DREDGING/DEWATERING Wilde Lake Maintenance Dredging
www.landandwater.com 25 DREDGING/DEWATERING
n the summer of 2012, JND ways and over 3,400 acres of Th omas Company, Inc., a gen- permanent open space including Ieral contractor based in River- three lakes; Lake Elkhorn, Lake dale, CA and Daytona Beach, FL Kittamaquundi and Wilde Lake. was awarded a contract by the Project representatives for the Columbia Association of Colum- Association were Dennis Mattey bia, Maryland for the maintenance - Head of Construction, Diana dredging of Wilde Lake. Th e com- Kelley, CPPB - Contract Admin- prehensive “turn-key” operation istrator and Charles Grey - Proj- included dredging, construction of ect Manager. the dewatering and staging areas, Wilde Lake is a 22-acre dredging methodology, dewatering man-made lake, located in Co- technology and equipment con- lumbia. Prior to its development fi guration, trucking and fi nal off - in 1966, the site was a grassy site disposal of the lake sediments meadow containing a small and the restoration of the site. Th e stream. Th e lake is surrounded Columbia Association funded the by residential and open recre- project for approximately $1.7 ational space and fed by an un- million. named tributary from the north and a fi fteen-foot high concrete Background dam exists at the outfall channel. Th e Columbia Association is Th e outfl ow of Wilde Lake pass- a community-controlled, private, es through Lake Kittamaqundi non-profi t service corporation cre- (another Columbia man-made ated to provide services, amenities lake) and eventually fi nds its and facilities for the benefi t of Co- way to the Little Patuxent River. lumbia, Maryland. It builds, op- Th e lake accepts drainage from erates and maintains community approximately 1,200 acres con- facilities, neighborhood centers, Unloading of Moray dredge at Wilde Lake. sisting primarily from residential sports clubs, pools, parks, path- properties. Over time, Wilde aquablok.com
Whendon’t traditional methodshold NativeNatiNtive SeedS d&Pl & PlantsPlantstf foforr water ErErosionosion Control Control ™ Stormwater ManagemenManagementt SShorelinehoreline RestorationRestoration
Basin Construction Trench Dams/ Manhole Sealing Dam/Berm/ & Rehab Water Stops Levee Rehab Engineered Bentonite • Effective for leak prevention & repair • Apply dry or through standing water • Highly durable & structurally stable • Simplifi es handling & reduces labor • Available in 2 convenient packages* www.agrecol.com *50-lb bags and bulk super sacks. Also inquire ™ about AquaBlok products for environmental remediation Nature’s Duct Tape where contamination must be contained and/or treated. Ph 608.223.3571 Fax 608.884.4640 Manufactured in U.S.A. ©2012 AquaBlok Ltd. All rights reserved. [email protected]
26 November/December 2012 DREDGING/DEWATERING
Lake had accumulated too much sediment, which diminished its overall holding capac- ity causing a rapid decline in water quality and excessive vegetative growth in undesir- able locations.
Engineering and Permitting Th e design, plans, specifi cations, cost estimating, engineering, permitting and construction oversight for the dredging project were performed by Anchor QEA of Columbia with local on-site supervision by Walter Dinicola, P.E. Regulatory oversight and permitting were secured through the Maryland Department of the Environmen- tal Dam Safety Division and the Howard County Department of Inspections, Li- censes and Permits.
Challenges and Mobilization Meeting the “turn-key” requirements of the project coupled with the complexi- ties of working within a highly populated Dredge removing accumulated sediment at inlet of Wilde Lake. residential area posed many challenges. First and foremost was the challenge of mobilization and deployment of dredging ing the addition of under drains prior to are trucked onsite without requiring any and dewatering equipment. Th e dewater- site preparation to meet compaction and “special” height or width permits. Th e de- ing site selected for the Wilde Lake Dredg- grading specifi cations. JND Th omas Com- watering plant has a relatively small foot- ing Project that off ered minimal disruption pany’s dredge and dewatering plant con- print and once assembled, takes less than to the residents had an active spring requir- sists of mobile, portable equipment that one half acre. In this case, a grassy knoll
The World’s Finest Sampling Equipment
AMS Piezometer Groundwater Monitoring and Sampling Kit The AMS “Piezometer Groundwater Monitoring and Sampling Kit” was designed in response to our clients’ need for a manually-operated groundwater kit, capable of providing a semi-permanent access point for water level measurements and shallow groundwater sampling investigations. This complete kit includes everything needed to take groundwater measurements and collect samples to a depth of 12ft., below ground surface. For tough soil conditions, a 1 ¾” regular soil auger, 6ft., of extensions, and a rubber-coated cross handle have been provided for “pre-augering” a borehole.
To learn more about this kit, please visit: www.ams-samplers.com or scan the QR code. 2XU¿QDQFLQJLVDYDOLDEOHRQOLQH
70 Years AMS, Inc. ∙ 105 Harrison Street ∙∙American Falls, Idaho 83211 Phone: 208-226-2017 / 800-635-7330 ∙ www.ams-samplers.com ∙ www.facebook.com/amssampling Since 1942
www.landandwater.com 27 DREDGING/DEWATERING
within an open space of Wilde Lake Park was selected. Th e construction of access THE CLEAR CHOICE FOR SEDIMENT CONTROL roads was minimal, all erosion control and silt fencing including safety postings were implemented and a turbidity curtain was installed 150’ in front of the outfall dam, all as required by the contract. Two cranes, 70 and 150 ton, were used for lowering the dredge and positioning the components of
Meeting the “turn-key” re- NATURAL SEDIMENT FLOCCULANT quirements of the project coupled with the complexi- ties of working within a highly populated residen- tial area posed many chal- lenges.
the plant. Th e mobilization took approxi- To inquire about Biostar-CH products and availability mately seven days from start to pumping, in the U.S. and International markets, contact us directly at 1-715-426-5131 allowing for coordination of traffi c, pipe- or visit us at www.biostar-ch.com line fusing and testing. Key JND partici- pants were David Driver - Off site Mgr, Email: [email protected] Keith Ayers - Project Mgr and Patrick HILD&ASSOCIATES,INC. Dunnigan - Dewatering Superintendent in ©2010 Hild & Associates, Inc. Biostar-CH is a trademark of Hild & Associates, Inc. addition to a team of six employees sharing dredging, dewatering, staging and loading responsibilities.
Dredging Th e dredging specs of the project called for removing accumulated sediment to the previous 1993 dredged grades (6”+ tolerance) in the northwest third of the lake. Neither the original lake bottom nor the current existing elevations are a smooth surface of uniform depth, but rather, an Filter Sock irregular bottom with varying depths that “Bringing You Compliance have evolved into sediment islands over- Without Complications” grown with undesirable vegetation. An 8” DSC Moray swinging ladder dredge with GPS positioning capability was deployed. Th e Moray can operate at a minimum wa- ter depth of 48” (ideal for Wilde Lake’s shal- low condition) and has the ability to work in tight areas by utilizing travel and posi- tioning spuds instead of cables for move- Attention: Blower Truck Dealers and Installers, Landscapers, ment. Capable of dredging depths up to Homebuilders, Wattle and Netting 18’, the Wilde Lake project depths around Manufacturers, Pipeline Contractors 6’ were easily accomplished producing and Erosion Product Distributors nominal fl ow rates up to 2,000 gpm @ 185 TDH (Total Delivered Horsepower). Th e Call Today For: cutterhead is a sealed planetary drive; 24” 6SHFLÀFDWLRQV3ULFLQJDQG7HFKQLFDO6XSSRUW inside diameter 5-blade basket cutter with 1.888.623.8823 nominal production capacity around 90 in-situ yards per hour. Th e Moray was con-
28 November/December 2012 DREDGING/DEWATERING
SPILLDAM ENVIRONMENTAL, INC. SILTDAM™ Turbidity Control Curtains: designed, engineered and manufac- tured to meet the demanding site requirements of our customers.
Dewatered silts, clays & organic sediment after being processed through JND’s Marine Construction plant. Demolition Dredging nected to a maximum of 3,200 feet of 8” in suspension and pumped to four - 14” Remediation HDPE fl oating and submerged discharge Hydro-cyclones. Any material larger than Erosion Control pipe (placed as specifi ed in the plans mini- 225 mesh drops onto two Linear Motion Shoreline Revetment mizing hiker/biker path interruptions and/ King Cobra Shakers where it is dried and or closures with all crossings being bur- removed. All remaining material less than ied). An additional DSC fl oating booster 225 mesh and water is collected below into Options include: pump was incorporated after beginning a second mix tank where it again is kept s IN MM IN MM AND the project to assist with the pumping of in suspension and pumped to the Clarifi er. IN MM &LOTATION sand and gravel. Hydro Data of Chester, Various types and amounts of specifi cally s 0ERMEABLE OR IMPERMEABLE VARIETIES Connecticut verifi ed all dredging progress formulated polymers are injected at various s 3KIRT DEPTHS FROM FT M TO FT with bathymetric surveys after the comple- points between the fi rst and last tanks to M tion of each section. Dredging began in the maximize the fl occulating process (separa- SMU1 and SMU2 prioritized areas located tion of solids from water). When applied at the northwest third of the lake. at the correct mix points and correct ratios, the polymers enhance the separation and Dewatering and Material Handling settling of ultra fi nes (organics, clays and JND’s dewatering plant uses mechani- silts presented as cloudy, discolored water) cal operations and clarifi cation tanks in and suspended solids (presented as fi ne free combination with the addition of poly- fl oating particles). Th e Amber Group of mers to dewater dredge spoils. Th e second- Irvine, CA provided the technical exper- ary benefi t is the enhanced clarifi cation of tise and product selection recommenda- lake water, which is returned back to the tions for the Wilde Lake project. Th ick- lake after exiting the plant. Th e process ened slurry is consolidated at the clarifi er begins with lake sediment and water be- and equally distributed to three 1.7-meter ing pumped from the dredge to the de- Charter Machine Company Belt presses watering plant at 10 – 15 percent solids. where the thickened fi nes are pressed to Th e slurry is fi rst directed over two sets of remove all Capillary (Intercellular) water. Dual Tandem Trash Shakers, exposing the Capillary Intercellular water can only be DBA "ROCKTON %QUIPMENT3PILLDAM )NC fl ow to 20 square feet of surface area for separated from solids by overcoming adhe- 0/ "OX removing any debris larger than 1/8th inch sive or capillary forces in pressure sections, "ROCKTON -! 53! in size. Th e pass thru slurry is collected be- like a belt press or centrifuge. By combin- &AX