SIA/PB/NCP/34917/2019 S.No. Detail of The
Total Page:16
File Type:pdf, Size:1020Kb
Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY Proposal No: SIA/PB/NCP/34917/2019 S.No. Detail of the Document Submitted Reply /Not Submitted/ Not applicable 1. Proof of ownership of land Submitted. But the list submitted Khasra Nos. of the plot along with ownership is not readable and proper list is to details is attached as Annexure 13. Khasra AREA Ownership be submitted. Nos (in acres ) belongs to of Plot 2. The project proponent is required to To be submitted. Copy of the presentation will be submitted submit the following: separately. A copy of presentation in pdf format converted from PPT format 3. TOR processing fee ( 25% remaining Built-up area = 8,53,320.49 sq.m. TOR processing fees i.e. Rs 2,13,330/- in the 75% at the time of EC) ha. 25% of the fee= Rs 2,13,330/- form of demand draft vide No. 040438 dated 07.09.2019 in the favor of Executive Director, Punjab State Council for Science and Technology is enclosed with the application. Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 2 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY Proposal No: SIA/PB/NCP/34917/2019 S.No. Detail of the Document Observation during Reply Scrutiny 1. Cost of the project duly certified by approved Not submitted Cost of the project duly certified by Chartered Accountant is valuers and Chartered Accountant enclosed as Annexure 5. According to which estimated cost of project is Rs.914.20 crores and Rs. 514.29 crores have been spent on the project till date. 2. Whether the project is in critical polluted area or Not submitted The project is located at Villages Mullanpur Garibdas, not notified by MoEF&CC. Dhanauran & Mastgarh, New Chandigarh, Mohali, S.A.S Nagar, Punjab which is not falling under any critically polluted area or not notified by MoEF&CC. 3. Various documents to be submitted along with Patiali Rao reserved 1. No. There is no diversion of forest land for the proposed the TOR are listed as under: forest 3 km; Sukhna project. i) Is the project involves diversion of forest Wildlife Sanctuary 5.6 2. Project is not covered under PLPA 1900, However NOC land. If yes, km; City Bird Sanctuary has been obtained from DFO, S.A.S Nagar. Copy of the (a) Extent of the forest land. 6.8 km whereas NOC is enclosed as Annexure 3. (b) Status of the forest clearance requirement is 10 Km. 3. (a) Sukhna Wildlife Sanctuary: 5.6 km (c) In case, project involves diversion of As such, application City Bird Sanctuary: 6.8 km forest land then the project proponent filed to NBWL for (b) Application has been submitted to for obtaining will file an application before the obtaining NOC to be wildlife clearance; application is in process. Copy of concerned DFO obtaining forest filed. Clarify all the application is enclosed as Annexure 12. clearance under Forest (Conservation) points? Act, 198 and submit acknowledgement along-with copy of application submitted to concerned DFO ii) (a) Is the project covered under PLPA, 1900, if No but located near to PLPA area then the project proponent is required to submit NOC from the concerned DFO to the effect that project area does not fall under the provision of PLPA Act, 1900. (b) Is the project covered under PLPA, 1900, if yes then Status of the NOC w.r.t PLPA, 1900. Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 3 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY iii) If the project falls within 10 km of eco- sensitive area. If yes, (a) Name of eco-sensitive area and distance from the project site. (b) Status of clearance from National Board for Wild Life (NBWL). (c) The project proponent is required to submit either documentary proof to the effect that Wildlife Sanctuary is more than 10 kms from the project site or in case, the same is within 10 kms radius then, the project proponent will file an application before the concerned DFO, Wildlife for obtaining NBWL permission and submit acknowledgement along-with copy of application submitted to concerned DFO Wildlife for obtaining permission from NBWL 4. Properly filled Form 1 and basic information As per column no. 1.15 During Construction phase, mode of disposal will be mode of disposal is through mobile STP of 10 KLD. septic tank followed by Earlier, CLU was obtained for 131.56 acres, out of soak pits. PPCB does which net planned area was 118.04 acres which is less not allow soak than 50 Ha for which EC is not applicable. Based on pits. Clarify? which, Consent to Establish was obtained and Further as per details, the project proponent construction was started on few plots by individual plot has already crossed the owners. As net planned area of the project is 139.20 acres 50 ha clause of 8(b) (56.33 ha); thus, EC applicable has been filed for. when the CLU has been obtained for 131 acres. Clarify why the project shall not be considered as violating case under the provisions of EIA Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 4 Mega Residential Project “The Palm” Village Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh Mohali, S.A.S Nagar, Punjab M/s Manohar Infrastructure & Constructions Pvt. Ltd EDS REPLY Notification, 2006. Submit proper evidence in reply to the query. 5. Submit a copy of the Master plan duly marked Submitted. But project Coordinates of all the corners of the project location are: with project site. site with all corners not A: 30.464307 N & 76.435618 E marked on B: 30.470816 N & 76.435250 E C: 30.474981 N & 76.447546 E D: 30.475319 N & 76.445784 E E: 30.470424 N & 76.452656 E Layout plan showing the same is enclosed as Annexure 9. 6. Proof of ownership of land Submitted. But please Khasra Nos. of the plot along with ownership is attached clarify the following: as Annexure 13. Khasra Nos AREA Ownership of Plot (in acres ) belongs to 7. The project proponent is required to submit the To be submitted. (i) Synopsis of project as attached as Annexure A following:- (ii) Agreed (i) Synopsis of the project (Annexure-A) in (iii) NOC has been obtained from CGWA for ground water pdf file converted from MS word format abstraction. Copy of the NOC is attached as Annexure (ii) A copy of presentation in pdf format 14. converted from PPT format (iv) Yes, provision of module system shall be kept during (iii) Whether online application for obtaining installation of STP. NOC for abstraction of ground water has (v) Sewer lines have not been laid till the project by been applied CGWA? GMADA. (iv) Whether provision of module system shall be kept during installation of STP? (v) What is the status of laying of sewer pipe lines? Eco Laboratories & Consultants Pvt. Ltd. (QCI-NABET Approved EIA Consultant) 5 Annexure-A S.No. Item Details 1. Online Proposal No. 2. Name and Location of the Mega Residential Project “The Palm” located at Villages project Mullanpur Garibdas, Dhanauran & Mastgarh, New Chandigarh, Mohali, S.A.S Nagar, Punjab by M/s Manohar Infrastructure & Constructions Pvt. Ltd. 3. Latitude & Longitude Corners coordinates A: 30.464307 N & 76.435618 E B: 30.470816 N & 76.435250 E C: 30.474981 N & 76.447546 E D: 30.475319 N & 76.445784 E E: 30.470424 N & 76.452656 E 4. Project/activity covered under The project falls under S.No. 8(b) - ‘Township and Area item of scheduled to the EIA Development’ Notification, 14.09.2006 5. Whether the project is in No. critical polluted area or not. 6. If the project involves No. Project does not involve any diversion of forest land. diversion of forest land. If yes, a. Extent of the forest land. b. Status of the forest clearance. 7. a. Is the p ro jec t covered Project is not covered under PLPA 1900. However NOC under PLPA, 1900, if No has been obtained from DFO, S.A.S Nagar for complete but located near to PLPA project. Copy of the NOC is enclosed as Annexure 3. area then the project proponent is required to submit NOC from the concerned DFO to the effect that project area does not fall under the provision of PLPA Act, 1900. b. Is the project covered under PLPA,1900, if yes then Status of the NOC w.r.t PLPA,1900. 8. If the project falls within 10 km Sukhna Wildlife Sanctuary and City Bird Sanctuary are of eco-sensitive area/ National located at distance of 5.6 km and 6.8 km from the park/Wild Life Sanctuary. If project location and application has been submitted to yes, NBWL. Complete application is enclosed as Annexure a. Name of eco-sensitive area/ 12. National park/Wild Life Sanctuary and distance from the project site. b. Status of clearance from National Board for Wild Life (NBWL). 9. Classification/Land Residential as per Master plan of Mullanpur. Master plan use pattern as per showing project location is enclosed as Annexure 10. Master Plan 10. Cost of the project Rs. 914.20 Crores 11. Total Plot area, Built- up FOR NEW PROJECTS: Area and Green The details of project is as under: area S.No.