REPUBLIC OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE VI SUB DISTRICT ENGINEERING OFFICE CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL

CY 2021 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR

CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), Sofronio Carmona National High School, Brgy. Igmaya-an, , Negros Occidental

( 15.00 m X 30.00 m COVERED COURT )

APPROVED: SUBMITTED : RECOMMENDING APPROVAL:

VENGIE C. MORACA JUAN ALFONSO G. JORBINA SR. JAIME SJ. JAVELLANA OIC-PLANNING & DESIGN SECTION OIC-OFFICE OF THE ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: DATE: E AF T Y S 1 CONSTRUCTION F I R S T SAFETY SIGNAGES TABLE OF CONTENTS REQUIREMENTS TO THE SITE SOFRONIO NATIONAL HIGHSCHOOL, BRGY. IGMAYA-AN PROJECT SITE DANGER BE POSTED ON SITE DON SALVADOR BENEDICTO SOFRONIO CARMONA MEM. NATIONAL HIGHSCHOOL, IGMAYA-AN SHEET NO. SHEET CONTENTS DON SALVADOR BENEDICTO , NEGROS OCCIDENTAL DEEP 2 REFER ON SITE DEVELOPMENT PLAN CITY CADIZ CITY SAGAY CITY EXISTING TWO STOREY EXCAVATION CITY FOR SIGNAGE LOCATION E.B. MAGALONA SCHOOL BUILDING 1 ESCALANTE CITY N CITY TOBOSO 7 TALISAY CITY

CONSTRUCTION CITY MURCIA SITE DON SALVADOR BENEDICTO CALATRAVA W E 3 BAGO CITY SAN CARLOS CITY 2 VALLADOLID LA CARLOTA CITYCANLAON CITY SAN ENRIQUE 14 ENTRANCE PONTEVEDRA 7 LA CASTELLANA C H I N A S E A S SITE SAFETY Hard Hat ISABELLA N Googles CITY P A C I F I C O C E A N 3 High Visibility Clothing ILOG 4 Protective Gloves CAUAYAN CITY 2 2 7 Safety Boots

SIPALAY CITY 7 7 4 HINOBAAN 7 5 Bewar e S U L U S E A Falling Debris EXISTING SCHOOL BUILDING 5 CONSTRUCTION 2 M I N D A N A O S E A 7 6 SITE 2 15 EXIT VM VICINITY MAP LM LOCATION MAP 10 6 3 4 3 SA F ETY 7 FIRST 7 KEEP THIS PLACE CLEAN 6 & ORDERLY 7 CAUTION I N D I C A T I V E S T R U C T U R E L A Y O U T 8 HARD HAT SCOPE OF WORKS/SUMMARY OF QUANTITIES SITE DEVELOPMENT PLAN AREA

! DANGER Safety 9 Harness required

DANGER CONSTRUCTION 10 AREA AUTHORIZED PERSONNEL ONLY 11 THIS WAY TO EXIT 12 THIS WAY TO EXIT

! DANGER 13 FALL HAZARD DO NOT CROSS WITHOUT FULL PROTECTION CAUTION 14 HOT WORK AREA

CAUTION P E R S P E C T I V E TEMPORARY 15 MATERIALS STACKING AREA

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 1 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental JANNA ROSE G. ATIENZA VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO ENGINEER II LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION CONSTRUCTION SAFETY A B SIGNAGES REQUIREMENTS TO A B BE POSTED ON SITE 15 14 REFER ON FIRST PAGE FOR 3 SIGNAGE LEGEND 4

1 3 10

VERIFY 2 TYP. TRAVERSE ELEVATION 6 5 4 3 2 1

3

7

4

VERIFY LONGITUDINAL ELEVATION A B

5

6

FLOOR PLAN VERIFY TYP.CROSS SECTION

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 2 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental JANNA ROSE G. ATIENZA VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO ENGINEER II LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION 1 2 3 4 5 6 6 5 4 3 2 1 PAGE 3

LEFT SIDE ELEVATION RIGHT SIDE ELEVATION

6 5 4 3 2 1

VERIFY LONGITUDINAL SECTION CONCEPTUAL VIEW OF LONG GIRT

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 3 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental JANNA ROSE G. ATIENZA VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO ENGINEER II LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION A B

F T B - 1 1 F-1 F-1 C-1 C-1

CONC.SLAB CONNECTION SECTION F T B - 1 F T B - 1 ( 6.00M X 15.00 M )

F T B - 1 F T B - 1 FOOTING TIE BEAM F-1 C-1 F-1 C-1 2 FOOTING TIE BEAM DET. F T B - 1 F T B - 1 F T B - 1 F T B - 1 F-1 F-1 C-1 C-1 3

( 15.00M X 18.00 M ) F T B - 1 F T B - 1 F-1 F T B - 1 F T B - 1 C-1 4 TRUSS GUSSET PLATE DET.

COLUMN AND FOOTING DET. F T B - 1 F T B - 1 F T B - 1 F T B - 1

5 F-1 F-1 C-1 C-1

F T B - 1 F T B - 1 ( 6.00M X 15.00 M ) F T B - 1 F T B - 1

F-1 F-1 C-1 C-1 6 F T B - 1 FOUNDATION PLAN

TRUSS TO COLUMN CONN. DET.

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 4 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental JANNA ROSE G. ATIENZA VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO ENGINEER II LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION A B

ROOFEAVES

1 R A F T E R T R U S S T-1 R A F T E R T R U S S

12mm O SAG RODS

S I D E G I R T 12mm O SAG RODS TRUSS ( T-1 ) DETAIL 12mm O PRB SWAY BRACE

12mm O PRB SWAY BRACING WITH TURN BUCKLE S I D E G I R T

WITH TURN BUCKLE R A F T E R T R U S S T-1 R A F T E R T R U S S 2 12mm O SWAY BRACING WITH TURN BUCKLE

12mm O SAG RODS

S I D E G I R T 12mm O SAG RODS LG-1

12mm O SWAY BRACE 12mm O SWAY BRACING R I D G E G I R T WITH TURN BUCKLE WITH TURN BUCKLE 3 R A F T E R T R U S S T-1 R A F T E R T R U S S LG-1 LONG GIRT (LG-1) DETAIL 12mm O SAG RODs 12mm O SAG RODS

BENDED FASCIA DETAIL

S I D E G I R T GRIDLINE GRIDLINE 12mm O SAG RODS 1 6 LONG G I R T

12mm O SWAY BRACING

WITH TURN BUCKLE 4 R A F T E R T R U S S T-1 T-1

12mm O SAG ROD 12mm O SAG RODS

RG-1 RIDGE GIRT DETAIL R I D G E G I R T S I D E G I R T 12 O SAG ROD 12mm O SAG RODS

12mm O SWAY BRACING 12mm O SWAY BRACING

WITH TURN BUCKLE WITH TURN BUCKLE GRIDLINE GRIDLINE R A F T E R T R U S S T-1 T-1 5 12mm O SWAY BRACING WITH TURN BUCKLE

12mm O SAG RODS 12mm O SAG RODS COLUMN TO TRUSS BASE CONN. SECTIONAL DETAIL

S I D E G I R T 10mm O SAG ROD S I D E G I R T 12mm O SAG RODS SG-1 12mm O SWAY BRACING SIDE GIRT DETAIL 12mm O SWAY BRACING 6 R A F T E R T R U S S WITH TURN BUCKLE T-1 WITH TURN BUCKLE PAGE 5

ROOF FRAMING PLAN TYP. GUSSET PLATE AND FASCIA FRAME DETAIL SG-1 WELDING DETAIL

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 5 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental JANNA ROSE G. ATIENZA VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO ENGINEER II LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION THE SITE A B SOFRONIO NATIONAL HIGHSCHOOL, BRGY. IGMAYA-AN PROJECT SITE DON SALVADOR BENEDICTO SOFRONIO CARMONA MEM. NATIONAL HIGHSCHOOL, IGMAYA-AN GENERAL NOTES DON SALVADOR BENEDICTO , NEGROS OCCIDENTAL MANAPLA CITY CADIZ CITY SAGAY CITY VICTORIAS CITY E.B. MAGALONA ESCALANTE CITY N SILAY CITY TOBOSO TALISAY CITY

BACOLOD CITY MURCIA DON SALVADOR BENEDICTOCALATRAVA W PULUPANDAN BAGO CITY SAN CARLOS CITY VALLADOLID LA CARLOTA CITYCANLAON CITY SAN ENRIQUE 1 PONTEVEDRA LA CASTELLANA C H I N A S E A HINIGARAN

BINALBAGAN ISABELLA N

HIMAMAYLAN CITY P A C I F I C O C E A N

ILOG C-1 CAUAYAN KABANKALAN CITY

CANDONI

SIPALAY CITY

HINOBAAN

S U L U S E A 2

M I N D A N A O S E A

VM VICINITY MAP LM LOCATION MAP

3 C-2 LEGEND : SYMBOL DESCRIPTION SYMBOL DESCRIPTION

20 M

4

2

ELEC'L DESIGN ANALYSIS M 5 USE: C-1 15 A-ACB 20 A -ACB C-2

C-3 30A-ACB 30A-ACB C-4

SINGLE LINE DIAGRAM SCHEDULE OF LOADS

6 ELECTRICAL LAY OUT PLAN

PROJECT TITLE : SHEET CONTENTS : DESIGN : CHECKED & REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI PURPOSE BUILDING(COVERED COURT), MODIFIED STANDARD DPWH COVERED COURT DESIGN REGION VI Sofronio Carmona National High School, Brgy. Igmaya-an, 6 NEGROS OCCIDENTAL 1ST SUB DISTRICT ENGINEERING OFFICE AS SHOWN CADD : CENTERMALL, SAN CARLOS CITY, NEGROS OCCIDENTAL Salvador Benedicto, Negros Occidental VENGIE C. MORACA JUAN ALFONSO G. JORBINA JR. JAIME SJ. JAVELLANA 6 REYMAN LORD A. AREVALO LOCATION : Brgy. Igmaya-an ,Don Salvador Benedicto, Negros Occidental PROF.ELECTRICAL ENGINEER ENGINEER III (OIC)ASST. DISTRICT ENGINEER DISTRICT ENGINEER ARCHITECT I (OIC)CHIEF, PLANNING & DESIGN SECTION