NYS Department of Transportation D / M / WBE Utilization Plans

Total Page:16

File Type:pdf, Size:1020Kb

NYS Department of Transportation D / M / WBE Utilization Plans 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: C031104 DESCRIPTION: STATEWIDE DRUG AND ALCOHOL TESTING SERVICES FOR NYSDOT. PIN #: A031.48.701 CONTRACTOR NAME & ADDRESS: ENERGETIX CORPORATION AWARD DATE: 4/20/2017 12:00:00AM 87 ST. PAUL ROAD N, CONTRACT COMPLETION DATE: HEMPSTEAD, NY 11550 CONTRACT AMOUNT: 543,245.00 IS CONTRACTOR D/M/WBE? Yes (MBE) D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT ENERGETIX CORPORATION MBE 543,245.00 87 ST. PAUL ROAD N, HEMPSTEAD, NY 11550 TOTAL: 543,245.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D010293-03 DESCRIPTION: HIGHWAY DESIGN, PHASES I-IV, I-390 EXPRESSWAY, I-490 TO ROUTE 104 MONROE COUNTY. REGION 4. PIN #: 4390.13.111 CONTRACTOR NAME & ADDRESS: BERGMANN ASSOC., ARCH, ENGRS, LS ARCH AND SURV AWARD DATE: 4/20/2017 12:00:00AM 200 FIRST FEDERAL PLAZA 28 EAST MAIN STREET CONTRACT COMPLETION DATE: ROCHESTER, NY 14614 CONTRACT AMOUNT: 1,883,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT AMERCOM CORPORATION CONSULTING ENGINEERS DBE 0.00 1259 ROUTE 46 EAST BUILDING 1 PARSIPPANY, NJ 07054 TOTAL: 0.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D030604 DESCRIPTION: RDSA, REGIONAL DESIGN SERVICES AGREEMENT FOR DESIGN AND DESIGN FUNCTIONS REGION 1, 2, 7 & 9. VARIOUS COUNTIES. PIN #: RDSA.01.101 CONTRACTOR NAME & ADDRESS: CREIGHTON MANNING ENGINEERING AWARD DATE: 4/19/2017 12:00:00AM 17 COMPUTER DRIVE WEST CONTRACT COMPLETION DATE: ALBANY, NY 12205 CONTRACT AMOUNT: 1,250,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT PRUDENT ENGINEERING LLP DBE 0.00 6390 FLY ROAD EAST SYRACUSE, NY 13057 TOTAL: 0.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031276 DESCRIPTION: CI, CONSTRUCTION INSPECTION SERVICES, BRIDGE REPAIR, BRONX RIVER PARKWAY BRIDGE OVER METRO-NORTH RAILROAD NYC PIN #: X110.24.302 CONTRACTOR NAME & ADDRESS: ENTECH ENGINEERING, P.C. AWARD DATE: 4/25/2017 12:00:00AM 11 BROADWAY 21ST FLOOR CONTRACT COMPLETION DATE: NEW YORK, NY 10004 CONTRACT AMOUNT: 1,000,000.00 IS CONTRACTOR D/M/WBE? Yes (DBE) D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT ENTECH ENGINEERING, P.C. DBE 476,135.00 11 BROADWAY 21ST FLOOR NEW YORK, NY 10004 SIDDIQUI ENGINEERING, P.C. DBE 67,883.00 183 BROADWAY STE 309 HICKSVILLE, NY 11801 TOTAL: 476,135.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031305 DESCRIPTION: HWY DES., SCOPING, PRELIMINARY AND FINAL DESIGN (PH. I - VI) FOR ANALYSIS, MODELING AND DESIGN (PHASE B) OF THE LOWER PIN #: 8823.48 CONTRACTOR NAME & ADDRESS: OVE ARUP AND PARTNERS CONSULTING ENGINEERS AWARD DATE: 6/6/2017 12:00:00AM 77 WATER STREET CONTRACT COMPLETION DATE: NEW YORK, NY 10040 CONTRACT AMOUNT: 2,400,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT FITZGERALD AND HALLIDAY, INC. WBE 814,934.00 416 ASYLUM STREE HARTFORD, CT 06103 HUDSON VALLEY ENGINEERING ASSOCIATES, PC WBE 462,467.00 560 ROUTE 52 - SUITE 201 BEACON, NY 12508 SIMCO ENGINEERING, P.C. MBE 155,612.00 80 MAIDEN LANE SUITE 501 NEW YORK, NY 10038 STUMP/HAUSMAN PTR WBE 111,526.00 402 MAIN STREET SUITE 100-322 METUCHEN, NJ 08840 TOTAL: 814,934.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031348 DESCRIPTION: DSA, HIGHWAY, DESIGN, REGIONAL DESIGN SERVICES AGREEMENT FOR DESIGN AND DESIGN FUNCTIONS (SMALL FIRM PIN #: S001.19.701 CONTRACTOR NAME & ADDRESS: CREIGHTON MANNING ENGINEERING AWARD DATE: 4/19/2017 12:00:00AM 17 COMPUTER DRIVE WEST CONTRACT COMPLETION DATE: ALBANY, NY 12205 CONTRACT AMOUNT: 750,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT KC ENGINEERING AND LAND SURVEYING, P.C. DBE 150,000.00 7 PENN PLAZA, SUITE 1604 NEW YORK, NY 10001 TOTAL: 150,000.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031381 DESCRIPTION: CI, TERM AGREEMENT FOR CONSTRUCTION INSPECTION SERVICES, IN REGION 1. GREENE COUNTY. PIN #: 1BOW.OG.301 CONTRACTOR NAME & ADDRESS: HOWARD L. BOSWELL ENGINEER AND LS PC AWARD DATE: 4/25/2017 12:00:00AM 330 PHILLIPS AVENUE CONTRACT COMPLETION DATE: SOUTH HACKENSACK, NJ 07606 CONTRACT AMOUNT: 2,500,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT POPLI, ARCHITECTURE + ENGINEERING AND L.S., P.C. MBE 0.00 555 PENBROOKE DRIVE PENFIELD, NY 14526 TOTAL: 0.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031430 DESCRIPTION: BRIDGE / INVENTORY, 2017-2018 BIENNIAL AND LATERIM BRIDGE INSPECTION OF THE GOWANUS EXPRESSWAY INTERCHANGE PIN #: CONTRACTOR NAME & ADDRESS: HNTB NEW YORK ENGINEERING AND ARCHITECTURE PC AWARD DATE: 6/14/2017 12:00:00AM 5 PENN PLAZA 6TH FLOOR CONTRACT COMPLETION DATE: NEW YORK, NY 10001 CONTRACT AMOUNT: 3,715,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT MP ENGINEERS, P.C. DBE 178,378.00 252 W 37TH STREET SUITE 503 NEW YORK, NY 10018 TOTAL: 178,378.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031431 DESCRIPTION: BI, 2107-2018, BIENNIAL AND INTERIM BI, QUEENS COUNTY, REGION 11 PIN #: XB17.02.101 CONTRACTOR NAME & ADDRESS: STANTEC CONSULTING SERVICES, INC. AWARD DATE: 5/3/2017 12:00:00AM 3 COLUMBIA CIRCLE CONTRACT COMPLETION DATE: ALBANY, NY 12203 CONTRACT AMOUNT: 9,040,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT PK ENGINEERING, P.C. DBE 494,831.00 60 MADISON AVENUE SUITE 1217 NEW YORK, NY 10010 TOTAL: 494,831.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031446 DESCRIPTION: HW DES, TERM AGREEMENT FOR PEDESTRIAN SAFETY ACTION PLAN (PSAP), REGIONS 3, 4, 5 & 6, ALL COUNTIES PIN #: PSES.01 CONTRACTOR NAME & ADDRESS: C & S ENGINEERS, INC. AWARD DATE: 6/20/2017 12:00:00AM 499 COL. EILEEN COLLINS BLVD. CONTRACT COMPLETION DATE: SYRACUSE, NY 13212 CONTRACT AMOUNT: 3,500,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT RAVI ENGINEERING & L.S., P.C. MBE 3,150,000.00 2110 SOUTH CLINTON AVENUE ROCHESTER, NY 14618 TOTAL: 3,150,000.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031448 DESCRIPTION: HIGHWAY DESIGN TERM AGREEMENT FOR PEDESTRIAN SAFETY ACTION PLAN (PSAP), REGIONS 8, 10 & 11 VARIOUS COUNTIES. PIN #: PSES.03.421 CONTRACTOR NAME & ADDRESS: GREENMAN-PEDERSEN, INC. AWARD DATE: 5/1/2017 12:00:00AM 325 WEST MAIN STREET CONTRACT COMPLETION DATE: BABYLON, NY 11702 CONTRACT AMOUNT: 3,900,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT GAYRON DE BRUIN LAND SURVEYING AND ENGINEERING PC WBE 0.00 11 UNION AVENUE BETHPAGE, NY 11714 SIMCO ENGINEERING, P.C. MBE 0.00 80 MAIDEN LANE SUITE 501 NEW YORK, NY 10038 TOTAL: 0.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031450 DESCRIPTION: HW, DESIGN, FINAL PHASES I-VI, CORRECTIVE AND PREVENTIVE MAINTENANCE OF RETAINING WALLS, REGION 11, ALL COUNTIES PIN #: XM18.60.101 CONTRACTOR NAME & ADDRESS: HNTB NEW YORK ENGINEERING AND ARCHITECTURE PC AWARD DATE: 4/11/2017 12:00:00AM 5 PENN PLAZA 6TH FLOOR CONTRACT COMPLETION DATE: NEW YORK, NY 10001 CONTRACT AMOUNT: 2,900,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT ENVIRONMENTAL PLANNING & MANAGEMENT, INC. DBE 69,732.00 1983 MARCUS AVE NEW HYDE PARK, NY 11042 SIMCO ENGINEERING, P.C. DBE 115,723.00 80 MAIDEN LANE SUITE 501 NEW YORK, NY 10038 TOTAL: 115,723.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031452 DESCRIPTION: CI, CONSTRUCTION INSPECTION SERVICES, BRIDGE STEEL REPAIRS IN NEW YORK CITY, VARIOUS LOCATIONS, VARIOUS COUNTIES PIN #: XM17.21 CONTRACTOR NAME & ADDRESS: MICHAEL BAKER ENGINEERING, INC. AWARD DATE: 6/22/2017 12:00:00AM 11 MARTINE AVENUE CONTRACT COMPLETION DATE: CONTRACT AMOUNT: 1,500,000.00 WHITE PLAINS, NY 10606 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT HAIDER ENGINEERING, P.C. MBE 352,496.00 91 TOLEDO STREET FARMINGDALE, NY 11735 W. ALLEN ENGINEERING PLLC 114,888.00 2944 YATES AVE BRONX, NY 10469 TOTAL: 352,496.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031453 DESCRIPTION: MISC, DESIGN SERVICES - TERM AGREEMENT FOR ASBESTOS ASSESSMENT & REMEDIATION MANAGEMENT SERVICES FOR REGION 8, 10 & PIN #: S000.13.108 CONTRACTOR NAME & ADDRESS: LOUIS K. MCLEAN ASSOCIATES ENGINEERS & SURVEYORS, PC AWARD DATE: 4/19/2017 12:00:00AM 437 SOUTH COUNTRY ROAD CONTRACT COMPLETION DATE: BROOKHAVEN, NY 11719 CONTRACT AMOUNT: 2,250,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT ENVIRONMENTAL PLANNING & MANAGEMENT, INC. DBE 0.00 1983 MARCUS AVE NEW HYDE PARK, NY 11042 KC ENGINEERING AND LAND SURVEYING, P.C. DBE 0.00 7 PENN PLAZA, SUITE 1604 NEW YORK, NY 10001 TOTAL: 0.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031456 DESCRIPTION: MISC., 2017 - 2018 OVERHEAD SIGN STRUCTURE INSPECTION, REGION 8, VARIOUS COUNTIES PIN #: S055.30 CONTRACTOR NAME & ADDRESS: COLLINS ENGINEERING, PC AWARD DATE: 6/8/2017 12:00:00AM 277 ALEXANDER STREET SUITE 204 CONTRACT COMPLETION DATE: ROCHESTER, NY 14607 CONTRACT AMOUNT: 1,200,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT AI ENGINEERS, INC., P.C DBE 11,321.00 99 WALL STREET 24TH FLOOR NEW YORK, NY 10005 TOTAL: 11,321.00 6/26/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D031459 DESCRIPTION: CI, TERM AGREEMENT FOR CONSTRUCTION INSPECTION SERVICES FOR REGION 8, ALL COUNTIES (SMALL FIRM OPPORTUNITY).
Recommended publications
  • Bridges in Albany County
    CDTC BRIDGE FACT SHEET BIN 1053380 Bridge Name 5 X over PATROON CREEK Review Date October 2014 GENERAL INFORMATION PIN County Albany Political Unit City of ALBANY Owner 42 - City of ALBANY Feature Carried 5 X Feature Crossed PATROON CREEK Federal System? Yes NHS? Yes BRIDGE INFORMATION Number of Spans 2 Superstructure Type Concrete Culvert At Risk? No AADT 26918 AADT Year 2010 Posted Load (Tons) INSPECTION INFORMATION Last Inspection 8/14/2012 Condition Rating 5.316 Flags NNN No Flags STUDY INFORMATION Work Strategy Item Specific Treatment 1 Concrete Patch Repairs Treatment 2 2014 Preliminary Construction Cost $100,000 MP&T Open Program (years) 10 Comments CDTC BRIDGE FACT SHEET BIN 2200130 Bridge Name KAEHLER LANE over FOX CREEK Review Date October 2014 GENERAL INFORMATION PIN County Albany Political Unit Town of BERNE Owner 40 - Town of BERNE Feature Carried KAEHLER LANE Feature Crossed FOX CREEK Federal System? No NHS? No BRIDGE INFORMATION Number of Spans 1 Superstructure Type Steel Stringer / Multibeam At Risk? Yes AADT 15 AADT Year 2009 Posted Load (Tons) INSPECTION INFORMATION Last Inspection 11/15/2012 Condition Rating 5.404 Flags NNN No Flags STUDY INFORMATION Work Strategy Item Specific Treatment 1 Place Asphalt WS Treatment 2 Repair Lagging Wall 2014 Preliminary Construction Cost $300,000 MP&T Detour Program (years) Immediate Comments CDTC BRIDGE FACT SHEET BIN 2200210 Bridge Name PICTUAY ROAD over COEYMANS CREEK Review Date October 2014 GENERAL INFORMATION PIN County Albany Political Unit Town of BETHLEHEM Owner 30 - Albany
    [Show full text]
  • Waterbody Classifications, Streams Based on Waterbody Classifications
    Waterbody Classifications, Streams Based on Waterbody Classifications Waterbody Type Segment ID Waterbody Index Number (WIN) Streams 0202-0047 Pa-63-30 Streams 0202-0048 Pa-63-33 Streams 0801-0419 Ont 19- 94- 1-P922- Streams 0201-0034 Pa-53-21 Streams 0801-0422 Ont 19- 98 Streams 0801-0423 Ont 19- 99 Streams 0801-0424 Ont 19-103 Streams 0801-0429 Ont 19-104- 3 Streams 0801-0442 Ont 19-105 thru 112 Streams 0801-0445 Ont 19-114 Streams 0801-0447 Ont 19-119 Streams 0801-0452 Ont 19-P1007- Streams 1001-0017 C- 86 Streams 1001-0018 C- 5 thru 13 Streams 1001-0019 C- 14 Streams 1001-0022 C- 57 thru 95 (selected) Streams 1001-0023 C- 73 Streams 1001-0024 C- 80 Streams 1001-0025 C- 86-3 Streams 1001-0026 C- 86-5 Page 1 of 464 09/28/2021 Waterbody Classifications, Streams Based on Waterbody Classifications Name Description Clear Creek and tribs entire stream and tribs Mud Creek and tribs entire stream and tribs Tribs to Long Lake total length of all tribs to lake Little Valley Creek, Upper, and tribs stream and tribs, above Elkdale Kents Creek and tribs entire stream and tribs Crystal Creek, Upper, and tribs stream and tribs, above Forestport Alder Creek and tribs entire stream and tribs Bear Creek and tribs entire stream and tribs Minor Tribs to Kayuta Lake total length of select tribs to the lake Little Black Creek, Upper, and tribs stream and tribs, above Wheelertown Twin Lakes Stream and tribs entire stream and tribs Tribs to North Lake total length of all tribs to lake Mill Brook and minor tribs entire stream and selected tribs Riley Brook
    [Show full text]
  • Sustain What? Preparing Our Students by Greening Our Campuses
    10th Annual Conference Sustain What? Preparing our Students by Greening our Campuses November 8–9, 2013 Pace University 861 Bedford Road Pleasantville, NY, 10570 Pace Academy for Applied Environmental Studies About the Environmental Consortium The Environmental Consortium of Colleges & Universities was established in 2004 to advance our understanding of the cultural, social, political, economic and natural factors affecting the region. By promoting collaboration among its members, the Consortium works to provide ecosystem-based curricular and co-curricular programming aimed at improving the health of the regional ecosystem. The mission of the Environmental Consortium is to harness higher education’s intellectual and physical resources to advance regional, ecosystem-based environmental research, teaching, and learning with a special emphasis on the greater Hudson-Mohawk River watershed. Spearheaded and hosted by Pace University, the Consortium’s headquarters is situated within the Pace Academy for Applied Environmental Studies in Pleasantville, New York. Among Pace Academy’s stated goals is to externally apply the university’s strengths to local and global environmental problems. As a testament to its commitment to interdisciplinary pedagogy, scholarship and service, the Academy provides essential administrative support that grounds the Consortium’s programs. www.environmentalconsortium.org Photos William McGrath, Pace University's Senior Vice David Hales, President, Second Nature delivered President and Chief Administrative Officer the opening keynote and spoke about living welcomed attendees and discussed Pace's sustainably in the future climate. ambitious Master Plan. The Friday Plenary Panel, "Preparing our Campuses for an Uncertain Future" was moderated by Andrew C. Revkin, Senior Fellow for Environmental Understanding Pace University Academy for Applied Environmental Studies and Dot Earth Blogger for The New York Times.
    [Show full text]
  • T a P P a N Z
    Federal Dam Watervliet Rt. 787 Bridge Starbuck Island Troy Rt. 2 Bridge Water chestnut Vallisneria Rt. 378 Bridge Other Stuff Albany Rensselaer Amtrack Bridges Rt. 20 Bridge Normans Kill Papscaneek Island e e r C e Campbell Island e n a c s p a Vloman Kill P Shad Island Castleton-On-Hudson Conrail and To 90 Bridges k Upper Schodack Island e e r C Lower Schodack Island k c a d o h Ravena c S Houghtaling Island k Cree Mill Bronck Island Coxsackie Island Nutten Hook Coxsackie Stockport Middle Ground Creek kport Stoc West Flats Middle Ground Flats Athens Hudson C Catskill a Rogers Island t sk il Rip Van Winkle Bridge l R o e Inbocht Bay li ff Ja nse Duck Cove n K ill Germantown Saugerties Esop us Creek Tivoli North Bay Tivoli South Bay Kingston-Rinecliff Bridge Kingston reek t C ou nd Ro Esopus Vanderburgh Meadows Cove Point Norrie State Park reek k C ac Bl Blunts Rock Bard Rock Highland Conrail Bridge Mid-Hudson Bridge Poughkeepsie k Lattintown Cre ree ek r C ge Marlboro in pp Wappingers Falls a W Newburgh Beacon Denning Point Fishkill Creek M ood na a Pollepel Island Cold Spring Constitution Island West Point Con Hook ek Bear Mt. Bridge re C le il sv nn Iona Island A Peekskill Bear Mt. State Park Peekskill Bay Buchanan Stony Point State Park H Georges Park Island A d V Pon E dar R Ce S T R A Croton-on-Hudson W r e v Haverstraw B i A R Y n o t o Croton r Point C Ossining T A P P A N Z E E Nyack Tarrytown Tappan Zee Bridge Piermont Irvington Piermont Marsh Hastings-on-Hudson Yonkers Yonkers Tenafly Englewood BRONX RIVER George Washington Bridge Bronx Fort Lee Fairview Union City Manhattan Hoboken EAST RIVER Jersey City Williamsburg Bridge Manhattan Bridge Brooklyn Bridge Bayonne Brooklyn KILL VAN KULL Verrazano-Narrows Bridge.
    [Show full text]
  • Hudson River Oil Spill Risk Assessment
    Hudson River Oil Spill Risk Assessment Volume 4: Spill Consequences: Trajectory, Fate and Resource Exposure Prepared for Scenic Hudson, Inc. One Civic Center Plaza Suite 200 Poughkeepsie, NY 12601-3157 Prepared by Dagmar Schmidt Etkin, PhD Environmental Research Consulting 41 Croft Lane Cortlandt Manor, NY 10567-1160 Deborah French McCay, PhD Jill Rowe and Deborah Crowley RPS 55 Village Square Drive South Kingstown, RI 02879-8248 John Joeckel SEAConsult LLC P. O. Box 243 Wachapreague, VA 23310-0243 Andy Wolford, PhD Risknology, Inc. 3218 Quiet Lake Drive Katy, TX 77450-5721 May 2018 Acknowledgments This project was commissioned by Scenic Hudson, Inc., of Poughkeepsie, New York, under a Professional Services Contract with Environmental Research Consulting (ERC). RPS ASA, SEAConsult LLC, and Risknology, Inc., were all subcontractors to ERC under separate contracts. The HROSRA research team acknowledges the invaluable inputs and discussions with Scenic Hudson over the course of the study period (September 2017 through May 2018), including the selection and development of the hypothetical spill scenarios. The contents of the report, data, analyses, findings, and conclusions are solely the responsibility of the research team and do not constitute any official position by Scenic Hudson. The Hudson River Oil Spill Risk Assessment was conducted as an independent, objective, technical analysis without any particular agenda or viewpoint except to provide quantitative and qualitative information that could be used to work to a common goal of spill prevention and preparedness. The study is intended to inform officials, decision-makers, stakeholders, and the general public about oil spill risk in the Hudson River. The diligent efforts of the RPS SIMAP modeling team of Deborah Crowley, Jenna Ducharme, Matt Frediani, Emily Skeehan, and Matt Bernardo provided the necessary data, results, maps, and graphics that formed the foundation of much of the analysis in the HROSRA.
    [Show full text]
  • Comprehensive Land Use Plan May 1994
    i l I j Town of New Scotland It1 ALBANY COUNTY i NEW YORK MAY 1994 7 lttT c 1 i O pE 21E 1VE L 1J I f11 Cre mr 011 r LtL r LJUx II X 5 51ftIi 11 X t Ii qHIF RJCE oIf1 O fME fJ5ilL 1MP5tCT rA f i STZtPE ME J rr I t prepared by the Town of New Scotland PlanningBoard iJ f l v t i J I I j t jJ i I A J Town of New Scotland BUILDING ZONING DEPARTMENT If C Ill PAUL M CANTLIN C C A 11II BUILDING INSPECTOR W F ZONING ADMINISTRATOR TOWN AlL If SLlNGERLANDS N Y 12159 518 765 3356 I i t c iijS Town of New ScotlaDd J Town Board Herbert Reilly Jr Supervisor Edward Donohue Councilman Richard Decker Councilman Scott Houghtaling Councilman Victoria Ramundo Councilman Corinne Cossac Town Clerk John T Biscone Town Attorney Town P1Al1lling Board Robert Stapf Chairman and Member Annick Belleville Member Raymond G MacKay Jr Member John Loucks Member William Childs Member Ann Dieckman Member Robert Smith Member L Michael Mackey Planning Board Attorney Zoning Board of Appeals jO George Miller Chairman and Member Frederic Carl Member Albert Dankert Member Ronnie Von Ronne Member Judith Wing Member Other Town Ofllces Michael Hotaling Highway Superintendent Kenneth Connolly Town Justice Tom Dolin Town Justice Paul Cantlin Building Inspector Paul Jeffers Code Enforcement Inspector Marily Holmberg Tax Collector Previous Contributing Town and pIAnnfng Board Memebers Wyman Osterhout Councilman John Sgarlata Councilman Peter VanZetten Councilman Craig Schufelt Councilman Robert G Hampston Planning Board Chair Samuel Stein Planning Board Member Ann Richards Planning
    [Show full text]
  • Ulster Orange Greene Dutchess Albany Columbia Schoharie
    Barriers to Migratory Fish in the Hudson River Estuary Watershed, New York State Minden Glen Hoosick Florida Canajoharie Glenville Halfmoon Pittstown S a r a t o g a Schaghticoke Clifton Park Root Charleston S c h e n e c t a d y Rotterdam Frost Pond Dam Waterford Schenectady Zeno Farm Pond Dam Niskayuna Cherry Valley M o n t g o m e r y Duanesburg Reservoir Dam Princetown Fessenden Pond Dam Long Pond Dam Shaver Pond Dam Mill Pond Dam Petersburgh Duanesburg Hudson Wildlife Marsh DamSecond Pond Dam Cohoes Lake Elizabeth Dam Sharon Quacken Kill Reservoir DamUnnamed Lent Wildlife Pond Dam Delanson Reservoir Dam Masick Dam Grafton Lee Wildlife Marsh Dam Brunswick Martin Dunham Reservoir Dam Collins Pond Dam Troy Lock & Dam #1 Duane Lake Dam Green Island Cranberry Pond Dam Carlisle Esperance Watervliet Middle DamWatervliet Upper Dam Colonie Watervliet Lower Dam Forest Lake Dam Troy Morris Bardack Dam Wager Dam Schuyler Meadows Club Dam Lake Ridge Dam Beresford Pond Dam Watervliet rapids Ida Lake Dam 8-A Dyken Pond Dam Schuyler Meadows Dam Mt Ida Falls Dam Altamont Metal Dam Roseboom Watervliet Reservoir Dam Smarts Pond Dam dam Camp Fire Girls DamUnnamed dam Albia Dam Guilderland Glass Pond Dam spillway Wynants Kill Walter Kersch Dam Seward Rensselaer Lake Dam Harris Dam Albia Ice Pond Dam Altamont Main Reservoir Dam West Albany Storm Retention Dam & Dike 7-E 7-F Altamont Reservoir Dam I-90 Dam Sage Estates Dam Poestenkill Knox Waldens Pond DamBecker Lake Dam Pollard Pond Dam Loudonville Reservoir Dam John Finn Pond Dam Cobleskill Albany Country Club Pond Dam O t s e g o Schoharie Tivoli Lake Dam 7-A .
    [Show full text]
  • Bridges in Use with Safety Rating at Or Below 3.375
    BRIDGES IN USE WITH SAFETY RATING AT OR BELOW 3.375 Bridge Identification Route or Terrain Condition Region County Number Route Carried Crossed Rating Mid-Hudson Region Dutchess 3343900 ON-THE-GREEN ROAD SPROUT CREEK 3.263 Dutchess 3343170 CRUM ELBOW ROAD FALL KILL 3.2 Dutchess 2262880 BRIDGE STREET MNRR HU LINE 3.164 Dutchess 3342640 COUNTY ROAD 2 MILL BROOK 3.104 Dutchess 2262560 HOFFMAN STREET MNRR HU LINE 3.063 Orange 5521410 987E SEVEN LKS PK ASKOTI DAM 2.755 Sullivan 3357260 CRAIGIE CLAIR RD BEAVER KILL 3.328 Ulster 2019580 GREENKILL AVENUE BROADWAY RTE 28 3.373 Ulster 2224250 MILL BROOK ROAD BELLE AYR BROOK 3.146 Capital Region Albany 3301050 COUNTY ROAD 55 VLOMAN KILL 3.333 Greene 3201140 MILL HOLLOW ROAD EAST KILL 3.263 Greene 3200860 SMITH ROAD DURHAM CREEK 3.151 Greene 3201250 SPRUCETON ROAD WEST KILL 2.854 Rensselaer 2202280 SECOND AVENUE MILL CREEK 3.265 Rensselaer 2202370 SPRING AVENUE POESTEN KILL 3.05 Rensselaer 2201520 S.E.HOLLOW ROAD S.E. HOLLOW BROOK 2.917 Saratoga 2202950 FRANCES STREET ANTHONY KILL 3.341 Saratoga 1007050 9P 9P15011082 SARATOGA LAKE 3.282 Saratoga 3304190 COUNTY ROAD 98 SACANDAGA RESER 3.085 Saratoga 2202940 NORTH MAIN STREET ANTHONY KILL 2.545 Schenectady 4416010 VISCHER FERRY RD WK 2.522 Warren 3305460 DILLON HILL RD MILL CREEK 3.316 Mohawk Valley Fulton 2204400 N PERRY STREET CAYADUTTA CREEK 2.409 Herkimer 2266850 PHILIP STREET STEELE CREEK 3.367 Herkimer 2255540 SOUTH ANN STREET MOHAWK RIVER 3.266 Herkimer 2266830 MAPLE GROVE AVE BELLINGER BROOK 3.129 Herkimer 1039040 168 168 23011138 TRIB OTSQUAGO
    [Show full text]
  • Discovery Report Appendix H Discovery Meeting Summary Memorandum Mid-Hudson Watershed HUC 02020006
    Discovery Report Appendix H Discovery Meeting Summary Memorandum Mid-Hudson Watershed HUC 02020006 June 2017 Federal Emergency Management Agency Department of Homeland Security 26 Federal Plaza New York, NY Memorandum To: Mid-Hudson Watershed Discovery Project File From: NYSDEC Floodplain Management Section Date: June 2017 Re: Mid-Hudson Watershed Discovery Meeting Summary Two initial Pre-Discovery webinars were held for all stakeholders within the Mid-Hudson Watershed on May 10, 2016 and May 11, 2016. The purpose of these webinars was to: introduce watershed stakeholders to Risk MAP Discovery project concepts; review the Discovery Stakeholder Survey to be completed by watershed stakeholders; the survey served as a way for FEMA and NYSDEC to collect information upfront on communities mapping needs and existing data that could be incorporated into a possible Risk MAP project; and to discuss upcoming timelines for future Discovery Meetings and the Discovery project overall. Five Risk MAP Discovery Meetings were held in the Mid-Hudson Watershed during the week of October 17, 2016. The purpose of the Discovery Meetings was to present the draft Discovery Report and Maps containing the information collected to date, and to provide the communities with an additional opportunity for input. This memo is a summary of the information collected through the Discovery project engagement process for the Mid-Hudson Watershed and will be used to determine the floodplain mapping restudy priorities. Albany County, CID# 36001C Pre- Discovery Webinar Attendance: Attended Discovery Stakeholder Survey Completed: June 5, 2016, October 19, 2016 Discovery Meeting Attendance: October 19, 2016 Community Representative(s): Lee Bormann, Critical Incident Emergency Management Unit Commander (Survey and Meeting) Albany County Sheriff Office 58 Verda Avenue Clarksville, NY 12041 518-720-8025 [email protected] Peter Bayzon, Natural Resource Specialist (Meeting) Albany County Soil and Water Conservation District P.O.
    [Show full text]
  • NATURAL AREAS and WILDLIFE in YOUR COMMUNITY a Habitat Summary Prepared for the Town of Bethlehem
    NATURAL AREAS AND WILDLIFE IN YOUR COMMUNITY A Habitat Summary Prepared for the Town of Bethlehem This summary was completed in August 2017 as an update to an earlier 2008 summary, providing information for land- use planning and decision-making as requested by the Town of Bethlehem. It identifies significant ecosystems in the Town, including coastal habitats, streams, forests, wetlands, and other natural areas with important biological values. This summary is based only on existing information available to the New York State Department of Environmental Conservation (DEC) and its partners, and, therefore should not be considered a complete inventory. Additional information about habitats in our region can be found in the Wildlife and Habitat Conservation Framework developed by the Hudson River Estuary Program (Penhollow et al. 2006) and in the Biodiversity Assessment Manual for the Hudson River Estuary Corridor developed by Hudsonia and published by DEC (Kiviat and Stevens 2001). Ecosystems of the estuary watershed—wetlands, forests, stream corridors, grasslands, and shrublands—are not only habitat for abundant fish and wildlife, but also support the estuary and provide many vital benefits to human communities. These ecosystems help to keep drinking water and air clean, moderate temperature, filter pollutants, and absorb floodwaters. They also provide opportunity for outdoor recreation and education, and create the scenery and sense of place that is unique to the Hudson Valley. Local land-use planning efforts are instrumental in balancing future development with protection of these resources. By conserving sufficient habitat to support the region’s astonishing diversity of plants and animals, communities can ensure that healthy, resilient ecosystems—and the benefits they provide—are available to future generations.
    [Show full text]
  • NYS Department of Transportation D / M / WBE Utilization Plans
    7/10/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: C031104 DESCRIPTION: STATEWIDE DRUG AND ALCOHOL TESTING SERVICES FOR NYSDOT. PIN #: A031.48.701 CONTRACTOR NAME & ADDRESS: ENERGETIX CORPORATION AWARD DATE: 4/20/2017 12:00:00AM 87 ST. PAUL ROAD N, CONTRACT COMPLETION DATE: HEMPSTEAD, NY 11550 CONTRACT AMOUNT: 543,245.00 IS CONTRACTOR D/M/WBE? Yes (MBE) D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT ENERGETIX CORPORATION MBE 543,245.00 87 ST. PAUL ROAD N, HEMPSTEAD, NY 11550 TOTAL: 543,245.00 7/10/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D010293-03 DESCRIPTION: HIGHWAY DESIGN, PHASES I-IV, I-390 EXPRESSWAY, I-490 TO ROUTE 104 MONROE COUNTY. REGION 4. PIN #: 4390.13.111 CONTRACTOR NAME & ADDRESS: BERGMANN ASSOC., ARCH, ENGRS, LS ARCH AND SURV AWARD DATE: 4/20/2017 12:00:00AM 200 FIRST FEDERAL PLAZA 28 EAST MAIN STREET CONTRACT COMPLETION DATE: ROCHESTER, NY 14614 CONTRACT AMOUNT: 1,883,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT AMERCOM CORPORATION CONSULTING ENGINEERS DBE 0.00 1259 ROUTE 46 EAST BUILDING 1 PARSIPPANY, NJ 07054 TOTAL: 0.00 7/10/2017 NYS Department of Transportation D / M / WBE Utilization Plans CONTRACT #: D015557-05 DESCRIPTION: HIGHWAY DESIGN, PHASES I - VI, NYS ROUTE 198 (SCAJAQUADA EXPRESS WAY) CORRIDOR, I-90 TO ROUTE 33, ERIE COUNTY PIN #: 5470.22 CONTRACTOR NAME & ADDRESS: BERGMANN ASSOC., ARCH, ENGRS, LS ARCH AND SURV AWARD DATE: 6/28/2017 12:00:00AM 200 FIRST FEDERAL PLAZA 28 EAST MAIN STREET CONTRACT COMPLETION DATE: ROCHESTER, NY 14614 CONTRACT AMOUNT: 8,135,000.00 IS CONTRACTOR D/M/WBE? No D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT PRUDENT ENGINEERING LLP DBE 281,851.00 6390 FLY ROAD EAST SYRACUSE, NY 13057 WATTS ARCHITECTURE & ENGINEERING, D.P.C.
    [Show full text]
  • December 16, 2004
    January 12, 2017 Ms. Georgia Gray, Chairperson Village of Voorheesville Planning Commission 29 Voorheesville Avenue Voorheesville, NY 12186 RE: Stewart’s Shops – 112 Maple Avenue Floodplain Evaluation CHA Project No.: 31753 Dear Ms. Gray: CHA Consulting Inc. (CHA) performed a Floodplain Evaluation in response to the following comment raised in a letter dated December 22, 2016 from Lauren Sherman of C.T. Male Associates: “The Applicant shall provide a quantitative analysis of any potential impacts the proposed fill in the floodplain (outside of the floodway) could have on adjacent properties.” This letter summarizes the scope and methodology utilized in CHA’s evaluation along with our findings and recommendations. Background The proposed project includes the construction of a new Stewart’s in the Village of Voorheesville (Village), Albany County, New York (See Figure 1 – Location Map). The proposed site is located along Vly Creek just southeast of the intersection of Route 85A (Maple Ave) and Altamont Road. A review of the effective Federal Emergency Management Agency (FEMA) Flood Insurance Study (FIS) for Albany County (March 2015), indicates that Vly Creek has been studied by detailed methods (Zone AE), and as such a base (100-year) flood elevation (floodplain) and floodway have been established through the project site (See Figure 2 – FEMA Map). Although the most recent hydrologic and hydraulic analysis for Vly Creek was completed in 1980, the floodplain was remapped on updated topography during the most recent countywide revision. For the purposes of the National Flood Insurance Program (NFIP), the concept of a floodway is used to assist in the matter of flood management.
    [Show full text]