Local Government & Rural Development Department Mohmand
Total Page:16
File Type:pdf, Size:1020Kb
Local Government & Rural Development Department District Mardan NOTICE INVITING E-BIDDING. Sealed tender based on MRS-2020/ Non MRS-items of the below mentioned works are herby invited on the basis of Single Stage Single Envelope Procedure from the government contractors registered with PEC and enlisted with C&W Department as per Centralized Enlistment policy of the government of Khyber Pakhtunkhwa for current Financial year as per following schedule. Work Name of Work E/C Bid Last Date/Time Last Date/Time Date/Time of Time No Security of submission of submission opening of of @ 2% of ONLINE of electronic bid comple (Rs) apply on HARDCOPY tion (Incase of website tender form error calculate 2%) 1 Construction of Streets, 16.4 328000 06-07-2021 07-07-2021 07-07-2021 As per R/Walls, Tuff tiles, Gratting upto12:00am 12:00 Pm 1:00 Pm work of Drains, etc in Uc Rorya, order Mohalla Shams ur Rehman Hanan koti, Seri Korona UC Ghala Dher, Mian Jan kili, Irum Colony & Mohalla miangan, Tehsil, District Mardan 2 Construction of culverts, 6.00 120000 06-07-2021 07-07-2021 07-07-2021 As per RCC walls, Tuff tiles etc upto12:00am 12:00 Pm 1:00 Pm work UC Mohabat Abad, UC order Rorya, UC Muslim Abad, UC Hoti 3 Construction of PCC roads, 2.00 40000 06-07-2021 07-07-2021 07-07-2021 As per Drains, culverts, RCC at Jail upto12:00am 12:00 Pm 1:00 Pm work road C/O Umar Farooq order 4 Maintanance and Repair 1.400 28000 06-07-2021 07-07-2021 07-07-2021 As per Work at Forest Office and upto12:00am 12:00 Pm 1:00 Pm work Central jail Barracks order Mardan 5 13.93 278660 06-07-2021 07-07-2021 07-07-2021 As per Pavement of streets, Drains, upto12:00am 12:00 Pm 1:00 Pm work Culverts, Rwalls etc at UC order Kohi Barmol, Dheri Likpani, Babozai, Alo, Qasami, Construction of monument at UC Dheri Likpani 6 Construction of Tuff Tiles, 3.500 70000 06-07-2021 07-07-2021 07-07-2021 As per Streets at Shah Dhand, upto12:00am 12:00 Pm 1:00 Pm work Sadat Baba, & Landi Shah order Kalay Lund Khwar 7 Supplying and Installation 3.500 70000 06-07-2021 07-07-2021 07-07-2021 As per of HDPI water supply pipe upto12:00am 12:00 Pm 1:00 Pm work & Costruction of PCC order Cachment boxes at Aman Kot Kalay, Sar Bata, Garo , Tanoor, Bagi, Shtya, Tangori, Surkhabi Dhara UC Machi/Rustam/Bazar 8 Construction of PCC roads 0.500 10000 06-07-2021 07-07-2021 07-07-2021 As per & Culverts at Jrando UC upto12:00am 12:00 Pm 1:00 Pm work Saro Shah order 9 Construction/Rehabilitation 2.630 52600 06-07-2021 07-07-2021 07-07-2021 As per of Village Council Building upto12:00am 12:00 Pm 1:00 Pm work Pirsaddi-1 order 10 Constuction of three 17.00 340000 06-07-2021 07-07-2021 07-07-2021 As per Janazgah at Karkawand, upto12:00am 12:00 Pm 1:00 Pm work Akbar Abad, Khat Kili & order completion of remaining work at Janazgah Sikandari 11 PCC and Tuff tiles at Moh 8.00 160000 06-07-2021 07-07-2021 07-07-2021 As per Ali Khan Toru and Adjacent upto12:00am 12:00 Pm 1:00 Pm work streets order 12 Construction of streets, Tuff 5.00 100000 06-07-2021 07-07-2021 07-07-2021 As per tiles, Drains, Street Grating upto12:00am 12:00 Pm 1:00 Pm work etc at UC Bari Cham order 13 Construction of Streets 4.700 94000 06-07-2021 07-07-2021 07-07-2021 As per Drains culverts RCC at upto12:00am 12:00 Pm 1:00 Pm work Pohan colony, Jabba Mayar, order UC Pir saddi, Parkho dheri, M&R commissioner House and handpump at Ghareb abad Mayar. 14 Pavement of Streets, Drains 13.00 300000 06-07-2021 07-07-2021 07-07-2021 As per Culverts, Rwalls at UC upto12:00am 12:00 Pm 1:00 Pm work Toru, Gumbat, order 15 Construction of Bwall at 0.7 14000 06-07-2021 07-07-2021 07-07-2021 As per Fish Hatchery charbanda & upto12:00am 12:00 Pm 1:00 Pm work Construction of street VC order Jamra 16 Construction/Rehabilitation 6.600 132000 06-07-2021 07-07-2021 07-07-2021 As per of Masjid AbuBakar upto12:00am 12:00 Pm 1:00 Pm work Tabreez Kalay Katlang2, order Karamar masjid, Bilal masjid, madrassa oryakalay, tashkand bala masjid, jafar kandao masjid, madrassa chek taja, madrassa dogat UC machi Rustam 17 Construction of Masjid 3.95 79000 06-07-2021 07-07-2021 07-07-2021 As per Noor Mosque Jamal Garhi 2 upto12:00am 12:00 Pm 1:00 Pm work order 18 Solarization of Government 4.00 80000 06-07-2021 07-07-2021 07-07-2021 As per residences in Mardan upto12:00am 12:00 Pm 1:00 Pm work order 19 Installation of Solar System 20.00 400000 06-07-2021 07-07-2021 07-07-2021 As per in Mosques at UC Hoti & upto12:00am 12:00 Pm 1:00 Pm work Muslim Abad order 20 Installation of Integrated 20.00 400000 06-07-2021 07-07-2021 07-07-2021 As per Street Lights LED (All in upto12:00am 12:00 Pm 1:00 Pm work one) 90 watts solar lights in order UC Bari Cham , Ghalla dher, Toru, Muslim Abad, Roria, Hoti, Bagh e Irum, Sheikh Maltoon, Mohabbat Abad & Gulli bagh 21 Solarization of 02 Nos 1.067 21340 06-07-2021 07-07-2021 07-07-2021 As per mosques at Dheri and Kohi upto12:00am 12:00 Pm 1:00 Pm work Barmol order TERMS & CONDITIONS. 1- The Financial bidding will be online through E-Bidding system. Tender form and BOQ can be filled online and downloaded from the official website of LGERDD (www.lgkp.gov.pk) after one day of publishing NIT. 2- The bidders are required to fill Electronic bids online and attach online scan copy of BID security in shape of original call deposit in the name of Procuring Entity along with (Additional Security if any), and submit hard copy of the same printed electronic bid form to the procuring Entity/Executing agency. 3- Electronic bids and original call deposits received through fax or by hand will not be acceptable. Sealed bids sent through registered mail/Courier service should reach up to the specified time and date as mentioned above. 4- The eligible bidder must have the relevant codes for the above mentioned works as per Pakistan Engineering Council. The relative codes shall be according to the items mentioned in BOQ while the contractor category shall be as per the estimated cost of the scheme. If the code and category does not match, the bid will be considered non-responsive. 5- For Solarization schemes (work no 18,19,20,21) the bidder must have relevant solarization and electrical codes Including EE11(General Electrification works) and Sub Solar Codes of EE11 ( EE11(i) or EE11 (ii) or EE11(iii) or EE11 (vi) or EE11(xvii) ) failing which the bidder will be disqualified. 6- The contractor or his representative may be present at the time of opening of electronic bids opening. 7- The call deposits i.e Bid security along with (additional security if any), for the work/contract must be prepared after publishing of NIT, before closing time of the Electronic bid apply. 8- As per KPPRA Notification No S.R.O (12)/Vol:1-20/2020-21 Dated April 21,2021 The contractors quoting their bids more than 10% below on Engineer’s estimate shall submit an Additional Security equal to 8% of the bid cost along with the 2% bid security (both in shape of original CDR) at the time of bid submission failing which the bidder will be disqualified and rejected. 9- If the successful candidate who has quoted a rate more than 10% below on the Engineer Estimate and has repudiated the contract, the entire security deposit i.e 2% and 8% shall be forfeited in the favor of government. If the successful bidder has repudiated the contract for three different times in different bids during the same financial year, the n the entire security 2% and 8% shall be forfeited and the contractor shall also be proceeded for blacklisting for a period of five years. 10- Any electronic bidder who provide false, or materially inaccurate or incomplete information, or does not send information/bidding Documents in hard form will be disqualified as per KPPRA Act Section 29 (I) read with KPPRA Rule (43). Furthermore the procuring entity/Executing Agency will recommend and send cases for debarring /Blacklisting and will initiate/take action in light of approved procedure/mechanism as per KPPRA Act section 29(2) read with KPPRA rule (44). 11- Electronic Bids will remain valid for 100 days from the closing date of bids.. 12- The contractor shall bear all the expenses of the testing as well as vetting of the structure design from the government laboratories, registered structure engineers, as directed by the Engineer LGRDD Mardan and will re execute works in case of failure without any payment.. 13- Tender will be received till mentioned time on the opening date of tender and the tentative comparative statement downloaded from the website will be announced at the opening time, and final result will be announced after evaluation of bids in all respect in Bid validity time.