FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the Project/S
Total Page:16
File Type:pdf, Size:1020Kb
6 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Environmental Clearance for the Proposed Housing Project (“Heera Atmosphere”) by M/s Heera Construction Co. Pvt. Ltd. 2. S. No. in the schedule 8 (a), Construction Project with built-up area 1,23,081.02 sq.m. 3. Proposed capacity / area / length Total Plot Area= 2.2703 ha.(22,703.62 sq.m.) / tonnage to be Total Built-up Area = 1,23,081.02 sq. m. handled/command area/lease Total No. of Apts. = 515 Apartments area/ number of wells to be drilled 4. New/Expansion/Modernization New (Proposed Housing Project) 5. Existing capacity/area etc., N.A. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Survey Nos. 2659/A3, 2659/B, 1501, 1501/1, 1502/A, 1503, 1499, 1500, 1502/B, 2659/A2, 2659/A1, 1498, 1498/1, 1498/1-1, 1487, 1504/1, 1504/8-5, 1496/B1-2-1,1496/A2-3-1, 1496/B1-2-4, 1496/B-1, 1496/A-2, 1496/B-1-2-2-1, 1489/1-1, 1488/6, 1488/7, 2671/1-2-1, 2671/1-1, 1495/1, Kowdiar Village, Thiruvananthapuram Taluk & District, Kerala. Plot/Survey/Khasra No. Survey Nos. 2659/A3, 2659/B, 1501, 1501/1, 1502/A, 1503, 1499, 1500, 1502/B, 2659/A2, 2659/A1, 1498, 1498/1, 1498/1-1, 1487, 1504/1, 1504/8-5, 1496/B1-2-1,1496/A2-3-1, 1496/B1-2-4, 1496/B-1, 1496/A-2, 1496/B-1-2-2-1, 1489/1-1, 1488/6, 1488/7, 2671/1-2-1, 2671/1-1, 1495/1, Village Kowdiar Tehsil Thiruvananthapuram District Thiruvananthapuram State Kerala 10. Nearest railway station/airport The nearest railway stations (Trivandrum along with distance in Kms Railway Station) which is located at about 6 km. and Trivandrum International Airport is at about 8 km. away from the project site. 11. Nearest Town, city, District Kowdiar town – Project site is within the Headquarters along with distance town limits. in Kms Trivandrum City – Project site is within the 7 City limits. District Headquarter - Civil Station, Kudappanakunnu, Trivandrum – 5 km. 12 Village Panchayats, Zilla Village office address : Parishad, Municipal Corporation, Village Officer, Local body (complete postal Kowdiar Village Office, addresses with telephone nos. to Kanaka Nagar, Nanthancodu be given) Thiruvananthapuram, Kerala 69503 Ph. 04712313595. Municipal Corporation of Thiruvananthapuram, Vikas Bhavan P.O. Thiruvananthapuram, Kerala-695 033. Ph. 0471-2320821. 13 Name of the applicant Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. 14 Registered Address M/s Heera Construction Company Pvt. Ltd. Citi Centre, 1 st Floor, Patto Plaza, Panaji, Goa-403001. Address for correspondence : Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. Heera Park, M.P. Appan Road, Vazhuthacaud, Thiruvananthapuram, Kerala-695014. Name Dr. A.R. BABU, Designation(Owner/Partner/CEO) Managing Director Address Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. Heera Park, M.P. Appan Road, Vazhuthacaud, Thiruvananthapuram, Kerala-695014. Pin Code Kerala-695014. E-Mail [email protected] [email protected] [email protected] Telephone No. 0471-6612700 Fax No. 0471-2321561 16 Details of Alternative Sites Not Applicable examined, if any. Location of Village-District-State these sites should be shown on a 1. topo sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The Wildlife (Protection) Act, NO 1972? (c) The CRZ Notification, 2011 ? NO 8 22 Whether there is any NO Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will be permanent change in land change in land use, land cover use, land cover or topography including or topography including increase in intensity of land use. increase in intensity of land use The present project is a group housing (with respect to local land use project and is located at Kowdiar plan) Village which is falling in Corporation limits of Thiruvananthapuram. The land related documents are provided. During construction phase, about 200 workers (average) will be at site. During operation phase, on full occupancy of housing project, the maximum population expected is 2,575 persons (residents) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC) 1.2 Clearance of existing land, Yes Most of the area is vacant land, vegetation and buildings? however, some portion of the land, there are some of native species of trees and different varieties of shrubs, herbs, grass & climbers at site. For the development of the proposed project, existing trees, different varieties of shrubs, herbs, grass & climbers will be cleared. 1.3 Creation of new land uses? Yes The new land use will be for 515 Apartments with supporting infrastructure. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. As per the 9 soil investigation report, the water table is varies between 0.1 m. to 0.5 m. below the ground level. The Soil Investigation Report is enclosed. 1.5 Construction works? Yes Construction of 515 Apartments with supporting infrastructure facilities. Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? No Not applicable 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing housing of construction workers (about of construction workers? 200 persons). 1.8 Above ground buildings, Yes It is proposed to construct a residential structures or earthworks building block along with first aid including linear structures, cut facility within the site. The max. no. of and fill or excavations floor of the building is Parking Level 1, 2 + Ground + 31 floors. Excavation of earthwork for foundation of structures will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes and the excess earth would be disposed as per guidelines. Also there is a level difference which will be used for parking level. 1.9 Underground works including Yes No underground works including mining mining or tunneling? / tunneling required except the work and foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods Yes Separate raw material store of cement or materials? and other construction materials is made within the project premises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be about 80 Kg/day and domestic sewage will be about 11 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP for the treatment of domestic sewage from the labour colony. Operation phase :- Solid waste generation will be about 1,030 Kg/day and which will be collected separately as Bio-degradable and Non- biodegradable waste as per the MSW 10 Rules, 2000. The non-biodegradable and recyclable waste would be sold to the vendors. The biodegradable waste would be sent to the bio-gas generation plant. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 288 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be installed within the project premises. 1.16 Facilities for long term housing No The proposed project is housing project of operational workers? and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne No Not applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings in the project site.