Library of Parliament Annual Report 2019–2020 Table of Contents
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Parliamentary Precinct Lighting Protocol (2019)
Federal Land Use, Design, and Transaction Public Approval Submission No. 2020-P45 To Board of Directors For DECISION Date 2020-04-23 Subject/Title Parliamentary Precinct Exterior Lighting Master Plan Purpose of the Submission To obtain approval of the Board of Directors for the Parliamentary Precinct Exterior Lighting Master Plan. Recommendation • THAT the Parliamentary Precinct Exterior Lighting Master Plan (ELMP) be approved subject to the following condition: o That the subsequent implementation projects for architectural and landscape lighting planned for in the ELMP be submitted to the NCC for review and approval; and • THAT the preparation and signature of the federal approval document for the Parliamentary Precinct Exterior Lighting Master Plan be delegated to the Vice President, Capital Planning Branch. Submitted by: Pierre Vaillancourt, A/Vice President, Capital Planning Branch______ Name _______________________________________________________ Signature Submission: 2020-P45 Page 1 of 5 Federal Land Use, Design, and Transaction Public Approval Submission 1. Authority National Capital Act, sections 11 and 12 2. Project Description • The Parliamentary Precinct is the home of Canada’s parliamentary system and the physical expression of our commitment to democracy and the principle of freedom. The picturesque landscape and architectural style of the Precinct are enduring visual symbols of our country, while the openness, accessibility and security of the public spaces are representative of the values treasured and celebrated by all Canadians. The Precinct provides the setting for the work of Parliamentarians and staff in a secure and efficient manner, but it is also the preeminent gathering place for public expression and celebration, as well as a place of quiet reflection. -
The Evolution of Modelling Practices on Canada's
The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-2/W11, 2019 GEORES 2019 – 2nd International Conference of Geomatics and Restoration, 8–10 May 2019, Milan, Italy THE EVOLUTION OF MODELLING PRACTICES O N CANADA’S PARLIAMENT HILL:AN ANALYSIS OF THREE SIGNIFICANT HERITAGE BUILDING INFORMATION MODELS (HBIM) L. Chow 1, K. Graham 1, T. Grunt 1, M.Gallant1, J. Rafeiro,1 S. Fai 1 * 1 Carleton Immersive Media Studio (CIMS), Carleton University, Ottawa, Canada - (lchow, kgraham, tgrunt, mgallant, jraferio, sfai)@cims.carleton.ca KEY WORDS: Heritage Building Information Model, Level of Detail, Model Tolerance, Level of Accuracy, Data management ABSTRACT: In this paper, we explore the evolution of modelling practices used to develop three significant Heritage Building Information Models (HBIM) on Canada’s Parliament Hill National Historic Site — West Block, Centre Block, and The Library of Parliament. The unique scope, objective, and timeline for each model required an in-depth analysis to select the appropriate classification for Level of Detail (LOD) and Level of Accuracy (LOA). With each project, the refinement of modelling practices and workflows evolved, culminating in one of our most complex and challenging projects — the Library of Parliament BIM. The purpose of this paper is to share ideas and lessons learned for the intricate challenges that emerge when using LOD and LOA classifications including trade-offs between model performance, tolerances, and anticipated BIM use. In addition, we will evaluate how these decisions effected managing the digitization, data processing, data synthesis, and visualisation of the models. 1. OVERVIEW monument. As both the political and symbolic locus of Canada’s parliamentary democracy, the site is in every sense a stage where In 2012, Public Services and Procurement Canada (PSPC) and Canada’s nationhood is played out for national and international the Carleton Immersive Media Studio (CIMS) began a research audiences. -
District Energy Space 2019
■ North America District Energy Space 2019 Spotlighting Industry Growth 2019: More than 180 million square feet reported Over 2.5 billion square feet reported since 1990 District■ North America Energy Space 2019 Industry Growth Around the World Dedicated to the growth and utilization of district energy as a means to enhance energy efficiency, provide more sustainable, reliable and resilient energy infrastructure, and contribute to improving the global environment. The publication of District Energy Space has become an annual tradition for the International District Energy Association (IDEA) since 1990. Compilations beyond North America were initiated in 2004. This issue features a compilation of data provided by our members including the number of buildings and their area in square feet that have been committed or recommitted to district energy service in North America during calendar year 2019, or previously unreported for recent years. Each year, IDEA asks its member systems to provide information on buildings that committed or recommitted to district energy service during the previous calendar year. To qualify for consideration in District Energy Space, a renewal must be a contracted building or space that had been scheduled to expire during the calendar year and was renewed under a contract with a duration of 10 years or more. Year-to-year rollover--simple continuation of service to existing buildings is not considered renewal. Established in 1909, the International District Energy Association serves as a vital communications and information hub for the district energy industry, connecting industry professionals and advancing the technology around the world. With headquarters just outside of Boston, Mass., IDEA comprises over 2,400 district heating and cooling system executives, managers, engineers, consultants and equipment suppliers from 25 countries. -
E-Democracy and E-Government: How Will These Affect Libraries?
DOCUMENT RESUME ED 472 848 IR 058 555 AUTHOR Pare, Richard TITLE E-Democracy and E-Government: How Will These Affect Libraries? PUB DATE 2002-08-00 NOTE 7p.; In: Libraries for Life: Democracy, Diversity, Delivery. IFLA Council and General Conference: Conference Programme and Proceedings (68th, Glasgow, Scotland, August 18-24, 2002); see IR 058 549. AVAILABLE FROM For full text: http://www.ifla.org. PUB TYPE Opinion Papers (120) Speeches/Meeting Papers (150) EDRS PRICE EDRS Price MF01/PC01 Plus Postage. DESCRIPTORS *Access to Information; Electronic Libraries; Federal Government; *Federal Programs; Foreign Countries; *Government Libraries; Information Sources; *Internet; *Library Role; *Online Systems IDENTIFIERS *Canada; *Parliamentary Libraries ABSTRACT In the late 1980s, when few Canadian citizens had Internet access, federal departments and agencies in Canada were already preparing for the future by putting information and documentation online. This paper outlines several government-sponsored programs--SchoolNet, the Canadian Investment. Fund, Community Access Program, Canada Foundation for Innovation, VolNet, and the Smart Communities Program--that have ensured that Canadians, their communities, their libraries and their schools have quick access to the Internet. Discussion then moves to efforts to promote e-democracy, including Internet sites that feature a wide variety of material to keep voters informed, email addresses for voters to contact elected officials, campaigning over the Internet, and electronic voting. The paper then focuses on the impact of e-government and e-democracy on libraries, and specifically on how e-government and e-democracy are affecting the Canadian Library of Parliament. The Intraparl internal web, site, online catalogs, electronic news monitoring service (PARLMedia), the LEGISinfo research tool, and the electronic document series known as TIPS are each described briefly, followed by projections for the future. -
Building the Future Provides the Minister of Public Works and Government Services Canada with House of Commons Requirements
Building the Future provides the Minister of Public Works and Government Services Canada with House of Commons requirements for planning and implementing the long-term renovation and development of the Parliamentary Precinct. BuildingBuilding thethe FutureFuture House of Commons Requirements for the Parliamentary Precinct October 22, 1999 ii Building the Future Table of Contents Preface . v Foreword . .vii Executive Summary . ix The Foundation . 1 A. Historical Considerations . 2 B. Current and Future Considerations . 6 C. Guiding Principles . 8 Requirements for Members’ Lines of Business . 9 Chamber . .10 Committee . .14 Caucus . .24 Constituency . .28 Requirements for Administration and Precinct-wide Support Services . .33 Administration and Support Services . .34 Information Technology . .38 Security . .43 Circulation . .47 The Press Gallery . .51 The Visiting Public . .53 Requirements for Implementation . .55 A. A Management Model . .56 B. Use of Buildings . .58 C. Renovation Priorities . .59 Moving Ahead: Leaving a Legacy . .65 Appendix A: Past Planning Reports . .67 Appendix B: Bibliography . .71 Building the Future iii iv Building the Future Preface I am pleased to submit Building the Future: House of Commons Requirements for the Parliamentary Precinct to the Board of Internal Economy. The report sets out the broad objectives and specific physical requirements of the House of Commons for inclusion in the long-term renovation and development plan being prepared by Public Works and Government Services Canada. In preparing this report, the staff has carefully examined the history of the Precinct to ensure that our focus on the future benefits from the expertise and experiences of the past. Moreover, this work strongly reflects the advice of today’s Members of Parliament in the context of more recent reports, reflections and discussions since the Abbott Commission’s Report in 1976. -
Ottawa, Ontario West Block Parliament Hill HERITAGE CHARACTER
Ottawa, Ontario West Block Parliament Hill HERITAGE CHARACTER STATEMENT The West Block was built in 1859-65 to the designs of Thomas Stent and Augustus Laver, architects. New wings designed by the Department of Public Works were added in 1874-78 and 1906-09, and major interior renovations designed by Mathers & Haldenby of Toronto were carried out in 1961-65. Public Works and Government Services Canada is the custodian department. See FHBRO Building Report 86-52. Reason for Designation The West Block was designated Classified because of its exceptional importance in terms of historical associations, architectural quality and environmental impact. Designed to accommodate the civil service, the West Block is directly associated with the substantial role played by the administrative arm of the federal government during the country's formative years. Together with the 1859-65 wings of the East block, and the Library of Parliament, the West Block ranks with the best mid-19th century Gothic Revival buildings in the world. The product of three separate building campaigns, it presents an essay in the evolution of the Gothic Revival style from mid-19th century to the early 20th century. In addition to being a national landmark in its own right, the West Block plays a critical role in establishing the overall character of Parliament Hill and strongly influences the character of the west end of Wellington Street. Character Defining Elements The heritage character of the West Block resides in its picturesque massing, footprint, structural ornament, finish materials, and in surviving portions of the 19th and early 20th century interior plans, features and finishes. -
BILINGUALISM in PUBLIC SERVICE of CANADA Report of the Standing
HOUSE OF COMMONS CANADA BILINGUALISM IN PUBLIC SERVICE OF CANADA Report of the Standing Committee on Official Languages Pablo Rodriguez, M.P. Chair May 2005 The Speaker of the House hereby grants permission to reproduce this document, in whole or in part for use in schools and for other purposes such as private study, research, criticism, review or newspaper summary. Any commercial or other use or reproduction of this publication requires the express prior written authorization of the Speaker of the House of Commons. If this document contains excerpts or the full text of briefs presented to the Committee, permission to reproduce these briefs, in whole or in part, must be obtained from their authors. Also available on the Parliamentary Internet Parlementaire: http://www.parl.gc.ca Available from Communication Canada — Publishing, Ottawa, Canada K1A 0S9 BILINGUALISM IN PUBLIC SERVICE OF CANADA Report of the Standing Committee on Official Languages Pablo Rodriguez, M.P. Chair May 2005 STANDING COMMITTEE ON OFFICIAL LANGUAGES CHAIR Pablo Rodriguez, M.P. Honoré-Mercier (QC) VICE-CHAIRS Pierre Poilievre, M.P. Nepean—Carleton (ON) Yvon Godin, M.P. Acadie—Bathurst (NB) MEMBERS Guy André, M.P. Berthier—Maskinongé (QC) Stéphane Bergeron, M.P. Verchères—Les Patriotes (QC) Françoise Boivin, M.P. Gatineau (QC) Jean-Claude D’Amours, M.P. Madawaska—Restigouche (NB) Marc Godbout, M.P. Ottawa—Orléans (ON) Guy Lauzon, M.P. Stormont—Dundas—South Glengarry (ON) Andrew Scheer, M.P. Regina—Qu’Appelle (SK) Hon. Raymond Simard, M.P. Saint Boniface (MB) Maurice -
Lop Collective Agreement
COLLECTIVE AGREEMENT BETWEEN THE LIBRARY OF PARLIAMENT AND THE CANADIAN ASSOCIATION OF PROFESSIONAL EMPLOYEES ANALYSTS AND RESEARCH ASSISTANTS EXPIRY DATE June 16, 2022 LIBRARY OF PARLIAMENT PAGE i CONTENTS Page **ARTICLE 1 – PURPOSE OF AGREEMENT ............................................................................................ 1 ARTICLE 2 – INTERPRETATION AND DEFINITIONS .............................................................................. 1 ARTICLE 3 – APPLICATION ....................................................................................................................... 3 ARTICLE 4 – PRECEDENCE OF LEGISLATION AND THE COLLECTIVE AGREEMENT ...................... 4 ARTICLE 5 – MANAGERIAL RESPONSIBILITIES ..................................................................................... 4 ARTICLE 6 – RECOGNITION ..................................................................................................................... 4 ARTICLE 7 – EMPLOYEE REPRESENTATIVES ....................................................................................... 5 ARTICLE 8 – TECHNICAL CHANGE .......................................................................................................... 5 ARTICLE 9 – CHECK OFF .......................................................................................................................... 5 ARTICLE 10 - INFORMATION .................................................................................................................... 6 ARTICLE 11 – PROVISION OF BULLETIN -
Annualreport 2010-2011-E.Pdf
LIBRARY OF PARLIAMENT | ANNUAL REPORT Library Contact Information Email: [email protected] Phone: 613-995-1166 Fax: 613-992-1269 Public line: 613-992-4793 Toll-free: 1-866-599-4999 Web: www.parl.gc.ca 2010–2011 ANNUAL REPORT i Contents Message from the Parliamentary Librarian 1 Vision, Mission, Strategic Outcome 4 Overview of the Library of Parliament 7 Operating Environment for 2010–2011 10 Strategic Priorities and Key Accomplishments 13 Ongoing Operations 22 Senior Management Team 27 ii LIBRARY OF PARLIAMENT 2010–2011 ANNUAL REPORT 1 Message from the Parliamentary Librarian Being associated with one of the most impressive buildings in the country can be both a blessing and a curse. I love walking into Parliament’s Library and I still marvel at how the recent restoration has returned this 135-year- old building to its former glory. U.S. President Barack Obama described the eff ect best with one word during his February 2009 tour – “Wow.” At the same time, I recognize that this view, shared by the many visitors to Parliament each year, leaves many people with the impression that the Library of Parliament is little more than a very beautiful building , a nice piece of history with little relevance in the information age. In reality, nothing could be farther from the truth. Parliamentarians need independent, authoritative and reliable information in order to represent their constituents eff ectively and hold the Government to account. Employees at the Library are proud of our history in supporting Canadian parliamentary democracy. In the past year alone we received over 71,000 requests for reference and information. -
Augmented Reality Markerless Multi-Image Outdoor Tracking System for the Historical Buildings on Parliament Hill
sustainability Article Augmented Reality Markerless Multi-Image Outdoor Tracking System for the Historical Buildings on Parliament Hill Silvia Blanco-Pons 1,*, Berta Carrión-Ruiz 1, Michelle Duong 2, Joshua Chartrand 2, Stephen Fai 2 and José Luis Lerma 1 1 Photogrammetry & Laser Scanning Research Group (GIFLE), Department of Cartographic Engineering, Geodesy and Photogrammetry, Universitat Politècnica de València, 46022 Valencia, Spain 2 Carleton Immersive Media Studio, Carleton University, Ottawa, ON K1S 5B6, Canada * Correspondence: [email protected] Received: 31 May 2019; Accepted: 30 July 2019; Published: 7 August 2019 Abstract: Augmented Reality (AR) applications have experienced extraordinary growth recently, evolving into a well-established method for the dissemination and communication of content related to cultural heritage—including education. AR applications have been used in museums and gallery exhibitions and virtual reconstructions of historic interiors. However, the circumstances of an outdoor environment can be problematic. This paper presents a methodology to develop immersive AR applications based on the recognition of outdoor buildings. To demonstrate this methodology, a case study focused on the Parliament Buildings National Historic Site in Ottawa, Canada has been conducted. The site is currently undergoing a multiyear rehabilitation program that will make access to parts of this national monument inaccessible to the public. AR experiences, including simulated photo merging of historic and present content, are proposed as one tool that can enrich the Parliament Hill visit during the rehabilitation. Outdoor AR experiences are limited by factors, such as variable lighting (and shadows) conditions, caused by changes in the environment (objects height and orientation, obstructions, occlusions), the weather, and the time of day. -
Building Stones of Canada's Federal Parliament Buildings
Volume 28 Numbu 1 also restored the role of the geologist, with they represent. Their design and construc- the requirement to understand the tion has been the work of formative complex reactions of the building stone to architects and builders. Great pains have the environment and its neighbouring been taken to ensure that these are masonry clcments, and in the quest to significant structures, of unique design find suitable replacement stone. and beauty, using quality materials and built with exacting craftsmanship, worrhy R~UM~ of thc importance of the business that Les pierres de construction utilisk pour transpirs within thcir walls. Canada's les tdifices du Parlement h Omwa Parliament Buildings in Ottawa are no prwienncnt de nombreuses carrikres exception. autant au Canada, aux &ts-Unis que de This is the first of a series of Building Stones plusieurs pays europkns. Ells ont et4 articles about the building stones of till&, pods et sculpt& suivant des Canada's federal and provincial Parlia- of Canada's Federal procedCs precis, en conformite avec 1s ment Buildings. Historians, political Parliament Buildings r&glesde I'an de I'epoque. La rcconstruc- scientists, architects, and engineers have tion de I'Cdifice du centre qui est le sujet written at length about the buildings and D.E. Lawxnce du prCsent article, a ttt une &rc qui tbcir varied histories. Geologists, for the Geological Survey of Cad s'est Ctirk Ctant donnt les prioritCs lors de most part, have been silent. It is expected GO1 Booth Smrt la Grande Guerrc de 1914-1918. Ces that this series will be written by a Ottawa, Ontario KIA OE8 pierres de revetement des edifices du number of geologists, and may cover all [email protected] Parlement ont subi les avanies du climat, provinces and territories to document the du feu, de tremblements de terre et de la stories of the stones themselves. -
Parliament Hill | Ottawa, Ontario
Experience. CASE STUDY Innovation. Parliament Hill | Ottawa, Ontario Balancing Technology with Photo: ManikMati Photography Historical Integrity The renovation of Parliament Hill’s West Block was an $863 million project that fi nally wrapped up in fall 2018, uniting the charm of a Victorian Gothic structure that was completed in 1865 with the technological advancements of 21st-century construction. During the renovations, architects looked at every conceivable angle to modernize the facility while also maintaining the building’s historical integrity. “The West Block was last renovated over 50 years ago,’’ said Georges Drolet, a partner in EVOQ and an architectural historian. The fi rm formed a joint ventured partnership in 1995 with Architecture 49 to plan and design the West Block Rehabilitation Project. “In that time span, all the expectations and standards of operating and working in a parliamentary offi ce building changed, from security concerns to Photo: Heather + Little communications networks, energy effi ciency targets, hazardous materials management, universal accessibility standards, broadcasting and public engagement programs and so on.” One of the most fascinating and unique projects in the overhaul of West Block was a complete roof overhaul. A striking, self-supporting, curved glass roof stands overtop the central courtyard, which will serve as the temporary home for the House of Commons. The project by Seele included 2,485 square meters of triple- Perhaps the most essential glazed glass, 938 tons of steelwork for roof and tree columns, task for architects and 2,554 square meters of laylight glazing under the roof, and engineers in the renovation 1,813 square feet of open-grid fl ooring for a service catwalk at was overhauling the the roof level.