Kellockbank Junction
Colpy
HUNTLY
Old Rayne Colpy Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Pink Calculation Area Map Title Oldmeldrum Figure 11.13 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-V Option - Sheet 1 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000013 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Junction Daviot
Kellockbank Junction Durno
Colpy
Whiteford Pitcaple
Old Rayne Colpy Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Pink Calculation Area Map Title Oldmeldrum Figure 11.14 Violet !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-V Option - Sheet 2 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000014 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Uryside Junction Junction West Uryside Daviot Junction East
Durno
Whiteford Pitcaple
Old ayne
Port INVERURIE Elphinstone
Tavelty Junction
KINTORE
Route Option Affected Road Network Project Name Pink A947 A96 Dualling East of Huntly to Aberdeen Study Area Kemnay Violet Calculation Area Map Title Oldmeldrum Figure 11.15 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-V Option - Sheet 3 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000015 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Kellockbank Junction
Colpy
HUNTLY
Old Rayne Colpy Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Pink Calculation Area Map Title Oldmeldrum Figure 11.16 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-O Option - Sheet 1 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000016 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot
Pitscurry Junction
Kellockbank Junction
Durno
Colpy
Whiteford Pitcaple
Old Rayne Colpy Junction
Drimmies Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Pink Calculation Area Map Title Oldmeldrum Figure 11.17 Orange !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-O Option - Sheet 2 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000017 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot
Pitscurry Junction
Durno
Blackhall Road Junction
Whiteford Pitcaple
Old ayne
Port INVERURIE Elphinstone
Drimmies Junction
KINTORE
Thainstone Junction
Kemnay
Route Option Affected Road Network Project Name Pink Study Area A947 A96 Dualling East of Huntly to Aberdeen Orange Calculation Area Map Title Oldmeldrum Figure 11.18 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-P-O Option - Sheet 3 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000018 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Colpy
HUNTLY
Old Rayne Colpy Junction
Kellockbank Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Brown Calculation Area Map Title Oldmeldrum Figure 11.19 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-V Option - Sheet 1 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000019 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Junction Daviot
Durno
Colpy
Whiteford Pitcaple
Old Rayne Colpy Junction
Kellockbank Junction
Carden Insch Junction
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Brown Calculation Area Map Title Oldmeldrum Figure 11.20 Violet !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-V Option - Sheet 2 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000020 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Uryside Junction Junction West Daviot Uryside Junction East
Durno
Whiteford Pitcaple
Old ayne
Port INVERURIE Elphinstone
Carden Junction KINTORE
Tavelty Junction
Route Option Affected Road Network Project Name Brown A947 A96 Dualling East of Huntly to Aberdeen Study Area Kemnay Violet Calculation Area Map Title Oldmeldrum Figure 11.21 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-V Option - Sheet 3 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000021 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Colpy
HUNTLY
Old Rayne Colpy Junction
Kellockbank Junction
Insch
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Brown Calculation Area Map Title Oldmeldrum Figure 11.22 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-O Option - Sheet 1 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000022 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Pitscurry Junction
Durno
Colpy
Whiteford Pitcaple
Old Rayne Colpy Junction
Kellockbank Junction Drimmies Junction
Insch Carden Junction
Route Option Affected Road Network Project Name Red Study Area A947 A96 Dualling East of Huntly to Aberdeen Brown Calculation Area Map Title Oldmeldrum Figure 11.23 Orange !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-O Option - Sheet 2 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000023 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot Pitscurry Junction
Durno
Blackhall Road Junction
Whiteford Pitcaple
Old ayne
Port INVERURIE Elphinstone
Drimmies Junction
Carden Junction KINTORE
Thainstone Junction
Kemnay
Route Option Affected Road Network Project Name Brown Study Area A947 A96 Dualling East of Huntly to Aberdeen Orange Calculation Area Map Title Oldmeldrum Figure 11.24 !( First Issue Noise Assessment Study and C01 MMAZ LPAG MBUT FMAX NHAC Huntly A96 !( Calculation Areas 1 !( 16/11/20 16/11/20 17/11/20 19/11/20 20/11/20 2 Inverurie A97 3 Revision Created Checked Reviewed Approved Authorised R-Br-O Option - Sheet 3 of 3 !( !( Kilometres Map Number Insch Kintore | Project | Originator | Volume | !( 0 1 2 3 4 A96PEA - AMAR - ENV - Kemnay Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LN - 000024 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Rhynie Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved for Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.