Progress Report of Buildings Division,

Progress Report for the month of Janury2017

NAME OF Amount Amount Present stage

PROJECT date Sl.No. Budget page page Budget in lakhs in Division Name of of Name Remarks contractor agreement S.H.O Date Department & Date No. TS AS No. Date & & Date No. AS upto financial financial upto Actual DOC Actual Agreed PAC Agreed Estimte PAC Estimte D.O.C as per Date of tender of Date Extended DOC Extended Amount required required Amount Estimate amount Estimate LA Constituency LA Head of Account of Head Budget provision provision Budget Physical Progress Physical Agreement No. & & No. Agreement Tender percentage Tender Period of of Period in completion upto Expenditure month current Stages ofStages Electrification 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 Construction of G.O (Rt) No. ORDER 9/SEJ/EK Approval of AR 10 tvm Court complex, 3249/2012/ No.TVM/2 M/2015- drawing is Home pending with Kattakkada - Home dt 2- 015- 2016 court Kattakkada Phase I 11-2012 for 2016/2016 dtd authorities. 310 Lakhs /156 16.03.20 Revised soil Dated:11- 16 investigation is N/A 15 months 15 18.05.2016 17.08.2017 310 310 Lakhs under process Rs 289,94,342/- Rs 286,75,405/- Rs

4059-01-051-98 02-2016 for 310 1.1%E/R below DSR 2014 with CI 1.4667 with DSR 2014 Lakhs M/S Saraswathy Constructions M/S Saraswathy 2 Construction of G.O (Rt) No. 14/SEBSC/ 4/SEBSC Foundation 10 tvm building for 2036 2013-2014 /2014- work in progress Vilavoorkal Govt. /2013/G dtd 2015

Kattakkada HSS Edn dt 12.06.201 dtd N/A

Gen.Education 14/05/2013 3 for 110 12.05.20 9 9 months 15.04.2016 14.01.2017 110 110 Lakhs Rs 104,84,779/- Rs 136,30,213/- Rs 4202-02-800-85 for 110 Lakhs 14 30% above E/R 30%above Lakhs CPWD data with SOR 2012 with CPWD data M/S M/S Constructions Olga

Page 1 of 93 3 Construction of G.O (Rt) No. 5/SEBSC/2 32/SEBS Work 100 tvm new block for PHC 303/14 014-15 dt C/2014- completed. H&FWD at Balaramapuram H&FWD 19.07.201 2015 dated 4 for Rs. dtd 27.01.14 for 124.32 17.12.20 12 months 12 29.12.2014 28.12.2015

Rs. 124.32 Lakhs 14 J.Vijayan Sri. Rs 114,60,246/- Rs 137,51,149/- Rs Work completed Work NABARD RIDF - XIX Rs. 124.32 Lakhs 124.32 Rs.

Lakhs E/R 19.99%above CPWD data with SOR 2012 with CPWD data requested upto 28.06.2016 upto requested 4 Construction of G.O (Rt) No. Quotation finishing work in 60 tvm new building for 1137/2014/ no. Progress

Kovalam Govt.LPS, G.Edn dt 06/EE/201 Mudipuranada, 03.03.2014 5-16 dt. 6 6 months Gen.Education 95 Lakhs 95 19.11.2015 18.05.2016 31.03.2017 Venganoor for 95 Lakhs 16.05.201 not started Rs 91,15,750/- Rs requested upto upto requested Rs 118,27,686/- Rs 4202-01-800-88

5 (29.75%above) DSR 2013 with CI 1.38 with DSR 2013 Sri. S. Chandradas S. Sri. Chandradas 5 Construction of G.O (Rt) No. AS to be tvm modern clinical 4064/13/H revalidated

H&FWD pathology lab &FWD attached to dated N/A General Hospital, 06.12.2013 150 150 Lakhs

Neyyattinkara 4210-01-110-67 Rs.150 Lakhs 6 Civil works to No. MSP3- 47/EE/2 work in progress tvm Trauma care unit, 59740/2014 016-17

H&FWD General Hospital, /DHS dated dt. Neyyattinkara 27.01.2015 07.07.20 Neyyattinkara 6 6 months 26 Lakhs 26

for Rs. 26 16 not started Sri. T.S. Biju T.S. Sri.

2210-01-110-35-05 Lakhs DSR 2014 with CI 1.4667 with DSR 2014

Page 2 of 93 7 Construction of an G.O (Rt) No. Tender no. 94/SEBS Earth work in 10 tvm Auditorium for 1773/2015/ E58/SESCB C/2015- progress Government H.Edn dated L/2015-16 16 dt. Polytechnic 13/07/2015 dt 03.03.20

Neyyattinkara College, from the 19.01.201 16

Higher.Education Neyyattinkara Deputy 6

Secretary , N/A 9 9 months Governmen 13.06.2016 12.03.2017 Rs 131,40,945/- Rs 121,88,226/- Rs 4202-02-104-99 Rs. 140 Lakhs Rs. 7.25%below E/R

t of G.Vijayakumar Sri. DSR 2014 with CI 1.4667 with DSR 2014 Rs. 140 Lakhs

8 construction of a Go(Rt) 1063/2016- 63/EE/2 Site handed over on 15-11- tvpm new building for No.168/201 17 dt. 016-17 2016. work not

Kovalam sub register office 6/T.D Dated 22.06.201 dt. started 1.4667

Registration venganoor 26.02.2016 6 10.08.20 12 months 12 15.11.2016

16 46,82,516/- Rs DSR 2014 with CI with DSR 2014 Rs.54.10 lakhs Rs.54.10 Item BOQ rate Sri. S. Chandradas S. Sri. Chandradas 9 SJD - ICDS GO(Rt) no. Quotation 59/EE/2 Brick work in 10 tvm Athiyannoor - 531/2015/S no. 016-17 progress Construction of a JD dt. 04/EE/201 dt. building for 20.08.2015 6-17 dt. 01.08.20 Social Justice Social Justice Neyyattinkara Angananavady Rs. 12 lakhs 21.07.201 16 N/A No. 72 at 6 E/R 8 8 months Rs. 12 lakhs 12 Rs. Muttakkadu in 11,24,363/- Rs 11,24,363/- Rs 4235-02-102-96

Perumbazhuthoor B Sri. Sukumaran DSR 2014 with CI 1.4667 with DSR 2014 village, Neyyattinkara. 10 SJD - ICDS - order no. 123/EE/ Roof slab in tvm Athiyannoor - ICDS.A7- 2016-17 progress

Kovalam Construction of a 7755/15 dt. dt. building for 07.06.2016 17.11.20 Social Justice Social Justice Anganvady no 86 for Rs. 13 16 at lakhs N/A E/R 6 6 months

Mangalathukona 02.12.2016 Rs 11,51,176/- Rs 11,51,176/- Rs Rs. 13 lakhs 13 Rs. m in Venganoor 4235-02-102-96 Sri. B Sri. Sukumaran

village, CI 1.4667 with DSR 2014 Neyyattinkara

Page 3 of 93 11 SJD - ICDS G.O.(Rt) No. 66/EE/2 Finishing work tvm Vellanad - 323/2015/S 016-17 in progress Construction of a JD dt dt.

Kattakkada building for 04.06.2015 22.08.20 Social Justice Social Justice Anganvady no 66 & order no. 16 at Kottappuram in ICDS.A7- Kulathummal 7756/15 dt. N/A E/R N.John 8 8 months village, Kattakada 23.06.2015 5.10.2016 Rs 12,24,467/- Rs 12,24,467/- Rs Rs. 13 lakhs 13 Rs. 4235-02-102-90 for 13 Lakhs DSR 2014 with CI 1.4667 with DSR 2014

12 Providing fencing D- 50% completed

tvpm to existing 4/14269/16 compound wall of /DTE dated Government 25/05/2016

Neyyattinkara Polytechnic

College, lakhs Rs.25 4202-02-104-99 Technical.Education

Neyyattinkara P.Manikantan sri. DSR 2014 with CI 1.4667 with DSR 2014

13 construction of D- 110/EE/ work started

tvpm bus parking shed 4/7943/16/ 2016-17 to Government DTE dated dt. Polytechnic 21/03/2016 26.10.20

Neyyattinkara College, 16 2 2 months 14.11.2016 Rs.9lakhs Rs 6,27,088/- Rs Neyyattinkara T.S.Biju Sri. Item BOQ rate Technical.Education DSR 2014 with CI 1.4667 with DSR 2014 2203-00-05-79-17 MW plan 2203-00-05-79-17 14 NABARD - RIDF GO(Rt) No. AS obtained.

tvpm XXII - Construction 4385/2016/ Estimate for TS

Kovalam of a three storied Gen Edn is under building for Govt. preparation.

Gen.education High School Kottukal in Thiruvananthapur Rs. 215 Lakhs Rs. am District NABARD - RIDF XXII DSR 2014 with CI 1.4667 with DSR 2014

Page 4 of 93 15 Construction of Estimate

tvpm Semi permanent submitted Home third floor with GI roof truss and a

Neyyattinkara Lift to the Court Complex Building,

Neyyattinkara 286.5Lakhs Rs. DSR 2014 with CI 1.4667 with DSR 2014

16 Construction of a Estimate

tvpm new building for submitted

kovalam govt.Model HSS Venganoor 1.4667 Rs. 145 Lakhs Rs. Gen.education DSR 2014 with CI with DSR 2014 17 Construction of a Estimate

tvpm new building for submitted

kovalam Govt.GHSS Malayinkeezhu Gen.education Rs. 280 Lakhs Rs. DSR 2014 with CI 1.4667 with DSR 2014 18 Construction of a Estimate

tvpm new building for submitted

Kovalam Govt.HSS Kottukal CI 1.4667 Gen.education DSR 2014 with with DSR 2014 Rs. 238 Lakhs Rs. 19 Construction of a Estimate

tvpm new building for submitted

kovalam Govt.HSS 1.4667 Balaramapuram Gen.education Rs. 220 Lakhs Rs. DSR 2014 with CI with DSR 2014 20 Construction of a estimate

tvpm new building for submitted GHSS Vilavoorkal 1.4667 Kattakkada Rs. 210 Lakhs Rs. DSR 2014 with CI with DSR 2014 Gen.education 21 Construction of a Estimate

tvpm new building for submitted. sub register office Kattakkada

Registration Malayinkeezhu

Page 5 of 93 22 Construction of Estimate under

tvpm new building for preparation

revenue village office at kattakada vilappil village kattakada 23 Construction of Estimate

tvpm new building for submitted GBHSS, Neyyattinkara Neyyattinkara Gen.education Rs. 300 Lakhs Rs. 24 Construction of Contour PWD tvpm additional block Submitted for for PWD Rest AR drawing house, Neyyattinkara Neyyattinkara 300 Lakhs Rs. 25 Construction of Estimate for ISM

tvpm new IP block for Contour Taluk Ayurveda submitted Hospital,

Neyyattinkara Neyyattinkara

26 Renovation works Estimate

tvpm of General submitted hospital Neyyattinkara Neyyattinkara

Page 6 of 93 27 MLA - ADS 2016- Estimate 17 - Kattakada submitted constituency -

Kattakkada Beautification & Infrastructure Development of KSRTC Bus Stand, Kattakada - Providing interlocking paver blocks, side drain, foot path etc.

Buildings Section, Parassala 1 General Education GO)Rt) Order 13/EE/201 Civil work 100

tvm Budget 2012-13- no.1273/2013/ No.55/SCBSC 5-16 completed. Construction of new G.Edn dt 2013-14 DATED Kovalam

building for Govt L.P.S 93(p) 18.03.2013 for Dt:28/02/201 15/05/201 16990167 17601813 Not started Not 3.8.2016 12 months 12 200lakhs Rs.200lakhs 4 5 4202-01-202- 3.6%above K. Rajendran K. Gen.Education 2 Construction of New GO(Rt) Order 7/SEBSC/2 work completed 100

tvm three storied building no.4093/12GE No:CE/BL/Tv 014-15 Dt for Govt. L.P.S Poovar dnDt:25.8.201 m/7557/2013 30/05/201 Kovalam

2 225lakhs Dt: 4 Azad 99(p)(v) 24543650 30679569 Not started Not 12months 225lakhs 7/12/2013 09-06-14 08-06-15 25%above 4202-01-201- Abdul Kalam Abdul

Gen.Education 25875000 3 Construction of New 150/EE/20 work completed 100

tvm three storied building 15-16 Dt for Govt. L.P.S Poovar- 8/2/2016 Kovalam NA

First floor Balance Azad 3938318 4398150 40 lakhs 40 started Not 12months work 09-02-16 08-02-16 10%above Abdul Kalam Abdul Gen.Education 4 Construction of New GO(Rt) No. 3/SEBSC/201 2/SEBSC/2 plastering work in 50

tvm building for Govt. Hss 1138/2014GEd 4-15 015-16 progress

Higher Poovar n Dt: 3/3/2014 Dt:24/5/2014 Dt:16/4/2 Kovalam Azad 88(NP) 165 lakhs 015 16093092 19900718 12 months 12 11-01-16 10-01-17 165 165 lakhs started Not 4202-01-800- Abdul Kalam Abdul 23.66%above 5 Construction of three GO (Rt) 54/CE/BL/20 6/SEBSC/2 plastering work in 60

tvm storied building for No.4092/12GE 13-14 015-16 Dt progress GHS Kazhivoor dn Dt:30/12/201 29/4/2015 Kovalam

99(pv) Dt:25/8/2012 3 26498604 37164292 12 months 12 Not started Not 240lakhs 15-06-15 14-06-16 31-05-17

4202-01-202- 240 lakhs Gen.Educatio S.Chandradas 40.25%above

Page 7 of 93 6 Construction of GO(Rt) No. 24/SEBSC/20 66/SEBSc/ work completed 100

tvm building for Govt HSS 1330/2013/G.E 13-14 2013-14 for girls Neyyattinkara dn 20/03/2013 Dt:08/07/201 13/02/201

for 165 lakhs 3 165 lakhs 3 VC 99(np) Completed 15674164 20213246 10months 18-08-14 17-05-15 165 165 lakhs 4202-01-202- Neyyattinkara Constructions 45.99%above Gen.Education 7 Construction of a GO (RT) No. 23/SEBSC/ 72/SEBS work completed 100

tvm 1343/2013 2013-14 building for GHS C/2013- Gedn 8/7/2013

Perumpazhuthoor 21/03/2013 167 Lakhs 14 30-09-15 lakhs 99(np) Completed

for 167 lakhs 10months

28/02/2 28-02-14 31-12-14 30-09-15 167 167 lakhs 19717240 15705845 4202-01-202- S.Sasidharan Neyyattinkara Gen.Education 014 39.99%above 8 Construction of a GO(Rt) 32/SEBSC/ 44/SEBS first floor roof 50

tvm No.4019/201 2014-15 building for C/2014- slab work

Higher 4 Gedn 21/1/2015 V&HSS Kulathoor 8/10/2014 15 completed and

160 lakhs 31/03/2 finishing works started Not 12 months 12 30-09-15 29-09-16 Neyyattinkara 160 lakhs 015 15907098 15426704 in progress S.Sasidharan 3.02% below 4202-01-202-91(p) _ 9 a Construction of a GO(Rt) 39/SEBSC/20 24/SEBSC/ work started 0%

tvm No.1505/201 14-15 2016-17

HEdn building for THS 4/Hedn 31/03/2015 1/6/2016 Kulathoor 4/7/2014 14501561 16504227 12months

150 150 lakhs 150 lakhs started Not Neyyattinkar S.Sasidharan 4202-01-800-88 13.81%above 10 Construction of Go(Rt)No:96 28/EE/2013- 1/EE/2014- work completed tvm

8/2013 Gedn 100% new building for 14 15 27/2/2013 17/7/2013 23/4/2014

Govt: High School 25/9/2015 8682452 1298809 Not started Not 12 months 12 Thirupuram 15-07-14 22-04-15 30-09-15 100 100 lakhs Neyyattinkara 4202-01-202-99 49.59%above Gen.Education G.Vijayakumar 11 Construction of new GO (Rt) No. 66/EE/2013- 122/EE/20 Ground floor 5% tvm building for Govt. Hs 1246/2013GEd 14 14-15 Roof Slab for Girls at Parassala n dated 24/9/2013 20/11/201 P. P. Completed parassala 16/03/2013 for 4 9547826 9months 13693492 Not started Not 16-04-15 15-01-16 100 100 lakhs Rs 100 Lakhs Radhakrishna 4202-01-202-99 43.42%above Gen.Education 12 Construction of new GO (Rt) 65/EE/2013- 123/EE/14- Footing work 10%

tvm lab building for Govt. No.2027/2013/ 14 15 completed. The Hs for Girls at Gedn 24/09/2013 20/11/201 contractor was P. P.

parassala Dhanuvachapuram 14/5/2013 60 4 terminated with 5612944 6738900 9months 60 lakhs 60 started Not lakhs 16-04-15 15-01-16 risk and cost Radhakrishna 4202-02-800-85 20.06%Above Gen.Education

Page 8 of 93 13 Construction of new GO(MS) 54/CE/BL/20 43/SEBSc/ work completed 100

tvm Administrative block No:17/2011/Lb 11-12 2012-13 and final bill Labour Labour

building for ITI r 5/02/2011 2/9/2011 12/7/2012 31-05-15 submitted

parassala Dhanuvachapuram 270 lakhs 292 lakhs 2010-11 22347140 27933925 15months 20-04-13 19-07-14 31-05-15 270 270 lakhs 25%above 4202-02-800-95- R.Sathya nesan R.Sathya Work completed Work 14 Construction of new GO(Rt) 1/SEBSc/201 17/SEBSC/ work completed 100

tvm building forMaternity No.3292/2012/ 3-14 13-14 Work Work Health Health

unit in THQ Parassala 31 H&FWD dt 18/4/2013 18/7/2013 parassala

150lakhs 5/10/2012for 150 Lakhs 13630339 10months 129993650 completed SamDavid 2210-01-110- 150 lakhs 4.9%above 15 Construction of IP Unit GO (Rt) 30/SEBSC/2 24/SEBSC footing work in 10

tvm for Govt.Ayurvedic 1095/2014 014-15 /2015-16 progress Marma Hospital PWD dt 27/11/2014 20/8/2015 Kovalam H & FWD & H Kanjiramkulam 6/8/2014for T.Babu 15months 21-03-16 20-06-17 23903048 27368990 250 250 lakhs 250 Lakhs started Not 14.5%Above 4210-02-104-95

Construction of new GO (Rt) No. 22/SEBSC/2 59/SEBSC Work completed 1 16 ra

tvm building for CHC 1692/2013 H& 013-14 /2013-14 with in estimate Venpakal FWD 8/7/2013 29/1/2014 PAC 95 H& FWD H&

18/5/2013 J.Nizar 10 mnths 13983814 28-11-14 31-12-15 7%above 150Lakhs Not started Not 4202-01-800-

Neyyattinka 150 Lakhs 17 Reconstruction of new GO(Rt) No 95/EE/201 111/EE/ Work

tvm building for PWD PWD 1298/2013O 3-14 14-15 completed Buildings Section 100% PWD. dated 30/12/201 4/11/201 42515.00 parassala Office Parassala 3/10/2013 3 4

for 34 lakhs 6months 34 lakhs 34 3727064 4286124 03-05-15 15-02-16 15%Above Work completed Work S.Chandradas 4059-01-051-86

18 Construction of ICDS A7-662/14 work completed 100

tvm 3/3/2014 new Anganawady and final bill building at Karodu submitted 42154.00 8 8 lakhs 114 799997 799997 07-01-15 29-02-16 31-05-15 5 months 5 SocialJustice 4235-02-102-94 Neyyattinkara estimate rate estimate S.R.Yohannan 19 Construction of ICDS A7- plinth beams work 10 tvm new Anganawady 7755/2015 completed 16/6/2015 13 building at Karodu lakhs 1223132 1223132 4 months 4 months

86 Selvaraj 13 lakhs 13 SocialJustice Neyyattinkara 4235-02-102-96 estimate rate estimate

Page 9 of 93 Construction of ICDS A7- Estiamted submitted tvm new Anganawady 18498/14 for TS Dated building at

parassala 13/09/2014 parasala 165 11.66 lakhs Social Social Justice 11.66lakhs 4235-02-102-96(p) Construction of ICDS A7- land not handed tvm new Anganawady 18498/14 over to PWD Dated building at

parassala 13/09/2014 thirupuram 44 11.66 lakhs SocialJustice 11.66lakhs 4235-02-102-96(p) Construction of ICDS A7- land not handed tvm new Anganawady 7755/2015 over to PWD 16/6/2015 13

Kovalam building at lakhs kanjiramkulam 17 SocialJustice 13 lakhs 13 4235-02-102-96(p) 20 Construction of GO(RT)120/2 Estimate 013/PWD

TVM resubmitted to new mini station DATED;21/01

Kovalam at karukulam /2013 240 Govt for Revises LAKHS AS of Rs.395 lakhs and soil

200 lakhs 200 investigation completed 4202-01-202-93(p0

21 Construction of Estimate tvm Compound wall submitted for and other Alied AS works Govt SC ST 60 lakhs 60 Neyyattinkara ITI Mariyapuram

22 SC Devolopment- Estimate tvm Construction of submitted for New buildingfor AS the Up graded of Neyyattinkara

Govt ITI. 100lakhs Mariyapuram

Page 10 of 93 23 KNM-Govt. Arts and A1/11219/20 TVM/2015- Work completed 100

tvm Science College -Built 15 16/2015/61

H.Edn New toilet and wash dated:26/11/2 53 dated 75

Kovalam basin for Girls 015 29/01/2016 10Lakhs 2202-03-103- 24 KNM-Govt. Arts and A1/762/2014 TVM/2015- work completed ####

tvm Science College - dated 2016/2015/

H.Edn Renovation and 7/03/2015 6178 dated

Kovalam mordernation of 29/1/2016 existing toilets of Boys 7lakhs

and Girls 2202-03-103-75 24 KNM-Govt. Arts and A1/11219/20 TVM/2015- work in progress 50

tvm Science College - 15 dated 2016/2015/

H.Edn Construction work and 26/11/2015 5666 dated

kovalam renovation of various 4/01/2016 works- inconnection with NAAC visit lakhs 40

25 Providing and fixing A1/11219/20 TVM/2016- Tender Progress Aluminium partition 15(2) dated 2017/2016/ TVM

H.Edn ,false celing and allied 4/01/2016 493 dated

Kovalam work at KNM Govt 27/08/2016 Arts and science

college Kanjiramkulam lakhs 7.75

26 Construction of New Estimate

tvm Higher Secondary submitted for AS Block at NKM Govt

parassala Higher Scondary

School Lakhs 50 Dhanuvachapuram 27 Construction of New Estimate

tvm Higher Secondary submitted for AS

Higher block at GHSS parassala

Parassala 100 lakhs 28 Construction of Higher Estimate submitted

tvm Secondary block- for AS

Higher Second floor Govt Kovalam VHSS Poovar lakhs 60 Construction of Higher Estimate submitted 29 ra

tvm Seconmdary bock - for AS

Higher Seconf Floor, Govt HS Thirupuram 60 lakhs 60 Neyyattinka Construction of Higher Estimate 30 ra

tvm secondary block at submitted for AS

Higher GHSS Neyyatinkara- First floor 200 200 lakhs Neyyattinka

Page 11 of 93 31 Construction of new Estimate

tvm higher secondary block submitted for AS nkara

Higher at Govt KVHSS Ayira Neyyatti 150 150 lakhs Construction of New Estimate submitted 32 ra

tvm Block for Govt for AS Vocational Higher Secondary School Vocational Vocational 150 150 lakhs

Neyyattinka Paraniyam 33 Construction of new Estimate submitted building for CHC for AS nkara Venpakal- Ground Neyyatti floor 130 lakhs 34 Construction of new Architectural tvm building Govt colege drawing under Higher kulathoor preparation 3 3 crores neyyatinkara current budget current 35 Construction of Estimate under new building for preparation Govt. HSS

kulathoor, 2 crores neyyatinkara balance work Buildings Section, Kunnathukal Construction of New GO (Rt) No. 122/EE/14-15 158/EE/20 Founmdation work Nil Nil 1 nil nil

tvm Building for Govt. HSS 2410/2014 dt 16-10- 15-16 dt in progress School Mylachall. General 2014 18-02- education dt 2016 months 10 10 moths 10 19-06-2014 73,33,958 90,31,036 18-12-2016 H .Chandran H 4202-01-800-88 4202-01-800-88 73,33,958 Lakh 73,33,958 23.14%above Gen.Education Project Under LAC Under Project Buildings Sub Division Progress Report for the month of Janury 2017 (Nedumangad)

Page 12 of 93 NAME OF Present stage

PROJECT year Sl.No. Division Remarks S.H.O Date S.H.O Department Actual DOC Actual Agreed PAC Estimte PAC Estimte Date of tender of Date TS No. Date & Amount & Date No. TS AS No. Date & Amount & Date No. AS Extended DOC Extended Estimate amount Estimate LA ConstituencyLA Head of Account ofHead Physical Progress Physical Tender percentageTender Name of contractor of Name Agreement No. & date & No. Agreement D.O.C as per agreement per as D.O.C Budget provision in lakhsprovision Budget in Budget page No./Item No. No./Item pageBudget Amount required upto financial upto requiredAmount Period of completion in months completion in ofPeriod Electrification ofStages Expenditure upto month current

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 # 20 21 22 23 24 25 26 27 28 1 Construction of Order 78/EE/20 Nearing tvm class IV staff No.M2- 14-15 dtd completion quarters at 9182/2014 10-07- ARYANAD Jersey farm, /PLG 2014 4,500,000 Vithura dated. 4403-102-96(P) 20.3.2014 of the Director of AH, TVPM Animal Animal Husbandry Department 2 Improvements GO RT 43/EE/20 Selection tvm to internal roads 713/2014/ 14-15 dtd notice issued

by providing AD 31.3.14 12-12- 2265451 40mm chipping 2014 carpate in Jercy 4403-102-96(P) VAMANAPURAM farm extension unit Chettachal Animal Animal Husbandry Department

Page 13 of 93 3 Construction of G.O(Rt)No. 76// pwd Footing works tvm Mini Civil 455/12 dt. buildings/ completed Station, Vellanad 23-3-2012 2013 14 ARYANAD 19550022 Date 20/ months 12 2/ 2014 4059-01-051-86 (Revenue (Revenue Department) 4 Construction of a Go(Rt)No.8 309/SEBS 56/SEB Structure tvm NDD new building for 670/2014/ C/2015- SC/201 completed . Sub Treasury Fin dt. 16 dtd 24- 5-16 18036067 Nedumangad 18.11.2014 06-2015 dtd 02- months 12

for Rs 210 12- % above 4.99 lakhs 2015 4059-01-051-90(P) (Revenue (Revenue Department) HeatherInfrastructure 5 Govt. College G.0(Rt) 17/SEBSC 67/SEB Earth work tvm NDD NDD- No.241/20 /13-14 SC/13- and rock Construction of 13/ H Edn. DTD 14 DTD 25.16% blasting 13740276 ladies hostel dt. .02.2013 13.02.2 SHUKOOR completed.The under (plan 18/2/13 AS 014 termination fund) college Rs. 150 notice under 2202-03-103-75 (P) 2202-03-103-75 HIGHER HIGHER EDUCATION infra structure Lakhs preparation.

and up gradation MONTHS12-12-2015 10 programme.

6 Construction of G.O(Rt) ORDER ` Work was tvm Village Building No.1973/1 No./2015- started

in Tholicode. 2/PWD/TV 2016/201 2300000 ARYANAD PM dt. 4_2015_1 26.11.12 313 4210-02-110-98 Rs 20 Dated:04- Lakhs. 05-2015 (Revenue (Revenue Department)

Page 14 of 93 7 Construction of M2 143/EE/2 Nearing tvm quarantine shed 3321/2014 014-15 completion

for 10 cows in /PLG DTD dtd 12- 2265451 Jercy farm A8 3 12-2014 extension unit 2014Direct 4403-102-96(P) VAMANAPURAM Chettachal or ANIMAL Husbandry Animal Animal Husbandry Department 2225-02-102-88 8 SC Construction of Order No. 80/EE/20 flooring work H SC/ST B- 14-15 in progress

E Development - 2944/13(2) date 10 7- 4135150 ARYANAD D Harmlet dated. 2014 UL Development 20.2.2014 E Scheme - ITDP TR Aruvikkara LAC- Project 10 months 30 -1-2016 months 10 -1-2016 30 IB Construction of Officer, E Community Hall Nedumang at Podiyakala ad 2225-02-102-88 9 SC Providing ORDER 196/EE/2 The proposal H Building fecilities No.TVM/2 014-15 dt not received

E to 014- 16.03.201 5676654 from the ITD ARYANAD D Chettiyampara 2015/2015 5 department UL Model /147 for the recast E Residential Dated:27- estimate TR School in 03-2015 IB Tholicode Rs month 12 (15-03-2016) E Panchayath

Page 15 of 93 10 T Department of Revised O Tourism- estimate U Repaires and 1 crore under RI maintanance of preparation S Gust house

VAMANAPURAM M IInd block- balance work 11 T Department of Revised O Tourism- estimate U Construction of under RI new Guest crore 7.27 preparation S house at

VAMANAPURAM M Ponmudi for Tourism -phase II

12 Construction of a G.O (Rt) Esrimate tvm Higher No. submitted for G EDN Secondary Block 4781/13 TS since the for Govt H.S.S dated. expiry of AS Mithirmala Gidn . completed 4202-01-202-91 VAMANAPURAM 12.11.2013 fresh AS to be accorded, fresh estimate submitted for AS 4216-01-106-98 13 Construction of Go(Rt)No.8 310/SEBS 57/SEB Structure NDD PWD flat type 670/2014/ C/2015- SC/201 completed Quarters for Fin dt. 16 dtd 24- 5-16 Finishing work 23042332 Govt. employees 18.11.2014 06-2015 dtd 02- months 15 under

at Netta, for rs. 250 12- above) (4.99% progress. Nedumangad lakhs 2015 (Public Works HeatherInfrastructure Department)

Page 16 of 93 HEALTH AND FAMILY WELFARE FAMILY AND HEALTH 4210-02-103-95 14 Construction of G.O(Rt) 36/SEBSE not work nearing quarters for staff No.1973/1 2013-14 execute completion and Doctors 2/PWD/TV dated 30 d ARYANAD attached to PM dt. 9 2013 10073340 AbdulHakim Primary Health 26.11.12 Centre at Rs 100 Malayadi. Lakhs. 4210-02-103-95 15 H Construction of Revised EA Building for estimate LT C.H.C , Vellanad submitted to ARYANAD H months 10 health A Department N D FA M IL Y W EL FA RE

16 Construction of GO(RT)No3 Esrimate tvm new building for 823/2011/ submitted to H&FW Community H&FWDdn the EE for TS. Health Centre dt 16-11- but AS period Kallara. 2013 Rs expired. Fresh

VAMANAPURAM 175 lakhs AS is to 4210-02-104-95-01 obtained.

Page 17 of 93 EXCISE 4501-051-94-StateExcise-16 17 Construction of G.O (Rt) 39/SEBSC Land not available Excise Range No.924/20 /13-14

Office Aryanad 12/ TD Dated 9612075 ARYANAD TVPM of 25/11/13 TAXES 1,04,6500 Departmen 0 t Dt 6/12/12 91Lakhs 5452-01-800-76 18 T Department of GO(RT NO 67/CEBL/ 30/SEB 90% O Tourism- 2143/2012 TVM/ SC- completed U Construction of /TSM dt 16- 9356/ 2014- RI new Guest 3-2012 dated 15- 15 33591546 S house at 02-2014 Dated

VAMANAPURAM M Ponmudi for 11.11.2

Tourism 014 months 18 10-7-2016 4202.-01-202-99 19 Construction of GO(Rt) No 43/EE/20 14 footing work Building for 1329/2013 13-14 dt 7/ in progress G EDN PK PK Jose

vocational /Gedn 14-8- EE 6499735 ARYANAD Higher TVPM Date 2013 /1 secondary school 17-5-2013 4- vellanadu 15 dt

04. Months12 (03-02-2016) 02. 20 15 above 36.75% E/R 4202-01-800-88 20 Construction of GO(Rt) No 68/SCBSC 52/SEB work Building forGovt 5050/2014 /2014-15 SC/201 completed G EDN Voccational /Gedn dt 10-4- 5-16 dt ARYANAD 10194192 Higher TVPM Date 2015 27/11/ months 10 9.45% above 9.45% secondary school 17-11- 15 AbdulHakkim Aryanadu 2014

Page 18 of 93 HEALTH 4210-02-104-95-01 21 CHC - G.O (Rt) No1204/201355/EE/20 H&FWD tvm dated 4/4/2013 Nearing Construction of 13-14 dtd completion Suni Lal

ward building in 2-09- 4517844 the first floor of 2013 the existing ward

VAMANAPURAM building. LABOUR 4059-01-051-71 22 Construction of G.O(Rt) 191/CE/D 32/SEB Termination hostel building No.1187/0 & SC/201 notice issued for Govt.ITI, 9 PWD for LW/09/10 1/12 to the ARYANAD Aryanad Rs.90.0 date Dated2 contractor,and ChandraDas Lakhs 13/9/201 6/8/20 case filed by 0 11 the contractor

23 T Tourism Order NO. Ts not O Department 1004/2016 accorded

U Annual (8H) lakhs 28 RI Maintenance- Tourism S renuvation and Dept Dated

VAMANAPURAM M upgradation of 1/8/2016 Tourism Guest house block I at Ponmudi 24 T Tourism Estimate O Department submitted for

U Special repairs to 269,734 Division RI public Toilet S ground floor of

VAMANAPURAM M Ponmudi Police station 25 T Urgent Estimate O improvement of submitted for

U old passage in 668,497 Division RI Ponmudi near S Guest house

VAMANAPURAM M

Page 19 of 93 26 T Urgent Estimate O maintenance of submitted for

U Police Station 282,734 Division RI Ponmudi S

VAMANAPURAM M 27 T Tourism Work to be O Department- started U Provide new 27,922 RI submersible S pump for New

VAMANAPURAM M Guest House Ponmudi 28 T Tourism work to be O Department- tendered in

U Construction of 834,275 Dvn.office RI Bore well at S Ponmudi

VAMANAPURAM M 29 HED-RIDF XVIII- Estimate

NDD Construction of submitted to boys hostel and Government compound wall of Kerala on 3- for Government 11-2012. College Nedumangad

Page 20 of 93 30 HED – RIDF XVIII- Estimate

NDD Directorate of submitted to Collegiate Government Education & of Kerala on 3- Directorate of 11-2012. Technical Education- Auditorium- Cum Library Government College Nedumangad 4202-01-800-88-Projects-ADS (NP) LAC Under 31 Construction of a G.O(Rt) No.2463/2014/GEdn94/EE/20 TVPM dated 23.6.14. Work dropped

NDD building for 14-15 as per G EDN

Govt. Girls dated 4792342 direction from Higher 7.8.2014 MLA Secondary School Kanyakulangara - Construction of class room..

Page 21 of 93 4202-01-800-88-Projects-ADS (NP) LAC Under 32 Construction of a G.O(Rt) No.2408/1492/EE/20 G. Edn TVPM dated. 19.6.14 Work dropped

NDD building for 14-15 G EDN

Govt. Girls dated 2356581 Higher 31.7.2014 Secondary School, Neduveli in Vembayam Grama Panchayath - Construction of class room. 4202-01-202-99 33 Construction of a G.O(Rt) No.967/2013/G.27/EE/20 Edn (M) TVPM dated 27/02/13 MLA directed building for 13-14 dtd to drop the G EDN

Government 16-07- 5477227 work. high School 2013

VAMANAPURAM Madatharakani 4202-01-800-88. 34 Construction of a G.O(Rt) No.2860/2014/G.117/EE/2 Edn TVPM dated 18/07/14 finishing work building for Govt 014-15 nearing G EDN

HS Jawahar dtd 30-09- 4953414 completion. colony 2014 VAMANAPURAM 4202-01-800-88. 35 Construction Estimate

NDD ofCommunity submitted for G EDN

Hall at Iriyanad Lakhs 30 AS in Panchath

Page 22 of 93 4202-01-800-88. 36 Construction of a G.O (Rt) AS obtained

NDD building for Govt No. trees in the G EDN

L.P School at 684/2016/ Lakhs 30 site is to be Attukal in G Edn. removed by Panavoor Dated LSGD Panchayath. 18/2/2016 HIGHER EDUCATIONHIGHER 4202-01-800-88-Projects-ADS (NP) LAC Under 37 MLA ADF 2013- G.O(Rt) No.1312/2014/H93/EE/20 Edn TVPM dated. 24.6.2014 Work dropped

NDD 14 - Kerala 14-15

University dated 2286574 College for 31.7.2014 Teacher Education Nedumangad - Construction of Seminar hall over the existing building HEALTH 4210-02-103-95 38 -do- -do- G.O (Rt) Tentered Primary Health No.517/20 several times

Centre Kallara- 13 H& 5597900 and quotation Construction of FWD TVPM invited ,no 20 beded ward dt. response MLA

VAMANAPURAM 16/02/13 has proposed to cancelled the work

Page 23 of 93 HEALTH 39 Construction of a Estimate building for Govt submitted to

Ayurveda 3000000 Government Hospital for AS

VAMANAPURAM Perayam LSGD 45-15-00-800-96 40 Improvement to GO(Rt) No 1161/2013/LSGD16/2015- work to be Panchayath 16 dt started 6 6 month

stadium 10.04.201 3317063 6 6 months ARYANAD Uzhamalakkal 5 REVENUE 4059-60-051-72-ADS(NP) LAC ProjectsUnder 41 Construction of Go(Rt)No.2544/2015/RD565/SEBS dt.64/SEB 18.5.2015 New Proposal

NDD Internal Roads, C/2015- SC/201 is forward to

Cloak 16 dtd 20- 5-16 dt 9675543 EE for 7 7 % above Room,Toilet 07-2015 28/12/ months 10 approval Block, Multi level for 101 2015 Parking Facilities lakhs & beautification HeatherInfrastructure works at Revenue tower compound, Nedumangad

42 Construction of work completed record room in Nelson Manoorkara 772044 3 3 months village office

Page 24 of 93 43 Construction of Go( Rt) Fresh estimate Trainees Hostel No.2185/2 under in IAH & VBI 010/AD preparation Palode (Agricultur al Departmen t) Dt.9/12/20 10 44 Construction of No.M2- 9 Nearing Staff Quarters 37511/201 mo completion for class III 4/plg nths 4 Officers at Jersey dated 4 Farm Vithura. 4/9/2015 0 3- 0 0- 1 0 2- 9 6( P) Azhikode labour Azhikode contractors society Operative Co.

Page 25 of 93 45 AHD- No.M2- 21 Nearing Construction of 7204/2015 mo completion Feed Storage at /plg TVPM nths Jersey Farm 4 Dt.24/1/20 Vithura. 4 15, 30 0 lakhs 3- 0 0- 1 0 2- 9 6( p) Thiruvananthapuram LabourJanakeeya jilla Contract

46 Constriction of 12 Nearing New ward ( First 4 mo completion 2

floor ) and other 8902181 9955309 nths allied works at 1

CHC Vithura. 0- above 11.83% 0 S. Krishnakumar 1- 1 1 0- 7 4( pl a n)

Page 26 of 93 47 Construction of Order no. 78/EE/20 45 Nearing class IV staff M2- 14-15 lak completion quarters at 9182/2014 dated hs Jersey farm, /plg dated 10/7/201 Vithura 20/3/2014 4 of the Director of AH TVPM

48 Rectification of GO(rt) No. Nearing Leak proof to 62/2016/A completion standardisation HD dated lab at VBI Palode 15/2/2016

49 Construction of 5 Proposal will new building cr be forward to from CE for prepare Nedumangad AR drawings Rest House and design

50 Construction of 15 Forwarded to New Revenue Cr CE for prepare Tower at of estimate Nedumangad and design through Spl.bldgs

51 Constuction of 3 Estimate unde Library block at Cr preparation Govt. college Nedumangad

Page 27 of 93 52 Constyrucyionof 13 9 Selection modern La mo Noteiceissued

Anganvadi at kh 1226313 nths J.Stephan Pangode (Centre- s 75) 53 Constyrucyionof 13 9m Selection modern lak ont Noteiceissued

Anganvadi at hs 1226312 hs J.Stephan Kallara Panchayath (Centre- 101) 54 AHD- 26/EE/2 6 Selection Construction of 4 016-17, mo Noteiceissued 4

Vermi Compost Dated 2114372 2799437 nths 08-07-17

Plant at 0 13-6- A.Krishnan Jerseyfarm 3- 2016 Extention Unit, 0 Chettachal, 0- Thiruvananthapu 1 ram 0 2- 9 6( p)

AWAITED FOR AS 1 Construction of a Building for HSS Neduveli 14627125

Page 28 of 93 2 Construction of aSecond floor for Higher

Secondary Block 6705207.43 at Poovathoor GHSS

3 Urgent repairs work at several buiding under

the jurisdiction 270045.34 of building section Nedumangad for a period of six months from 1/9/2016 (Running contract basis) 4 Construction o fOperation theater at

Veterinary 2454851.46 Hospital, Kuttiyani 5 Govt UP School Vamanapuram Maintenance

work 1743946.6 6 Maintenance of Govt. quarters at Netta,

Nedumangad 4445599.36

Page 29 of 93 7 Providing and laying vitrified

tile in the court 126500 hall of Additional Munsiff at the Munsiff Court, Nedumangad

8 Maintenance of Govt. quarters at Netta,

Nedumangad 7935599.36 and Providing childrens park

9 Providing and laying tile to the floor and other

additional 1687805.92 finishing works to the newly constucted school building at GHSS Poovathoor

10 Providing and laying in the Chamber of Sub

Judge at court 198940.23 Complex Nedumangad

Page 30 of 93 11 Separate office Cabin for the

third 176800 commercial Tax officer,Commerc ial tax Office, Revenue Tower, Nedumangad

12 Construction of a building for HSS Bharathanoor 14627125

13 Construction of a building for Boys HSS Mithrumala 14618645 14 Construction of a building for UPS Peringammala 10534690.5 15 Construction of a building for VHSS, Kallara 14627125

16 MLA _ ADS Construction of a community hall

at Iryanadu in 2999999.99 Anadu, Gramapanchayat h

Page 31 of 93 17 USR to the Labour Quarters at Tea Estate, Bonakkad 30939485.78

18 Construction of building for Sub Registrar Office

Vithura 8430034.6 19 Construction of Analytical unit above PCR Lab

CDIO, Palode 5664483.3 20 Construction of a new building for Govt. Homeo

Dispensary at 4703715.51 Vithura

21 Construction of toilet block for girls and boys in

ABVN CBSC 2354399.43 School Njaraneeli 22 Providing a slurry pump at Jersey farm

Extension Unit, 372569.52 Chettachal 23 Providing floor & wall tiles to the male and female

ward at Thaluk 2650000.01 Hospital Vithura

Page 32 of 93 24 Construction of concrete tile road to Arippa

Settlement area 5296302.95

25 Construction of a kitchen, compound wall,

toilet block and 2561905.41 maintenance to M.G.L.C, Pottomavu at Arrippa

26 Construction of a building for Jawahar Govt.

LPS, Thennoor 8471706.9 27 Urgent special repairs to the male & female

ward at Thaluk 572927.89 Hospital, Vithura

28 Side protection work to the

internal roads at 150000 Dr.Ambedkar Vidhyanikethan CBSE School at Njaraneeli 29 Construction of a slurry channel at

Jersey farm 2979130 Vithura

Page 33 of 93 30 Construction of new ward (First Floor) and other

allied works at 9621765.17 CHC Vithura

31 Construction of a building for centre for wild

life studies CDIO 7476235.88 Palode 32 Internal roads by providing 40mm

chipping carpate 2280000 in J.F.E.U, Chettachal

33 Construction of a Generator of Generator room

at ABVN CBSE 1269950.17 School, Njaraneeli 34 Urgent special repairs work at several buildings

comes under the 269386.56 Jurisdiction of buildings section, Palode for a period of six months from 01.10.2016 (Running contract basis)

Page 34 of 93 35 Urgent special repairs to the quarters at

Kallara CHC 1278137.7 36 Construction of compound wall for police

station, Pangode 800515.33

37 Construction of open vehicle shed and

rennovation to 2977760.46 gate and compound wall at VBI, Palode 38 IAH & VB Palode Construction works to

Remaining 8372484.05 portion of compound wall

39 Maintenance & Providing roofing sheets to selected labour quarters 19548078.62 (layams) in Bonakadu Tea Estate 40 Urgent special repairs to the quarters at

Jerseyfarm 3441979.9 Vithura

Page 35 of 93 41 Renovation works to the roof and first

floor of main lab 9585193.24 VBI, Palode 42 Providing trussed roof to pre metric hostel

for Boys 2894352.16 Nanniyode 43 Urgent special repairs to the pottomavu

Anganvadi and 3393442.62 construction of compound wall at Arippa 44 Construction of a waiting room at fire & rescue 281785.1 station, Vithura 45 Blasting of rock in the campus of

pre-metric 2500000 hostel, Nanniyode 46 Construction of soak pit & wash basin to pre-

metric hostel for 354183.93 Boys Nanniyode

Page 36 of 93 47 Construction of wasing shed for premetric hostel

for boys 1100039.51 Nanniyode

48 Urgent repairs & maintenance to toilet blocks (4

Nos) in ABVN 1956679.79 CBSC School, Njaraneeli

49 Scheduled Tribe development construction of

compound wall 10,50,000/- the proposed compound of community hall podiyakala

50 Schedule Tribe Department, Construction of

compound wall 845906.98 MGLC compound podiyakala 51 Improvements to Malayadi open hall in

Tholicode Grama 1676736.11 panchayath 2012-13

Page 37 of 93 52 Urgent AS Obtained maintenance of police station

Ponmudi 282734.72 53 Construction of compound wall 77700 for Rest house Aryanad 54 Torism Department Urgent

maintenance of 276775.85 special repairs to guest house Ponmudi Block I

55 Tourism Department Annual

maintenance 2044381.04 Renovation and upgradation of Tourism guest house Block I at Ponmudi 56 Health and family welfare department

Construction of 4901458.39 30 beded ward attached to PHC Tholicode (Balance work)

Page 38 of 93 57 Construction of a building for Anganwadi

No.39 for 1221276.54 Uzhamalakkal Grama Panchayath 58 Tourism Department Urgent Special

Repairs to public 296734.47 toilet at ground floor of Ponmudi Police station under the guest house Ponmudi

59 Construction of a building for HSS

Poovachal 845907 60 Construction of a building for HSS Tholicode 1676736.1 61 Construction of a building for Laboratory building for

Govt.H.S.S 11,330,189.60 Aruvikkara

Page 39 of 93 62 Urgent Special Repairs works comes under the

Jurisdiction of 568708.13 Building section Aryanad for the period of 6 months from 1.9.2016

63 Construction vehicle shed at vetinary

despensary 113058.92 Kuttichal (Balance work) 64 Special repairs of leak proofing to Vetinerinary

despensary 1069297.53 Kuttichal - roof concrete

65 Providing arragements of court facilities

for Gama 694191.58 Nayalaya Vellanadu 66 Construction of building for ITDP Sub centre

kuttichal- 920756.27 Kottoor - Animal Husbendary Department

Page 40 of 93 67 Construction of a building for HSS Kulathummal 3782801.8 Buildings Sub Division Progress Report of January 2017

NAME OF Amount Amount Present stage

PROJECT date Sl.No. Budget page page Budget Division Name of of Name Remarks contractor S.H.O Date Department & Date No. TS AS No. Date & & Date No. AS upto financial financial upto Actual DOC Actual Agreed PAC Agreed Estimte PAC Estimte Date of tender of Date Extended DOC Extended Amount required required Amount Estimate amount Estimate LA Constituency LA Head of Account of Head Budget provision provision Budget Physical Progress Physical Agreement No. & & No. Agreement Tender percentage Tender Period of of Period in completion agmt D.O.C as per upto Expenditure month current Stages ofStages Electrification

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Attingal Section 1 PLAN FUND- GO(Rt) 38/AEE/ agmt for soil

TVM construction of no.2127/20 2016-17 investigation 112137 111688

multistoried 16/H.Edn dt dt 1month executed.

Academic block in 12.08.2016 23.01.20 0.4%below V.Harikumar Technical Edn Technical

Attingal Govt Polytechnic 17 400 lakhs 400 College, Attingal

2 Construction of GO(Rt).No.3 37/AEE/ agmt for soil

TVM new Highschool 351/2016/G 2016-17 investigation 82137 81316

Gen.Edn Block in Govt H S, .Edn dt dt 1month executed. 1%below Njekkad, Attingal 14.10.16 for 23.01.20 V.Harikumar Attingal

399.50 lakhs 399.50 Rs.399.50 17

4202-01-202-93 lakhs

Page 41 of 93 3 PLAN FUND- GO(Rt) No. ORDER First floor roof 30 2509/2015/H No./2016- Centre for slab concrete

TVPM Edn dt 2017/2015/ Attingal Excellence 23.09.2015 3615Dated: and block

scheme- for 300 lakhs 01-07-2016 04.08.2016 masonry 247.12 lakhs 247.12 Construction of for 300 partially lakhs Higher Education Higher science block-II completed.

7/300/vol.1 annex.11 7/300/vol.1 phase(Balance portion of first itemwise James.P.J 300 lakhs 300

floor and a 280,99,985 234,96,981 05.11.2016

portion of second 4202-01-203-83 floor) in Govt. College Attingal 35/SEBSC/2016-17 dt 29.09.2016 dt 35/SEBSC/2016-17 started work on 05.12.2016 after test results 05.12.2016 test after on work started 4 Construction of an G O (Rt) No.2015- 20/SEBSC block work and 55

tvm additional block in no.898/2015/L 2016/2014_ /16-17 dt plastering work in 2015_768 Labour Govt ITI Attingal- BR dt 28.05.201 progress Attingal phase II 08.07.2015 for dt 20-01- 6

260 lakhs 2016 for 09.03.2016 Rs.260 12 months 242,00,911 241,52,509 260 260 lakhs lakhs 4202-02-800-95 0.2%E/R below part bill submitted bill part kollam….labour society kollam….labour 5 Construction of GORt(No).7

TVM academic block in 9/2017/G.E

Gen edn Gen Govt Muslim High dn dt School Nadayara, 13.01.2017

Varkala -phase for

I(Ground & F.F) lakhs 387.80 Rs.387.80

4202-01-202-93 (P) 4202-01-202-93 lakhs 6 MLA-ADS- GO(Rt) order 49/EE/1 Agmnt

tvm No.5360/201 no.TVM/201 Rennovation of 6-17 dt executed. Site 5/G Edn dt 5- Varkala G/F and 16.11.2015 16/2015/27 12.07.16 to be handed construction of for 40 lakhs 55 dt over by 40 lakhs 40 6months

17.02.2016 39,49,623 42,91,265 Gen.Education F/F for Muslim panchayath 8.65%above 4202-01-800-88

for 40 lakhs Hameed Abdul HS,Nadayara authorities 7 Balance works to GO(Rt) No ORDER 8/SEJ/EK N.A completed up to 70 N.A tvm Additional Block and 1814/2015/Ho No./2015- M/15-16 roof level construction of 3rd me dated 2016/2014_ dt Attingal Judiciary floor with sheet 20.07.2015 for 2015_873D 03.03.201

215 lakhs ated:06-02- 12 months

roofing in Court 215 lakhs 6 Baiju.R.S 167,53,383 148,77,004 31.03.2016 30.03.2017

Complex Attingal 4059-60-051-73 2016 for 11.20%below 215 lakhs

Page 42 of 93 8 Construction of a go(Rt) order NA S N to be issued no.2016- TVM

building for VHSE No.924/201 Syam 17/2015/58 Attingal in Boys HSS lakhs 50 6/GL.Edn dt 56 dt Attingal (NABARD) 02.03.2016 06.09.2016 Technical Edn Technical for 50 lakhs for Rs.49,99,81 9 Deposit work- G O (Rt) ORDER 98/EE/1 work in good 70

tvm No./2016- Rennovation of no900/15/LBR 6-17 dt progress 2017/2015/ Labour dt 08.07.2015 Attingal workshop building for 58 lakhs 5362Dated: 06.10.20 and other allied 09-06-2016 16 2015/5362

for Rs.58 below 58 lakhs 58

works in A.Nazeer 3months lakhs 57,95,243 48,39,538

Govt.ITI,Attingal 2230-03-101-87-17

10 Construction of a No. Dev. C 1- 82/EE/2014- 136/EE/20 NA nearing 95

tvm building for Govt. 23751/12(KDS 15 dt 15-16 dt completion SCDD Nursery school, ) dt 15-03-14 21.07.2014 11.01.201 Attingal Edakkodu of the Director, for 27.50 6 SC lakhs 2313983 2796448 6 months

Development A.Nazeer 19.02.2016 18.08.2016 27.50lakhs 4202-01-202-99

for Rs. 20.85%above 27,50,000 11 Construction of Model GO(Rt) No.345/201 114/EE/20 The existing old

tvm anganawadi no.79 in No.485/2014/ 5-16 dt 15-16 dt building to be Mavinmoodu in SJD dt 30.6.2015 07.12.201 demolished by the 6 months Attingal GP 05.08.2014 for 11.66 5 panchayat for 11.66 lakhs authorities and the E/R

SocialJustice site is to be handed 1039522 1039522

lakhs 6 months over to PWD 06.06.2016 11.66lakhs 4235-02-102-96(P) Gopalakrishnan Nair Gopalakrishnan 12 Construction of Model GO(Rt) No.343/201 116/EE/20 work completed 15

tvm anganawadi no84 in No.485/2014/ 5-16 dt 15-16 dt up to lintel level Thachodu in SJD dt 30.6.2015 07.12.201 6 months Chemmaruthy GP 05.08.2014 for 11.66 5 for 11.66 lakhs E/R SocialJustice 1039522 1039522

lakhs 6 months 11.66lakhs 4235-02-102-96(P) Gopalakrishnan Nair Gopalakrishnan 13 MLA-ADF- GO (RT) No. TVM/2015- 41/EE/1 Agmnt

tvm 115/2016/G 16/2015/37

VarkalaLAC- 6-17 dt executed. Site suppl Edn dated 26 dt Varkala Construction of a 11.01.2016 17.02.2016 01.07.20 to be handed building for LPS for 25 lakhs for Rs.25 16 over by 25 lakhs 25 6months

lakhs 23,49,618 25,74,007 Gen.Education Hariharapuram panchayath 9.55%above 4202-01-800-88 Abdul Hameed Abdul authorities

Page 43 of 93 14 Asset Development GO(Rt)

tvm Fund - Construction of No.88/2016/SJ a Building for D dt Attingal Anganvadi in 12.02.2016 for Sreenivasapuram 10 lakhs Social Social Justice Colony of lakhs 10

Chemmaruthy 4235-02-102-92 Panchayath Chirayinkil Section 15 Construction of a new GO(Rt) No. 48/CE/BL/14- 70/SEBSC/ plastering work 70% _

tvm Block for Taluk 2564/2014/H& 15 dated 2015-16 dt nearing completion Hospital Varkala FWD dated 31.03.2015 06.01.201 Varkala

H & FWD & H 30.07.2014 for for 290 lakhs 6 Rs 290.00 23832364 22323775 %below 290 290 lakhs jalaludeen 28.01.2016 05.04.2016 15months(5/4/16) 4210-02-800-95 Lakhs 15months(5/4/16) 16 Construction of (1)GO (Rt) No Order 19/ first floor roof 55%

tvm 1994/2013/H&F CE/BLDGS/TV N A Payward Block in WD dt 10-06- M/126/2014/dt SEBSC R.C.C work Varkala Nature Cure 2013 for 100 21-07-2014 /2015- completed H & FWD & H Hospital, Varkala Lakhs; (2)GO 16 (Rt) No 1724/2012/H&F Dated WD dt 23-05- 11/08/2 2012 for 125 015 95 Lakhs; (3)GO months-10.01.2017 15 (Rt) No 2659006 280 280 lakhs 30954566

880/2012/H&FW 10.01.2017

D dt 17-03-2012 S.Krishnakumar for 55 Lakhs 15 months-10.01.2017 15 4210-03-200-992210-04-200-95-17; ; 2210-04-200-

17 H&FWD-(Health Go(Rt) ORDER 36/SEBS Columns raised 10%

TVM service Annual plan 2012- No1011/20 NoTvm./2 C/2016- upto lintel 2013 implimentation of 14/H&FWD 016- 17 DT level.Solid Block H & FWD & H itemrate plan scheme- setting up lakhs 250 Chirayinkil 12 months 12 months 12 of maternity units in dt 24-03- 2017/2016 18.08.2016 06.10.20 204,74,701 178,93,250 01.11.2016 work selected THQH)- 2014 for _4385 16 started.lintel Gopalakrishnan Construction of 250lakhs dated:18- concrete work new maternity 08-2016 completed

wing in THQH- 2210-01-110-31 for 250lakhs

Page 44 of 93 18 Construction of a GORt(No).4 TVM building for Govt 357/2016/G

Gen edn Gen HSS Edn dt Palayamkunnu 26.12.2016 Attingal 106 lakhs 106

4202-01-202-91 4202-01-202-91 for 106 lakhs 19 Construction of a GORt(No).4 TVM new building for 357/2016/G

Gen edn Gen Govt Higher Edn dt Secondary School, 26.12.2016 175 lakhs 175

Chirayinkil Vakkom

4202-01-202-91 4202-01-202-91 for 106 lakhs 20 Construction of

TVM new building for

Gen edn Gen Govt HSS (bala nce work for lab buildings under XII GORt(No).4 33 lakhs 33

Chirayinkil FC award for Govt 357/2016/G HSS Kadakkavoor) Edn dt 4202-01-202-91 (P) 4202-01-202-91 26.12.2016 for 33 lakhs 21 Annual Plan 2013-14 GO (Rt) No. 197/EE/2014- 103/EE/20 Agreemnt

tvm Additional Building 4781/13/G.Edn 15 dt 18-03- 15-16 datd executed on 25- for Govt. HSS Vettoor - dated 12-11-13 2015 for 100 25-11- 11-2015. Work to varkala Construction of Six for Rs. 100 lakhs 2015 10 months be started,existing Class rooms for Two Lakhs tiled roofed Storied building building is to be Gen.Education 9689289 10127245 10 months 100 100 lakhs demolished.site 24.09.2016 Shamudeen 4.52%above 4202-01-202-91 not handed over to PWD

Construction of 3 Class G.O(Rt) No. D6/726/2014 177/EE/20 NA work to be started- NA

22 NA

tvm room of Single storied 1726/2014/G.E dt 23-06- 15-16 dt old bldg to be building in Govt HSS dn dtd. 06-05- 2014 for 50 04.03.201 demolished Varkala NA Varkala 2014 for Rs. Lakhs 6 NA 9.11% 4971125 5423994 6 6 months 50 lakhs 50 A.Nazeer 50 Lakhs aboveE/R 03.09.2016 Gen.Education 4202-01-800-88

Page 45 of 93 23 Construction of GO(Rt) No 57/EE/14- 72 / EE / plastering 80% tvm six class rooms in 2778/13/G. 15 dt 2015-16 work Govt. UPS, Edn. dated 23.06.201 dt completed

Chirayinkil Sarkara 04/07/2013 4 for 80 22.09.20 fixing of doors and Gen.Education for 80 lakhs lakhs 15 80 lakhs 80 7765802 10732338 21.06.2016 windows,painti 38.20%above 4202-01-202-93 ng etc started Saraswathy constrn Saraswathy 9 mopnths (21-06-16) mopnths 9 9 mopnths (21-06-16) mopnths 9 24 Renovation and repair GO (Rt) 2016/2017/20 91/EE/16- N A Agreement

tvm works of New block at No.187/2015/ 15/331 dt 17 dt Executed Govt: Guest House, TSM dtd 25- 25.05.2016 03.10.201 Varkala Tourism Varkala 05-2015 for for 37,99,968 6 6 months 37,82,245 32,14,699 38 lakhs 38 Rs. 38 lakhs 5452-01-800-87 R.sanal kumar R.sanal 25 A.D.F ,M.L.A Go(Rt) ORDER solid block work TVM LSGD Varkala assembly No796/201 No./2016- up to lintel level Varkala Trideep constituency lakhs 48 6/LSGD dt 2017/2016 completed,lintel

,Renovation works 25.02.2016 /359 05.10.2016 shade concrete and other allied for48lakhs dated:04- work completed works to 08-2016

Municipal Bus 4515-00-800-96 for stand Varkala. 4786718.2 7 26 2017/2015/ Construction of an GO(Rt) 3298 dt TS cancelled No.713/2016/ 06.10.2016 Indoor Stadium at Estimate LSGD for for Kattuvila in Rs.35.74 Rs.35,73,82 resubmitted for GP lakhs 35.74 lakhs 9 TS 27 USR and /2016/201

TVM maintenance of Order No 7/2016/91 Agreement Sub Registrar Tvm/2016/9 dated executed but 994499

Registration office, 1 dated 05/10/201 work not Chirayinkil Kadakkavoor 2059-60-051- 10/08/2016 6 started 28 Construction of a

TVM waiting room for Order No /2016/201 Judiciary Advocates, clerks and mediation at Order No 7/2015/38

Varkala Tvm/2015/3 99dated Extension roof Varkala Court 6,50,000 899dated 05/10/201 R.C.C WORK

Complex 2059-60-051-98 06/07/2016 6 completed

Page 46 of 93 29 Constructionof ICDS A7- TVM/2015- 168/EE/15- Roof slab 60

tvm anganvadi No 97 at 5913/14 dt 19-2016/2015/ 16 concreting Kizhuvilam at 02-2015 3071 dtd.01/03/ completed,plasteri 5 months Kizhuvilam Grama Dated:18-11- 2016 ng work in Chirayinkil 2015 for E/R progress

panchayath 8lakhs 5 months 743440 743440 Social Social Justice

Rs.8 lakhs 31.08.2016 4235-02-102-94 Abdul Hameed Abdul Kilimanoor Section 30 Construction of a GO (Rt)N0. ORDER agmt executed and No.TVM/20 TVM Class room 326/2016/G site not handed 15- Gl. Edn Gl. Edn over to PWD Attingal Building for Govt. l. Edn. Dtd, 2016/2016/ V.H.S.S., 25.1.2016 1328Dated: Alamcodu. lakhs 193 19-02-2016 4202-01-202-91 for 193 31 Construction of 20 GO (Rt) No. 2901/2015-lakhs 9/EE/16- Agmt executed. N.A

tvm bedded ward for CHC 1606/2014/H& 16 dt 17 dt Auction for trees is Pallickal FWD dated 19- 28.04.2016 20.05.201 to be cunducted by Varkala

H & FWD & H 05-2014 for Rs for 100 lakhs 6 the local authorities 100 Lakhs and the site is to 6 6 months 86,21,244 80,41,034

100 100 lakhs be handed over to P.Jalaludeen 6.73%below 4210-02-800-95 PWD.

32 Construction of GO(Rt) No. 105/EE/2013- 35/EE/201 Earth work done -

tvm Village office building 4938/13/Reven 14 dt 4-15 dt No response from and compound wall at ue dt 08.01.2014 30.05.201 contractor to Attingal 07.09.2013 4 continue the work. Recommended for

Land Revenue Land terminating the 3249997 43491472 3.7.2014 contractor and re- 5 month (30-10-2015) Nujum Khan Nujum 7.43%above 4059-01-051-96 arrangement of 5 month (30-10-2014) Work

33 Construction of a GO (Rt) 124/EE/2014- 47/ EE/15- Civil Work 95

tvm building for Govt. 1807/2014 15 dt 16 dt compled. Ayurveda Hospital, H&FWD dt 02- 16.10.2014 31.07.201 Electrical work 4500000 Attingal

H & FWD & H Karette in Pulimathu 06-2014 for 50 for 57.50 5 pending Grama panchayath Lakhs lakhs 5447187 6283875 50 lakhs 50 Thajudeen 10.08.2015 30.01.2016 15.36%above 6 months (30-01-2016) 6 months 6 months (30-01-2016) 6 months 34 LAC - ADS GO(Rt) No. 81/EE/2014- 21/EE/201 Civil work 95

tvm Construction of Three 1717/2014/G.E 15 dt 5-16 dt completed.

storied building for dn dt 10.07.2014 05.06.201 2798654 Varkala Government HS 05.05.2014 for 5

Navaikulam 50 lakhs Ajesh 4611262 5187670 50 lakhs 50 Gen.Education 04.02.2016 4202-01-800-88 12.50 above E/R 12.50above 8 month (05-02-2016) 8 month 8 month (05-02-2016) 8 month

Page 47 of 93 35 Construction of 4 Class GO(Rt) No. 58/EE/2014- 82/EE/201 Block work nearing 65

tvm room in First Floor of 5320/2013/G.E 15 dt 5-16 dated completion. Govt. HSS, Kilimanoor. dn 07.12.2013 23.06.2014 01-10- Attingal for 39 lakhs 2015 3668355 4615524 39 lakhs 39 Gen.Education 4202-01-800-88 Rajendrababu 40% above E/R 40%above suppl.agmt 03.11.16 suppl.agmt 6 month (01-04-2016) 6 month 6 month (01-04-2016) 6 month 36 Construction of a GO (Rt) TVM/2015- 56/EE/16- agreement N.A N.A N.A

tvm building for No.5999/2015/ 16/2015/917 17 dt executed. Navaikulam LPS G.Edn dt dt 17.02.2016 27.07.201 Varkala 22.12.2015 for for Rs.15 6 2 2 months 13,92,995 15,32,295 15 lakhs 15

15 lakhs Lakhs K.V.Arun 4202-01-800-88 Gen.Education 10% above E/R 10%above

37 Construction of model ICDS.A7- TVM/2015- 138/EE/15- Civil work 95% _

tvm anganwadi building 7755/15 dt 16/2015/50 16 dt completed.Electri (Udaya Anganwadi 24.08.15 for 68 dt 13.01.201 cal work not Attingal no.97) at Nagaroor in 13 lakhs 17.12.2015 6 started Nagaroor Panchayath for 13 Lakhs E/R 1147177 1147177 5 months 13 lakhs 13 Gurudas SocialJustice 12.06.2016 4235-02-102-96

38 Construction of Model ICDS.A7- 2016- 7/EE/16- Agreement _

tvm anganawadi no.53 in 7755/15 dt 17/2015/51 17 dt executed. Site to Pazhayakunnummel 24.08.15 for 83 dt 09.05.201 be handed over to 6 months Attingal Grama Panchayath 13 lakhs 224.04.201 6 PWD E/R 8 months 12,25,032 12,25,032 13 lakhs 13 6 for 13 N.Vijayan Social Social Justice 09.05.2016

4235-02-102-96 lakhs 39 Construction of an Order No 146/EE/2014- N A Contractor has not

tvm Anganvadi in Centre ICDS A7- 15 dt 12-12- yet turned to No 25 of Pallickal 18498/14 dt 2014 executed the varkala Panchayath 13.09.2014 of agreement even the Director, after repeated Social Social Justice

SJD for Rs 1128103 instructions-fresh 11,28,103 10.5 lakhs 10.5 10.5 Lakhs quotations to be 4235-02-102-96 invited A.K.Abdul Shukkoor A.K.Abdul 40 Construction of a GO (Rt) ORDER Agreement to be N.A

tvm building for doctors No.2320/2015/ No.2016- executed (single) quarters at H&FWD dated 2017/2015/ Varkala H & FWD & H

3825Dated: E/R

Madavoor PHC 21-07-2015 for Arun

13 lakhs 13 13 lakhs 22-06-2016 20 % above %above 20

4210-02-800-95 for Rs.12,92,77

Page 48 of 93 Construction of a GO(P) 1033/2015- 111/EE/15- column work 40

41 NA

tvm building for fish No.1639/15/LS 16 dt 16 dt completed LSGD

varkala market in Madavoor GD dated 09.09.2015 2.12.2015 Grama Panchayath 01.06.2015 for for 25 Lakhs 25 lakhs 2396584 2636242 25 lakhs 25 10%above 01.05.2016 R.Divakaran 4515-00-800-96 5 months (02-05-2016) 5 months 5 months (01-05-2016) 5 months PWD MAINTANANCE SUB DIVISION , VIKAS BHAVAN THIRUVANANTHAPURAM PROGRESS REPORT OF WORKS FOR THE MONTH OF JANUARY 2017

Present Stage Year Sl.No. Division Remarks S.H.O Date Agreed PAC Agreed Department Actual D.O.C Actual Estimate PAC Estimate Date of Tender of Date Extended D.O.C Extended Name of Project of Name Head of Account of Head LA Consistuency LA Estimate Amount Estimate Physical Progress Physical Tender percentage Tender Name of Contractor of Name Agreement No. Date No. Agreement TS No. Date & Amount & No. Date TS AS No. Date & Amount & Date No.AS D.O.C as per agreement per D.O.C as Stages of Electrification Stages of Budget page No./Item No. No./Item page Budget Budget provision in Lakhsin provision Budget Period of completion in months in completion of Period Amount required upto Financial Financial upto required Amount Expenditure upto current month current upto Expenditure

12 3 4567 89 10 11 12 13 141516171819202122 23 242526 27 28 VIKAS BHAVAN BUDGET

Construction of Administrative Site layout under 1 Block, Govt. College preparation Crores 4 Crores 4 GO(Rt) No GO(Rt) 10 months 10

Karyavattom dt.07.10.16 TVM/2015- Kazhakuttam 33520993.59 33520993.59 Buildings, Tvm Buildings, SK .Anilkumaar 4202-01-203-85 Higher Education Higher 2016/2016/1338 41/SEBC/2016-2017 41/SEBC/2016-2017 2099/14/H.Edn.dt: 30.08.14 30.08.14 2099/14/H.Edn.dt: of Higher Education Dept - 4 4 - Dept Education Higher of

Page 49 of 93 Estimate is Construction of a revised as per building for the existing Administrative requirements as block, including approved by the 2 Store, Lab, Class ITI authorities room and Hostel Sajeev and which was 3.30 Crores 3.30

Kazhakuttam block for I.T.I Buildings, Tvm Buildings,

4202-02-800-95 submiited to that

Technical Education Technical Women, Dept for revised Kazhakuttam AS not be arranged as per site condition per as arranged be not G.O(Rt)No.149/2012/LBR, dt: 25.1.12. The AS AS The 25.1.12. dt: G.O(Rt)No.149/2012/LBR, already issued was exhausted as the work could workcould theas exhausted was issued already VIKAS BHAVAN LAC - ADS

Construction of Auditorium cum class room for First floor Brick 3

College of Teacher work in progres 70% J Nizar J 14202268 14202268 21.02.2014

Education, 29.08.2014 16.02.2015 31.03.2016 Kazhakuttam Estimate Rate Estimate Buildings, Tvm Buildings, Karyavattom Higher Education Higher 10/SEBSC/2014-15 dt 10/SEBSC/2014-15 dt 40/SEBSC/2014-15 4202-02-800-85- LAC-ADS LAC-ADS 4202-02-800-85- G.O(Rt)No.349/2014/H.Edn., dt: dt: G.O(Rt)No.349/2014/H.Edn.,

Construction of Ground Floor of Auditorium cum Roof slab at left 4

class room building end in progress. 35% 19049355 25716629 10 months 10

for H.S.S 14.02.2014 13-12-2015 K Anil Kumar Anil K 38% above ER above 38% Buildings, Tvm Buildings, for RS. 198 lakhs RS.198 for Sreekaryam, Tvm 4059-01-051-NP General Education General 68/SEBSC/2013-14 dt dt 68/SEBSC/2013-14 4.03.13 Rs. 1.84 Crores 1.84 Rs. 4.03.13 50/SEBSC/12-13 dt 30.03.2013 dt 30.03.2013 50/SEBSC/12-13 G.O(Rt)No1056/2013/Gedn. dt: dt: G.O(Rt)No1056/2013/Gedn.

Page 50 of 93 LAC-ADS- Thiruvananthapura m Legislative Assembly Not started. Constituency- Report Construction of submitted to Sub 5 - -

PWD semi open hall Division to issue 20 Lakhs 20 1942254 1,650,722

room and shuttle 30.09.2016 notice to the

Buildings, Tvm Buildings, court at contractor 15.01% below ER below 15.01% Thiruvananthapuram Observatory Sasthamkotta, Kollam Government 15/EE/2016-17, dt: 31.05.2016 dt: 15/EE/2016-17, Quarters, Tvm agreement of date from months 4 4059-60-051-72 Projects under LAC-ADS under Projects 4059-60-051-72 TVM/2015-16/2014/211, dt: 18.2.16 - 20 Lakhs - 20 18.2.16 dt: TVM/2015-16/2014/211, G.O(Rt)No.359/2016/PWD, dt: 15.2.16 - 20 Lakhs 20 - 15.2.16 dt: G.O(Rt)No.359/2016/PWD, C Y Nizam, President, Kollam Progressive Labour Contract Co-op Society, Venga P.O, Venga Society, Co-op Contract Labour Progressive Kollam President, Y Nizam, C

VIKAS BHAVAN PLAN

Page 51 of 93 DTE - Construction of first floor to the canteen cum parking area in the 6 Directorate of technical education 4509998 4509998 S.Pradeep 14.05.2015 campus at 4399998.22 Buildings, Tvm Buildings, 4202-02-800-93 D4/51233/2014

Technical Education Technical Padmavilasom Thiruvananthapuram road, East Fort. 2015-2016/2014 2015 1632 dated dated 1632 2015 2015-2016/2014

Repairs and Old block Maintenance to the Renovation 7 Toilets in Post worksof toilets Tvm Matric Hostel at and bathroom in 01-2016 45 lakhs 45 4498989 3374242 6 Months 6 22-11-16 25%below TVM/2015-

Poochedivila M.CPratheep progress Buildings, Tvm Buildings, 4225-01-800-89 07-2015 Rs.4500000 Rs.4500000 07-2015 Edu.C3/3569/15 dated16- Edu.C3/3569/15 2016/2015/2820 dated21- 2016/2015/2820 R AJ BHAVAN PLAN Kerala RajBhavan- Rising height of compound wall from Jawahar 8 Work started

Nagar gate to near lakhs Praveen 3 months 3 Rajbhavan

Manmohan No. G.O(Rt) TVM/2016- Bunglow gate File 4059-public works 4059-public 9-11-2016 Rs 38.09 38.09 Rs 9-11-2016 Buildings dvn,TVPM Buildings 1252/2016/pwd dtd dtd 1252/2016/pwd 3/9/16 Rs. 38.1lakhs 3/9/16 Thiruvananthapuram ID: 2016/4784 dtd 2017/2016/4784 Kerala Raj bhavan - Urgent maintenance of Gardener's rest 9 Tendered room, wash room Rajbhavan of Gardener& Jayakumar TVM/2016- 27-12-2016 officer of SMPB. 11-2016. Rs 9 lakhs 9 Rs 11-2016. Buildings dvn,TVPM Buildings 4059-01-051-83-16 1 month and 15 days 15 and month 1 Thiruvananthapuram File ID: 2016/6994 TVM/2016/6994 dtd 01- dtd TVM/2016/6994 2017/2016/6994Dated:

Page 52 of 93 Kerala Raj bhavan- Compound wall- Rising of height for 10 security purpose Work is going on near Jawahar nagar 2 months 2 Rajbhavan GO(Rt) No GO(Rt) G.O(Rt) No. G.O(Rt) gate. lakhs 27.56 1302/2016/PWD 4059-public works 4059-public

Buildings dvn,TVPM Buildings File ID: 2016/3535 2016. Rs 27.56 lakhs 27.56 Rs 2016. Thiruvananthapuram Dated:23-09-2016 Rs. Dated:23-09-2016 1302/2016/pwd dtd 23-9- dtd 1302/2016/pwd

kerala Rajbhavan - Construction of Sent for AS. new PWD section Pending with 11 office in Rajbhavan other

Rajbhavan compound. department

File ID: 2016/7201 4059-01-051-86 Buildings dvn,TVPM Buildings Thiruvananthapuram CLIFF HOUSE PLAN

GV Raja Sports School Mylam, Tvm- Improvements and upgradation of Work hand over 12 outdoor stadium- to special Providing synthetic buildings. track, Volle ball 05.09.2014

court, foot ball 4202-01-800-9-(P)

stadium etc all works) Lakhs(for 550 G O (Rt) No. 3567/2014/Gedn dt dt 3567/2014/Gedn No. (Rt) O G

GV Raja Sports School Mylam, Tvm- Improvements and Work hand over 13 upgradation of to special indoor stadium- buildings. 05.09.2014 05.09.2014 Providing synthetic No. (Rt) O G

surface 4202-01-800-9-(P) 3567/2014/Gedn dt 3567/2014/Gedn 550 Lakhs(for all works) Lakhs(for 550

Page 53 of 93 GV Raja Sports School Mylam, Thiruvananthapura 14 work completed. m-Construction of 18.11.15 6 months 6

Sewage treatment 05.09.2014 17.05.2016 G O (Rt) No. (Rt) O G 43,99,400/- 4254220.00 plant 4202-01-800-9-(P) 3567/2014/Gedn dt dt 3567/2014/Gedn 1057/2015-16 Dated. Dated. 1057/2015-16 91/EE/2015-16 Dated. Dated. 91/EE/2015-16 550 Lakhs(for all works) Lakhs(for 550 10.09.15 for Rs. 45 Lakhs Rs. 45 for 10.09.15

GV Raja Sports School Mylam, Thiruvananthapura 15 Work started m-Providing and 20.6.156 3799820

developing the 05.09.2014 G O (Rt) No. (Rt) O G Higher Education Higher centralised kitchen 4202-01-800-9-(P) 29/EE/2016-17, dt: dt: 29/EE/2016-17, 3567/2014/Gedn dt dt 3567/2014/Gedn 550 Lakhs(for all works) Lakhs(for 550

GV Raja Sports School Mylam, Thiruvananthapura m-Providing a Yoga 16 Work completed and meditation hall 08.07.15 08.07.15 5 months 5

and constructing 05.09.2014 G O (Rt) No. (Rt) O G 10,00,077/- Scooter parking 4202-01-800-9-(P) 3567/2014/Gedn dt 3567/2014/Gedn shed Dated. 431/2015-16 550 Lakhs(for all works) Lakhs(for 550 121/EE/15-16, dt: 21.12.15 dt: 121/EE/15-16, GV Raja Sports School Mylam, Thiruvananthapura m-Modification of courtyyard- 17 Providing Sports Work completed 09.11.15

gallery and 1104663 4 months 4 08.03.2016 11,37,655/-

rectification of 05.09.2014 dt

toilet in staff room 4202-01-800-9-(P) 86/EE/2015-16 Dated. Dated. 86/EE/2015-16 353/EE/2015-16 Dated. Dated. 353/EE/2015-16 and other allied all works) Lakhs(for 550 01.07.15 for Rs. 11,50,000/- for 01.07.15 works 3567/2014/Gedn No. (Rt) O G

Page 54 of 93 GV Raja Sports School Mylam, 18 Thiruvananthapura Work completed m-Renovation of 09.11.15 3131281 6 months 6 05.09.2014 05.09.2014 08.05.2016 G O (Rt) No. (Rt) O G Main Building 33,99,871/- 4202-01-800-9-(P) 3567/2014/Gedn dt dt 3567/2014/Gedn 85/EE/2015-16 Dated. Dated. 85/EE/2015-16 473/EE/2015-16 Dated. Dated. 473/EE/2015-16 550 Lakhs(for all works) Lakhs(for 550 15.07.15 for Rs. 34 Lakhs Rs. 34 for 15.07.15

KPSC- Pattom - Thiruvanathapura m- onstruction of Estimate for AS 19 Canteen, is submitted Recreation room Commission

Public Service Service Public and Soceity 2051-00-102-99- Building

USR - Providing fencing around Work to be 20 the compound PWD wall and other tendered 16.11.2016 16.11.2016 allied works at No. (Rt) O G 1577/2016/PWD 1577/2016/PWD

Cliff House 2059-60-053-99(18)

Bungalow allworks) Lakhs(for 18.70 VIKAS BHAVAN NON PLAN

Govt. Mens' Hostel, Tvm-Renovation Renovation works to existing completed. toilets, bathrooms 21 Construction of site

and latrines and 2016 bathroom C.K.Rajan 1307976.4 1307976.4

construction of 22.02.2017 1307976.00 underway Buildings, Tvm Buildings, new bathroom block 4216-01-106-98(03 TVM/2015/192 Dated:08-07-2016 TVM/2015/192 2016-2017/2015/192Dated:26-07- 3 months from the date of handig over over handig of date the from months 3

Page 55 of 93 Govt. Mens' Hostel, Palayam, Tvm- Work under 22 Construction of site progress external toilet 05-2016 726587.9 726587.9 726588.00

block Surendran KC Buildings, Tvm Buildings, 2059-60-053-97 TVM/2016/2823 Dated:10-05-2016 TVM/2016/2823 2 months from the date of handing over over handing of date the from months 2 TVM/2016-2017/2016/2823Dated:24-

PWD- Construction of car shed for various 'B' type quarters, providing rear shed for A1 quarters and reconstruction of 23 PWD collapsed 2016 3 Months 3 22-08-16

compound wall in 1949883/- 1557957/- 19.50 lakhs 19.50 Rs.1950000 Shajikumar.S 20.1% Below 20.1% Buildings, Tvm Buildings,

Observatory 2216-05-053-98 campus NGO Quarters, Thiruvananthapura

m 01-10-2015 DATED 1485/2015/PWD TVM/2015-2016/2015/6037 dated 29-01- dated TVM/2015-2016/2015/6037 RAJ BHAVAN NON PLAN Kerala Raj bhavan - Providing marquee and other allied works in connection with 24 the AT Home Work is going on 2017 function in 7days Rajbhavan Rajbhavan - TVM/2016- 2059-80-053-97 2017. RS 9.91 lakhs 9.91 RS 2017.

Buildings dvn,TVPM Buildings Republic day Thiruvananthapuram celebrations 2017

File ID: 2016/8891 Dated:05-01- TVM/2016/8891 2017/2016/8891Dated:06-01-

Page 56 of 93 Kerala Raj bhavan – Resurfacing of internal roads from secretary quarters 25 Work completed to garage and from 1 month 1

Rajbhavan Jawahar nagar gate 16. Rs 10 lakhs 10 Rs 16.

to Centry post E 2059-80-053-97 Buildings dvn,TVPM Buildings D.S. Pradeesh kumar D.S. Pradeesh Thiruvananthapuram File ID: 2016/3516 TVM/2016-17/2016/3516 TVM/2016-17/2016/3516 TVM/2016/3516 dtd 17-6- dtd TVM/2016/3516 dtd 30-06-2016 Rs 10 lakhs 10 Rs 30-06-2016 dtd Kerala Raj Bhavan - Resurfacing of internal roads from 26 Sentry post C to E Work completed lakhs lakhs

in kerala Raj days 15 Rajbhavan bhavan. 2059-01-053-97 24/5/2016. Rs 9.92 9.92 Rs 24/5/2016. dtd 8/6/16. Rs 9.92 9.92 Rs 8/6/16. dtd

Buildings dvn,TVPM Buildings File ID: 2016/5391 D.S. Pradeesh kumar D.S. Pradeesh TVM/2015/5391 dtd dtd TVM/2015/5391 2016-17/2015/5391 2016-17/2015/5391 Thiruvananthapuram

KRB- Rectification of leakage and replacement of damged pipes of Work in 27 OH tank in the Progress 2 months 2

Rajbhavan Rajbhavan TVM/2016- compound 2216-05-053-97-02 Buildings dvn,TVPM Buildings lakhs 6.07 Rs 10-16. Thiruvananthapuram

File ID: 2016/6603 lakhs 6.10 Rs 10-2016. TVM/2016/6603 dtd 1- dtd TVM/2016/6603 2017/2016/6603 dtd 5- dtd 2017/2016/6603

Kerala Rajbhavan - Urgent repairs in work 28 D27 & D 28

lakhs lakhs Completed

Quarters. month 1 Rajbhavan File ID: 2016/5301 TVM/2016- 05/10/16. Rs 3.30 3.30 Rs 05/10/16. 2216-05-053-97-02 Buildings dvn,TVPM Buildings 01/10/2016. Rs 3.31 3.31 Rs 01/10/2016. TVM/2016/5301 dtd dtd TVM/2016/5301 Thiruvananthapuram 2017/2016/5301 dtd dtd 2017/2016/5301

Kerala RajBhavan- Urgent maintenance 29 works in quarters Work completed lakhs lakhs

D25 and D26 in Raj month 1 Rajbhavan Bhavan. File ID: TVM/2016- 5/10/16 Rs 2.97 Rs 2.97 5/10/16 17/2016/5681 dtd dtd 17/2016/5681 1/10/2016. Rs 2.98 2.98 Rs 1/10/2016. 2216-05-053-97-02

Buildings dvn,TVPM Buildings 2016/5681 TVM/2016/5681 dtd dtd TVM/2016/5681 Thiruvananthapuram

Page 57 of 93 Kerala RajBhavan- Urgent removal of building waste and 30 other wastes from Work completed lakhs lakhs

Rajbhavan days 10 Rajbhavan premises. File ID: TVM/2016- 5/10/16 Rs 1.43 Rs 1.43 5/10/16 1-10-2016. Rs 1.43 1.43 Rs 1-10-2016. 2216-05-053-97-02

Buildings dvn,TVPM Buildings 2016/6905 TVM/2016/6905 dtd dtd TVM/2016/6905 Thiruvananthapuram 2017/2016/6905 dtd dtd 2017/2016/6905

Keral Raj bhavan - Urgent repairs in 31 Work completed

quarter No. C4. File lakhs lakhs 1 month 1

Rajbhavan ID: 2016/6993 TVM/2016- 2059-60-053-97 14/10/16. Rs 3.13 3.13 Rs 14/10/16. 3.13 Rs 27/10/16. Buildings dvn,TVPM Buildings TVM/2016/6993 dtd dtd TVM/2016/6993 Thiruvananthapuram 2017/2016/6993 dtd dtd 2017/2016/6993

Kerala Raj bhavan - Urgent maintenance in Secretary quarters 32 Work completed

and maintenance lakhs 18 days 18

Rajbhavan work in Sabarigiri TVM/2016-

room toilet etc. 2059-60-053-97 Buildings dvn,TVPM Buildings D.S. Pradeesh kumar D.S. Pradeesh 14/10/2016. Rs 4.43 4.43 Rs 14/10/2016. TVM/2016/6971 dtd dtd TVM/2016/6971 Thiruvananthapuram File ID: 2016/6971 dtd 2017/2016/6971 27/10/16 Rs 4.43 lakhs 4.43 Rs 27/10/16

Kerala Rajbhavan:- Urgent repairs to 33 Work completed

Quarter No. D37. lakhs lakhs 1 month 1

Rajbhavan File ID: 2016/4465 TVM/2016- 1/10/16. Rs 1.70 Rs 1.70 1/10/16. Rs 1.69 5/10/16. 2216-05-053-97-02 Buildings dvn,TVPM Buildings TVM/2016/4465 dtd dtd TVM/2016/4465 Thiruvananthapuram 2017/2016/4465 dtd dtd 2017/2016/4465

Keral Rajbhavan- Reconstruction of compound wall adjoining the 34 To be tendered

boundaries of the lakhs 2016- 01-2017 6 months 6 Rajbhavan

church in Kerala no. G.O(Rt)

Rajbhavan. File ID: 2059-60-053-97 Buildings dvn,TVPM Buildings 1302/2016/pwd dtd dtd 1302/2016/pwd Thiruvananthapuram

2016/2407 52.20 Rs . 23/09/2016 2017/2015/2407Dated:13-

Page 58 of 93 Kerala Rajbhavan- Reconstruction of demolished 35 compound wall completed lakhs lakhs

near Manmohan days 20 Rajbhavan bungalow. File ID: TVM/2016- 2059-01-053-97 11/11/16 Rs. 5.31 5.31 Rs. 11/11/16 10/11/16. Rs. 5.31 5.31 Rs. 10/11/16.

Buildings dvn,TVPM Buildings 2016/8058 TVM/2016/8058 dtd dtd TVM/2016/8058 Thiruvananthapuram 2017/2016/8058 dtd dtd 2017/2016/8058 Nair K.Raveendran G. Kerala Rajbhavan- Internal marking of roads and providing & fixing 36 To be tendered

reflecting road lakhs 3.54 L 3.54 10 days 10

Rajbhavan studs in Rajbhavan. TVM/2016-

File ID: 2059-60-053-97 2017/2016/7776 2017/2016/7776 10/11/16. Rs. 3.54 3.54 Rs. 10/11/16. Buildings dvn,TVPM Buildings TVM/2016/7776 dtd dtd TVM/2016/7776 Thiruvananthapuram 2016/7776 Rs. 15-11-2016. dated Kerala Rajbhavan- Providing PVC water tank in various staff 37 Tendered

quarters due to lakhs 2.86 L 2.86 1 month 1

Rajbhavan scarcity of water. TVM/2016-

File ID: 2059-60-053-97 2017/2016/5502 2017/2016/5502 10/11/16. Rs. 2.87 2.87 Rs. 10/11/16. Buildings dvn,TVPM Buildings TVM/2016/5502 dtd dtd TVM/2016/5502 Thiruvananthapuram 2016/5502 Rs. 17-11-2016 dated Kerala Rajbhavan:- Urgent special repairs to Work in 38 Rajbhavan

lakhs Progress Quarters No. D5 & L 2.97 Rajbhavan D20. File ID: TVM/2016- 1 month 15 days 15 month 1 2059-60-053-97 2017/2016/7333 2017/2016/7333 10/11/16. Rs. 2.97 2.97 Rs. 10/11/16.

Buildings dvn,TVPM Buildings 2016/7333 TVM/2016/7333 dtd dtd TVM/2016/7333 Thiruvananthapuram dated 15-11-2016 Rs. Rs. 15-11-2016 dated Kerala Raj bhavan - Urgent maintenance of

39 m Recreation room of Sent for AS Kerala Raj bhavan. Rajbhavan File ID: Thiruvananthapura

Buildings dvn,TVPM Buildings 2016/8106

Page 59 of 93 Kerala Rajbhavan- Providing mosquito net in the kitchen of 40 Governors Work completed

appartment in days 2 Rajbhavan Kerala Rajbhavan TVM/2016- 18-11-16 Rs.0.4 LRs.0.4 18-11-16 2059-80-053-197 Buildings dvn,TVPM Buildings

File ID: L 0.4 Rs. 18-11-2016 Thiruvananthapuram TVM/2016/8237 dated dated TVM/2016/8237 2016/8237 dated 2017/2016/8237

Kerala Rajbhavan:- Urgent repairs to 41 To be tendered

Quarter No. C10. lakhs 2.80 lakhs 2.80 Rajbhavan File ID: 2016/7611 .TVM/2016- 2059-80-053-97 TVM/2016/7611 TVM/2016/7611 d:20-01-2017. 2.80 2.80 d:20-01-2017. Buildings dvn,TVPM Buildings Thiruvananthapuram Dated:19-01-2017. Rs. Dated:19-01-2017. 2017/2016/7611Date Kerala Raj bhavan - providing pandal inconnection with the swaering 42 Work completed ceremony of

Rajbhavan Honourable Minister M.M.Mani. Buildings dvn,TVPM Buildings Thiruvananthapuram File ID: 2016/8361 8443-00-108-Pwdeposit

Kerala Rajbhavan- Air conditioning of Work not started Rajbhavan due to delay in 43

auditorium(civil L 10 electrical 2016- 1 month 1

Rajbhavan work). File ID: tendering

2016/2370 2059-80-053-97 TVM/2016/2370 TVM/2016/2370 2017/2016/2370 2017/2016/2370 dated 25-05-16. Rs. 25-05-16. dated Buildings dvn,TVPM Buildings D.S. Pradeesh kumar D.S. Pradeesh dated 9-5-16 Rs. 10 L 10 Rs. 9-5-16 dated Thiruvananthapuram

Kerala Raj bhavan- Urgent special repairs in D9 44 quarter and repairs Sent for AS to roofing of D10 Rajbhavan quarter.

Buildings dvn,TVPM Buildings File ID: 2016/6992 Thiruvananthapuram

Page 60 of 93 KRB-Urgent repairs to quarter

45 m Sent for AS nos. C2 and C3.File

Rajbhavan ID: 2016/8178 2059-80-053-97 Thiruvananthapura Buildings dvn,TVPM Buildings

Kerala Rajbhavan:- Special repairs in

46 m Sent for AS Quarter No.C12.

Rajbhavan File ID:2016/8694 Thiruvananthapura Buildings dvn,TVPM Buildings Kerala Raj bhavan - Construction of new toilet near Dobby quarters 47 ,maintenance of Sent for AS toilet D45 and

Rajbhavan renovation of toilets near Buildings dvn,TVPM Buildings Thiruvananthapuram dispensary. File ID:2016/8172 Kerala Rajbhavan :- Urgent special repairs to 48 Rajbhavan Work completed lakhs 2.99 L 2.99

Quarters No. D33& month 1 G. Suresh G. Rajbhavan D34. File ID: TVM/2016- 2059-60-053-97 TVM/2016/7578 TVM/2016/7578 2017/2016/7578 2017/2016/7578 dated 15-11-16. Rs. 15-11-16. dated

Buildings dvn,TVPM Buildings 2016/7578 Thiruvananthapuram dtd:10-11-2016. Rs. 3 3 Rs. dtd:10-11-2016. CLIFF HOUSE NON PLAN 49 PWD

TME to the Main Building of G.V Raja 50 Work completed Sports School, 14, dt: dt: 14, 2016295 3 months 3

Mylam, Tvm 28.06.2016 38/EE/2016- C K Surendran KC

Page 61 of 93 TME to the Boys Hostel in G.V Raja 51 Work completed Sports School, 14, dt: dt: 14, 1525000 2 months 2 Vidhu S T S Vidhu

Mylam, Tvm 20.06.2016 31/EE/2016-

TME to the Girls Hostel in G.V Raja 52 Work completed Sports School, 14, dt: dt: 14, 1200000 2 months 2 Vidhu S T S Vidhu

Mylam, Tvm 20.06.2016 30/EE/2016- VIKAS BHAVAN DEPOSIT WORK Construction of two floors above the existing building for Meter Testing and Standard Laboratory for providing additional testing facilities for the newly procured 53 test equipments 1 Year 1 A.Hashim and instruments- lakhs 170 2.17 Crores 2.17 Buildings, Tvm Buildings, Setting up of Solar 1,30,07,472.52 1,30,07,472.52 Testing facility, Quality Control Deposit 8443-00-108-PW Testing facility and consultancy Wing and Accident 2016-2017/2015/1164Dated:29-08-2016 Prevention Monitoring Centre

etc - Dept. power of 29-09-15 dt: No.245/2015/PD, (Rt) GO

Page 62 of 93 Higher Education (G) Dept. - Technical - Construction of Lab Block for Civil Engineering 54 Department in site 1.25 Lakhs 1.25

Government 31.08.2017 1.25 Crores 1.25 9,663,839.83 9,663,839.83 9,663,839.83 Buildings, Tvm Buildings,

Engineering 2202-02-105-96 D Devanesan Nadar Devanesan D Technical Education Technical

College, Barton Hill, Crores 1.25 - 03.08.15 Thiruvananthapura G.O(Rt)No.1896/15/H.Edn., dt: dt: G.O(Rt)No.1896/15/H.Edn., 40/SEBSC/2016-17, dt: 07.10.16 dt: 40/SEBSC/2016-17,

m 29.8.16 dt: E-13/SESCBL/2016-17, 2016-2017/2015/471, dt: 27.8.16 - 27.8.16 dt: 2016-2017/2015/471, 9 months from date of handing over over handing of date from months 9

Excise Department - Modernization - Setting up of 55 office,cubicles 1544 Excise system in Excise 50 Lakhs 50 02.07.2016 4949930.62 Head Quarters, 42.02.491.00 Buildings, Tvm Buildings, Tvpm ER below 15.1% Thiruvananthapuram 4 months from date of agreement of date from months 4 176/EE/2015-2016, dt: 03.03.2016 dt: 176/EE/2015-2016, G.O(Rt)No.500/15/TD, dt: 07.07.15 & Order No. Order & 07.07.15 dt: G.O(Rt)No.500/15/TD, 2039-00-001-94-Modernisation of Excise Department-34- of 2039-00-001-94-Modernisation President ,Azhicode Labour Contract Co-op Society, Ltd No Ltd Society, Co-op Contract Labour ,Azhicode President XG1A/18627/13, dt: 13.7.15 of the Excise Comsnr - 50 Lakhs - 50 Excise Comsnr the of 13.7.15 dt: XG1A/18627/13,

Land use board Vikas Bhavan- Providing 56 conference hall 8443-00-108- 941419.53 941419.53

over newly 29.08.2016 TVM/2016- Sanal kumar Sanal Order. No. T- No. Order. 12,49,495.25 dt:05-10-2016 Buildings, Tvm Buildings, constructed block. 1004/16/L.U.B 2017/2016/5445, 2017/2016/5445, Thiruvananthapuram

Page 63 of 93 Construction of the second floor to the existing building for class rooms 57 and balance works 6months to First floor at lakhs 50 5001899.42 Kazhakuttam dt.14.06.2016 Buildings, Tvm Buildings, Sajih salahudeen Sajih

Govt. ITI (W) dt.28.12.2015 BR Technical Education Technical Kazhakkuttam 2016-2017/2016/2481 2016-2017/2016/2481 GO(Rt)No.1754/2015/L 8443-00-108-PWdeposit RAJ BHAVAN DEPOSIT NIL CLIFF HOUSE DEPOSIT NIL VIKAS BHAVAN MP LAD

2014-15 Work proposed by Shri.KN Balagopal MP (RS) .Construction of building and provision of 58 facilities for setting up of a centre for 4 months 4 24,96,587- 24,96,587- 2496587.24 2496587.24 Kazhakuttam the latin American Nizarudeen.H Buildings, Tvm Buildings, Studies at the keral

University Campus, 08.06.16 dt: 2015/1750, Karyavattam, Collector) (District MLA-MP Thiruvananthapura m 333/2015/DPO/TVPM/MPLADS/14-15 Progress Report for the month of Janury 2017 under Buildings Sub Divion,Thiruvananthapuram

Re NAME OF Present stage mar

PROJECT year Sl.No.

Division ks TSNo.Date & Amount ASNo.Date & Amount S.H.O S.H.O Date Department Actual Actual DOC AgreedPAC Estimte PACEstimte Dateoftender ExtendedDOC LAConstituency Headof Account Estimateamount Physical Progress Physical Tenderpercentage Name ofcontractor AgreementNo. & date D.O.C peragreement D.O.C as Budget provision in lakhs Budget in provision Budgetpage No./Item No. Amount upto required financial Period Period months ofcompletionin StagesofElectrification Expenditure upto monthcurrent

Page 64 of 93 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Construction of class rooms for 1 60%

TVM HSS Ayiroopara Gen. Edn Gen. 12 months Jalaludeen (NABARD) :23300000 23300000.00 Nedumangad 2262785lakhs Amt 10-2015 4202-01-202-90 Work not started notWork n dtd16/03/2015 Amt: GO(RT)1014/2015/Gl.E 3rd floor roof completed floor roof 3rd 1556/2015-2016 21- dtd:

Construction of school building 2 40% lakhs

TVM at HS Gen. Edn Gen. GO Rt No GO

Ayiroopara GO(Rt) No. Kumar Anil Nedumangad 1900000lakhs first floor lintel & lintel floorfirst sunshade completedsunshade 07/3/2013 for Rs. 182 07/3/2013 Rs. for 1115/2013/G. Edn dtd: 1115/2013/G.

Construction of girls higher 3 10%

TVM secondary school 6980889 Gen. Edn Gen. completed

Peroorkada 21/12/2015 Vattiyoorkavu K Shanavas A 6980889lakhs 25/09/2014 for Rs. 25/09/2014 Rs. for 11 footings partially partially 11 footings 127/EE/ 2015-16 dtd 127/EE/ 110/EEE 2014-15 110/EEE dtd

Page 65 of 93 Construction of 4 childrens theatre work 70% TVM Balabhavan Vattiyoorkavu Cultural affairs Cultural 14811476lakhs Meridian Cnstrn Thermal insulation work completed insulation Thermal Thermal insulationcompleted. Thermal 13/SEBSC/13-14 dtd 28/05/201313/SEBSC/13-14dtd GO Rt. No. 142/2013 CAD dtd. 20/03/2013 CAD dtd. 142/2013 No. Rt. GO A/C electrical duct pending. wing of work Could ceiling false after do only

Construction of Bldg for psychiatric ward 5 board

TVM (male) at MHC, Peroorkada, Vattiyoorkavu TVM Health & family Dept. family Health & soil investigationcompleted soil awaiting structural design from DRIQ design structural awaiting

Page 66 of 93 Providing and fixing Barricade 6 60%

TVM for tiger

enclosure completed. TVM/2015- Vattiyoorkavu 2800000lakhs Kollam SocietyKollam Museum & Zoo &Museum for Rs. 2800000 Rs. for No.MZ(F) 777/2014 No.MZ(F) 8443-00-108-PWdeposit Bottom concreting of barricade of concretingBottom 2016/2015/4182Dated:20-02-2016 Dated:22-07-2015 for Rs. 2800000 Dated:22-07-2015 Rs. for

Construction of 7 vehicle shed at 40% TVM PWD 2016- 3 lakhs 202780

Harihar Nagar 1 month 270373.91 22/08/2016 Vattiyoorkavu work completed work TVM/2015/5772 2216-05-053-97-02 Muraleedharan Nair Muraleedharan 2016 for Rs. 300000 Rs. 2016 for 2017/2015/5772Dated:11-08- Dated:25-06-2016 for 300000Dated:25-06-2016 for

Construction of NDPS godown 8 70%

TVM building at SAP 2016- 12 lakhs camp 6 months Vattiyoorkavu structure completed. structure 2016 for Rs. 121500 Rs. 2016 for Deepu RadhakrishnanDeepu 8443-00-108-Pwdeposit 12-11-2015 Rs.1215000 for GO(Rt)No. 2895/2015 GO(Rt)No. dated 2017/2016/1458Dated:23-06- tile work and painting pending and painting work tile

Page 67 of 93 Urgent repair and maintenance 9

TVM of sports men 100% Suresh 1950000 4 Months 4

barrack at SAP lakhs 19.50 Vattiyoorkavu work completed work 2059-60-051-89 site handed over handedsite 2015 for Rs. 1950000 Rs. 2015 for Dated:23-06-2016 for Rs. Dated:23-06-2016 Rs. for TVM/2016-2017/2016/3432 GO(Rt) No. 3013/2015Dtd:26-11-No. GO(Rt)

Construction of hatch room in 10 Poultry farm - 60% TVM 10.60%

Kudappanakunn 2400000 2145600 03-10-16 6 months stand still stand 2399999.51 TVM/2015-

Vattiyoorkavu u for Rs. 2399999 Rs. for Animal husbandryAnimal plastering completed plastering Santhosh SivanandanSanthosh 2015 for Rs. 2400000 Rs. 2015 for 8443-00-108-PWdeposit 2016/2015/4125Dated:25-02-2016 GO Rt No 108/2015/AD 20-01- Rt Nodtd: GO

Closing leakages in main building, 11 work shop,textile 60% TVM 20 days techology Vijayan 09-03-16 Vattiyoorkavu

Technical. Edn Technical. buildng, etc. work completed work

Page 68 of 93 Urgent maintenance and renovation works to GO quarter 12

TVM PWD No. 5 official 3 lakhs residence of Rs.Lakhs TVM/2016- Vattiyoorkavu for Rs. 3 Lakhs 3 Rs. for Suresh kumar P Suresh kumar District Judge at completed work 2216-05-053-97-02 Kowdiar 2017/2016/7233Dated:06-10-2016 TVM/2016/7233 Dated:05-10-2016

Re construction of damaged compound wall in the back yard 13 of Ward No.31 90% TVM at mental health 25-10-16 3 Months 712934.85 999909.3 L TVM/2016-

Vattiyoorkavu centre, 2059-60-053-97 TVM/2016/6882 for Rs. 999909.30 Rs. for

Peroorkada, Nair Muraleedharan Health & family Dept. family& Health TVM almost completed work Dated:25-09-2016 1000000 Dated:25-09-2016 2017/2016/6882Dated:01-10-2016

Re construction of damaged compound wall behind the men 14 rehabilitation TVM

ward at mental 1 month stand still stand not started not 761652.48 761652.48 25/10/2016 TVM/2016-

Vattiyoorkavu health centre, C K Sureendran K C 2059-60-053-97 Peroorkada, 999909.30 Rs. for Health & family Dept. family& Health TVM TVM/2016/7035Rs.1000000 for 2017/2016/7035Dated:06-10-2016

Page 69 of 93 Construction of ladies waiting 15 centre at 75% TVM concrete 1937969 1047215 1413740 Kudappanakkun slab roof 08-12-15 5 months completed 35% above

Vattiyoorkavu nu Sasidharan Nair Sasidharan Animal husbandryAnimal Central polytechnic 16 welcome TVM maintenance completed work almost work Vattiyoorkavu

Technical. Edn Technical. quarter no.c4 299624.6 lakhs 90% completed M. SureshKumar M.

Central polytechnic urgent closing 17 leakages of roof 80% TVM

and clearing Vijayan TVM/2016- Vattiyoorkavu for Rs. 299295 Rs. for

Technical. Edn Technical. toilet facilities 2059-60-053-97 299295.64 lakhs work in progressinwork etc. C3, E3, E8 299295.64 Rs. for 2017/2016/7530Dated:26-10-2016 TVM/2016/7530Dated:24-10-2016 NGO experimental quarters no. 1 in 18

TVM PWD Harihar Nagar- urgent welcome 299351 work started work Vattiyoorkavu

maintenance SureshKumar M.

Page 70 of 93 Urgent repairs and maintenance 19 50%

TVM work of annex 12 lakhs building of PHQ 3 Months TVM/2016- for 1420000for Police Dept. Police Vattiyoorkavu Krishna kumarKrishna work in progressinwork 8443-00-108-Pwdeposit Order.No J1-83786/2015/PHQOrder.No Dated:11-03-2016 for 1420000Dated:11-03-2016 for 2017/2016/4798Dated:14-07-2016

Renovation work of shed no. 53- 64 in the farm 20

TVM RPF 2016- 2050000 09-01-16 5 months

Kudappanakunn 2049944.69 1640183.03 Vattiyoorkavu work not started notwork

u SureshKumar M. Animal husbandryAnimal 2016 for 2049944.00 2016 for Dated:04-03-2016 for 8443-00-108-Pwdeposit GO(Rt)No.94/2016/AHD 2017/2015/2056Dated:13-07-

Regional Poultry Farm, Kudappanakunn 21

TVM u- Repair works 6 months 1124515.5 28/06/2016

of shed no. 40- 1499353.68 TVM/2015- work started work Vattiyoorkavu 43 4403-102-96(P) Animal husbandryAnimal for Rs.1499354.00 for Deepu RadhakrishnanDeepu GO (Rt) No(Rt) 1908/2015/ADGO Dated:17-11-2015 Rs.1500000 for 2016/2015/6105Dated:29-02-2016

Page 71 of 93 Asset maintenance and 22 renovation of TVM various buildings

Vattiyoorkavu at MHC 1 crore 75 lakhs 75lakhs crore 1 Waiting for tender for Waiting Health & family Dept. family& Health

DLF Kudappanakunn u- Internal road 23 retarring, TVM

providing 20mm 2184858 1937969 6 months S. Santhosh S. TVM/2015- for 2184857for Vattiyoorkavu chipping carpet below 10.60% work not started notwork 2184857.74 lakhs 2184857.74 Animal husbandryAnimal

over B.T surface M2-20324/2015/Plg 8443-00-108-Pwdeposit Dated:12-08-2015 for 2185000Dated:12-08-2015 for 2016/2015/4954Dated:25-02-2016

Renovation and maintenance of the Govt. homeo 24 50% 2016

TVM dispensary Health 690987 1 month 898588.94

building at 25/10/2016 TVM/2016- Kazhakootam work in progressinwork

Attipra. 5114/P2/2015/DH 8443-00-108-Pwdeposit brick work completed brick Dated:04-03-2016 900000 Dated:04-03-2016 2017/2016/5589Dated:06-10- Unemployed labour contract society contract labour Unemployed

Page 72 of 93 Construction of open auditorium and providing 25 floor tiles in TVM officer 1 monh

ASM hall, 2999340 2999340 2360481 02-08-16 P . Gireesan . P 21.3% below 21.3% Vattiyoorkavu

Cultural affairs Cultural Jawahar Balabhavan plan to be approved by executive be by approved plan to

Construction of a 26 school building TVM TVM at Pettah school Gen. Edn Gen. authorities 12 Months 12 6500000lakhs Suresh Kumar P Suresh Kumar 2016 for 6500000 2016 for Work not started yet started notWork GO(Rt) Edn No.569/2016/G Dated:11-02-2016 for 6500000Dated:11-02-2016 for site is not handed over by school by school over handed not is site 4202-01-800-88-Project LAC- Under TVM/2015-2016/2015/5864Dated:25-02-

Page 73 of 93 LAC-ADS- Aswas public 27 amenity centre- TVM MLA sappling

yathree bhavan Praveen Vattiyoorkavu Peroorkada 2545066lakhs Work not started yet started notWork Awaiting permission from social forestry to replant the replant to forestry social from permission Awaiting

Construction of school building 28 over

TVM for Govt, high 40 lakhs Gen. Edn Gen. school, Kachani Vattiyoorkavu site to be handed be to site Work not started yet started notWork

Asset Development Scheme LAC ADS Kazhakootam 29 LAC TVM Construction of received 55.5lakhs 55.5lakhs Taxes Dept. Taxes Rs.55.5 lakhs Rs.55.5 Kazhakootam new building for SubRegistrar Office 49/EE/2013-14 dtd3/9/201349/EE/2013-14 22/1/2015dtd139/EE/14-15 Kazhakuttam completed bldg of First phase Elecrtical works at 1st phase bldg not yet yet not bldg phase1st at Elecrtical works GO(Rt)No.228/2013/TD15/3/2013for

Page 74 of 93 Maintenance and renovation works 30 to PWD roads 50% TVM TVM PWD

division campus, Vijayan PMG, TVM Work in progressin Work

Construction of new building for 31 Male forensic TVM TVM

ward in MHC, structure completed 126 Lakhs 26/SEBSC GO(Rt)No. Vattiyoorkavu

Tvm 1/8/06 dt. WD. 2297/2006/H&F

Fire Force quarters, Chackai; - construction of 32

TVM manhole, soak 1 month pit and providing 24-10-16 TVM/2016- 671575.95 L for Rs. 828750 Rs. for 2059-60-053-97 started notwork 824546.03 Lakhs

new drainage 824546.03 Rs. for line Labour Janakeeya TVM Jilla 2017/2016/5087Dated:30-09-2016 TVM/2016/5087 Dated:25-09-2016

Govt Press Manannthala- 33 Construction of TVM

retaining wall tendered completed work to be to work soil investigationsoil

Page 75 of 93 Construction of compound wall around old age 34

TVM home,Pulayanark

otta 6Months TVM/2015- 29965000.01 4235-60-800-98 for Rs. 29965000 Rs. for GO(Rt).No. 507/2014/SJD GO(Rt).No. soil investigationcompleted soil Dated:08-08-2014 for 29965000 Dated:08-08-2014 for 2016/2015/2138Dated:25-02-2016 awaiting structural design from DRIQ board design structural awaiting Central Polytechnic College Vattiyoorkavu 35 _Renovation and 50% TVM Extension of the Gen. Edn Gen.

Vattiyoorkavu Boys Toilet and Modification of SureshKumar M.

Gents Toilet. lintel completed uptoWork

Urgent closing 36 leakages of work started ### TVM

garden office 20 lakhs Vattiyoorkavu Museum & Zoo &Museum Construction of a Structure multistoried finished, block building with 4

03-05-16 work class rooms, head progressing master and 37 teachers rooms ###

TVM TVM attached to 160 160 lakhs Gen. Edn Gen. Government UP School and M/s Heather Infrastructure Heather M/s Nursery schiool, Chali 84/SEBSC/2015-16 10/2/16dated G.O (Rt) no 3059/2014/Gen Edn 3059/2014/Gen no (Rt) G.O ORDERNo./2015- 2016/2015/183Dated:07-07-2015

Page 76 of 93 Construction of GF column work building for Chalai in progress

Govt. Tamil H.S.S, 15-04-16 14-04-17 20181259 38 Tvpm months 12 ### TVM TVM 207 207 lakhs Gen. Edn Gen. dated 27/11/2015 dated 49/SEBSC/2015-16 G.O (Rt) no (Rt) G.O Edn 152/2015/Gl 13.1.2015 dated ORDER No.TVM/2015- 2016/2015/787Dated: 07-07-2015 Construction of Ground floor infertility clinic at column works

W & C Hospital, 18-08-15 17-02-17 in progress. A 35542979 39 Thycaud, Tvm. months 18 KSEB post to be ### TVM TVM shifted 375 375 lakhs dated 11/08/2015 dated 20/SEBSC/2015-16 Health & family Dept. family& Health Construction of FF Column work building for in progress

Health & Family 09-05-16 08-05-17 31288851 40 welfare Trtaining months 12 ### TVM TVM Institute at 350 350 lakhs dated 08/02/2016 dated

Thycaud, Tvpm 81/SEBSC/2015-16 Health & family Dept. family& Health G.O (Rt)No (Rt)No G.O 3823/2013/H&FWD Construction of Work

kitchen block and dated completed, 2860189

class rooms for 30-05-16 29-12-16 41 7 months 21/05/2016 TVM TVM Ambalathara U.P. 30 lakhs 30 Gen. Edn Gen.

School 10/EE/2016-17

Construction of Cutting building for permission from Nemom Govt. U.P. Social forestry 12403995 11383146 10 months 10

School. 19/05/2016 obtained, Local 8.23%below 42 authority to TVM TVM

dated 08/07/2014 dated auction the tree 130 130 lakhs Gen. Edn Gen. 4/SEBSC/2016-17 dated G.O Ms 2705/2014/Gen G.OMs Edn

Page 77 of 93 Construction of Tendered, Multistoried Agreement to

Nemom building for be executed, 43 Commissioner for Building and tre TVM

Food & Safety, 100lakhs to be Thycaud, demolished

Trivandrum no (Rt) G.O & FWD 1961/2015/h ORDERNo.TVM/2015- 2016/2016/1971Dated:0 3-03-2016 MLA- ADF- Foundation Nemom works in 2704031

Constituency- 13-10-16 12-03-17 progress, workk 5 5 months

Construction of 03/10/2016 is halted due to 44 new building for changed TVM TVM Govt High School, demand from Gen. Edn Gen.

Vazhamuttam, dated 89/EE/2016-17 school PTA

Trivandrum T . Nair mohanan Vijaya

Urgent Weorks for Work near setting up of GST completion, Bill 18 days 18 Nemom K. Rajan K.

software at Tax 1407240 under 45

TVM Towers , preparation

Karamana, 74/EE/2016-17

Trivandrum 07/09/2016 dated Construction of Work Sidha Hospital , at Completed.

Enchakkal, 28-06-16

46 Triandrum Phase- 26/11/2015 TVM TVM 1 Das0 Vanamali 10/EE/2016-16 dated 10/EE/2016-16 Health & family Dept. family& Health Construction of FF Column First Floor in works in 8163087

newly constructed 03-10-16 02-04-17 progress, half 6 6 months

OP/IP block for 06/09/2016 portion slab 47

TVM TVM male and female casted ward at 73/EE/16-17 dated 73/EE/16-17 Health Dept. Health Poonthura CHC G.O (rt No (rt G.O dated 2616/2015/H&FWD 12.08.2015 ORDERNo./2016- 2017/2016/620Dated:14-06- 2016

Page 78 of 93 Renovation of Tendered, D Fisheries e Agreement to

48 fisheries Inspector office at p be executed

TVM TVM West Fort , o s Trivandrum

i t ORDERNo./2016- 2017/2015/4768D ated:23-08-2016 Construction of grade beam Sidha Hospital - works startyed Phase- 2 Ground 49 floor Structural TVM TVM works DD no 592497 dtd dtd DD592497 no 26/10/2015 ORDER No.TVM/2016- 2017/2016/6078Dated :23-08-2016 Govt Arts College- Work in Developmental progress, activities- Roofing works Providing G.I done, Column sheet roof over works of bridge

50 Education Higher commerce block, in progress, ### TVM TVM

constructing Foot lakhs 75 over bridge etc G.O 9rt) no 604/2016/H edn dated dated edn 604/2016/H no 9rt) G.O 29.02.2016 ORDERNo.TVM/2015- 2016/2016/509Dated:03-03-2016 Higher Education - Work nearing Developmental completion activities of Govt Arts College in 51 ###

TVM TVM connection with 75 lakhs 75 Higher Education Higher NAAC visit G.O no 4033/2015/H.Edn 4033/2015/H.Edn no G.O 05/12/2014 dated ORDERNo.TVM/2015- 2016/2016/309Dated:21-01- 2016 Secretariat- Work nearing gad Construction of completion semi permanent 52 roof over North TVM TVM

Sandwich block lakhs 72 and allied works G.O (Rt) No (Rt) G.O dted 1989/2015/gad 19/3/2015 ORDERNo.TVM/2015- 2016/2015/850Dated:02- 05-2015

Page 79 of 93 Construction of Power of building for Attorney Nemom 9843526

Karamana Govt. 01-11-16 executed by 10827879

53 months 12 G.H.S.S 10%Above M/s Heather TVM gen education gen 100 lakhs 131/EE/2015-16 dated 27/12/2015. dated G.O (Rt) no (Rt) G.O 4780/13/G.Edn. 12.11.2013 dated ORDERNo./2015- 2016/2013_2014_32 3Dated:10-04-2015 Govt Poly Technic- Work Tendered Kaimanam-

Nemom Construction of passage between 54 Electronica and Technic education Technic TVM computer blockl 17.5 lakhs 17.5 D4/14147/16/DTE dtd 08/05/2016 dtd D4/14147/16/DTE ORDERNo.TVM/2016- 2017/2016/2830Dated:27-12-2016 Secretariat- Work tendered gad Renovation of Chief ministers 55 computer cell at TVM TVM

4th floor of lakhs 5.68 Secretariat G.o ( Rt ) no )no Rt ( G.o dtd 7284/2016/GAD 18/11/2016 ORDER No.TVM/2016- 2017/2016/7970Dated :01-12-2016 Renovation of Work tendered jail Attakulangara jail ORDER olfd building and No.TVM/20 56 16-

TVM TVM finishing works of 2017/2016/ new building 5790Dated: 05-12-2016 34.8 lakhs 34.8 ORDER No.TVM/2016/5790 Dated:25-09-2016

Page 80 of 93 Home Department- Prisons- Annual Plan 2015- 16- Modernisation of Prisons- Kitchen Modernisation in 57 TVPM TVM Central Prison and Correctional Home, TVM/2016- Thiruvananthapur GO(Rt) No. 2017/2016 32/SEBS Home department- Prisons Homedepartment- am. 1001/2016/ /1637 dt C/16-17 Foundation PCC Home dt 15-07- dt work

4059-60-051-74(P) 17.03.16 2016 09.09.16 das Vanamali 12462663 11295948 08.07.2017 month 10 completed. 1% General Education (SC) Department - Higher Secondary Education- Annual Plan 2014-15- Infrastructure Development of Government Higher Secondary Schools (Works) - Government Girls Higher Secondary 58 School Pattom, TVPM TVM Thiruvananthapur am- Construction Hind GeneralEducation of School Building renc (Additional floors e and Extension). free site not TVM/2015- hand GO (Rt) No. 2016/2015 03/SEBS ed 152/2015/G /6208 dt C/16-17 over l. Edn dt 01-02- dt work not to

4202-01-202-91 13.01.15 2016 19.05.16 das Vanamali 19160472 17117966 month 12 started 0% PWD

Page 81 of 93 Construction of a new Building for Government TVM/2015- 59 Women's GO (Rt) No 2016/2015 80/SEBS TVM TVPM college,Thiruvanth 53/2014/H. /1544 dt C/ 15-16 Stan apuram Edn dt 01-12- dt Earth work for d Higher Education Higher

4202-01-203-85 09.01.14 2015 03.02.16 J.Nizar 32863244 29576920 02.02.2017 12month footing started 1% still Social Justice Department- Construction of Toilet and Bath room in Asha 60 TVPM TVM Bhavan for Women at GO (Rt) No. TVM/2015- Poojappura, 313/2014/S 2016/2016 25/EE/1 Pinting and Thiruvananthapur JD dt 06-05- /1952 dt 6-17 dt flooring work Social Justice Department SocialJustice

am. 4235-60-800-98 14 03-03-16 13.06.16 C.V.Sujith 719944 646718 2month pending 90% Construction of No Building for t Health Clinic in sta Social Welfare rte 61 Complex at d TVM TVM Poojappura, GO(Rt) No. 72/EE/ 112/EE/ Elect Thiruvananthapur 357/2013/T 2014-15 dt 2015-16 rical am VPM dtd 9- 10-07- dt 02-12- Civil Work pend Social Justice Department Social Justice

4235-60-800-98 07-2013 2014 15 Biju 4086082 5155818 01.06.2016 completed 100% ing Social Justice No Department- t Construction of sta new building and rte painting works of d old building at 62

TVM TVM Special Home and Children’s Home 99 at Poojappura GO (Rt) No. /EE/15- Elect 1473/2015/ 16 dt rical Social Justice Department SocialJustice PWD dt 01- 23.01.20 Civil Work pend

4235-60-800-98(P) 10-15 15 kumar.P Suresh 5325242 7108666 month 10 completed 100% ing

Page 82 of 93 MPLADS 2014- 2015 - Construction of a school building in Govt. Girls Higher Secondary School, 63 Cotton Hill, TVM TVM

MP-LAD Vazhuthacaud, Thiruvananthapur 539/2014/D am. PO/TVPM/ TVM/2015- work MPLADS/AK 2016/2015 92/EE/1 in A/14-15 dt /5951 dt 6-17 dt first floor roof prog

MLA - MP (District Collector) (District -MLAMP 16-01-16 20-01-16 03.10.16 Kumar Sasi A. 9599667 8578262 8 month slab casted. 40% ress MLA- ADS- Construction of new building for Govt Vocational Higher secondary 64

TVPM school, PMG, Thiruvananthapur GO(Rt)1816 Pile work work

GeneralEducation am. /13/GEdn. 103/EE/14- 145/EE/ completed. Pile in Dt 15 dt 18- 15-16 dt cap work in prog

4202-01-202-99 29/04/13 08-2014 29.01.16 das Chandra 7547980 10309786 8 month progress 40% ress Conservation of Central Stamp Depot - Urgent Special Repairs and Renovation works to the 65 TVPM TVM Heritage Building of Central Stamp TVM/2015- Depot at Thycard, Go.(Rt) 2016/2015 Guard room, Revenue Revenue Department Trivandrum No.2888/15 /3272 dt 02/EE/1 external toilets /RD dt 15-01- 6-17 dt works etc in

2029-00-800-77(P) 04/06/15 2016 28.04.16 Kumar Anil S.K. 9999857 7869887 month 12 progress 15%

Page 83 of 93 Construction of new building for Hind Govt. Pre-primary renc Teachers Training e Institute and free Nursery school, site 66 not TVM TVPM Cotton Hill, Thiruvananthapur TVM/2015- hand am. GO(Rt) 2016/2015 ed No.387/201 /5997 dt over

General Education Department GeneralEducation 6/G Edn dt 15-02- work not to

4202-01-800-88 30.01.16 2016 Praveen 4319371 month 10 started 0% PWD Construction of a compound wall and building for Govt UPS, 67 Nemom, TVM/2015- TVPM nemom

General Education GeneralEducation Thiruvananthapur G.O (Rt) no 2016/2015 129/EE/ Structure am 420/2015/P /4098 dt 15-16 dt completed. WD dt 03-10- 28.12.20 Solid block work

5054-01-337-98-of Devp 18.03.15 2015 15 Sajeer 5279845 5279845 6 month in progress 60% Construction of Retaining wall to the rear side of VTC and Nirbhaya 68 Shelter Home at TVM/2015- TVPM TVPM Poojappara, GO(Rt) No 2016/2015 work Thiruvanthapura 383/2015/S /3271 dt 151/EE/ anjili trees to be in m JD dt 11-12- 15-16 dt cut and prog Social Justice Department SocialJustice

4235-60-800-98 18.06.15 2015 10.02.16 Asokkumar T. 4659972 4161355 6month removed 70% ress

Page 84 of 93 Govt Law College, Trivandrum - Ladies Hostel renovation, Road taring, Water storage 69 construction, TVPM Staircase and Grill work, Ramp for TVM/2015- disabled (Deposit 2016/2015 work work). B719/2015- /4291 st 13/EE/1 Flooring in stan Higher Education Department Education Higher 16/GLC dt 15-01- 6-17 dt hostel rooms d

2202-03-103-92-33(L) 01.09.15 2016 30.05.16 S.Santhosh 3559612 3022111 4 Month completed. 30% still Asset maintenance :- University College Trivandrum. :- Renovation to 70 Economics block , Pay TVPM TVPM Mathematics men block , Cow shed GO(Rt) t to and Geology block No.2203/20 Estimate under be 16/H Edn dt preperation for depo Higher Education Department Education Higher

2202-03-103-70(NP) 19.08.16 TS sited

Estia mte Government for 71 Guest House, TS

TVPM TVPM Thiruvananthapur unde am- Urgent repair GO(Rt) No. r

Tourism department Tourism and renovation 347/2016/T prep works to Guest SM dt arati House building. 20.10.16 on.

Page 85 of 93 University college- No Construction of a t building for Ladies 127/EE/ structure sta work 72 B3/2916/20 109/EE/13- 14-15 dt completed. in TVPM TVPM amenity center rte 12 dt 14 dt 08.12.20 Finishing work d prog Higher Education Higher

2202-03-103-69- 27.02.13 15.01.14 14 Meridian M/s 4589938 5467534 6 month in progress 75% ress University college- No Construction of t new building by sta the side of the rte Botanical Garden d 73 in University TVPM TVPM College, Thiruvananthapur Order.No 41/SEBSC/ 11/SEBS structure work Higher Education Higher am B3/2916/12- 2013-14 dt C/2014- completed. in 13/UC dt 25-12- 15 dt 02- Finishing work prog

4202-01-203-99 27-02-2013 2013 07-2014 Meridian M/s 11816259 13458719 8month in progress 75% ress DHS- Renovation No works at the office t of the Director of sta Inter Health Service rte ior d draw 74 ing is

TVPM TVPM to be 13/SEBS finali C/16- 17 Dismantling and zed

Health service department service Health dt plastering of FF by

24.05.16 kumar Anil S.K. 15295621 12618887 9month hall completed 5% DHS Renovation and rectification of existing Dismantling temporary roof TVM/2015/ completed. RCC 75 4713 & TVM/2015- beam casted work TVPM TVPM and truss work at DHS, TVM/2015/ 2016/2016 44/EE/1 and column in Thiruvananthapur 4714 dt /683 dt 17- 6-17 dt work in prog Health & FamilyWelfare & Health

am. 4059-60-051-86 16.11.15 02-2016 04.07.16 P.Mohan 5499958 4779463 6month progress. 20% ress

Page 86 of 93 College of Fine Arts, Thiruvananthapur TVM/2015- 76 am- Construction GO (Rt) No. 2016/2015 Existing building work TVPM TVPM of First year class 2225/2015/ /6115 dt 14/EE/1 dismantled. stan room. H.Edn dt 25-01- 6-17 dt Yard levelling d Higher education Higher

4202-04-101-99 26.08.15 2016 30.05.16 S.Santhosh 8276548 7639254 month 12 completed 5% still Pareeksha Bhavan, Poojappura- Construction of TVM/2016- 77 1.50 lakhs liter 2017/2016 work started, TVPM capacity sump and GO(Rt) No. /7636 dt 70/EE/1 shutters

GeneralEducation pannel board 984/13 dt 29-10- 6-17 dt provided for

room 2059-60-053-97 28.02.13 2016 31.08.16 Suresh V. 2388476 2728594 5month electric room General Hospital, Thiruvananthapur am- Renovation and maintenance works to Physical 78 TVM/2016- TVPM and Rehabilitation unit building. GO(Rt) No 2017/2016 Agt

Health & FamilyWelfare & Health 111/2016/H /6400 dt to be FW dept dt 06-09- exec

2210-80-800-83(NP) 08.01.16 2016 P.Mohan 1570974 6month 0% uted No t Government sta School of Nursing, rte Thiruvananthapur d 79 am- Construction

TVPM TVPM of Additional TVPM/201 Floor (1stFloor) GO(Rt) No. 5-16/15/ 153 above Auditorium 536/15/H 1111 dt /EE/15-

Health service department service Health Building &FWD dt 27.05.201 16 dt Finishing work

05.02.15 5 11.02.16 kumar P.Anil 2948953 3407220 6month in progress 90%

Page 87 of 93 Deaf and Dump school, Jagathy- work

80 General Maintenance of M1/41449/ 42/EE/1 stan TVPM TVPM Hostel building 2012/DPI dt 4-15 dt Partially d

2202-80-800- 08.11.12 11.06.14 Baiju 3474712 2724174 6 month completed 45% still MLA ADS under Nemom Constituency- Govt High School, Pappananmcode, Thiruvavnanthapu 81

TVPM ram- Construction Nemom of a school GO(Rt) No. building. 845/2016/G 2016- Edn 2017/2016

General Education Department GeneralEducation dt 27-02- /170 dt 08- roof truss work

4202-01-800-88 2016 06-2016 Praveen 24849519 6 month progress 35% Urgent rectification to the drainage line around quarter G TVM/2016- 82 2017/2016 TVPM TVPM type at Police quarters, Palayam TVM/2016/ /6197 dt

Homedepartment 6197 dt 22- 31-08- Work almost

2216-05-053-98 08-2016 2016 Suresh 180430 days 10 completed 95% PTC, Thiruvananthapur am- Providing water tank, TVM/2016- 83 2017/2016 work TVPM TVPM leakage rectification and TVM/2016/ /5427 dt 130/BS/ in

Homedepartment connected works. 5427 dt 21- 21-07- 16-17 dt prog

2059-60-053-97 07-2016 2016 27.09.16 Raveendran 180882 1month work completed 100% ress

Page 88 of 93 University college, Thiruvananthapur am- MPLAD- Work proposed by Smt. Dr.T.N. Seema, Member of 84

TVPM Parliament- Construction of a 891/15/DP 2016- work Volleyball court O/TVPM/M 2017/2016 in PLADS/2015-/913Dated good

Higher Education Department Education Higher 16 dt :25-05- prog

MP LAD MP 01.03.16 2016 R.Rajan 499509 499509 Finishing stage 80% ress Repair and rehabilitation works to the Nirbhaya Shelter 85 Home, Annex 2016- work TVPM Building, 2017/2016 in Poojappura, 751/2015/S /2104 dt 96/EE/1 good Thiruvananthapur JD dt 24-05- 6-17 dt super structure prog Social Justice Department SocialJustice

am. 4235-02-103-99 30.12.2015 2016 05.10.16 Jacob 1199689 1066227 2 month completed. 55% ress University college, Thiruvananthapur am- MPLAD-Work proposed by Smt. Dr.T.N. Seema, Member of 86

TVPM TVPM Parliament- Construction of a 891/15/DP TVM/2015- work Basket ball court O/TVPM/M 2016/2016 Fencing work in in PLADS/2015-/1958 dt 87/EE/1 progress. good

Higher Education Department Education Higher 16/TNS/52 03-03- 6-17 dt Flooring work prog

MP LAD MP dt 06.02.16 2016 01.10.16 R.Rajan 1574892 1574892 3month pending. 75% ress

Page 89 of 93 Removal of parti accumulated ally earth and repair com of side drain at TVM/2015- plete 87 2016/2015 d. TVPM TVPM Flat Type Police Quarters at TVM/2015/ /4446 dt Stan

Homedepartment Palayam , 4446 dt 31- 04-11- earth removal d

Trivandrum 2216-05-053-97-01 10-2015 2015 Baiju 199894 1 month completed 50% still Government Sanskrit College,Thiruvana nthapuram- Plan fund 2015-16- 88

TVPM TVPM NAAC CIUP- College building A4/810/15/ TVM/2015- work renovation works GSC 2016/2016 171/EE/ in CollegiateEducation (Deposit work) dt 01-10- /376 dt 17- 15-16 dt work almost prog

2202-03-103-74-34other 2015 01-2016 02.03.16 society labour Azhycode 999712 848755 2month completed 90% ress Urgent renovation works to the toilets in Pareeksha Bhavan 89 at Poojappura, TVM/2016- TVPM TVPM Thiruvananthapur TVM/2016/ 2017/2016 work am. 6579 /6579 dt in dt 29-09- 30-09- prog Education Department Education

2059-01-053-97 2016 2016 Prakash 452352 1 month work started 20% ress

Page 90 of 93 Plinth protection work, rectification of floor to boys hostel and maintenance works to Headmaster quarters at 90

TVPM TVPM Government School for the Blinds,

Education Department Education Vazhuthacadu, TVM/2016- Thiruvananthapur TVM/2016/ 2017/2016 Agt am. 7029 /7029 dt to be dt 26-09- 27-09- work just exec

2059-60-053-97 2016 2016 society labour Azhycode 198781 1month tendered 10% uted Renovation works to the office of SP, SCRB, Pattom, tend Thiruvananthapur er 91 am. TVM/2016- sanc TVPM TVPM TVM/2016/ 2017/2016 tion 4915 /4915 dt to be Homedepartment dt 22-08- 23-08- work started obtai

2059-60-053-97 2016 2016 P.Saji 54279 1month and in progress. 0% ned Tourism Pe Department- ndi Urgent repair and ng renovation works 92 to the 2016- Elect TVPM TVPM Government P7- 2017/2016 rical Guest House, 4068/2016 /2259 dt 95/EE/1 third floor and work

Tourism department Tourism Thiruvananthapur dt 06-04- 08-06- 6-17 dt GF frame work pend

am. 5452-01-800-87 2016 2016 05.10.16 Pratheesh 629963 574936 2month completed. 25% ing

Page 91 of 93 Urgent repair and rectification works to the Press building situated inside the Central 93 TVM/2015- TVPM TVPM Jail compound, Poojappura, TVM/2016/ 2016/2016 Roof work Jail department Jail Thiruvananthapur 2294 /2294 dt 03/EE/1 rectification in am. dt 15-03- 30-03- 6-17 dt almost prog

2059-60-053-97 2016 2016 29.04.16 kumar P.Anil 999855 1077544 1month completed. 40% ress Social Justice Department- Repair works and additional construction in 94 TVM/2015- store room TVPM TVPM Asha Bhavan for Women at 471/2015/S 2016/2016 brick work, work Poojappura, JD /1965 dt 97/EE/1 Drain in Thiruvananthapur dt 30-07- 03-03- 6-17 dt protection, etc prog Social Justice Department Social Justice

am. 4235-60-800-98 2015 2016 05.10.16 Jacob 1229870 1203102 3month completed. 45% ress MLA ADS- Construction of Open Air Auditorium at Govt VHSS (Deaf 95 GO(Rt) No. TVM/2015- TVPM TVPM and Dump school), Jagathy, 335/2016/G 2016/2015 work Thiruvanathapura Edn /4351 dt 102/EE/ Footing in

General Edn Department GeneralEdn m dt 27-01- 15-02- 16-17 dt concrete prog

4202-01-800-88 2016 2016 17.10.16 E Shajudeen. 999950 969951 2month completed 10% ress

Page 92 of 93 MLA-SDF- Construction (Finishing)of First Floor for Pangodu Vivekananda 96

TVM/2015- 100% TVPM TVPM Library and reading Room in NoD6/1992 2016/2015

District collector District Poojappara ward /11 /1675 dt dt 09-03- 18-09-

MLA-SDF 2014 2015 599967 work completed

Page 93 of 93