Biomass Power Generation and Distribution to National Grid Our Objectives
Total Page:16
File Type:pdf, Size:1020Kb
Biomass Power Generation and Distribution to National Grid Our Objectives ➢ Using rice husks, the by-product from rice milling to produce electricity. ➢ Lessen the pollution caused by rice husks dumping. ➢ Create employment opportunities for people in this area. ➢ Rice millers to attain value from rice husks waste. ➢ Electricity produced by this power plant to be connected to the national grid to provide electricity to areas in need. KZL Co., Ltd is a rice milling enterprise in the Ayeyarwaday region of Myanmar. The company has been developing the rice milling business since the 1970’s. Existing Rice Mill (Myathida) 3TPH on Paddy, Myahaymar Industrial Zone, Myaungmya. Our rice mills are currently processing 4 Tons per hour (TPH on Paddy). There are two rice Mills in Myaungmya (3 TPH on Paddy) and one rice mill in Lubutta. (1 TPH on Paddy) Existing Rice Mill (Manawthukha) 3TPH on Paddy, Myahaymar Industrial Zone, Myaungmya. New Rice Mill (Paddy Star ) 14 TPH on Paddy, Myahaymar Industrial Zone, Myaungmya. We are constructing a new rice mill which has the capacity of processing 14 TPH on Paddy. We are expecting this mill to be up and running by the end of 2019. Milling Milling is a crucial step in post-production of rice. The basic objective of a rice milling system is to remove the husk (a.k.a hull) and the bran layers, and produce an edible, white rice kernel that is sufficiently milled and free of impurities. The husk and by-product constitutes about 20% of the paddy by weight. 1 ton of rice paddy produces 220 kg of rice husk. မမြြောင မြ Ayeyarwady MYAUNGMYA Delta The Ayeyarwady Region in Myanmar is a major rice planting area in Myanmar. Most of the rice mills in Myanmar are located in the Ayeyarwady. Myaungmya Township is located in the centre of the Ayeyarwady Region and this township alone has 52 rice mills in total. It can produce approximately 28 tons of biomass waste (rice husk) every hour. 50 KM away Form Myaungmya 16.612845,94.953586 There are over 200 rice mills within a 50KM / 31 Mile range of Myaungmya. These mills produce almost 90 tons of biomass waste (rice husk) every hour Current availability of rice husks As you can see there is No. of rice Rice Husks Township large amount of waste Mills TPH being generated in the 1 Myaungmya 52 28.00 region. 2 Wakema 36 10.80 Only 20% of the rice husk 3 Sakarmyar 6 2.00 is used in the dry season 4 Myinkaseit 10 2.00 (Oct to May) as fuel for brick baking. 5 Labutta 20 5.00 6 Einme 28 8.00 The other 80% is unused 7 Pathein 40 12.00 and is unethically disposed of. This can lead to 8 Mawgyum 57 17.00 negative environmental 9 Kyonmangay 10 3.00 impacts. Total 87.80 Transportation of Rice Husks This area is covered with a dense river network and currently relies on boats and trucks. We can utilize existing transportation methods to move rice husks to our Biomass plant with ease. With the abundance & accessibility of rice husk and a need for electricity in the region. This provides us with an opportunity to start a Biomass power plant. An example of how rice husk (biomass) can be converted into electricity Proposed Site Power Plant 50 Acres Power Plant 11/33 KV Line Substation-WKM 50 Acres Myaungmya Industrial Zone Industrial Zone Pathein MyaungmyaSub Station Pathein The proposed site for the Biomass plant is on 50 acres of land that is owned by KZL Co., Ltd. It is near Myuangmya’s industrial zone, where rice millers are located. To Laputta (36.38)miles C.V.T W.T L.A 66kV Pathein-Myaungmya Line D.S.E (16)miles C.T D.S.E - - 5 200-400/5-5- - 5 / 5 M.O.C.B 200/5 - 100 G.C.B - 33kV Myaungmya- 5 - C.T 50 5 G.C. B G.C. B 100 5 D.S D.S C.T Wakama Line (22) miles D.S D.S (66/33)kV P.T P.T 5MVA 33 kV / 110V G.C.B 66 kV / 110V G.C.B ✓3 ✓3 ✓3 ✓3 C.T L.A C.T 50-100/5-5- L.A 30-60/5-5-5 5 D.S (66/11)kV (66/11)kV (66/11)kV 5MVA 5MVA 5MVA AG X’mer Capital Power YTE X’mer V.C.B X’mer V.C.B Myoma C.T C.T (1) 200-400/5-5- 300-600/5-5-5 5 V.C.B V.C.B Peak Load C.T V.C.B 3.5MW C.T 200-400/5-5- 50- C.T 5 100/5-5 P.T 200-400/5-5-5 11kV / 110V ✓3 ✓3 Peak Load Peak Load Peak Load 0.5MW 3MW Peak Load 0.3MW 3MW Single Line Diagram of 66/11KV (5MVAx3 ),66/33KV( 5MVA ) MyaungMya Substation To Laputta (36.38)miles C.V.T W.T L.A 66kV Pathein-Myaungmya Line (16)miles D.S.E D.S.E C.T 5 - miles miles Wakama 33kV - 5 200-400/5-5-5 - G.C.B M.O.C.B Myaungmya 200/5 - 100/5 - 5 Line (22) (22) Line - C.T 50 G.C.B D.S D.S G.C.B To use in future C.T 100 5 for KMN D.S D.S (66/33)kV P.T - P.T 5MVA 33 kV / 110V ✓3 ✓3 L.A 66 kV / 110V G.C.B G.C.B L.A ✓3 ✓3 P.T Wakama+SL+KMN C.T C.T 3 3 kV / 110V L.A 50-100/5-5-5 30-60/5-5-5 D.S.E ✓3 ✓3 D.S G.C.B 5 - (66/11)kV (66/11)kV (66/11)kV 5 C.T C.T - 5 5MVA 5MVA / 5MVA 150/5 50-100/5 C.T AG X’mer Capital Power YTE X’mer 100-200/5-5-5 600 - Wakama V.C.B X’mer V.C.B V.C.B V.C.B 300 (33/11)kV C.T Myoma (1) C.T C.T 5MVA 200-400/5-5-5 300-600/5-5-5 V.C.B V.C.B C.T V.C.B P.T C.T - 5 Station Used 200-400/5-5-5 - 11kV / 110V 50-100/5-5 C.T ✓3 ✓3 P.T 200-400/5-5-5 200/5 - 33kV Yekyi-Eime 11kV / 110V Line (43.2)miles 100 5 ✓3 ✓3 C.T (33/11)kV P.T 5MVA 11kV / 110V ✓3 ✓3 One Line Diagram of MyaungMya District 66/11K 66/11K V V 5MVA 5MVA We are seeking both national and international investors. The amount of capital we raise will influence the direction of this Biomass project. If you are interested and/or have any questions please contact; Ko Zaw Lay: [email protected] (Burmese) Kyi Kyi Lynn: [email protected] (English/Burmese/Chinese) Danny Le: [email protected] (English) THANK YOU VERY MUCH.