Normal Template
Total Page:16
File Type:pdf, Size:1020Kb
Site Specific Wildlife Conservation Plan for Proposed Expansion of LPG Storage Capacity (Mounded Storage Vessel) at Solapur LPG Plant Prepared by ERM India Private Limited December, 2017 CONTENTS 1 INTRODUCTION 2 1.1 BACKGROUND 3 1.2 LOCATION & ACCESSIBILITY 3 1.3 PROJECT DESCRIPTION 6 1.3.1 Resource Requirement 6 1.3.2 Operation Description 6 1.4 POLLUTION SOURCE, CATEGORIZATION AND CONTROL MEASURES 7 1.4.1 Waste Water 7 1.4.2 Solid Waste 7 1.4.3 Hazardous Waste 8 1.4.4 Air Pollution 8 1.4.5 Noise Pollution 10 1.5 GREEN BELT AND PLANTATION DETAILS 10 2 BASELINE ENVIRONMENT 12 2.1 PROJECT IMPACT AREA 12 2.2 PHYSICAL ENVIRONMENT 12 2.3 SOCIO-ECONOMIC ENVIRONMENT 13 2.4 BIOLOGICAL ENVIRONMENT 14 2.4.1 Methodology 14 2.4.2 Vegetation Type 16 2.4.3 Floral Assessment 16 2.4.4 Faunal Assessment 18 2.4.5 Protected Areas 21 3 POTENTIAL IMPACT ON BIOLOGICAL RESOURCES 25 3.1 CONSTRUCTION PHASE 25 3.1.1 Terrestrial Flora and Fauna 25 3.1.2 Aquatic Flora and Fauna 25 3.2 OPERATION PHASE 26 3.2.1 Terrestrial Flora and Fauna 26 3.2.2 Aquatic Flora and Fauna 27 4 BIODIVERSITY MANAGEMENT PLAN 29 4.1 CONTRIBUTING TO THE EXISTING HABITAT IMPROVEMENT PROGRAMME OF THE FOREST DEPARTMENT 29 4.2 CAPACITY BUILDING OF FOREST DEPARTMENT STAFFS 29 4.3 AWARENESS GENERATION MEETINGS AT VILLAGES 30 ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 1 LIST OF TABLE Table 1.1 Hazardous Waste Generation 8 Table 1.2 Potential Pollutant and Control Measures during Construction Phase 8 Table 1.3 Air pollution sources, fuel consumption and stack height details 9 Table 2.1 Amphibians observed/recorded from the Study Area 18 Table 2.2 Reptiles observed/reported from the Study Area 18 Table 2.3 Avifaunal Species observed in the Study Area 19 Table 2.4 Details of Mammals observed/ reported from the Study area 21 LIST OF FIGURE Figure 1.1 Project Location on Survey of India Toposheet 4 Figure 1.2 Accessibility Map of the Project Site 5 Figure 1.3 Green belt around the LPG Plant 10 Figure 2.1 Habitats within the Study Area 17 Figure 2.2 Eco-sensitive Map of the Project Site 23 Figure 2.3 Eco-sensitive Map on Survey of India Topo Map 24 ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 2 1 INTRODUCTION 1.1 BACKGROUND Bharat Petroleum Corporation Limited (hereinafter referred to as “BPCL”), has a LPG bottling plant in Solapur district in Maharashtra, operational since 1988. The plant has a bottling capacity of 132000 metric tonnes per annum (MTPA) and LPG storage capacity of 1800 MT (4 X 125 MT Bullets, 2 x 650 MT spheres). Currently, BPCL intends to enhance the capacity of the storage facility with addition of mounded storage vessels (MSV) of 600 MT (2 x 300 MT). On commissioning of the MSV, existing LPG Bullets of 4 nos. X 125 MT will be decommissioned. Thus the final LPG storage capacity in the plant after this expansion would be 1900 MT (2 X 650 MT Spheres + 2 X 300 MT MSV). The proposed project will require Environmental Clearance (EC) from State Environment Impact Assessment Authority (SEIAA), Maharashtra as per the requirements of the EIA Notification, 2006. BPCL has received an approved Terms of Reference (ToR) from State Expert Appraisal Committee (SEAC). The condition no 5 relating to Forest & Wildlife related issues stipulates as follows. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à- vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife. 1.2 LOCATION & ACCESSIBILITY The proposed MSV units will be constructed within the premises of the existing plant. The existing plant is located at Chincholi village in Mohol taluka of Solapur district, Maharashtra. The plant can be accessed from Solapur by National Highway 65 (NH); which runs along the southern boundary of the project site. The nearest railway station is Pakni, which is approximately 3 km from the plant. The nearest airport in Pune is approximately 280 km from the plant. The district Head Quarter, Solapur is approximately 12 km from the plant towards south-east. ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 3 Figure 1.1 Project Location on Survey of India Toposheet ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 4 Figure 1.2 Accessibility Map of the Project Site ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 5 1.3 PROJECT DESCRIPTION 1.3.1 Resource Requirement Land: The Solapur LPG plant was constructed on 49.11 acres of land. Area required for the proposed MSV i.e., approximately 1600 sq. m. (~0.40 acre) is available within the plant premises. No additional land will be required for the proposed project. Water: During construction phase, peak water requirement will be about 3.0 KLD to meet domestic and drinking water requirement for construction workers. About 10 Kilolitres per Day (KLD) of water will be required for construction work. Domestic water requirement will be met through Maharashtra Industrial Development Corporation (MIDC) supply, whereas water requirement for construction work will be sourced from local supplier. Presently, about 27 KLD of water is required for operation of the plant. Water is sourced from MIDC, Chincholi. After proposed expansion, additional quantity of water will not be required for the project. Power: During construction phase, power will be sourced from two diesel generator sets each having capacity of 125 kilo-volt-ampere (KVA). During operational phase, maximum demand of power for plant is about 380 KVA which is obtained by the grid connection from Maharashtra State Electricity Board (MSEB). Further, diesel generators sets (1x 500 KVA, 1x 250 KVA and 1 x 65 KVA) are installed to serve as alternative sources of power supply during power failure. No additional quantity of power will be required for the proposed expansion project. Manpower: The construction and commissioning of the project will take about approximately 12 months and peak labour requirement will be about 60 including skilled, unskilled and professional work forces. Construction workers will be sourced from nearby villages & town. No labour camp would be developed on-site. Existing amenities like portable drinking water, toilet, rest room etc. will be used by the construction workers. Manpower requirement for day to day operation of the plant is 100 including BPCL staff and contractor’s workmen. No additional manpower is required for the proposed expansion project. 1.3.2 Operation Description Existing operational process at the Solapur LPG plant is receipt of LPG by bulk tankers, storage of LPG in different type of storage vessel (MSV, Sphere etc.), bottling of LPG using electronic carousel, quality checking of LPG cylinder and finally dispatch to different distribution centre. Under this ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 6 proposed expansion project, there will not be any changes in the existing operational process. Description of Proposed Storage Facility- MSV Proposed project will involve construction of MSV (2 Nos X 300 MT). Mounded storage is the term given to the pressurised storage at ambient temperatures of liquefied petroleum gases in horizontal cylindrical tanks placed at or just below ground level and completely covered with suitable backfill. Here it is proposed that two tanks to be placed side-by-side under one ‘mound’. Proposed MSV will be constructed as per OISD (Oil Industry Safety Directorate) 150 and PD 5500/ SMPV (The Static and Mobile Pressure Vessels) rules. 1.4 POLLUTION SOURCE, CATEGORIZATION AND CONTROL MEASURES 1.4.1 Waste Water Construction Phase Sewage will be generated during this phase from site office. The same is planned to be treated onsite using the existing STP of 15 KLD capacity. Treated water will be utilised for landscaping. Operational Phase During operational phase, approx. 8 KLD of waste water will be generated from domestic use. Sewage generated from the plant will be treated through the existing STP of 15 KLD capacity. Approx. 14 KLD of effluent will be generated from the process. This effluent will be treated through ETP of 15 KLD capacity. Sludge generated from the ETP will be disposed at designated disposal site of the MIDC Chincholi. The treated water from STP and ETP will be utilised for watering of landscape area. Proposed expansion project will not generate additional quantity of sewage and effluent. Also, drainage system at the plant is to be provided with oil-water separator to prevent contaminants especially oil and grease, from being carried off by runoff. Storm water from the site will be discharged into adjoining drainage stream. 1.4.2 Solid Waste Construction Period During the construction period, construction wastes such excess excavated earth, construction debris and metal chippings will be generated. The ERM WILDLIFE & BIODIVERSITY CONSERVATION PLAN PROJECT #I 11991/0365808 DECEMBER 2017 7 construction debris will be used for filling work. Cement bags will be sold off to recyclers. Metal chippings will also be collected at site and sold to recyclers. Also, about 6 kg/day of municipal solid waste will be generated during construction phase of the project.