State Oil Company of the Azerbaijan Republic International Financial

Total Page:16

File Type:pdf, Size:1020Kb

State Oil Company of the Azerbaijan Republic International Financial State Oil Company of the Azerbaijan Republic International Financial Reporting Standards Consolidated financial statements 31 December 2017 State Oil Company of the Azerbaijan Republic Consolidated financial statements Contents Independent auditor’s report Consolidated financial statements Consolidated statement of financial position ...................................................................................................... 1 Consolidated statement of profit or loss and other comprehensive income ...................................................... 3 Consolidated statement of changes in equity..................................................................................................... 4 Consolidated statement of cash flows ................................................................................................................ 5 Notes to the consolidated financial statements 1. The Group and its operations ................................................................................................................... 6 2. Basis of preparation and significant accounting policies.......................................................................... 6 3. Critical accounting estimates and judgments ......................................................................................... 23 4. Adoption of new or revised standards and interpretations and new accounting pronouncements........ 27 5. Segment Information .............................................................................................................................. 32 6. Financial risk management .................................................................................................................... 37 7. Balances and transactions with related parties ...................................................................................... 44 8. Cash and cash equivalents and deposits .............................................................................................. 47 9. Restricted cash ....................................................................................................................................... 47 10. Available-for-sale investments ............................................................................................................... 47 11. Trade and other receivables .................................................................................................................. 48 12. Inventories .............................................................................................................................................. 49 13. Other current assets ............................................................................................................................... 49 14. Other non-current assets ....................................................................................................................... 49 15. Other non-current financial assets ......................................................................................................... 50 16. Property, plant and equipment ............................................................................................................... 51 17. Intangible assets other than goodwill ..................................................................................................... 52 18. Investments in joint ventures .................................................................................................................. 53 19. Investment in associates ........................................................................................................................ 56 20. Trade and other payables ...................................................................................................................... 60 21. Borrowings ............................................................................................................................................. 60 22. Taxes payable ........................................................................................................................................ 64 23. Asset retirement obligations ................................................................................................................... 64 24. Other provisions for liabilities and charges ............................................................................................ 65 25. Deferred income ..................................................................................................................................... 66 26. Other current and non-current liabilities ................................................................................................. 66 27. Deferred acquisition consideration payable ........................................................................................... 67 28. Charter capital, additional paid-in capital, retained earnings and gain on sale of subsidiary share ...... 67 29. Analysis of revenue by categories ......................................................................................................... 69 30. Analysis of expenses by nature ............................................................................................................. 69 31. Other operating income .......................................................................................................................... 69 32. Finance income ...................................................................................................................................... 70 33. Finance costs ......................................................................................................................................... 70 34. Income taxes .......................................................................................................................................... 70 35. Advances received for sale of interest ................................................................................................... 73 36. Put option liabilities ................................................................................................................................. 73 37. Significant non-cash investing and financing activities .......................................................................... 74 38. Changes in liabilities arising from financing activities ............................................................................ 74 39. Contingences, commitments and operating risks .................................................................................. 74 40. Business combination, acquisition of non-controlling interests, acquisition of subsidiary which is not a business, acquisition of interests in PSA, goodwill and intangible asset with indefinite useful life ................................................................................................................................. 82 41. Material partly-owned subsidiaries ......................................................................................................... 86 42. Events after reporting date ..................................................................................................................... 89 State Oil Company of the Azerbaijan Republic Consolidated financial statements Consolidated statement of financial position (Amounts presented are in millions of Azerbaijani Manats) 31 December 31 December 2016 Note 2017 (reclassified*) Assets Current assets Cash and cash equivalents 8 5,217 4,163 Restricted cash 9 265 121 Deposits 8 218 1,039 Available-for-sale investments 10 174 82 Trade and other receivables 11 10,007 8,618 Inventories 12 4,810 4,968 Other current assets 13 1,614 1,564 Total current assets 22,305 20,555 Non-current assets Property, plant and equipment 16 25,669 20,116 Goodwill 40 327 342 Intangible assets other than goodwill 17 739 689 Investments in joint ventures 18 5,022 4,555 Investments in associates 19 4,571 4,442 Deferred tax assets 34 905 841 Other non-current financial assets 15 685 578 Other non-current assets 14 1,124 889 Total non-current assets 39,042 32,452 Total assets 61,347 53,007 Equity Charter capital 28 3,036 1,802 Additional paid-in capital 28 4,541 2,159 Retained earnings 7,357 6,265 Other capital reserves (6) (46) Put option on company’s shares (1,310) (1,305) Gain on sale/purchase of subsidiary share 28 1,181 1,280 Cumulative translation differences 5,806 6,292 Equity attributable to equity holders of the Group 20,605 16,447 Non-controlling interests 1,370 1,257 Total equity 21,975 17,704 * Certain amounts shown here do not correspond to the 2016 financial statements and reflect reclassifications made as detailed in Note 2. The accompanying notes are an integral part of these consolidated financial statements. 1 State Oil Company of the Azerbaijan Republic Consolidated financial statements Consolidated statement of profit or loss and other comprehensive income (Amounts presented are in millions of Azerbaijani Manats) Note 2017 2016 Revenue 29 92,571 51,905 Cost of sales 30 (87,352) (47,387) Gross profit 5,219 4,518 Distribution expenses 30 (864) (814) General and administrative expenses 30 (1,267) (1,092) Loss on disposal of property, plant and equipment and intangible assets (26) (34) Social expenses (125) (148) Exploration and evaluation expenses 30 (38) (35) Other operating expenses 30 (1,326) (1,196) Other operating income 31 949 697 Operating profit 2,522 1,896 Finance income 32 117 189 Finance
Recommended publications
  • Azerbaijan 2021 Energy Policy Review Co-Funded by the European Union
    Co-funded by the European Union Azerbaijan 2021 Energy Policy Review Co-funded by the European Union Azerbaijan 2021 Energy Policy Review INTERNATIONAL ENERGY AGENCY The IEA examines IEA member IEA association the full spectrum countries: countries: of energy issues including oil, gas Australia Brazil and coal supply and Austria China demand, renewable Belgium India energy technologies, Canada Indonesia electricity markets, Czech Republic Morocco energy efficiency, Denmark Singapore access to energy, Estonia South Africa demand side Finland Thailand management and France much more. Through Germany its work, the IEA Greece advocates policies Hungary that will enhance Ireland the reliability, Italy affordability and Japan sustainability of Korea energy in its 30 Luxembourg member countries, Mexico 8 association Netherlands countries and New Zealand beyond. Norway Poland Portugal Slovak Republic Spain Sweden Switzerland Turkey United Kingdom United States The European Commission also participates in the work of the IEA Please note that this publication is subject to specific restrictions that limit its use and distribution. The terms and conditions are available online at www.iea.org/t&c/ Source: IEA. All rights reserved. International Energy Agency Website: www.iea.org Foreword The International Energy Agency (IEA) has been conducting in-depth peer reviews of the energy policies of its member countries – and of other countries – since 1976, and it recently modernised these reviews to focus on some of the countries’ key energy transition and security challenges. FOREWORD Azerbaijan is one of the focus countries of the EU4Energy programme, which is carried out by the IEA and the European Union along with the Energy Community Secretariat and the Energy Charter Secretariat.
    [Show full text]
  • Azerbaijan Investment Guide 2015
    PERSPECTIVE SPORTS CULTURE & TOURISM ICT ENERGY FINANCE CONSTRUCTION GUIDE Contents 4 24 92 HE Ilham Aliyev Sports Energy HE Ilham Aliyev, President Find out how Azerbaijan is The Caspian powerhouse is of Azerbaijan talks about the entering the world of global entering stage two of its oil future for Azerbaijan’s econ- sporting events to improve and gas development plans, omy, its sporting develop- its international image, and with eyes firmly on the ment and cultural tolerance. boost tourism. European market. 8 50 120 Perspective Culture & Finance Tourism What is modern Azerbaijan? Diversifying the sector MICE tourism, economic Discover Azerbaijan’s is key for the country’s diversification, international hospitality, art, music, and development, see how relations and building for tolerance for other cultures PASHA Holdings are at the future. both in the capital Baku the forefront of this move. and beyond. 128 76 Construction ICT Building the monuments Rapid development of the that will come to define sector will see Azerbaijan Azerbaijan’s past, present and future in all its glory. ASSOCIATE PUBLISHERS: become one of the regional Nicole HOWARTH, leaders in this vital area of JOHN Maratheftis the economy. EDITOR: 138 BENJAMIN HEWISON Guide ART DIRECTOR: JESSICA DORIA All you need to know about Baku and beyond in one PROJECT DIRECTOR: PHIL SMITH place. Venture forth and explore the ‘Land of Fire’. PROJECT COORDINATOR: ANNA KOERNER CONTRIBUTING WRITERS: MARK Elliott, CARMEN Valache, NIGAR Orujova COVER IMAGE: © RAMIL ALIYEV / shutterstock.com 2nd floor, Berkeley Square House London W1J 6BD, United Kingdom In partnership with T: +44207 887 6105 E: [email protected] LEADING EDGE AZERBAIJAN 2015 5 Interview between Leading Edge and His Excellency Ilham Aliyev, President of the Republic of Azerbaijan LE: Your Excellency, in October 2013 you received strong reserves that amount to over US $53 billion, which is a very support from the people of Azerbaijan and were re-elect- favourable figure when compared to the rest of the world.
    [Show full text]
  • Republic of Azerbaijan Preparatory Survey on Yashma Gas Combined Cycle Power Plant Project Final Report
    Republic of Azerbaijan Azerenerji JSC Republic of Azerbaijan Preparatory Survey on Yashma Gas Combined Cycle Power Plant Project Final Report August, 2014 Japan International Cooperation Agency (JICA) Tokyo Electric Power Services Co., LTD Republic of Azerbaijan Preparatory Survey on Yashma Gas Combined Cycle Power Plant Project Final Report Table of Contents Table of Contents Abbreviations Units Executive Summary Page Chapter 1 Preface ............................................................................................................................ 1-1 1.1 Background of Survey .......................................................................................................... 1-1 1.2 Purpose of Survey and Scope of Survey ............................................................................... 1-1 1.2.1 Purpose of Survey .................................................................................................................. 1-1 1.2.2 Scope of Survey ..................................................................................................................... 1-1 1.2.3 Duration of the Study ............................................................................................................ 1-4 1.3 Organization of the Team ...................................................................................................... 1-6 Chapter 2 General Overview of Azerbaijan .................................................................................. 2-1 2.1 Overview of the Republic of Azerbaijan
    [Show full text]
  • Shah Deniz Gas Field Expansion Project (Phase 1)
    Environmental and Social Compliance Audit Project Number: 49451-002 August 2016 AZE: Shah Deniz Gas Field Expansion Project (Phase 1) This is an updated version of the Final Report posted in June 2016 available on https://www.adb.org/projects/documents/aze-shah-deniz-stage-2-investment-plan-jun-2016-escar The updated version of the Environmental and Social Compliance Audit Report for Shah Deniz II-Gas Field Expansion Project Azerbaijan, again, prepared by Sustainability Pty Ltd for Asian Development Bank; other financial institutions and banks that are or will be providing financial assistance to Southern Gas Corridor Closed Joint-Stock Company (SGC); and SGC in August 2016. This environmental and social compliance audit is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. LENDERS ENVIRONMENTAL & SOCIAL SAFEGUARDS CONSULTANT ENVIRONMENTAL & SOCIAL AUDIT REPORT SHAH DENIZ II – GAS FIELD EXPANSION PROJECT AZERBAIJAN August 2016 INDEPENDENT ENVIRONMENTAL & SOCIAL CONSULTANT ENVIRONMENTAL & SOCIAL REVIEW AND AUDIT STAGE 2 OF THE SHAH DENIZ PROJECT AZERBAIJAN Prepared for: Asian Development Bank (Lender); Southern Gas Corridor CJSC (Borrower); and Other banks and financial institutions that are or will be providing financial assistance to SGC.
    [Show full text]
  • Shah Deniz Stage II Gas Field Expansion Project
    The Reality of Aid IFI OBSERVATORIO Shah Deniz Stage II Gas Field Expansion Project COUNTRY INCLUSIVE DATES OF IMPLEMENTATION STATUS Azerbaijan 2015 - 2020 Active/Ongoing The Reality of Aid IFI OBSERVATORIO Shah Deniz Stage II Gas Field Expansion Project The upstream project includes construction of 26 subsea wells, two offshore platforms, gas and condensate subsea pipelines, expansion of the Sangachal terminal, two 900 mmscfd gas compressors, and connection to the South Caucasus Pipeline. Objectives and scope of the project: (1) To increase the output of one of Azerbaijan's most important economic generators, (2) to establish Azerbaijan as peer in the regional economy in contributing to the promotion of value-added industries such as downstream processing, and (3) to generate substantial employment in Azerbaijan. The Shah Deniz Gas Field is part of the Southern Gas Corridor which is a network of pipelines that connects Central Asia and Eastern Europe gas supplies to Western Europe. These pipelines are the following: the South Caucasus Pipeline extension (SCPx): Azerbaijan-Georgia; the Trans-Anatolian Pipeline (TANAP): Turkey; and the Trans-Adriatic Pipeline (TAP): Greece-Albania-Italy. The Reality of Aid IFI OBSERVATORIO NAME OF IFI/DFI Asian Development Bank European Bank for Reconstruction and Development TOTAL COST ADB: USD 475 million EBRD: USD 500 million (cancelled disbursement in 2019) $ NATURE OF FUNDING Co-funding TYPE OF ASSISTANCE Grant PRIVATE SECTOR PARTNER/S Lukoil Overseas Shah Deniz (LOSD) CSO PARTNER/S None OTHER PARTNER/S None The Reality of Aid IFI OBSERVATORIO POSSIBLE/EXISTING IMPACTS ON COMMUNITIES/HUMAN RIGHTS According to Crude Accountability's report in 2017, the project violated FPIC procedures and environmental standards.
    [Show full text]
  • Slussac WP Garnet SOCAR
    The State as a (Oil) Company? The Political Economy of Azerbaijan∗ Samuel Lussac, Sciences Po Bordeaux GARNET Working Paper No. 74/10 February 2010 Abstract In 1993, Azerbaijan was a country at war, suffering heavy human and economic losses. It was then the very example of a failing country in the post-soviet in the aftermath of the collapse of the USSR. More than 15 years after, it is one of the main energy partners of the European Union and is a leading actor in the Eurasian oil sector. How did such a change happen? How can Azerbaijan have become so important in the South Caucasian region in such a short notice? This paper will focus on the Azerbaijani oil transportation network. It will investigate how the Azerbaijani oil company SOCAR and the Azerbaijani presidency are progressively taking over this network, perceived as the main tool of the foreign policy of Azerbaijan. Dealing with the inner dynamics of the network, this paper will highlight the role of clanic and crony capitalist structures in the makings of a foreign policy and in the diversification of an emerging oil company. Keywords: Azerbaijan, Network, Oil, South Caucasus, SOCAR. Address for correspondence: 42 rue Daguerre 75014 Paris Email: [email protected] ∗ The author is grateful to Helge Hveem and Dag Harald Claes for their valuable comments on previous versions of this research. This study has mainly been written during a research fellowship at the University of Oslo thanks to the generous support of GARNET (FP 6 Network of Excellence Contract n°513330). 1 Introduction Since 1991, Azerbaijan has drawn the energy sector’s attention, first for its oil reserves and now for its gas ones.
    [Show full text]
  • The Outlook for Azerbaijani Gas Supplies to Europe: Challenges and Perspectives
    June 2015 The Outlook for Azerbaijani Gas Supplies to Europe: Challenges and Perspectives OIES PAPER: NG 97 Gulmira Rzayeva OIES Research Associate The contents of this paper are the authors’ sole responsibility. They do not necessarily represent the views of the Oxford Institute for Energy Studies or any of its members. Copyright © 2015 Oxford Institute for Energy Studies (Registered Charity, No. 286084) This publication may be reproduced in part for educational or non-profit purposes without special permission from the copyright holder, provided acknowledgment of the source is made. No use of this publication may be made for resale or for any other commercial purpose whatsoever without prior permission in writing from the Oxford Institute for Energy Studies. ISBN 978-1-78467-028-3 i April 2015: The Outlook for Azerbaijani Gas Supplies to Europe Contents Preface ................................................................................................................................................... v Acknowledgements ............................................................................................................................. vi Introduction ........................................................................................................................................... 1 1. Natural Gas in Azerbaijan – Historical Context .......................................................................... 4 The first stage of Azerbaijan’s oil and gas history (1846-1920)......................................................
    [Show full text]
  • AZERBAIJAN IN-DEPTH R IN-DEPTH Energy Charter Secretariat Charter Energy and Market Structure in Thein Energy Sector Follow-UP E 2011 V Ie
    AZERBAIJAN FOLLOw-UP IN-DEPTH REVieW of the Investment Climate and Market Structure in the Energy Sector Energy Charter Secretariat ENERGY CHARTER ENERGY 2011 Disclaimer Information contained in this work has been obtained from sources believed to be reliable. However, neither the Energy Charter Secretariat nor its authors guarantee the accuracy or completeness of any information published herein, and neither the Energy Charter Secretariat nor its authors shall be responsible for any losses or damages arising from the use of this information or from any errors or omissions therein. This work is published with the understanding that the Energy Charter Secretariat and its authors are supplying the information, but are not attempting to render legal or other professional services. © Energy Charter Secretariat, 2011 Boulevard de la Woluwe, 56 B-1200 Brussels, Belgium ISBN: 978-905948-108-4 (English, PDF) Reproduction of this work, save where otherwise stated, is authorised, provided the source is acknowledged. All rights otherwise reserved. Table of Contents 1. INTRODUCTION...................................................................................................................... 6 2. POLICY CONCLUSIONS ADOPTED BY THE ENERGY CHARTER CONFERENCE.......................................................................................................................... 7 3. MAIN FINDINGS OF THE SECRETARIAT .......................................................................... 9 4. GENERAL INDICATORS.....................................................................................................
    [Show full text]
  • Azeri, Chirag, Gunashli Full Field Development Produced Water Disposal Project (ACG FFD PWD)
    Azeri, Chirag, Gunashli Full Field Development Produced Water Disposal Project (ACG FFD PWD) Operated by Environmental and Socio-economic Impact Assessment Final Report January 2007 ACG FFD PWD Project ESIA Final Report This page is intentionally blank. January 2007 ACG FFD PWD Project ESIA Final Report Master Table of Contents Glossary................................................................................................................................... i Units and Abbreviations ................................................................................................. xxii References ...................................................................................................................... xxviii Executive Summary ES1 Introduction.....................................................................................................................i ES1.1 Project background and objective .....................................................................i ES2 ESIA process................................................................................................................iii ES3 Project Description.........................................................................................................v ES3.1 Option assessment...........................................................................................v ES3.2 Selected project option....................................................................................vi ES3.3 ACG FFD PWD Project procurement and transportation.............................
    [Show full text]
  • Energy Policy Turkey FUTURE of POLICIES and STRATEGIES JANUARY 2016 FIRST ISSUE
    Energy Policy Turkey FUTURE OF POLICIES AND STRATEGIES JANUARY 2016 FIRST ISSUE «IRAN IN THE ENERGY GAME» «ROLE OF TURKEY AS AN ENERGY CENTER» «RUSSIAN CHESS ON GAS POLITICS: EVALUATION OF TURKISH STREAM» «NORTHERN IRAQ & TURKEY» Visit us @ http://www.EnergyPolicyTurkey.com TURKEY'S ENERGY STRATEGIES AND POLITICS RESEARCH CENTER ENERGY POLICY TURKEY JANUARY 2016 FIRST ISSUE FALL 2016 ISSUE 1 EDITOR Necdet Karakurt (TESPAM) PUBLISHING COORDINATOR Ali Maraşlı (TESPAM) TURKEY'S ENERGY STRATEGIES AND POLITICS RESEARCH CENTER ENERGY POLICY TURKEY JANUARY 2016 FIRST ISSUE GRAPHIC DESIGN & PUBLISHING Necdet Karakurt (TESPAM) & Onur Kabay (MEGA TEKNİK) WEB DESIGN Mustafa Akça (TESPAM) RIGHT HOLDER ON BE HALF OF TURKEY ENERGY STRATEGIES & POLITICS RESEARCH CENTER Oğuzhan Akyener (TESPAM) INSIDE THE FIRST ISSUE EDITOR’S VIEW Necdet KARAKURT PAGE 6 DID ARAB UPHEAVAL CHANGE THE ENERGY GAME OR THE WEST STILL HAVE AN EDGE ON IT? Necdet KARAKURT Serhat ÇUBUKÇUOĞLU Oğuzhan AKYENER PAGE 8 IRAN IN THE ENERGY GAME WHILE PASSING THROUGH THE ENERGY DOOR Necdet KARAKURT Oğuzhan AKYENER Serhat ÇUBUKÇUOĞLU Mehmet APAYDIN Ali MARAŞLI PAGE 20 COMMENTS ON THE ROLE OF TURKEY AS AN ENERGY CENTER Oğuzhan AKYENER Mehmet APAYDIN PAGE 32 AZERBAIJAN GAS EXPORT POTENTIAL & RELATED INFRASTRUCTURES FOR EU & TR ENERGY SECURITY ISSUES (UP TO 2050) Oğuzhan AKYENER PAGE 42 ENERGY SECURITY STRUGGLE IN CASPIAN REGION FROM CASPEAN THE VIEW OF IMPORTANT PIPELINE PROJECTS SEA Oğuzhan AKYENER PAGE 52 DOABILITY OF TRANS-CASPIAN PIPELINE AND DELIVE- RABILITY OF TURKMEN GAS TO TURKEY
    [Show full text]
  • Realism on Caspian Energy: Over-Hyped and Under-Risked
    Realism on Caspian Energy: Over-Hyped ticipatory democracy, freedom of expression or responsible and Under-Risked governance. Turkmenistan is a failed state. Uzbekistan is the linchpin of Central Asia, containing key pipelines and By Maureen S. Crandall* the largest population. It dreams of becoming the political Introduction and military power in Central Asia, and like the others has no qualms in suppressing internal opposition. China closely The Caspian region’s oil and gas potential has attracted watches both political and energy developments, given its a lot of interest since the breakup of the Soviet Union. The rapidly rising energy consumption. Iran and Russia see them- U.S. and other major oil consuming countries focused on the selves as long-term players in the Caspian, and each wants a idea that the Caspian would become a major alternative to oil role in energy developments and/or transport flows. supplies from the volatile Middle East, postponing the days The regional leadership has not successfully implement- of higher prices or demand restraints. The region is often ed rules of law or independent judiciaries, has not moved to termed strategic, without specifying the strategic nature of defuse ethnic and regional tensions or conflicts, has become the links to either U.S. foreign policy or to energy policy. increasingly intolerant of dissent, and widely abuses human The area was hailed as having as much as 200 billion barrels rights. The risks of dissidents’ turning to extremism are high in oil reserves. Before these overstatements were challenged, and can feed potential terrorism. Moreover, oil and gas mon- the Caspian’s oil potential was likened to a new Middle East.
    [Show full text]
  • Sector Assessment (Summary): Energy
    Shah Deniz Gas Field Expansion Project (RRP AZE 49451-002) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector plays a central role in Azerbaijan’s economy, contributing 31% of the country’s gross domestic product and 87% of the country’s total gross exports in 2015.1 Since 1994, the government has successfully pursued a strategy of developing the oil and gas sector as the country’s primary source of economic growth, which has led to an estimated $61.1 billion in foreign direct investment in Azerbaijan during 1994–2014.2 a. Oil and Gas Sub-Sector 2. Azerbaijan’s first post-independence oil field was the Azeri, Chirag and deep-water Gunashli (ACG), which started operations in December 1994. It is referred to as the “Contract of the Century,” and its oil reserves were estimated at 6 billion barrels. ACG oil is transported via a 1,768 kilometer Baku–Tbilisi–Ceyhan pipeline linking Azerbaijan, Georgia, and Turkey. It started operations in July 2006, transports more than 1 million barrels per day, and is the world’s second-longest oil pipeline. 3. The Shah Deniz gas and condensate field was discovered in 1999 and transformed Azerbaijan into a major gas producer. Stage 1 of the Shah Deniz is now complete and supplies Georgia and Turkey with 10 billion cubic meters (bcm) of natural gas per year via the South Caucasus Pipeline.3 Stage 2 of the Shah Deniz (Shah Deniz-II) started in December 2013 and is currently under construction. It will add 16 bcm annually to Azerbaijan’s gas production.
    [Show full text]