Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New , S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY

Proposal No: SIA/PB/NCP/34917/2019

S.No. Detail of the Document Submitted Reply /Not Submitted/ Not applicable 1. Proof of ownership of land Submitted. But the list submitted Khasra Nos. of the plot along with ownership is not readable and proper list is to details is attached as Annexure 13. Khasra AREA Ownership be submitted. Nos (in acres ) belongs to of Plot

2. The project proponent is required to To be submitted. Copy of the presentation will be submitted submit the following: separately. A copy of presentation in pdf format converted from PPT format 3. TOR processing fee ( 25% remaining Built-up area = 8,53,320.49 sq.m. TOR processing fees i.e. Rs 2,13,330/- in the 75% at the time of EC) ha. 25% of the fee= Rs 2,13,330/- form of demand draft vide No. 040438 dated 07.09.2019 in the favor of Executive Director, Punjab State Council for Science and Technology is enclosed with the application.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant)

2 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY

Proposal No: SIA/PB/NCP/34917/2019

S.No. Detail of the Document Observation during Reply Scrutiny 1. Cost of the project duly certified by approved Not submitted Cost of the project duly certified by Chartered Accountant is valuers and Chartered Accountant enclosed as Annexure 5. According to which estimated cost of project is Rs.914.20 crores and Rs. 514.29 crores have been spent on the project till date. 2. Whether the project is in critical polluted area or Not submitted The project is located at Villages Mullanpur Garibdas, not notified by MoEF&CC. Dhanauran & Mastgarh, New Chandigarh, Mohali, S.A.S Nagar, Punjab which is not falling under any critically polluted area or not notified by MoEF&CC. 3. Various documents to be submitted along with Patiali Rao reserved 1. No. There is no diversion of forest land for the proposed the TOR are listed as under: forest 3 km; Sukhna project. i) Is the project involves diversion of forest Wildlife Sanctuary 5.6 2. Project is not covered under PLPA 1900, However NOC land. If yes, km; City Bird Sanctuary has been obtained from DFO, S.A.S Nagar. Copy of the (a) Extent of the forest land. 6.8 km whereas NOC is enclosed as Annexure 3. (b) Status of the forest clearance requirement is 10 Km. 3. (a) Sukhna Wildlife Sanctuary: 5.6 km (c) In case, project involves diversion of As such, application City Bird Sanctuary: 6.8 km forest land then the project proponent filed to NBWL for (b) Application has been submitted to for obtaining will file an application before the obtaining NOC to be wildlife clearance; application is in process. Copy of concerned DFO obtaining forest filed. Clarify all the application is enclosed as Annexure 12. clearance under Forest (Conservation) points? Act, 198 and submit acknowledgement along-with copy of application submitted to concerned DFO ii) (a) Is the project covered under PLPA, 1900, if No but located near to PLPA area then the project proponent is required to submit NOC from the concerned DFO to the effect that project area does not fall under the provision of PLPA Act, 1900. (b) Is the project covered under PLPA, 1900, if yes then Status of the NOC w.r.t PLPA, 1900.

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 3 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY

iii) If the project falls within 10 km of eco- sensitive area. If yes, (a) Name of eco-sensitive area and distance from the project site. (b) Status of clearance from National Board for Wild Life (NBWL). (c) The project proponent is required to submit either documentary proof to the effect that Wildlife Sanctuary is more than 10 kms from the project site or in case, the same is within 10 kms radius then, the project proponent will file an application before the concerned DFO, Wildlife for obtaining NBWL permission and submit acknowledgement along-with copy of application submitted to concerned DFO Wildlife for obtaining permission from NBWL 4. Properly filled Form 1 and basic information As per column no. 1.15 During Construction phase, mode of disposal will be mode of disposal is through mobile STP of 10 KLD. septic tank followed by Earlier, CLU was obtained for 131.56 acres, out of soak pits. PPCB does which net planned area was 118.04 acres which is less not allow soak than 50 Ha for which EC is not applicable. Based on pits. Clarify? which, Consent to Establish was obtained and Further as per details, the project proponent construction was started on few plots by individual plot has already crossed the owners. As net planned area of the project is 139.20 acres 50 ha clause of 8(b) (56.33 ha); thus, EC applicable has been filed for. when the CLU has been obtained for 131 acres. Clarify why the project shall not be considered as violating case under the provisions of EIA

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 4 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY

Notification, 2006. Submit proper evidence in reply to the query. 5. Submit a copy of the Master plan duly marked Submitted. But project Coordinates of all the corners of the project location are: with project site. site with all corners not A: 30.464307 N & 76.435618 E marked on B: 30.470816 N & 76.435250 E C: 30.474981 N & 76.447546 E D: 30.475319 N & 76.445784 E E: 30.470424 N & 76.452656 E Layout plan showing the same is enclosed as Annexure 9. 6. Proof of ownership of land Submitted. But please Khasra Nos. of the plot along with ownership is attached clarify the following: as Annexure 13. Khasra Nos AREA Ownership of Plot (in acres ) belongs to

7. The project proponent is required to submit the To be submitted. (i) Synopsis of project as attached as Annexure A following:- (ii) Agreed (i) Synopsis of the project (Annexure-A) in (iii) NOC has been obtained from CGWA for ground water pdf file converted from MS word format abstraction. Copy of the NOC is attached as Annexure (ii) A copy of presentation in pdf format 14. converted from PPT format (iv) Yes, provision of module system shall be kept during (iii) Whether online application for obtaining installation of STP. NOC for abstraction of ground water has (v) Sewer lines have not been laid till the project by been applied CGWA? GMADA. (iv) Whether provision of module system shall be kept during installation of STP? (v) What is the status of laying of sewer pipe lines?

Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 5 Annexure-A

S.No. Item Details 1. Online Proposal No. 2. Name and Location of the Mega Residential Project “The Palm” located at Villages project Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh, Mohali, S.A.S Nagar, Punjab by M/s Manohar Infrastructure & Constructions Pvt. Ltd. 3. Latitude & Longitude Corners coordinates A: 30.464307 N & 76.435618 E B: 30.470816 N & 76.435250 E C: 30.474981 N & 76.447546 E D: 30.475319 N & 76.445784 E E: 30.470424 N & 76.452656 E 4. Project/activity covered under The project falls under S.No. 8(b) - ‘Township and Area item of scheduled to the EIA Development’ Notification, 14.09.2006 5. Whether the project is in No. critical polluted area or not.

6. If the project involves No. Project does not involve any diversion of forest land. diversion of forest land. If yes, a. Extent of the forest land. b. Status of the forest clearance.

7. a. Is the p ro jec t covered Project is not covered under PLPA 1900. However NOC under PLPA, 1900, if No has been obtained from DFO, S.A.S Nagar for complete but located near to PLPA project. Copy of the NOC is enclosed as Annexure 3. area then the project proponent is required to submit NOC from the concerned DFO to the effect that project area does not fall under the provision of PLPA Act, 1900.

b. Is the project covered under PLPA,1900, if yes then Status

of the NOC w.r.t PLPA,1900.

8. If the project falls within 10 km Sukhna Wildlife Sanctuary and City Bird Sanctuary are of eco-sensitive area/ National located at distance of 5.6 km and 6.8 km from the park/Wild Life Sanctuary. If project location and application has been submitted to yes, NBWL. Complete application is enclosed as Annexure a. Name of eco-sensitive area/ 12. National park/Wild Life Sanctuary and distance from the project site. b. Status of clearance from National Board for Wild Life (NBWL).

9. Classification/Land Residential as per Master plan of Mullanpur. Master plan use pattern as per showing project location is enclosed as Annexure 10. Master Plan 10. Cost of the project Rs. 914.20 Crores

11. Total Plot area, Built- up FOR NEW PROJECTS: Area and Green The details of project is as under: area S.No. Description Area 1. Plot area 6,11,439.536 m2 (Total scheme area) (or 151.09 acres) 2. Built-up area 8,53,320.49 m2 3. Green area 34,034.0625 m2

12. Population (when fully Estimated population: 21,200 Persons. operational) 13. Water Requirements & 20 KLD of water will be required during construction source in Construction Phase phase which will be met by Private water tankers.

14. Break up of Water Requirements & source in Operation Phase (Summer, Rainy, Winter): S. Season Fresh water Reuse water Total No Domestic Others Flushing Green HVAC (KLD) . (KLD) (KLD) (KLD) area (KLD) (KLD) 1. Summer 1847 - 924 187 - 2958 2. Winter 1847 - 924 61 - 2832 3. Rainy 1847 - 924 17 - 2788

S.No. Description Source of water 1. Domestic Ground water 2. Others (Pl define) - 3. Flushing purposes Treated waste water 4. Green area Treated waste water 5. HVAC -

15. Treatment & Disposal Mobile STP of capacity 10 KLD arrangements of waste water in Construction Phase Treated water from mobile STP will be 8 KLD out of which 3 KLD will be used for dust suppression and 5 KLD will be used for green area of 506 m2. 16. Disposal Arrangement of Total wastewater generation will be 2,598 KLD which will Waste water in Operation be treated in proposed STP of 3 MLD based on MBBR Phase technology to be installed within project premises.

Season Flushing Green area MC Sewer (KLD) (KLD) (KLD) Summer 924 187 1243 Winter 924 61 1369 Monsoon 924 17 1137

17. Rain water recharging 144,250,920 m3/year rain water will be collected in detail 132 no. of recharging pits which will be provided to recharge the rooftop rainwater of buildings after treatment through oil & Grease traps. 18. Solid waste generation and its a) 8279 kg/day disposal b) Solid wastes will be appropriately segregated (at source. by providing bins) into recyclable, Bio-degradable Components, and non-bio- 18. Solid waste generation and its a) 8279 kg/day disposal b) Solid wastes will be appropriately segregated (at source by providing bins) into recyclable, Bio-degradable Components, and non-bio- degradable. c) 3725 Kg/day Bio-degradable will be processed by Mechanical composters. d) 4387 Kg/day recyclable waste will be sold to authorized recyclers e) Inert waste will be dumped to designated dumping site

19. Hazardous Waste & E- Waste Used oil from DG sets will be sold to registered recyclers and E-waste will be disposed off as per the E-waste (Management) Amendment Rules 2018.

20. Energy Requirements a) 11,888 KW from PSPCL. & Saving b) 2 x 62.5 KVA (silent DG sets) Energy Saving measures: a) LEDs will be used in place of CFL b) Solar lights will be used for lighting the streets

21. Environment Management During construction phase, 200 lakhs will be Plan along with Budgetary responsible and during operation phase, 15 lakhs will break up phase wise be responsible for implementation of the EMP. and responsibility to implement Description Capital Recurring Monitoring of cost cost Air, Noise, (lakhs) (lakhs) water (per annum) Rs. Construction 200 5 1 Operation - 15 2

22. CER activities along with budgetary break up and responsibility to implement Mr. Tarinder singh will be responsible for implementation of the CSR activities. The estimated cost of project is Rs. 914.20 Crores out of which Rs. 514.29 Crores have been incurred till 31.03.2019. Thus, Rs. 2 Crore (@ 0.50 % of remaining cost i.e. Rs. 399.91) is required for C.E.R activities as per Office Memorandum vide F. No. 22-65/ 2017-IA.III dated 01.05.2018. However, Rs. 1 Crore has been spent on CSR. The following activities have been proposed to be covered under CER S.No. CER Activities Fund Time schedule allocated Start Completed (Lakhs) 1. Maintenance of School Building, Construction of 85 After Grant 7 Years Toilets and Installation of RO system at Govt. Senior of EC Secondary School, Mullanpur Garibdass. 2. Adoption of pond in Village Mastgarh 30 After Grant 7 Years of EC 3. Installation of solar lights in Villages of Mastgarh and 15 After Grant 7 Years Mullanpur Garibdass of EC 4. Health Facilities like provision of ambulance, wheel 50 After Grant 7 Years chairs and health checkup camps in nearby villages of EC 5. Promoting tree plantation & maintenance in nearby 20 After Grant 7 Years surrounding areas of EC Total 200

Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

Application for Environmental Clearance Form – I (I) Basic Information: S. Item No. Details No. 1 Name of the Project/s Mega Residential Project “The Palm” located at Villages Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh, Mohali, S.A.S Nagar, Punjab by M/s Manohar Infrastructure & Constructions Pvt. Ltd. 2 S. No. in the schedule The project falls under S.No. 8(b) - „Township and Area Development‟ 3 Proposed capacity / area / length/ Total scheme area : 151.09 Acres tonnage to be handled / command area Net planned Area : 139.20 Acres / lease area / number of wells to drilled Built-up Area = 8,53,320.49 sq.m. The following documents are enclosed: Annexure-1: Change in Land use Annexure-2: Consent to Establish from PPCB Annexure-3: Forest NOC Annexure-4: Board of Resolution Annexure-5: CA Certificate Annexure-6: MOA & AOA Annexure-7: Google Image showing project location Annexure-8: Contour plan Annexure-9: Layout plan Annexure-10:Master plan of Mullanpur showing project loaction Annexure-11: Consultant Accrediation Certificate Annexure-12: NBWL application Annexure-13: Revised Khasra Nos. Details Annexure-14: NOC from CGWA 4 New / Expansion / Modernization New 5 Existing capacity / Area etc Not Applicable

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

24 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

6 Category of the project „ A‟, „B‟ , „C‟ Category „B1‟ 7 Does it attract the general conditions? No If Yes, Please Specify. 8 Does it attract the specific conditions? No If Yes, Please Specify 9 Location Topographic sheet showing location of the project site is enclosed with the application. Plot/ Survey/Khasra No. Khasra nos. 15/2, 17/1, etc. Village Mullanpur Garibdas, Dhanauran & Mastgarh Tehsil S.A.S Nagar State Punjab 10. Nearest railway station / Airport along Kharar Railway Station: 12 km (SW); with Distance in kilometers. Chandigarh Railway Station: 12.5 km (SE); Chandigarh International Airport: 13.5 km (SE). 11 Nearest town/District headquarters The project lies within Mohali. along with distance in kilometers District Headquaters: SAS Nagar 12 Village Panchayat, Zilla Parishads, Municipal Corporation SAS Nagar, Municipal corporation, local Bodies Sector-68, Mohali. (Complete Postal address with Contact No. : 5044907,5044910 telephone No. to be given) Fax No. : 5044913 E-Mail : [email protected] 13 Name of the applicant Mr. Dhanwant Singh Sidhu (Authorized Signatory) Board of resolution for authorization is enclosed as Annexure 4. 14 Registered address M/s Manohar Infrastructure & Constructions Pvt. Ltd. Manohar Campus, SCO No. 139-141, Sector 17-C, Chandigarh 15 Address for correspondence : M/s Manohar Infrastructure & Constructions Pvt. Ltd. Manohar Campus, SCO No. 139-141, Sector 17-C,

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

25 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

Chandigarh Name : Mr. Dhanwant Singh Sidhu Designation (owner / Partner / CEO) Authorized Signatory Address M/s Manohar Infrastructure & Constructions Pvt. Ltd. Manohar Campus, SCO No. 139-141, Sector 17-C, Chandigarh Pin Code 160017 E- Mail [email protected] Telephone No. 9216497333 Fax No. - 16 Details of alternative Sites examined, No if any. Location of these sites should be shown on the topo Sheets. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If Yes, date of submission. Not Applicable 20 If No, reason Not Applicable 21 Whether the Proposal involves NOC from Forest department is attached as Annexure 3. approval / Clearance under : If Yes, details of the same and their to be given . (a) The Forest Conservation, Act,1980 (b) The wild life Protection Act, 1972 (c) The C.R.Z Notification, 1991. 22 Either their is any government Order / No. policy relevant / relating to the site? 23. Forest land Involved (hectare) No

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

26 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

24. Whether there is any litigation No. There is no litigation pending against the project. pending against the project and /or land in which the Projects is proposed to be set up? (a) Name of the court (b) Case no. (c) Orders / Directions of the Courts , if any and its relevance with the Project.

(II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes The earlier land was agriculture land. CLU use, land cover or topography including was obtained for 131.55 acres of land and increase in intensity of land use (with later on, additional CLU of 60.909 acres has respect to local land use plan) been obtained. Copy of all CLU documents is enclosed as Annexure 1. 1.2 Clearance of existing land, vegetation and Yes The development of project requires buildings? clearance of existing land & vegetation. 1.3 Creation of new land uses? No The land use is changed but the project is in residential zone as per Master plan of Mullanpur. However permission for change of Land use has already been obtained. Copy is attached as Annexure 1. Master plan showing location of project is enclosed as Annexure 10.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

27 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

1.4 Pre-construction investigations e.g. bore Yes Pre-construction investigations have houses, soil testing? already been done. 1.5 Construction works? Yes The construction of the project shall be as per approved layout plan and details of the same are mentioned in Conceptual Plan. Copy of layout plan is enclosed as Annexure 9. 1.6 Demolition works? No No Demolition work will be carried out. 1.7 Temporary sites used for construction Yes All the construction activity including works or housing of construction stocking of raw materials will be confined workers? within the project only. Sanitation facilities shall be provided for the workers within the project only. 1.8 Above ground buildings, structures or Yes Excavation will be carried out for the earthworks including linear structures, cut laying of the services such as plumbing, and fill or excavations roads, etc. Soil excavated will be stored within the project & will be used for filling as well as landscaping. 1.9 Underground works including mining or No No underground works including mining or tunneling? tunneling is required except excavation of earth. 1.10 Reclamation works? No No reclamation work is required. 1.11 Dredging? No No dredging is required. 1.12 Offshore structures? No No offshore structure is required. 1.13 Production and manufacturing processes? No No production and manufacturing process is involved as project is a township project. 1.14 Facilities for storage of goods or Yes Raw materials will be stored at site in a materials? covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

28 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

1.15 Facilities for treatment or disposal of solid Yes Solid waste waste or liquid effluents? Construction phase Construction activities will cause generation of debris, brick bats, plaster falls, battered stone mixture, aggregate leftovers, sand leftovers, empty cement bags, cartons, etc. Most of the construction waste generated will be reused in road construction and filling.

Operation phase Solid waste of about 8,279 (@ 0.40 kg/capita/day for residential and @ 0.2 kg/capita/day for commercial) will be generated from project at full occupancy. A separate area is earmarked for segregation of solid waste. Biodegradable waste will be composted by use of Mechanical Composters. Inert waste will be dumped to authorized dumping site. All the solid waste generated during construction and operational phase will be treated and disposed off as per MSW (Management & Handling) Rules, 2000 and its amendments. Liquid effluent: Construction phase During construction phase, Mobile STP of capacity 10 KLD will be provided for treatment. Operational phase

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

29 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

2,598 KLD of sewage will be generated from the project at full occupancy which will be treated in proposed STP of 3 MLD capacity. Treated water will be reutilized within premises for flushing and horticulture demand and remaining will be discharged into GMADA sewer. 1.16 Facilities for long term housing of No Local labourers will be hired from nearby operational workers? areas during construction phase for the expansion. Therefore, there is no need to create permanent facilities for long term housing of operational workers. 1.17 New road, rail or sea traffic during Yes The site has good connectivity to sector construction or operation? roads by road network. Internal roads & paths will be developed for vehicular movement. During operation, the gestation period for occupation will be 5-8 years. The vehicles such as four/two wheelers shall be used by the occupants. 1.18 New road, rail, air waterborne or other No No new infrastructure for this purpose shall transport infrastructure including new or be required. The site has well connected altered routes and stations, ports, airports roads. Only internal roads to be etc constructed. 1.19 Closure or diversion of existing transport No There is no need of diversion of existing routes or infrastructure leading to changes transport routes. in traffic movements? 1.20 New or diverted transmission lines or No There are no new or diverted transmission pipelines? lines. 1.21 Impoundment, damming, culverting, No No Impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

30 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

hydrology of watercourses or aquifers? hydrology of watercourses or aquifers is proposed. 1.22 Stream crossings? No There is no stream running across the site. 1.23 Abstraction or transfers of water form Yes Construction phase ground or surface waters? Water required during the construction period is being supplied through private water tanker.

Operation phase During operation phase, total domestic water requirement at full occupancy will be 2,771 KLD which will be supplied from borewells. Ground water recharging will be done so as to compensate the abstraction of ground water. 1.24 Changes in water bodies or the land No Run off will increase due to increased surface affecting drainage or run-off? paved surface. However, increased run off is being managed by well designed rain water recharging system and storm water management plan. 1.25 Transport of personnel or materials for Yes During construction phase, movement of construction, operation or 15-20 vehicles shall be there. decommissioning? During operation phase, Individual plot owners will be responsible for the provision of parking within their plot itself. Apart from it, 383 ECS parking is proposed in commercial. 1.26 Long-term dismantling or No No long-term dismantling or decommissioning or restoration works? decommissioning or restoration work is involved. 1.27 Ongoing activity during decommissioning No Not Applicable

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

31 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

which could have an impact on the environment? 1.28 Influx of people to an area in either No Local laborers from nearby area will be temporarily or permanently? employed during the construction phase. In the operation phase, most of the expected occupants will be from the surrounding areas. Hence, the project will lead to a redistribution of occupants within the city. Thus, no significant influx of people is envisaged. 1.29 Introduction of alien species? No The landscaping is being carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions. 1.30 Loss of native species or genetic No There will be no significant impact on the diversity? loss of native species or genetic diversity. 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S.No Yes/ Information/Checklist confirmation quantities /rates, wherever possible) with . No source of information data 2.1 Land especially undeveloped or No The earlier land was agriculture land. Earlier agricultural land (ha) CLU was obtained for 131.55 acres of land and later on, additional CLU of 60.909 acres has been obtained. Copy of all CLU documents is enclosed as Annexure 1. 2.2 Water (expected source & competing Yes During operation phase, water supply will users) unit: KLD be provided from bore wells. The total domestic water requirement will be 2,771

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

32 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

KLD. Fresh water requirement will be 1,847 KLD. 2.3 Minerals (MT) Yes Minerals such as sand & aggregates will be required during the construction phase. 2.4 Construction material – stone, aggregates, Yes These materials shall be procured from sand/s oil (expected source – MT) authorized outlets in and around Chandigarh. 2.5 Forests and timber (source – MT) Yes The Project involves minimum use of timber during construction purpose. All material required for shuttering purpose shall be that of mild steel. At the most chowkets may be of wood. 2.6 Energy including electricity and fuels Yes Total Power requirement for the project (source, competing users) Unit: fuel (MT), wiill be approx. 11888 KW which shall be energy (MW) provided by Punjab State Power Corporation Limited. Total 2 DG sets of 62.5 KVA capacity each will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist confirmation Yes/ Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No The project will not use any hazardous

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

33 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

hazardous (as per MSIHC rules) to human substances/ chemicals except used Oil from health or the environment (flora, fauna, DG set (Hazardous Waste category 5.1). and water supplies) The same shall be stored in HDPE tanks and will be sold to the authorized recyclers in the region. It shall be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet. 3.2 Changes in occurrence of disease or affect No Suitable drainage and waste management disease vectors (e.g. insect or water borne measures are being adopted in the diseases) construction phase such that there is no stagnation of water or accumulation of waste. This effectively restricts the reproduction and growth of disease vectors. 3.3 Affect the welfare of people e.g. by Yes The project shall provide improved living changing living conditions? facility to local people. It is also providing employment during construction period as well as later in activities like security, operation and maintenance of pollution control equipments, landscaping etc. 3.4 Vulnerable groups of people who could be No Impacts of this type are not expected. affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other cause No Not Applicable 4. Production of Solid Wastes during construction or operation or decommissioning (MT/month) S.No Information/Checklist confirmation Yes/ Details thereof (with approximate . No quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not much spoil, overburden or mine wastes will be generated. 4.2 Municipal waste (domestic and or Yes Construction phase commercial wastes) Construction activities causes generation of

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

34 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

debris, brick bats, plaster falls, battered stone mixture, aggregate leftovers, sand leftovers, empty cement bags, cartons, etc. Most of the construction waste generated will be reused in road construction and filling. Operation phase Solid waste of about 8,279 kg/day (@ 0.4 kg/capita/day for residential and @ 0.2 kg/capita/day for commercial) will be generated at full occupancy. A separate area has been earmarked for segregation of solid waste. Biodegradable waste will be composted by use of Mechanical Composters of size 1000 kg (4 no‟s). Inert waste will be dumped to authorized dumping site. All the solid waste generated during construction and operational phase will be treated and disposed off as per MSW (Management & Handling) Rules, 2000 and Amended Rules, 2016. 4.3 Hazardous wastes (as per Hazardous Yes The only hazardous waste in the project will Waste Management Rules) be used/spent oil from standby DG set, which is classified as Hazardous waste Category 5.1 as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. The spent oil will be carefully stored in HDPE drums under isolated storages and will be sold to authorized vendors. 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from Yes Sludge will be generated from proposed effluent treatment STP to be installed within the project premises. 4.7 Construction or demolition wastes Yes The construction waste consists of excess earth & construction debris along with cement bags, steel in bits & pieces, including insulating & packaging materials, etc. Recyclable waste construction materials

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

35 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms. 4.8 Redundant machinery or equipment No Redundant machinery will not be generated.

4.9 Contaminated soils or other materials No Contaminated soils or other materials will not be generated. 4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist confirmation Yes/ Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels Yes The unit shall install 2 DG sets of capacity from stationary or mobile sources 62.5 KVA each which shall run on HSD. These are to be used only as Standby & shall comply with emission limits as given in G.S.R. 520(E), EPA Rules 2003 at the manufacturing stage itself. DG sets shall be procured from agencies complying the noise emission standards at manufacturing stage itself as per G.S.R. 371(E), The Environment (Protection) second Amendment Rules, 2002. 5.2 Emissions from production processes No No production processes involved. Hence, there will be no such emissions. 5.3 Emissions from materials handling No Not Applicable including storage or transport 5.4 Emissions from construction activities Yes This will be restricted to the construction including plant and equipment phase and the construction site only.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

36 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

5.5 Dust or odours from handling of materials Yes The construction material involved shall not including construction materials, sewage provide any odour. A green belt is further and waste proposed along the boundary with internal parks and lawns and solid waste segregation area to mitigate crossover of odours, if any. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. 5.6 Emissions from incineration of waste No No incineration of waste is proposed.

5.7 Emissions from burning of waste in open No Not Applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, Yes The project shall install 2 DG sets of ventilation plant, crushers capacity 62.5 KVA each for standby use during operational phase. The DG sets shall be with in-built acoustic enclosure as approved by CPCB and conforming to MoEF Notification, GSR 371 (E). 6.2 From industrial or similar processes No Not Applicable. 6.3 From construction or demolition No Normal construction will be there without using any heavy machinery. No construction at night shall be there. No demolition is involved. 6.4 From blasting or piling No Not Applicable.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

37 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt and PUC vehicle will be only operated. 6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage No The used oil from DG sets will be carefully of hazardous materials stored in HDPE drums at isolated storage and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. 7.2 From discharge of sewage or other Yes About 2,598 KLD of sewage shall be effluents to water or the land (expected generated from the project after full mode and place of discharge) occupancy which will be treated in proposed STP of capacity 3 MLD to be installed within project based on MBBR technology. Treated water shall be recycled for the purpose of irrigation and flushing in toilets within the project. The remaining

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

38 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

treated wastewater will be disposed off to GMADA sewer. 7.3 By deposition of pollutants emitted to air No The DG sets will be provided with stacks into the land or into water of adequate height. Hence, dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location. 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build up of No Not Applicable pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc Yes To deal with any fire related accident, from storage, handling, use or firefighting facility will be provided within production of hazardous substances the project. 8.2 From any other causes No The project shall comply with the requirement of National Building Code towards Fire Safety. 8.3 Could the project be affected by natural Yes All building to be constructed within the disasters causing environmental damage project will be designed against (e.g. floods, earthquakes, landslides, Earthquakes for Zone-IV requirements as cloudburst etc)? laid down in NBC.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

39 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities /rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Yes The project is upcoming residential project utilities, ancillary development or that will provide high end facilities to the development stimulated by the project population and isn‟t likely to impact the which could have impact on the environment adversely in any manner. The environment e.g.: related impacts are discussed. There shall •Supporting infrastructure (roads, not be any further consequential cumulative power supply, waste or waste water impacts. treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No Not Anticipated. could have an impact on the environment 9.3 Set a precedent for later developments Yes The project will provide good infrastructure and better life style and will set an example for later developments in the areas. 9.4 Have cumulative effects due to No Not Applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

40 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

S.No. Areas Name/ Aerial distance (within Identity 15 km) Proposed project location boundary 1 Areas protected under international Sukhna Wildlife Approx. 5.6 km (NE) conventions, national or local legislation for Sanctuary their ecological, landscape, cultural or other related value City Bird Approx. 6.8 km (E) Sanctuary 2 Areas which are important or sensitive for Sukhna Lake Approx. 8 km (SE) ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, Patiali Rao Approx. 3 km (SE) mountains, forests reserved forest 3 Areas used by protected, important or sensitive Patiali Rao Approx. 3 km (SE) species of flora or fauna for breeding, nesting, reserved forest foraging, resting, over wintering, migration Sukhna Wildlife Approx. 5.6 km (NE) Sanctuary

City Bird Approx. 6.8 km (E) Sanctuary 4 Inland, coastal, marine or underground waters No None 5 State, National boundaries Chandigarh- Approx. 2.5 km (SE) Punjab boundary

Haryana-Punjab Approx. 9 km (NE) boundary 6 Routes or facilities used by the public for - Approx. 1 km (E) access to recreation or other tourist, pilgrim Chandigarh Road areas 7 Defense installations CRPF 13 BN HQ Approx. 8 km (S) 8 Densely populated or built-up area Mullanpur Approx. 1 km (NE)

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

41 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

9 Areas occupied by sensitive man-made land Chandigarh Approx. 5 km (SE) uses (hospitals, schools, places of worship, College of Architecture, community facilities) Chandigarh Punjab University, Approx. 4 km (SE) Chandigarh

Max Super specialty Approx. 6 km (SW) Hospital, Mohali

Approx. 5.0 km (SE) PGI, Chandigarh

Gurudwara Pind, Approx. 0.7 km (S) Mastgarh

Gurudwara Approx.1 km (NW) Ratwara Sahib

10 Areas containing important, high quality or Sukhna Lake Approx. 8 km (SE) scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or None The area is not subjected environmental damage. (those where existing to any environmental legal environmental standards are exceeded) damage. 12 Areas susceptible to natural hazard which could Earthquakes The site falls under the cause the project to present environmental zone IV as per the problems (earthquakes, subsidence, landslides, Seismic Zone Map of erosion, flooding or extreme or adverse and is thus prone to climatic conditions) high damage risk zone. Adequate measures will

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

42 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

be taken during the construction of the project.

(IV) Terms of Reference: Proposed TOR points are given below:

1. Examine details of land use as per Master Plan and land use around 10 km radius of the project site. Analysis should be made based on latest satellite imagery for land use with raw images. Check on flood plain of any river. 2. Submit details of environmentally sensitive places, land acquisition status, rehabilitation of communities/villages and present status of such activities. 3. Examine baseline environmental quality along with projected incremental load due to the project. 4. Environmental data to be considered in relation to the project development would be (a) land, (b) groundwater, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economic and health. 5. Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Any obstruction of the same by the project 6. Submit the details of the trees to be felled for the project. 7. Submit the present land use and permission required for any conversion such as forest, agriculture etc. 8. Submit Roles and responsibility of the developer etc. for compliance of environmental regulations under the provisions of EP Act. 9. Ground water classification as per the Central Ground Water Authority. 10. Examine the details of Source of water, water requirement, use of treated waste water and prepare a water balance chart. 11. Rain water harvesting proposals should be made with due safeguards for ground water quality. Maximize recycling of water and utilization of rain water. Examine details. 12. Examine soil characteristics and depth of ground water table for rainwater harvesting. 13. Examine details of solid waste generation treatment and its disposal. 14. Examine and submit details of use of solar energy and alternative source of energy to reduce the fossil energy consumption. Energy conservation and energy efficiency. 15. DG sets are likely to be used during construction and operational phase of the project. Emissions from DG sets must be taken into consideration while estimating the impacts on air environment. Examine and submit details. 16. Examine road/rail connectivity to the project site and impact on the traffic due to the proposed project. Present and future traffic and transport facilities for the region should be analyzed with measures for preventing traffic congestion and providing faster trouble free system to reach different destinations in the city.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

43 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I

17. A detailed traffic and transportation study should be made for existing and projected passenger and cargo traffic. 18. Examine the details of transport of materials for construction which should include source and availability. 19. Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan with cost and parameters. 20. Submit details of a comprehensive Disaster Management Plan including emergency evacuation during natural and man-made disaster. 21. Details of litigation pending against the project, if any, with direction /order passed by any Court of Law against the Project should be given. 22. The cost of the Project (capital cost and recurring cost) as well as the cost towards implementation of EMP should be clearly spelt out.

I hereby give the Undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief, I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 21.09.2019 Place: Mohali

Signature of the applicant Mr. Dhanwant Singh Sidhu M/s Manohar Infrastructure & Constructions Pvt. Ltd. Manohar Campus, SCO No. 139-141, Sector 17-C, Chandigarh

NOTE: 1. The project involving clearance under Coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendation of the state coastal zone Management Authority (at the stage of EC). Simultaneous action shall

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

44 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali,S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd Form I also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The project to be located within 10 km of the National parks, Sanctuaries, Biophere Reserves, Migratory Corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project location and the recommendation or comments of the Chief wildlife warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

Eco Laboratories & Consultants Pvt. Ltd. Format No. EL\EIA\F-5.3\10 Dated 15.01.2019 (QCI-NABET Approved EIA Consultant)

45