Sewage Treatment Plant, Bottrop, Germany

Total Page:16

File Type:pdf, Size:1020Kb

Sewage Treatment Plant, Bottrop, Germany Reference Sewage Treatment Plant, Bottrop, Germany © Dieter Golland / www.nachtzeichen.de Reference data ■ Building activity ■ Client Concrete restoration Emschergenossenschaft Kläranlage Bottrop ■ Object address ■ Architect In der Weilheimer Mark 190, 46238 Bottrop Ibb Althans & Hesselmann GbR - Technische Berater ■ Date / Completion 2013 ■ Contractor Peter Presch GmbH - Betoninstandsetzung ■ representatives Johannes Wilp ■ Viewing possible? No Remmers (UK) Limited ■ Tel.: +44 (0) 1293 594 010 ■ [email protected] ■ www.remmers.co.uk Reference Description The Emscher wastewater treatment plant is one of four central treatment plants at Emscher and is located in the Welheimer Mark district of Bottrop. The first sewage treatment plant was installed at this location in 1929, which mechanically purified all the river water.The current sewage treatment plant purifies up to 8,500 litres of water per second. The catchment area of the plant covers the river systems of the Boye, Schwarzbach, Lanferbach, Holz-, Resser- and Sellmannsbach. It covers 240 km² in the area of the cities of Bottrop, Bochum, Essen, Gelsenkirchen and Gladbeck.The four egg-shaped digesters of the Emscher sewage treatment plant, almost 50 meters high, can be seen from afar. The digestion towers look very futuristic, especially when illuminated at night with blue steel, which also serves as a landmark. Problem Considerable damage was visible at digester No. 4 as a result of a biogenic sulphuric acid attack (BSK attack) to the concrete. The structural condition analysis revealed advanced damage to the concrete surface. In some areas it showed indentations of up to 5 cm. The dome area was also to be given a new coating. Product systems / sizes used › Betofix R4 SR Art. No. 1084 Impressions © Dieter Golland / www.nachtzeichen.de © Remmers Remmers (UK) Limited ■ Tel.: +44 (0) 1293 594 010 ■ [email protected] ■ www.remmers.co.uk Reference Further information can be found on: https://www.remmers.co.uk/en_GB/referenceDetail/833 Remmers (UK) Limited ■ Tel.: +44 (0) 1293 594 010 ■ [email protected] ■ www.remmers.co.uk .
Recommended publications
  • Nachhaltiges Kommunales Flächenmanagement Der Weg in Eine Zukunftsfähige Stadtentwicklung
    Nachhaltiges kommunales Flächenmanagement Der Weg in eine zukunftsfähige Stadtentwicklung Modellprojekt 2008 – 2010 Grundlagen, Fazit und Perspektiven Gefördert durch: © LAG 21 NRW e.V. 2010 Übersicht 1 Flächenmanagement als neue Herausforderung 5 2 Das Modellprojekt 10 3 Ergebnisse - beispielhaft 18 4 Erfahrungen der Projektkommunen – Ergebnisse der Befragung 24 5 Perspektiven 26 LAG 21 NRW e.V. 2 Landesarbeitsgemeinschaft Agenda 21 NRW e.V. Nachhaltigkeit ist unser Thema Netzwerk Nachhaltigkeit 120 Kommunen, Kreise, Verbände, Initiativen Arbeitsfelder Professionalisierung Agenda 21-Prozesse Bildung für Nachhaltige Entwicklung Nachhaltigkeitsmanagementsysteme Forschung LAG 21 NRW e.V. 3 Nachhaltiges kommunales Flächenmanagement als neue Herausforderung Das Nachhaltige kommunale Flächenmanagement verknüpft Lösungs- ansätze zu aktuellen Herausforderungen der Städte und Gemeinden: flächenschonende Stadtentwicklung kosteneffiziente Nutzung der Infrastrukturen Bewältigung des demografischen Wandels. In Deutschland werden täglich nahezu 100 ha Böden neu für Siedlungs- und Verkehrsfläche in Anspruch genommen. Grundgesetzlich verankert ist, ist die kommunale Planungshoheit bei der Einführung eines Nachhaltigen Kommunalen Flächenmanagementsystems zu berücksichtigen. LAG 21 NRW e.V. 4 Nachhaltiges kommunales Flächenmanagement als neue Herausforderung Beitrag zur systematischen Verankerung des Leitbilds Nachhaltigkeit in der kommunalen Flächenplanung Infrastrukturkostenentlastung, Standortqualität, Ökonomie Wettbewerbsvorteil Bewältigung
    [Show full text]
  • Lärmaktionsplanung, 3. Stufe, Überprüfung
    KURZ UND FISCHER GmbH ▪ Brückenstraße 9 ▪ 71364 Winnenden KURZ UND FISCHER GmbH Brückenstraße 9 Verbandsbauamt Plochingen 71364 Winnenden Abt. Hochbau Fon: 0 71 95 . 91 47 – 0 Schulstraße 5 Fax: 0 71 95 . 91 47 – 10 73207 Plochingen Mail: [email protected] Internet: www.kurz-fischer.de 17.03.2020 12597/Ku/gb Lärmaktionsplanung 3. Stufe, Überprüfung LAP Plochingen Gutachterliche Stellungnahme 1. Aufgabenstellung Die Europäische Union (EU) hat im Jahr 2002 die Richtlinie 2002/49/EG [1] (EU- Umgebungslärmrichtlinie) verabschiedet. Mit dieser Richtlinie sollte ein gemeinsames Konzept festgelegt werden, um schädliche Auswirkungen durch Umgebungslärm zu verhindern, ihnen vorzubeugen und diese zu mindern. Die EU-Umgebungslärm- richtlinie [1] ist die Basis für die Lärmminderungsplanung auf nationaler Ebene und wurde mit dem Gesetz zur Umsetzung der EU-Umgebungslärmrichtlinie [2] in deut- sches Recht überführt, der § 47 des BImSchG [3] zur Lärmminderungsplanung wurde dadurch novelliert. Entsprechend diesen gesetzlichen Vorgaben hat der GVV Plochingen den Lärmakti- onsplan der 1. Stufe mit Stand vom 28. Januar 2013 verabschiedet. Dieser wurde im Zuge der 2. Stufe der Lärmaktionsplanung am 13. Dezember 2017 [4] überarbeitet. Die Erstellung dieser Lärmaktionspläne wurde anhand eigener detaillierter Berechnungen durchgeführt. In diese Betrachtungen sind neben den vom Land kartierten Hauptver- kehrsstraßen (Bundes- und Landesstraßen) auch sonstige Straßen (Kreis- und Gemein- destraßen) eingeflossen, d. h. der Detaillierungsgrad der Untersuchungen war deutlich größer als die der Lärmkartierung des Landes. [1] Richtlinie 2002/49/EG, vom 25. Juni 2002 über die Bewertung und Bekämpfung von Umgebungslärm (EU- Umgebungslärmrichtlinie 2002/49/EG) [2] Gesetz zur Umsetzung der EG-Richtlinie über die Bewertung und Bekämpfung von Umgebungslärm vom 24.
    [Show full text]
  • Maßnahmen Der Emschergenossenschaft 43 Königsland- Ter HÜNXE Wehrgrabendatteln-Hamm-Kanalbergkamen Neustäd Fuchsbach Bach Schölsbachgrenz- RECKLING- Bach Mühlen- Klg
    Loemühlenbach Schwarzbach Klg. Selm- Klg. Selm- Gartroper Galgenbach Klg. MARL Bork Cappenberg Mühlenbach Marl-West Dortmund- Ems-Kanal Klg. Gewässer Klg. Barloer Busch Hünxe Dattelner eißer Krüskamp- Dorsten- Mühlenbach W Schöls- Rapphofs Steinrapener Landwehr- Östrich bach Mühlenbach Datteln-Hamm-KanalKlg. Lippe graben Dümmer Bach Bach 225 Waltrop bach Beverbach Lippe Wesel-Datteln-Kanal Gräfingheide Rennbach Westerbach Ulfkotter Heidebach Erdbach Bach Sauer- Mosel- kamp- graben Krempel- Deipenbrauksbach bach Maßnahmen der Emschergenossenschaft 43 Königsland- ter HÜNXE wehrgrabenDatteln-Hamm-KanalBERGKAMEN Neustäd Fuchsbach Bach SchölsbachGrenz- RECKLING- bach Mühlen- Klg. Lünen- bach Lüner Wevelsbach Mühlenbach WALTROP Heide- graben Grenz- HAUSEN graben BOTTROP HERTEN Kuhbach Gartroper Mühlenbach Klg. Herten- Dortmund-Ems-Kanal Klg. Lünen- 224 Hasseler Westerholt Sesekemündung Stellen- VOERDE Mühlenbach Breuskes Herdicksbach bach Seseke Mühlenbach Rühenbecke Langhorster Leitgraben 223 Klg. GE- Suderwicher WALTROP Picksmühlenbach Bach Bruckhauser Bruckhauser Mühlenbach Backumer Klg. Lünen- Seseke Picksmühlenbach pulbach Mommbach Brügger- Bach Brambauer S Neuer Leitgraben bach 2 Groppenbach Mommbach Wiesent RECKLING- albach Holzbach LÜNENLüner Klg. DINSLAKEN Hauptkanal RE Mühlenbach 31 Pawig- HERTEN Voerde bach HAUSEN Braune- Iländer Bach LÜNEN V Süggelbach Mahl- bach Leitgrabenoerder Hohe PW Herten- HRB Mengede bach Klg. Resser Bach Emscher Heide Resser Bach Kamen Bären- Boye -Bach Brabecker bach 3 Elsbach GLADBECK Hellbach Herrentheyer
    [Show full text]
  • JOSEF ALBERS 1888 Born: Bottrop, Westphalia, Germany 1925
    37 Popham Road, Scarsdale NY, 10583 T: (914) 723-8738 | www.madelynjordonfineart.com JOSEF ALBERS 1888 Born: Bottrop, Westphalia, Germany 1925 Appointed Bauhaus master, Dessau, Germany 1939 Became a citizen of the United States 1933-1948 Taught at Black Mountain College, Black Mountain, NC 1948-1950 Member of Advisor Council of the Arts, Yale University, New Haven, CT 1950 Appointed Director of Department of Design, Yale University, New Haven, CT 1975 Died: New Haven, CT SELECTED EXHIBITIONS 2017 Small-Great Objects: Anni and Josef Albers in the Americas, Yale University Art Gallery 2013 Window to the World. From Durer to Mondrian and Beyond Museo Cantonale d'Arte and Museo d'Arte, Lugano September 16, 2012 to January 6, 2013 Fondation de l'Hermitage, Lausanne January 25 to May 20, 2013 Josef Albers: Spritualità e Rigore (Josef Albers: Spirituality and Rigor) Galleria Nazionale dell'Umbria, Perugia March 19 to June 19, 2013 2012-2013 Inventing Abstraction MOMA, New York December 23, 2012 to April 15, 2013 2012 50 Years of Prints - Greg Kucera Gallery, Seattle, WA Josef Albers en Amérique - Galerie Keza, Paris Josef Albers - Galerie Denise René - Rive Gauche, Paris Josef Albers en Amérique, Peintures sur papier - Centre Pompidou - Musée National d´Art Moderne, Paris The Sacred Modernist: Josef Albers as a Catholic Artist - Lewis Glucksman Gallery, Cork 2011 Josef Albers in Amerika - Malerei auf Papier - Kunstmuseum Basel, Basel Josef Albers - Galleria Civica di Modena, Modena Louisiana – on paper Josef Albers - Louisiana Museum of Modern
    [Show full text]
  • 76, Josef Albers Museum, Bottrop-Ebel
    MICHAEL WOLF 1954 -2019 Born in Munich, Germany, EDUCATION 1971-1972 North Toronto Collegiate Institute, Toronto, Canada 1972-1973 UC Berkeley, CA 1973-1976 Studied photography and visual communications at the University of Essen, Germany, with Otto Steinert; Degree in Visual Communication SOLO EXHIBITIONS 2019 Life in Cities Retrospective, Urania, Berlin, Germany 2019 Bottrop-Ebel '76, Josef Albers Museum, 2018-2019 Life in Cities Retrospective, Deichtorhallen, Hamburg, Germany 2018 Bottrop-Ebel '76, Flowers Gallery, Kingsland Road, London, UK 2018 Life in Cities Retrospective, Stelline Foundation, Milan, Italy 2017-2018 Life in Cities Retrospective, The Hague Museum of Photography, Netherlands 2017 Life in Cities Retrospective, Les Rencontres de la Photographie, Arles, France 2016 Hong Kong, Informal Solutions, Centre photographique - Pôle Image Haute-Normandie, France 2015 Tokyo Compression, Belfast Exposed, Northern Ireland Informal Arrangements, Flowers Gallery, London, UK 2014 Architecture of Density, Flowers Gallery, London, UK The Real Toy Story – K11 Art Foundation, Shanghai 2013 Small God, Big City – M97 gallery, shanghai, Industrial Architecture – M97 gallery, shanghai Transparent City – Bau-Xi Gallery, Toronto, Canada, Architecture of Density – bienal de arquitetura, Sao Paulo, Brazil, Tokyo Compression – rencontres gaspesie, Canada Small God, Big City – 25books, Berlin Germany Architecture of Density / the scout shots & small god, big city, Galerie Wouter van Leeuwen, Amsterdam Netherlands 2012 Life in Cities & Real Fake Art,
    [Show full text]
  • Richard Parker Peppi Bottrop Benoit Platéus
    FOR IMMEDIATE RELEASE MICHAEL THIBAULT is pleased to present: RICHARD PARKER PEPPI BOTTROP BENOIT PLATÉUS CLUNIE REID MATTHIAS SCHAUFLER ARIBERT VON OSTROWSKI curated by MARC LeBLANC September 12 ­ October 25, 2014 Opening reception Friday, September 12th, 6 ­ 9PM MICHAEL THIBAULT 3311 W. Washington Blvd. Los Angeles, CA 90018 +1 (312) 316­4210 [email protected] www.michaelthibaultgallery.com "Having become in some degree pacified, we continued to watch the ship until we finally lost sight of her, the weather becoming hazy, with a light breeze springing up. As soon as she was entirely gone, Parker turned suddenly towards me with an expression of countenance which made me shudder. There was about him an air of self­possession which I had not noticed in him until now, and before he opened his lips my heart told me what he would say. He proposed, in a few words, that one of us should die to preserve the existence of the others..." The Narrative Of Arthur Gordon Pym Of Nantucket, Edgar Allan Poe, 1838 (p. 112) Richard Parker serves as a metonymic title for the abstraction, inconsistency, disjointedness, and inevitable annihilation inherent in the expression and mediation of individuals and their identities. ­ Marc LeBlanc Michael Thibault would like to thank those galleries whose continued support made Richard Parker possible: Galerie Jan Kaps in Cologne, Galerie Hammelehle & Ahrens in Cologne, Galerie Albert Baronian in Brussels, and MOT International in London. For further information and/or images, please contact the gallery at [email protected] ARTIST’S BIOGRAPHIES Peppi Bottrop (b. 1986 in Bottrop, DE) lives and works in Düsseldorf, DE.
    [Show full text]
  • Gebietsforum Emscher 6. November 2007 Dr. Jochen Stemplewski
    Dr. Jochen Stemplewski Emschergenossenschaft Gebietsforum Emscher 6. November 2007 Einführung Ist-Situation Emscher Ziel WRRL bis 2015 Offene Schmutz- Für Oberflächengewässer: wasserläufe Guter ökologischer und („Köttelbecke“) chemischer Zustand Für erheblich veränderte Ausgebaute Wasserkörper: Gutes Bachläufe, ökologisches Potenzial und technisch überformt guter chemischer Zustand Altlasten und Für Grundwasser: bergbaubedingte Guter chemischer und Regulierung des mengenmäßiger Zustand Grundwasser Der Emscherumbau und die WRRL Handlungsbedarf wurde in den 1980er-Jahren erkannt… Modernisierung der Abwasserbehandlung Entflechtung des Entwässerungssystems Verminderung der Eintrag von Schadstoffen Herstellung/Verbesserung Strukturgüte/Durchgängigkeit … die Umsetzung mit dem Emscherumbau 1991/92 beschlossen Bau von modernen Kläranlagen Bau von rd. 400 km Abwasserkanälen Renaturierung von rd. 350 km dann abwasserfreien Gewässerstrecken Investitionsvolumen 8,7 Mrd. DM (4,4 Mrd. Euro) Der Emscherumbau ist das Programm zur Umsetzung der WRRL im Emschergebiet Festlegung der Bewirtschaftungsziele im Emschergebiet – Randbedingungen Ergebnisse der vorläufigen Bestandserfassung (2004): Anteil erheblich veränderter/künstlicher 75 % - Wasserkörper - Fließgewässerlängen 87 % „Guter Zustand bzw. gutes ökologisches Potential“ bis 100 % 2015 unwahrscheinlich Der laufende Emscherumbau wurde bei der Bestands- erfassung nicht berücksichtigt ! Festlegung der Bewirtschaftungsziele Randbedingungen im Emschergebiet Die Gewässer sind dauerhaft anthropogen beeinflusst
    [Show full text]
  • Maßnahmenübersicht Gemäß § 74 LWG Für Das Einzugsgebiet Der Emscher - PE EMR 1000 Emscher-Ost Und PE EMR 1100: Emscher-Mitte-West
    Maßnahmenübersicht gemäß § 74 LWG für das Einzugsgebiet der Emscher - PE_EMR_1000 Emscher-Ost und PE_EMR_1100: Emscher-Mitte-West - Foto Borbecker Mühlenbach: Foto Borbecker Mühlenbach: Schmutzwasserlauf nach Umgestaltung Bearbeiter: Emschergenossenschaft Fluss & Landschaft (23-FL) Kronprinzenstr. 24 45128 Essen Essen, im März 2020 Inhalt Literaturverzeichnis .................................................................................................................... 3 Abkürzungen .............................................................................................................................. 4 Zielsetzung der Maßnahmenübersicht ....................................................................................... 5 Verfahren zur Erstellung der Maßnahmenübersichten ............................................................... 6 Planungsraum ............................................................................................................................. 8 Erarbeitung der Maßnahmenübersicht ..................................................................................... 12 Zusammenfassung der geplanten Maßnahmen ........................................................................ 15 Erläuterungen zur Tabelle 1 „Programmmaßnahmen“ ........................................................ 15 Erläuterungen zur Tabelle 2 „Funktionselemente“ .............................................................. 15 Ausblick ...............................................................................................................................
    [Show full text]
  • GREEN CITY Innovationcity BACKGROUND
    Blue sky GREEN CITY InnovationCity BACKGROUND Since 2010 InnovationCity Ruhr | Model City Bottrop has been developing innovative ideas and solutions as to how the challenges of climate and structure change can be faced in an urban space. Beyond the mere concept, the “Bottrop laboratory” demon- strates how these solutions can be realised as well. THE IDEA are promoted. Potential consequences of the climate change shall be countered by greening the town space The idea for the InnovationCity Ruhr project was and the optimisation of the water balance. developed by the Initiativkreis Ruhr, an affi liation of about 70 leading companies in the Ruhr area. A MORE THAN 200 INDIVIDUAL PROJECTS complete quarter of the town with a population of about 70,000 will turn into a model quarter for energy After the town of Bottrop had won a region-wide com- effi ciency by 2020. The aim: A climate-adapted urban petition of InnovationCity Ruhr in 2010, more than 200 reconstruction whilst safeguarding the industrial projects could be initiated within a very short period of location. The concrete aim is to cut the CO2 emissions time already. Another 170 projects are being planned by half and to increase the quality of life. in addition. ENERGY TRANSITION FROM THE BOTTOM FIELDS OF ACTION The fundamental concept behind InnovationCity Ruhr The various individual projects and measures can be is „Energy Transition (Energiewende) from the bottom“. divided up into the following fi elds of action: This means that households which had been energy _Living _Mobility consumers so far are now becoming energy producers _Working _City as well.
    [Show full text]
  • Last Hour Logistics
    In cooperation with DO AMAZING THINGS WITH DATA Marketing Material* November 2019 Research Report LAST HOUR LOGISTICS The brand DWS represents DWS Group GmbH & Co. KGaA and any of its subsidiaries, such as DWS Distributors, Inc., which offers investment products, or DWS Investment Management Americas Inc. and RREEF America L.L.C., which offer advisory services. There may be references in this document which do not yet reflect the DWS Brand. Please note certain information in this presentation constitutes forward-looking statements. Due to various risks, uncertainties and assumptions made in our analysis, actual events or results or the actual performance of the markets covered by this presentation report may differ materially from those described. The information herein reflects our current views only, is subject to change, and is not intended to be promissory or relied upon by the reader. There can be no certainty that events will turn out as we have opined herein. For Professional Clients (MiFID Directive 2014/65/EU Annex II) only. For Qualified Investors (Art. 10 Para. 3 of the Swiss Federal Collective Investment Schemes Act (CISA)). For Qualified Clients (Israeli Regulation of Investment Advice, Investment Marketing and Portfolio Management Law 5755-1995). Outside the U.S. for Institutional investors only. In the United States and Canada, for institutional client and registered representative use only. Not for retail distribution. Further distribution of this material is strictly prohibited. In Australia, for professional investors only. *For investors in Bermuda: This is not an offering of securities or interests in any product. Such securities may be offered or sold in Bermuda only in compliance with the provisions of the Investment Business Act of 2003 of Bermuda which regulates the sale of securities in Bermuda.
    [Show full text]
  • 1/2 Hydrogen Opportunities Netherlands and North Rhine
    Alexander Limbach/AdobeStock Hydrogen Opportunities Netherlands and North Rhine-Westphalia Thursday, November 26, 2020, 2 – 3 pm The Netherlands and Germany are natural partners when it comes to advancing a hydrogen infrastructure that extends from the North Sea to the industrial regions on the Dutch and North Rhine-Westphalian sides of the border. The webinar gives an insight into current activ- ities and opportunities in both countries to strengthen this hydrogen structure and to inspire collaboration. The Port of Rotterdam Authority is working with various partners to become an international hydrogen hub for production, use and trading coupled with import and transport to the hinter- land. Both the Netherlands and Germany will benefit from this transition. The Emscher-Lippe Hydrogen Coordination in North Rhine-Westphalia brings together a whole region and devel- ops a hydrogen strategy with all stakeholders involved. The overall objective of the Port of Rotterdam is to support industry and logistics in order to become carbon neutral in 2050 whilst supporting the national economy substantially. In do- ing so, the port is hosting a wide range of hydrogen projects and activities: the development of a hydrogen backbone through the port; a port authority operated conversion park where wind-powered electrolysers from Shell and a Nouryon-BP partnership will produce carbon- free hydrogen; projects to develop blue hydrogen that will be used as industry fuel to gener- ate heat needed to produce fuels and other products; and an initiative to enable 500 hydro- gen-powered zero-emission trucks on the roads connecting the Netherlands, Belgium and West Germany - these are just a few examples of the range of hydrogen activities.
    [Show full text]
  • Pumpwerke Schrittmacher Der Wasserwirtschaft Titelbild: Maschinenhalle Pumpwerk Alte Emscher Foto: Tim Foltin
    TECHNIK Pumpwerke Schrittmacher der Wasserwirtschaft Titelbild: Maschinenhalle Pumpwerk Alte Emscher Foto: Tim Foltin Pumpwerk Bottrop-Boye Foto: Klaus Baumers 2 Pumpwerke – Schrittmacher der Wasserwirtschaft Liebe Leserinnen und Leser, scheinbar mühelos fließt das Wasser durch Emscher, Lippe und ihre Nebenläufe. Doch selbstverständlich ist diese Tatsache nicht, denn in den vom Bergbau geprägten Einzugs- bereichen müssen wir den Abfluss der Gewässer täglich aufwändig und technisch an- spruchsvoll organisieren. In den Poldergebieten der Emscher- und der südlichen Lipperegion arbeiten Entwässe- rungspumpwerke flächendeckend Tag und Nacht. Auch der Abfluss des Abwasserkanals Emscher (AKE) wird in Zukunft rund um die Uhr mit Hilfe von drei Großpumpwerken unter- stützt: Sie gleichen das Tiefenniveau aus, das der AKE durch sein Gefälle zwischen Dort- mund und Dinslaken unterirdisch erreichen würde. Seit unserer Gründung zählen der Hochwasserschutz, die Regelung des Wasserabflusses und die Abwasserableitung zu unseren Kernaufgaben. Mit dem Betrieb von insgesamt 276 Pumpwerken an Emscher und Lippe tragen wir entscheidend zur Lebensqualität in der Re- gion bei. Unsere Anlagen wurden im Laufe der Jahrzehnte stetig modernisiert, erweitert und an aktuelle Anforderungen angepasst. Mit dieser Broschüre möchten wir Ihnen die große Bedeutung unserer leistungsfähigen „Wasserschrittmacher“ näher bringen. Viel Spaß bei der Lektüre wünschen Ihnen Ihre EMSCHERGENOSSENSCHAFT und Ihr LIPPEVERBAND 3 Träge Flüsschen werden Abwassersümpfe Kurvenreiche Gewässer in landwirtschaftlicher Idylle Ursprünglich flossen Emscher und Lippe in zahlreichen Schleifen durch eine von Landwirt- schaft geprägte Region. Aufgrund ihrer geringen Fließgeschwindigkeit führten die Flüsse bei starken Regenfällen regelmäßig Hochwasser und überfluteten das flache Umland. Da- bei entstand eine lebendige Auenlandschaft mit Wäldern, Röhrichten, Hochstaudenfluren, sumpfigen und grasigen Bereichen. Wenn die Niederschläge nachließen, regulierten sich die Pegel jedoch bald wieder.
    [Show full text]