Installation Instructions for Overly GSA Class 5 Vault Door

Total Page:16

File Type:pdf, Size:1020Kb

Installation Instructions for Overly GSA Class 5 Vault Door 574 West Otterman Street • Greensburg, PA • 15601 Toll Free: (800) 979-7300 • Local: (724) 834-7300 Fax: (724) 830-2871 • Email: [email protected] DOOR COMPANY 47" TO 49" M.O. Installation Instructions for Overly GSA Class 5 Vault Door General Information The primary purpose of the Overly Class 51 7/8" FRM. WD. 5 Security Vault Door is to provide protection of records and other valuable or sensitive material against burglary and/or surreptitious attack. If installed as directed the Security Vault Door and Frame unit meets Federal . Specification AA-D-600D (Class 5-V). The T H M. frame is a clamp-on design and is not M.O. intended to be filled with grout after R 83" 4" F installation. O 1/ Each Overly Class 5 Vault Door unit is 84 shipped in one palletized container of GSA 82" T approved dimensions. The container will contain a door and frame; an inside, three piece clamping frame appropriate for the masonry wall thickness specified in the purchase order; and other materials required FIGURE 1 for installation. Net weight for the Class 5 unit is about 1225lbs. Its shipping weight is 2. Remove the lid from the container to about 1400lbs. expose the door unit. Remove all If a GSA Special Item No. 489-154 internal packing and check that the standard Day Gate was specified, it is also following items are included: shipped in the container along with modified inside clamping frame sections. It adds A. Vault Door and frame unit with steel 120lbs. to the shipping weight. spreader permanently attached to the bottom of the frame. (Do not Masonry Opening remove spreader.) The Masonry Opening Dimensions for these doors must have a minimum width of B. Two (2) Inside Clamping Frame 47" and a maximum width of 49", a minimum Vertical Jamb sections notched at height of 82" and a maximum of 83" from the one end. (Top End.) finished floor. C. One (1) Inside Clamping Frame Prior to unpacking the Vault Door, check head section, notched at each end. the masonry opening to make certain that it complies with the above D. One bag containing fifteen (15) 1/2" dimensions as shown in Figure 1. diameter by 1-1/2" long hex head bolts and flat washers for attaching the back frame sections. Installation Procedure 1. Clear all debris and foreign matter from E. One aluminum threshold, notched at around the opening, both on the wall each end, with a bag containing four and floor. (4) 1/4" diameter by 1-1/2" long flat Copyright © 2003 Overly Door Company 1 ENGD-012 Rev#00 01/26/2003 head stainless steel mounting bolts 6. Insert the two all thread rods into the and four expansion shields. anchor blocks located on the interior side of each jamb, approximately 33" F. One box containing either floor- from the top. Tighten them snugly and mounted or wall-mounted doorstop remove the nuts and washers. Place the with related screws and anchors. Temporary Clamping Bar over the all thread and secure the door in position, G. One Temporary Installation Kit, using the two nuts and washers that consisting of two (2) 1-1/2” x 2-1/2” were supplied. wood spreaders, one (1) 2” x 4” wood temporary clamping bar (with 7. The forklift or ratchet hoist and any two drilled holes) and two (2) additional equipment used to raise the lengths of 1/2" diameter all thread door into position may now be removed with nuts and washers. as the door is effectively clamped into the opening. H. One sealed envelope marked "Confidential Information." which 8. Have the inside installer insert the two contains combination lock wood spreaders. Upper spreader is instructions, and change key. This placed 18" down from the top of the sealed envelope also contains two frame. Lower spreader is positioned 18" (2) "Emergency Release Keys", one from the floor. The spreaders must be of which must be supplied to the maintained in position throughout the inside installer before the door is plumbing and shimming operation. hoisted into the opening. (See point 4.). 9. The outside installer, using a 6' or 8' spirit level; places it: 3. Lay the container flat on the floor with the bottom end of the door adjacent to A. Across the frame head flange, to the opening into which the door is to be ensure that it is dead level installed. horizontally. If not, use a pry bar and shims at bottom of appropriate jamb 4. Place one installation person inside the to achieve a true horizontal vault with a flashlight, a pry bar, vise condition. grips, hammer, a ¾” flat open end wrench or an adjustable wrench, the B. On the face of the jambs, to ensure complete temporary installation kit (as that each side is in a true vertical described in part 2.G above), an position. If not use shims behind the emergency release key, and the three outer flange. inside clamping frame sections. It is advisable to provide ear plugs where C. On the edge of the hinge jamb necessary. flange. to ensure that it is truly plumb. Note: Emergency Release Key MUST be supplied to inside installer. 10. The inside installer, using a 3/4" flat open end wrench, extends the 6 hinge 5. Raise the door unit into the vertical side adjustment bolts until they contact position in the doorway and insert into the wall snugly. opening. A forklift or chain hoist may be used to raise the door into position; Do not torque, racking in the frame however, be careful to protect the may occur and cause binding. surface of the door if pushing with a forklift or attaching straps or chains. The 11. The outside installer then, again, checks inside installer should use the pry bar to the edge of the hinge side jamb flange guide the unit into place. to ensure that it remains plumb. If not, instruct the inside installer to tighten Copyright © 2003 Overly Door Company 2 ENGD-012 Rev#00 01/26/2003 or loosen adjusting screws until the the wall. Do not over tighten and warp hinge side is plumb. the frame. 12. Inside installer is to work across head of 16. Take the inside Clamping Frame Head frame, tightening up the adjustment section and insert it into position. Install bolts in 3 locations. the 1/2" diameter x 1-1/2" long hex bolts and washers in each location. Using an 13. Open the door by pressing down on the open end, box end or socket wrench, lever handle. Using only moderate force, tighten the bolts until they are snug. At test for free movement of locking bolts this point the door is firmly secured into and door within the frame. This unit was the opening and the clamping bar. All pre-hung in the factory and inspected for thread and temporary spreaders may be free and easy movement of all parts. removed. Due to manufacturer’s recom- mendations, units shipped with X-09 17. Install the 2 vertical jamb sections in the locks are shipped in the locked position. same manner as the head section. Before attempting to open, the factory Install and snug all 1/2" diameter x 1- combination must be dialed and the lock 1/2” long hex bolts. To final torque bolts, bolt retracted. turn each bolt approximately 1/2 turn. * NOTE: Do not attempt to force the Do not apply excessive torque on the outside lever handle downward as it bolts as this could deform the back contains a shear pin that will break, frame and damage the unit. If the rendering it inoperable. Excessive door has been installed correctly and force on the inside handle when is plumb in all directions, it should following "Emergency Escape" now open easily and freely. procedure may damage it. Avoid Lockouts 14. If door does not open easily, one of two Maintain one person inside the vault conditions has occurred: while working on the door or manipulating the combination lock. A. Frame has slipped out of alignment. This person can override the Double check frame placement with combination by following the spirit level and make appropriate Emergency Escape Procedure adjustment. printed on the label on the face of the access panel. Setting of the B. Someone has manipulated the combination should be done only by combination dial from its factory a qualified Vault Door and safe setting, locking the door. This can specialist. Overly will not pay be determined if the inside installer, charges for correcting lockouts. following "Emergency Escape" procedure is able to unlatch and 18. With the door in the open position, place open the door. the aluminum threshold over the permanent spreader between the jambs Combination must then be reset and mark the floor at each hole location to factory setting following in the threshold. The permanent procedure described under the spreader has been provided with section of the instructions oversize holes that match the threshold, entitled 'Activating Combination drill 1/2" diameter holes to receive Lock at Factory Settings." expansion shields and install the threshold with the supplied fastener. 15. After the door is operating freely, have inside installer make sure that all of the 19. Install doorstop. adjustment bolts are still in contact with Copyright © 2003 Overly Door Company 3 ENGD-012 Rev#00 01/26/2003 Activating Combination Lock at combination and activate its locking mechanism. This may also be done while Factory Settings the door is open, permitting the door to be The Overly door is equipped with a GSA secured automatically upon closing.
Recommended publications
  • Basic Technical Rules the Nubian Vault (Nv)
    PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 BASIC TECHNICAL RULES THE NUBIAN VAULT (NV) TECHNICAL CONCEPT THE NUBIAN VAULT ASSOCIATION (AVN) ADVICE TO MSA CLIENTS Version 3.0 SEASON 2013-2014 COUNTRY INTERNATIONAL Association « la Voûte Nubienne » - 7 rue Jean Jaurès – 34190 Ganges - France February 2015 www.lavoutenubienne.org / [email protected] / +33 (0)4 67 81 21 05 1/14 PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 CONTENTS CONTENTS.............................................................................................................2 1.AN ANCIENT TECHNIQUE, SIMPLIFIED, STANDARDISED & ADAPTED.........................3 2.MAIN FEATURES OF THE NV TECHNIQUE........................................................................4 3.THE MAIN STAGES OF NV CONSTRUCTION.....................................................................5 3.1.EXTRACTION, FABRICATION & TRANSPORT OF MATERIAL....................................5 3.2.CHOOSING THE SITE....................................................................................................5 3.3.MAIN STRUCTURAL WORKS........................................................................................6 3.3.1.Foundations........................................................................................................................................ 6 3.3.2.Load-bearing walls.............................................................................................................................. 7 3.3.3.Arches in load-bearing
    [Show full text]
  • READY VAULT Instructions #1050224 Product #222933 Revision A
    READY VAULT Instructions #1050224 Product #222933 Revision A 1 IMPORTANT SAFETY INFORMATION • This vault is designed to increase safety of unloaded firearm(s). Completely unload the firearm(s) before using this device. • Treat every firearm as if it were loaded. • Always keep the muzzle pointed in a safe direction when handling any firearm. • Read the owner’s manual and instructions supplied with your firearm before attempting to operate the firearm and use this vault. • Always store unloaded and locked firearms in a safe place inaccessible to children and other unauthorized persons. Store ammunition in a separate locked or secure location. • Do not store the combination to the vault in the same place as your vault. • This vault is only part of an effective firearm safety and storage solution, and should not be a substitute for safe firearm handling or secure storage. • This vault is designed to be a convenient locking mechanism, but tools, determination, and time can overcome any vault. • Always engage the safety and never touch the trigger when placing or removing the firearm from the vault. • Always fasten the vault to a secure object. See mounting instructions. IMPORTANT • This vault features a programmable lock mechanism. Upon removing this product from the packaging for the first time, be sure to program the lock to a unique combination (See programming lock instructions for more details). • You should document your programmed combination and store this documented combination in a secure location, so that the combination can be retrieved if forgotten. Combination should be stored in a secure location, inaccessible to children and unauthorized individuals.
    [Show full text]
  • The Vault with Curvilinear Ribs in the “Hall of Arms”
    In: Proceedings of the First Conference of the Construction History Society, ed. by James W P Campbell et al., 459-468. Queens’ College, Cambridge 2014 (authors’ manuscript) The Vault with Curvilinear Ribs in the “Hall of Arms” in the Albrechtsburg Meissen: Studies on the Concept, Design and Construction of a Complex Late Gothic Rib Vault David Wendland, María Aranda Alonso, Alexander Kobe During the 14th and 15th centuries, the challenge of creating vaulted ceilings lead to ever more complex solutions in late Gothic architecture. These ambitious, astonishing and sometimes daring constructions rank amongst the finest masterpieces of architecture – extremely demanding from the structural point of view and particularly challenging in their geometric design. Their builders managed to overcome the difficulties of planning the complicated meshes of ribs soaring along spatial curves, providing instructions for the production of their single components and their assembly on the building site, and achieving a curved vault surface which corresponds to the equilibrium condition of shell structures. The discussion on how the design and planning of these structures was performed and how their construction process was organized, has been so far largely based on sources (some of them dating from long after late Gothic architecture was practised), and in particular on their interpretation as established in the 19th century. However, this current state of research can be shown to be in contrast with the evidence of many of the actual built objects. At this point, it appears necessary to formulate hypotheses on the design directly from the built artefact, and on this basis attempt a re-interpretation of the known drawings and treatises.1 For this approach it is also necessary to deal with the methodological challenges of using the building as source.
    [Show full text]
  • Transformer Vault Placement and Space Requirements
    Transformer Vault Placement and Space Requirements Consolidated Edison Company of New York, Inc. 4 Irving Place New York NY 10003 www.conEd.com Transformer Vault Placement and Space Requirements Whether you’re constructing a new building Con Edison supplies service to buildings at our or adding electric load to an existing one, standard voltage of 120/208. In addition, 265/460- Con Edison strongly encourages you to con- Volt or high-tension service is available, but may involve an incremental cost to the customer. tact us early in the design process to discuss your transformer vault requirements. This When transformer vaults are required to serve the step will help you to avoid unnecessary and building’s load, it is essential that you consider the vault requirements before you proceed with the costly design changes or delays that may design of your building. This will mitigate costly result if these requirements are not incorpo- design changes for you and/or delays to your rated into your final building design. project. Typical transformer vault space require- All Con Edison transformer vaults require natural ments depend on the number of transformers ventilation and must have sidewalk gratings, as required to supply electricity to your build- noted in the enclosed drawings, which identify the ing. In addition, there may be an incremen- space requirements for sidewalk transformer vault installations. The gratings provide ventilation for tal customer cost to supply service at your the transformer as well as a means of entry for Con requested point of entry. Your final service Edison personnel to maintain, remove, or install design will be developed after Con Edison equipment.
    [Show full text]
  • Data Vault Data Modeling Specification V 2.0.2 Focused on the Data Model Components
    Data Vault Data Modeling Specification v2.0.2 Data Vault Data Modeling Specification v 2.0.2 Focused on the Data Model Components © Copyright Dan Linstedt, 2018 all rights reserved. Abstract New specifications for Data Vault 2.0 Methodology, Architecture, and Implementation are coming soon... For now, I've updated the modeling specification only to meet the needs of Data Vault 2.0. This document is a definitional document, and does not cover the implementation details or “how-to” best practices – for those, please refer to Data Vault Implementation Standards. Please note: ALL of these definitions are taught in our Certified Data Vault 2.0 Practitioner course. They are also defined in the book: Building a Scalable Data Warehouse with Data Vault 2.0 available on Amazon.com These standards are FREE to the general public, and these standards are up-to-date, and current. All standards published here should be considered the correct and current standards for Data Vault Data Modeling. NOTE: tooling vendors: if you *CLAIM* to support Data Vault 2.0, then you must support all standards as defined here. Otherwise, you are not allowed to claim support of Data Vault 2.0 in any way. In order to make the public statement “certified/Authorized to meet Data Vault 2.0 Standards” or “endorsed by Dan Linstedt” you must make prior arrangements directly with me. © Copyright Dan Linstedt 2018, all Rights Reserved Page 1 of 17 Data Vault Data Modeling Specification v2.0.2 Table of Contents Abstract .........................................................................................................................................1 1.0 Entity Type Definitions .............................................................................................................4 1.1 Hub Entity ......................................................................................................................................................
    [Show full text]
  • Barrell Vault
    BARREL VAULT Tile Counter Batten and Batten Installation Guide www.Boral .com BARREL VAULT Tile Actual Size= 43 13/16”x 15 5/8” Exposure= 43 1/4”x 14” Weight= 5.4lbs. per panel Panels per square (100 sq. ft.) = 23.8 pcs Weight per square= 130 lbs. Mission Cap Actual Size= 15 1/4”x 6” Exposure= 14 1/2"x 6” Weight per cap= 1lb. BARREL VAULT The BARREL VAULT is designed to simulate traditional Spanish tile. The profile gives a traditional look of a spanish “S” tile appearance and adds strength and durability making it a very walkable stone coated steel roof. The installation procedures demonstrated in this manual are recommended methods for the installation of the Boral Steel BARREL VAULT battenless roofing system. They are not the only ways to install a Boral Steel system but are acceptable methods for the standard installation of the Boral Steel product. Contractors and installers should at all times use their professional judgment, and modify and tailor details to fit their specific installation and to meet local codes and ordinances. Due to the fact that Boral Steel has no control over the actual installation of the product, Boral Steel assumes no liability for incorrect installation of its product or any personal injury that m ay occur while installing such product. Nor does Boral Steel express nor imply any warranty related to the installation of the product. Boral Steel’s liability with regards to the Boral Steel product is limited exclusively to its standard written lifetime limited warranty. Therefore, Boral Steel recommends that only professional roofing contractors, who have completed the Boral Steel Factory Training Program, should install the Boral Steel roofing system.
    [Show full text]
  • The Influence of the Arch
    The Influence of the Arch The Influence of the Arch by ReadWorks The lasting influence of ancient Rome is apparent in many areas of our contemporary society. Sophisticated elements of law, engineering, literature, philosophy, architecture, and art can all be traced back to the Roman Empire. But perhaps one of the most lasting contributions from Roman civilization is something we see nearly every day: the Roman arch. An arch is a curved structure designed to support or strengthen a building. Arches are traditionally made of stone, brick, or concrete; some modern arches are made of steel or laminated wood. The wedge-shaped blocks that form the sides of an arch are called voussoirs, and the top center stone, called the keystone, is the last block to be inserted. During construction, the arch is supported from below before the keystone is put in. The curve of an arch may take different shapes, but it is often a rounded or pointed semicircle. Although the Romans revolutionized the arch, the structure has been around since before them. The Assyrians used arches to construct vaulted chambers or underground drains. However, these early arches were only suitable for small structures. The designs weren't sophisticated enough to support larger edifices, like palaces or government buildings. The Romans, however, improved the arch and made it strong enough for large-scale, widespread use. By developing an arch capable of supporting huge amounts of weight, they laid the groundwork for some of the most important advancements in architectural history. The arch became a vital feature of bridges, gates, sewers, and aqueducts, which in turn were integral to the modernization of cities.
    [Show full text]
  • Vault Roof and Mud-Walled House
    Vault Roof and Mud-walled House Problem/Need The depletion of building resources like timber, bamboo and thatch have progressively made the village house-builder’s jobs more and more difficult. Timber used to be the principal structural material while bamboo came in handy for almost everything. Shrinking forests have contributed to removing timber and bamboo from the reach of the poor. Even thatch has become scarce and the frequent repair require for thatch roofs make them problematic. Local mud fortresses or garhis furnished excellent building mud. These garhis are getting extinct and the resource drying out. Black cotton soil is unfit for wall making. The need therefore is to have a roof timber or thatch along with mud walls using ordinarily available soil. Approach/Strategy The above need was sought to be met through designing a low-cost house with an arched roof of hollow cylindrical clay tiles resting on a ring beam supported by brick pillars, while the non- supporting walls are made from non-erodible and rodent-proof mud walls using special techniques. This technique has been developed and propagated by Centre of Science for Villages (Wardha). Technology Package Ö Guna Vault Roof: “Guna” in Telugu, is a tapering, burnt clay pipe. The familiar semi-cylindrical pan tiles are obtained by splitting such pipes vertically into two. These “Guna” tapering pipes can be socketed into one another forming an arch over a suitably curved shuttering. A series of such arches make a barrel vault capable of withstanding considerable loads – upto 1 ton/m2. The top of the roof is given a plaster finish.
    [Show full text]
  • The Use of the Trompe Volume in a Brick Vault
    The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-2/W11, 2019 GEORES 2019 – 2nd International Conference of Geomatics and Restoration, 8–10 May 2019, Milan, Italy THE HBIM ANALYSIS OF THE GEOMETRY TO UNDERSTAND THE CONSTRUCTIVE TECHNIQUE: THE USE OF THE TROMPE VOLUME IN A BRICK VAULT D. Attico 1, A. Turrina 1, F. Banfi 1*, A. Grimoldi 2, A. Landi 2, P. Condoleo 3, R. Brumana 1 1 Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Milan, Italy (fabrizio.banfi, raffaella.brumana)@polimi.it 2 Department of Architecture and Urban Studies, Politecnico di Milano, Milan, Italy (alberto.grimoldi, angelogiuseppe.landi)@polimi.it 3 Department of Civil and Environmental Engineering, Politecnico di Milano, Milan, Italy [email protected]; KEY WORDS: Geometry, brick vault, trompe, constructive technology, 3d model, HBIM, NURBS, generatives, cloister vault, dome ABSTRACT: The construction of brick-vaulted systems between the 16th and 18th centuries is a typical mark among the noble buildings in large part of Northern Italy. Nowadays they are still a witness of a high level of constructive knowledge by workers, formalized in historical treatises and manuals supporting a literature of theories and practices known since ancient times. The way a vault is geometrically built, regardless of its typology, is not unique and it differs in treatises, according to its location in time and space. The consequence is the generation of “mixed” solutions, where the result of the final volume is achieved by the integration of different generative models and spatial solutions. The observation of cloister vaults, apparently similar to each other but built adopting different constructive techniques within a single building, Magio Grasselli Palace in Cremona, helped to understand this topic.
    [Show full text]
  • State Payments to Two Companies for COVID-19 Testing
    State Payments to Two Companies for COVID-19 Testing SPECIAL REVIEW July 2021 Office of the Legislative Auditor State of Minnesota State of Minnesota Office of the Legislative Auditor Special Reviews We conduct special reviews in response to requests from legislators and other public officials, or to address a government issue that has come to our attention in some other way. While the focus of a special review is more narrow than an audit or evaluation, our objective is the same: to find the facts and report them accurately and objectively. For more information about the Office of the Legislative Auditor, go to our website at: www.auditor.leg.state.mn.us For more information about OLA and to access its reports, go to: www.auditor.leg.state.mn.us. To offer comments about our work or suggest an audit, evaluation, or special review, call 651-296-4708 or email [email protected]. To obtain printed copies of our reports or to obtain reports in electronic ASCII text, Braille, large print, or audio, call 651-296-4708. People with hearing or speech disabilities may call through Minnesota Relay by dialing 7-1-1 or 1-800-627-3529. Photo provided by the Minnesota Department of Administration with recolorization done by OLA. (https://www.flickr.com/photos/139366343@N07/25811929076/in/album-72157663671520964/) Creative Commons License: https://creativecommons.org/licenses/by/2.0/legalcode Printed on Recycled Paper OFFICE OF THE LEGISLATIVE AUDITOR O L A STATE OF MINNESOTA • James Nobles, Legislative Auditor July 2021 Members of the Legislative Audit Commission: In response to complaints we received, we examined state payments to two companies that conducted COVID-19 specimen collection and analysis, starting in late 2020.
    [Show full text]
  • Behaviour of Masonry Vaults and Domes: Geometrical Considerations
    Structural Analysis of Historical Constructions, New Delhi 2006 P.B. Lourenço, P. Roca, C. Modena, S. Agrawal (Eds.) Behaviour of Masonry Vaults and Domes: Geometrical Considerations G. Arun Yıldız Technical University, Faculty of Architecture, 34349 Yıldız, Istanbul, Turkey ABSTRACT: In historic buildings, constructed of stone and brick masonry, the forms used to span between vertical supports and enclosing walls are arches, vaults and domes of various pro- files and surfaces. The geometry of these forms and their force distribution has different charac- teristics. Stone, brick and mortar as building materials are weak in tension and can only with- stand compression. Cracks are the visible signs of damage at the weaker zones. The geometry of such curved surfaces constituting the structure has important role in safety evaluation. The deep knowledge of the geometry and surface characteristics can help predicting the possible weaker zones and implement appropriate modelling in numerical analysis. 1 INTRODUCTION Most historic vaulted and domes buildings are constructed of masonry blocks as stone and brick that are not resistant to tension and can only withstand compression. Due to the high ratio be- tween the specific weight and the bearing capacity, masonry structures bear loads in massive and rigid forms. Aging, increased loads, exposure to environmental factors often result in dete- rioration of such structures. To understand the causes and mechanism of decay, diagnostic stud- ies are carried out. Preliminary survey, before any intervention to a historic masonry structure include historical survey, geometric survey and a detailed survey of existing cracks and other damages the structure had developed during its life.
    [Show full text]
  • From the Vault: Happiness Is Worth Celebrating!
    From the Vault: Happiness is worth celebrating! From the Vault is an exclusive feature for the Keepsake Community from Hallmark Historian Samantha Bradbeer. Proud History Peanuts, the popular comic strip featuring characters like Charlie Brown, Linus, Lucy and Snoopy, was created and drawn by American cartoonist Charles Schulz (1922-2000). This month marks its 70th anniversary – as Peanuts made its first appearance on October 2, 1950, in seven newspapers. Over the next decade, Peanuts’ popularity grew, and, so much so, that it’s zany characters eventually caught the eye of Hallmark Editor Arnold Shapiro, who fostered the iconic partnership between the two global brands. Peanuts’ relationship with Hallmark began in 1960 with a retail test of 4 greeting cards. “Certainly Schulz is the cartoon champion of all time - and for greeting cards, too. He is a magician with a pencil. The simplicity of his drawings and the unaffected frankness depicting everyday life give his characters an appeal the public never tires of,” said Hallmark founder J.C. Hall. Since 1960, over 1 billion Hallmark Peanuts cards have been sold. Their immediate popularity inspired a variety of other Hallmark products featuring Peanuts characters— books, candles, gifts, partyware, ornaments and more – that have been sold and treasured in over 40 countries worldwide. Today, Hallmark is celebrating Peanuts’ 70th anniversary with joyful gifts and exclusive collectibles, including over a dozen ornaments, in stores and online. When the time came to curate this collection, countless artists, designers, and writers visited the Hallmark Archives for inspiration. Many of their final designs pay homage to Peanuts’ early history.
    [Show full text]