Steel on Environment: Lok Sabha 2012-13

Q. No. Q. Type Date Ans by Ministry Members Title of the Questions Subject Political State Specific Party Representative MoUs for Setting Up 4983 Unstarred 07.05.2012 Steel Shri Khagen Das Steel Plants EIA CPI(M) Tripura Environmental Shri Tarachand Clearance for POSCO 5988 Unstarred 14.05.2012 Steel Bhagora Project EIA INC Rajasthan Shri Bhismshankar Pollution Control by 6192 Unstarred 14.05.2012 Steel Alias Kushal Tiwari PSU Plants Pollution BSP Uttar Pradesh Shri Kapil Muni Accidents at Steel Disaster 471 Unstarred 26.11.2012 Steel Karwariya Plants Management BSP Uttar Pradesh Health and Shri Ram Sundar Das Sanitation JD(U) Bihar

MOUS FOR SETTING UP STEEL PLANTS 7th May, 2012

LSQ 4983

SHRI KHAGEN DAS

Will the Minister of STEEL be pleased to state:-

(a) the details of the Memorandum of Understandings (MoUs) entered for setting up of steel plants across the country;

(b) whether many of these plants have not become operational and started production even after the lapse of six year of the MoUs;

(c) if so, the reasons therefor;

(d) whether the Ministry has stipulated any time frame for starting the production in such plants;

(e) if so, the details thereof and if not, the reasons therefor; and

(f) the role played and the steps taken by the Ministry in this regard?

THE MINISTER OF STEEL (SHRI BENI PRASAD VERMA)

(a) As per the available information in the Ministry of Steel, 301 MoUs have been signed by the Steel developers with various State Governments across the country. State-wise details of MoUs, as available in the Ministry, are given at Annexure –A, B & C.

(b)&(c): Yes, Madam. Most of the projects are delayed due to problems related to land acquisition, pending environment and forest clearances, raw material linkages and local law & order situation.

(d)&(e): No, Madam. Steel is a de-regulated sector. Ministry of Steel does not stipulate any time frame for starting production in the individual steel units. It is purely project specific outcome which depends on many factors like availability of finance, conditions of market and other techno-commercial parameters, in addition to the progress on the fronts of land acquisition, raw material linkages and environment & forest clearances etc.

(f) Ministry of Steel facilitates the implementation of the major private sector projects through coordination with concerned Ministries and State Governments. An Inter-Ministerial Group (IMG) has been set up in the Ministry for monitoring and coordinating on the issues concerning major steel investments.

Annexure – A LIST OF STEEL PLANT PROJECTS FOR WHICH MoUs HAVE BEEN SIGNED WITH THE STATE GOVERNMENT OF ORISSA(Year 2006 onwards) Sl. Date of Investment Present status N Name of the Company Location Capacity in MTPA signing of Rs. in crore & progress o MoU Land has been M/s. Arcellor Mittal India Phase – 1 6.00 22,000 identified. 1 Patna, Keonjhar 21/12/2006 Ltd. Phase - II 6.00 28,000 The DPR has not submitted 2 M/s. Welspun Power & Steel Tangi-Choudwar 3.00 5828.15 01.10.2006 Land Ltd. of Cuttack & acquisition is Darpani of Jajpur under district progress 3 M/s. Ltd. Location is yet to 3.00 6103.80 3.10.2006 Land finalized acquisition is under

progress

4 M/s. SSL Energy Ltd. Nuahata near Phase – I 3.00 4339.00 21.12.2006 Land Banarpal, Angul Phase – II 4270.00 acquisition is under progress 5 M/s. MGM Steels Ltd. Nimdiha, 0.25 208.10 22.12.2006 Land Motagaon, acquisition is Dehnkanal under progress 6 M/s. Surendra Mining Barahamusa, 0.25 221.62 22.12.2006 Commence Industries Pvt. Ltd. Bonai, Sundergarh production of sponge iron 7 M/s. Crackers India (Alloys) Gobardhanpur, 0.25 236.39 22.12.2006 Commence Ltd. Konjhar production of sponge iron 8 M/s. Brahamani River Pellet Tonto, Nalda in 4.0 1485.00 15.03.2008 Production Ltd. Keonjhar & Duburi (Pelletati not started in Jajpur on Plant) 9 M/s. Pradhan Steel & Power Durusia, Athagada, 0.50 606.00 29.01.2008 Production (P) Ltd. Cuttack not started 10 M/s. Tecton Ispat Private Ltd. Tarkabeda, 0.25 227.13 29.01.2008 Production Dhenkanal not started 11 M/s. Atha Mines Private Ltd. Tarkabeda, 0.25 291.00 29.01.2008 Production Dhenkanal not started

Annexure-B LIST OF IRON & STEEL PLANT PROJECTS FOR WHICH MoUs HAVE BEEN SIGNED WITH THE STATE GOVERNMENT OF JHARKHAND (Year 2006 onwards) Date of Present status & S. No. Name of the Company Location Capacity in MTPA Signing Progress MoU M/s. Essel Miniing Jagnathpur, W.Integrated Steel Production not 1 05.05.06 Industries Ltd. Singhbhum Plant – 1.0 Started Saraiakela -Integrated Steel Production not 2 M/s. Sesa Goa Limited 07.09.06 Kharswan Plant – 0.5 Started Barlanga, Integrated Steel Production not 3 M/s. Mukund Steel 07.09.06 Hazaribagh Plant – 2.0 Started Guraa & Production not M/s. Feegrade & Integrated Steel 4 Rangamati W. 11.09.06 Started Company Pvt. Ltd. Plant – 0.3 Singhbhum Kundubera & Production not M/s. Bonai Industrial Integrated Steel 5 Singh Pokharia, W. 11.09.06 Started Company Limited Plant – 0.25 Singhbhum M/s. Rungta Mines Gaisuti, WestIntegrated Steel Production not 6 11.09.06 Limited Singhbhum Plant – 4.5 Started Lupungdih, Production not M/s. Vini Iron & Steel Integrated Steel 7 Chandil, Saraikela 14.09.06 Started Udyog Limited Plant – 0.6 Kharswan Khunti, Chandil, Production not M/s. Narsingh Ispat 8 Saraikela Mini Steel – 0.25 14.09.06 Started Limited Kharaswan M/s. Core Steel & Production not started 9 Musabani, Ghatsila Mini Steel – 1.0 29.12.06 Power Ltd. Integrated Steel Production not started 10 M/s. Ispat Industry Ltd. Kara, Khunit 12.01.07 Plant – 2.8 M/s. Ma Chandi Durga Integrated Steel Production not started 11 Nala Block Jamtara 09.02.07 Ispat Ltd. Plant – 1.1 M/s. Jagdamba Fiscal Raneshwar, Integrated Steel Production not started 12 09.02.07 Services Ltd. Sikaripara, Dumka Plant – 1.1

M/s. Brahmi Impex Afjalpur, Integrated Steel Production not started 13 09.02.07 Ltd. Balablock, Jamtara Plant – 1.1 M/s. Adhunik Integrated Steel Production not started 14 Dhanbad 09.02.07 Corporation Ltd. Plant – 1.1 M/s. Traingle Trading Saraikela - Production not started 15 Steel Plant - 0.24 14.02.07 Pvt. Ltd. Kharswan M/s. Premier Ferro Production not started 16 Alloys & Securities Barlanga, Ranchi Steel Plant - 1.0 23.02.07 Ltd. M/s. Pushp Steel & Production not started 17 Chandil Steel Plant - 0.25 24.02.07 Mining (P) Ltd. M/s. SarthaK Industries Production not started 18 Rajkharswan Steel Plant - 2.2 26.02.07 Ltd. M/s Jindal Steel & Patratu Integrated Steel 08.11.07 Production not started 19 Power Ltd. Plant - 6.0 M/s. Bhushan Steel Galudih, E.Integrated Steel 04.01.08 Production not started 20 Limited Singhbhum Plant – 3.1 M/s. Ma Chhinmastika Ramgarh Integrated Steel 09.07.08 Partially 21 Sponge Iron Ltd. Plant – 1.0 commissioned M/s. Maa Chhinmastika Ramgarh Integrated Steel 09.07.08 Partially 22 Cement and Ispat Pvt. Plant – 0.128 commissioned Ltd. M/s. V.M. Salgaocar & Ghatishila Integrated Mini 11.07.08 Production not started 23 Brothers Pvt. Ltd. Steel Plant – 0.5 M/s. Ramgarh Sponge Hosir, Hazaribagh Steel Plant – 0.25 14.07.08 Partially 24 Iron Pvt. Ltd. commissioned M/s. SKS Ispat and Kanchi Bundu,Steel Plant – 1.3 07.08.08 Production not started 25 Power Ltd. Ranchi M/s. Jupiter Iron Ramgarh Steel Plant – 0.25 07.08.08 Production not started 26 Industries Pvt. Ltd.

Annexure-C LIST OF STEEL PLANT PROJECTS FOR WHICH MoUs HAVE BEEN SIGNED WITH THE STATE GOVERNMENT OF CHHATTISGARH (Year 2006 ONWARDS) S.No. Name of the Location Capacity in MTPA Investment Date of Present status Company Rs. in signing of & progress crore) MoU 1 M/s. Ind Synergy Raigarh Sponge Iron – 0.40 960.00 06.10.2006 Partially Limited commissioned (Expansion Project) 2 M/s. Shree Bajranj Raipur Sponge Iron – 0.60 1400.00 06.10.2006 Production Power and Ispat Blast Furnace – 0.231 not Started Limited (Expansion Project) 3 M/s. SKS Ispat Raipur Sponge Iron – 0.33 1175.00 06.10.2006 Production Limited Mini Blast Furnace – not Started (Expansion 0.5 Project) 4 M/s. Raipur Alloys Raipur Sponge Iron – 0.50 720.00 06.10.2006 Production and Steel Limited Steel – 0.24 not Started (Expansion Project) 5 M/s. Shree Bajrang Raipur Pig Iron – 0.060 109.41 21.10.2006 Production Metallics and not Started Power Limited (Expansion Project) 6 M/s. Rajesh Strips Raipur Steel Melting Shop – 120.00 18.05.2007 Production

Limited 0.30 not Started (Expansion Project) 7 M/s. Jindal Steel Raigarh Blast Furnace – 0.32 8000.00 18.05.2007 Production and Power Ltd. not Started (Expansion Project) 8 M/s. Bhushan Rajnandgaon Integrated Steel 5500.00 06.10.2006 Production Power and Steel Making Facility – 1.2 not Started Ltd. 9 M/s. Monnet Ispat Naharpalli, Blast Furnace – 1.0 2087.00 04.05.2007 Production and Energy Ltd. Raigarh Sponge Iron for not Started (Expansion captive use – 0.40 Project) 10 M/s. Vandana Ispat Borai, Durg, Integrated Steel Plant 1310.00 04.05.2007 Production Limited Anjora, – 0.83 not Started Rajnandgaon Steel Melting Shop – 0.75 11 M/s. Topworth Borai, Durg Blast Furnace – 0.50 1225.74 04.05.2007 Production Steel Pvt. Ltd. not Started (Expansion Project) 12 M/s. MSP Steel Raigarh Pig Iron – 0.40 1400.00 04.05.2007 Production and Power Limited Sponge Iron for not Started (Expansion captive use – 0.3 Project) 13 M/s. Salasar Raigarh Steel Plant – 0.10 230.00 04.05.2007 Production Sponge and Power not Started Ltd. (Expansion Project) 14 M/s. Prakash Champa, Steel Plant – 1.2 2145.00 18.06.2007 Production Industries Ltd. Janjgir, not Started (Expansion Champa Project) 15 M/s. Singhal Raigarh Sponge Iron – 0.2 500.00 23.06.2007 Production Enterprises Steel – 0.3 not Started (Expansion Project) 16 M/s. Anjani Steel Raigarh Integrated Steel Plant- 410.00 02.08.2007 Production Private Limited 0.25 not Started (Expansion Project) 17 M/s. H.E.G. Durg Sponge Iron – 0.35 280.00 02.08.2007 Production Limited not Started (Expansion Project) 18 M/s. Mangal Bilaspur Sponge Iron – 0.12 445.00 02.08.2007 Production Sponge & Steel not Started Limited (Expansion Project) 19 M/s. S.K. Sarawagi Bilaspur Sponge Iron – 0.21 330.00 02.08.2007 Production and Company Pvt. Steel – 0.15 not Started Ltd. 20 M/s. Aarti Sponge - Sponge Iron – 0.105 305.00 08.08.2008 Production and Power Pvt. Steel Melting Shop – not Started Ltd. 0.09 21 M/s. API Ispat and - Sponge Iron – 0.525 1000 08.08.2008 Production Powertech Pvt. not Started Ltd.

22 M/s. Jai Balaji - DRI Plant – 0.6 1450.00 08.08.2008 Production Industries Ltd. Steel Melt Shop – 1.0 not Started 23 M/s. Baldev Alloys - Sponge Iron – 0.54 430.00 08.08.2008 Production Pvt. Ltd. SMS Plant – 0.2 not Started (Expansion Project) 24 M/s. Crest Steel - Sponge Iron – 0.75 1536.00 08.08.2008 Production and Power Pvt. Steel Melting Shop – not Started Ltd. 0.5 (Expansion EAF – 0.32 Project) 25 M/s. Godawari - DRI – 0.6 1570.00 08.08.2008 Production Power and Ispat Steel Billet – 0.6 not Started Ltd. 26 M/s. Jindal Steel Gram DRI – 5.1 18300.00 08.08.2008 Production and Power Ltd. Saraipali, not Started (Expansion Kosampali, Project) Dhanagar, Raigarh 27 M/s. Khetan - Sponge iron – 0.09 209.00 08.08.2008 Production Sponge and Induction Furnace – not Started Infrastructure Pvt. 0.06 Ltd. (Expansion Project) 28 M/s. Nalwa Steel Gram DRI (coal based)– 3100.00 08.08.2008 Production and Power Ltd. Taraimal, 0.33 not Started (Expansion Raigarh Steel Melting Shop – Project) 0.336 DRI (gas based)-2.0 29 M/s. Jaysawal - Sponge Iron – 0.6 2020.00 08.08.2008 Production Necco Industries Steel Billet – 0.7 not Started Ltd. 30 M/s. Nova Iron and Bilaspur Sponge Iron – 0.6 606.00 08.08.2008 Production Steel Ltd. not Started (Expansion Project) 31 M/s. Raipur Power - Sponge Iron 0.135 135.00 08.08.2008 Production and Steel Ltd. Induction Furnace – not Started 0.09 32 M/s. Rashmi Ispat - Sponge Iron – 0.315 550.00 08.08.2008 Production Pvt. Ltd. Steel Melting Shop – not Started 0.21 33 M/s. Real Ispat and - Sponge Iron – 0.30 720.00 08.08.2008 Production Power Ltd. not Started (Expansion Project) 34 M/s. R.L. Steel and - Sponge Iron – 0.4 293.00 08.08.2008 Production Energy Ltd. not Started 35 M/s. Satya Power - Sponge Iron – 0.24 376.00 08.08.2008 Production and Ispat Pvt. Ltd. not Started 36 M/s. Shri Shyam - Sponge Iron – 0.135 205.00 08.08.2008 Production Sponge and Power not Started Ltd. (Expansion Project) 37 M/s. SKS Ispat and - Sponge iron – 1.2 3611.00 08.08.2008 Production Power Ltd. Blast furnace – 0.27 not Started 38 M/s. Surya Global - DRI – 1.4 3000.00 08.08.2008 Production Steel and Jenpower Blast furnace with not Started Ltd. PCM- 0.6

39 M/s. Visa Steel - Blast furnace with 4750.00 08.08.2008 Production Limited sinter – 1.5 not Started Sponge iron – 1.0 40 M/s. NMDC - Integrated Steel Plant 10000.00 03.09.2008 Production Limited – 3.00 not Started 41 M/s. K. Energy - Sponge iron – 0.21 469.00 12.09.2008 Production Limited Induction furnace – not Started 0.192 42 M/s. Prakash - Blast furnace – 1.15 2750.00 12.09.2008 Production Industries Limited Sponge iron – 1.6 not Started Steel Melting shop – 2.0 43 M/s. Singhal Steel - Blast furnace – 0.3 700.00 01.10.2008 Production Pvt. Ltd. Sponge iron – 0.2 not Started Induction furnace – 0.3 EAF – 0.3 44 M/s. MSP Steel - Sponge iron – 0.9 4930.00 01.10.2008 Production and Power Ltd. Blast furnace – 0.7 not Started Steel melting shop – 1.5 45 M/s. Mahendra - Sponge iron – 0.27 485.00 01.10.2008 Production Sponge and Power Steel Billet – 0.15 not Started Pvt. Ltd. 46 M/s. Hind Energy - Sponge iron – 0.405 505 03.10.2008 Production and Coal Steel melting shop – not Started Beneficiation 0.216 (India) Pvt. Ltd. 47 M/s. Sky Aloys - Induction Furnace – 270 11.09.2009 Production and Power Pvt. 0.1 not Started Ltd. 48 M/s. Godwari - Steel Melting Shop – 5920.00 24.05.2010 Production Power and Ispat 0.2 not Started Limited 49 M/s. Rashi Strips - DRI plant with 2200 17.06.2010 Production Private Limited gasification – 1.0 not Started Steel Melting Shop – 0.9

ENVIRONMENTAL CLEARANCE FOR POSCO PROJECT 14th May 2012

LSQ 5988

SHRI TARACHAND BHAGORA

Will the Minister of STEEL be pleased to state:-

(a) whether the National Green Tribunal has suspended the environment clearance/granted to POSCO mega steel project in in January, 2011 until the Ministry of Environment and Forests reviews it afresh; (b) whether the tribunal has pointed out that memorandum of Understanding (MoU) between Odisha Government and POSCO states that the project is for production of 12 million tonnes of steel per annum whereas the environment impact assessment report is for 4 MTPA Steel production in the first phase; (c) if so, the details, thereof; and (d) the reaction of the Government thereto?

MINISTER OF THE STATE IN THE MINISTRY OF STEEL (SHRI BENI PRASAD VERMA) (a)to(d): The Ministry of Environment & Forests (MoEF) had granted environmental clearance on 19.7.2007 to an integrated iron and steel plant by M/s. POSCO - India Pvt. Ltd. in Odisha subject to various environmental safeguards. Based on the report submitted by a four member Committee, additional conditions were stipulated on 31st January, 2011. In an appeal filed before the National Green Tribunal (NGT) challenging the environmental clearance accorded on 19.7.2007 as well as the order dated 31st January, 2011 imposing additional conditions, the NGT vide its Judgment dated 30th March, 2012 has suspended the order dated 31st January, 2011 of MoEF. NGT has further directed the MoEF to make a fresh review of the Project with specific reference to the observations/apprehensions raised by the Review Committee by issuing fresh Terms of Reference. The MoU has been signed between Odisha Government and POSCO for setting up of a 12 Mtpa steel plant. NGT has directed MoEF to consider proportionately optimizing the land requirement for setting up of 4 Mtpa steel plant in the first phase.

POLLUTION CONTROL BY PSU PLANTS 14th May, 2012

LSQ 6192

SHRI BHISMA SHANKAR ALIAS KUSHAL TIWARI

Will the Minister of STEEL be pleased to state:-

(a) whether the pollution control devices have not been installed in various plants of Ltd. (SAIL); (b) if so, the details thereof alongwith the reasons therefor; (c) the details of the total expenditure incurred by the SAIL in installation of environment friendly devices in its plants during the last three years, year-wise and plant-wise; (d) whether the employees of SAIL in various units have been suffering suffered from several ailments due to non- observance of the minimum environmental norms; (e) if so, the details thereof; and (f) the corrective steps taken by the Government in this regard?

MINISTER OF THE STATE IN THE MINISTRY OF STEEL (SHRI BENI PRASAD VERMA)

(a)&(b): Pollution control devices have been installed and operating in all the five integrated steel plants of Steel Authority of India Limited (SAIL).

(c) The total expenditure incurred by SAIL in installation of environment friendly devices in its integrated steel plants during 2008-09 to 2010-2011 is given below: [Rs. Crores] Year BSP DSP RSP BSL ISP TOTAL 2008-09 5.53 0.40 10.27 9.39 6.35 32.34 2009-10 1.47 2.39 15.16 18.18 2.76 30.25 2010-11 10.37 10.52 7.20 27.59 4.27 59.95 Note: BSP: , DSP: , RSP: , BSL: , ISP: IISCO Steel Plant. (d)to(f): The air and water pollution parameters are within the prescribed norms and there are no specific reports of workers suffering from ailments due to non-observance of minimum environmental norms.

ACCIDENT AT STEEL PLANTS 26th November, 2012

LSQ 471

SHRI KAPIL MUNI KARWARIYA SHRI RAM SUNDAR DAS

Will the Minister of STEEL be pleased to state:-

(a) the number and nature of accidents that took place in various steel plants in the country during each of the last three years and the current year, plant-wise;

(b) the number of persons injured/died and total loss of property in these accidents during the said period;

(c) whether any investigation has been conducted to ascertain the causes of such accidents;

(d) if so, the outcome thereof and the action taken against the officials found responsible for such accidents;

(e) the amount of compensation paid to the injured persons and families of the deceased persons in such cases;

(f) the average annual expenditure on the maintenance of these plants and changing pipelines and carrying out electric repairs and maintenance of equipments during the said period; and (g) the concrete steps taken/being taken to avoid recurrence of such accidents in future?

THE MINISTER OF STEEL (SHRI BENI PRASAD VERMA)

(a)&(b): A statement showing details of accidents which occurred in different public sector steel plants of the Steel Authority of India Limited (SAIL) and Limited (RINL) during the requisite period is annexed.

Accidents in the plants of SAIL did not involve any loss of property. As regards RINL, there has been a major incident on 13th June 2012 at VSP while commissioning of Converter-1 in Steel Melting Shop-2 in the Pressure Reducing Station-3.

Steel is a deregulated sector. There are a large number of steel factories/plants in the country. Therefore in regard to the private steel sector, the requisite data/information is not maintained by the Ministry of Steel.

(c)&(d): Yes, Madam. All fatal accidents are investigated by a plant level enquiry committee to identify the causes of such accidents and give recommendations to prevent recurrence of such incidents. Status of implementation of the recommendations made by the committee are monitored and reviewed at appropriate levels for their timely compliance. Wherever recommended by the Plant enquiry committee appropriate actions are taken against the erring employees/officials for violation of safety norms leading to an accident. In case of contractual employees, the same is done as per the penalty provisions given in the terms and conditions of the contract.

(e) In case of contract labour, compensation/dependent benefit is paid under the Employee State Insurance Scheme (ESIS) by the Employees’ State Insurance Corporation (ESIC). In case of fatal accidents to regular employees, the compensation is given as per the law/company policy. SAIL and RINL provide compensation to their employees in case of death/disablement due to accident arising out of and in course of employment as per the Workmen’s Compensation Act, Employee Family Benefit Scheme and company policy. SAIL and RINL have paid a total of ` 17,37,13,722/- as compensation to the injured persons and families of deceased from 2009 till date.

(f) The average annual expenditure on maintenance of different plants (including expenditure incurred on repairs, change in pipelines, electric repairs and mechanical maintenance) of SAIL and RINL during the years 2009-10 to 2011-12 was ` 5307.33 crore and ` 741.89 crore respectively.

(g) Measures taken by SAIL Plants/Units to avoid occurrence of such accidents in identified areas of concern are as follows:- i. Enforcing usage of job specific Personal Protective Equipments (PPEs) by all concerned, mandatory use of full body harness in place of safety belts; ii. Campaign and training on rail and road safety; iii. Use of retardant dress while handling liquid metal; iv. Provisions of automatic gas leak detection and alarm system in hazardous areas, Conducting periodic mock drills as per emergency plan; v. Strict adherence to Inter Plant Safety Standards procedures; vi. Enforcement of safety induction training; and vii. Strict adherence to safety procedures, medical fitness and height pass.

viii. Adoption of systematic approach for safety management (OHSAS-18001 implementation, internal & external safety audits etc.)

Based on the findings of the enquiry committees which probe into the incident of each fatal accident, the cause of each accident is identified and the following measures are taken in RINL: i. Comprehensive safety audit has been conducted by Regional Labour Institute, Chennai, DGFASLI in July 2012. ii. Review of Hazard Identification and Risk Assessment Training programme has been conducted by Director Safety, Regional Labour Institute, Chennai, DGFASLI in October 2012. iii. Mock-drills as per the emergency plan conducted periodically. iv. Automatic gas leak detection alarm in critical and gas prone areas provided. v. Enforcing usage of job specific personal protective equipment. vi. Conducting special training programmes on Behavioral Based Safety and Legal awareness vii. Carrying out risk assessment by third party before commissioning of new units

Annexure

Statement showing details of accidents which occurred in different public sector steel plants and units

of the Steel Authority of India Limited (SAIL) and Rashtriya Ispat Nigam Limited (RINL) during the last three years and the current year (plant-wise)

PLANTS /UNITS Fatal accidents (fatality) Other reportable accidents (excluding fatal accidents)

Period 2009 2010 2011 2012 (till 2009 2010 2011 2012 Oct'12) (till Oct'12)

Steel Authority of India Ltd

Bhilai Steel 2 0 1 1 11 3 8 5 Plant

Durgapur Steel 1 4 0 7 2 2 0 0 Plant

Rourkela Steel 4 4 3 4 16 10 12 5

Plant

Bokaro Steel 10 8 3 4 12 15 5 6 Plant

IISCO Steel 3 10 6 2 10 26 12 8 Plant

Alloy Steel 0 0 1 0 3 2 0 0 Plant

Salem Steel 5 1 0 0 4 2 3 1

Plant

Visvesvaraya 0 0 3 0 13 10 6 7 Iron and Steel Plant

Chandrapur 0 0 0 2 6 4 3 Ferro Alloys 0 Plant .

Stock yard 2 1 1 1 0 1 5 0

Raw Material 1 2 ~0~1 0 4 6 1 1 Division (Mines)

Bhilai Mines 0 0 1 1 38 29 17 13

Collieries 0 3 1 0 6 3 5 1

SAIL 0 0 1 0 0 0 8 19 Refractory Unit

Total (SAIL) 28 33 21 20 121 115 86 69

Rashtriya 11 10 8 5 67 46 46 28 Ispat Nigam Ltd.

GRAND 39 43 29 25 178 161 132 97 TOTAL