Application for Environmental Clearance Form – I (I) Basic Information: S. No. Item No. Details 1 Name Of the Project/s “SSL Highway Towers” Project at - Highway, Bassi, Distt. SAS Nagar (), Punjab by M/s. SAB Industries Limited. 2 S. No. in the schedule The project falls under S.No. 8(a) - ‘Building & Construction Project’ as the built-up area of the project is 67,778.261 sq.m. 3 Proposed capacity / area / length/ The Project “SSL Highway Towers” is located at tonnage to be handled / command area / Chandigarh-Ambala Highway, , Distt. lease area / number of wells to drilled SAS Nagar (Mohali), Punjab which is being developed by M/s. SAB Industries Limited. Earlier, Environmental Clearance was obtained for Residential apartments, Mall & multiplex from MoEF vide Letter No. 21-799/2007-IA.III dated 11th Jan, 2008 for plot area of 32,968.97 sq.m. (or 8.14 acres) and built-up area of 67,638 sq.m. Land documents are enclosed as Annexure 1. Copy of Earlier Environmental Clearance is enclosed as Annexure 2. Thereafter, construction was started on the site. But, due to recession in the market, project could not be completed & construction was stopped in the year 2009. Further, a part of land was sold. Now, project has been revived and planning has been changed for development in area of 26,503.925 sq.m. (or 6.54 acres). Now, application has been filed for fresh Environmental Clearance for 14 Residential Blocks (9 are Category A Blocks and 5 are Category B Blocks), EWS Block and One Club Building.

The total cost of project is Rs. 123 Crores. The area details are given in Conceptual Plan.

The following documents are enclosed: A-1 : Land documents. A-2 : Copy of Environmental Clearance earlier obtained from MoEF. A-3 : Site Photographs A-4(a): Board of Resolution for authorization. A-4(b): Undertaking from Project Proponent A-5 : Affidavit regarding Environment Management Cell A-6 : Memorandum and Articles of Association A-7 : PERT Chart A-8 : Demographic Details A-9 : Energy Savings Details A-10(a) : Lab reports A-10(b) : Field data sheets A-10(c) : Email print for intimation regarding monitoring. A-11 (a) : Permission regarding Solid Waste Disposal & sewerage connection from Municipal Council, Dera Bassi. A- 11(b) : Application submitted to CGWB. A-12 : Documents of Environment Consultant. A-13 : Acknowlegdement receipt of application to NHAI. A-14 : Acknowlegdement receipt of application to Forest Deptt.

The following drawings are enclosed: D-1: Master Plan of Derabassi showing project site. D-2 : Google Earth Image showing project site & surroundings within 500 m. D-3 : Conceptual Plan D-4 : Contour Plan D-5 : Marked Layout Plan. D-6 : Layout Plan showing location of sampling. D-7 : Basement Parking Plan. D-8 : Services Drawing D-9 : Solar water heater system 4 New/Expansion / Modernization New 5 Existing capacity / Area etc Earlier Accorded EC Built-up Area = 67,638 sq.m. 6 Category of the project ‘ A’, ‘B’ , ‘C’ Category ‘B’ 7 Does it attract the general conditions? If No Yes, Please Specify. 8 Does it attract the specific conditions? If No Yes, Please Specify 9 Location The change of land use has been mentioned in the Letter from Chief Town Planner, Deptt. of Town & Country Planning, Punjab vide Memo no 1537- CTP(PB)SD-46 dated 26.02.2010. Copy of the same along with land documents are attached as Annexure 1.

Master plan of Dera Bassi showing location of the project is attached along as Drawing 1. Plot/ Survey/Khasra No. The change of land use has been mentioned in the Letter from Chief Town Planner, Deptt. of Town & Country Planning, Punjab vide Memo no 1537- CTP(PB)SD-46 dated 26.02.2010. Copy of the same along with land documents are attached as Annexure 1. Village -- Tehsil Dera Bassi District S.A.S. Nagar State Punjab 10. Nearest railway station / Airport along Ghaggar Railway station: 5 km (approx.); with Distance in kilometers. : 20 km (approx.) 11 Nearest town/District headquarters The project lies within Dera Bassi, SAS Nagar. along with distance in kilometers District Headquaters: 2 km 12 Village Panchayat, Zilla Parishads, Municipal Council, SAS Nagar. Municipal corporation, local Bodies (Complete Postal address with telephone No. to be given) 13 Name of the applicant Mr. Anil Kumar Singla (Authorized Signatory) Board of resolution for authorization is enclosed as Annexure 4(a). 14 Registered address M/s. SAB Industries Limited. SCO 49-50, Sector-26, Madhya Marg, Chandigarh-160019. 15 Address for correspondence : M/s. SAB Industries Limited. SCO 49-50, Sector-26, Madhya Marg, Chandigarh-160019. Name : Mr. Anil Kumar Singla Designation(owner/ Partner/CEO) Authorized Signatory Address M/s. SAB IndustriesLimited. SCO 49-50, Sector-26, Madhya Marg, Chandigarh-160019. Pin Code 160019 E- Mail [email protected] Telephone No. 9814115652 Fax No. - 16 Details of alternative Sites examined, if No any. Location of these sites should be shown on the topo Sheets. 17 Interlinked Projects. No 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If Yes, date of submission. Not Applicable

20 If No, reason Not Applicable

21 Whether the Proposal involves approval Undertaking from the project proponent is / Clearance under : If Yes , details of the enclosed as Annexure 4(b). same and their to be given . (a) The Forest Conservation , Act,1980 (b) the wild life Protection Act, 1972 (c) The C.R.Z Notification, 1991. 22 Either their is any government Order / Not Applicable. policy relevant / relating to the site? 23. Forest land Involved (hectare) Not Applicable

24. Whether there is any litigation pending Not Applicable. Undertaking from the project against the project and /or land in which proponent is enclosed as Annexure 4(b). the Projects is proposed to be set up? (a) Name of the court (b) Case no. (c) Orders / Directions of the Courts , if any and its relevance with the Project

(b) I hereby give the Undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief, I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 03.05.2016 Place: Mohali

M/s. SAB Industries Limited. SCO 49-50, Sector-26, Madhya Marg, Chandigarh-160019. (Project Proponent/Authorised Signatory)

NOTE:

1. The project involving clearance under Coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendation of the state coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The project to be located within 10 km of the National parks, Sanctuaries, Biophere Reserves, Migratory Corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project location and the recommendation or comments of the Chief wildlife warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. (II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes Project “SSL Highway Towers” is located at in land use, land cover or Chandigarh-Ambala Highway, Dera Bassi, topography including increase Distt. SAS Nagar (Mohali), Punjab. The in intensity of land use (with change of land use has been mentioned in the respect to local land use plan) Letter from Chief Town Planner, Deptt. of Town & Country Planning, Punjab vide Memo no 1537-CTP(PB)SD-46 dated 26.02.2010. Copy of the same along with land documents are attached as Annexure 1. 1.2 Clearance of existing land, No Vegetation has already been cleared from the vegetation and buildings? site after obtaining the earlier Environmental Clearance. 1.3 Creation of new land uses? No The change of land use has been mentioned in the Letter from Chief Town Planner, Deptt. of Town & Country Planning, Punjab vide Memo no 1537- CTP(PB)SD-46 dated 26.02.2010. Copy of the land use is attached as Annexure 1. 1.4 Pre-construction investigations Yes The pre-construction activities have already e.g. bore houses, soil testing? been done prior to the start of work at the site. 1.5 Construction works? Yes The construction shall be as per proposed land use plan and details of the same are mentioned in Conceptual Plan. PERT/CPM is enclosed as Annexure 7. 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for Yes The manpower required during construction construction works or housing period is around 200. The most of the workers of construction workers? will be local or from nearby areas. Only 80 workers will reside at the site during peak construction period of 30 months. Temporary hutments and sanitation facilities will be provided for these workers within the project site. 1.8 Above ground buildings, Yes Part of excavation has been done for the structures or earthworks foundation of building & basements. Some including linear structures, cut Soil excavation i.e. 44,163.3 cu.m. will be and fill or excavations done at the site, stored within project site & used for cutting & filling and landscaping. 1.9 Underground works including Yes Part of excavation has been done for the mining or tunneling? foundation of building & basements. Some Soil excavation i.e. 44,163.3 cu.m. will be done at the site, stored within project site & used for cutting & filling and landscaping. 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods Yes Cement and other construction materials are or materials? stored at site for which temporary sheds have been constructed. 1.15 Facilities for treatment or Yes The total design population of the project is disposal of solid waste or liquid 2,192 persons [residential will be 2170 and effluents? floating will be 22]. The water requirement as per Manual on Water Supply & Treatment, Government of @ 200 lpcd for residential and @ 45 lpcd for floating will be approx. 435 KLD.

348 KLD of sewage will be generated from the project. This wastewater will be treated in STP of 400 KLD installed within the project site based on MBBR Technology. The water balance diagrams for 3 different seasons i.e. Summer, Winter & Monsoon season is shown in Figure 1, 2 & 3 respectively in the Conceptual Plan.

Solid waste of about 873 kg/day will be generated @ 0.4 kg/capita/day for residential and @ 0.2 kg/capita/day for floating. A separate area is earmarked for segregation of solid waste within the site. 1.16 Facilities for long term housing No Local labourers will be hired from nearby of operational workers? areas during construction phase. Therefore, there will be no need to create permanent facilities for long term housing of operational workers. 1.17 New road, rail or sea traffic Yes During construction phase, movement of 10- during construction or 12 vehicles will be there. operation? During operation, the gestation period for occupation is 5-8 years. The vehicles as four/two wheelers shall be used by the occupants. 1.18 New road, rail, air waterborne No No new infrastructure for this purpose shall be or other transport infrastructure required. The site has well connected roads. including new or altered routes Only internal circulation road to be made. and stations, ports, airports etc 1.19 Closure or diversion of existing No There is no need of diversion of existing transport routes or transport routes. infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No There are no new or diverted transmission lines or pipelines? lines. 1.21 Impoundment, damming, No No Impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the hydrology changes to the hydrology of of watercourses or aquifers is proposed. watercourses or aquifers? 1.22 Stream crossings? No There is no stream running across the site. 1.23 Abstraction or transfers of Yes During Construction period, a Water demand water form ground or surface of 131 KLD (@30% of the demand during waters? operation) will be there depending upon phases of construction. This includes domestic demand for 200 workers during peak period @ 40 KLD.

Rainwater harvesting will be done from roof top area which be used to recharge aquifer. For the roof top area @ 7,418.01sq.m. with peak hourly rainfall of 45 mm and assuming run off coefficient 0.8, total runoff available will be 267.05 cum/hr. The ground water shall be recharged by providing 3 no. of rain water recharging pits to recharge water from rooftop area. Site plan showing 3 recharge pits is enclosed as Drawing 5. 1.24 Changes in water bodies or the No Not Applicable. land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes During construction phase, movement of 10- materials for construction, 12 vehicles will be there. operation or decommissioning? During operation phase, 538 ECS of parking space will be provided within the project site. The vehicles as four/two wheelers shall be used by the occupants. Basement Parking Plan is enclosed as Drawing 7. PARKING REQUIRED

As per Punjab bye Laws:  Parking space for Category A units: 1.5 ECS/D.U. = 252×1.5 = 378 ECS  Parking space for Category B units: 1 ECS/D.U.= 140×1 = 140 ECS Parking required = 378+140 = 518 ECS PARKING PROPOSED

Area reqd. SI. Parking Area Parking Area Parking proposed Particulars for 1 ECS No. (in Sq.ft.) (in Sq.mt.) (in ECS) (in Sq.mt.) 1. Basement Car Parking 1,85,401.806 17,224.391 32 538

Total Parking Proposed 538 ECS 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No There shall be no influx but routine either temporarily or movement of people. The maximum permanently? number of workers engaged in construction at any time will not be more than 200. Out of these, more than half of the work force will be local and only about 80 workers will reside at the site.

The expected population of the Project on full occupation will be 2,192 persons. This will also have a gestation period of atleast 5-8 years after the construction is over. So, there will be no sudden influx but gradual occupation.

1.29 Introduction of alien species? No Not Applicable

1.30 Loss of native species or No There will be no significant impact on the genetic diversity? loss of native species or genetic diversity.

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Information/Checklist Yes/ S.No. /rates, wherever possible) with source of confirmation No information data 2.1 Land especially undeveloped or No The area taken for “SSL Highway Towers”, agricultural land (ha) Project is occupied by M/s. SAB Industries Limited. 2.2 Water (expected source & Yes During operation phase, water supply will be competing users) unit: KLD provided from Municipal Water Supply and will be met through Tubewell (1 No.). The total water requirement will be 435 KLD. Domestic water requirement will be 337 KLD. 2.3 Minerals (MT) Yes Minerals such as sand & aggregates will be required during the construction phase. 2.4 Construction material – stone, Yes These materials will be procured from aggregates, sand/s oil (expected authorized outlets in and around Mohali. source – MT) Aggregates-15,000 cubic meter, Cement Bags- 1,71,000 bags, Sand- 83,000 cubic meter, Bricks- 35 Lakhs, etc. 2.5 Forests and timber (source – Yes The Project involves minimum use of timber MT) during construction purpose. All material required for shuttering purpose will be of mild steel. During construction, a mix of MDF (e.g. For Cupboards and Door Panels), aluminium (for window shutters) will be used to make minimum use of wood. At the most chowkets may be of wood. 2.6 Energy including electricity and Yes Total Power requirement of 2057.73 KW to be fuels (source, competing users) provided by Punjab State Power Corporation Unit: fuel (MT), energy (MW) Limited. Total 2 DG Sets (capacity 750 KVA and 500 KVA) are proposed for standby use for operating lifts etc. 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 3.1 Use of substances or materials, No Project involves construction of residential which are hazardous (as per complex of 434 dwelling units. The project will MSIHC rules) to human health not use any hazardous substances/ chemicals or the environment (flora, fauna, except for the used Oil from DG set and water supplies) (Hazardous Waste category 5.1). The same shall be stored in HDPE tanks and will be sold to the authorized recyclers in the region. 3.2 Changes in occurrence of No Not Applicable disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes The project shall provide improved living by changing living conditions? facility to local people. It shall also provide employment during construction period as well as later in activities like security, operation and maintenance of pollution control equipments, landscaping etc. 3.4 Vulnerable groups of people No Not Applicable who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other cause No Not Applicable 4. Production of Solid Wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No wastes 4.2 Municipal waste (domestic and Yes The construction waste is being used in making or commercial wastes) the internal roads/floors. About 873 kg/day of solid waste will be generated. The solid waste shall be duly segregated into biodegradable and non- biodegradable components. Primary collection of solid waste will be done and then it will be transferred manually using covered trolleys to common solid waste segregation area. After segregation, the biodegradable waste will be composted using mechanical composter, recyclable waste will be sold to local recyclers and the inert waste will be disposed to authorized dumping site for which NOC from Municipal Council, Derabassi has already been obtained. 4.3 Hazardous wastes (as per Yes Category 5.1, used oil from DG sets. Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes STP sludge will be generated as in-house STP from effluent treatment will be installed within the project site. 4.7 Construction or demolition Yes The construction waste consists of excess earth wastes & construction debris along with cement bags, steel in bits & pieces, including insulating & packaging materials, etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms. 4.8 Redundant machinery or No Redundant machinery will not be generated. equipment 4.9 Contaminated soils or other No Contaminated soils or other materials will not materials be generated. 4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes The unit shall install 2 DG Sets (Capacity 750 fossil fuels from stationary or KVA and 500 KVA) which shall run on Diesel. mobile sources These are to be used only as Standby & shall comply with emission limits as given in G.S.R. 520(E), EPA Rules 2003 at the manufacturing stage itself. DG sets shall be procured from agencies complying the noise emission standards at manufacturing stage itself as per G.S.R. 371(E), The Environment (Protection) second Amendment Rules, 2002. 5.2 Emissions from production No No production processes involved. Hence, there processes will be no such emissions. 5.3 Emissions from materials No Not Applicable handling including storage or transport 5.4 Emissions from construction Yes Dust will be generated during construction activities including plant and activities as per PERT and CPM Chart using equipment machines. PERT/ CPM chart is attached as Annexure 7. The vehicles which carry construction material as sand will be covered from top and made wet before movement and thus no dust is generated.

5.5 Dust or odours from handling of Yes The construction material involved does not materials including construction provide any odour. A green belt is further materials, sewage and waste proposed along the boundary and solid Waste Segregation Area to mitigate crossover of odours if any.

5.6 Emissions from incineration of No No incineration of waste is proposed. waste 5.7 Emissions from burning of No Not Applicable waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 6.1 From operation of equipment Yes Unit shall install 2 DG Sets (capacity 750 KVA e.g. engines, ventilation plant, and 500 KVA) for standby use. The DG sets crushers shall be with in-built acoustic enclosure as approved by CPCB and conforming to MoEF Notification, GSR 371 (E). 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or No Normal construction will be done without using demolition any heavy machinery. No construction at night will be there. No demolition is involved. 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes The traffic during construction phase will be operational traffic around 10-12 vehicles/day. This will not be having any significant impact. During the operational phase, only personnel vehicles as cars/ two wheelers i.e. 538 ECS shall be used by the flat owners. In addition, adequate green area i.e. 13,185.205 sq.m will be provided. 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 7.1 From handling, storage, use No Not Applicable or spillage of hazardous materials 7.2 From discharge of sewage or Yes About 348 KLD of sewage shall be generated other effluents to water or the from the project which will be treated in STP of land (expected mode and capacity 400 KLD which will be installed within place of discharge) the project site. Treated water shall be recycled for the purpose of irrigation and flushing in toilets within the project. 7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term No Not Applicable build up of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No Not Applicable etc from storage, handling, use or production of hazardous substances 8.2 From any other causes No The Building shall comply with the requirements of National Building Code towards Fire Safety for multistory structures. 8.3 Could the project be affected by Yes The Building is designed against Earthquakes natural disasters causing for Zone-IV requirements as laid down in environmental damage (e.g. NBC. Risk assessment plan is enclosed with floods, earthquakes, landslides, the application. cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 9.1 Lead to development of Yes The project is upcoming residential project that supporting. utilities, ancillary will provide high end facilities to the development or development population and isn’t likely to impact the stimulated by the project which environment adversely in any manner. The could have impact on the related impacts are discussed. There shall not environment e.g.: be any further consequential cumulative •Supporting infrastructure impacts. (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment 9.3 Set a precedent for later No Not Applicable developments 9.4 Have cumulative effects due to No Not Applicable proximity to other existing or planned projects with similar effects (III) Environmental Sensitivity

S.No. Areas Name/ Aerial distance (within 15 Identity km) proposed project location boundary 1 Areas protected under international No - conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Bir Approx. 0.5 km ecological reasons - Wetlands, watercourses or Forest Reserve other water bodies, coastal zone, biospheres, mountains, forests Bir Dandrala Approx. 0.5 km Forest Reserve

Ghaggar river Approx. 5 km 3 Areas used by protected, important or sensitive Chhatbir Zoo Approx. 5 km species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

4 Inland, coastal, marine or underground waters No -- 5 State, National boundaries Punjab- Approx. 7 km Boundary 6 Routes or facilities used by the public for NH-22 Approx. 0.5 km access to recreation or other tourist, pilgrim (Chandigarh- areas Ambala Expressway) 7 Defense installations Chandimandir Approx. 20 km 8 Densely populated or built-up area No The demographic details is attached as Annexure 8. 9 Areas occupied by sensitive man-made land Sri Sukhmani Approx. 1 km uses (hospitals, schools, places of worship, Multispeciality community facilities) Hospital

Sri Sukhmani Approx. 0.5 km International School 10 Areas containing important, high quality or Ghaggar river Approx. 5 km scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No The area is not subjected to environmental damage. (those where existing any environmental damage. legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which -- The area has not faced any could cause the project to present natural hazard so far. environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies

Not Applicable as project comes under category 8(a).