Detail Project Report
Total Page:16
File Type:pdf, Size:1020Kb
GOVERNMENT OF MADHYA PRADESH HARSUD LIFT IRRIGATION SCHEME DETAIL PROJECT REPORT REPORT Chief Engineer Indira Sagar Project (Canals) Sanawad District Khargone (MP) 1 HARSUD LIFT IRRIGATION SCHEME INDEX S.No. Content Pages 1. Check List 3-19 2. Salient Features 20-24 3. Report 25-44 4. Annexures 45-58 5 List of Drawing 60 2 HARSUD LIFT IRRIGATION SCHEME DETAILED SCHEME REPORT Check List 1 GENERAL DATA I Name of the Scheme HARSUD LIFT IRRIGATION SCHEME 2 Location (a) State Madhya Pradesh Khandwa (b) District(s) (i) Supply Source Indira Sagar Reservoir (ii) Lifting Point ISP Reservoir near village Nandgaon (iii) Delivery Point (iv) Benefits District Khandwa (c) Taluka(s)/Tehsil(s) (i) Supply Source ISP Reservoir near village Nandgaon (ii) Lifting Point ISP Reservoir near village Nandgaon (iii) Delivery Point Near Village 1. Benefits District Tehsil Village. Khandwa Harsud 13 Total 13 (d) Longitude/Latitude 76037’45” / 22008’45” (i) Supply Source As per list enclosed (iii) Delivery Point Near village (e) Survey of India 55C/9 Topographical Map reference No.(s) 3 (f) Earthquake zone number (i) Lifting Reach Zone III (Moderate Seismic) (ii) Command Area Zone III (Moderate Seismic) (g) Complete address for Chief Engineer, Indira Sagar Scheme, (Canals), correspondence along with pin Sanawad Dist. Khargone (M.P.) code /e-mail E mail [email protected] 3. Category of the Scheme (a) Irrigation/Multipurpose Irrigation (b) Storage/diversion By lift II PLANNING 4. Has the Master plan for overall No, the surface water of ISP Reservoir will be development of the river basin used. been prepared and stages of basin development discussed? 5. Have the alternative proposals No, being a lift irrigation scheme no alternative (including set of smaller studies are required. developments vis-à-vis a single large development) been studied and their merits and demerits discussed. 6. Does the scheme fit in the Not required. overall development of the river basin and has its priority in the overall development of the basin been discussed? 7. Is the present scheme proposed No. to be executed in stages? If so, are its various stages of execution and development discussed in the report? 4 8. Are the effects of the scheme No, The Scheme has no effects on riparian on the riparian rights & existing rights and existing upstream and downstream upstream and downstream use. Scheme etc. discussed? III INTERSTATE AND INTERNATIONAL ASPECTS 9. Are there any International/Interstate issues involved? If so, have these issues been identified and present status of agreement or tribunal decision indicated specially in respect of (a) Sharing of water (b) Sharing of cost (c) Sharing of benefits (Irrigation, flood No, interstate and international control, power tec.) aspects are involved. (d) Acceptance of the submergence by the upstream state(s) (e) Acceptance by the upstream state(s) of compensation of land coming under submergence (f) Settlement of oustees (g) Any other IV. SURVEYS 10. Have the detailed topographical surveys The scheme is prepared based been carried out for the following items and on the top sheet studies. The maps prepared as per prescribed scales. detailed topographical survey will be carried out by turnkey agency before execution of the scheme. (a) River surveys Not required (b) Reservoir surveys Not required (c) Headwork Surveys (dam(s), dyke(s), Not required barrage(s), weir (s) etc. and auxiliary components) 5 (d) Plant and Colonies sites Not conducted. (e) Canal(s), branch canal(s) and water Distribution system. (f) Major canal structures Not necessary as it will be an underground piped canal. (g) Tunnel(s), adit (s), penstocks etc. Not required 11. Surveys (detailed and sample) of areas of Not done. the command for OFD and drainage works (j) Soil Surveys Not required being a micro irrigation project. (k) Surveys for soil conservation Not necessary (l) Any other surveys i.e. archaeological, Not necessary right of way, communication etc. V. FOUNDATION INVESTIGATIONS 12. Have the detailed foundation investigations The detail surveys will be done (including in-situ tests and laboratory tests) before execution, by the Turnkey for the following structures been carried out agency to ensure suitable and detailed report(s) appended? foundation for pump house. (a) Earth and rock fill dam(s) Not required as lift scheme and pipe line being used. (b) Masonry/concrete dam(s) Not applicable (c) Barrage(s)/ Weir(s)/head regulator(s) etc. (d) Canal(s) & Canal Structures Not applicable (a) Power house(s). tunnel(s), Not applicable transformer cavern(s), desalting chamber(s), surge tank(s)/shaft(s), intake(s) 6 (f) Pump House(s) The detailed investigations will be carried out before execution. (g) Any other. 13. Are there any special features affecting the No designs? VI. CONSTRUCTION MATERIAL SURVEYS 14. Have the surveys and laboratory tests for Mainly, the scheme is to be the following construction materials been constructed by underground pipes of M.S., HDPE. These carried out and report (s) appended. pipes are to be manufactured either at factory campus or shall be brought readymade. The material requirement for construction of pump houses and other structures is nominal and the material of specified quality are easily available in the economical vicinity hence this survey is not felt essential at this stage. (a) Soils for impervious, semi-pervious and Not required pervious zones of earth and rock fill dam (s) (b) Sand Not required (c) Rock and coarse aggregates Not required (d) Brick and tiles Not required (e) Pozzolona Not required (f) Cement and lime stone Not required (g) Steel Not required (h) Any other Not required 7 15. Have the sources for each of the above Yes material been identified and need etc. indicated? 16. Have the proposal for procurement of scarce No, material is found scarce. materials been indicated? VII. HYDROLOGICALAND METEOROLOGICALINVESTIGATIONS 17. (a) Have the hydrological and meteorological These surveys are not required for investigations been carried out and status this scheme, even though (i) to (ii) of following data discussed in report? has been discussed in the report. i) Rainfall Yes ii) Temperature Yes iii) Sunshine - iv) Gauge & Discharge - v) Sediment - vi) Water quality - vii) Evaporation - (b) Has the above data been collected & Yes appended? VIII HYDROLOGY 18. Is the hydrology dealt with in detail in a It is not a storage scheme hence separate volume? Have its brief details been these surveys are not mandatory included in this Report? and therefore not included in the report. 19. Have hydrological studies been carried out Not necessary for the following: (a) To establish the availability of water for Sufficient water is available in the benefits envisaged? ISP Reservoir. (b) Command area rainfall Rainfall detail attached 20. Has the Ground Water Potential (existing use Yes, indicated in report. and additional availability) been indicated? 8 21. Have the studies regarding reservoir Not applicable being a lift sedimentation been carried out and revised scheme. elevation – area capacity curves been used in the simulations studies (Working Table) ? IX. LAND ACQUISITION AND The proposed scheme is not a RESETTLEMENT OF OUSTEES storage scheme hence no land will be submerged. The canal system is proposed through underground pipes, (minimum 1 m. below ground level), thus no land will be permanently acquired for pipe line system only temporary land acquisition will be acquired under pipe line duct act. Only land for pump houses, rising man, approach road to pump houses (if found necessary) and for building construction at pump house will be acquired. No Abadi area is proposed to be acquired. 22. Have the type and quantum of land proposed to be acquired in the submerged area, Yes, as above. Scheme area, area coming under canals and distribution system, area required for rehabilitation of the oustees been detailed ? 23. Is the basis for provision for land As per New Land acquisition compensation indicate? Act. 2013. 24. Have the rehabilitation measures, amenities Not applicable. and facilities to be provided to the Scheme affected persons been discussed and whether their provisions included in the report? Are these in accordance State’s policy/Scheme specific policy / draft national policy for rehabilitation and resettlement? 9 25. Are the basis of land acquisition of the Not applicable. Being lift submerged area up to FRL/MWL etc. scheme. discussed? X. DESIGNS The hydraulic design of rising main, pump house and canal system has been carried out. The structural design will be done by turnkey agency and will be approved by competent authority. 26. Are the canals and distribution system being Not required as it is an lined and if so what is the minimum capacity underground piped canal system. of the channel proposed to be lined? 27. Is the locations of canal structures on main Since it will be Underground Pipe and branch canals fixed after detailed line hence no major structures will surveys of the final alignment? come across. 28. Are the regulation arrangements of the off- Yes, the pipe line flow will be taking channel both near and away from the regulated by SCADA. cross regulators discussed? 29. Are sufficient escapes including terminal As it is an underground piped escapes provided on the main/branch canal system, thus escapes are not distributaries/ minors? required. XI IRRIGATION AND COMMAND AREA DEVELOPMENT 30. Have the conveyance and field irrigation In Khandwa district Soyabin is a efficiencies for paddy and upland crops prominent crop covering about during kharif, rabi etc. been indicated, 50% area. discussed and justified? 31. Are there any proposals for introducing Yes, Irrigation water shall be warabandi and if so have these proposals catered only by WARABANDI been discussed in the report and sample through WUA paripassu with the calculations for a typical development of command area.