6

APPENDIX I

(See paragraph – 6)

FORM 1

(I) Basic Information

Sr. Item Details No.

1. Name of the project/s Environmental Clearance for the Proposed Housing Project (“Heera Atmosphere”) by M/s Heera Construction Co. Pvt. Ltd. 2. S. No. in the schedule 8 (a), Construction Project with built-up area 1,23,081.02 sq.m. 3. Proposed capacity / area / length Total Plot Area= 2.2703 ha.(22,703.62 sq.m.) / tonnage to be Total Built-up Area = 1,23,081.02 sq. m. handled/command area/lease Total No. of Apts. = 515 Apartments area/ number of wells to be drilled 4. New/Expansion/Modernization New (Proposed Housing Project) 5. Existing capacity/area etc., N.A. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Survey Nos. 2659/A3, 2659/B, 1501, 1501/1, 1502/A, 1503, 1499, 1500, 1502/B, 2659/A2, 2659/A1, 1498, 1498/1, 1498/1-1, 1487, 1504/1, 1504/8-5, 1496/B1-2-1,1496/A2-3-1, 1496/B1-2-4, 1496/B-1, 1496/A-2, 1496/B-1-2-2-1, 1489/1-1, 1488/6, 1488/7, 2671/1-2-1, 2671/1-1, 1495/1, Kowdiar Village, Taluk & District, . Plot/Survey/Khasra No. Survey Nos. 2659/A3, 2659/B, 1501, 1501/1, 1502/A, 1503, 1499, 1500, 1502/B, 2659/A2, 2659/A1, 1498, 1498/1, 1498/1-1, 1487, 1504/1, 1504/8-5, 1496/B1-2-1,1496/A2-3-1, 1496/B1-2-4, 1496/B-1, 1496/A-2, 1496/B-1-2-2-1, 1489/1-1, 1488/6, 1488/7, 2671/1-2-1, 2671/1-1, 1495/1, Village Kowdiar Tehsil Thiruvananthapuram District Thiruvananthapuram State Kerala 10. Nearest railway station/airport The nearest railway stations (Trivandrum along with distance in Kms Railway Station) which is located at about 6 km. and Trivandrum International Airport is at about 8 km. away from the project site. 11. Nearest Town, city, District Kowdiar town – Project site is within the Headquarters along with distance town limits. in Kms Trivandrum City – Project site is within the

7

City limits. District Headquarter - Civil Station, Kudappanakunnu, Trivandrum – 5 km. 12 Village Panchayats, Zilla Village office address : Parishad, Municipal Corporation, Village Officer, Local body (complete postal Kowdiar Village Office, addresses with telephone nos. to Kanaka Nagar, Nanthancodu be given) Thiruvananthapuram, Kerala 69503 Ph. 04712313595.

Municipal Corporation of Thiruvananthapuram, Vikas Bhavan P.O. Thiruvananthapuram, Kerala-695 033. Ph. 0471-2320821. 13 Name of the applicant Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. 14 Registered Address M/s Heera Construction Company Pvt. Ltd. Citi Centre, 1 st Floor, Patto Plaza, Panaji, Goa-403001. Address for correspondence : Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. Heera Park, M.P. Appan Road, Vazhuthacaud, Thiruvananthapuram, Kerala-695014. Name Dr. A.R. BABU, Designation(Owner/Partner/CEO) Managing Director Address Dr. A.R. BABU, Managing Director M/s Heera Construction Company Pvt. Ltd. Heera Park, M.P. Appan Road, Vazhuthacaud, Thiruvananthapuram, Kerala-695014. Pin Code Kerala-695014. E-Mail [email protected] [email protected] [email protected] Telephone No. 0471-6612700 Fax No. 0471-2321561 16 Details of Alternative Sites Not Applicable examined, if any. Location of Village-District-State these sites should be shown on a 1. topo sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The Wildlife (Protection) Act, NO 1972? (c) The CRZ Notification, 2011 ? NO

8

22 Whether there is any NO Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will be permanent change in land change in land use, land cover use, land cover or topography including or topography including increase in intensity of land use. increase in intensity of land use The present project is a group housing (with respect to local land use project and is located at Kowdiar plan) Village which is falling in Corporation limits of Thiruvananthapuram.

The land related documents are provided. During construction phase, about 200 workers (average) will be at site. During operation phase, on full occupancy of housing project, the maximum population expected is 2,575 persons (residents) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC) 1.2 Clearance of existing land, Yes Most of the area is vacant land, vegetation and buildings? however, some portion of the land, there are some of native species of trees and different varieties of shrubs, herbs, grass & climbers at site. For the development of the proposed project, existing trees, different varieties of shrubs, herbs, grass & climbers will be cleared. 1.3 Creation of new land uses? Yes The new land use will be for 515 Apartments with supporting infrastructure. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. As per the

9

soil investigation report, the water table is varies between 0.1 m. to 0.5 m. below the ground level. The Soil Investigation Report is enclosed. 1.5 Construction works? Yes Construction of 515 Apartments with supporting infrastructure facilities. Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? No Not applicable 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing housing of construction workers (about of construction workers? 200 persons). 1.8 Above ground buildings, Yes It is proposed to construct a residential structures or earthworks building block along with first aid including linear structures, cut facility within the site. The max. no. of and fill or excavations floor of the building is Parking Level 1, 2 + Ground + 31 floors. Excavation of earthwork for foundation of structures will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes and the excess earth would be disposed as per guidelines. Also there is a level difference which will be used for parking level. 1.9 Underground works including Yes No underground works including mining mining or tunneling? / tunneling required except the work and foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods Yes Separate raw material store of cement or materials? and other construction materials is made within the project premises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be about 80 Kg/day and domestic sewage will be about 11 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP for the treatment of domestic sewage from the labour colony. Operation phase :- Solid waste generation will be about 1,030 Kg/day and which will be collected separately as Bio-degradable and Non- biodegradable waste as per the MSW

10

Rules, 2000. The non-biodegradable and recyclable waste would be sold to the vendors. The biodegradable waste would be sent to the bio-gas generation plant. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers.

Effluent :- The domestic sewage about 288 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be installed within the project premises. 1.16 Facilities for long term housing No The proposed project is housing project of operational workers? and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne No Not applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings in the project site. 1.23 Abstraction or transfers of Yes Water from wells. It is proposed to use water form ground or surface the well water for the project. waters? 1.24 Changes in water bodies or the No There is no changes in water bodies or land surface affecting drainage the land surface affecting drainage or or run-off? run-off. 1.25 Transport of personnel or Yes Transportation of personnel / material materials for construction, during the construction and operation operation or decommissioning? phase is envisaged. In the construction phase, approx. 10-14 trucks / day is envisaged for transportation of materials. 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the

11

environment? 1.28 Influx of people to an area in Yes The proposed project is housing either temporarily or project and would provide job facilities permanently? for about 300 persons in the operation phase and about 200 nos. of labourers (skilled/unskilled) during construction phase. Further, on full occupancy of the project, the maximum population expected is 2,575 Persons (fixed population) and hence there will be influx of people to the project area. 1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or Yes There are some of native trees, shrubs, herbs and grass, some of them are genetic diversity? native species, will be lost during site development.

1.31 Any other actions? None Nil

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S. Information/checklist Yes / Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Plot area 2.2703 ha. is the agricultural land (ha) undeveloped vacant land with some of native trees and different varieties of grass, shrubs, herbs existing at site. 2.2 Water (expected source & Yes Construction phase :- competing users) unit: KLD The water consumption during construction phase is for meeting the domestic requirement (about 14 KLD) of the construction labourers and for construction purposes water requirement (about 34 KLD).

The source of water will be from stored rain water & well water. Operation phase :- The total daily domestic water consumption for the proposed project would be 360 KLD (which includes fresh water requirement of 236 KL) (taken @ 135 LPCD for residents & 45 LPCD for club area). The sources of water during operation phase for the proposed project are: - 1. Roof Rain water (Non-flushing req.) (Rainy days-Concurrent use) 2. Stored rain water / well water /

12

KWA supply (Non flushing req.) (non-rainy days) 3. Treated waste water from STP (Flushing Req.) (Entire Year) The details regarding the water consumption related items are provided at daily water balance chart and daily water consumption chart attached.

2.3 Minerals (MT) No Not Applicable 2.4 Construction material – stone, Yes Steel : 40,302 MT aggregates, sand / soil (expected M-Sand: 105,903 cu.m. source – MT) Laterite blocks & Cement Blocks : 1,20,031 cu.m. Cement : 2,86,950 Bags The construction materials would be brought from local suppliers available in the area. 2.5 Forests and timber (source – MT) Yes Wood shall be used for frame of doors however recyclable wood shall be used for doors. 2.6 Energy including electricity and Yes Total Power Req. : 5,000 kVA fuels (source, competing users) Power Source: KSEB Unit: fuel (MT), energy (MW) Total capacity of D.G. Sets proposed (1000 kVA x 1 no.) (Standby power back up arrangement) Fuel – HSD (High Speed Diesel) 2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or mat erials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist Yes / Details thereof (with approximate N. confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes This is a housing project and no which are hazardous (as per storage of hazardous chemicals MSIHC rules) to human health ( as per MSIHC Rules ) will be done, or the environment (flora, apart from diesel storage for D.G. fauna, and water supplies) Sets which will be operated only during emergency and suitable arrangement will be adopted for the same. It will be stored in HDPE drums and kept in covered rooms under lock and key. 3.2 Changes in occurrence of No Suitable drainage and waste disease or affect disease management measures will be vectors (e.g. insect or water adopted in both the construction and borne diseases) operation phase which will restrict stagnation of water or accumulation of water within the site & the surroundings. This will effectively restrict the reproduction and growth

13

of disease vectors. Further, appropriate sanitation facility will be provided at site during construction phase & operation phase. Good house keeping and hygienic measures will be followed during construction and operation phase to avoid any cause which can lead to occurrence of disease. 3.3 Affect the welfare of people Yes The proposed project is a e.g. by changing living multistoried apartment project and conditions? thereby the living index of the people around the project site will definitely improve. Also there will be various ancillary activities like convenient shops, transport facilities etc. attached to the project which will benefit the local people and change their living condition. 3.4 Vulnerable groups of people No Not applicable. There is no storage of who could be affected by the any material within the site which project e.g. hospital patients, will affect the vulnerable groups of children, the elderly etc., people. 3.5 Any other causes None Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No No such spoil over burden or mine wastes waste will be generated. The construction debris will be used for back filling purposes. 4.2 Municipal waste (domestic and Yes There will be about 80 kg/day of or commercial wastes) municipal solid waste during construction phase. The total Municipal solid waste to be generated from the proposed project would be about 1,030 Kg/day on full occupancy during operation phase. 4.3 Hazardous wastes (as per Yes The oil used in the D.G. sets (as a Hazardous Waste standby source of power) after Management Rules) certain of hours of operation, needs to be changed. This used oil from the D.G. Sets will be sold to the CPCB approved recyclers. The list of authorized recyclers are M/s Perfect Alloys, Chengannur, M/s Peejay Enterprises, Thiruvalla, M/s Excel Petrochemicals, Kochi & M/s Cee Jee Lubricants, Aluva are the approved recyclers for discarded batteries & used oil located in Kerala. Used oil will be stored in HDPE drums in isolated covered facility.

14

4.4 Other industrial process No Not applicable wastes 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge Yes The sludge from S.T.P. will be from effluent treatment partially recycled for enhancing biological treatment and the excess sludge will be sent to the filter press and the de-canted sludge will be used as manure in green area during operation phase. 4.7 Construction or demolition Yes Construction/demolition waste will wastes be used for back filling purposes. 4.8 Redundant machinery or No Not applicable equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes Yes Some horticulture waste will be generated and which will be disposed accordingly.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate S. Information/Checklist confirmation Yes quantities / rates, wherever No. / No possible) with source of information data 5.1 Emissions from combustion of fossil Yes The operation of proposed project fuels from stationary or mobile does not envisage any major air sources pollutant generating sources except D.G. Sets and vehicular movement during construction phase and operation phase. It is proposed to have a D.G. set of 62.5 kVA x 1 no. capacity during construction phase and 1,000 kVA x 1 no. during operation phase. 5.2 Emissions from production No Not applicable. No production activity envisaged. processes 5.3 Emissions from materials handling Yes This will be restricted to the including storage or transport construction phase and within the project site only. 5.4 Emissions from construction Yes Dust will be generated during activities including plant and unloading of construction equipment materials, drilling and grinding operations etc. This will be restricted to the construction phase and within the project site only. The other source of emission is from D.G set of 62.5 kVA of 1 no. which will be used during construction phase. 5.5 Dust or odours from handling of Yes During construction phase dust

15

materials including construction will be generated during the materials, sewage and waste handling of construction materials. Sprinklers for suppression of dust will be installed during construction phase to minimize the dust generation. Wind breakers (i.e. barricades with GI sheets) at all vulnerable sides (all along the nearby houses) or locations or using shade nets will be used for dust control. 5.6 Emissions from incineration of waste No Not applicable, no incineration proposed. 5.7 Emissions from burning of waste in No Not applicable open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not applicable

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: Yes Details thereof (with approximate S. Information / Checklist / No quantities/rates, w herever No. confirmation possible) with source of information data 6.1 From operation of equipment e.g. Yes During construction, the engines, ventilation plant, crushers machinery used for construction will be of highest standards and will be of reputed make and will adhere to international standards. These standards itself take care of noise generated from these machines. The construction involved is residential building, no heavy machinery is required. Hence insignificant impacts due to construction machinery are envisaged. The source of vibration from the project is during construction of the building. Pile foundation excavation through rotary drilling is the source of vibration. The PPV levels from the rotary drilling for pile foundation would be maintained within 10 mm / sec. at 20 m. from the source. Therefore, there will not be any damage due to the vibration to be generated during foundation work to the nearby structures. The other details regarding foundation of structures is provided in the Soil Investigation report which is attached.

16

Apart from this, the construction activity will be restricted to day time only. Noise will be created from operation of D.G. sets but all the D.G. sets shall be silent generators to restrict the noise within the permissible limit. Noise barriers all along the project boundary will be created. Also the marble / tile cutting area noise barrier enclosures will be created at appropriate height. 6.2 From industrial or similar processes No Not applicable 6.3 From construction or demolitio n Yes Due to the various construction activities, there will be short term noise impacts in the immediate vicinity of the project site. The construction activity will include the following noise generation activities: Operation of D.G. Sets, concreting mixing and excavation. 6.4 From blasting or piling No No blasting is adopted in the construction process. 6.5 From construction or operational Yes Some amount of noise will be traffic generated from vehicular movement in the construction and operation phase. 6.6 From lighting or cooling systems No The lighting proposed within the project area during construction phase and operation phase will be limited to the permissible lux level. The proposed project is a housing project thereby the buildings will not be centrally air conditioned and cooling system will not be installed in the project. 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate S. Information/Checklist Yes quantities/rates, wherever possible) No. confirmation / No with source of information data 7.1 From handling, storage, use or No Used Oil from the D.G. Sets will be spillage of hazardous materials stored in HDPE drums and will be kept at a separate place and sold to CPCB approved recyclers. Therefore there is no risk of contamination due to used oil. The storage of used oil will be in such a way that no spillage of hazardous materials. 7.2 From discharge of sewage or No Sewage will be disposed off through

17

other effluents to water or the proposed Sewage Treatment Plant to land (expected mode and place be developed within the premises of discharge) both during construction and operation phase. There is no chance of spillage or discharge of sewage and all the sewage will be chanalized properly through closed pipes to the STP. The sewage after treatment will be utilized for flushing & horticulture purposes. 7.3 By deposition of pollutants No There is no emission except of D.G. emitted to air into the land or set. By use of HSD diesel, the into water emission from the D.G. sets will be within the norms. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build No Not applicable up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, Yes The project is a residential project. fires etc from storage, The chances of explosions, spillages, handling, use or production of fire are minimal. hazardous substances During construction all the labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will be provided to all supervisors and labours involved in construction activity. An agreement will be signed with the contractor which will clearly deals with the safety aspects during construction. No major hazardous waste is being stored within the project site. No Industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures will be provided. 8.2 From any other causes No Not applicable 8.3 Could the project be affected No As per seismic classification, the project by natural disasters causing site falls in Zone-III. No reported environmental damage (e.g. cloudburst in the area. Also, there is no floods, earthquakes, hilly area around the project site, there landslides, cloudburst etc)? is no chance of landslide. Structural design aspects as per the seismic codes – IS 1893 (2002), IS 13920 (1993) and IS 456 (2000) as applicable would be incorporated in our project.

18

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of Appropriate infrastructure like roads, supporting utilities, ancillary power supply, waste management and development or development waste water treatment will be stimulated by the project which developed within the site so that could have impact on the chances of occurrence of any adverse environment e.g.: impacts are minimized. • Supporting infrastructure Yes During construction skilled, unskilled (roads, power supply, waste or and professional work force including waste water treatment, etc.) temporary and permanent employees shall be hired locally in order to generate the employment to the local people. While during the project operation stage for the purpose of day- to-day maintenance, workers will be employed. Moreover, more employment will be created as a result of positive induced development in the immediate vicinity of project site. • housing development Yes Proposed housing project. • extractive industries No Not applicable • supply industries No Not applicable • other No Not applicable 9.2 Lead to after-use of the site, No Not applicable which could have an impact on the environment 9.3 Set a precedent for later No Not applicable developments 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

S. Name/ Aerial distance (within 15 km.) No. Areas Identity Proposed project location boundary

1 Areas protected under No None within the area. international conventions, national or local legislation for their ecological, landscape, cultural or other related value

2 Areas which are important or Yes Water bodies :- sensitive for ecological reasons Amayizhanchan thodu- About 1 km - Wetlands, watercourses or Aakulam lake - About 4.5 km. other water bodies, coastal Lakshadweep sea - About 6.5 km. zone, biospheres, mountains,

19

forests 3 Areas used by protected, No None within the area important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

4 Inland, coastal, marine or Yes Water bodies :- underground waters Amayizhanchan thodu- About 1 km Aakulam lake - About 4.5 km. Lakshadweep sea - About 6.5 km. 5 State, National boundaries No None within the area 6 Routes or facilities used by the No None within the area public for access to recreation or other tourist, pilgrim areas

7 Defense installations Yes Military area = Aakulam, about 4 km. 8 Densely populated or built-up Yes Project site is located within area Trivandrum Corporation limit which is densely populated. 9 Areas occupied by sensitive Hospitals, schools, places of man-made land uses (hospitals, Yes worship, community facilities are schools, places of worship, located within 15 km. around the community facilities) site

10 Areas containing important, No Not applicable high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11 Areas already subjected to No Not applicable pollution or environmental damage. (those where existing legal environmental standards are exceeded)

12 Areas susceptible to natural No The project area and it’s hazard which could cause surroundings falls under Zone-III, the project to present according to the Indian Standards environmental problems Seismic Zoning Map. (earthquakes, subsidence, No reported earth quake, landslides, erosion, flooding or subsidence, erosion, cloudburst in extreme or adverse climatic the area or in its surroundings. conditions) Also, there is no reported landslides in and around the project site.

(IV). Proposed Terms of Reference for EIA studies Ans. The project is having built-up area 1,23,081.02 sq. m. which is less than 1,50,000 sq.m. and therefore, as per EIA Notification, 2006, the project falls under 8 (a) and hence EIA Studies is not required for this project.