GOVERNMENT OF INDIA SHIPPING, ROAD TRANSPORT AND HIGHWAYS

UNSTARRED QUESTION NO:5957 ANSWERED ON:04.05.2005 CONSTRUCTION OF ROADS THROUGH BOT ROUTE Singh Shri Dushyant

Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state:

(a) the roads proposed to be constructed through BoT route in different States;

(b) whether any such road has been selected for construction in through BoT route in 2005-06; and

(c) if so, the details thereof? Answer

THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS (SHRI K. H. MUNIYAPPA)

(a) The National Highways proposed to be upgraded on BOT basis under NHDP Phase II, NHDP Phase III and other than NHDP projects are at Annexure - I, Annexure - II and Annexure - III respectively.

(b) and (c) Yes, Sir. The details are at Annexure - IV.

Annex - I

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 5957 FOR ANSWER ON 04.05.2005 ASKED BY SHRI DUSHYANT SINGH REGARDING CONSTRUCTION OF ROADS THROUGH BOT ROUTE.

BOT Projects proposed to be upgraded under NHDP Phase - II (North South & East West Corridor)

Sl. No. NH Section NH No. Length (km) State

1 Assam / WB Border to Gairkatta 31C 28 West Bengal 2 Assam / WB Border to Gairkatta 31C 24 West Bengal 3 Assam / WB Border to Gairkatta 31C 26 West Bengal 4 Gairkatta to Silliguri 31C 30 West Bengal 5 Gairkatta to Silliguri 31 & 31C 21 West Bengal 6 Gairkatta to Silliguri 31C 20 West Bengal 7 Gairkatta to Silliguri 31 & 31C 23 West Bengal 8 Siliguri to Islampur 31 29 West Bengal 9 Gorakhpur Bypass 28 32.4 Uttar Pradesh 10 Bara to Orai 2 & 25 62 Uttar Pradesh 11 Pindwara to Palanpur (Rajasthan - 42 km & Gujarat - 34 km) 14 76 Rajasthan and Gujarat 12 Panipat Elevated Highway 1 10 Haryana 13 Agra Bypass km 199.8 of NH-2 to km 8.0 of NH-2 2 & 3 29 Uttar Pradesh 14 Gwalior Bypass (Approx length 24 km) & Gwalior - Jhansi 75 119 Uttar Pradesh/ Madhya Pradesh 15 Jhansi to Lalitpur 26 92 Uttar Pradesh 16 Lahknadon to MP/MH Border 7 108 Madhya Pradesh 17 MP/MH Border to Manasar 7 37 18 Manasar to Nagpur I/C Kamptee Kanoon bypass 7 34 Maharashtra 19 Nagpur Bypass 7 30 Maharashtra 20 MH/ AP border to Armur 7 134 Andhra Pradesh 21 Armur to Kalkallu Village 7 138 Andhra Pradesh 22 Farukhanagar to Kottakata 7 98.2 Andhra Pradesh

ANNEX - II

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 5957 FOR ANSWER ON 04.05.2005 ASKED BY SHRI DUSHYANT SINGH REGARDING CONSTRUCTION OF ROADS THROUGH BOT ROUTE.

STRETCHES PROPOSED TO BE UPGRADED UNDER NHDP PHASE - III Stretch/ NH No. Stretch/ Corridor Length States involved Corridor No. (km)

1 1 Jalandhar-Amritsar 49 Punjab 2 1A Srinagar-Baramula-Uri 101 J&K 3 3 Guna Bypass 14 MP 4 3 Indore-Khalghat-MP/Maharashtra Border-Dhule- 546 MP/Maharashtra 5 4 Neelamangala-Bangalore -Hoskote-Kolar-Mudbagal 105 Karnataka 6 4 Kalamboli - Mumbra (6 laning) 20 Maharashtra 7 4A Balgaum-Panji 153 Goa/Karnataka 8 6 Sambalpur-Baragarh-Chattisgarh/Orissa Border 88 Orissa 9 6 Aurang-Raipur 45 Chattisgarh 10 6 Nagpur-Maharashtra/Chattisgarh Border-Durg 226 Maharashtra / Chattisgarh 11 6 Nagpur-Talegaon-Amravati 148 Maharashtra 12 6 Gujarat/ Maharashtra Border-Surat 84 Gujarat 13 7 Bangalore-Hosur 25 Karnataka 14 8 Kishangarh-Ajmer-Beawar 82 Rajasthan 15 8D Jetpur-Somnath 127 Gujarat 16 9 Pune-Sholapur 170 Maharashtra 17 9 Hyderabad-Vijayawada-Machhlipatnam 240.5 Andhra Pradesh 18 10 Delhi-Hissar 160 Delhi/ Haryana 19 11 Agra- Bharatpur - Jaipur -Reengus 282 UP/Rajasthan 20 12 Bhopal-Deori-Jabalpur 297 MP 21 12 Jaipur-Tonk 86 Rajasthan 22 14 Beawar - Pali - Pindwara 246 Rajasthan 23 15 Amritsar-Pathankot 101 Punjab 24 17 Panvel-Indapur 84 Maharashtra 25 17 Maharashtra/Goa border-Panaji-Goa/KNT Border 139 Goa 26 17 Kundapur-Surathkal 71 Goa/ Karnataka/ Kerala 27 17 Mangalore - Khozikode - Eddapally 469 Karnataka/ Kerala 28 18 Cuddapah-Mydukur-Kurnool 192.5 Andhra Pradesh 29 19 & 77 Patna-Muzzaffarpur-Sonbarsa 149 Bihar 30 19 & 85 Gopalganj-Chapra-Hajipur 153 Bihar 31 21 Chandigarh-Kiratpur 73 Chandigarh/ Punjab 32 22 Ambala-Kalka-Shimla 168 Haryana/Punjab/Himachal Pradesh 33 24 Muradabad-Sitapur-Lucknow 322 UP 34 28A Motihari-Raxaul 67 Bihar 35 30 Patna-Bakhtiarpur 53 Bihar 36 31 Bakhtiarpur - Begusarai - Khagaria - Purnea 255 Bihar 37 33 Barhi-Ranchi-Jamshedpur 265 Jharkhand 38 35 Barasat-Bangaon 60 West Bengal 39 36,39 Doboka-Dimapur 124 Assam, Nagaland 40 31,52 & 52A Baihata Chariali (on EW corridor)-Itanagar 345 Assam/ Arunachal Pradesh 41 39 Kohima-Imphal 140 Nagaland/ Manipur 42 43 Kurnud-Dhamtari 23 Chhatisgarh 43 44,53 Shillong-Agartala (excluding Shillong Bypass) 447 Meghalaya/ Assam/ Tripura 44 45 Dindigul-Trichy 80 Tamil Nadu 45 45B Madurai-Arupukottai-Tuticorin 144 Tamil Nadu 46 45 Ex Dindigul-Perigulam-Theni 73 Tamil Nadu 47 47 Cherthalai-Tiruvananthapuram-Kanyakumari 265 Kerala/ Tamil Nadu 48 48 Neelamangala − Hassan 154 Karnataka 49 49 Madurai-Ramnathpuram-Rameshwaram-Dhanuskodi 186 Tamil Nadu 50 50 Pune-Khed 30 Maharashtra 51 54 Silchar (on E-W corridor) -Aizawl 190 Assam/ Mizoram 52 57A Forbesganj-Jogwani 13 Bihar 53 1,24,58,72 Delhi− 280 Delhi/ UP/ Uttaranchal 54 59 Indore-Jhabua-Ahmedabad 379 MP/ Gujarat

55 66 Krishnagiri-Thiruvannamalai- 210 Tamil Nadu/ Pondicherry Tindivanam-Pondicherry

56 67 Nagapatnam - Thanjarur - Trichy - Karur 180 Tamil Nadu 57 67 Ex Coimbatore-Mettupalayam 45 Tamil Nadu 58 68 Salem- Ulundrupet 134 Tamil Nadu 59 69 Obaidullaganj-Bheembetka 13 MP 60 75 Jhansi - Khajuraho 100 MP 61 80 Mokama-Munger 70 Bihar 62 84 Patna-Buxar 130 Bihar 63 86 (Ext) Bhopal - Sanchi 40 MP 64 91 Ghaziabad-Aligarh 106 UP 65 200 Raipur-Simga 28 Chhatisgarh 66 200 Chandikhole-Duburi 39 Orissa 67 202 Hyderabad-Yadgiri 30 Andhra Pradesh 68 203 Bhuaneswar-Puri 59 Orissa 69 205 Tirupati-Tiruthani-Chennai 138 Andhra Pradesh/ Tamil Nadu 70 215 Panikholi-Keonjhar-Roxy 249 Orissa 71 220 Theni-Kumili 57 Tamil Nadu

Total 10417

Annex - III

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 5957 FOR ANSWER ON 04.05.2005 ASKED BY SHRI DUSHYANT SINGH REGARDING CONSTRUCTION OF ROADS THROUGH BOT ROUTE.

BOT Projects proposed to be upgraded on sections other than NHDP

Sl. No. NH Section NH No. Length (km) State

1 Km. 493.00 to km 524.00 of Pune Hyderabad section 9 31 Andhra Pradesh 2 Rewa Bypass 7 19.4 Madhya Pradesh 3 Shajapur Bypass 3 12 Madhya Pradesh

Annex - IV

ANNEXURE REFERRED TO IN REPLY TO PART (b) AND (c) OF LOK SABHA UNSTARRED QUESTION NO. 5957 FOR ANSWER ON 04.05.2005 ASKED BY SHRI DUSHYANT SINGH REGARDING CONSTRUCTION OF ROADS THROUGH BOT ROUTE.

BOT Projects proposed to be upgraded in the State of Rajasthan

Sl. No. NH Section NH No. Length (km)

NHDP PHASE II (East - West Corridor)

1 Pindwara to Palanpur 14 42

NHDP PHASE III

2 Jaipur-Reengus 11 54 3 Jaipur-Tonk 12 86 4 Beawar-Pali-Pindwara 14 246 5 Kishangarh-Ajmer-Beawar 8 82