Thank you for being here! We’re looking forward to hearing from you.
Tonight’s meeting will be Zoom tips: divided into two parts: 1. Click on the “Participants” button, hover PART 1 – Project presentation over your name and click on the “Rename” button to add your full name and a picture by design team of yourself.
PART 2 – Questions moderated 2. Connect your audio (you will be muted by EDC during the presentation but will have the opportunity to unmute if you have a question).
3. Ask a question! Raise your hand or type into the comment box at any time.
1 LOWER MANHATTAN COASTAL RESILIENCY PROJECT – BATTERY Introductory Community Presentation
March 24, 2021 Stantec team
Greg Sprich April Schneider Amy Seek PE, ENV SP PE, LEED®AP ND, ECODISTRICTS AP, ENV SP RLA, WEDG
PROJECT MANAGER / CIVIL ENGINEER CIVIL ENGINEERING LEAD LANDSCAPE ARCHITECTURE LEAD
3 Lower Manhattan Coastal Resiliency projects
N
4 Project location
PRO JEC T BO UNDARY
N
5 Wharf History Timeline 1855-1890 Castle Clinton used as the 1811 federal immigration center; 1940-1952 The earliest known Southwest Battery Fort (now processed approximately Battery Park closed to build 2019 inhabitants in the area known as Castle Clinton) eight million immigrants Brooklyn-Battery Tunnel and LMCR Study were the Lenape erected 200ft offshore during this time Battery Park Underpass 1600 2000 1900 2100 1700 1800
1626 1853-1872 1890-1941 1974 2012 Fort Amsterdam Period of waterfront filling to create developable Castle Clinton acquired 1.2 million cubic yards Hurricane Sandy constructed by land. Roughly 20% of the larger metropolitan by New York City of earth from the World the Dutch for the region is built on landfill and much of that fill is Department of Public Trade Center foundation purposes of trade varied forms of waste from city development Parks and operated as excavation was used to and defense projects and garbage the New York Aquarium create Battery Park City
7 A legacy of change
1767 1827 1821
1886 1848
1930 1946
CURRENT WHARF EXTENTS
N
0' 50' 100' 200'
8 WHARF HISTORY
CIRCA 1890 CIRCA 1920 1946 PLATFORM
9 Wharf Activity Direct waterfront access WHARF ACTIVITY
FERRY GARDENS OF REMEMBRANCE
PROMENADE
VARIED SEATING
11 Frequented by passenger vessels WHARF ACTIVITY
Ferry service out of the Battery has been operating since 1953, when the Circle Line started taking visitors to the Statue of Liberty.
12 WHARF ACTIVITY
Around 2004, New York Water Taxi also began running operations out of the Battery and berths at slip 6.
13 A range of park activities WHARF ACTIVITY
INCIDENTAL VIEWS OF THE WATER
14 Wharf Condition The wharf is in poor condition WHARF CONDITIONCONDITION
1 SECTIONS OF TIMBER PILES MISSING DUE TO ROT 5 MARINE DEGRADATION AND TIMBER ROT
2 STRUCTURAL CRACK IN CONCRETE CAP 6 DAMAGED SEA RAIL
EXPOSED CONCRETE GRAVITY WALL FACE DUE TO 7 DAMAGED DECK 3 COLLAPSING GRANITE BLOCK FASCIA 8 SINKHOLES 4 DAMAGE TO TIMBER LINE CAP
6
8
EXISTING WHARF EL. +6.00 3
7 2 5 1 1 4 1
All elevations in NAVD88 16
PAGE 8/13
WHARF CONDITION
SINKHOLE
2018
17
Photo 9: Picture taken in February 2018, looking west
Photo 10: Picture taken in February 2018 – concrete foundation TABLE 3.1-6 SUMMARY GANGWAY CONDITIONS Gangway No. Condition Primary Defect(s) Light mechanical damage, corrosion Gangway 1 Moderate cracking on returns Gangway 2 Moderate Corrosion cracking Gangway 3 Moderate Moderate mechanical damage Heavy mechanical damage, open Gangway 4 Advanced spall, exposed reinforcing Heavy mechanical damage, exposed Gangway 5 Advanced reinforcing Gangway 6 Minor Light mechanical damage
WHARF CONDITION
HEAVED CONCRETE CAP
18
Photograph 3.1-12 Heaved concrete apron adjacent to Merchant Mariner Memorial.
3-38 WHARF CONDITION
EXPOSED CONCRETE GRAVITY WALL FACE
COLLAPSING GRANITE BLOCK FACADE
DAMAGED CONCRETE FOUNDATION
TIMBER PLATFORM EXHIBITING ROT
19 WHARF CONDITION
EXPOSED AND CORRODED WIRE REINFORCEMENT
MARINE DEGRADATION AND TIMBER ROT
20
Photograph 3.1-13 Full height loss of granite block fascia along concrete gravity wall.
Photograph 3.1-14 Prior spall repair developing corrosion cracking and additional spalls.
3-39
Photograph 3.1-10 Deflected pile cap. Note separation from concrete deck above.
WHARF CONDITION
STRUCTURAL CRACK IN CONCRETE CAP
21
Photograph 3.1-11 Large structural crack in concrete deck perpendicular to pile caps.
3-29
Photograph 3.1-5 Typical heavy corrosion of batter pile steel connection hardware.
WHARF CONDITION
SECTIONS OF TIMBER PILES MISSING DUE TO ROT
22
Photograph 3.1-6 Heavy section loss of timber pile due to top rot.
3-25 Timeline
The wharf will continue its history of adaptation as we elevate it to address sea level rise for the next 80 years. 1600 1700 1800 2000 2020 2100 1900
23 Climate Context 2021 daily water levels CLIMATE CONTEXT
25 Relative sea level rise at the Battery CLIMATE CONTEXT
SINCE 1900, MEAN SEA LEVEL SINCE 1950, MEAN SEA LEVEL HAS RISEN BY ABOUT 2' HAS RISEN BY ABOUT 1'
Adapted from New York City Panel on Climate Change 2019 Report Chapter 3: Sea Level Rise
We are seeing a new, more extreme, trendline starting in the 1990s. 26 Designing with uncertainty CLIMATE CONTEXT
WHARF DESIGN WILL CONSIDER THE 90TH PERCENTILE SCENARIO
Adapted from New York City Panel on Climate Change 2019 Report Chapter 3: Sea Level Rise
27 2021 MHHW CLIMATE CONTEXT
PRESENT DAY MHHW IS 3.5' BELOW THE WHARF
28 2050 MHHW if wharf remains at current elevation CLIMATE CONTEXT
MHHW IS 1’ BELOW THE WHARF
DAILY INUNDATION OF BOAT SLIPS
29 2080 MHHW if wharf remains at current elevation CLIMATE CONTEXT
MHHW INUNDATION REACHES 1' ABOVE THE WHARF
30 2100 MHHW if wharf remains at current elevation CLIMATE CONTEXT
MHHW INUNDATION REACHES 2.5' ABOVE THE WHARF
31 2100 daily water levels CLIMATE CONTEXT
HIGHER HIGH WATER WOULD OVERTOP WHARF FOR ~4.5 HOURS
32 CLIMATE CONTEXT
HURRICANE SANDY OCTOBER 29, 2012
33 CLIMATE CONTEXT
DAILY TIDAL FLOODING
34 Design Criteria Wharf elevation DESIGN CRITERIA
EXISTING WHARF EL. +6.0
MHHW EL. +2.28
MSL EL. 0.00
MLLW EL. -2.77
All elevations in NAVD88 36 Wharf elevation DESIGN CRITERIA
MHHW + SLR EL. +8.58
EXISTING WHARF EL. +6.0
6.3 FT (2100 90TH PERCENTILE SLR)
MHHW EL. +2.28
MSL EL. 0.00
MLLW EL. -2.77
All elevations in NAVD88 37 Wharf elevation DESIGN CRITERIA
MHHW + SLR EL. +8.58 1.32 FT (WAVE HEIGHT)
EXISTING WHARF EL. +6.0
6.3 FT (2100 90TH PERCENTILE SLR)
MHHW EL. +2.28
MSL EL. 0.00
MLLW EL. -2.77
All elevations in NAVD88 38 Wharf elevation DESIGN CRITERIA
PROPOSED WHARF EL. +11.0 EL. +11.0 1.1 FT (FREEBOARD)
MHHW + SLR EL. +8.58 1.32 FT (WAVE HEIGHT)
EXISTING WHARF EL. +6.0
6.3 FT (2100 90TH PERCENTILE SLR)
MHHW EL. +2.28
MSL EL. 0.00
MLLW EL. -2.77
All elevations in NAVD88 39 LMCR project coordination
EL. +18.5 SOUTH BATTERY PARK CITY RESILIENCY PROJECT FINANCIAL DISTRICT AND SEAPORT 100-YEAR STORM SURGE + CLIMATE RESILIENCE MASTER PLAN 2050 SEA LEVEL RISE (30") CRITERIA AND DESIGN TBD COORDINATION POINT
LOWER MANHATTAN COASTAL RESILIENCY PROJECT – BATTERY 2100 SEA LEVEL RISE (75")
EL.+11
N
0' 50' 100' 200'
All elevations in NAVD88 40 Coordinated adaptation projects DESIGN CRITERIA
SOUTH BATTERY PARK CITY RESILIENCY PROJECT LOWER MANHATTAN COASTAL RESILIENCY PROJECT – BATTERY
EL +18.5 EL +13 EL +10 EL +10 EL +9 EL +11
EX. WHARF EL. +6.0
All elevations in NAVD88 41 2020 vessel elevations DESIGN CRITERIA
+11.0
EXISTING WHARF EL. +6.0
2020 MLLW
All elevations in NAVD88 42 Two-slip fixed platform DESIGN CRITERIA
+11
+6
+8.5 +11 BOTTOM SLIP AT EL. +6 TOP SLIP AT EL. +8.5
All elevations in NAVD88 43 Understanding the Site Existing access to wharf UNDERSTANDING THE SITE
RESTAURANT
LEGEND
PARK ENTRANCE STAIRS MOVABLE SECURITY FENCING N 0' 50' 100' 200' PRIMARY PATH TO WHARF RAMPS / SLOPED PATHWAYS INACCESSIBLE FOR REPAIRS
SECONDARY PATH TO WHARF 45 Current typical wharf segment UNDERSTANDING ELEVATED GARDENS OF REMEMBRANCE DIRECT CIRCULATION FROM THE SITE PARK TO WHARF, USES STAIRS IN MANY CASES
QUEUING AND SLIP AREA ROW OF EXISTING MATURE TREES FOR VESSEL OPERATIONS +8.5
+6
BOSQUE PATHWAY
GARDENS OF REMEMBRANCE
WHARF CIRCULATION
SLIP & VESSEL OPERATIONS AREA
VARIES 22.5' 32.5' MHHW 2.28 (El.)
6' MLLW -2.77 (El.)
46 Seating UNDERSTANDING THE SITE
LINEAR BENCH - 840LF
BACKED BENCH - 224LF (28) BACKLESS BENCH - 264LF (44)
47 Significant views UNDERSTANDING THE SITE
TO WTC
PIER A (LANDMARKED)
RESTAURANT TO STATUE OF LIBERTY
LEGEND TO STATUE PANORAMIC VIEW OF LIBERTY WATER VISIBILITY LINE (WINTER) N
0' 50' 100' 200' INCIDENTAL VIEWS
FRAMED VIEWS 48 Incidental views UNDERSTANDING THE SITE
49 Framed views UNDERSTANDING THE SITE
50 View of the water horizon UNDERSTANDING THE SITE
Current water view from bosque HORIZON
+9' +6' Current water view from bosque MHHW EL. +2.28 MLLW EL. -2.77
51 View of the water horizon UNDERSTANDING THE SITE
Current water view from bosque Proposed reduced view of water, with preserved water horizon HORIZON
+9' + 11 ' Proposed water view from bosque +6' Current water view from bosque MHHW EL. +2.28 MLLW EL. -2.77
52 Artworks and memorials
HISTORIC SHORELINE MARKERS BREAKWATER FLAGSTAFFS
KOREAN WAR VETERANS MEMORIAL NORWEGIAN VETERANS MONUMENT
EMMA LAZARUS MEMORIAL PLAQUE G
A R THE IMMIGRANTS D MARINE FLAGSTAFF E N S O F R E M E M B R AN CE AMERICAN EAST COAST MERCHANT ADMIRAL GEORGE DEWEY MEMORIAL MEMORIAL MARINERS' MEMORIAL
GARDENS OF REMEMBRANCE RIVER THAT FLOWS TWO WAYS
ADMIRAL DEWEY PROJECT MARKERS
N
0' 50' 100' 200'
53 Artworks and memorials
AMERICAN EAST COAST MERCHANT MEMORIAL MARINERS’ GARDENS OF REMEMBRANCE MEMORIAL RIVER THAT FLOWS TWO WAYS
N
0' 50' 100' 200'
54 UNDERSTANDING THE SITE
Gardens of Remembrance DESIGNER: PIET OUDOLF DATE: 2003 55 UNDERSTANDING THE SITE
East Coast Memorial ARTIST: ALBINO MANCA DATE: 1963 56 American Merchant Mariners' Memorial ARTIST: MARISOL ESCOBAR DATE: 1988 The River That Flows Two Ways ARTIST: WOPO HOLUP DATE: 2000 Historic structures
CASTLE CLINTON (LANDMARKED)
RESTAURANT PIER A (LANDMARKED)
N
0' 50' 100' 200'
59 UNDERSTANDING THE SITE
Castle Clinton National Monument ARCHITECT: JOHN MCCOMB JR. DATE: 1811 60 A departure point UNDERSTANDING THE SITE
Approximately 4.2 million people visit Liberty Island annually. 80% depart from the Battery.
61 BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
Vessel activityWASHINGTON ST
STATE STREET
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
WEST ST OUR LADY OF THE PEARL ST 17 STATE COMFORT STREET ROSARY STATION STATE STREET WEST ST FROM STATEN ISLAND FERRY SUBWAY TUNNEL THE BATTERY URBAN FARM SUBWAY ENTRANCE B AT TER LITTLE W ST Y BIKEWAY SOUTH FERRY BUS LOOP SU BATTERY PLACE BWA Y TU LONG QUEUES WRAP AROUND CASTLE NNEL WHITEHALL CLINTON, CAUSING PARK CONGESTION PETER MINUIT PLAZA TERMINAL 84” OUTFALL SEWER LABYRINTH INTERCEPTOR SEWER
PIER A BATTERY TUNNEL PLAYSCAPE PARK BUILDING COMFORT FROM WHITEHALL SEAGLASS STATION CAROUSEL TERMINAL
CASTLE BATTERY PARK CLINTON (LANDMARKED) UNDERPASS
PARKING
CAFE EAST COAST THE VIEW PIER A (LANDMARKED) THE VIEW US COAST GUARD PIER A (LANDMARKED) BOSQUE AT THE FOUNTAIN MEMORIAL BATTERY PARKING BOSQUE RESTAURANT GARDENS CAFE NPS SECURITY TENT SECURE ZONE
SOUTHERN TERMINUS
NY WATER TAXI STATUE CRUISES
N
0' 50' 100' 200'
62 Statue Cruises queuing UNDERSTANDING THE SITE
68 UNDERSTANDING THE SITE
STEEP SLOPE MAKES IT DIFFICULT FOR PEOPLE TO BOARD
64 UNDERSTANDING THE SITE
SECURITY SCREENING
NEW YORK WATER TAXI Lines for New York Water Taxi and Statue Cruises overlap, causing confusion.
65 Design Goals Design goals
Connect Through Accessible Design Stablize and Build Resilience
Prepare for Climate Change Preserve and Enhance
1. Reconstruct and elevate the wharf Park Character
Connect Through Accessible Design Stablize and Build Resilience approximately 5 feet to address its Enhance Value Through Resilient Design Strategies 1. Maximize visibility of water/edge. deteriorating condition while also taking into account future sea level rise. 2. Minimize disturbance to physical structures, view corridors, and character of park. 2. Tie into adjacent resilience projects. 3. Conserve existing artworks. 3. Improve drainage. Enhance Value Through Resilient Design Strategies 4. Minimize adverse impacts on historic structures and trees. 5. Reuse existing site materials. 6. Maximize sustainability of design/ Support Site Uses construction. 7. Provide new planting and public amenities. 1. Accommodate Statue of Liberty,
Connect Through Accessible Design Stablize and Build Resilience Ellis Island, and Water Taxi vessels 8. Protect the park’s historic resources. during and after construction. 2. Prioritize universal design. 3. Maintain sufficient seating.
Enhance Value Through Resilient Design Strategies
67 Prepare for climate change Stablize and Build Resilience Connect Through Accessible Design Enhance Value Through Resilient Design Strategies DESIGN GOALS
IMPROVE DRAINAGE RECONSTRUCT DETERIORATED ACROSS THE SITE WHARF STRUCTURE
+8.5 +11
ELEVATE WHARF TO ADDRESS SEA LEVEL RISE
2100 MHHW 8.6 (EL.)
18' 2100 MLLW 3.5 (EL.) 40'
68 Preserve and enhance park character
Stablize and Build Resilience Connect Through Accessible Design Enhance Value Through Resilient Design Strategies
LIMIT IMPACT TO EXISTING TREES
PRESERVE GARDENS OF REMEMBRANCE
MINIMIZE VISUAL OBSTRUCTIONS IMPLEMENT A RESILIENT TO THE WATER PLANTING SYSTEM
69 Support site uses
Stablize and Build Resilience Connect Through Accessible Design Enhance Value Through Resilient Design Strategies
ENSURE CIRCULATION FROM PARK TO WHARF IS INTUITIVE AND ACCESSIBLE
PRIORITIZE UNIVERSAL DESIGN
MAINTAIN ACCESSIBLE VESSEL OPERATIONS
70 Design Concept BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
OUR LADY OF THE WEST ST PEARL ST 17 STATE ROSARY STREET
STATE STREET
WEST ST
SOUTH FERRY BUS LOOP WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
4 4 9.44 9. 7" 9.9.7" 7"7"
PLAYSCAPE AREA
BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST CASTLE CLINTON (LANDMARKED)
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
THE VIEW US COAST GUARD EAST COAST AT THE OUR LADY OF THE BATTERY WEST ST PEARL ST 17 STATE ROSARY Proposed concept design STREET MEMORIAL PIER A (LANDMARKED) STATE STREET
WEST ST
NPS SECURITY TENT SOUTH FERRY BUS LOOP +8.8 WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
.4 .494 9 . 4 " 9 ."7 97 "" 77 +8.5' PLAYSCAPE AREA +11 PRO JEC T B OUN DARY
CASTLE CLINTON (LANDMARKED)
THE VIEW US COAST GUARD EAST COAST AT THE BATTERY MEMORIAL
PIER A (LANDMARKED)
NPS SECURITY TENT +8.8
PRO JEC T B OUN DARY
LEGEND
RAMPS WITH HANDRAILS
NEW / RESTORED PLANTING N WORLD’S FAIR BENCH 0' 50' 100' 200'
72 BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
OUR LADY OF THE WEST ST PEARL ST 17 STATE ROSARY STREET
STATE STREET
WEST ST
SOUTH FERRY BUS LOOP WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
4 4 9.44 9. 7" 9.9.7" 7"7"
PLAYSCAPE AREA
BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST CASTLE CLINTON (LANDMARKED)
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
THE VIEW US COAST GUARD EAST COAST AT THE OUR LADY OF THE BATTERY WEST ST PEARL ST 17 STATE ROSARY Proposed concept design STREET MEMORIAL PIER A (LANDMARKED) STATE STREET
WEST ST
NPS SECURITY TENT SOUTH FERRY BUS LOOP +8.8 WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
.4 .494 9 . 4 " 9 ."7 97 "" 77 +8.5' PLAYSCAPE AREA +11 PRO JEC T B OUN DARY
CASTLE CLINTON (LANDMARKED)
THE VIEW US COAST GUARD EAST COAST AT THE BATTERY MEMORIAL
PIER A (LANDMARKED)
NPS SECURITY TENT +8.8
PRO JEC T B OUN DARY
LEGEND
RAMPS WITH HANDRAILS
NEW / RESTORED PLANTING N WORLD’S FAIR BENCH 0' 50' 100' 200'
73 BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
OUR LADY OF THE WEST ST PEARL ST 17 STATE ROSARY STREET
STATE STREET
WEST ST
SOUTH FERRY BUS LOOP WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
4 4 9.44 9. 7" 9.9.7" 7"7"
PLAYSCAPE AREA
BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST CASTLE CLINTON (LANDMARKED)
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
THE VIEW US COAST GUARD EAST COAST AT THE OUR LADY OF THE BATTERY WEST ST PEARL ST 17 STATE ROSARY Proposed concept design STREET MEMORIAL PIER A (LANDMARKED) STATE STREET
WEST ST
NPS SECURITY TENT SOUTH FERRY BUS LOOP +8.8 WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
.4 .494 9 . 4 " 9 ."7 97 "" 77 +8.5' PLAYSCAPE AREA +11 PRO JEC T B OUN DARY
CASTLE CLINTON (LANDMARKED)
THE VIEW US COAST GUARD EAST COAST AT THE BATTERY MEMORIAL
PIER A (LANDMARKED)
NPS SECURITY TENT +8.8
PRO JEC T B OUN DARY
LEGEND
RAMPS WITH HANDRAILS
NEW / RESTORED PLANTING N WORLD’S FAIR BENCH 0' 50' 100' 200'
74 BROADWAY BOWLING GREEN
GREENWICH ST CITIBANK
WASHINGTON ST
NATIONAL DEVELOPMENT BRIDGE ST COUNCIL (NDC)
OUR LADY OF THE WEST ST PEARL ST 17 STATE ROSARY Proposed concept design STREET
STATE STREET
WEST ST
SOUTH FERRY BUS LOOP WHITEHALL PETER MINUIT PLAZA TERMINAL LITTLE W ST
BATTERY PLACE
.4 .494 9 . 4 " 9 ."7 97 "" 77
PLAYSCAPE AREA
CASTLE CLINTON (LANDMARKED)
THE VIEW US COAST GUARD EAST COAST AT THE BATTERY MEMORIAL
PIER A (LANDMARKED)
NPS SECURITY TENT +8.8
PRO JEC T B OUN DARY
LEGEND
RAMPS WITH HANDRAILS
NEW / RESTORED PLANTING N WORLD’S FAIR BENCH 0' 50' 100' 200'
75 Typical wharf segment DESIGN CONCEPT
Design concept preserves Gardens of Remembrance footprint and uses both stairs and ramps for wharf access. 76 Typical wharf segment DESIGN CONCEPT
Design concept preserves Gardens of Remembrance footprint and uses both stairs and ramps for wharf access. 77 Typical wharf segment DESIGN CONCEPT
78 Typical wharf segment DESIGN CONCEPT
79 DESIGN CONCEPT
+11.3 2% +10.6 +8.5
10'-0" 4'-6" 8'-0" 38'-6"
80 DESIGN CONCEPT
81 DESIGN CONCEPT
82 Project Timeline PROJECT TIMELINE
WE ARE HERE 2021 2022
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY
OUTREACH ROUND II OUTREACH ROUND III STAKEHOLDER PUBLIC MEETING YOUR FEEDBACK! YOUR FEEDBACK! ENGAGEMENT 3/24
DESIGN CONCEPT DESIGN (30%)
PRELIMINARY DESIGN (50%)
FINAL DESIGN (75-100%)
CONSTRUCTION
84 Questions?
Thank you for listening. There are two ways to ask a question or submit a comment.
Ask a question! Or, type into the comment Raise your hand. box at any time.
Check back to our website: https://www1.nyc.gov/site/lmcr/progress/battery-coastal-resilience.page
86