'Artech Malabar Hills'
Total Page:16
File Type:pdf, Size:1020Kb
Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode FORM-1 FOR ENVIRONMENTAL CLEARANCE FOR THE PROPOSED RESIDENTIAL BUILDING PROJECT ‘ARTECH MALABAR HILLS’ AT KASABA VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT BY PEEVEEKAY PROPERTIES AND HOTELS PVT LTD 5TH FLOOR, INDUS AVENUE, KALLAYI ROAD CALICUT Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode FORM 1 (I) Basic Information Serial Item Details Number 1. Name of the project/s Artech Malabar Hills, Residential Building Project at Kasaba Village, Kozhikode Taluk, Kozhikode District 2. S.No. in the schedule 8 (a), Category (B2) 3. Proposed Total plot area: 8277 m2 capacity/area/length/tonnage to be FSI: 3.87 handled/ command area/lease Total construction built-up area for the project: area/number of wells to be drilled 51, 688.57 m2 Coverage: 57.54 % No.of floors: G+21 floors 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. Not Applicable 6. Category of Project i.e.’A’ or ‘B’ Category (B2) 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify 9. Location Kasaba Village, Kozhikode Taluk, Kozhikode District Plot/Survey/Khasra No. Resurvey No. 105/1C, 105/1 A1 and Sy No.s 989/1, 989/1,2 Village Kasaba Tehsil Kozhikode District Kozhikode State Kerala 10. Nearest railway station/airport The nearest railway stations are Vellayil railway station at a along with distance in kms distance of 2.9 km and Kozhikode railway station at a distance of 3.8 km The nearest airport is Calicut International Airport at a distance of 28.4 km 11. Nearest Town, city, District The site is located within Kozhikode city Headquarters along with distance in kms. 12. Village Panchayats, Zilla Kasaba Village Office, Parishad., Municipal Corporation, Taluk Road, Kozhikode, Local body (complete postal Kerala, addresses with telephone nos. to 673012 be given 0495 2723920 13. Name of the applicant PEEVEEKAY Properties and Hotels Pvt Ltd 14. Registered address PEEVEEKAY Properties and Hotels Pvt Ltd 5th Floor, Indus Avenue, Kallayi Road, Calicut 15. Address for correspondence: PEEVEEKAY Properties and Hotels Pvt Ltd 5th Floor, Indus Avenue, Kallayi Road, Calicut Name Mr Viju Varghese Designation(Owner/Partner/CEO) Authorized Signatory for obtaining EC of Artech Malabar Hills Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode Address PEEVEEKAY Properties and Hotels Pvt Ltd 5th Floor, Indus Avenue, Kallayi Road, Calicut Pin Code 695014 E-mail [email protected] Telephone No. 9388189889 Fax No. -- 16. Details of Alternative Sites The site is in possession of project proponent. As per examined, if any. Location of Kozhikode City Development Plan, the site falls within these sites should be shown on a residential zone and hence no alternative site was considered toposheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not applicable approval/clearance under: if yes, details of the same and their status to be given (a)The Forest (Conservation) No Act,1980? (b) The Wildlife (Protection) No Act,1972? (c) The C.R.Z.Notification,1991? No 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No. pending against the project and / or land in which the project is Affidavit to this effect is enclosed propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever possible) S.No. Information/Checklist confirmation Yes/No with source of information data 1.1 Permanent or temporary change in land use, Yes The project site is a fallow land. Site will land cover or topography including increase be developed with a residential buildings in intensity of land use (with respect to and necessary amenities local land use plan) 1.2 Clearance of existing land, vegetation and Yes The site is fallow land with 26 end of life buildings? coconut trees, 10 Indian Almond, 4 acacia trees and 3 rain trees and 2 Vakamaram and 10 other small trees. Common Scientific No. Name Name of (Malayalam) trees in the site Coconut Tree Cocos 26 (Thengu) nucifera Indian Almond Terminalia 10 catappa Acacia Acacia 4 auriculiformis Rain tree Samanea 3 (Mazhamaram) saman Vakamaram Albizia 2 lebbeck Others 10 To compensate for this, a green belt will be developed with native species. 1.3 Creation of new land uses? No The project site is a fallow land. Site will be developed into a residential buildings and other necessary amenities 1.4 Pre-construction investigations e.g. bore Yes Geotechnical Investigation will be houses, soil testing? carried out. 1.5 Construction works? Yes Construction of Residential Building and Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode related infrastructure 1.6 Demolition works? No No demolition will be carried out 1.7 Temporary sites used for construction works No No housing or accommodation for or housing of construction workers? construction workers is planned as the labourers deployed will be accommodated offsite and will be the responsibility of the contractor. 1.8 Above ground buildings, structures or Yes The building is constructed above ground. earthworks including linear structures, cut and The land is level and hence cutting and fill or excavations filling are not needed. 1.9 Underground works including mining or No Does not involve mining or tunnelling. tunneling? 1.10 Reclamation works? No Not involved 1.11 Dredging? No Not involved 1.12 Offshore structures? No Not involved 1.13 Production and manufacturing processes? No Not involved 1.14 Facilities for storage of goods or materials? Yes During construction phase temporary storage facilities will be created onsite to store the construction raw materials. 1.15 Facilities for treatment or disposal of solid Yes For treatment of sewage, STP will be waste or liquid effluents? constructed. Treated effluent will be recycled for flushing and gardening The sludge from STP will be disinfected, dried, composted and used as manure The solid waste generated shall be segregated at source to biodegradable, non-biodegradable and domestic hazardous waste All the organic solid waste generated will be treated onsite in biogas plant, and the slurry from biogas plant will be treated in STP All the recyclable solid waste shall be send to recyclers All the domestic hazardous waste will be handed over to authorized waste facility operators 1.16 Facilities for long term housing of operational No All the operational workers will be from workers? the district itself and no housing accommodation will be provided to them. 1.17 New road, rail or sea traffic during Yes Additional road traffic during the construction or operation? operation phase is envisaged 1.18 New road, rail, air waterborne or other No The site is abutting Mini Bypass road transport infrastructure including new or which is 20m wide, and a side road altered routes and stations, ports, airports etc? which is 7m wide Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode 1.19 Closure or diversion of existing transport No There will not be any closure or routes or infrastructure leading to changes in diversion of existing transport routes or traffic movements? infrastructure leading to changes in traffic movements 1.20 New or diverted transmission lines or No There is no transmission pipelines along pipelines? the project site 1.21 Impoundment, damming, culverting, No There will not be any impoundment, realignment or other changes to the hydrology damming, culverting, realignment or of watercourses or aquifers? other changes to the hydrology of water courses or aquifers 1.22 Stream crossings? No There are no stream crossings 1.23 Abstraction or transfers of water form ground Yes Water will be extracted from the existing or surface waters? bore wells during construction phase. Water from the Kerala Water Authority will be available during the operation phase. 1.24 Changes in water bodies or the land surface Yes There will be an increase in run off after affecting drainage or run-off? the development which will be mitigated by installing ground water recharge pits, storm water detention and controlled release structures. Hence runoff will be reduced before the pre construction scenario. 1.25 Transport of personnel or materials for Yes There will be transport of personnel and construction, operation or decommissioning? construction materials during the construction phase. Precautions will be taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours 1.26 Long-term dismantling or decommissioning No Not applicable or restoration works? 1.27 Ongoing activity during decommissioning No Not applicable which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Since it is a residential development, temporarily or permanently? there will be influx of people to occupy the dwelling units.