Company Profile

Grounding Systems Cathodic Protection Systems “Petweld” Exothermic Welding Equipment Lightning Protection Systems Flange Insulation kits

LOB 8 Office 15 Ground Floor P.O.Box 17565, Jebel Ali, Dubai, U.A.E

Tel :+(971) 4 88 11 361 Fax:+(971) 4 88 11 363

[email protected] www.petuniafze.com

January, 2010 Contents: Chapter 1: President's Message 6 Chapter 2: Company Overview 10 Chapter 3: Capabilities 14 Chapter 4: Project Refrences 20 Chapter 5: Equipment Details 74 Chapter 6: Organizational Chart 80 Chapter 7: Key Personnel 84 Chapter 8: Copies of Work Order 88 Chapter 9: Quality System 102 Chapter 10: Certificates 106 Chapter 11: Customer Satisfactions 114 Chapter 12: Catalogues 122

Contents

President’s Message

Chapter: 1 President’s PETUNIA Message

6 www.petuniafze.com Message: Dear Sir/Madam, President, PETUNIA M.R. Hedayati Sincerely to any ofyour projects. Justcallus. managementandadministrative team are ofPETUNIA readyMembers to give theirpersonalattention We great take eachday to pride provide thefineprotection solutions. East. Middle we areexcellence inthe thelargest inourproductsandservices, organization inprotection industry 18yearsNow after ofourcustomer, ofexceeding theexpectation to thehighestlevel byaspiring of hasbeenestablishedasanewcompany ofexothermic intheworld welding technologyIt in1991. Prevention. solutions for Grounding Systems, LightningandSurge Protection andCorrosion Control and hasbeendeveloping businessesthroughout thatprovides asanenterprise theworld totalPETUNIA support. directors, andStaffs, Managers On behalfofPETUNIA I to thank would like you for your patronage and 7 www.petuniafze.com PETUNIA President’s Message

Company Overview

Chapter: 2 PETUNIA Capabilities

10 www.petuniafze.com 2.1. BusinessDefinition: Company Overview: 2.4. International Tie-up: 2.3. Standards: Point:2.2. Goal case to casebasiswhenrequired. These companiesassistusin providing andsystems someofthematerials asback upassistanceona activity: subcontractors, alongwiththeir internal hasforgedPETUNIA, strategic leadersinits tieupwithworld requirements. are committed to standards provide thatexceed thehighestquality ourcustomers’ and expectations We manufacturetheaforesaid items asperaccepted standards.we localandinternational AtPETUNIA, complete customer satisfaction. to meetourcostumersneedsandexpectations. confirm equipment andservices Therefore, we achieve of theabove systems inaccordance withacceptable methods, to ensure anddemonstrate thatour The Company aimsare to provide materials: We are sufficientlyequippedto provide, manufacture, design and testofthe followingsystems: through throughout effective products thatare theirlife.rity engineering andhighquality supported supply thewholegrounding/lightning to protection ensure andcorrosion control assetinteg- package longer. Wether you are inoilandgas, andcivilengineering, marine andsubstations, powerplants we protection andgrounding cansave facilities;howeffective corrosion last structures control canmake we are buildingonmoreAt PETUNIA, understandingofhoweffective than18years unrivalled lightning r'03&/%MJHIUOJOHQSPUFDUJPOBOEFBSUIJOHTZTUFNT 5VSLFZ r4*#*--&'".&$"UFNQPSBSZFBSUIJOH 'SBODF r"--5&$TVSHFBOEMJHIUOJOHQSPUFDUJPO 6OJUFE4UBUFT r)0$,8":DPSSPTJPODPOUSPMTZTUFNT 6OJUFE,JOHEPN r&OWJSPONFOUGSJFOEMZ r4BGF r8JUI[FSPEFGFDU r0OUJNF r&DPOPNJDBMMZ r&íFDUJWFMZ r463(&1305&$5*0/ r'-"/(&*/46-"5*0/,*5 r-*()5/*/(1305&$5*0/ r&905)&3.*$8&-%*/( r$"5)0%*$1305&$5*0/ r&"35)*/(

We are amemberof: 3%"TTPDJBUJPO'PS.JOF*OEVTUSZ ofIranian EquipmentManufacturers. ofSociety 6. Member Industries Corrosion Association5. Iranian Engineers &Electronics Association ofElectrical 4. Iranian 3. Several ChamberofCommerce andIndustries 2. Association ofFaculty of ofEngineering University Systems Council onLarge Electric 1. International 11

www.petuniafze.com PETUNIA Capabilities

Capabilities

Chapter: 3 PETUNIA Capabilities

14 www.petuniafze.com 3.1. OurExistingFacilities: Capabilities: 3.3. MajorProducts &Services: 3.2. EngineeringandDesign Team: Head office: 3.3.1. Producing: PETUNIA has extensive experience ofawiderangethefollowing experience hasextensive ranges: product PETUNIA efficiently their requirements. Clientshave recognizedPETUNIA. through PETUNIA’s theprovision services, ofproject to provide ability outin Advantage hasbeensuccessfullyinvolved advancedengineering project carried inalmostevery fields. We are ableto provide teams ourclientswiththeproject to meetthechallengespresented bymature unique alternative experience. currently hasacore staffofseveralPETUNIA engineers. All ofthesehave becauseoftheir beenselected www.petuniafze.com [email protected] Fax:+(971) 48811363 Tel :+(971)48811361 P.O.Box 17565,JebelAli,Dubai,U.A.E LOB 15 Ground 8Office Floor r&BSUIJOH-JHIUOJOH1SPUFDUJPO4ZTUFNT r1FU8FME&YPUIFSNJD8FMEJOH4ZTUFNT 9. Lightning Strike Counters & 9. LightningStrike Testers. 8. ESEActive LightningCord. -JHIUOJOH1SPUFDUJPO"JS3PET 6. LightningProtection ClampsandFastenings. 5. Tinned Copper CableLugs. &BSUIJOH3PETBOE"DDFTTPSJFT Clamps. 3. Differentkinds ofEarthing 2. “PetWeld“ Thermo Welding and Accessories. Moulds Powder.1. “PetWeld”Welding Thermo

3.3.5. Site survey &Inspection: 3.3.5. Site survey Design: 3.3.4. Software 3.3.3. Design andEngineering: 3.3.2. Back-up Services: PETUNIA undertakes thefollowing surveys: undertakes PETUNIA water, location,stray current andothertesting. bymeansofsoil, andLightningactivities to evaluate theCorrosion, Earthing are undertaken Site surveys in successfullyachievingtheiradvancedfield technology requirements. are to hasdeveloped thecompany's assistan operator anumberofsoftwares specializations. PETUNIA design andconfiguration andothersoftware for customers’In-house requirements solutions bespoke forparamount concerns asuccessfulproject now. tailed design andengineering drawings in"AutoCAD", documentationare together withallnecessary processes theprojectexecutionThe engineering anddesign during phase isoneofthekey stage. De- ofthehighestquality. service from initialdesign to finalcommissioning.services Theaimis to give customers anefficient, professional the clients. hasensuredThe considerableexperience thattheCompany canprovide complete back-up sothatitcantailoritsproductoffering to theneedsof withthemarket maintainsclosecontact PETUNIA r-JHIUOJOH1SPUFDUJPO-FWFM4VSWFZ r-JHIUOJOH1SPUFDUJPO*OTUBMMBUJPO4VSWFZ r$POUJOVPVTMZ4VSWFZ r$POUBDU7PMUBHF 5PVDIBOE4UFQ7PMUBHFT 4VSWFZ r(SPVOEJOH4ZTUFN3FTJTUBODF4VSWFZ r$BSCPOBUF"OE4VMGBUF*POT4VSWFZ r1)4VSWFZ r4VMGVS3FEVDFE#BDUFSJB 43# 4VSWFZ r0WFSIFBEMJOF&íFDUPO#VSJFE4USVDUVSFT4VSWFZ r#VSJFE4USVDUVSFT/BUVSBM1PUFOUJBM4VSWFZT r"OPEFCFE3FTJTUBODF4VSWFZ r$PBUJOH3FTJTUBODF4VSWFZ r0O0í1PUFOUJBM4VSWFZ r4USBZ$VSSFOU*OUFSGFSFODF4VSWFZT r$MPTF*OUFSWBM1PUFOUJBM $*14 4VSWFZ r%JSFDU$VSSFOU7PMUBHF(SBEJFOU %$7( 4VSWFZ r$VSSFOU"UUFOVBUJPO5FTU $"5 4VSWFZ r$VSSFOU3FRVJSFNFOU%SBJOBHF4VSWFZ r4PJM3FDFQUJWJUZ4VSWFZ r'MBOHF*OTVMBUJOH,JUT r$BUIPEJD1SPUFDUJPO4ZTUFNT 14. Zinc Earthing Cells 14. ZincEarthing 13. Different Types ofAnodes 12. Test, andBondCurrent Control Boxes $V$V4P1FSNBOFOUBOEQPSUBCMF3FGFSFODF$FMMT .BOVBMBOE"VUPNBUJD5SBOTGPSNFS3FDUJñFST 15

www.petuniafze.com PETUNIA Capabilities PETUNIA Capabilities

16 www.petuniafze.com 3.3.6. Training: training package. training package. PETUNIA’s Complete Training requirement System hasbeendesigned asaresult for ofindustry aflexible provide anappropriated backuplevel. services hensive rangeofmaintenance andsupport Operator andmaintenance trainingcanbetailored to meetcustomer needsandPETUNIA’s compre- 17

www.petuniafze.com PETUNIA Capabilities

Project References

Chapter: 4 Project PETUNIA Refrences

20 www.petuniafze.com Project References References Project 2- Engineering 1- Supply 4.1. Worldwide Projects:4.1. Worldwide Itm Client/End user Project title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project title, Description Client/End user Itm 5ABBFu usain 2001 2000 2000 Four Substations 1999 1998 United ArabEmirates Proj. System Pro. Earthing Aghar &DalanPro. 1996 A.B.B AluminumInd. AlMehdy Sunir T.S.G Pro. I.R.IRailway FRI 15 14 Zhamper 13 12 11 10 1Zia 2002 2002 2002 Proportional Part 2002 2002 Lashte NeshaSubstation 2002 2001 4 Oroumiyeh-Miandoab Daelim 2002 Zhital 2002 Tablieh Roudsar-Langeroud Substations A.B.B Dehno&BorazjanSubstationExt. 2001 A.B.B Pipe 32 A.B.B 31 2001 2001 Toyo 2001 4SubstationinZanjan 30 2001 Borazjan 2002 Temporary Device Earthing A.B.B 29 A.B.B Dehno&BorazjanSubstations Substation Miandoab 28 Oroumiyeh27 Substation 2001 26 Connector DubaiSafe Way Co. A.B.B Pro. I.R.IRailway 25 A.B.B 24 A.B.B 23 Abu DhabiProj. A.B.B 22 A.B.B 21 20 19 Adyard AbuDhabiLLC 18 17 16 Some ofthemajorprojectreferences are asfollow. ground systems, Lightningprotection systems andCathodicprotection systems. for under Currently to contracted provide services materials, project engineering designs andsupport hasbeeninvolved ofthedomesticmarket. Since itsformation, PETUNIA inamainproportion .. hmErhn tto 2006 2006 station GhomEarthing 2005 2005 Power plant 2005 2006 RoudshourPower Plant Safa& Borzouyeh Petrochemical RoudshourPower Plant A.B.B 2000 C.P.T 9 SA UnitInternational E.E.S Cathodic Materials JKT 9 A.B.B 8 7 6 Technips-Nargan 5 Force Navy 4 3TOYO2 1 4 4- Installing/Testing/Training 3- Manufacturing th th Aoai 2002 Aromatic Aoai 2004 Aromatic th Oei 2003 Olefin ** ** **** ** ** **** ** ** ** **** *** ** ** *** ** ** ** ** *** ** *** *** ** ** ** ** ** ** *** ** **

* 2- Engineering 1- Supply Worldwide Projects: Itm Client/End user Project title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project title, Description Client/End user Itm 9CadErhn ytm2006 2004 System Earthing 2004 2006 2004 2004 Harat Substation LOT 2.3 2006 LOT 2.1 Al SinvaAinAlBayza System Afghanistan EquipmentEarth Chaad ArianEnergy Pars Shargh Moham 39 Pakistan Siemens SAPTA 38 Pakistan Siemens TMB 37 36 35 34 33 8Eao2009 2009 2009 2009 2008 2008 2008 2007 2008 Elaco 2007 P.I.D.E.C 2007 SaadiSubstation Elaco 2007 Zhalkeh 2007 CPT 2007 Elaco 2007 2007 STG.CO 68 2007 DIDEC 67 2007 Zob Foolad A.B.B G3000 66 Zhalkeh 65 2007 DarrehShahr 64 2007 2007 2007 2007 Zhalkeh 63 2007 Technical SuppliesEst RoudshahrPower House 62 A.C.A 2007 61 Technical SuppliesEst A.B.B 60 Order 5 Tariana 59 Zhalkeh 58 2007 57 Siemens 2006 56 A.C.A 55 AljonoobolAragh 2006 SNT System Earth 54 53 A.C.A PO-377 52 AljonoobolAragh 2006 System Earth 51 Siemens Temporary SubstationQum(III) Earth Tablieh 50 Spec 49 Shabbir 48 Hafif 47 A.B.B 46 UISA.Co 45 A.B.B 44 43 42 41 40 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** *** 21

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

22 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End user Project title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project title, Description Client/End user Itm 1Nmaa e I2003 2003 2003 Pet II 2002 LAB Storage Khark Tanks 2002 9 EpPlant ShahrMTBE Mah Plant(BIPC) Namvaran 2002 2002 EnershimiLLDPE N.I.O.C 2001 Enershimi 2003 21 Storage Tanks Storage Tanks PIDEC Technips-Nargan 20 Cathodic Materials 19 2001 Namvaran 18 Plant 17 Petrochemical Khark Plant 16 Bandab olAnbiaCo. Khatam Cathodic Materials 15 SadraCo. 14 13 12 Palayesh Naft Co. 11 10 7Ia eea otatr ii2006 2005 2005 2009 2005 2005 2004 2005 Oroumiyeh Power Gas House 2004 Siri 2005 Damavand U/G Station Khavaran Strategic Tanks2,4 BamRah Urea 2004 4 2004 2004 2004 GeneralContractors Iran BinaConsultant SabonOil&Gas Parsian 2004 38 Nargan 37 Parsian 36 LAB 35 Namvaran TOYO 2004 34 Khorak SPEC 33 SPEC 32 Urea &AmmoniacPlant 31 30 Energy Mesbah 29 Borzuyeh Petrochemical Co. Enershimi 28 AriaEnergy Pars 27 SadafCo. PIDEC 26 25 24 23 22 ... ahdcMtras2000 1999 1999 Cathodic Materials MTBE Plant College Pipeline Gas 1998 1998 1998 Sure Project Soleiman Gas Masjed Aghar &Dalan Well Casing(OIEC) 1998 N.I.G.C N.I.G.C PIDEC Arak Petrochemical Plant Namvaran 7 6 Namvaran Arak Petrochemical Co. N.I.O.C 5 4 3 2 1 ernJvnC.Ctoi aeil 2000 Cathodic Materials 2000 Power Unit 7-8Ramin Station Tehran Javan Co. Consultant GhodsNiroo Eng. 9 8 4- Installing/Testing/Training 3- Manufacturing &Zabol Water Transmission th Pipeline Aoai 2004 Aromatic th Oei 2003 Olefin 2001 * ** ** ** ** ** ** ** ***** *** ** ** ** ** ** ** ** ***** ** ***** **** ** * * * * ** ** ** * ** * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End user Project title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project title, Description Client/End user Itm 4SzhHP a 2005 2005 2005 HDPEJam Cathodic Protection 2005 2005 Benzen Project PVC,C/F Arvand Milad Tower Sazeh Nargan Chagalesh Mesbah 44 43 BolandPayeh Sazeh 42 41 40 39 6Rs r yi 2007 2007 2007 Syria 2007 2007 2007 Syman Shahrekord 4Substation ButadinDerivation 2007 2007 Substation 4 Pars Power Plant Ardebil Power Plant Ara Rasm 2006 2006 2007 Fars Scout 2007 2006 Ishmally Namvaran Parsian Petrochemical Amir Kabir 2006 76 Asalooyeh Power Plant Niroo Mabna Syriah Hamah KermanshahHDPE SAPTA 2006 75 Sangal Rasab 74 2006 73 72 Namvaran 2006 Parsian Power 2006 Plant SimanBojnurd SAPTA 71 2006 LightningofGondaleh 70 GhaemRefinery Power Plant EhdasSanat 2006 Sazeh 69 Power Plant 68 FULMEN 2006 2006 2006 67 2006 Control Station Urea &AmmoniacPlant Shargh Moham 66 ChadorMalu 65 Behinab Power Plant 2006 JamPetrochemical Unit-2 Air64 Separation 2006 2006 Panah Iran Saz Nargan 63 Siri 62 Asalooyeh 6,7,8Phases Namvaran Power Gas Plant 2006 61 2005 IOEC 2005 Shargh Moham 60 Harat Station 59 Namvaran 2005 2005 Sazeh 58 Pars South 6,7,8 Pars Petrochemical RLL-840403-LA 57 Pars Keyhan Chad 56 ShahriarIron Protection 55 SinaShishe IGC Shargh Moham 54 53 52 Lavan OilRefinery Petro Pay Sazeh 51 Sazeh 50 49 RoshdSanat 48 47 46 45 4- Installing/Testing/Training 3- Manufacturing Kazerun ProtectionKazerun Site, project Mobin Yazd LightningProtection Site,Old 2005 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** 23

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

24 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 aaeNf 1996 1996 1996 Kereng NGL-1500 Injection Gas OilRefinery 1995 1995 1996 SaziArakSubstation Mashin Substationfor ArakPower 230KV Plant 1995 Kalaye Naft Khozestan Cement Pro. N.I.O.C IsfahanOilRefinery 1995 1995 GilanPower Fara Plant Niroo 114 Substation ofGharbState 400KV 1995 Sarcheshme Copper Industry SAPTA 113 Khozestan Cement 112 Tabriz Petrochemical Pro. 111 G West Power Plant 1995 110 GilanPower Plant 1995 109 of Chabahar Office Free Zone Khiz 108 GoleGoharIron Industrial ofaSubstationinAbadan Repair Tabriz Petrochemical 107 106 SAPTA ChabaharFree Zone 105 Control1994 104 Tehran Niroo 103 Office Tehran of Traffic 102 Tehran of Office Traffic Control 101 100 7FLE 3 VSrohSbtto 1993 2009 Substation Sormogh 132KV 1993 2009 Petrochemical Ilam 2009 2260-1-2-0603 ShazandArakRefinery 2009 2008 2260-1-2-0603 ShazandArakRefinery 2009 olAnbiaHospital Khatam FULMEN 2008 2260-1-2-0603 ShazandArakRefinery 2005 2007 Pars, South Phases12 Sazeh olAnbiaHospital Khatam Norahan Sanaye NF3Plant ofBIPC Sazeh 97 NF3Plant ofBIPC Compressor NarGas 2007 Sazeh 2007 96 Petrochemical Ilam 2007 95 94 I.O.E.C NASRConsortium 2007 2007 93 Petrochemical Ilam Namvaran 92 HDPE Ilam 2007 Namvaran Sys., Earthing 6,7,8Phases 91 Farab 2007 Farab 90 2007 Damavand Power Plant CrudeOil Qeshm Tankage Ganji Area 89 2007 Norahan Sanaye 88 Pars South Power Gas Plant 87 Hirbodan QeshmInvestment Co. 86 Asia Electric EIED Khodro Sazeh Iran 85 Mapna 84 83 Hirbodan 82 Safanicu 81 Shargh Moham 80 79 78 77 9SPARstWtrNtok 1994 1994 WaterNetwork Abuzar Offshore Platform SAPTA Sadra 99 98 4- Installing/Testing/Training 3- Manufacturing South Pars,South Field Gas Developement Three SubstationsinSistanand leGhrIa r r.1995 Oreol eGoharIran Pro. Bluchestan State. Phases 15&16 2008 1995 ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** *** ** ****** ** *** *** *** ******* *** *** **** **** *** *** **** ** ** ** ** ** * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4 ... ua a neto r.1997 1997 Pro. Injection Kupal Gas 1997 IstahbanCement Pro. 1997 1997 Factory NirooTransProduction Tractor SaziPro. N.I.O.C IstahbanCement 1997 NirooTrans Refrans 1997 141 Petrochemical Khark BidbolandNGL-1500 Pro. 1997 Injection Gas N.I.G.C 1997 1997 140 139 Tractor Sazi 1996 ShoshtarSubstation 400KV 1996 N.I.O.C Pro. Pazanan Injection Gas Substation Sh. Gayati 400KV 1996 138 N.I.O.C 137 1996 Pro. Injection Gas Gachsaran Cement Karoun Pro. 136 Substation Meibod 1996 Sariak ZanjanPower Plant 135 1996 Safanicu 1996 N.I.O.C 134 SaloonofAlestom Power Sport Plant Cement Ilam Pro. DamPlant Karkhe 1996 133 1996 BandarAbbasOffshore Platform Cement Karoun N.I.O.C 132 131 FULMEN IslamAbadGharbSubstation 1996 Substation Borazjan 130 Tavanir 129 1996 1996 Cement Ilam I.O.E.C 128 Pro. Parsi Injection Gas Sadid 1996 127 Hormozgan Cement Pro. SAPTA 126 Substation Kangavar 1996 125 State Substationfor Markazi Pars Niroo 124 1996 123 ArakPetrochemical Pro. Hormozgan Cement N.I.O.C 122 Power Bakhtar Plant Seven SubstationofFars State 121 Day Electro 120 119 ArakPetrochemical 118 Fars Power Plant 117 116 115 4 atIdsr oserAoi ln 1997 1997 Atomic Boushehr Plant 1997 1Power Karoon Plant 1997 1997 Tehran Tower Pro. Shahrood Cement Pro. Industry Naft ofMaskan 14SubstationSets 1997 Pump Station BandarAbbasRefinery Farab West Power Plant 148 Shahrood Cement Forj Jonoob 147 SAPTA Sadra 146 145 144 143 142 4 ernPwrPat1997 1997 1997 Substation 230&63KV Substation ChadorMaloo Tehran Power Plant Yazd Power Plant Tehran Power Plant 151 150 149 4- Installing/Testing/Training 3- Manufacturing Kereng NGL-1500 Cathodic Prot. Kereng NGL-1500 Cathodic Prot. Expansion of Islam-Abad 230 KV Expansion ofIslam-Abad230KV Substation System System 1997 1997 1997 ** *** **** ********** ** ** **** ** ** *** *** *** *** ** ** *** **** *** **** *** *** ***** **** ** ** ***** ** ** *** ** **** * * 25

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

26 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 5 io odrGsIjcinPoet1998 1998 1998 Project Injection Gas Cathodic Protection Pro. KermanSubstation 1997 Pirok BornaElectric Bargh Mahtab 230/63KV Sh.Mofateh SAPTA 230KV 157 156 Power Bakhtar Plant 155 Power Bakhtar Plant 154 153 152 8 asNro 1999 1999 1999 PWPPro. 1999 1999 1999 Substationfor 10Sets IsfahanState AbbaspourSubstation Substation Azadegan 1999 1999 Raysoot Power 1999 Plant 1999 SAPTA Substation 132/20&63/20KV ArakPetrochemical Substation 63/20KV Pars Niroo Cement Karoun SubstationPro. OneSubstation 1998 Tehran Niroo 188 Parsian 187 Mapna Power Transmission 1998 LinePro. SAPTA 186 ShoshtarSubstation 400/132KV SAPTA 185 SAPTA 184 SAPTA 183 1998 182 Farasaz 181 Safanicu 180 1998 SiloofKermanshah 1998 179 1998 1998 178 Bayjan Substation Azar 63/20KV 177 1998 ArakPower PlantPro. Sistan Substation 63/20KV Genaveh 230/66KV Substation SAPTA 176 1998 1998 Cathodic Protection System Pro. 1998 175 SistanBalouchestanPower Plant 1998 Substation Abad132KV Khatoon Niroo Mabna 1998 G. T. S. 1998 174 Fara Montazer Ghayem Power Niroo Plant YCD’s Projects 173 1998 FULMEN 1998 Substations Pro. Safab 172 SAPTA 171 SKProject 1998 1998 SiriLandOilProject 170 IsfahanIron Work NasbNiroo ArakPetrochemical Cathodic Project 169 168 Turkmenistan Pro. Gas Power Semnan Plant N.I.O.C 167 ArakPetrochemical 166 165 S.M.Engineering JahanPars N.I.G.C 164 N.I.G.C 163 N.I.O.C 162 161 160 159 158 Development of Electricity Development ofElectricity Development ofElectricity Organization Organization 4- Installing/Testing/Training 3- Manufacturing Kouzestan Temporary SubstationsE. Substation for Khuzestan Water & otzrGamPwrPat 1998 GhaemPowerMontazer Plant Sbtto rkPwrPat 1997 SubstationArakPower Plant rkPwrPat 1998 Arak Power Plant Power Org. Devices 1998 1998 *** *** ***** ** ** *** ** *** ** *** *** ***** ** *** ** *** ** ** ** ** ** *** *** ** *** ** ***** *** ** ** ****** * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 ernPwrPatMaaiSbtto 2000 Maanavi Substation Tehran Power Plant 218 1999 1999 Turkmenistan Pro. 1999 for oneSubstation Earthing N.I.O.C Power Khorasan P Mapna 192 Fars Power Plant 191 190 189 2 eai ioz usain2000 2000 2000 Firouzi Substation 2000 QatranProject 2000 2000 Petrochemical Razi Pro. 2000 2000 230KV. Substation Metanir 2000 Substation Khoy 2000 3Substation Karoun Energy Mesbah Substation Rajaee Fara SanatSaz 1Substation Karoun 9 2000 223 Substation Khash Tondar Electronic 222 2000 Tehran Power Plant SAPTA 221 2000 2000 220 Parsian 2000 KermanPaslaft Substation. olifine 219 Parsian System for Earthing Substation 2000 Parsian 1999 Substations 8 217 Parsian Pro. Pipe Working 1999 2000 216 Bargh Mahtab Poly Acril Project 215 1999 NasbNiroo 214 AbuzarOffshore Platform 1999 213 FULMEN 3 Karoun Power Khorasan Plant 212 EIEC GodarLader 211 Substation Gavbandi 1999 Karoun I.O.E.C 1999 1999 210 1999 Poly Acril 209 I.O.E.C Dam ofKarkhe Interface 208 1999 Tehran Niroo 207 SistanSubstations 1999 1999 Tehran Niroo 206 Parsian 205 Parsian 204 Parsian System Pro. Earthing 1999 N.I.O.C Tel.Station 203 Parsian System for Earthing Production Factory 202 Rasan Niroo 201 200 Defense Ministry 199 Azarakhsh Electro Pol &Dezh 198 N.I.O.P.D.C 197 196 Yazd Power Plant 195 194 193 2 asa akePo 2000 2000 Pro. Karkhe 2000 3Substation&Power Karoun Plant Parsian Sabir GolGoharIron Industrial 226 225 224 4- Installing/Testing/Training 3- Manufacturing atKoaa usain 1999 Substations Khorasan lant Darab, Divandare &Boushehr Substations 2000 ** ** ** ** ** **** ***** ** ** *** *** *** ** ** ** **** ** ** ** ** ** ** ** ** ** *** ** ** *** ** *** ** **** **** **** * * 27

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

28 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 3 asa esea usain2000 2000 Substation Neishekar 2000 2000 Substation 132/20KV AbadSubstation Khatoon HamadanSubstation 2000 Parsian Power Khorasan Plant SAPTA ShadmehrSubstation SAPTA 232 Parsian 231 230 Power Khorasan Plant 229 228 227 6 aaa 2000 2000 2000 2000 2000 2000 2000 BusProduct Industry Airport Khomeini Imam Arminestan Tehran (mosalla) 2000 2000 2000 ArakS.S Farasaz 2000 Substation Soleiman Masjed Dara Electro Barsam GheshmSubstation 2000 2000 Tabiran 1Power Karoon Plant 2000 264 Forj Jonoob SAPTA 263 2000 ntrolling I.R.I.Railway Pro. DamPower Karkhe Plant 262 Safanicu 2000 261 2000 Parsian Power Soleiman Masged Plant 2000 260 Parsian 2000 Farab 259 Hormozgan Substation 258 Maharan KermanS.S 2000 Farab 257 Substation Garb Farab 256 DubaiSubstation 2000 Zhital Abadan WaterNetwork 255 2000 2000 254 Ponel Substation 132KV 253 Parsian Damavand Sepehr 252 2000 2000 Tehran Niroo Fajr Substation 251 Parsian 2000 5SubstationFrom250 18Substation Parsian 2000 Ges 249 1Substation Karoun 2000 SAPTA 248 Substation Gangali 2000 247 Petrochemical BandarImam Pro. Substation Iranshahr 246 FULMEN Airport Khomeini Imam 245 Parsian Tondgooyan Petrochemical 2000 244 2000 Substation SAPTA IsfahanDefense Industry 243 ZadnooreJonoob Production Methanol Kharg Complex 242 Parsian 241 Parsian 240 N.I.O.C.E SAPTA 239 PIDM 238 2000 237 system for Earthing Substation 236 235 Water Khoozestan andSewage 234 233 4- Installing/Testing/Training 3- Manufacturing Neka &AlamdehSubstation230/63/ Neka KV 2000 ** ** ** ** ** **** ** ** ** ** ** ** ** *** ***** ** ** *** ** ** **** ****** *** ******* ** *** ** ** **** ** ** *** ** *** * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 0 aaio 2001 2001 2001 2001 2001 2001 2001 2001 Bootadin AmirKabir 2001 Power Karoon Plant 2001 Substation Razi Safaniroo 2001 Chagalesh Farasanat Ban Parsian 2001 Fars Substation Abezh 303 2001 302 Parsian Tabriz Petrochemical Plant 2001 2001 301 Sazeh Khavar Sabir 300 Power Khoy Plant 299 Tower Electro Substation Senegan 298 Substation Khaf Control Electro 297 Parsian Sazeh 296 295 Toseeh Silooha 294 Bargh Mahtab 293 Bargh Mahtab 292 291 290 289 8 agnBneePo 2001 2001 Banzene Pro. 2001 Pars South 2001 1 Khouzetan 3SubstationsIn 2001 2001 2001 2001 2001 2000 Tabriz Temporary Device BootadinProject Earthing 2001 Nargan GilanSubstations 2001 FULMEN I.O.E.C Amir Kabir IDROPro. Niroo Mabna Clamps Some 2000 288 Station ButaneGas Chagalesh 2000 287 2001 2000 Bargh Mahtab 286 2000 285 Azarakhsh Mashal Frico Production Factory 2000 Cement Boushehr Pro. 284 ShafaS.S JahadDaneshgahi 2000 2000 2000 Faragir 283 Fars S.S Khoy Power Plant 282 Butane 2000 281 Polyethilene Pro. WaterNetwork Abadan– N.I.O.C 280 BoushehrCement BotadinTabriz Freeko 279 2000 278 KermanTablo 277 Parsian Substation Soleiman Masjed 276 Parsian 2000 275 Chagalesh 274 Chagalesh 273 Substation Kangan Niroodeh SAPTA 272 N.I.O.C 271 270 Mapna 269 268 Fars Power Plant 267 266 265 4- Installing/Testing/Training 3- Manufacturing ** ** **** ** ** ** ** ** ***** ** *** ** *** *** *** * *** ** ** *** ** *** *** *** *** *** * ** *** *** ** ** ** ** * * * * * * 29

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

30 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 ia arzRfnr 2001 2001 2001 Tabriz Refinery 2001 2001 Substation Khoy 2001 2001 Project Azarkhsh Yazd Line Overhead 63KV Misan Petrochemical AmirKabir Substation Khandab Tondar Electronic Tehran Niroo SAPTA Sehat 310 309 Nargan 308 Parsian 307 306 305 304 3 atrnEeti 2001 2001 2001 2001 2001 2001 Substation NeishabourInterface 2001 2001 Isfahan& Torbat Jam Substations Zabol Water Pipe LineProject Kazeroon 2Substation 2001 2001 ShariatiSubstation Parsian 2001 Khorasan Melamine Crystal FULMEN SAPTA 2001 Parsian 2001 2001 2001 DamProject Karkhe 342 2001 341 Parsian Nastaran Electric 2001 340 Zahedan Water LineProject Nargan Dam Soleiman Masjed IsfahanNuclear 339 Etanir 338 Faragir Industrial Khozestan 2 Maroon Dam 337 Farab 2001 336 2001 2001 Tabriz Petrochemical 2001 SAPTA 335 2001 Farab 334 2001 2001 Hashtgerd Substation &Divandareh Substations SAPTA 333 Polyethylene 2 332 2001 Tehran Niroo Port Sea 3rd Metanol Imam 331 FULMEN Avang 330 2001 329 2001 FULMEN Kazeroon Substation 328 FULMEN Project Khomeini Imam 2001 327 2001 2001 Chagalesh Sazeh 326 KermanPower Plant 2001 325 3SubstationinDarab 324 Power Semnan Plant Fajr SahandeKish Substation Armenia SubstationProject 323 Parsian 322 Parsian 321 Pars Tablo Natan 320 319 FULMEN 2001 SAPTA 318 317 Parsian 316 Abad Susstation Khatoon 315 NasirBonyad 314 concrete industries consortium 313 312 311 4- Installing/Testing/Training 3- Manufacturing ** ** *** *** ** ** ** *** *** *** ** *** ** ** *** **** ** ** *** *** *** **** *** ** *** *** ** *** *** *** *** *** ** ** *** *** * * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 8 asa eaSbtto 2002 2001 2001 2002 Substation Neka 2001 Methanol 2001 Substation Mahshahr 2001 2001 BootadinTabriz 2001 2001 NGLSubstation 2001 Khodroproject Iran Parsian 2001 2001 Parsian Sazeh Plant GoharIron Gol 2001 2001 Chagalesh 2001 2001 381 GilanProject 380 FULMEN Rasab 379 Abadan2Substation 2001 2001 378 Namvaran 377 Simaran 376 2001 Power Kazeroon Plant Bargh Mahtab 375 2001 2001 374 BornaElectronic 2001 Pro. I.R.IRailway 373 Parsian 2001 372 Substation Daryasar Pars Hassas 371 3Substation Karoon 370 Mapna ChinehVardineh 2001 1 PET Kaloot 369 2001 368 P.O.G.C 2001 Syria SubstationIn 8Sets 367 Yazd366 WaterPlan Parsian 2001 Lootek Substation 2001 365 Parsian Power Karkheh Plant 2001 2001 364 2001 DieselPlant Khodro Iran ShahabNiroo 363 2001 Chagalesh 2001 362 Parsian Substation Iranshahr Ahvaz South 361 Substations Khorasan ArmandArmeh 360 2001 FULMEN 2001 SariSubstation Farab 359 358 IstaFar BooinZahraSubstation 2001 2001 357 Bargh Mahtab 356 Parsian 2001 Pars South 355 FULMEN Khozestan Substation 354 Substation Karoon 353 Parsian Payesh sanatNovin Frahan Substation 352 Parsian 351 Control Sanaat 350 ElmoSanaat 349 FULMEN SAPTA 348 347 FULMEN 346 345 344 343 4- Installing/Testing/Training 3- Manufacturing *** **** ** *** ** *** ** ** *** *** *** *** ** ** *** *** ** *** ** *** *** ** ** ** ** *** *** *** ** ** ** *** ** ** * * * * * 31

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

32 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 8 i as2002 2002 2002 2002 Tanks Khark Metanol 2002 ButadinTabriz 2002 Bistoon Petrochemical 2002 Bahregansar Sazeh Khavar Kiana Ahvaz West Substation North FULMEN Pars Nir 388 Rasab 387 BornaElectronic 386 Parsian 385 384 383 382 1 ai 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 Attachment AmirKabir Thirty 2002 QumTelecom Sabir 2002 Attachment 2002 2002 Peyman SanaatFajr Syria Substation 418 Attachment Thirty GilanPower Plant 2002 417 Nargan Damavand Power Plant 2002 416 Petrochemical BandareImam 415 Azarab Kish 2002 414 Petrochemical Amir Kabir P.I.D.C.O 2002 2002 413 Toseeh Silooha 412 Parsian Offside Sunir 411 410 Cooling Tower attachment Dara Electro 2002 409 408 Attachment Polypropylene Thirty 2002 407 2002 Tondgouyan Petrochemical BolandPayeh 406 Tondgouyan Petrochemical 2002 Chagalesh 405 Tabriz Petrochemical Plant Mapna 2002 2002 404 Nargan 403 Kiana 402 Tooshka 2002 Parand Substation 401 Chagalesh 400 TPP Port Petrochemical Imam 2002 399 398 Nargan 397 FULMEN SistanBalouchestanPower Plant 396 I.O.P.T.C 395 B.I.P.C 394 DenaElectric 393 392 391 390 Inspected Technical &Engineering 389 4- Installing/Testing/Training 3- Manufacturing Second AttachmentSecond BootadinAmir One Attachment ofBootadinAmir Second attachment of Amir Kabir attachmentofAmirKabir Second Petrochemical Plant Kabir Kabir 2002 2002 2002 *** *** **** *** ** ** *** *** ** ** **** *** ** *** *** *** *** ** **** ** ** ** *** *** ** *** *** *** **** ** *** *** *** *** * * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 2 oae aa 2002 2002 2002 2002 2002 2002 2002 2002 Parand Substation 2002 Substation ClampKaraj BAMSubstation 2002 2002 2002 FULMEN Fars Engineering Research FULMEN Temporary Earth Sazan Solaleh 431 SubstationUorim 2002 430 429 Safaniroo Project SubstationMoniran 73 Toseeh Montazer GhaemPower Payam Zagros House 428 Balagar 427 Farasaz 426 Parsian 425 Parsian 424 Parsian Yam 423 422 421 420 419 5 oa rn2002 2002 2002 2002 2002 2002 2002 BAMSubstation 2002 Kiana 2002 2002 2002 BornaElectric Zolal Iran Karoon Fractional part 2002 2002 Kiana Tabriz Station Abezh 454 Contractors Industrial Iran Design Industrial Iran I.T.I 453 System 2002 Syria Earth 2002 452 Alvand 451 Parsian SubstationAbadan738 450 2002 Nicksazan 2002 449 2002 Substation Namvaran Tooga 448 2002 2002 447 Nir Arya 2002 Khavaf &Sangan Farahan Substation Attachment Earthing 446 2002 ElmoSanaat Fajr-Kangan Substation 445 Aromatic 4BXNI801 444 2002 Aromatic 4AXNI 801 BaghiElectric 443 Parsian Tondgouyan Petrochemical 442 BoilerKangan System inSuriyeh Earth Bargh Mahtab 441 FULMEN 440 Parsian Sazeh 439 Sazeh 438 437 Energy Azarab 436 Parsian 435 434 433 432 5 aa as2002 2002 2002 426Khondab Earth Parsian JahanPars Petro Pars 457 456 455 4- Installing/Testing/Training 3- Manufacturing ** *** *** *** ** *** *** ** ** ** ** *** ** ** *** *** ** *** ** ***** ** ** *** ***** *** *** ** *** *** ** *** *** *** *** * * * 33

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

34 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 6 asa aonSbtto 2002 2002 2002 Maroun Substation 2002 KeritSubstation 2002 2002 2002 Bisotoon Petrochemical &LightningPro. Earthing Parsian Parsian Pars Online SAPTA 464 Forg Shargh 463 462 Payesh SanatNovin 461 Power Khorasan Plant 460 459 458 9 omza oe ln 2002 2002 2002 2002 2002 Damavand Substation 2002 2002 2002 Poonel Substation BAMSubstation Substation CheshmeSefid 2002 Parsian 2002 2002 TOLA Substation Power Soleiman Masjed Plant Bargh Mahtab 2002 Hormozgan Power Plant SAPTA 2002 Substation Ilame 2002 496 Parsian 2002 2002 495 Payam Bargh 2002 494 Bisotoon Substation Electro Farab MTBE-1 Cathodic 493 2002 492 shomali Rashte Polypropylene 2002 Bargh Mahtab 2002 491 490 HajiAbad Parchin 2002 Petrochemical Mahshahr 489 Khorasan Melamine Crystal 2002 Abadan758 SamenAndish SAPTA 2002 488 487 2002 2002 Fumen Substation Bargh Mahtab 486 Farbod Saz Communication station Asalooyeh Gas 485 2002 OilRefinery 484 Nargan Polypropylene SAPTA 483 482 Parsian 2002 2002 2002 481 FULMEN N.I.G.C 480 2002 &LightningPro. Earthing 479 Nargan Neyshabor Substation 2002 Sehat 478 Bahregansar 477 Nargan 2002 JaafariStation 476 475 Shabakeh Electro Tooga 474 Gerifin Kuyeh 2 Azadegan andDesign Inspection 473 Parsian 472 I.O.E.C 471 Defense Ministry 470 469 SahandPomp Station Tehran Niroo 468 467 466 465 4- Installing/Testing/Training 3- Manufacturing ** ** **** ** ** *** ** ** ** ** ** *** ** ** *** ** ** ** *** *** *** ** ** ** *** ** *** *** ** ** *** *** *** *** * * * * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 3 aos 2002 2002 2002 2002 2002 2002 2002 4UnitPomp Station 2002 2002 2002 &Lashtenasha Substations Rasht North 2002 Tavoosi Namvaran Jord Pump olMonazzah Station 2002 FARS Substation 2002 Bargh Mahtab Parsian Saco 535 2002 2002 534 ArmandAb 2002 533 532 Bandar AbbasRefinery BornaElectric Misan 531 Contractors Industrial Iran Etocsilat 530 Asalooyeh Project 529 Keysoon Management Hirbodan 528 527 JahanZangAzar 526 Payesh Sanat Novin 525 ArakPetrochemical Farasanat Ban 524 Nargan 523 522 521 520 1 RB2002 2002 2002 2002 EtanMaroun Bazyaft 2002 2002 BOYLER 2002 2002 2002 NematAbadProject 2002 2002 Nargan 2002 2002 2002 Maroon Polypropylene GISFardose Energy Azarab 2002 IRIB NasirBonyad 2002 519 Parsian Bahregansar 518 2002 517 DROD 516 Bargh-o-Technic Nargan concrete industries consortium 515 FULMEN 514 Barsam 2002 513 2002 2002 512 Parsian BooshehrCement 2002 511 Electero Niroo 2002 510 2002 JahanPars SHERENOSubstation LightningPro. Defence Ministry 1 Karoon 509 P.I.D.C.O 508 Power Kazeroun Station BaghiElectric 507 506 Chineh Vardineh SamanSanat 505 504 Parsian Telecom Station Gas 503 Farab 502 AirPort Khomeini Imam 501 500 499 Khozestan Petrochemical 498 497 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** *** ** ** *** ** *** **** *** ** *** *** ** ** ** ** ** ** ** ** *** ** *** *** *** ** *** ** ** ** *** *** * * * * 35

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

36 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4 MC2002 2002 2002 Gheshm Tanks 2002 2002 JahanPars Damavand Substation CMEC Refinery Gas Ilam Ag Electro Niroo Mabna 541 540 Toseeh Silooha 539 Tehran Jonoob 538 537 536 7 aot2002 2002 2002 2002 3Communication 2002 18Different Feeder 2002 2002 2002 2002 2002 BXHFOO6A&BXHF00ECCathodic 2002 AXHFOOGA KermanSubstation 2002 Tehran Niroo N.I.G.C 2002 Syria Substation Kaloot 2002 2002 Sazeh Petrochemical BandarImam Co. 573 Fars Power Plant Tehran Niroo 2002 Dorriz 572 2002 2002 Sazeh 571 2002 2002 570 Safaniroo 569 P.I.D.E.C 568 Tower Electro 2002 567 Safaniroo MTBE 566 STEAM 2002 2002 565 Mapna 564 Asid Acetic Plant CMB 563 2002 2002 562 Tabiran 2002 2002 Petrochemical BandareImam 2002 561 2002 2002 560 2002 ShiratTalashGostar Pars Hassas ArakSubstation 559 2002 Asfalt Toos 558 Khark Zolal Iran Tanks BangladeshSubstation EIED 557 NGL 556 555 554 Gharargahe OlAnbia Cement Khatam Khouzestan Sazeh Khavar 553 Parsian 552 Parsian 551 Tabriz Refinery 550 JahanPars 549 Mouj Kar 548 Tanavob 547 Techinco 546 Tooshka 545 544 543 542 4- Installing/Testing/Training 3- Manufacturing Temporary Device. for Earthing Ivan, Nagal, 2002 ** *** ** ** ** ** ** *** ** *** *** ** *** *** ** *** *** *** **** *** *** **** ** *** ** ** *** *** ** ** ** ** * * * * * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 0 an io atigMtra 2003 2003 2003 Material Earthing 2003 2003 2003 Material Substation-Earthing Mobin Moniran Material Propilen -Earthing Maruon 2003 2003 Material Earthing Niroo Mabna Parsian 2003 Parsian Ahvaz 3Substation 608 Material Substation -Earthing Azna 2003 Tabriz Substation Nargan 607 606 Energy Mesbah 2003 Material Amak-Earthing Peyma Bargh 605 P.I.D.E.C 604 P.I.D.E.C 2003 2003 603 Parsian Material Earthing Material 6StationsProject -Earthing SAPTA 602 2003 Material Bahregansar -Earthing 601 Material LarDamSubstation-Earthing Iritec 600 2003 599 Fanavaran Petrochemichal Material ZanjanSubstation-Earthing 2003 Enteghal Niroo O.I.E.C 598 2003 I.O.E.C Material Substation-Earthing Minab 597 2003 2003 596 595 Enteghal Niroo A.B.B 594 FULMEN Cathodic Protection 593 Material Earthing 2003 Safaniroo 592 Material 9tholefin-Earthing 2003 591 Safaniroo 2002 590 2003 ArmandAb 2003 589 Bardasbi Pump Station Enershimi Aromatic -4Catodic Protection P.I.D.E.C 588 9tholefin- Catodic Protection Nargan 2003 587 2003 Namvaran 2003 586 material AXHF006A -Earthing 18Different Material Feeder -Earthing Farda Sakhtar Sazeh Material Kerman1&2-Earthing 585 584 Nargan 583 Tehran Niroo 582 Tehran Niroo Sazeh 581 580 I.R.IRailway 579 578 577 576 7 agn9hOei 2002 2002 9thOlefin Melamine Crystal Khorasan Nargan Nargan 575 574 4- Installing/Testing/Training 3- Manufacturing Temporary Devices Earthing Modolar AsalooyeModolar Fars Substation- Jord Pump olMonazzah Station- Maroon Petrochimical -Earthing substation - Earthing Sanandaj substation-Earthing Khouzestan 5Substations- Khouzestan Earthing Material Earthing Material Earthing Earthing Material Earthing Substation Material Material 2003 2003 2003 2003 2003 2003 ** ** *** ** ** ** *** *** *** ** *** *** ** ** *** ** ** *** *** ** ** ** ** ** *** ** ** ** ** ** *** ** * * * 37

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

38 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 asa bdnSbtto atigMtra 2003 Material AbadanSubstation-Earthing 2003 Material Earthing Parsian Enershimi Enteghal Niroo 613 AmeranOfogh 612 Tehran Niroo 611 610 609 4 asbZvh&Zri ah 2004 2004 -2004 2004 Zaveh &ZarrinDasht 2004 BOPDamavand 2004 2004 2004 2004 Asalooyeh Tehran 18Feeder Regional Electricity Maroon Field Development JamPolyethylene Mahsab Siri2 2004 Tehran Niroo Parsian 2003 2003 644 Refinery Abkherad 2003 Chagalesh S/S Khodro Iran 2004 643 Parsian 642 Nargan Material Earthing Material Earthing 641 Strategic Storage Tanks 2003 Tehran Material Niroo Earthing Sadaf 640 2003 Material Qum3Substation-Earthing 639 2003 Enteghal Niroo 638 Material Substation-Earthing Songon 637 SabonOiland Gas Material Earthing Toseeh Silooha 636 BAROUS 2003 A.B.B 635 Etanir 634 2003 A.B.B 633 2003 2003 632 Material Earthing BornaElectric Damavand 2Substation 2003 631 Material Binak-Earthing 630 Parsian Material Earthing 2003 629 Petrochemical BandareImam Sazeh 628 Material Earthing 2003 627 2003 Tarh Material Earthing oPalayesh Parsian 2003 626 2003 2003 625 Material Asepas Substation-Earthing Material Earthing Moshiran DaneshPouya Sepehr 624 Material Earthing Material Earthing 623 Structure Enteghal Niroo Material Earthing 622 621 Enteghal Niroo 620 Tabdil Energy Paya Pars Parto 619 618 Kaloot OilRefinery 617 616 615 614 4- Installing/Testing/Training 3- Manufacturing Mobile Gakigoor Substation- Gakigoor Mobile LAB -Bistoon Petrochimical - BXHF006DA -AR4Project - Old kermanSubstation- Sahel BorjSubstation- Boushehr Substation- Cathodic Protection Earthing Material Earthing Earthing Material Earthing Material Earthing Earthing Material Earthing Earthing Material Earthing 2003 2003 2003 2003 2003 2003 ** ** ** *** *** ** *** ** *** *** ** *** *** *** *** ** ** ** *** *** ** ** ** * * * * * * * * * * * * * Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 8 i pca oe-2004 2004 2004 - 2004 2004 (REQ-EE-019-L00) Aryasasol ASCAP 2004 2004 Koranj/Parsi - 2004 MR-E-055N 2004 2004 Sazeh OilSpecialZone 2004 SimanFars Nou Sazeh Sazeh 2004 2004 Damavand P.P. 682 S/S Kashkuieh 681 2004 NoughS/S Farda Sakhtar Minab 2004 680 Energy Mesbah 2004 inAsalooyeh EthaneRecovery BolandPayeh 2004 679 Parsian Kerman5S/S 678 2004 - JamPolyethylene (A/G) Toseeh Silooha 677 Tehran Niroo 676 2004 Tehran Niroo - 675 Nargan Mosala Pars KhodroS/S 2004 2004 674 Parsian 2004 2004 673 2004 Safaniroo 672 Nargan MR-1611-201(9thOlefine) 671 - 2004 2004 NirooPadjoo JamPolypropylene (UG) 2004 670 S/S 4Mobile Sahand Shargh Moham 669 - 2004 Tehran Niroo 668 Pars Parto 2004 667 Nargan Tehran Regional Electricity Takestan S/S 2004 666 - - 665 Nargan GhadirPetrochemical 664 2004 Tadbir Niroo 2004 663 Oil4S/S 2004 2004 Trans Post Pars 662 Mapna 2004 Marun Kaloot 661 S/SDevelopment 2004 Material 660 Earthing Refinery FULMEN BuinZahra 659 2004 BornaElectric - 658 Moshiran 657 - 10thOlefine Trans Post Pars 656 Parsian 655 P.O.G.C Montazer Ghaem Spec 654 653 Parsian 652 Toseeh Silooha 651 650 Nargan BostanabadCivil 649 Parsian 648 647 646 645 4- Installing/Testing/Training 3- Manufacturing Pars Petrochemical Co. (REQ-EE-319-L00) 2004 ** *** *** ** *** ** ** ** *** ** ** ** ** ** ** *** *** ** ** ** ** ** ** *** *** *** ** ** ** ** ** *** ** *** ** *** *** ** 39

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

40 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 8 AT htue / 2004 2004 2004 2004 Ghatruyeh S/S NasrShiraz JonahS/S 2004 4P.P. 2004 2004 Bardsir, E/1406 SAPTA Tabas Coal SAPTA Borzuyeh Petrochemical Co. SAPTA Farab 689 Consortium JKT 688 FULMEN 687 Niroo Mabna 686 685 684 683 2 asa ae 8 2004 2004 Saveh 785 2004 784 Mahabad 2004 2004 2004 LightPolyethylene Aryasasol 2004 Jovein 2004 2004 791 Mosala Tehran Regional Electricity 2004 2004 Parsian - Parsian Ferro Chrome 2004 Nargan 2004 2004 KhodroCasting Iran Isfahan South ASCAP Trans Post Pars 721 2004 Ghareh ZiaAlDinS/S 2004 Trans Post Pars 720 Trans Post Pars 719 Parsian Ghatruyeh S/S 718 500000blb Tank -Site 1 2004 - Trans Post Pars Avang 717 2004 2004 716 - Niroo Mabna SAPTA 2004 715 Sazeh Oshnavieh S/S 714 713 Tabnak Petro Field Gas Part 2004 2004 2004 SAPTA 712 2004 2004 Asid Acetic Plant 2004 - 2004 711 Central Esfahansteel Refinery P.P. Telecom Iran 710 Toos-Shirvan-Esfarayen 709 JannatAbadSemnan Niroo Mabna &Lahijan Masal andDesign Inspection Tehran Tower 2004 708 Zolal Iran 2004 707 - Rah Sema - 2004 706 EIED Jahanveg. OilFactory 705 Tondar Electronic Barsan 704 2004 Dareh Takht SAPTA 1P.P. 703 SAPTA 702 - ASP 701 2004 700 Antarest EastBandarAbbasS/SDevelopment N.I.G.C 699 Egypt Hatel 698 IWPRD 697 696 FULMEN 695 Taftan 694 ArminSanaatGostaran 693 692 691 690 4- Installing/Testing/Training 3- Manufacturing *** ****** ** *** ** ** ** ** ** ** **** ** ** ** ** *** ** ** ** ** ** ** ** ** ** *** ** ** *** ** ** ** ** *** ** ** ** ** Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 6 a ar amn2004 2004 2004 2004 Salman 2004 2004 Ext. Neka 2004 2004 Isfahan South - Spare Parts 2004 SafSadra 2004 Rods JaskEarth SAPTA Saveh Sefid Cement Rods Earth Rahan Mian Misan Yazd Rods Earth IIExt. 760 Parsian 759 Energy Transfer SAPTA 758 SAPTA 757 SAPTA 756 SAPTA 755 754 753 752 751 4 AT inRhn2004 2004 2004 2004 2004 Fars rods 3S/SEarth Rahan Mian Yazd IIExt. 2004 Valiasr S/S 2004 GavbandiS/S 2004 P.P. Neka SAPTA 2004 2004 2004 SAPTA Ghayati SAPTA 2004 Takestan Development 2004 S/S SAPTA - 2004 BTS &Commissioning Installation SAPTA 750 Yad 2004 BudShohada 2004 749 2004 Marand Parhoon Tarh 748 Agglomeration Ardakan 747 - Asia Kavosh Kam 2004 FULMEN Danial7101 746 2004 FULMEN Damavand 763 Shoush 745 2004 NosaziMadares 744 Parsian 2004 2004 743 Niroo Mabna P.P. Kazerun Ehdasi 742 - 2004 Site NonIndustrial Mahshahr 741 Navid ZarShimi 740 Parsian 2004 3 Minab Masal 2004 739 Parsian 2004 Ahvaz 500000blb Tank 738 Parsian 2004 2004 737 BolandPayeh Spec 736 Ahvaz 3 Baghein775 2004 735 EshghAbad Tabas S/S Pars Keyhan 734 - Petro Part Sahand 733 Bonyan Tosee Mahsab SanatKhodro SAPTA 732 731 Shargh Moham 730 Farda Sakhtar 729 Parsian Barsan 728 727 Shafaye sari 726 Mapna 725 724 723 722 4- Installing/Testing/Training 3- Manufacturing ** ** ** *** ** *** ** ** ** *** ** *** ** ** *** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** 41

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

42 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 6 asbVrahn2004 2004 Varzaghan AjabShir 2004 2004 2004 2004 Petrochemical LLDPE-AmirKabir Co. ApadanaCeram 2004 EshghAbad Tabas S/S Yazd Power House Enershimi Mahsab LightPolyethylene Aryasasol Mahsab Shargh Moham 767 BolandPayeh 766 Parsian 765 Nargan 764 763 762 761 9 an emnPP 2004 2004 2004 2004 2004 KermanP.P. Surmagh(Part 1) Sanandaj 2004 2004 Choghadak2 2004 Ahvaz Bangestani Wells 2004 Mapna 2004 2004 E.B. Station Khavaran Emergency A.B.B 2004 2004 Parsian 2004 Parsian 2004 P.P. Kazerun Gachsaran 799 Ramshir 739&778 2004 Urea &Ammoniac Sazeh 798 Bina 797 2004 2004 S/S Semnan 796 Chagalesh 2004 795 2004 794 2004 2004 Tabdil Energy Paya (NLP-102-058) Neka BolandPayeh 793 Namvaran Kangan 792 Parsian 791 S/SExt. Neka Niroo Mabna 2004 SainGhaleh 790 2004 Caspian 2004 789 Farda Maroon Petrochemical Sakhtar Mojan 788 2004 787 2004 BarToos Mouj Esfarayen 786 IsfahanWest 2004 2004 BagheinS/S 2004 785 Parsian 2004 Pouyeshgaran Azarpad SAPTA 784 A.B.B 783 33/11K/VS/S Esfahan South A.B.B 2004 782 Switch Yard GavbandiS/S 781 Shargh Moham 780 Safaniroo 779 Parsian 778 S/S Khezri Trans Post Pars 777 Trans Post Pars 776 Parsian SAPTA 775 Zhital 774 773 Shargh Moham 772 Volcanic 771 770 769 768 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** *** ** ** ** ** ** *** ** ** ** *** *** ** ** *** ** *** ** ** ** ** ** ** ** ** ** ** *** *** ** ** **

Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 3 asa ea 2005 2005 2005 2005 2005 West Cement 2005 Jenah 2005 Ghorveh Ilam 2005 2005 Urea 2005 2005 Divandareh SAPTA 2005 2005 Parsian 2005 2004 Voshmgir SAPTA SAPTA ChehelShahid Alamdeh Kaloot 837 Dar Galeh N.P.C.C 836 2004 Namvaran 835 Parsian 2004 - 834 TOPMAT 2004 833 FULMEN 832 KPP-8331087 FULMEN 2004 831 KPP-8331084 2004 FULMEN 2004 SAPTA 830 2004 Khorak 829 Emdad 828 2004 FULMEN 2004 4thAromatics Kits Insulating 827 Sazmans 826 Sarakhs Spec 825 Urea &Ammoniac Spec 824 Borzouyeh Petrochemical 2004 2004 823 2004 2004 BXHF006DA 2004 822 Pars Energy Arya Sazeh 821 STPC-82490/82494-TH Persian GulfPetro Gas 2004 820 AR4(BXHF006F) 2004 AXHJ00B-AR4 819 P.I.D.E.C 2004 BXNI801A 2004 818 Tondgouyan Petrochemical 2004 Enershimi 817 Sadaf 9thOlefine 816 BXHF006DA(Insulation16) Sazeh 2004 PET2 815 BXHF006E STEAM 814 Sazeh AXHJ002S Sazeh 813 Sazeh 812 golan Deh 2004 Sazeh 811 810 Nargan 2004 Agha Injection JariGas 809 Namvaran Sazeh 808 Sazeh 807 Storage Kharg Tanks 806 SAPTA 805 804 Keysoon Gharargahe OlAnbia Khatam 803 802 801 800 4- Installing/Testing/Training 3- Manufacturing (PO-4-EL-852) LAB-Bisotoon Petrochemical Co. 2004 ** ** ** ** ** ** ** *** *** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ***** *** ** ** ** ** **** ** 43

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

44 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4 AT obIfhn2005 2005 2005 JoobIsfahan Kangan 2005 2005 2005 Damavand 3) Post 63KV(Minab 2005 SAPTA JamPolyethylene(U/G) Parsian Parsian Mahsab 844 843 842 Nargan Asia Kavosh Kam RoshdSanaat Va Kongereh 841 840 839 838 7 ab 2005 2005 2005 2005 Soleiman Masjed 2005 2005 2005 PVC-Part(EDC/VCM) Arvand 2005 2005 Yazd LightningSystem Masba Kazeroon GhadimLightningSystem PVC-Part C/F Arvand HPE 2005 2005 Damavand Power House SAPTA Ilam Sazeh 2005 763Damavand Power House Parsian group Industrial Masba 875 2005 Masba 874 2005 Sazeh 873 2005 Post Marand 2005 Oroumiyeh Power Gas House 872 Mapna 2005 2005 2005 871 Parsian System Substationcaspian Earth 870 Parsian SAPTA 869 (3) Iranshahr Neka Toseeh Sirajn2 ElhaghieNo.1 868 2005 2005 BaamRah 867 BidSubstation GhadirgahandKhoram Niroo Mabna A.B.B 866 865 Shargh Moham 864 2005 2005 Shargh Moham 863 2005 Congress Co. SAPTA 862 Masba 861 2005 2005 2005 Khavaran Stop Compulsive 860 2005 2005 System SubstationSaeinGhale Earth SafaSaveh 859 N.I.G.C Borzouyeh Petrochemical -Rider 2005 858 857 BinaConsultant Ahvaz Strategic Tanks 2-4 856 A.B.B Joint Venture JKT N.I.G.C 855 854 A.B.B 853 SabonOilandGas 852 Novin Tablo 851 850 Ehya SanaatiKaveh Energy Transfer 849 Palayesh Niroo 848 847 846 845 Technical andEngineering Design and Inspection 4- Installing/Testing/Training 3- Manufacturing 2005 ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 ha 2005 2005 9 2005 2005 Olefin Complex 2005 2005 System Earthing 2005 2005 2005 2005 Chaad SiriStrategic Tanks II Nargan IsfahanPower South House Avang SinaGlass 2005 2005 913 Tablieh JahanSanaatSadid 2005 912 SAPTA Boshrooye Substation 911 2005 Parsian 910 2005 2005 2005 909 RoshdSanaat HDPEjam 908 2005 of Construction Towhid Mosque ranged Neka2 IRIB Shargh Moham 907 Faraz Firooz KoohCement Towhid Ahvaz Mobeen 906 2005 2005 Farda Sakhtar 2005 905 Congress Co. Test linksouthernSemnan project 904 2005 903 Hegmatan Cement Sazeh 902 Tabdil Energy Paya SAPTA 901 2005 Ahvaz SAPTA 900 AbiekCement Masba 899 2005 2005 898 2005 Nargan 897 SubstationDevelopment Iranshahr group Kerman2Industrial Shirvan 896 2005 Gostar Emkan group Industrial Rafsanjan 2005 895 Shargh Moham 2005 894 Shargh Moham Parsian 3KermanSubstation Project Ethylene Banzen 893 2005 Shimbar SAPTA 892 2005 2005 Ghareh ZiaAldin SAPTA 891 2005 2005 Bakhtiari ChaharMahal Bandarabass Development East 890 Parsian 2005 889 Chagalesh 2005 BagheinDevelopment Substation Injection SAPTA Gas 888 PVC Arvand 887 Rahian Mian Niroo Mabna 886 vamargand Marand Lor FULMEN 885 Parsian SAPTA 884 883 Keysoon 882 Farda Sakhtar Sazeh 881 SAPTA 880 879 878 877 876 4- Installing/Testing/Training 3- Manufacturing Produce Polyethylene Olefin9 (Cathodic Protection) Yazd Development II

2005 2005 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** 45

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

46 www.petuniafze.com Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 1 asa aadj2005 2005 2005 2005 2005 2005 SubstationKahoorestan Polymer Aryasasol SubstationBandarabbas Sanandaj 2005 Pars South Phase6-7-8 FULMEN FULMEN Sazeh Parsian 920 Pars Hassas 919 Foolad eKavir 918 AbrandErtebat 917 916 915 914 5 asa hrhCaa 2005 2005 2005 2005 2005 Ghareh Chaman -Part CA PVCArvand 2005 System Earthing 2005 GISJask Substation20/132 K/VAnabod 2005 Parsian 2005 2005 Sazeh 2005 Agglomeration ardakan 2005 Niroo Mabna 2005 Rasab 2005 System Earthing Sazeh 951 2005 SAPTA 950 Milad Tower Foolad Mobarakeh 949 RoudshurPower House 948 2005 2005 SAPTA 947 946 Panahsaz Iran 2005 SAPTA 2005 2005 945 2005 BolandPayeh 944 Safanicu E.E.S KermanshahPetrochemical 943 942 Shimbar 2005 941 2005 Pirok Tondar 2005 940 JahanPars 939 Namvaran 938 2005 Daryan 2005 Kashan 2005 937 2005 4 Karoon 936 Pars Keyhan Karamouj Combinative Cycle Plant 935 Neka 2005 934 N.P.C.C SaziArak Mashin Shangarf JamPetrochemical Building 933 Novin Joosh 932 Niroo Tavan 931 Safanicu Farab 930 929 Niroo Mabna Rasab 928 927 EMDAD 926 Farda Sakhtar 925 I.O.P.T.C 924 923 922 921 Ghadir Oureh andAmoniac Petrochemical 4- Installing/Testing/Training 3- Manufacturing Substations Rain ,RostamAbad Substations Rain Mohamad Abad Mohamad 2005 2005 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** Worldwide Projects: 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 8 AT 2005 2005 2005 2005 2005 2005 2005 2005 2005 Pars South RLL-840403-LA Phase6-7-8 Galvanizer Kashan 2005 2005 System Earthing DashteAbbas Yazd 1 Lavan OilRefinery Petro Pey 2005 2005 Safanicu 2005 2005 Mr. Sheshgalani 990 2005 Niroo Mabna SAPTA 989 Dorood Cement Rahan Mian 988 Oliya Gotvand Fara Niroo 987 2005 2005 ShazandArak 986 Rahavard Khoob 985 Pars JahanZangAzar Oil Offside Pars Petrochemical Dorriz 2005 984 2005 Bafgh Substation 983 Safanicu SAPTA 982 2005 2005 Farab 981 2005 2005 AmirKabir 980 Safanicu System Earthing Sazeh 979 Anabod Post Substation20/132KV Shahrair Iron Production 9 2005 Dorriz 978 Divandareh 977 Daryan 976 Niroo Mabna 975 Olefin Complex Trans Post Pars 974 Volkanic 2005 Sazeh 973 2005 972 Boyer AhmadSubstation132/33KV 971 Parsian AmamiehSubstation1 ArminSanaatGostaran 970 969 Nargan Tabdil energy Paya 968 967 RoshanGostar Toos 966 965 964 6 AT ot enn2005 2005 2005 Semnan South 2005 Yazd 2 Semnan Shahmirzad 2005 2005 SAPTA 2005 2005 SAPTA 2005 2005 2005 SAPTA Fath System SubstationEarth OlMobin System SubstationEarth Mahshahr 2005 Substation Jakigoor System AbadanSubstation Earth System Earthing 963 Eshtehard Tabdil Energy Paya 962 Montazer ghaem Yazd Tabdil Energy Paya 961 Tabdil Energy Paya NirooFaran 960 Bargh Mahtab 959 Tavana Co. 958 Trans Post Pars Chaad 957 956 Parsian 955 954 953 952 4- Installing/Testing/Training 3- Manufacturing **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** 47

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

48 www.petuniafze.com Worldwide Projects: 08PrinAhr2006 2006 2006 2006 2006 Abhar 7125(I)Omidieh 2006 IedehLou Larestan Cement Park Wild Gonaveh 2006 2006 2006 Parsian 2006 2006 Parsian System Earthing Parsian 2006 2006 Parsian 1029 Ahvaz Tubing Parsian 2006 2006 2006 1028 Parsian System Earthing 1027 Parsian System Earth 2006 KermanshahPetrochemical 1026 Chagalesh 1025 2006 2006 1024 2006 1023 Power Ray Management Safanicu petrochemical Polyethylene Aryasasol Parsian Noavar emrooz 1022 LightningProtection Namvaran 2006 1021 ArmehDal 1020 2005 Heydarieh & Berelian Substations Rider Transfo Iran 2006 1019 Nargan 2005 1018 2005 2005 1017 Peyman Moshtari Nicksazan 1016 System Earthing 2006 Adel Gas 2005 2005 Spec 1015 1014 Fathol Mahshahr Rider Mobin 2005 Bargh Mahtab 1013 Dorriz System Earthing 1012 System Earthing 1011 Tabdil Energy Paya Omran Atlas 1010 ChabaharProject 1009 Farasazehaye Sangin 1008 moujMashhad Kara 1007 Omran Atlas Toseeh NamadKowsar 1006 1005 AirForce Sepah Kaloot 1004 SAPTA 1003 1002 1001 1000 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 9 raGzMd2005 2005 2005 2005 2005 2005 Pars South Phase6-7-8-Parts C6&C7 Yazd Clamp 2Earth 2005 Ethylene Benzan-PO-180-200-311 Mad Gaz Arya Petro Pey Trans Post Pars 997 Chagalesh Support Industry Iran 996 Kaveh 995 ParsEnergy Arya 994 993 992 991 9 aaNroKvrYz atigSse 2005 2005 System Earthing Sardrood Substation230K/V Fara Kavir Niroo Yazd Virayesh Niroo 999 998 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** Worldwide Projects: 05NroFrn2006 Faran Niroo 1045 06Se 2006 2006 2006 2006 2006 System Earthing 2006 2006 Earthing 2006 2006 2006 Olefin Complex 2006 moujMashhad Kara Spec Network AndimeshkEarth Kashan 2006 Material Electrical System Earthing Spec 2006 Borzouyeh Petrochemical 1068 Unit-2 Air 2006 Separation 1067 Serik 1066 Shargh Moham Union Wire to Page RedseaInternational FZCO 2006 2006 1065 Aryasasol 1064 Nicksazan 1063 Parand Power Gas House Parsian 2006 2006 1062 Sazeh West Isfahan 2 2006 1061 1060 Fallah Executive OperationsOffside System Earthing VEGETAL OILJAHAN 1059 2006 Pars Keyhan 2006 1058 Energy Process andManagement Zanjan Temporary Substation Earth Niroo Mabna 1057 2006 2006 1056 2006 Safaniroo Toseeh NamadKowsar 1055 Volkanic System Earthing ShahidMontazeri Substation Development Khorramshahr ofOil 1054 2006 Hadid Rasa Bam&SirjanProject A.B.B 1053 2006 1052 2006 2006 2006 Fath AbadSubstation 1051 Bina Tajhiz Pars Niroo Mabna 2006 1050 2006 Substation Niroo Mabna Varzaghan Substation 2006 1049 4Substations zanjan 2006 AjabShirSubstation 1048 Safanicu Asalooyeh Phase6-7-8 1047 2006 System Earthing Tehran Niroo 1046 2006 System Earthing Shargh Moham Trans1044 Post Pars Mahsab 2006 2006 System Earthing 1043 Mahsab SafaSaveh Substations 1042 Chaad 1041 Project EastSemnan Aryasasol System Earthing 1040 Niroo Mouj 1039 Niroo Chakad 2006 1038 A.B.B 1037 Niroo Sarv Toos Deficitof 1036 Gachsaran Tajhizat Pars 1035 Kandovan SAPTA 1034 1033 Tabdil Energy Paya 1032 1031 1030 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** 49

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

50 www.petuniafze.com Worldwide Projects: 16PrinAaaaSrm2006 2006 2006 ApadanaSaram Khark Olefin 2006 2006 Earthing 2006 2006 2006 2006 System Earthing Earthing RoudShour Power House Parsian Gorgan Substation Nargan System Earthing Earthing 2006 2006 2006 2006 Pars Hassas UnitInternational SA 1106 2006 Foolad Kavir 2006 1105 1104 Tanesh Arman SafirErtebat Earthing 2006 Earthing 1103 Earthing Chaad Earthing 1102 Industrial Towns BaamRah 2006 Earthing Neka 1101 Saravan Substation 2006 1100 2006 1099 2006 2006 Parsian Noavar Emrooz 1098 RoshanGostar Toos 2006 B5100 1097 Substation 63/203 Iranshahr Peyman Moshtari Sare Shomal Oroumiyeh Power House 1096 SAPTA 2006 2006 Toos 1095 Earthing Safaniroo Koohsangi & Taleghani Substation 1094 Damavand 1 ZhoubinNiroo 1093 2006 BidestanSubstation 2006 1092 2006 2006 Paydar Energy Persia 2006 2006 1091 Shargh Moham Mapna &Gonbad3Substations 1090 SaghezSubstation2 ShariatiSubstation 1089 AirForce Sepah 2006 2006 Lavarak Substation Trans1088 Post Pars Fars Power SAPTA House 1087 SAPTA 1086 Tanesh CheshmehSefid 1085 Ethylebanzane Safaniroo 1084 Safaniroo 2006 1083 2006 Safaniroo 2006 2006 1082 SAPTA 2006 Pressure Increasing Gas Yazd Station Combinative Cycle Power House 1081 1080 Shargh Moham Bootadinjam Derivation CheshmehKhosh Chahak 1079 DAELIM Petro Arya Global Gas Spec 1078 C.P.T 1077 1076 1075 Tabdil Energy Paya Namvaran 1074 1073 Shargh Moham 1072 BinaConsultant 1071 1070 1069 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing strengthening gaspressure Parsian Station Emergency 2006 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** Worldwide Projects: 14SmnJitErhn 2006 2006 2006 2006 Earthing Earthing 2006 MCFoolad Mobarakeh 2006 Tehran Power Substation10 Urea &Ammoniac 2006 2006 2006 SamanJoint Safanicu Substation3 Bakhtar 2006 Pey 2006 Zharf FULMEN Earthing 2006 1144 Cooling Tower Namvaran 2006 1143 Power Mashhad House 2006 System Earthing Safaniroo 2006 1142 KermanSubstation3 1141 SAPTA 1140 Sarouj IsfahanCement 2006 System Earthing 1139 2006 2006 2006 2006 Shargh Moham Namvaran 1138 Barzin 2006 1137 Kaloot Agglomeration Ardakan System Earthing 1136 Abadan Refinery SAPTA PVC Arvand 1135 Matba 2006 2006 2006 Polymer Aryasasol 1134 Fars Scot 2006 1133 2006 ChadorMaloo 1132 Kit Gasket Insulatings BehsooNiroo 1131 Behpazhoh 1130 System Earthing Daryan 2006 2006 1129 Sazeh 2006 1128 Sazeh 2006 1127 Aryasasol 1126 Dorriz System Earthing ePol Sar eZahab 2006 1125 1124 2006 System Earthing Daryan Bastan Kalaye Electric 2006 1123 2006 2006 1122 Aryasasol GhadirPetrochemical 1121 System Earthing LarSabzevar Cement Niroo Mosha 1120 2006 Fara System Earthing Niroo System Earthing 2006 1119 ZarrinSabar 1118 1117 System Earthing Design Industrial Iran 1116 I.O.E.C LightningSystem BinaSanaatNovin 1115 1114 Palayesh Niroo Moshiran 1113 Nekanovin 1112 1111 Nastaran Electric Pey Zharf 1110 1109 1108 1107 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm Ghadir Petrochemical Complex (Urea &Ammoniac) 4- Installing/Testing/Training 3- Manufacturing 2006 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** 51

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

52 www.petuniafze.com Worldwide Projects: 12TasPs asYz 2006 2006 Yazd 1 2006 2006 2006 2006 System Earth 2006 System Earthing 2006 Trans Post Pars SiriIsland System Earthing 2006 Behinab Arg eJadid Telecom 2006 1182 1181 DaneshPouya Sepehr 2006 2006 1180 Peymankari Omomi iran Earthing 2006 KCD-8524381 Tavan Electric Bargh 2006 1179 Nargan 2006 1178 Power Neka House 1177 2006 Earthing Dubai System Earthing 1176 2006 Iran’s Petrochemical Havasan Earth Trade 1175 Khoozestan 2006 Farda Sakhtar 1174 2006 2006 Panahsaz Iran 1173 Avang 1172 2006 Earthing 2006 1171 Energy Mesbah Balagar AnbarAbad 1170 2006 2006 System 1169 Shargh Moham System Earthing 1168 2006 2006 1167 2006 Nargan Earth Fars Cement andKhouzestan System Earth 1166 2006 Jiroft 1165 Energy Process andManagement Shargh Moham NoorRiz System Earthing 1164 Nohbandan NaienCement 2006 1163 2006 ArminSanaatGostaran 1162 ShazandArak Havasan Earth group NedaIndustrial 1161 BolandPayeh 1160 2006 Yazdan Ghaleh 2006 1159 2006 Shargh Moham 2006 Ghaleh Sorkh E.E.S 1158 Shargh Moham SaghezSubstationII 1157 Barsan Taleghani &Khouzestan 1156 Safanicu 2006 System 1155 2006 Bargh Mahtab 1154 Bargh Mahtab 1153 System Earthing 1152 Shargh Moham System Earthing Safaniroo 1151 1150 1149 Sanaye Mojtameh GhaemReza 1148 Fanavaran Petrochemical Sazeh SanaatKaran 1147 1146 1145 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm Ghadir Petrochemical Complex (Urea &Ammoniac) 4- Installing/Testing/Training 3- Manufacturing Montazer GhaemPower House Refinery 2006 2006 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** Worldwide Projects: 19PopaeKro ope atigSse 2006 System Earthing Complex Phosphate Karoon 1189 27Mha 2006 2006 Olefin9&10 Rider 2006 2006 2006 2006 2006 2006 - Ray Tabriz System Earth BTS Mobile Nargan Havasan 2006 Khark Olefin Rider 2006 2006 KHP-840245-KH Mahras ChabaharSubstationGIS 1219 2006 Sazeh Pad Tehran 2006 2006 2006 1218 2006 Parsian System Rahnama 1217 KermanLightning System 1216 Energy Mesbah Nargan 2006 Cement 1215 Tavana Isfahan Rider Olefin9&10 1214 SAPTA Lavan SVCFoolad Khouzestan 1213 Group Mapna 1212 2006 2006 2006 1211 2006 Institute A.S.AElectrical 1210 Shargh Moham 1209 Shargh Moham Hadid Rasa 1208 Nargan System Earthing INSIGSteel Company 2006 2006 1207 Chagalesh 1206 LightningAgglomeration Ardakan 1205 Niroosangostar 2006 1204 System Earthing 1203 RoshanGostar Toos ChadorMaloo 2006 1202 A.B.B 2006 2006 Institute A.S.AElectrical 1201 Isfahan 1200 OilPier ontheLavan Island Polymer Aryasasol Faraman Project 1199 Pars Oil 1198 System Earthing 1197 Afrand Fanavar 1196 Pars Eskeleh 1195 Shargh Moham Hadid Rasa 1194 Sare Shomal 1193 1192 1191 1190 18MbaNroZhdn32006 2006 2006 2006 Zahedan3 Kazeroon Power House 2006 Faraman ShomalPark System Earth Niroo Mabna Parsian 2006 Shargh Moham Sewage Industrial AbadanSettling 1188 Shargh Moham 1187 Group NedaIndustrial AndisheOxin 1186 1185 1184 1183 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm Ghadir Urea andAmmoniac Petrochemical 4- Installing/Testing/Training 3- Manufacturing Naien&BandarAbbas2Substations Hegmatan Petrochemical Substation 63/6 63/20 Ȇ 3K/V 2006 2006 2006 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** 53

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

54 www.petuniafze.com Worldwide Projects: 27HjGai2006 2006 2006 2006 2006 System Earthing 2006 2006 2006 MD/HDPE 2006 HamahSyria Cement HajGhazi System Earth 2006 Kaloot 2006 System Earth 2006 BaamRah 1257 HDPEKermanshah BinaSanatNovin -SalianSubstation Azarbayjan EhdasSanaat 1256 Sazeh 2006 System Earth 2006 1255 1254 SAPTA Rahavard Khoob 2006 AirPort Khomeini Imam 1253 9 2006 Foolad Hormozgan 1252 SAPTA 2006 1251 Sazeh Peymankari OmomiIran 2006 BamSubstation 1250 2006 1249 AbrandErtebat Pars Parto 2006 1248 Toseeh Shiraz Olefin 2006 1247 Pars South Pahse 9-10 2006 IRITEC PWP-50234 1246 2006 Peymankari OmomiIran LightningProtection 1245 2006 Safanicu 2006 1244 Darband Main Takestan Systems Industrial 1243 System Earthing Shargh Moham IslamAbadGharbSubstation 2006 1242 I.O.E.C ArakPetrochemical P/O:KCD-8524658 1241 2006 Safaniroo 2006 2006 1240 1239 Shargh Moham Niroo Mabna G3000 1238 2006 2006 AR4-SHR-EE-2422006 LightningProtection 1237 Hampa Kalaye Petroshimi Senegal BagherAbad 1236 System &Factory Earth Ranged 2006 1235 Rahavard Khoob 2006 1234 2006 Iran’s NuclearReactors 1233 Abad& Kian 2006 Toseeh Yasooj Substation Foolad Niroo Energy Khouzestan Tariana Arzesh Arkan 1232 1231 Sazeh Shargh Moham System Earthing 2006 1230 FULMEN 1229 Parsian Kordsa Kian Kazeroon LightningSystem 1228 1227 Safanicu Institute A.S.AElectrical 1226 Arzesh Arkan 1225 Group Mapna 1224 1223 Shargh Moham 1222 1221 1220 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing MTBE Noorbakhsh StoreMTBE Room Noorbakhsh (Insulating Kit) Kit) (Insulating 2006 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** Worldwide Projects: 25SPASara 2007 2007 2007 2007 Shahriar 2007 2007 2007 2007 Fasa 2007 Ilam 2007 Ardebil Power House SAPTA 2007 2007 2007 2007 Tehran Govar 2007 DelvarAfzar Asalooyeh Power House Petrochemical AmirKabir 1295 Parsian 2007 Tehran Saam Andish 1294 Rasab 2007 1293 kahnooj 2007 1292 NiroogaheParsian 1291 2007 Hospital Karami Namvaran 2007 1290 Ab Azar 2007 1289 2007 Ara Rasm BandarBahl 1288 2007 1287 Metanir Pazhouhan Sanaat 2007 2007 Fajr Petrochemical 1286 SAPTA Isfahan 1285 Sabzevar Taban Raad 1284 Kazeroon 2007 2007 1283 Phosphate Karoon 2007 1282 SAPTA ChegalAndishan 1281 Tarid Kala 1280 System Earth Niroo Mabna Bangestan 1279 2007 System Earth Mr. Ahmadi 1278 Parsian 2007 1277 Parsian 2007 1276 1275 System Earth Tabdil Energy Paya 2007 2007 1274 System Earth Hamrah Pooshesh Moshiran 2006 1273 SAPTA System Earth 2007 Eritec 1272 2006 1271 System System Earth Earth 1270 System Earth EhdasSanaat Management Hirbodan 1269 System Earth 1268 PVC-(CF) Arvand 2006 1267 Moshanir Polyethylene (MR-1611-201) Arysasol 1266 1265 Niroo Mabna Farab Mosharekat SaamAndish Safanicu 1264 Balagar 1263 Nargan 1262 Sazeh 1261 1260 1259 1258 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm Parsian Power House&Industrail Developments 4- Installing/Testing/Training 3- Manufacturing at ytm2007 System Earth ** ** ** **** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** 55

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

56 www.petuniafze.com Worldwide Projects: 31Sie 2007 2007 2007 2007 2007 2007 Republic Azarbayjan 2007 2007 2007 2007 2007 LightningSystem Installation 2007 Bootadin Derivation 2007 2007 Saghez Atomi Reactor Sookht SAPTA Peymankari OmomiIran Saiber 1334 Kaloot 2007 1333 Namvaran 2007 1332 Sazeh 1331 Tanavob 2007 2007 1330 Safaniroo 2007 1329 2007 Cement Sare Shomal Hatel 1328 Koohmard Sorkhi 2007 1327 2007 Substation 2007 1326 Cathod Electric 2007 1325 Razan KermanshahUrea &Ammoniac 2007 Day Electro 2007 Omran Anarak Cement 1324 Azar Co. Rad 1323 Soofian 1322 Shargh Moham Haris 2007 Farasanat Ban AbadehCement 1321 2007 2007 Namvaran 1320 Parsian Janjan 2007 2007 1319 Niroo Mabna 1318 Niroo Mabna 2007 1317 2007 Kerman 2007 Niroo Mabna 1316 Pars Power House Niroo Mabna 1315 Barsan 2007 2007 1314 AndisheOxin 2007 Kahoorestan 1313 Safanicu 2007 2007 1312 Anzali 1311 DaneshPouya Sepehr Bargh Mahtab 1310 Kashan SAPTA 1309 Arzesh Arkan 1308 Bairamli 1307 Navid ZarShimi FULMEN 1306 Niroo Mabna 1305 1304 Chaad Tadbir Moshaver Sakht 1303 Parsian 1302 1301 Shargh Moham SAPTA 1300 Co. Ramp 1299 1298 1297 1296 Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 2- Engineering 1- Supply 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ** Worldwide Projects: 33JhnZn zr2007 2007 2007 2007 2007 2007 DANDI 2007 2007 2007 2007 Khodro Sazeh Iran 2007 2007 2007 2007 JahanZang Azar FULMEN 2007 Shargh Moham 1373 Setrah Pars Petrochemical Zabol 1372 Cable Alborz 2007 2007 1371 Sare Shomal 1370 Saveh 2007 1369 Toseeh Neishekar 2007 AmadSanaat 1368 Pars Petrochemical SiemensAG 1367 2007 2007 Tabnak EthyleneKhark Olefin 2007 1366 Niroo Sarv Toos 2007 AmadSanaat 1365 Jam Bootadin 2007 Farda Sakhtar 1364 Masba 1363 FULMEN Ardebi Power House 2007 2007 1362 Sazeh Syria 1361 Nargan 2007 2007 1360 Power Karoon House3 Payandan 1359 Namvaran 2007 1358 Takba Bahregan 1357 2007 Parsian 2007 2007 2007 1356 KermanshahUrea &Ammoniac 1355 ArianEnergy Pars Ara Rasm Farab 1354 2007 1353 2007 1352 Sanaye Shargh Anzali Pars Keyhan 2007 1351 I.O.E.C 2007 2007 1350 2007 Shahre Kord Cement 1349 Tak Makaron 1348 Sanaate Sepahan Azmoodeh Hadid Rasa 1347 RavandKashan 1346 Sanandaj GhadirPetrochemical Niroo Mabna 1345 Pars 1344 Kandovan Fars Scot 1343 1342 Fan Rasta Ertebat Niroo Mabna 1341 1340 Shargh Moham 1339 Afrand Fanavar 1338 Asia Gostar Raad 1337 1336 1335 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ***** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** **** ** 57

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

58 www.petuniafze.com Worldwide Projects: 42Sez2007 2007 2007 2007 2007 2007 2007 2007 2007 Speez 2007 2007 HDPE Ilam Zob Ahan Alborz 2007 Negin 2007 Zagros Petrochemical Taghidizaj &Moghan Ardestan 1412 Ranged’s Systems Phase6,7,8 Pazhouhan Sanaat 1411 Behravesh Bargh Asia 1410 2007 Management Hirbodan 1409 2007 2007 ZhobinNiroo EIED 1408 2007 Rafie Tower NaghsheJahan 1407 Shizari 2007 Petrochemical Ilam 1406 2007 1405 Damavand Combinative Cycle Zanjan 1404 Tank’s Iritec 2007 group NedaIndustrial Farab Mosharekat AmadSanaat SaamAndish 1403 Takab 2007 Petrochemical Ilam 1402 2007 2007 Group Mapna 1401 Power Gas House’s Pars South Abad Mahmoud 1400 &Milad ShooshtarMahshahr 2007 AliAbadGorgan &Fajr Felezi Masnooat Sangin 1399 2007 2007 2007 2007 Management Hirbodan Trans1398 Post Pars Kish 2007 NekaNo 2007 2007 1397 2007 Novin Joosh 1396 Pars OilBoiler 1395 Shargh Moham BandarAbbas Hamedan Parsian 2007 Area Non-Industrial 1394 2007 Parsian 2007 Zone Industrial 2007 1393 2007 1392 Ganji 1391 KermanshahPetrochemical Gostar Garma 1390 KermanshahPetrochemical asu2 Gaskets 1389 Shargh Moham FULMEN 2007 2007 1388 1387 SanaatFalat Rah Gostar Rezvan 1386 1385 Navard -Ahvaz Safanicu Management Hirbodan 1384 Misan agg 1383 1382 Sazeh Telecom Markazi 1381 ShabAfrooz Spec 1380 1379 Safanicu 1378 ChadorMaloo 1377 1376 1375 1374 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** **** ** ** *** ** ** ** ** ** ** ** ** ** ** **** ** ** ** ** *** ** ** ** *** ** *** ** ** ** ** ** ** ** ** Worldwide Projects: 44Pr abrFn2007 Pars TadbirFan 1434 40MhmSag aehn 2007 2007 2007 2007 2007 2007 Taleghani 2007 Ardebil Power House 2007 2007 2007 2007 Shargh Moham 2007 2007 SarajehQum Iran’s Nuclear Reactors 2007 Pars Tadbir Rasab Fan 1450 Salman khoozestan Aryasasol 1449 Kaloot 2007 1448 Mojan Lar Latifi 1447 2007 Mr. Sarhangi 2007 1446 2007 Chagalesh 1445 Iaran Khodro 2007 1444 Shargh Moham 2007 Pars Sadra 1443 Kandovan 2007 Shahmirzad JahanAbad 1442 2007 2007 Niroo Mabna 1441 2007 Haris 1440 Fara Pouya Mouj 1439 Shargh Moham Mahshahr Mr. Shirazi 1438 2007 Salman 1437 Siri ZhobinNiroo 1436 SAPTA 1435 Niroo Mabna 2007 2007 2007 ZhobinNiroo 1433 1432 2007 2007 Daryan 1431 Peymankari OmomiIran 2007 Maharan Petrochemical Ilam Shargh Cement 2007 Sadra 1430 Doshan Tapeh & Isfahan 2007 1429 Pey Fond 2007 Asalooyeh Power House 1428 Tavana 1427 -Parand -Hashtgerd 2007 1426 NorahanSanaye Farineh Sanat 1425 SAPTA 2007 Olia Gatvand 1424 Niroo Mabna 1423 Focus Power Pars HouseSouth Balagar Abhar&Ghayati 1422 SAPTA 1421 1420 NiroogaheParsian 1419 Bojnord Cement Pars Oil Farab 1418 1417 FULMEN 1416 1415 1414 1413 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Items DeficitofLightning Items Protection System 2007 *** ** ** **** ** ** ** ** ** *** ** ** ** ** *** **** *** *** ** ** ** ** ** ** *** ** ***** ** ** *** *** ** ***** ** ** ** 59

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

60 www.petuniafze.com Worldwide Projects: 47FltSzGsTascinPps3 2007 2007 Gas Transaction Pipes 30 2007 2007 2007 2007 2007 Zaveh Cement 2007 Olefin 5 Asalooyeh 2007 Ardebil Pumping Stationary 2007 Khark Olefin Falat Saz 2007 2007 SVCFoolad Mobarakeh Petrochemical Morvarid Shargh Moham Behinab 1487 Tower Paneer 2007 2007 1486 2007 1485 Nargan 1484 Safanicu ( Mes Electro Towhid Kerman) 1483 Sare Shomal 1482 2007 BaamRah 1481 2007 Balagar 1480 2007 Tavana Co. 1479 Modarres Yazd 2007 1478 ShomalCement 2007 1477 Kalaye Petroshimi Sari4 1476 Sari5 Tehran1475 Power Plant 2007 Khark Olefin Tehran Paya Power Parto Plant 2007 1474 2007 2007 2007 2007 Niroo Mabna 2007 1473 2007 1472 Trans Post Pars 2007 1471 Shargh Moham Fars Power Plan Senegal 1470 Petrochemical Ilam Shargh Moham 2007 1469 2007 Nargan 1468 2007 2007 Farab Mosharekat SaamAndish 1467 Novin Joosh Abhar Wire andCable 1466 1465 Bisotoon DaneshPouya Sepehr 1464 FULMEN Zagros Petrochemical 1463 NirooPayesh 1462 Maharan 1461 Pouyesh 1460 2007 1459 Shargh Moham Kaloot 1458 Cathodic Protection System 1457 Petro Sina 1456 Atanoor Iran Farab Mosharekat SaamAndish 1455 Lavak Iran 1454 1453 1452 1451 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Pars Petrochemical KCD:8621683 Ask- Four Substitationof Mobile Montazer Ghaem Refinery Montazer Ghaem Refinery Power House Khouzestan ing to Buy 2007 2007 2007 ** *** *** *** *** ** ***** ** ** ** ** ** *** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** *** *** *** *** ** *** *** *** Worldwide Projects: 53NsmAaeh2008 2008 2008 2008 2008 Syria -10Substations Tana ) (International 2008 2008 Welding 2008 2008 Nar’s RelayPressure Gas 2008 2008 Elaco Modarres Yazd 2008 Farab Substation Masali 2008 NasimAmayesh System Earth SaadatShahr Farasanat Ban Farab 1525 1524 2008 Niroo Mabna 1523 Petro Sina 2008 2008 1522 SAPTA 2008 2008 1521 LightningSystem Kish 2008 2008 1520 Shargh Moham Paya Parto 2008 1519 Eastern Site) Earth Rider(Wells ChalipaNiroo 1518 2008 2008 Kahnouj 1517 JETI Wells Eastern Site Earth Farasanat Ban 1516 Group ButaneIndustrial Chagalesh 2008 1515 SarePol eZahab DANDI Rider 1514 Balagar 1513 Group ButaneIndustrial 2008 2008 2008 2008 1512 2008 Omran Anarak Cement 1511 Safaniroo Tehran Power Plant 1510 SVCFoolad Mobarakeh System GhaenEarth Fars Scut PRO-189-1714/A 1509 Safanicu 2007 1508 Azarbayjan FULMEN Saba 1507 2007 2007 1506 Trans1505 Post Pars Safanicu 2007 1504 Chagalesh 2008 1503 873-svc Rider Foolad Mobarake 2007 1502 Shargh Moham Kaloot 2007 2007 20/63 Adimi ZabolSubstation 1501 Petrochemical( Ilam Order) Rider Gostar Rezvan 1500 Lavarak 2007 Shahidrajaie 1500 Safanicu Niroo Sarv Toos (S.N.T) 1499 2007 Lar Latifi 1498 NorahanSanaye 1497 Falat Saz kermanshahTelecom 1496 AbiekCement 1495 BandarAbbas Niroo Mabna 1494 Safaniroo 1493 Niroo Mabna 1492 1491 AriaNoori DahrSepid 1490 1489 1488 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** 61

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

62 www.petuniafze.com Worldwide Projects: 53PrinGsDvlpet2008 2008 2008 2008 2008 2008 2008 Shazand0-04201-0420-2-1 Shazand0-0420-1-1 Khark Olefin 2008 2008 System Earth 2008 2008 Sazeh Sazeh Parsian Development Gas 2008 Tabriz 2008 1563 Nargan 2008 2008 Tehran Power Plant 2008 944 Rider 1562 Mes Kany 1561 Mapna Sare Shomal 1560 2008 Abadan’s Sand Filters 2008 2008 Zanjan 1559 Tamin Novin Maskan Omidieh1 1558 2008 (Executive) Lavan refinery 1557 Power Control Co. Energy andRefinery Kherad 1556 AmoujFarayand 2008 1555 2008 ZiaGostar 2008 1554 Peymankari OmomiIran 2008 Faraji 2008 Miss. Trans1553 Post Rasab Pars 1552 Foolad mobarakehSVC FULMEN 2008 2008 Jahrom 3 1551 2008 Boiler Mapna 1550 BandareImam PVCIn Arvand 1549 DaneshPouya Sepehr 1548 Afarin Abzar Kar Modarres of Deficit Yazd Pirok Tondar 1547 2008 Nar Safanicu 2008 2008 2008 1546 Niroo Mabna 1545 Sazeh 1544 System Lavan Earth Niroo Mabna Shahre Kord Cement 1543 2008 Gostar Rezvan 1542 2008 Samen Electro 1541 Balagar 1540 2008 Farab 1539 2008 Power Control Co. 2008 1538 Fars Scot Shamehr 1537 System Binack Earth 1536 5092-4065-3966/2 Rider group NedaIndustrial 1535 Bisotoon 1534 Novin Joosh Hormozgan Power Plant 1533 1532 Management Hirbodan Shargh Moham Paya Parto Iritec 1531 1530 1529 Shargh Moham 1528 1527 1526 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Strengthen Earth SystemStrengthen Earth

2008 ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** *** ******** ** *** ** ** ** ** ** ** *** Worldwide Projects: 56FrbSma 2008 Simrah 2008 Petrochemical Mobien Farab Shargh Moham 1597 1596 61FrbDfcto a 2008 2008 2008 2008 ofNar Deficit 2008 2008 2008 2008 Khark Olefin Farab 2008 2008 2008 AmadSanaat Pishtaz Sectiran Alton DezhShargh 1601 1600 Vahdatie 975 Rider 1599 2008 2008 Nargan Rostami 1598 2008 Afrand Fanavar Metanir 2008 2008 2008 Toseeh Anjirak System &LightningProtection Earth 1595 2008 BaamRah khouzestanSVC DaneshPouya 2008 Sepehr 1594 2008 2008 Niroo Mabna 1593 1001 Rider Niroo Mabna Arkwaz 2008 1592 Foolad System Hormozgan Earth 2008 2008 JahanPars 1591 1590 Shargh Moham 1589 Shargh Moham 2008 2008 2008 1588 Safanicu IslamAbad Shargh ZangSetizan 1587 1586 Shargh Moham Balagar Bahaie GISSheikh 2008 1585 2008 2008 1584 2008 1583 Peymankari Omomiiran Novin Joosh 1582 Group ButaneIndustrial 2008 1581 ZPC-86520420 Barsan Shargh ZangSetizan 1580 Metanir 1579 P.I.D.E.C 2008 Ardebil(Mapna) 1578 2008 2008 1577 NaghsheJahanSubstation230K/V Zagros Petrochemical Parhoon Tarh 1576 BaamRah 1575 Niavaran Tower 1574 Sazeh Kanrood Iran 956 Rider Rafie Tower 1573 Faranovin1572 Kish Rasab 1571 Co. Ramp 1570 1569 BaamRah DaneshPouya Sepehr 1568 Parsian Post 1567 1566 1565 1564 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Khorramshahr Gas Substation Gas Khorramshahr Power House 2008 ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ***** ***** ** ** 63

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

64 www.petuniafze.com Worldwide Projects: 67FrbSme 2008 2008 2008 2008 2008 Simreh 2008 Kashan 2008 2008 2008 2008 Farab 2008 Lightning System Azadegan Project 2008 Navid ZarShimi Mojan 2008 Maroon Petrochemical 1637 2008 Tehran Afra 2008 1636 Andico Kashan Ravand 1635 2008 1634 Pars Petrochemical 1633 Peymankari Omomiiran Shargh Moham 2008 SafaNiroo 2008 1632 2008 Balagar 1631 Virayesh Niroo 1630 2008 Technology Mouj 1629 Kalaye Petroshimi Energy &Sazeh Sazan Imen 2008 1628 System(Safanicu) Earth 1627 2008 1626 Rahavard Pardis Sepahan 1625 Technology Mouj ZiaGostar 1624 AbniehEquipments&Installation Faranovin1623 Kish SafaFoolad 1622 2008 GORZIN 2008 1621 2008 Tehran Power Plan 2008 & Substation Rabie Khajeh 1620 2008 BolandTabagheh 1619 Niroo Mabna 1618 2008 Dehloran 1617 Fan Avari Khavar Mouj BehsooNiroo Afghanistan Nar Faranovin1616 Kish Substation3 khouzestan 2008 2008 1615 Shargh Moham 1614 Petro Taksan 2008 1613 SaadatShahr 1612 969 Rider Shargh Moham FULMEN Safanicu 1611 Balagar Bisotoon Farab 1610 1609 1608 Shargh Moham Virayesh Niroo 1607 1606 Petro1605 Arya Global Gas Shargh Moham 1604 1603 1602 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Telecom Test &Design LightningPro- tection Systemtection POGCAsalooyeh Port Earth System &LightningProtectionEarth Earthing &LightningProtection of Earthing Taleghani Substation& Temporary Oil Squares of Sarvestan &Saadat Oil Squares ofSarvestan Project Earth System Earth Abad as2008 ȿFars 2008 2008 2008 2008 ** ** ** ** ** *** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** Worldwide Projects: 64Blgr2008 2008 2008 2008 2008 2008 2008 2008 Refinery 2008 Ardebil Power House 2008 2008 Darkhoin A 2008 Tarh oBazrasi Balagar Abadan 2008 2008 2008 Pishtaz Sanaat Rasab 2008 Oroumiyeh 2008 1675 JahanPars 1674 2008 1673 Petro Arya Global Gas 1672 Sazeh ChegalAndishan 2008 1671 Parsian 2008 2008 1670 BaamRah 1669 Aroon Ab 1668 CIDEK Mansouri 1667 1666 2008 2008 2008 2008 1665 Group ButaneIndustrial 2008 Pasargad Jonoob 2008 1664 BornaElectronic Karafarin 1663 2008 Safanicu 1662 Shouricheh Amin Niroogahe No Chikard Farda Sakhtar Sarkhoon 1661 Falat 2008 2008 Saz 2008 1660 Jajan 1659 2008 Sanaye GhaemReza Persia Khodro 1658 Ilam 1657 Tamin Novin Maskan 2008 Faranovin1656 Kish Yazd Power House Yam Faranovin1655 Kish 2008 1654 2008 Pouya Electric 1653 Safanicu 1652 2008 1651 Shargh Moham Safanicu 2008 Azodi 1650 1649 SVCFoolad Mobarakeh BolandTabagheh Fakour Sanat 1648 Mes Kany 1647 1646 1645 Hormozgan power Plant 1644 SafaFoolad FULMEN 1643 AbniehEquipments&Installation 1642 Kalaye Electric 1641 1640 Cement ZarrinRafsanjan 1639 1638 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Oroumiyeh Power HouseGrounding Test 2008 ** ** ** ***** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ** *** ** ** ** ** 65

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

66 www.petuniafze.com Worldwide Projects: 74Soaea 2008 2008 2008 2008 Lishtar 2008 2008 2008 2008 2008 2008 2008 2008 2008 Lahijan Substation63K/V Shojaieyan FULMEN Ghadir(Executive-Control) Executive-Tests Tabdil energy Paya 2008 Virayesh Niroo 1714 2008 2008 2008 Foolad Paya 1713 1712 2008 P.I.D.E.C West Power Plant 2008 2008 1711 2008 Tehran Afra 1710 BolandPayeh 1709 Petrochemical Mobien 1708 2008 2008 Zagros Petrochemical Parhoon Tarh 1707 2008 NF3 Pars Keyhan 1706 Chagalesh 2008 1705 2008 1704 Shargh Moham 2008 1703 DaneshPouya Sepehr 2008 2008 1702 Electero Sedan AbiekCement 1701 Rider Tana Pars Oil 1700 Namvaran 2008 1699 Metanir 1698 2008 Moshiran 2008 1697 1696 2008 Tehran 2008 Power Plant 1695 2008 BolandTabagheh Petro Sina Farab 1694 1693 Hormozgan Steel Rider Genoo 1692 Sazeh 2008 Khozestan Karoon &Najaf Karbala 1691 2008 2008 1690 Atropad Sanaat Paya Parto 1689 1688 Yazd Power House Safanicu AriaNoori DahrSepid 1687 2008 1686 Shargh Moham Kaloot 1685 Fajr Pars SVC(SafaFoolad) Khouzestan 1684 1683 Shargh Moham Maharan 1682 1681 SafaFoolad Gostaresh Informatic 1680 1679 Asia Gostar Raad 1678 1677 1676 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** ** ** ***** ** ** ** ** ** ** ** ** Worldwide Projects: 72Sr hml2008 2008 2008 2008 2008 Dareh Shahr 2008 2008 2008 2008 2008 GoleGohar Sare Shomal Niroo Industrial 2008 Sazan Imen Safanicu Tehran Refinery 1752 2008 2008 1751 Tondar Electric 2008 Niroo Pishgamane Sanaat System Earth 2008 2008 2008 1750 2008 Shargh Moham Foolad Paya 1749 2008 1748 Rider1083 Asia Gostar Raad ZabolCement Temporary Zahedan &Nikshahr Earth Tabriz’s1747 Gas Chagalesh Petrochemical 1746 Morvarid Ganji 2008 Rasab IOEC Mr. Hosseini 2008 1745 2008 1744 2008 FULMEN 1743 Peymankari OmomiIran DehloranCement Substation132Kw 1742 Shargh Moham Farineh Sanat 1741 Janjan 1740 Neer Energy Asia Raad 2008 (Mapna) 1739 Rasab Safanicu 2008 1738 I.O.E.C 2008 2008 1737 Istafar 1736 HHISite Shop 2008 2008 1735 2008 -NF3 Kit Insulating RoshanaieSheedEngi 1734 BolandTabagheh Safanicu 2008 1733 2008 1732 2008 2008 Cement Khaf Majd 1731 Yazd HararatiPower Khorshidi House Sazeh Pad Tehran 2008 HeidarAbadSubstation63/20K/V 1730 2008 2008 Namvaran 1729 1728 ZamanEnergy Systems optimum Pars Khavaran Niroo CPT Niroo Mazand 1727 1726 1725 Fadak BostanJonoob 1724 Trans1723 Post Pars AmiriPower andIndustry Fajr Pars 1722 AbiekCement 1721 1720 Lorestan Petrochemical 1719 Pazhvak Ertebat Arya Parhoon Tarh 1718 1717 1716 1715 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing The Company Project Consortium Management 2008 ** ** ** ** *** ** ** ***** ** ** ** ** ** *** *** *** ** ** ** ** ***** ***** ** ** ** ** ** ** ** ** ** ** ** ** ** 67

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

68 www.petuniafze.com Worldwide Projects: 79Mhrn2009 2009 2009 2009 2009 2009 Shahriar IslamAbad 2009 2009 Kit Insulating Shargh Moham Maharan 2009 2009 2009 Barsan 2009 2009 2009 Tana 1790 2009 GhodsNiroo Danesh Pouya Sepehr 1789 2009 ShahidBagheri Ahan Makan Farasanat Ban 1788 Sazeh 2009 2009 1787 1786 2009 N.A.S.RConsortium 1785 1278 Rider 2009 Tehran1784 Power Plant 2009 Tehran Fara Niroo Power Plant 1783 2009 1782 Afrooz Maad Bookan 1781 Bahrjan 2009 Iran’s NuclearReactors 1780 Rahavard Khoob Ganji Deficit AbiekCement 1779 1778 2009 Balagar Asia Gostar Raad 1777 2009 NaghsheJahan 2009 1776 Rahavard Khoob 2009 ZiaGostar 2009 1775 2008 1774 Energy Asia Raad Safanicu 2009 1773 Safanicu Sahand 2009 2008 Temporary Earth 1772 Khalil Rafie Tower 1771 2008 Maharan 1770 Mapna Yazd Power House 1769 2008 1768 Malzoomat Bargh 1767 Shargh Moham 1766 Shargh Moham Taksa 1765 Shargh Moham 2008 2008 1764 Fajr Parsian 1763 1762 Kaloot Takab NirooFars Petrochemical Mobien JamiOlAsgariya 1761 Novin Joosh 1760 SanaatiNovin 1759 1758 AbadanOilRefinery 1757 Shargh Moham 1756 Shargh Moham 1755 1754 1753 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Tashrin Power HouseCombinative Cathodic Protection Phase12 (EPC) South Pars South (EPC) Cycle 2009 2009 ** ** *** ** ** ** ** ***** ** ** ** ** **** ** ** ** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** *** ** ** ** ** ** Worldwide Projects: 85Sr io os(..)2009 2009 Executive SamanGharbCement Niroo Sarv Toos (S.N.T) 1806 1805 88IOEC2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 SaadatShahr 2009 I.O.E.C Temporary Earth 2009 Ghaen 2009 2009 2009 4 Katoon 2009 Asia Gostar Raad Farab Mosharekat SaamAndish 1828 Shargh Moham 1827 2009 2009 Management Hirbodan 1826 Rahavard Khoob AliAbad Fara Fajr Niroo 2 Shazand 1825 2009 2009 2009 Trans1824 Post Pars Pars Oil 1823 FULMEN Saravan 1822 1821 Arak Niroo Kian 1820 Kalaye Barghe Amiri 1819 AmeranOfogh FULMEN 2009 1818 Sazeh 2009 1817 Mokhtari 2009 2009 1816 2009 Yazd SafaNiroo Temporary Earth 1815 2009 Gostar Garma 1814 2009 2009 Zahedan4 1813 Takab NirooFars Fahraj Yazd Diaco Electro 1812 2009 1811 IslamAbadRider Shargh Moham Kaloot 1810 2009 2009 Polymer 1809 1808 2009 2009 Niroo Mabna Executive 1807 2009 Niroo Mabna Barsan Pars Khavaran Niroo 1804 BehsooNiroo Emadeh 1803 Aryasasol 1802 BehsooNiroo 1801 Namvaran 1800 Farab 1799 1798 Asia Gostar Raad 1797 Niroo Mabna Sazeh 1796 Kavir Electro 1795 Cable Metal 1794 1793 1792 1791 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing Special Executive Resistance Test Executive 2009 ** ** ** ** ** ** ***** ** ** ** ** ** *** *** *** *** **** ** ** ** ***** ** ** ** ** **** ** ** ** ** ** ** ** ** ** ** 69

www.petuniafze.com PETUNIA Project Refrences Project PETUNIA Refrences

70 www.petuniafze.com Worldwide Projects: 87CaaehLvn2009 2009 2009 2009 Lavan 2009 2009 2009 Power GhaenGas House 2009 Material Phase12 Earthing 2009 2009 2009 2009 Chagalesh Bijar 2009 Mapna N.A.S.RConsortium SVC 2009 Yazd Power House 2009 Sazan Imen Oil Refinery 1867 2009 Maharan 1866 SafaFoolad 1865 2009 2009 2009 1864 Shargh Moham Saveh 1863 Shargh Moham 2009 1862 2009 SafaFoolad 1861 AmiriPower andIndustry Lahrood 1860 2009 Tavan gostar 1859 2009 1858 2009 2009 Kalaye Electric 1857 RoshanaieSheedEngineer FULMEN 1856 Zahedan&Nikshahr 1855 SadrSanaatAsia 2009 1854 2009 Mersad 2009 1853 Cement ZarrinRafsanjan Asia Gostar Raad Syria 1852 Abedini Electro 2009 1851 2009 2009 Gorgan Oil Warehouse Farayand TarhGostar Parhoon Tarh 1850 2009 FULMEN 2009 Rastagh 1849 1848 Nastaran Siahpoosh Electric 1847 Shargh Moham Oliya Gotvand 1846 Toseeh Silooha 2009 2009 Petro Aram Saveh 1845 Isfahan 2009 1844 2009 DaneshPouya Sepehr 1843 Shargh Moham 2009 2009 Substation15 Bakhtar 1842 Shargh Moham Yazd Power House Abshar 1841 FULMEN Saleh3 Kamal 1840 Peymankari Omomiiran Saleh2 Kamal 1839 Mr. Khani Masoum Trans1838 Post Pars Sectiran 1837 Parhoon Tarh 1836 1835 SanatiMehrabad 1834 Barsan SanatiMehrabad 1833 1832 SamanGharbCement 1831 1830 1829 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing ** ** ** ** *** ***** ** ** ** ***** ** ** ** *** ** ** ** ** ** ** ** ** *** ** ** ** ** ** ***** *** ** ** ** ** ** ** Worldwide Projects: 81EE 2009 2009 2009 2009 2009 2009 Mobarakeh Shazand 2009 Niroo Mabna Urea &AmmoniacShiraz IsfahanOilRefinery AndisheOxin EIED 1874 Sazeh 1873 Petro Sina 1872 P.I.D.E.C 1871 1870 1869 1868 89PDCUe moic 2008 2009 2009 Urea &Ammoniac 2009 2009 kit Insulating 2009 2009 2009 Sarab 2009 PIDEC Petrochemical Ilam Complex Oliya Gotvand 2009 Aryasasol Sazeh 2009 2009 2009 1889 2009 Norahan Sanaye 1888 Lahrood Kalaye Bargh Jafari 1887 Kaloot GhadirIranian Shahreza Farab 1886 Boukan 1885 Bonab Farineh Sanat 1884 1883 Cable Metal 1882 Fanavar andMetals Mineral Niroo Mabna 1881 Niroo Mabna 1880 Niroo Mabna 1879 Niroo Mabna 1878 1877 1876 1875 2- Engineering 1- Supply Itm Client/End User Project Title, Description Year 1 * 2 * 3 * 4 * 4 * 3 * 2 1* Year Project Title, Description Client/End User Itm 4- Installing/Testing/Training 3- Manufacturing High High Temp. Kit Insulating Shazand Arak 2009 ******** *** ** ** ** ** ** ** ** ** ** *** ** ** ** ** *** ** *** *** 71

www.petuniafze.com PETUNIA Project Refrences

Equipment Details

Chapter: 5 Equipment PETUNIA Details

74 www.petuniaco.com 5.1. Machinery Equipments: 5.1. Machinery Equipment Details: t.EupetDsrpin ae oe aaiyQty. Description,Make, Model&Capacity Equipment Itm. 2MtlSw2 1 1 1 1 1 1 22A 1 2 24A 20A 1 32A 3 3 250Kg 1 1 500litter 30mm 100litter 3 1 1 30cm 1 Saw Metal Paper Electrical Covering Machine Bus-Bar Tin Plating Machine 20Amps ShrinkMachine SpecialSaw 34 ShotBlastMachine 10tons 1 33 4 200Kg 60tons 32 AirCompressor Cutting Manual Machine 2 50Kg 31 AirCompressor 30 Elec. Etching Machine 29 Grinder Surface 50mm 30mm 28 3 Furnace Electrical 150Amps 27 0.5Hp 2 50&35Amps Circular Saw Machine 26 AirScrew Driver 25 HandPower Press 24 Elec. Power Press 23 Mixture Vibration Machine 22 40cm Amps 50-400 21 Auto RollingMachine 20 ShearingMachine 19 Oven Induction 18 Oven Electrical HandDrills 17 16 15 Foot Sealer Operator Impulse 14 Arc Welding Transformer 13 12 11 10 N otrMcie9060c 1 0-35mm 900x600cm Machine Milling CNCRouter Machine 2 1 uoTraigMcie0-20mm Auto Threading Machine 3 pih yeDiln ahn 0-20mm Upright Type Drilling Machine 4 9 Buffing & Polishing Machine 2 Hp1 1 1 1 1 2 1Meter 1.2“ 2Hp 2Meter Buffing& Machine Polishing SpongeSander Action Dual Capstan LatheMachine Machine Lathe Machine Lathe 9 8 7 6 5

2 2 2 2 2

4 1 1 2 2 5.2. Testing Equipments: andSurvey t.EupetCuty aeMdl&Cpct t.Y Qty. Model&Capacity Country, Make Equipment Itm. t.EupetDsrpin ae oe aaiyQty. Description,Make, Model&Capacity Equipment Itm. 7P ee hn,Hna00-40 1999 2002 1997 1 1 0.00-14.00 1 0-430 V 20A, 32 V- 3A China,Hanna IRAN SAIRAN Iran, PHmeter Auto Transformer 17 Power Source 16 15 14 1Wso rdeJpn edd01Ω12001 1 2002 0.1Ω 1 Malaysia, Instek 1-1000mΩ,1000 V, Japan,Leaded Oscilloscope Taiwan, SEW 13 Digital Insulation Tester Weston Bridge 12 11 10 Thickness Meter Thickness 10 iia aie hn -5m,00%12000 1999 1 1999 1 2000 2002 0-150mm,0.01% 2002 1 2001 2001 0-25mm,0.01% 1 1 1 1 0-10R/M China 1 300g, 0.001g China,AA 0-3300R/M,0.33Kw 1200˚C 1000 W 7Sieve, 220 W 2001 Digital Caliper Japan,AND Badi Iran, Delta Micrometer Badi Iran, 9 1 Iran Aria Iran, 8 Stirrer HeatingMagnetic Digital Balance Centrifuge 7 Zoom: 1000, 6 Sieve Shaker PRIOR United Kingdom, Thermo-Lab 5 Oven 4 Microscope 3 2 1 5Pes10tns1 1 1 150tones 1 1 1 1 1,5m,25Cm 1 100A 1 1 1 400A 3KW 6mm,2.5m 0-35mm2 Press NCMachine 3Meter SparkMachine 45 Hydraulic Punch, Bending, cutting Welding Machine Cutter Electromechanically 44 RotationInvertor 43 Machine Milling 42 Hydraulic Press 41 RollingMachine 40 LatheMachine 39 38 37 36 35 Function Signal Genera- tor United Kingdom, Elcom-United Kingdom, rn A 0m, 2002 1 50mV, AAE Iran, eter 0.01 mV, 2Chan- 20MHz, . m12001 1 0.1 μm nel 2002 1 ear ofManufacture 75

www.petuniaco.com PETUNIA Equipment Details Equipment PETUNIA Details

76 www.petuniaco.com t.EupetCuty aeMdl&Cpct t.Y Qty. Model&Capacity Country, Make Equipment Itm. 38 18 4ErhRssac ee irtu aa,11996 2002 1 1 1-300mV, Taiwan, Lodestar Japan, Kioritsu, 26 dbmeter 25 Resistance Meter Earth 24 23 4CapErhtse aa,mt1 2002 2002 1 2003 2002 2 2002 1 3 10Kw, 80Ω 380/2500 V, 15KVA 3 1997 20KV Siemens Sara Iran, Iran Japan,met-1 1 10A,1000 Digital Multimeter V DC,750 V AC tester ClampEarth 35 Transformer Korea, Finest Resistance 34 33 Iran Digital Multimeter 32 Surge Arrester Zn-O 31 2002 30 SphericalSurge Arrester 2002 29 1999,2001 2 2 2 USA, Tucker 110 600A,300 V 3525 USA,Pearson electronics Signal Analyzer Japan,Kyoritsu USA,Pearson electronics, Current Monitor 22 Current Monitor 21 ClampMeter 20 19 7D oe upy05 ,05 2001 1 0-50v, 0-50A DcPower Supply 28 27 6Tru ee nln,BRT 030N 2002 1 (10 370-2000 70-340Nm ,Time England, BERITO Hardness Tester Torque Meter 37 36 Portable Infrared Infrared Portable Ther- Digital Soil Receptivity Digital Receptivity Soil Adj., Frequency Power Cu-CuSo4 Reference Calomel Reference Electrode Electrode mometer Supply Meter emn,HSAT 5 80˚ 2002 1 150–1800˚C Germany, HNSPACTO emn, i,550 2001 1 4Pin, 5-5000Ω Germany, rn E12002 1 AE Iran, 5K,06 z -00V12002 1 15 KW, 0-5000 0-60Hz, V 10 A,1000 V DC,750 V 100KHz,150 db,80100KHz,150 db Type 3562A,DCto dynamic range AC, 10MΩ 6 N/m 2 2002 1 ) 2002 2 2002 2 1994 1 ear ofManufacture 77

www.petuniaco.com PETUNIA Equipment Details

Organizational Chart

Chapter: 6 Organizational PETUNIA Chart

80 www.petuniafze.com Manager Finance Accountant Backlog Control Deputy ISO Manager Engineer C.P. Dept. Sales Sales Director President President R&D Sales Manager Earthing Dept. Earthing Vice Engineer Sales Commercial Commerce Manager Director Foreign Draftsman Procurement Manager Advertising Manager Manager Stock Control Project Production Manager Manager Factory Technical Draftsman Manager Construction Laboratory Supervisor Manager Control Quality 81

www.petuniafze.com PETUNIA Organizational Chart

Key Personnel

Chapter: 7 Key PETUNIA Personnel

84 www.petuniafze.com Key Personnel Advisors: Managers: Senior Directors: t.Nm il fSuyPosition Field ofStudy Name Itm. 3M.ShabbirHussain 13 2A aii Stock Manager Manager Advertising Project Control Manager GraphicDesign Industrial A.Rahimi N.Ansari Y. Monemi 12 11 10 6D edr Si nutyOrganization St. IT&Network Advisor Advisor inLaw Affairs Advisor inCommerce Computer Expert MSinIndustry DBAinMBA MSinLaw M.Khorram D. Heidari A.Imamjomeh Gh. Yadaea 17 16 15 14 ..Hdyt hmsr Procurement Manager Foreign CommerceManager Technical Manager SalesManager Chemistry oftheBoard Member Commerce oftheBoard Member Material Engineering SalesandMarketing Production Manger Metallurgy A.A.Hedayati M.Ensafjou President Physics M.Shabani Material Engineering B. Yazdani 9 8 A.Hedayati 7 Engineering Electrical Engineering Mechanical 6 F. Khoshnevisan F. Noori 5 M.Motevallibashi 4 M.R.Hedayati 3 2 1 Licentiate Electrical EngineeringLicentiate Electrical (L.E.E) Vice President andCommercial Advisor inCathodic Protection Director

85

www.petuniafze.com PETUNIA Key Personnel

Copies of Work Orders

Chapter: 8 Copies of PETUNIA Work Orders

88 www.petuniafze.com Field. tion System for Phase 15&16,SouthPars Gas 4VCKFDU t t$MJFOU t%BUF 4VCKFDU t t$MJFOU t%BUF Petunia Won theEPCContract. Pars Field. Gas Storage Tanks ofEPC1Project, Phase 12,South August 2009 March 2009 /"43$POTPSUJVN 1FUSP1BST$P Sepanir CathodicProtection System For Earthing andLightningProtec- Earthing ect, Phase 2 ect, Grounding Materials t%BUF 4VCKFDU t t$MJFOU t%BUF t4VCKFDU t$MJFOU September 2008 March 2004 Jahanpars MAPNA Boiler Earthing System For Proj- Earthing Darkhoin LightningProtection System and 89

www.petuniafze.com PETUNIA Copies of Work Orders Copies of PETUNIA Work Orders

90 www.petuniafze.com t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU System Purchase August 2009 March 2008 G.I.S.Co. ODCC Grounding andLightningMaterial LightningProtection andEarthing t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU 4ZTUFNGPS,IP[EBS1SPKFDU July 2009 2008 October Fulmen ChagaleshConsulting Co. Temporary andGrounding Earthing Earthing System Purchase Earthing 91

www.petuniafze.com PETUNIA Copies of Work Orders Copies of PETUNIA Work Orders

92 www.petuniafze.com chase t%BUF 4VCKFDU t t$MJFOU t%BUF 4VCKFDU t t$MJFOU chemical Complex June 2009 September 2009 PIDEC NorahanCo. CathodicProtection Pur- Material Earthing System for ShirazPetro- Earthing System Purchase t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU station, Dare ShahrProject August 2008 2008 December Morvarid Petrochemical Co. Morvarid SafanicuSepahan &BSUIJOH4ZTUFNGPS,74VC LightningProtection andEarthing - 93

www.petuniafze.com PETUNIA Copies of Work Orders Copies of PETUNIA Work Orders

94 www.petuniafze.com t%BUF 4VCKFDU t t$MJFOU t%BUF t4VCKFDU t$MJFOU System Purchase Purchase December 2007 December 2009 May Parsian Co. SetiranCo. LightningProtection andEarthing LightningProtection Equipment Project, Port Imam System for Birjand Tankage Area t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU December 2008 December 2009 May Namvaran Co. Petrogas Aria Global 'MBOHF*OTVMBUJPO,JUTGPS/' LightningProtection andEarthing 95

www.petuniafze.com PETUNIA Copies of Work Orders Copies of PETUNIA Work Orders

96 www.petuniafze.com t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU Project, Port Imam Purchase October 2007 October 2008 October ChagaleshCo. Namvaran Co. CathodicProtection System for NF3 LightningProtection andEarthing t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU August 2009 February 2008 Sakhtar Farda Sakhtar Co. Sazeh Pad Co. Earthing System Purchase Earthing System Purchase Earthing 97

www.petuniafze.com PETUNIA Copies of Work Orders Copies of PETUNIA Work Orders

98 www.petuniafze.com dan Petrochemical Complex t%BUF t4VCKFDU t$MJFOU t%BUF t4VCKFDU t$MJFOU June 2009 November 2007 AndisheOxin Petro Sina Earthing System Purchase Earthing &BSUIJOH4ZTUFNGPS17$6OJU "CB - Cable Accessories t%BUF 4VCKFDU t t$MJFOU t%BUF t4VCKFDU t$MJFOU October 2006 October June 2009 Iran NuclearFuel Iran Co. PIDEC LightningProtection Equipments Earthing and Installation Material Material andInstallation Earthing 99

www.petuniafze.com PETUNIA Copies of Work Orders

Quality System

Chapter: 9 Quality System PETUNIA

102 www.petuniafze.com 9.1. Policy: SystemQuality 9.3. Quality Manual: 9.3. Quality 9.2. ISO9000: A copy oftheCompany willbepresented following Quality inthis section ontheform ofcertificate. ispresented onthe A copy ofthecurrent certification following page. Number0410020040751. System Certificate Quality 1&56/*"JT*40DFSUJñFECZ5¾7$&35$FSUJñDBUJPO#PEZ ofourstaff.consistent upgrades theskills We placegreat emphasison beingtop ofnewtechnological trends and developments andmarket customers, thereby focusing onthecustomers’ changing needsandexpectations. ourendeavor toIn achieve ourobjectives, we develop close,relationships interactive, withour working complete isourgoal. customer satisfaction system isdesignedThe quality to therefore, meetourcustomer's needandexpectations; achieving solutionsto ourcustomers.turnkey agement, procurement, thereby we installationandafter-sales production, provide services, complete We are committed to ensure thehigheststandards indesign, engineering, andquality project man- PG5¾7/03%4ZTUFNT(NC)VOEFS

103

www.petuniafze.com Quality PETUNIA System

Certificates

Chapter: 10 Certificates PETUNIA

106 www.petuniafze.com Brief Confirmation: Client: Material: Subject: Laboratory: Year: Brief Confirmation: Subject: Laboratory: Year: College Welding Connections Wire (SASCW) Copper withStranded AnnealedSoft nections were melted before thewelded points. peres to which injected thesamples, the wires 2003 2001 ABBCo. Current Injection ontheExothermic Current Injection 5FTUJOHPGDPQQFS#POEFE&BSUI3PE 3Nos. ofExothermic Welded Con- ElmOSanatUniversity, Electrical Laboratories Met Confirmed Against 4500-5000am- College Welding Connections melted before thewelded points. towhich injected thesamples, thewires were Soft Copper Soft Wire with50sqmm StrandedAnnealed nections +0.001 % +0.1AndthePurityofFe was:0.011% Brief Confirmation: Material: Subject: Laboratory: Year: Brief Explain: Material: Subject: Laboratory: Year: 2002 2002 Metallographic Test onZinc Anode onExothermic Current Injection 2Nos. ofExothermic Welded con- AsampleofZnAnode ElmOSanatUniversity, Electrical 3B[J.FUBMMVSHJDBM3FTFBSDI$FOUFS oftheZnwas:99.8 The purity Against 5000amperes 107

www.petuniafze.com Certificates PETUNIA Certificates PETUNIA

108 www.petuniafze.com melted before allofthewelded points. towhich injected thesamples, thewires were Wire Material: Subject: Laboratory: Year: Brief Confirmation: Material: Subject: Laboratory: Year: Brief Confirmation: College College Welding Connections Welding Connections. Soft Copper Soft Wire 70 sqmm&120StrandedAnnealed 1998 2001 Current Injection onExothermic Current Injection Current Injection ontheExothermic Current Injection 6 sets of welded connections with 6setsofwelded connections Stranded Annealed Soft Copper Stranded AnnealedSoft ElmOSanatUniversity, Electrical ElmoSanatUniversity, Electrical Against different currents TestConfirmed Center College Welding Connections. Brief Confirmation: Material: Subject: Laboratory: Year: Brief Confirmation: Subject: Laboratory: Year: the coat the base material isseen. the coatbase material Wire 2001 2002 AnalysisoftheCoating ontheExothermic Current Injection Stranded Annealed Soft Copper Stranded AnnealedSoft ElmoSanatUniversity, Electrical 3B[J.FUBMMVSHJDBM3FTFBSDI TestConfirmed Complete adhesionof 109

www.petuniafze.com Certificates PETUNIA Certificates PETUNIA

110 www.petuniafze.com the coat the base material isseen. the coatbase material Laboratory: Year: Brief Confirmation: Subject: Laboratory: Year: Brief Confirmation: Subject: Center Center the coatbasemetalisseen 1999 2001 Microscopic AnalysisoftheCoating Microscopic Microscopic AnalysisoftheCoatingMicroscopic 3B[J.FUBMMVSHJDBM3FTFBSDI 3B[J.FUBMMVSHJDBM3FTFBSDI Complete Adhesion of Complete adhesionof trical University trical Center Welding Connections Wire (SASCW) Copper withStranded AnnealedSoft nections Testing Brief Confirmation: Subject: Laboratory: Year: Brief Confirmation: Material: Subject: Laboratory: Year: before thewelded points. tojected thesamples, thewires were melted 1998 2002 Current Injection ontheExothermic Current Injection 2Nos. ofExothermic Welded Con- Chemical Compound andStandard 3B[J.FUBMMVSHJDBM3FTFBSDI Ministry ofEnergy, Ministry Water &Elec- Against current whichin- Certified 111

www.petuniafze.com Certificates PETUNIA

Customer Satisfactions

Chapter: 11 Customer Satisfactions PETUNIA

114 www.petuniafze.com thermic thermic Welding powders. Year: From: Brief Explain: Subject: Year: From: Confirmation: Subject: Satisfaction Test.Satisfaction Welding Powders. 2001 2003 NIGC 5BCSJ[0JM3FñOFSZ$P Exothermic Welding Powder, Type 15g Exothermic Welding PowdersExothermic Welding Confirming ofPETUNIA’s Confirming Exo- PETUNIA’s 15gExothermic curement Brief Explain: Subject: Year: From: Brief Explain: Subject: Year: From: Software isbasedonIEEE 80-86. Software 1996 2003 ElmOSanatUniversity, College Electrical /*0$ ,BMB/BGU$P PETUNIA’s Software Co. PETUNIA It is confirmed thatPETUNIA’s isconfirmed It Confirmation of Material Material of Confirmation Pro- 115

www.petuniafze.com Customer PETUNIA Satisfactions Customer Satisfactions PETUNIA

116 www.petuniafze.com Protection Products. &Lightning for theEarthing with PETUNIA, Year: From: Brief Explain: Subject: Year: From: Brief Explain: Subject: faction 2002 2000 /*0$ ,BMB/BGU$P Namvaran Satisfaction Notice Satisfaction Co. ofPETUNIA Confirmation Confirmation of Quality Satis- ofQuality Confirmation We ourcooperation confirm earthing accessories and satisfaction notice. andsatisfaction accessories earthing Brief Explain: Subject: Year: From: Brief Explain: Subject: Year: From: garding performance ofsuppliedequipment. garding performance 2000 2000 Parsian SAPTA Material Procurement Material Notice Satisfaction We expressre- oursatisfaction We thepreparation confirm of 117

www.petuniafze.com Customer PETUNIA Satisfactions Customer Satisfactions PETUNIA

118 www.petuniafze.com Year: From: Brief Explain: Subject: tion Products. thermic Welding, &LightningProtec- Earthing 2004 FULMEN Confirmation of PETUNIA Co. ofPETUNIA Confirmation We the confirm “PetWeld” Exo- 119

www.petuniafze.com Customer PETUNIA Satisfactions

Catalogues

Grounding Systems 123 Cathodic Protection Systems 140 Flange Insulating Gasket Kits 166 Chapter: 12 Catalogues PETUNIA

122 www.petuniafze.com Earth RodClamps Earth rodCopper BondEarth Materials Earthing Grounding Systems Earth RodDriver Earth Type: IPCE Type: IPCP GRC-UB Clamp Type: Clamps Type :GRC-L Clamp Type :GRC-O Clamp Type :GRC-B Clamp Type :GRC-W Coupler Type :GRU Driving Head Type :GRPC Rod Type :GR-CB An easysafe rods andlow costinstrument for into theground. installingoftheearth Concrete Inspection Pit.Concrete Inspection Pit.Light andSimplePlastic Inspection 3FDPNNFOEFEGPSSVOUBQFUPSPEDPOOFDUJPO U bolt–cross orparallelcableto rod connections. U boltrod clamprecommended for tapeconnections. 3FDPNNFOEFEGPSUZQFUPSPEDPOOFDUJPOT Use for cableto rod connections. head madefrom hightensile steel. tensile steel. Couplers from manufactured copperbronze alloy. Driving The rod madefrom minimum254μmpure copperbondedonahigh

123

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

124 www.petuniafze.com Earth Plates : Earth C Clamp Flexible Bond Copper Earth Split BoltConnectors Bimetallic Washers Grounding Equipotential Mats BackFill Bed for Earthing Type :BPQ Mate Type :EM plate Copper Lattice Earth Type: ESI Plate CopperSolid Earth Type: ES Type: CC Type :FC Type: BCSU Type :BPC 3FDUBOHVMBS#JNFUBMMJD8BTIFSGPSHBMWBOJDDPSSPTJPOQSPUFDUJPO dimensuions andshapesare available. The matsare madefrom hottipgalvanized steel. Several Crimp type connector clamp(C Clamp) connector type Crimp bonding inmoving structures. bondsrecommendedFlexible for copper earth electrically Used assplitboltfor cables. oftwo connecting Square Bimetalicwasherfor galvaniccorrosion protection. providing auniform environmental ofearth. 3FDPNNFOEFEGPSSFEVDJOHUIFHSPVOECFESFTJTUBODFBOE  Cable Lug Link Disconnecting Tape Conductors: Type: CPS Type: CBS Type: DL&DLT Type: EP6/1 Type: EP6 Type: EP1/1 Type: TTC Type: TC 17$$PWFSFEZFMMPX(SFFO4UBOEBSEFE$PQQFS$POEVDUPST Bare Standarded copperConductors requested specification. With holesandcanbeaccordance oneortwo withthe barwithonediscountinglink. Six way earth bar.Six way simpleearth link. Simple disconnecting Tinned copper tape conductor suitableinhighcorrosion places.Tinned coppertapeconductor Flat copper tapeconductor 125

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

126 www.petuniafze.com Polarization Cell Temporary Device Earthing Type :NB8 Type :GTE25COS barclamp inthehigh cylindrical Used aslineearthing Type :SF200 Type :S20120 Type :S540 Cable Earth Bronze earth clamp in the temporary earthing systems. earthing clampinthetemporary Bronze earth devises. earthing clampinthetemporary Aluminum earth devices. voltage temporary devices. voltage temporary barclampinthehigh cylindrical Used aslineearthing systems. temporary clampinhighvoltage conductor Used aslineearthing devices. earthing forconductor temporary )JHIMZóFYJCMF QMBTUJDDPOWFSFE 4UBOEBSEBOOFBMFEDPQQFS ofinducedacpower from protected structures. andremovaldecoupling system for fualtcorrent service For andacbondira cathodicprotection dcblocking '*--)0-& 5&3.*/"-4 CELL SOLUTION ):%309*%& POTASIUM PLATES STEEL STAINLESS Designing Rodchim™ PETUNIA Installing Resistivity Soil Testing Type :PRE Type 185 :ETD Type :NB33S that thecompany canprovide agoodandreliable installation. stage.projection team hasensuredThe considerableexperience processes the during The installingphaseisoneof thekey with theminimumcostandeffort. can beachieved anmaintained over thelife oftheinstallation resistancea valuableinsightinto how value thedesired earth Soil resistivitymeasurementsatanintended site taken provide to provide to clientstheprojects meetthebestgrounding. has acore staffofhighlyqualifiedengineers whichthey are able thisregard,both lives currently andequipment. In PETUNIA designedA correctly andinstalledsystem, willsafeguard grounding systems usedwhere real estate islimited. effective alternative to water well grounds andotherexpensive 5IF1&56/*"3PEDIJN%FFQ4FSJFT&MFDUSPMZUJD4ZTUFNJTBDPBTU earthing systems. earthing )FBWZEVUZJOTUBMMBUJPOTUJDLTGPSUFNQPSBSZ systems. earthing in thesteel structures for temporary 3FDPNNFOEFEBTFBSUIJOHUFSNJOBMEPVCMFQPTJUJPO systems. temporary clampintheearthing Used asCu/Al earth 127

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

128 www.petuniafze.com ihnn rtcinSses SystemsProtection Lightning Testing System anEarthing Light Anchoring System U ShapedAnchoringSystem FREE STANDING MASTS MastSaddle Anchoring andSupporting Adapting Pieces Early Streamer EmissionAir Terminal (ESE) Type: HDGL Type: ARA Type: LAS Type: USAS HDGF Type: Used as supporting the Air erminal ontheSurface. theAirerminal Used assupporting tapeconnection. conductor Used for adapting theAir Terminal, round mastandinternal ordown 'PS4VQQPSUJOHUIF"JS3PEPOUIFXBMM 'PS4VQQPSUJOHUIF"JS3PEPOUIFXBMM &YQPTFEWFMPDJUZJOUIFTFNBTUTBSF,NI XJUITFDVSJUZG The mastsare calculated according to acceptablestandards. order to conduct the lightning current to earth viaasafeorder path. thelightningcurrent to to earth conduct itbeforecapturing any otherelementwithinitsprotection zone in areconductor byreaching characterized to theapproach oflightning, StreamerEarly EmissionAir Terminal (ESE),Pulsating emitter lightning andtesting backupservices. surveying system. Ourstaffprovides site installation ofanearthing resistance. process after This isoneofthemostimportant to measure the andconfirm result earth usually necessary system hasbeendesigned andinstalled, it’sWhen anearthing BDUPSG

Air RodBase Air Rod Wall Base Multiple Air Rod Simple Air Rod Pipe Bond Cylindrical Support Rod Brackets AirRod Coupling Type: ARS Type :CRB Type: MPTA Type: AT ,MAT Type: CYS1, CYS2 Type: RB Type: RTC system and connecting thedownsystem wire andconnecting to theairrods. Used for fixingair ofthelightningprotectionrods onto thewallnetwork For andlarge bondingto diameter ducts pipework. supporting itonthesurface. supporting For to thedownconductor theAir connecting Terminal and itonthesurface. supporting For to and thedownconductor theairterminal Connecting fromThe bodyisfrom pure copperalloyandspikes copper. withthetaperpointed copperairterminals.Used inconjunction Coated copper ofNickel-Chrome Made Brase Cylindrical Fixing 'PSTVQQPSUJOHUIF"JS3PEPOUIFXBMM For to adaptingair terminal thedown tapeorcableluge. 129

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

130 www.petuniafze.com DC TapeClip Fixing Clamp Tape Clip Tapeto Tape TestClamp Cable to Cable Test Clamp One HoleCable Clip Cable Clip Cable to Tape Clamp junction Cross TapeClamp Type: TCIW Type: CJC Type: XJC Type: DJC Type: TC Type: DTC Type: CTC Type: TCW For thecablesonwall. supporting For joiningcablesandtapes. Suitable for four ofthecoppertapeconductors. way connection These are usedwiththebare for copperconductor fixingitonthewall. These are usedwithbare asasimplefixer copperconductor for tapes. lightning protection system. lineforUsed asadisconnecting testing oftheresistance inthe lightningprotection system. lineforUsed asadisconnecting testing oftheresistance inthe 3FDPNNFOEFEGPSñYJOHUIFDBCMFDPOEVDUPST Small Object Protection Small Object PreventionLightning Systems Tower Clamp Earth T Clamp Square Cable Clamp High Risk Protection Risk High ProtectionMedium Risk ProtectionMedium Risk ProtectionStandard Risk TS-50AD TS-50T TS-50 DTECType: TEC, Type: CTT Type: SCC Vertically Mounted TS-500 TS-400 TS-120 TS-100 Scada Systems, Microwave Dishes. 4BUFMMJUF%JTIFT $PNNVOJDBUJPO"OUFOOBT 3FNPUF Used for bondingwire orcableto steel structure. Used for forming andbonding Tee joints. Used for cross ofthecable. connection Communication Towers, Bridges, Petro-Chemical Storage Facilities, Stacks. .POPQPMFT )JHI.BTUMJHIUOJOH &YUFSOBMMZ.PVOUFE$BNFSBT Antennas, DishesandSensors. Protection for sideMounted Tower Equipmentsuchas 0îDF#VJMEJOHT 4IFMUFST *OEVTUSJBM'BDJMJUJFT )PNFT 8BSFIPVT FT

131

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

132 www.petuniafze.com Illuminated WarningSystem Protection Risk High Surge Protection Devices Plastic Clamp Test Clamp L.C Tester Lightning Strike Counter Led Beacon Lights Horizontally Mounted TS-510 High PowerHigh LightningArresters Aluminium body Communication Towers, Bridges, Petro-Chemical Storage Facilities, Stacks. '##&ODBQTVMBUFE(BT%JTDIBSHF5VCF," Surge Protection ClassI Plastic ClampFor Isolated Ground $PQQFSXJUI1MBTUJD$PWFSJOH'PS3PVOE$POEVDUPST 5IFUFTUFSXJMMJOEJDBUFE0,PS'"6-5XJUIUIFIFMQPGSFEPS transformer. ahighfrequency The counter Includes current. The events are monitored byamechanicalcounter display . '03&/%-4$XPSLTXJUIBOJOEVDUJWFFíFDUPGUIFMJHIUOJOHTUSJL r r r r )JHI#SJHIUYIFH[BHPOBM-&%JMMVNJOBUJPO r r 4QFDJBMEFTJHOSFEDPMPVSFE67SFTJTUHMBTTDBQ  r Anticorrosive coated microprocessor based day withphoto &nightdetection –diod Instant andwarning faultdetection Instant 8 different with2different operatingfunction, operating speed, Produced according to IP67 HSFFO-&% F Surge Protection ClassIII(Parallel Protection) Surge Protection ClassII(Parallel Protection) Spark Gap Coaxial Protection Lightning Arrested

',01'PS#/$$POOFDUPS FIDP-16 '#4&ODBQTVMBUFEQPXFSTQBSLHBQ*JNQ," -/ '%3&JHIUGPMEQSPUFDUFETPDLFU ,B  " Poles, U Surge Arresters Discharge +Encapsulated Gas Tube –3 &ODBQTVMBUFEHBTEJTDIBSHFUVCF,"  FDP-16

N Y7**; 1SPUFDUFE4PDLFU,B  " 1SPUFDUFE4PDLFUXJUIIJHIGSFRñMUFS ,B  " 133

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

134 www.petuniafze.com PetWeld Exothermic Welding Systems WeldingPetWeldExothermic Torch Scraper Tools Mould One Time Flint Gun Smokeless Moulds Handle Clamp Yellow Tube WeldingPower Blue Tube WeldingPower Type: SM... Type: NHC Type: C Type: C Type: SM Type: FG For indooruse Usual for mostofmoulds. 3FDPNNFOEFEGPSDBUIPEJDQSPUFDUJPOQVSQPTFT Used for ofwelding. generalpurpose different welding works. Wich comewithdifferent shapesofmoulde to suite for powder.Ignite thestarting joint hasbeenmade. For a removing inthecrucibleafter slagleft joint hasbeenmade. For a removing inthecrucibleafter slagleft

Lighter Quick Starter Metal Disks Mould Brush File Card Brush Cross Cable Connection Tee Cable Connection End to EndCable Connection Type: CC-X Type: CC-TH Type: CC-E Lighter are usedfor igniting quickstarter. moulds.smokeless used for igniting ofexothermic welding powder in isalso It weld metalisusingofwick. A way to start the weldding powder tackplace. inplaceuntiltheraction The diskrests onthebottom ofthecrucibleandhold been made. For ajointhas removing inthecrucibleafter slagleft For CleaningConductors &pipes before welding. For angles. horizontal cableatright two between connection Suitable to joinahorizontal cabletapto ahorizontal cable run. Used for horizontal endto endcableconnections. 135

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

136 www.petuniafze.com Cross Cable Connection Horizontal TeeConnection Cross Cable to RebarConnection Cross Cable to RebarConnection Cross Cable to RebarConnection Tee Cable to RebarConnection Tee cableto RodConnection Cable to RodConnection Parallel Cable Connections Type: CA-TL Type: CR-T Type: CR-AR Type: CC-HF Type: CC-XS Type: CA-TH Type: CI-TH Type: CA-XS Type: CA-PV rebar connection. 3FDPNNFOEFEGPSUFFIPSJ[POUBMDBCMFUPWFSUJDBM the tapofarod Suitable for ofahorizontal run cableto connection groundtap ofavertical rod. Used for terminate horizontal coppercableatthe Used to horizontal parallelcables. jointwo 'PSKPJOJOHPG)PSJ[POUBMDBCMFTXJUIPVUDVUUJOH tee connection. tee connection. 3FDPNNFOEFEGPSIPSJ[POUBMDBCMFBOESFCBS Use for horizontal thrucableto railconnection. 3FDPNNFOEFEGPSIPSJ[POUBMBOEWFSUJDBMDSPTTDPOOFDUJPO horizontal rebar connection. 3FDPNNFOEFEGPSWFSUJDBMDPOEVDUPSUP Vertical TeeConnection Vertical Tee TapeConnection Horizontal Tapeto TapeConnection Vertical Tapeto TapeConnection Horizontal Tapeto Tape Horizontal cableEnd to tapeEndconnector Horizontal cableto tapeconnector Vertical cableto tapeconnector Horizontal TeeConnection Type: BB-TV Type: BB-DP Type: BB-V Type: BB-EH Type: BB-EV Connection Type: CB-E Type: CBS-H Type: CBS-VS Type: BB-TH 3FDPNNFOEFEGPSDPOOFDUJPOCFUXFFOIPSJ[POUBMUBQFUPEPXOUBQF to arunhorizontal tape. 3FDPNNFOEFEGPSDPOOFDUJPOCFUXFFOIPSJ[POUBMUBQF Tapes endto end. downhorizontal copper Used to two connected copper vertical Used to two connected Tapes endto end. horizontal copper Used to two connected Tapes endto end. Used for cableand tapeendto oftwo end. connecting 3FDPNNFOEFEGPSDPOOFDUJOHCFUXFFOUXP)PSJ[POUBMDBCMFBOEUBQ 3FDPNNFOEFEGPSDPOOFDUJOHCFUXFFOUXPWFSUJDBMDBCMFBOEUBQF 6TFEUPDPOOFDUJOHBIPSJ[POUBM5BQFUPB)PSJ[POUBMUBQFSVO UBQ  F  137

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

138 www.petuniafze.com Cable orPipe Endto Connection Steel Surface Vertical Connection cableto Structure Vertical tape Type: CP-TH Type: BS-VI Connection Type: CS-VI Generally usedfor cathodicprotection purposes. surface. Used for ofatapeendinto avertical connecting 3FDPNNFOEFEGPSDPOOFDUJOHPGBDBCMFFOEJOUPBWFSUJDBMTVSGB DF INDEX CATALOGUE PETUNIA CATHODICOF SYSTEMSPROTECTION 4*5&4637&:4"/%&91&35*&4 41&$*"-*45&26*1.&/5"/%"$$&4403*&4 ."5&3*"-4"/%&26*1.&/54 2. APPLICATIONS &/(*/&&3*/("/%130+&$5."/"(&.&/5 4"$3*'*$*"-$1 *.13&44&%$633&/5$1 2.4.WELL CASING #633*&%"/%46#.&3(&%1*1&-*/&4 2.2.IN PLANTPIPING "#07&(306/%4503"(&5"/,4 3.2.3. ALUMINUM ANODES 3.2.2. ZINCANODES 3.2.1. MAGNESIUM ANODES 3&'&3&/$&&-&$530%&4 +6/$5*0/#09&4 53"/4'03.&33&$5*'*&34 3.1.1. ANODES )";"3%064"3&" 3.1.2.2. OILCOOLED "*3$00-&% )*()4*-*$0/$"45*30/ . .*9&%.&5"-09*%& ..0 56#6-"3 *9&%.&5"-09*%& ..0 8*3&"/%3*##0/ 139

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

140 www.petuniafze.com Engineering and Project Management Engineering andProject Management Cathodic Systems Protection Design looking to execute efficient cathodic protection packages as part ofan overall EPC project. to aspart executelooking efficientcathodic packages protection r8FXPSLDMPTFMZBOEFíFDUJWFMZXJUIFOHJOFFSJOHQSPDVSFNFOUB r8FTVQQPSU0QFSBUPST XIPSFRVJSFBVEJUJOHBOEPSDBUIPEJDQS cathodic protection design andprojectexecution needs: engineering divisionisequipped Our highlyqualifiedandexperienced to meeteachof your specific r8FMM$BTJOHT r4VCTFBQJQFMJOFTBOEóPXMJOFT r4UFFMQJMJOHBOEKFUUJFT r0íTIPSFQMBUGPSNTBOE'140T r&YUFSOBMBOEJOUFSOBMCVSJFEWFTTFMT r&YUFSOBMBOEJOUFSOBMBCPWFHSPVOETUPSBHFUBOLT r*OQMBOUQJQJOH r#VSJFEQJQFMJOFT r0OTIPSFBOEPíTIPSF including: provide detaileddesign engineering ofCathodicprotectionPETUNIA systems to protect allstructures ing designs andequipmentsupplyto site installationandcommissioning. oftheanticorrosion process aspect from through initialinvestigativecovers every to engineer- surveys want maximumprotection for existingoperationsonshore oroffshore. andexpertise Ourexperience or whetheryou provides plananewbuildfacility acomplete cathodicprotectionPETUNIA package PUFDUJPOJOUFHSJUZNBOBHFNFOU OEDPOTUSVDUJPO &1$ DPOUSBDUPST Seamless IntegrationSeamless Turnkey Cathodic Protection Projects EPCContractors Supporting CP SYSTEM DESIGN Supporting Operational FacilitiesSupporting Operators Supporting Design Consultancy Fast Track Accurate Execution the fullprojectscopeandimplementation plan.Onexistingplantswe offer comprehensive operational tion requirements. Following theydeliver comprehensive detailedsite surveys, proposals thatdefine engineersOur team ofexperienced and technicians travel to worldwide corrosion determine preven- fined project scopedocuments for efficientcathodic and protection tendering execution. project andbasiccathodicprotection system designsWe thatproduce site surveys well de- canalsoperform tional integrity. oped before orders material are confirmed. This andimprovesreduces errors inconstruction opera- tages meanourdesign ofbothcathodicprotection systems andtheoverall plantcanbemore devel- system design, ourstrong capability. supplierrelationships andinhousemanufacturing These advan- incathodicprotectionWe for period equipmentthanksto ourexpertise critical canreduce thedelivery fully integrated into ourclient’s overall project. sure to closelywithEPCcontractors and work make thatourcathodicprotection systems are success- into EPCprojects. protection packages We adopta rigorous design andprojectmanagementapproach We are acutely aware whenintegrating thatdesign cathodic andscheduleissuesare vitallyimportant process. ofatendering tion system designs lowest andensuring possibleinstalledcost:this canbedoneaspart strong positionto give invalidatingcathodicprotec- theadvantageofourexperience EPCcontractors As cathodicprotection company,approved anexperienced bymostofthemajoroperators, we are ina AND WRAPPED LOOSE AND WRAPPED SURPLUS CABLE TO BECOILED GL T STP STP 2 No. REFERENCECELL&COUPON XLPE/PVC/SWA/PVC OF NMO WIRE CABLE TAIL, TOTAL 6No. 35mm2 NMO ANODECABLE TAIL 1No.FROM EACH END 3 No. NMOANODEINSOCK NOM. 1M PTL NOM. 1M 2 No. 10mm TEST MONITORING CABLES 10M 2 No. TEST FACULTY BOX POSITIVE DISTRIBUTIONBOX 500

2

XLPE/PVC/SWA/PVC 100 PIPE 1

1/2L

DEPTH 1M DEPTH CABLE BURIAL CABLE TOTAL 2No. 6mm2 TAILS 1No. FROMEACH, REFERENCE CELL&COUPON

PIPE 2

100 500

GL 2M 141

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

142 www.petuniafze.com Training Material Supply Undertank CPSystems Undertank andinternal tankprotection base/external Undertank Cathodic Protection for above ground storage tanks Applications Software Longer lastingImpressedICCP systems baseprotection. dertank currentImpressed CPICCP systems are more reliable, effective odes andflexiblethansacrificial forun- ing temperature. retrofit. We cater oursolutions towards tankdimensions,typeandquality, product,coating andoperat- tions andstandards, whethernewbuildorexisting cansupplycorrosion protection forPETUNIA any tankdesigned to operator specifica- andinternational modelling. also design sophisticated element cathodicprotection systems for complexstructuresusingboundary recognised for software allCPdatamanagement (CPDM)andintegrity. usesindustry PETUNIA We can r3FNPUFNPOJUPSJOHBOEDPOUSBDUT r$BUIPEJDQSPUFDUJPOTZTUFNPQFSBUJPOBOENBJOUFOBODF r4VSWFZFRVJQNFOUBOEUFDIOJRVFT techniques: hands-on practical Our tailor-made trainingprogrammes meetthespecificclient requirements usingbothclassroom and andcontroltoring systems. BOEOPOIB[BSEPVT5SBOTGPSNFS3FDUJñFST KVODUJPOCPYFT BOPEFT "U1&56/*"XFTVQQMZUIFGVMMDBUIPEJDQSPUFDUJPONBUFSJBMQBDL control.monitoring from total assetassuranceto maintenancesupport and 750 UPVC SLEEVES UPVC SLEEVES THROUGH TANK BASEPOSITION 350 200 Fig 1: Typical sideviewlayout usingtheloopsystem Undertank REFERENCE ELECTRODES HDPE MEMBRANE Anode Junction SAND WELL BRADED COMPACTEDWELL BRADED SAND BHFJODMVEJOHBWBSJFUZPG"5&9SBUFE DBCMF UFTUTUBUJPOBOESFNPUFNPOJ ANODES LOOPS

- A typical CP Undertank system CPUndertank A typical system willinclude: requiredICCPThe materials for newundertank atypical r r r r An undertank tube for ventilation, watering and/or portable measuring tubefor ventilation, and/orportable watering An undertank Permanent reference electrodesfor monitoring MMO titaniumanodematerial A standard transformer rectifier ANODE JUNCTION BOXANODE JUNCTION POSITIVE FEEDERCABLE REFERENCE CELLS Fig 2: Typical looplayout Undertank R7 TRANSFORMER RECTIFIER TRANSFORMER R2 R3 0 0 1 2 R1 DRAW OFFSUMP 3 R5 4 R6 5 6 ANODE LOOPS 143

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

144 www.petuniafze.com Choosing the external tankCPsystemChoosing theexternal –Neworretrofit Internal Tank CPSystems TANK SHELL CABLE TRAYCABLE ANODE JUNCTION BOXANODE JUNCTION silver reference chloride electrodes. would atransformer incorporate rectifier, tankprotection internal package A typical andsilver/ MMOtitaniumanodematerial A Typical Impressed CPInternal System Reference Elec- pipe isalsorecommended. Sulphate reference electrodesfor /watering potentialmonitoring monitoring. Aventilation /portable ..0UJUBOJVN MPPQBSSBOHFNFOUXJUIBTUBOEBSEWBSJBDDPOUSPMMF circumstancesUnder normal withgiven information scope, PETUNIA’s recommended system isan Anod Layout TR System trodes TS ELECTRODE COFFERELECTRODE DAM Fig 3a: Typical Internal Tank ICCP System

REFERENCE ELECTRODE CABLE & SUPPORT ROPE pin datgsDisadvantages Reference Electrodes Silver Silver Chloride Low cost Advantages Grid/ribbon Impressed Sacrificial Options Zinc Reference Electrodes ence Electrodes Copper Copper Sulphate Refer- Loop/wire TANK ANODE COFFER DAM

1.5MM MMO ANODE WIRE & SUPPORT ROPE TENSIONING ROPE POLYPROPYLENE ANODE HEADER CABLE SPLICE ANODE HEADERCABLE under thetank to measureAbility potentials anode material Less expensive thanlinearmore lasting Reliable, canincrease output,long Reliable in clean sand Subject to drying Subject types Electrode other Permanent Reference Good to compare againstother Reliable incleansand can beavoided duringconstruction reduces time, construction sumps the box straight intheground), required, ready to install(outof No messyinfield connections HHLL TETHERING LUGTETHERING Fig 3b:AnodeCofferdam Assembly 0.6MM POLYPROPYLENE FLANGE ASSEMBLY ANODE WIRE CABLE TIED CABLE ANODE WIRE 6” DIAPIPE TO ROPEAT INTERVALS SUPPORT ROPE E53BOEQFSNBOFOU$PQQFS$PQQFS NYLON THIMBLE output capability, failprematurely Limited noincrease effect, of more expensive Mixed reliability, to drying, subject problematic to anodes withcontact inthefield,connections sumps Difficultto install, reliantongood difficult costMore thansacrificial Higher alone reference Not suitableasstand less anodematerial More expensive thangrid anodes, TANK FLOOR POLYPROPYLENEROPE TENSIONING MMO ANODE WIRE ANODE WIRE TO SPLICE HEADERCABLE ANODE WIRE HEADER CABLE TO BOXTHE JUNCTION TANK ROOF

Internal Tank CPSystem Special Cases Sacrificial Systems Storage Tanks Water Carrier Choosing Tank Internal Protection Oily Product wire system. inresistivityPETUNIA’sAlthough water varies recommended methodisusinganimpressed closeanode system is designed on a case-by-case basis. system isdesigned onacase-by-case innature. each Dueto acidicoralkaline thesevariations Storage tankscanholdproducts thatare very be installedalongthetankfloor. atthebaseofstorage tank. that fallsoutandcollects To prevent anodesshould corrosion sacrificial )ZESPDBSCPOQSPEVDUTTUPSBHFUBOLTTPNFUJNFTDPOUBJOSFTJEVFPG and tanksides. We supplyaluminium,magnesium and zincanodesto uniformly bedistributed around thetankfloor Tank Type Chemical System ICCP –Cathodic ytmTp nomto Typicalsystem Information System Type ICCP –Anodic arfca Used for water drop out Sacrificial Sacrificial Sacrificial ICCP 152 Fig 4:Internal Tank AnodeArrangement Sacrificial High resistivity requiresHigh highervoltage Low resistivity –requires large current "/0%&'*9*/("55"/,#"4& 4*%&&-&7"5*0/ Suitable for low phandhightemperature, lower power requirements, potential Generally not used as products and operating conditions can be particularly andoperatingconditionsGenerally notusedasproducts canbeparticularly Temperature –Ambient, Small diameter tanks, Large diameter tanks Mid rangeresistivity Mid High temperaturesHigh Tank base 1065 1219 914 monitoring critical, hard to control, variedsuccess High current requirementHigh Easier to control aggressive Magnesium orzincanodeslocatedMagnesium on 140 No monitoring devices employed. Aluminium,Magnesium orzincanodes Aluminium,Magnesium

TR driven usingauto potential control

XBUFS GSFRVFOUMZTBMJOFJOOBUVSF  140 Niobium Titanium anodes TitaniumNiobium Tubes, MMO/Platinised Si Fe orMMO Titanium tank floor or Copper wire 145

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

146 www.petuniafze.com In PlantPipingIn Cathodic for protection PlantPiping In Planning the Ideal In Plant PipingPlanning theIdealIn CPSystem Our CPsystems takeinto consideration: we cansupplyfor thefollowing circumstances: We supplyarangeofCPsystems, to meetyour environment andfactors. As aruleofthumbhowever, have theoptimumCPsystem for your needs. small stationsorlarge productionfacilities, we anddetaileddesign sure offer to make siteyou surveys ofpipeto longrunsofcomplexpiping, sections andwhetherin from short As inplantpipingcanvary tion leaving exposedareas thatcanonlybeprotected byCP. movement,Damage to pipelinescoatingsoccurduring installation orsimplygeneralcoatingdeteriora- andfieldappliedcoatings. defence to factory secondary corrosion andasapowerful We supplyCathodicProtection to steel protect inplantpipingfrom andstainlesssteel carbon buried r r r r r r r r Power availability valves or take-offs In-line Pipeline routing Plant congestion andcorrosivity Soil type Age ofpipeline/coatingsystem Coating system applied Isolation Types ofsystems available: For TemporaryProtection: For Permanent Protection: Sacrificial Disadvantages: Advantages: remoteSemi distributed ground beds: Disadvantages Advantages: Impressed: Closeanodesystems Older pipelines typically needmoreOlder pipelinestypically CP, withmore test stationswithhigherpotential (-1-7v)anodes. age canbelimited. The numberofanodesyou needto protect pipelinedepends onitscharacteristics. Recommendation: to suit the construction choice. Ingots are choice.to easierto Ingots suittheconstruction installattest pointlocationshowever are ribbon Small magnesiumanodes or zincanodes. connected toconnected atest cable above ground for inatest facility. purposes monitoring Life –10-15years. “Packaged” 27kg (medpotential) magnesiumanodes. a test stationisnotconsidered necessary. lated. Typically anodecablesare through connected test stationsfor purposes. monitoring For hydrants pipingruns and fire hydrants.Magnesium anodesareusedonshort typically Allpipingmustbeiso- r r r r r r :PVDBONJYBOENBUDIEFQFOEJOHPOQJQJOHMBZPVUT r :PVDBODIPPTFNVMUJBOPEFTPSMJOFBSBOPEFT r r Piping mustbeisolated Limited effect over plant Expensive drilling Several deepboreholes are needed Simple wiring toThe design pipinglayout issubject maximisestheanode’sIt effect regardless ofisolation hr elcae ie Sacrificial well coated pipes Short ml ieiescin Sacrificial Small pipelinesections We recommend anodesare two installedatany cover- onelocation,asdistribution hrceitc Possible Systems Characteristics ogse ra Impressed –closedistributed Congested areas ut ieie Impressed Multi pipelines e ieie Closeanodewire New pipelines oglntsImpressed Long lengths erftMultiDeepwells ordistributed closeanode Retrofit These canbecircular or ‘d’ anodes shapedingotsorribbon These are 2mfrom buried thepipelineand 147

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

148 www.petuniafze.com Anode Types Power Supply Impressed Canistered Anodes: Deepwell anodes Linear for continuous protection Canistered for closedistributed For mostPlants AC power isavailable andwe recommend atransformer rectifier: 7BSZEFQFOEJOHPOMPDBUJPO cal locationsalongthepipelineroute. Protection levels canbemeasured andmonitored attest stationssituated atregular accessibleandcriti- 5IFQPXFSTVQQMZHFOFSBUFTBOBEKVTUBCMFWPMUBHFPG7EDUP Our impressed include: CPsystems typically better locations(life suited for 2-5years). desert r r r r r r r 3FRVJSFTEFFQCPSFIPMF r r 3FNPUFNPOJUPSJOHDPOUSPMmDPOTUBOUDVSSFOUDVSSFOU r r r )PUFOWJSPONFOUmPJMDPPMFE r r r r r Beneficial effect from multianodes boxesMulti cabletailsterminated injunction To follow 15-50mdependingonsoilconditions pipelineroute anodeevery orhorizontally vertically Installed onadjoiningpipelines/structures Interference Limited rangeandeffect Casing required voltage/fully automatic Low output–rectifierswitch modeunits Cool orindoorenvironment –air-cooled Single core cable Test facilities Anodes orgroundbeds Power supplyunits – string ofMMO –string Titanium anodes: – coke filledMMOtitaniumtubularanodes. –coke –sock-filled andMMOtitaniumwire withcoke anode. ESJWFBHSPVOECFEPGBOPEFT Junction Boxes:Junction Linear Anodes: steel t t TZTUFNBOE53 t t r r r Range ofnonhazardous Range Bond Multipipelines Negative box Junction boxAnode junction alongpipeline(currentEven limited distribution to pipelines–nointerference) Follow pipelineroute alongsidepipelinerouteInstalled to terminate anodecablesfor andcontrol monitoring m#POEJOHKVODUJPOCPYFTBXBZGSPN53 to terminate negative cablesfor andcontrol monitoring to multipipeline to Exe, ExnandExd enclosures Allmadewithpainted steel orstainless 149

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

150 www.petuniafze.com Cathodic Protection For BuriedandSubmerged Pipelines CP solutions Our impressed CPsystems include: typically Impressed We supply: Sacrificial Planning lastingpipelineprotection cal locationsalongthepipeline route. Protection levels canbemeasured andmonitored attest stationssituated atregular accessibleandcriti- groundbed ofanodes. FEBSFBT5IFQPXFSTVQQMZHFOFSBUFTBOBEKVTUBCMFWPMUBHFPG CP systemsareCoverage andextra required is upto 50-100km onlongormultipipelinesincongest- r r well coated pipelines. tion onshort r So ourCPsystems consider: leaving exposedareas thatcanonlybeprotected byCP. movement orjust through construction, Coating coatingdetioration, damagehappenseitherduring andfieldappliedcoatings. defence factory after fective secondary CathodicProtection supplythehighestquality forPETUNIA andsubmerged buried pipelinesasanef- Zinc Anodes Magnesium Anodes Galvanic Anodes Galvanic r r r r r r r 3VSBMPSVSCBOBSFBT r r r r Single core cable Test Facilities Anodes orGroundbeds Power supplyunit Power availability valves ortake-offs In-line Pipeline routing andcorrosivity Soil type Age ofpipelineandcoatingsystem Coating system applied for water lessthan1000Ωcm lowresistivities andinbrackish new highgrade coatings New plasticcoating, to provide temporary CP during the construction phaseorfor protec- theconstruction permanent CPduring to provide temporary -0k eghSacrificial length 0-20 km 0 mlnt Impressed length 20+ km Corrosive Soil l otnsImpressed Old Coatings for mediumresistivities (5000-10000Ωcm) hrceitc CPsystem Characteristic Rural Remote monitoring andcontrol sacrificial during construction Impressed with temporary Impressed Use ofsolarpower/wind 7EDUPESJWFB%$DVSSFOUUISPVHIB Sacrificial PETUNIA’S Cathodic Protection smart for well casing Typical Cathodic Protection system We baseourCPsystems onyour needsandyour environment Other available systems:Other The issues plex sites. Each require detaileddesign andforethought. One ofourCathodicProtection systems canprotect well clusters andmultiCPsystems canrotect com- Power supplyunitwithDeepwell borehole groundbed located 100-200metres from thewell casings. repairs downtime. andproduction casing, allowingwaterpenetration oftheexternal to enter through to theannulus, leadingto expensive to surrounding soil. Lectrochemical cellscanform whichleadto corrosion active sites andeventually to thecasingin borehole.anchoring Poor cementationcanleadto bare steel casingbeingexposed Corrosion ofwellconcern. casingsisaserious Well casingsare usuallycemented for of thepurpose r r r )B[BSEPVTDPOEJUJPOTm"$BWBJMBCJMJUZ r r r r r r Future development andCPlayoutThe quantity canonlybeestablishedbysite survey. Soil resistivity Pipelines andflowlines andwhetherornot isolateto groundingElectrical Formation resistivities Cementing practices Ground conditions, water Salinity andlocationofwell casingstoNumber ofwells, protect geometry 151

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

152 www.petuniafze.com HEAD STRUCTURE ANODE GROUNDBED Diagram of typical CPsystemDiagram for oftypical well-casing ANODE JUNCTION BOXANODE JUNCTION PVC–CASING PERFORATEDPVC–CASING ANODE CHAINS PVC–CASING T/R–UNIT JUNCTION BOXJUNCTION CATHODE

WELL- HEAD WELL CASING WELL I–FLANGE FLOWLINE Operating Characteristics andStandardOperating Characteristics Dimensions Materials andEquipments Wire Mixed MetalOxide (MMO) Wire andRibbon Chemical Composition Typical Applications Oxide(MMO)Mixed Metal Tubular Anodes Impressed Current Cathodic Protection The tubular anodes can be manufactured in various formsThe tubularanodescanbemanufacturedinvarious to suittheintended application: Seawater intakes Structures Offshore/Marine Plant ProtectionInternal Anode Strings Deepwell /OpenholeGroundbeds )PSJ[POUBM(SPVOECFET The wire forms anodescanbemanufacturedinvarious to suittheintended application: optimized current distribution. Wire anodesare usedto protect incongested andcloseproximity locationsto providing thestructure Coke, Calcined r r r r r niomn nd ieCurrent Output AnodeSize Environment Potroleum Sea WaterSea Canistered Multiple anodesonastring Single cabletail With backfill the anodeencasedwithinacotton bagfilledwithcoke Long to aheadercable lengthsofMMO wire atregular connected intervals Backfill Substrate Coating 212m 5ap 20years 20years 20years 20years 20years 75amps 20years 60amps 50amps 12amps 32x1224mm 10amps 8amps 32x1000mm 25x1000mm 32x1224mm 32x1000mm 25x1000mm 550m2 ms20years 25amps 25x500mm 550m4ap 20years 4amps 25x500mm (ASTM B348Grade1or2) IrO2 / IrO2 Ta2O5) Titanium Life

153

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

154 www.petuniafze.com Ribbon Chemical Composition Ri NominalDimensionsofSolid Typical Applications Under tankprotection Closeanodesystems for pipelinesInternal Tank Protection connected toconnected theMMOanodebyspotwelds appliedatthepointofcrossover. toattenuation thepositive lossesandalsoconnects cableviarod connectors. is The titaniumribbon anodeandreduce theMMOribbon connect to conductor electrically asaninert acts Titanium ribbon rebar. .FTI3JCCPO..0"OPEFTBSFVTFEJODPODSFUF$BUIPEJD1SPUFDUJPO base plates. 3JCCPO..0BOPEFTBSFQSJNBSJMZVTFEJOUIFQSPUFDUJPOPGVOEFS Electrical Resistance Electrical Substrate Coating Titanium (ASTM B348Grade1or2) 3.0mm dia.wire –0.062ohms/m 1.5mm dia.wire –0.248ohms/m IrO2 / IrO2 Ta2O5

MMO LinearAnodealongsidepipeline ..03JCCPO"OPEFGPS6OEFSUBOL$1

Surface Area ofRibbon Surface Standard Coll Length Standard Coil Weight Thickness Width UBOL"CPWF(SPVOE4UPSBHF5BOL GPSUIFQSPUFDUJPOPGUIFDPODSFUF (0.635mm (0.025”) 6.35mm (0.25”) 0.014m² per/m 1.12kgs 100m bbon Titanium Conductor BarDimensions Standard Coll Length Standard Coil Weight Thickness Width 0.9mm (0.035”) 12.7mm (0.50”) 3.8kgs 100m 155

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

156 www.petuniafze.com High SiliconHigh Cast Iron Air Cooled Transformer Rectifiers Transformer Rectifiers Applications Chemical Composition Silicon Cast ofHigh IronAnode(BS1591/ASTMA518-80) cooled transformer installationprohibitive. rectifier would make suited to non-hazardousand are area particularly applicationswhere thesize andweight of anoil whether indoorsoroutside. The unitsare generallysmallerandof lighter weight thanoilcooledunits generally upto 50amperes andare suitablefor environments inambienttemperatures upto 55°C "JS$PPMFE5SBOTGPSNFS3FDUJñFSTBSFEFTJHOFEGPSBQQMJDBUJPOT 5IFEFHSFFTPGQSPUFDUJPOPGCPUIPJMDPPMFEBOEBJSDPPMFE53* cording to cathodic protection design). Cooling system insuchtransformer rectifiersbeingof “AN”type. oftransformer may rectifiers This type withdifferent bemanufactured controls upon request(orac- corrosion protection systems. procedure theferrosiliconof themanufacturing andthismakes recognized anodesinternationally for regulations.strict The outstandingcorrosion resistivityandotherfavorable are theresult characteristics The anodesare eitherbymouldcastingortraditionalsandprocedures manufactured using ofelementsintheend-product. antees theequaldistribution procedure inasemiautomatic plantwhichprecludesofmetalcontaminationandguar- thepossibility oftheferrosiliconThe excellentmelting quality withinduction anodesisensured bythemanufacturing Molybdenum Manganese Chrome Carbon Silicon Iron Composition: vrg 2,5% 4,5% therest - 0,95% therest 0,75% 4,5% 14,5% 0,95% therest - 0,75% - 14,5% 0,85% average 0,75% average 14,5% average average average average erslSFroi RFerrosil MO Ferrosil CR Ferrosil S 1UISPVHI*1XJMMCFVQPOSFRVFTU XIFSFMPXFSDVSSFOUVOJUTBSFSFRVJSFE 

Oil Cooled Transformer Rectifiers Control Applications Input Supply Input Control rectifier unit. processdesign allows usto buildmultiple outputchannelsinto andmanufacturing asingletransformer with ambienttemperatures upto 55°C,andare available withcurrent ratingsofupto 400A.Ourinhouse 0JM$PPMFE5SBOTGPSNFS3FDUJñFSTBS tank. The coolingsystem insuchtransformertype. are rectifiers ofONAN also asilicageloilbreather Also, oillocationshave absorbent. inlet-outlet beenprovided onthesaid suchtransformer rectifiers,In theoiltankwillbeequippedwithalevel site gauge, and dialthermometer installed. board are componentsofthecircuit fixedterminals andinput-output to thebodywhichelectrical UVSFE*OTVDI53T UIFUSBOTGPSNFS SFDUJGZJOHCSJEHFBOEñMUF 5PJODSFBTFUIFTBGFUZGBDUPSPGUIF53JOUFOTFDPOEJUJPOT PJ $POTUBOU$VSSFOU$POTUBOU7PMUBHF r r $POUJOVPVTMZWBSJBCMFUSBOTGPSNFS 7BSJBD r 6QUP7UISFFQIBTF r 7UP7TJOHMFQIBTF r r $POTUBOU$VSSFOU$POTUBOU7PMUBHF r r $POUJOVPVTMZ7BSJBCMF5SBOTGPSNFS 7BSJBD r Discrete Step Switching in16,20,25,63steps (Step Control) Automatic Potential Controlled. Discrete Step Switching in16,20,25or63Steps (Step Control) FJEFBMMZTVJUFEUPIFBWZEV MDPPMFEUSBOTGPSNFSSFDUJñFSTBSFNBOVGBD STDPODFSOFEXJMMCFJNNFSTFEJOUPPJM" UZBQQMJDBUJPOTJOBSEVPVTFOWJSPONFOUT

- 157

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

158 www.petuniafze.com Hazardous Area (ATEX Certified) Transformer Rectifiers Input Supply Input certification, fullyinaccordance andEuropean withallapplicableBritish standards.certification, All unitsare assuranceprocedures safety suppliedto andrigorous stringent quality underourISO9001 air designs. andthushave agreaterAir Natural)coolingcategory inherent reliabilitythanoilcirculated andforced 4BGFUZBOE3FMJBCJMJUZJTQBSBNPVOU5IF"5&9DFSUJñFEUSBOTGPS inarduous environmental specificationsandperform conditionswhere continualOperational industry andoffshorefarms structuresand vessels. Theyhave beendesigned to complywiththemoststringent These are specifically for theCathodic Protection ofSteel includingjetties, Structures pipelines, tank Zone 2hazardous areas with: 8FTVQQMJFEUIFSBOHFPG"5&9$FSUJñFE0JM$PPMFE)B[BSEPVT"S (BTHSPVQ**$ #BTFFGB"5&9 r (BTHSPVQ**# #BTFFGB"5&9  r 6QUP7UISFFQIBTF r 7UP7TJOHMFQIBTF r r Automatic Potential Control. NFSSFDUJñFSTBSFJOUIF0/"/ 0JM/BUVSBM FB5SBOTGPSNFS3FDUJñFSTGPSVTFJO Junction BoxesJunction Applications Supply Input Control Features put voltage, current, reference electrodepotentials, andremote control ofoutputvoltage andcurrent. tomised to suittheapplicationorclientspecification. Thisincludeslocaland remote ofout- monitoring ofinnovativeThey are features, of theirdesign suppliedwithawidevariety canbecus- aspect andevery a singlerectifier enclosure where required. ent temperatures upto 55°C,current ratingsofupto 600A.Multipleoutputchannelscanbebuiltinto include oilrefineries, LNGplants, chemicalplantsandoffshore installations. Units are available for ambi- perature class T3, where thehigheststandards ofequipmentsafety are required. Typical applications 0JM$PPMFE)B[BSEPVT"SFB5SBOTGPSNFS3FDUJñFSTBSFQSPWJEFEGP ardous andnonhazardous locations. We andtest boxes manufactureandsupplyafullrangeofjunction to suitany CPSystem for bothhaz- Group IIBorIIC "5&9'VMMZ$FSUJñFEGPS)B[BSEPVT"SFB;POF (BT Enclosures ofIP66, –Sealedto aprotective category 6QUP7UISFFQIBTF r 7UP7TJOHMFQIBTF r r $POTUBOU$VSSFOU$POTUBOU7PMUBHF r r $POUJOVPVTMZWBSJBCMFUSBOTGPSNFS 7BSJBD r 1BJOUFE4UBJOMFTT4UFFM)FBWZEVUZXFMEFEHSBEFTPS r .JME4UFFM)FBWZEVUZXFMEFEXJUI'MBNF;JOD4QSBZBOE1BSU r )JHI*1SBUJOHTVQUP*1 r r r (31 (MBTT3FJOGPSDFE1MBTUJD r r r r Automatic Potential Control. Discrete Step Switching in16,20,25or63Steps (Step Control) All sizes available Gas Group to IIBorIIC Cast aluminiumpainted Atex certified steel,Mild painted withoptionalgalvanizing Stainless Steel 316/304–painted ifrequired enclosures type areAll material available

SVTFJO;POFIB[BSEPVTBSFBTUFN &QPYZ1PMZVSFUIBOF$PBUJOH

- 159

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

160 www.petuniafze.com Reference Electrodes Portable Reference Electrodes Types Permanent Reference Electrodes and portable Silver Silver electrodesfor Chloride offshoreand portable potential measurement. Copper Copper Sulphate reference supplyarangeofruggedportable PETUNIA electrodesfor onshore Types available include: reference we permanent supplyarangeofbare andprepackaged At PETUNIA electrodes. r r r r r r r seawater structures withCP andburied r pipelines,externals, vesselsstructureswithCP buried andother r Current Control Boxes. andMonitoring Negative DrainBoxes BoxesAnode Junction Positive andControl Boxes Distribution /Junction Negative andControl Boxes Distribution /Junction Monitoring Test StationsPoints Zinc for seawater Silver suitablefor Chloride seawater orsoilswithhighchlorides. These are for ASTtankinternals, Copper Copper Sulphate suitablefor freshwater orsoilswithlowchlorides. These are for ASTtank

Type Anodes Magnesium Sacrificial Cathodic Protection Cast Anodes Magnesium uneconomical. monly usedonshore (inhigherresistivityelectrolytes) where theuseofzincandaluminum would be voltage usedforMagnesium hasthehighestdriving ofmaterials anodesandismostcom- sacrificial design andcustomise equipmentto suitourclients’PETUNIA requirements andcater for: applications. are madefrommagnesium ingotsandare highquality suitablefor awiderangeofcathodicprotection Cast magnesium anodesare available instandard potential alloyandhighpotential alloy. The products r r Any numberofCircuits. All DCcurrent requirements

161

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

162 www.petuniafze.com Zinc Anodes Anodes Ribbon Magnesium Extruded Chemical Composition ofCast Anodes Magnesium Chemical composition of extruded magnesium ribbonanodes Chemical composition ofextruded surfaces of the connections are coated oftheconnections byazinclayer.surfaces outby The form castingoftheblocksiscarried andcleansingsalts. covering cal necessary ,andinclusionfree state.The alloywillbecastinoxide- The furnace, ingraphite placein theinduction meltingpots,takes withtheapplicationofmetallurgi- For (99.99%)Znblocks.The ofzincanodeswe meltingprocedure usehigh-purity themanufacturing magnesium anodescanalsobecutto meetcustomer’s ribbon requirements. magnesium anodesare ribbon producedExtruded instandard coils. 1000ft The lengthofextruded Other Imp. Each Other et05-. .100 .0 0.03 0.001 0.02 0.01 0.50-1.3 Rest gMn Mg (max) Total n.-. .50701-. .5070.15-0.7 0.15-0.7 0.15-0.7 0.15-0.7 Mn0.5-1.3 lmn ihPtnilA6BHA Z3(I)AZ63D(HIC) AZ63C(HIB) AZ63B(HIA) Potential High Element u(a)00 .200 0.1 0.05 0.02 0.02 Cu (max) e(a)00 .0 .0 0.003 0.003 0.003 0.03 Fe (max) i(a)0010020030.003 0.003 0.002 0.001 (max) Ni i(a)00 .50 0.3 0.3 0.15 0.05 Si (max) gRmidrRmidrRmidrRemainder Remainder Remainder Remainder Mg n-253525352.0-4.0 2.5-3.5 2.5-3.5 - Zn l<.15367 .-.15.0-7.0 5.3-6.71 5.3-6.71 <0.01 Al (max) Al .5--- - - 0.05 . . . 0.3 0.3 0.3 0.3 (max) Cu (max) Ni (max) Fe ahTotal Each .50.3 0.05 Other Imp.Other (max) Aluminum Anodes chemical composition ofAluminumAnod Chemical Composition is 5-50kg. shape meetingtherequirements oftheUSMILL,BS,andDINstandard. The weight ofstandard anodes The form castingoftheanodeisexecuted incastiron moldingsaccording to theordered size and is produced by thealloying ofthe99.99%pure furnace. metalininduction For level Alblocks. ofaluminumanodeswe use99.799.99%purity themanufacturing The idealcasting means ofcastiron mouldsaccording to theUSMILL,BS,DINstandards. Element Element Zinc Cd a0.20max Ga Cu n00 0.0014max 0.05% Cn Pb n465mx0.003max 4-6.5max Zn Fe e 01%0.005max 0.10% Fe Al lTers Reminder The rest Al n00 a 0.002max 0.02max In i02%0.003max 0.21% Si i0.025max Ti (ASTMB-418 TypeI) (ASTMB-418 TypeI) MIL-A-18001 MIL-A-18001 0.005 max 0.006 max 0.005 max Reminder 0.02-0.07 0.1-0.5 Weight Content Weight Content ASTM B-418 ASTM B-418 0.0014 max 0.005 max 0.002 max 0.003 max 0.003 max Reminder Type II Type I 163

www.petuniafze.com Catalogues PETUNIA Catalogues PETUNIA

164 www.petuniafze.com Installation Supervision Installation Site Surveys and Expertise Cable Corrosion Coupon Cell /ZincEarthing Spark Gaps Cadweld Connectors/Linetaps Splice Kits support system CP comprehensive accessories, and equipment Specialist lation of conventional horizontal and vertical groundbeds and all supporting monitoring/test facilities, groundbedslation ofconventional horizontal andvertical allsupporting cathodicprotection. cathodicprotectionThese includeinternal andundertank instal- We alsosupervise ofcathodicprotection assistandoversee systems. theinstallationofalltypes services Our supervisory ing accurate site dataisthefoundation for anddurablecathodicprotection systems. highquality we incollect- have engineers qualifiedandexperienced and At PETUNIA technicians whoseexpertise supplyarangeofcableincluding: PETUNIA 1&56/*"TVQQMZ$PSSPTJPO$PVQPOGPSFBTVSJOH*3GSFFQPMBSJ[FE 1SPUFDUJPOGSPNQPUFOUJBMMJHIUOJOHEBNBHFJOIB[BSEPVTBSFBT  long-lasting, reliable grounding networks. nections. The Cadweld exothermic system provides neededfor low-resistance permanent, connections ofgrounding oftheircon- The ability andpersonneldependsonthequality circuits to protect property Linetaps. To suitany size ofcableandcurrent capacity. 0VSIJHIRVBMJUZ4QMJDF,JUTQSPWJEFTFDVSFCFMPXHSPVOEDBCMF rupt allCPsystems atthesametime, i.e. norequirement for synchronized switch off. ).81& r 17%').81& r 9-1&17$ BSNPVSFEPSOPO r 17$17$ BSNPVSFEPSOPO r DPOOFDUJPOTUIBUMBTU JOBDDPSEBODFXJUI%*/7%& QPUFOUJBMTXJUIPVUUIFOFFEUPJOUFS

- Soil Resistivity Surveys Resistivity Soil Coating Surveys CIPS Surveys System Commissioning Remote Monitoring andControl Maintenance andMonitoring Current DrainageSurveys AC Surveys Interference E-Log ISurveys your actual cathodicprotectionyour current requirements. actual systems to determine pipingandtankage onnewandoldburied outcurrent drainagesurveys We carry mitigation systems. site datafor and collecting design ofAC outspecialist surveys andDC terfaces. This includescarrying theeffects andmonitoring ofboth includemeasuring AC andDCin- surveys Our pipelineintegrity powergroundbeds. and rectifiers sourcesgroundbeds and temporary or temporary withanELogjunction Isurvey. We installedimpressed canuseeitherpermanently current transformer We incon- well casingprotection offer throughfor external current detailedsurveys drainagesurveys groundbedalong withdeepwell vertical locations. geonics equipmentto calculate pipelineroute andto resistivity locate conventional shallow/horizontal 8FQSPWJEFEFUBJMFETJUF4PJM3FTJTUJWJUZTVSWFZTVTJOHUIF'PV equipment. Pearson survey 8FQSPWJEFEFUBJMFEQJQFMJOFDPBUJOHTVSWFZTVTJOHUIF%JSFDU$ interrupters. TVSWFZTVTJOHTQFDJBMJTFE(14TZODISPOPVTEBUBMPHHFST TVDIBT potential PotentialWe withONOFFpipe-to-soil canprovide Surveys detailedCIPS–CloseInterval setting upandoperatingremote andcontrol monitoring systems outinitialandfinalcommissioningofcompleted cathodicprotectionWe systems. carry Thisincludes remote control monitoring and auditexistingCPsystems andsupport systems. withourCPDMprogramme conjunction andrangeofremoteIn systems, monitoring we canmanage component includingtransformers, bondsandforeign/road crossings. structure includingremote andinplantsystems. to validateWe eachsystem surveys canalsoconduct plans. We andmaintenance outmonitoring for areany cathodicallyprotected ableto manageandcarry We canreview existingcathodicprotection systems andthendevelop andimplementcorrective action referenceincluding permanent electrodesand coupons. S1JO8FOOFSNFUIPEBOEFMFDUSPNBHOFUJD VSSFOU7PMUBHF(SBEJFOU %$7( *3BOE UIF"MMFHSP$96OJUBOE(14DVSSFOU 165

www.petuniafze.com Catalogues PETUNIA Flange Insulating Gasket Kits

Flange insulating kits for metallic pipelines are available for all flange sizes, types, pressure ratings and materials. Flange insulating kits are commonly installed at each end of a pipeline to electrically isolate the pipe for other buried foreign metallic structures and plant grounding systems therefore limiting the amount of cathodic protection current required to protect the pipeline.

PETUNIA manufactures and maintains a supply of quality products and materials which can help pre- venting leakage, preventing corrosion, and saving the integrity of the pipeline.

Not only understands the importance of delivering a timely and technically competent service, our rapid delivery options and flexible logistics systems can provide you with considerable savings. Through our in depth knowledge of the market, products, applications, production, logistics and infra- structure, we are the ideal service partner in the field of insulating gaskets. PETUNIA www.petuniafze.com

166 Catalogues Type E Isolating Gaskets: andSealing Insulating Gasket Sets Rubber Faced Phenolic gaskets Type F as the type Egasket. as thetype automatic positioningofthegasket. anexact, assuring gasket, These are available inthesamematerials theinsidediameter oftheboltholecircleF gasket, isslightlysmallerthantheoutsidediameter ofthe Type of theflangeonly. are Fgaskets madeto fittheraisedfaceportion Asthere are noboltholesinthe phenolic, ofhightemperature aswell materials. asavariety theflangeinsulation.vented from shorting areType Egaskets available inplainfaceorNeoprene face This design facilitates proper installationandforeign during alignment ofthegasket ispre- material Type withthesameoutsidediameter astheflangeandprecision Eisafull-facedgasket cutboltholes. usforPlease contact additionalinformation onavailable options. perature materials. Flat are gaskets usedinspecialapplicationssuchaselevated temperatures require thatoften hightem- The temperature isapproximately limitofthesegaskets 80ºC. retainer providing aneffective sealingsurface. for many appliedto years. bothsidesofalaminated neoprenephenolic Soft rubber sheetsare factory have ofgaskets beenusedasstandard These kind “flat” intheoilandgasindustries isolatinggaskets y g p

167

www.petuniafze.com Catalogues PETUNIA Isolating Sleeves: There is one full length sleeve (extending half way into both steel washers) for each flange bolt. This shall be a 1/32” thick tube with a 400 volts/mil dielectric strength and water absorption of 1.1% or less.

Isolating Washers: There is two 1/8 inch thick glass clad phenolic isolating washers for each bolt. Their compressive strength shall be 25,000 psi, dielectric strength 400 volts/mil and water absorption 1.6% or less. Two 1/8 inch thick steel washers for each bolt are needed as well. The I.D. of all washers shall fit over the isolating sleeve and both the steel and isolating washers shall have the same I.D. and O.D.

Specifications

Gaskets

Maximum Material Dielectric Strength Water Absorption Compressive Strength Temperature Plain Faced 400 VPM 1.1% 25,000 psi 107 ° C Phenolic Neoprene Faced 400 VPM 1.1% 25,000 psi 79 ° C Phenolic

Special & high temperature materials are available upon request.

Sleeves

Material Dielectric Strength Water Absorption Maximum Temperature Polyethylene 400 VPM 0.01 41 ° C

Phenolic 400 VPM 1.1 107 ° C

Teflon 600 VPM 0.01 232 ° C

Special & high temperature materials are available upon request.

Washers

Material Dielectric Strength Water Absorption Compressive Strength Maximum Temperature

Phenolic 400 VPM 1.1% 25,000 psi 107 ° C

Special & high temperature materials are available upon request. PETUNIA www.petuniafze.com

168 Catalogues Ordering Specifications PACKAGING 5. Consult factory for specials. 5. Consult factory 4. Specifysleeve material. 3. Specifysinglewasherordoubleset. EorF. type: 2. Specifygasket 1. Specifyflangesize andpressure rating. To Order Please Specifythefollowing taggedwithflangesize,from shipment.Eachsetisclearly damageduring pressure rating. separately andarelating sleeves andwashersare cushionedwithinthebox to packaged protect them boxes. individuallyindurablecorrugated Insu- kit ispackaged Each Advance flangeinsulationgasket

169

www.petuniafze.com Catalogues PETUNIA