install total 19 nos. of DG from stationary or mobile sources Sets (4×1250 KVA, 2×1000 KVA, 1×500 KVA for commercial purpose, 8×1000 KVA for industrial, 3×500 KVA & 1× 320 KVA for residential) which shall run on Diesel. These are to be used only as Standby & shall comply with emission limits as given in G.S.R. 520(E), EPA Rules 2003 at the manufacturing stage itself. DG sets shall be procured from agencies complying the noise emission standards at manufacturing stage itself as per G.S.R. 371(E), The Environment (Protection) second Amendment Rules, 2002. 5.2 Emissions from production processes No No production processes involved. Hence,

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

39 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

there will be no such emissions.

5.3 Emissions from materials handling No Not Applicable including storage or transport 5.4 Emissions from construction activities Yes This will be restricted to the construction including plant and equipment phase and the construction site only. 5.5 Dust or odours from handling of materials Yes Dust will be generated during loading and including construction materials, sewage unloading of construction materials and and waste excavation of upper earth surface. The construction material involved shall not provide any odour. A green belt is further proposed along the boundary with internal parks and lawns and solid waste segregation area to mitigate crossover of odours, if any. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. 5.6 Emissions from incineration of waste No No incineration of waste is proposed.

5.7 Emissions from burning of waste in open No Not Applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, Yes The unit shall install total 19 nos. of DG ventilation plant, crushers Sets (4×1250 KVA, 2×1000 KVA, 1×500 KVA for commercial purpose, 8×1000

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

40 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

KVA for industrial, 3×500 KVA & 1× 320 KVA for residential) for standby use during operational phase. The DG sets shall be with in-built acoustic enclosure and adequate stack heigt as approved by CPCB and conforming to MoEF Notification, GSR 371 (E). 6.2 From industrial or similar processes No Not Applicable. 6.3 From construction or demolition No Normal construction will be there without using any heavy machinery. No construction at night shall be there. No demolition is involved. 6.4 From blasting or piling No Not Applicable. 6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt and PUC vehicle will be only operated. 6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage No The used oil from DG sets will be carefully of hazardous materials stored in HDPE drums at isolated storage and periodically sold to authorized

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

41 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

recyclers. All precautions will be taken to avoid spillage from storage as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. 7.2 From discharge of sewage or other Yes 1,944 KLD of wastewater will be generated effluents to water or the land (expected from the project after full occupancy; out of mode and place of discharge) which; 982 KLD of black water will be treated in STP of 1500 KLD capacity based on MBBR technology and remaining 962 KLD of wastewater/grey water will be treated in WWTP of 1500 KLD capacity. Treated water will be recycled for flushing, landscaping & HVAC cooling and remaining will be discharged to GMADA sewer. Apart from this, Manav Mangal Smart World School has already installed its STP of 75 KLD. 7.3 By deposition of pollutants emitted to air No The DG sets will be provided with stacks into the land or into water of adequate height. Hence, dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location. 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build up of No Not Applicable pollutants in the environment from these sources?

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

42 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc Yes To deal with any fire related accident, fire from storage, handling, use or fighting facility will be provided within the production of hazardous substances project. 8.2 From any other causes No The Building to be developed by plot owners/ constructed by proponent shall comply with the requirements of National Building Code towards Fire Safety. 8.3 Could the project be affected by natural Yes However, project is a development project. disasters causing environmental damage Even, if any building is to be constructed (e.g. floods, earthquakes, landslides, then it will be designed against Earthquakes cloudburst etc)? for Zone-IV requirements as laid down in NBC.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities /rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Yes The project is upcoming Super Mega Mixed utilities, ancillary development or Use Integrated Industrial Park that will development stimulated by the project provide high end facilities to the population which could have impact on the and isn’t likely to impact the environment

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

43 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

environment e.g.: adversely in any manner. The related •Supporting infrastructure (roads, impacts are discussed. There shall not be any power supply, waste or waste water further consequential cumulative impacts. treatment, etc.) The project will have positive impact on the • housing development ancillary infrastructure like road, markets, • extractive industries public health, amenities, conveyance • supply industries facilities etc. • other The project is proposed for the development of residential plots, commercial plots, etc. 9.2 Lead to after-use of the site, which No Not Anticipated. could have an impact on the environment 9.3 Set a precedent for later developments Yes The project will provide good infrastructure and better life style and will set an example for later developments in the areas. 9.4 Have cumulative effects due to No Not Applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

S.No. Areas Name/ Aerial distance (within Identity 15 km) Proposed project location boundary 1 Areas protected under international Kholhai Raitan Approx. 14 km (NE) conventions, national or local legislation for Reserved Forest their ecological, landscape, cultural or other Dariya Reserved Approx. 7.5 km (NW) related value Forest City Bird Approx. 12 km (NW) Sanctuary

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

44 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

Sukhna Wildlife Approx. 14 km (NE) Sanctuary Approx. 10.5 km (NE) Barwala Bird Sanctuary 2 Areas which are important or sensitive for Ghaggar River Approx. 1.5 km (SE) ecological reasons - Wetlands, watercourses or Sukhna Choe Adjacent to the site other water bodies, coastal zone, biospheres, mountains, forests Sukhna Lake Approx. 12.5 km (NW)

3 Areas used by protected, important or sensitive Kholhai Raitan Approx. 14 km (NE) species of flora or fauna for breeding, nesting, Reserved Forest foraging, resting, over wintering, migration Dariya Reserved Approx. 7.5 km (NW) Forest City Bird Apprrox. 12 km (NW) Sanctuary Sukhna Wildlife Approx. 14 km (NE) Sanctuary Barwala Bird Approx. 10.5 km (NE) Sanctuary Chhat Bir Zoo Approx. 4 km (SW) 4 Inland, coastal, marine or underground waters No None 5 State, National boundaries Chandigarh- Approx. 6 km (NW) boundary Haryana-Punjab Approx. 3 km (NE) boundary 6 Routes or facilities used by the public for NH 22 Approx. 1 km (W) access to recreation or other tourist, pilgrim areas 7 Defense installations CRPF 13 BN HQ Approx. 13 km (NW) 8 Densely populated or built-up area Zirakpur Approx. 2.5 km (NW)

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

45 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

Panchkula Approx. 7 km (N)

9 Areas occupied by sensitive man-made land Amar Approx. 5 Km (NW) uses (hospitals, schools, places of worship, Professional

community facilities) College of Nursing

Dashmesh Approx. 3.5 Km (W) Khalsa College

IISER, Mohali Approx.11 km (NW) St. Xavierrs’s Approx. 2 km (SW) International

School

Government Approx. 2.5 km (W) Senior Secondary School, Ramgarh Bhudda Shemrock Smart Approx. 2.2 km (NW)

School

Subsidiary Approx. 4 km (NW) Health Centre Bhabat

V Care Hospital Approx. 2.2 km (NW)

Gurudwara Guru Approx. 1 km (NE) Gobind Singh

10 Areas containing important, high quality or Sukhna Lake Approx. 12.5 km (N) scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

46 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

11 Areas already subjected to pollution or None The area is not subjected environmental damage. (those where existing to any environmental legal environmental standards are exceeded) damage. 12 Areas susceptible to natural hazard which could Earthquakes The site falls under the cause the project to present environmental zone IV as per the problems (earthquakes, subsidence, landslides, Seismic Zone Map of erosion, flooding or extreme or adverse India and is thus prone to climatic conditions) high damage risk zone. Adequate measures will be taken during the construction of the project by individual plot owners or project proponent.

(IV) Terms of Reference: Proposed TOR points are given below:

1. Examine details of land use as per Master Plan and land use around 10 km radius of the project site. Analysis should be made based on latest satellite imagery for land use with raw images. Check on flood plain of any river. 2. Submit details of environmentally sensitive places, land acquisition status, rehabilitation of communities/villages and present status of such activities. 3. Examine baseline environmental quality along with projected incremental load due to the project. 4. Environmental data to be considered in relation to the project development would be (a) land, (b) groundwater, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economic and health. 5. Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Any obstruction of the same by the project 6. Submit the details of the trees to be felled for the project. 7. Submit the present land use and permission required for any conversion such as forest, agriculture etc.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

47 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

8. Submit Roles and responsibility of the developer etc. for compliance of environmental regulations under the provisions of EP Act. 9. Ground water classification as per the Central Ground Water Authority. 10. Examine the details of Source of water, water requirement, use of treated waste water and prepare a water balance chart. 11. Rain water harvesting proposals should be made with due safeguards for ground water quality. Maximize recycling of water and utilization of rain water. Examine details. 12. Examine soil characteristics and depth of ground water table for rainwater harvesting. 13. Examine details of solid waste generation treatment and its disposal. 14. Examine and submit details of use of solar energy and alternative source of energy to reduce the fossil energy consumption. Energy conservation and energy efficiency. 15. DG sets are likely to be used during construction and operational phase of the project. Emissions from DG sets must be taken into consideration while estimating the impacts on air environment. Examine and submit details. 16. Examine road/rail connectivity to the project site and impact on the traffic due to the proposed project. Present and future traffic and transport facilities for the region should be analyzed with measures for preventing traffic congestion and providing faster trouble free system to reach different destinations in the city. 17. A detailed traffic and transportation study should be made for existing and projected passenger and cargo traffic. 18. Examine the details of transport of materials for construction which should include source and availability. 19. Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan with cost and parameters. 20. Submit details of a comprehensive Disaster Management Plan including emergency evacuation during natural and man-made disaster. 21. Details of litigation pending against the project, if any, with direction /order passed by any Court of Law against the Project should be given. 22. The cost of the Project (capital cost and recurring cost) as well as the cost towards implementation of EMP should be clearly spelt out.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

48 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

I hereby give the Undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief, I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 30.07.2019

Place: Mohali Mr. Rajinder Sharma Village Nagla, In front of Manav Mangal School, Tehsil Derabassi, District SAS Nagar, Punjab-140603. Tel: 1762-514500

NOTE: 1. The project involving clearance under Coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendation of the state coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The project to be located within 10 km of the National parks, Sanctuaries, Biophere Reserves, Migratory Corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

49 Super Mega Mixed Use Integrated Industrial Park Project-Phase-I Villages Nagla, Bhankerpur, Shatabgarh, Bakarpur and Chhat, Tehsil Derabassi, District SAS Nagar (Mohali), Punjab M/s. Shipra Estates Limited Form I

location and the recommendation or comments of the Chief wildlife warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) Format No. EL\EIA\F-5.3\7 Dated 15.07.2019, Rev.02

50