IL&FS POWER COMPANY LIMITED

ENVIRONMENTAL/CRZ CLEARANCE VALIDITY EXTENSION FOR ITPCL CAPTIVE PORT AND OTHER FACILITIES DISTRICT, TAMIL NADU

UPDATED FORM 1 JULY 2017

Submitted By

L&T Infrastructure Engineering Limited C1171304 RP001, Rev.0

L&T Infrastructure Engineering Ltd. Client: IL&FS Tamil Nadu Power Company Limited Project: Environmental/CRZ Clearance Validity Project No.: Extension for Captive Port and Other C1171304 Facilities of ITPCL Title: Document No.: Rev.: Updated Form 1 RP001 0

This document is the property of L&T Infrastructure Engineering Ltd. (formerly File path: known as L&T-Rambøll Consulting Engineers Limited) and must not be l:\ports\2017\c1171304 - itpcl port ec extn-bifurcation\working\reports\001 - passed on to any person or body not authorised by us to receive it nor be copied ec validity extension application\updated form 1 28.07.2017\updated form 1 or otherwise made use of either in full or in part by such person or body without - itpcl captive port ec ext 29.07.17.doc our prior permission in writing.

Notes: 1.

Revision Details:

0 29.07.2017 First Submission ALJ BRT CVS Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved TABLE OF CONTENTS Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

TABLE OF CONTENTS 1 Basic Information ...... 1 2 Activity ...... 7 3 Environmental Sensitivity ...... 21

LIST OF APPENDICES Appendix A: Environmental and CRZ Clearances and the status of compliance Appendix B: Integrated Layout Showing Thermal Power Plant (TPP), Desalination Plant & its associated facilities and Captive Port Appendix C: Layout Showing Facilities Developed and yet to be Developed of Captive Port and Desalination Plant’s/TPP’s associated facilities such as Intake/Outfall System Appendix D: Location map

Table of Contents Page i UPDATED FORM 1 Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

FORM 1

1 Basic Information S. No. Item Details 1. Captive Port and Desalination Plant’s/Thermal Power Plant’s (TPP) associated facilities such as Intake/Outfall System at Kottatai, , Tamil Nadu Name of the Project Application is for Extension of Validity of Environmental and CRZ Clearance upto October 28, 2020 (three more years) for the facilities yet to be developed.

2. S. No. in the schedule  Captive Port included as Item 7(e) in the Schedule of the Notification.  Captive Desalination Plant’s/ Thermal Power Plant’s associated facilities such as intake and outfall system does not attract EIA Notification. 3. Proposed Environmental and CRZ Clearance was capacity/area/length/tonnage to be obtained in October 29, 2010 and copy of handled / command area/lease EC/CRZ clearance and its latest area/number of wells to be drilled compliance report submitted to MoEF&CC, regional office is given in Appendix A. (I) As per the clearance obtained, the following major Project components of Captive Port along with Desalination Plant’s/ TPP’s associated facilities have been permitted: A. Captive Port: To handle the coal requirement for the 3600 MW (2x600 MW and 3X800 MW) Thermal Power Plant1, a captive port with enabling infrastructure has been proposed:

1 The details of the facility/systems developed by ITPCL under MoEF&CC granted Thermal Power Plant EC, Corrigendum and amendments are given below:  2 x 600 MW (1200 MW): Boiler, turbine and generator for 2 units of 600 MW each; Fuel oil system; ESP; 1x275m stack; cooling towers; Fire protection system; Power evacuation (transmission lines); FGD system; Ash handling system; Seawater intake and outfall system; Other utilities (Desalination plant, DM plant etc.); Environment Management System; Rail line for coal transport  For the entire 3180 MW: (2X600 MW and 3X660 MW) - Revised configuration as per EC amendment letter no: J- 13012/34/2008-IA.II(T) dated February 04, 2014) Rainwater disposal system; Coal handling system and coal stockyard; Ash pond; Intake system for drawal of seawater 1 Basic Information Page 1

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

S. No. Item Details  Handling Capacity – 15.0 MMTPA  Two (02) Coal Berths – Total length of 600m and depth of (-) 15.5m CD  Two (02) Breakwaters – Northern breakwater of 2100m and Southern breakwater of 1150m  Approach Channel – 3300m long, 160m wide, (-) 16.1m CD to cater 80,000 DWT and facilities enhanced in future to receive 200,000 DWT vessels  Turning Circle – 500m Diameter and depth of (-) 15.5m CD  Mechanical unloaders – 4000 TPH capacity on each berth  Evacuation/conveying of coal to power plant  Capital Dredging – 11 MCM (out of which ~1 MCM will be used along the waterfront for leveling purpose and balance will be disposed to identified offshore location at 30m contour).  Buildings associated with Captive port including utility buildings etc. B. Captive Desalination Plant (302 MLD - Reverse Osmosis) and TPP associated facilities:  Intake System: ~34,1003 m3/hr of seawater for thermal power and desalination plant will be sourced from intake proposed in between breakwaters towards northern side along with essential systems such as Desilting Basin, Pump House etc.  Outfall System: ~25,8864 m3/hr of return cooling water and reject brine will be discharged at the outfall proposed towards north of northern breakwater, more than 1500m distance into the sea

For the balance capacity of 1980 MW (i.e. 3 x 660 MW), the facilities are yet to be developed are: Boiler, turbine and generator for 3 units of 660 MW each; 1x275m stack; Intake pump house & outfall pipes; Captive port and external coal handling system; Cooling towers and water systems (Desalination plant & DM plant) and Power evacuation. 2 Desalination Plant (within power plant premises): Capacity has been revised to 40 MLD as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter dated February 04, 2014. 3 Intake quantity has been optimised to 33,000 m3/hr as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter No: as per EC amendment letter dated February 04, 2014 4 Outfall quantity has been optimised to 24,062 m3/hr as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter No: as per EC amendment letter no: J-13012/34/2008-IA.II(T) dated February 04, 2014 1 Basic Information Page 2

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

S. No. Item Details

Integrated layout showing approved TPP, captive Desalination Plant & its associated facilities and Captive Port facilities are given as Appendix B. (II) The Project components along with its associated facilities developed/constructed so far at site are as follows: A. Captive Port:  No Facilities pertaining to captive port have been constructed. B. Captive Desalination Plant (10 MLD - Reverse Osmosis) and TPP (2X600 MW) associated facilities have been developed/constructed.  Intake System: About 700m long to draw Seawater for the entire 3180 MW capacity till desilting basin and Pump House for 1200 MW  Outfall System: > 1500 m from Shore to discharge return cooling and reject brine (III) The components along with its associated facilities to be developed at site are as follows: A. Captive Port:  Handling Capacity – 15 MTPA  Two (02) Coal Berths – Total length of 600m and depth of (-) 15.5m CD  Two (02) Breakwaters – Northern breakwater of 2100m and Southern breakwater of 1150m  Approach Channel – 3300m long, 160m wide, (-) 16.1m CD to cater 80,000 DWT and facilities enhanced in future to receive 200,000 DWT vessels  Turning Circle – 500m Diameter and depth of (-) 15.5m CD  Mechanical unloaders – 4000 TPH capacity on each berth  Evacuation/conveying of coal to power plant

1 Basic Information Page 3

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

S. No. Item Details  Capital Dredging – 11 MCM (out of which ~1 MCM will be used along the waterfront for leveling purpose and balance will be disposed to identified offshore location at 30m contour).  Buildings associated with Captive port including utility buildings etc. B. Captive Desalination Plant (30 MLD - Reverse Osmosis) and TPP (3X660 MW) associated facilities.  Intake System: Augmentation of intake pump house to pump about 33,000 m3/hr (Total)  Outfall System: Augmentation of outfall pipelines to discharge about 24,062m3/hr (Total) No changes in The Project configuration, activity, capacity and facilities remain same as for which Environmental/CRZ clearances and amendments (in TPP EC) have been granted. The facilities to be developed will be in line with the clearances granted. Captive Port and Desalination Plant’s/TPP’s associated facilities Layout showing existing and to be developed facilities are given as Appendix C.

Extension of validity of Environmental and 4. New/Expansion/Modernisation CRZ Clearance 47.35 Ha (~117 acres) of land allotted for development of Captive port and Captive Desalination Plant’s/ Thermal Power Plant’s associated facilities such as intake and outfall systems. No Port facilities have been 5. Existing Capacity/Area, etc. developed so far and only Intake system till desilting basin for entire TPP capacity, pump house for initial 1200 MW and part of outfall system facilities have been developed. 6. Category of Project i.e., ‘A ‘or ’B’ Category ‘A’ Does it attract the general Environmental/CRZ Clearances obtained 7. condition? If yes, please specify under Category ‘A’ only. Does it attract the specific 8. condition? If yes, please specify No

1 Basic Information Page 4

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

S. No. Item Details Location The project site is located on the coastal side of Kottattai in Bhuvanagiri Taluk of Cuddalore district, Tamil Nadu.

Location map given as Appendix D. Sea Poramboku Land Owned by Tamil Plot/Survey/Khasra No. Nadu Maritime Board (TNMB) Village Kottattai Tehsil Bhuvanagiri District Cuddalore State Tamil Nadu 9. Nearest railway station/ airport Railway Station: Puduchatram ~4.7 km 5 along with distance in km Airport: Thiruchirapalli ~141 km International Airport: ~167 km 10. Nearest town, city and district Nearest Town: ~17 km headquarters along with distance in km6 District Headquarters: Cuddalore ~25 km 11. Village Panchayats, Zilla Parishad, Municipal Corporation, Kottattai village, Bhuvanagiri Taluk of Local body (complete postal Cuddalore district, Tamil Nadu. addresses with telephone nos. to be given) 12. M/s IL&FS Tamil Nadu Power Company Name of the applicant Limited (ITPCL) 13. IL&FS Tamil Nadu Power Company Ltd 4th Floor, KPR Tower, Old No. 21, New No. Registered Address 2, 1st Street, Subba Rao Avenue College Road, Chennai- 600 006. Tamil Nadu, . 14. IL&FS Tamil Nadu Power Company Ltd 4th Floor, KPR Tower, Old No. 21, New No. Address for correspondence: 2, 1st Street, Subba Rao Avenue College Road, Chennai- 600 006. Tamil Nadu, India. Name Mr. M.S. Srinivasan, IAS (R) Designation (Owner/Partner/CEO) Chairman IL&FS Tamil Nadu Power Company Ltd 4th Floor, KPR Tower, Old No. 21, New No. Address 2, 1st Street, Subba Rao Avenue College Road, Chennai- 600 006 Tamil Nadu, India. Pin code 600 006. E-mail [email protected] Telephone No +91- 44 - 30725550 Fax No +91- 44 - 30725551 15. Details of Alternative Sites Environmental and CRZ Clearance were

5 Aerial distances are measured from Captive Port Site 6 Aerial distances are measured from Captive Port Site 1 Basic Information Page 5

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

S. No. Item Details examined, if any. Location of obtained. This application is for EC/CRZ these sites should be shown on a validity extension only. Toposheet. 16. Interlinked Projects Nil Whether separate application of 17. interlinked project has been Not Applicable submitted 18. If yes, date of submission Not Applicable

19. If no, reason Not Applicable 20. Whether the proposal involves Project does not attract the Forest approval/ clearance under: (Conservation) Act, 1980 and the Wildlife  The Forest (Conservation) (Protection) Act, 1972. Act, 1980 This proposal is for extension of validity of  The Wildlife (Protection) Environmental and CRZ clearance only. Act,1972 Environmental and CRZ clearance has  The CRZ Notification, 2011 been obtained vide MoEF&CC Letter No.: F. No. 11-43/2010-IA.III dated October 29, 2010 (Appendix A) 21. Whether there is any Government Port Limits were declared by Tamil Nadu order/ policy relevant / related to Maritime Board and land also allotted by the site? them for the development of Captive Port. 22. Forest land involved (hectare) None 23. Whether there is any litigation pending against the project and/or Local villagers (petitioner) filed complaint land in which the project is stating that ITPCL had constructed proposed to be set up desalination plant within CRZ area. TNPCB  Name of the court and MoEF&CC had responded after  Case no inspection that the facility has not been built  Orders/ directions of the court, in CRZ area. ITPCL had also contested that if any and its relevance with the complaint does not have merit. the proposed project.

1 Basic Information Page 6

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

2 Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) No. confirmation with source of information data Development of Captive port and its Permanent or temporary associated facilities will be carried out in change in land use, land cover 47.35 Ha (117 acres) of land. The or topography including change in land use shall be as per the 1.1 Yes increase in intensity of land use approved layout. (with respect to local land use The topography of the project site is flat plan) terrain with a gradual slope towards the Bay of Bengal.

Details of project site were presented to Clearance of existing land, EAC and Environmental and CRZ 1.2 Yes vegetation and buildings? clearances were obtained. The area will be developed as per the approved layout.

No new land use involved. Development 1.3 Creation of new land uses? No as per approved layout is envisaged.

All the requisite pre-construction Pre-construction investigations 1.4 Yes investigations have been carried out as e.g. bore houses, soil testing? necessary. Construction activities include development of Captive port and remaining part of Captive Desalination 1.5 Construction works? Yes Plant’s/Thermal Power Plant’s associated facilities such as intake and outfall. 1.6 Demolition works? No - Adequate temporary facilities (houses, Temporary sites used for water, power, fuel, sanitation etc.) for 1.7 construction works or housing of Yes construction labour camp will be construction workers? provided. Above ground buildings, structures or earthworks Partly implemented as per the project 1.8 Yes including linear structures, cut requirement (Intake/outfall) in and fill or excavations compliance with clearances obtained. Envisaged as a part of development and project requirement for the facilities yet Underground works including 1.9 Yes to be developed in compliance with mining or tunneling? clearances obtained. Above ground buildings/underground

2 Activity Page 7

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) No. confirmation with source of information data works such as Gate complex, Port operation building, Administration building, Parking, Canteen building, Water storage tank, Substation, Fire station, buildings, Pump house, underground sump, remaining part of intake and outfall, utilities, etc. Captive Port and Desalination Plant’s/ TPP’s associated facilities Layout showing existing and to be developed facilities are given as Appendix C.

It is proposed to use only 1.0 MCM of suitable dredged material for dumping 1.10 Reclamation works? Yes along the waterfront for levelling purposes within the port boundary in compliance to the clearance obtained.

Dredging (11 MCM) would be carried out 1.11 Dredging? Yes in compliance to the clearances obtained.

Offshore structures of Captive port (Breakwaters / Berths / Trestle / Creation of navigation channel etc.) and remaining part of Captive Desalination 1.12 Offshore structures? Yes Plant’s/Thermal Power Plant’s associated facilities such as intake and outfall in compliance to the clearance obtained. Production and manufacturing 1.13 No - processes?

The coal stack yard is located within Facilities for storage of goods or power plant area and there will not be 1.14 No materials? any intermediate storage of coal within in port premise.

STP (840 KLD) at thermal power plant Facilities for treatment or premises is operational and same will be disposal of solid waste or liquid No 1.15 effluents? utilised to meet Captive port requirements.

Facilities for long term housing 1.16 No - of operational workers?

2 Activity Page 8

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) No. confirmation with source of information data Construction Phase:  Vehicles involved in men and material transportation  Construction equipment/ machinery and material shall be brought to the site by road New road, rail or sea traffic 1.17 during construction or Yes Operation Phase: operation?  Coal will be brought to the Captive port by ships and from there it will be transported via covered conveyer belts to the thermal power plant.  Sea traffic during operation is envisaged for import / transportation of coal  Access road connecting TPP project site from NH/SH/MDR is already in New road, rail, air waterborne or place which will be used by Captive other transport infrastructure Port employees to access the site 1.18 including new or altered routes Yes and stations, ports, airports and Captive Port site. etc.?  Development of Captive port to handle coal (import) as per approvals obtained. Closure or diversion of existing transport routes or infrastructure 1.19 No - leading to changes in traffic movements? Closed conveyer system for transportation of coal from Captive port to the Existing Transfer Tower T1 of New or diverted transmission 1.20 Yes power plant and remaining part of lines or pipelines? intake/outfall system and pipelines would be developed in compliance with clearances obtained.

Impoundment, damming, Storm water drainage will be developed culverting, realignment or other 1.21 No within Captive Port site in compliance changes to the hydrology of with clearances obtained. watercourses or aquifers? 1.22 Stream crossings? No - 320 m3/day of water is required for Captive Port Operations which will be Abstraction or transfers of water 1.23 No sourced from Desalination plant located form ground or surface waters? in the power plant premises.

2 Activity Page 9

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) No. confirmation with source of information data No groundwater will be drawn. Storm water drainage system within the Changes in water bodies or the Captive Port site will be developed 1.24 land surface affecting drainage No without affecting natural drainage or run- or run-off? off. Construction Phase:  Movement of construction material including cement, aggregates, rock, sand and reinforcement  Movement of construction workers Transport of personnel or by vans/buses 1.25 materials for construction, Yes operation or decommissioning? Operation Phase:  Movement of workforce from the townships/ habitations to the captive port  Coal through covered conveyor from Captive Port to TPP area. Long-term dismantling or 1.26 decommissioning or restoration No - works? Ongoing activity during decommissioning which could 1.27 No - have an impact on the environment? Influx of people to an area in  Temporary and limited during either temporarily or construction phase 1.28 Yes permanently?  Marginal and permanent during operation phase 1.29 Introduction of alien species? No - Loss of native species or 1.30 No - genetic diversity? 1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources that are non-renewable or in short supply): Details thereof (with approximate S. Information/checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data Land especially undeveloped or Development of Captive port and 2.1 Yes agricultural land (ha) Desalination Plant/TPP associated facilities such as intake and outfall

2 Activity Page 10

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data system is being carried out within 47.35 ha (117 acres) of land. The change in land use will be as per the approved layout. 320 m3/day of water is required for Water (expected source & Captive Port Operations which will be 2.2 Yes competing users) unit: KLD sourced from Desalination plant located in the power plant premises. 15.00 MMTPA coal will be imported 2.3 Minerals (MT) Yes for power plant Construction material – stone, Construction material will be sourced from the approved quarries located in 2.4 aggregates, sand / soil (expected Yes source – MT) the vicinity of the project.

2.5 Forests and timber (source – MT) No -  Power requirement during construction and operation phase will be tapped from the power Energy including electricity and plant generated in-house 2.6 fuels (source, competing users) Yes  Power during emergency will be Unit: fuel (MT), energy (MW) sourced from 2 Nos. of DG Sets of 1500 KVA  Fuel required for the DG sets will be about 0.5 T/d Any other natural resources (use 2.7 No - appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate S. Information/Checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data - Use of substances or materials, which are hazardous (as per 3.1 MSIHC rules) to human health or No the environment (flora, fauna, and water supplies)

3.2 Changes in occurrence of No - disease or affect disease vectors

2 Activity Page 11

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data (e.g. insect or water borne diseases)  The project is likely to provide direct employment to ~160 persons during operation phase and ~200 persons during construction phase. Affect the welfare of people e.g.  The aim of the project is to 3.3 Yes by changing living conditions? generate beneficial social impacts as a part of the development of the project and all measures required for that shall be planned and implemented. Vulnerable groups of people who could be affected by the project 3.4 No - e.g. hospital patients, children, the elderly etc.,

3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate S. Information/Checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data Construction Phase:  Capital dredging quantity is estimated as 11 MCM during port construction activities (out of which ~ 1 MCM will be utilised along the waterfront for levelling Spoil, overburden or mine purpose and balance will be 4.1 Yes wastes disposed to identified offshore location at 30m contour) Operation Phase:  The maintenance dredging quantity is estimated as 10,000 m3/yr. Capital and maintenance dredging

2 Activity Page 12

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data and disposal of dredged material will be in compliance with Environmental/CRZ Clearances obtained. Municipal wastes in the form of kitchen wastes, domestic wastes, papers etc. would be of the order of Municipal waste (domestic and 4.2 Yes 2.4 T/month. Local authorised waste or commercial wastes) handler will be employed to remove solid waste generated in port area and collection bins will be provided. - 4.3 Hazardous wastes (as per No Hazardous Waste Management Rules)

4.4 Other industrial process wastes No -

4.5 Surplus product No - Captive port sewage will be sent to STP in the power plant premises. Sewage sludge or other sludge 4.6 Yes Sludge from the STP is being utilised from effluent treatment as manure in the greenbelt area of TPP. Construction and Demolition wastes Construction or demolition will be utilised within the project site 4.7 Yes wastes for site grading and other filling purposes.

Redundant machinery or 4.8 No - equipment Soil contamination is not envisaged and if any from accidental spills, shall be mitigated through suitable preventive and control measures Such as (i) Covered conveyors equipped with Spill Guards, (ii) Dust Contaminated soils or other 4.9 No extraction system at Transfer Towers, materials (iii) Routine Checks (iv) Arrangements to collect the spilled material and storage (Oil spill on the land will be properly cleaned using absorbents, cotton waste, sand, saw dust etc.)

2 Activity Page 13

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate S. Information/Checklist quantities /rates, wherever Yes/No No. confirmation possible) with source of information data 4.10 Agricultural wastes No -

4.11 Other solid wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data  From the operation of diesel engine driven construction equipment and movement of trucks/ vehicles carrying men and material  Emissions from DG sets during Emissions from combustion of emergency 5.1 fossil fuels from stationary or Yes  Fugitive emissions during coal mobile sources handling at the berths Mitigation measures such as covered conveyor/Dust suppression measures will be provided in compliance with Environmental and CRZ Clearances obtained.

Emissions from production 5.2 No - processes The potential source of fugitive emissions in the captive port will be from coal handling specially during Emissions from materials coal unloading operations and 5.3 handling including storage or Yes suitable control measures including transport Covered Conveyor, dust suppression system to minimise the impacts will be implemented. Emission from diesel operated pumps, concrete mixers, equipments and excavators during construction Emissions from construction activities. These equipments will be 5.4 activities including plant and Yes maintained properly to ensure equipment minimum emissions, more-over construction activity will be for a short duration of period and restricted within the Project boundary. 2 Activity Page 14

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data  Dust suppression measures such as Covered conveyors, transfer towers fitted with dust extraction system, specialised unloaders, water sprinkling etc. will be Dust or odours from handling of implemented at site 5.5 materials including construction Yes  Sewage from workers colonies materials, sewage and waste will be treated in STP (temporary/mobile) and sewage from Port during operation stage will be sent to TPP’s STP for treatment. Emissions from incineration of 5.6 No - waste

Emissions from burning of waste - 5.7 in open air (e.g. slash materials, No construction debris)

Emissions from any other - 5.8 No sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data Mitigation measures will be implemented during construction activities. Operation Phase – Following are From operation of equipment Noise generating sources 6.1 e.g. engines, ventilation plant, Yes  Seawater intake pumps crushers  Vehicular movement  Port operations such as handling equipments and Conveyors etc. Acoustic enclosures will be provided at high noise generating areas.

From industrial or similar - 6.2 No processes

2 Activity Page 15

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data Mitigation measures will be implemented during construction activities. The measures includes  The construction equipment deployed would be provided with suitable mufflers / Enclosures  Personal protective equipment like earmuffs will be provided to operating personnel  Exercise of route selection as well as measures such as traffic regulation, timings of transportation etc. will be followed  High noise generating activities such as piling and drilling will be scheduled in a day time such as to minimise noise impacts  Procurement of machinery / construction equipment will be done in accordance with specifications conforming to 6.3 From construction or demolition Yes source noise levels of 85 dB (A)  Only well-maintained construction equipment, which meets the regulatory standards for source noise levels, will be used  Any equipment emitting high noise, where possible, will be oriented so that the noise is directed away from sensitive receptors  Noise attenuation will be practiced for noisy equipment by employing suitable techniques such as acoustic controls, insulation and vibration dampers. The attenuation devices will be properly maintained throughout the construction period.  Periodic maintenance of equipment for diesel generators units, air compressors, engines, etc. will be undertaken. 2 Activity Page 16

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data  Worn out parts will be replaced and rotating parts will be lubricated to minimise noise emissions No blasting. Piling activities will be carried out with necessary precautionary measures such as High 6.4 From blasting or piling Yes noise generating activities (piling) will be scheduled in a day time such as to minimise noise impacts.

Vehicles complying with Standards From construction or 6.5 Yes prescribed under the Motor Vehicles operational traffic Act will be allowed to operate Minor operations such as welding, cutting, electrical lighting, power circuits, drilling etc. produce Sound/lighting but it would be temporary and necessary safety From lighting or cooling 6.6 Yes gadgets for noise/light will be systems provided. Air conditioning and ventilation system generates noise and necessary enclosure shall be provided. 6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data

7.1 From handling, storage, use or No - spillage of hazardous materials  The reject brine will be discharged to sea along with return cooling water of ~24,062 m3/hr (Total) From discharge of sewage or from the power plant premises. other effluents to water or the 7.2 Yes  Captive Port sewage will be land (expected mode and place treated in TPP’s STP. Treated of discharge) sewage and the sludge shall be used for gardening/greenbelt development.

2 Activity Page 17

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

Details thereof (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data Air  Emissions from DG sets during emergency  Fugitive emissions during coal handling and transport. Measures such as covered conveyor have been considered. Land By deposition of pollutants 7.3 emitted to air, onto the land or Yes  Local authorised waste handler into water will be employed to remove Municipal solid wastes generated in port area and collection bins will be provided. Water  The reject brine will be discharged to sea along with return cooling water of ~24,062 m3/hr (Total) from the power plant premises. 7.4 From any other sources No -

Is there a risk of long term Not envisaged build-up of pollutants in the 7.5 No environment from these sources?

2 Activity Page 18

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data Material Quantity Risk 8.1 From explosions, spillages, No spillage fires, etc. from storage, envisaged handling, use or production of during hazardous substances operation. 13.40 Spillage may Coal MTPA happen during accidents if any. No Storage at Yes Captive Port premises.

The coal will be handled and transported by using specialised unloaders and covered conveyors and thereby protecting the land and water from contamination. Accidental Spills if any will be contained and recovered at the earliest. - 8.2 From any other causes No

Could the project be affected Cyclone prone area. Structural by natural disasters causing design has factored these aspects for 8.3 environmental damage (e.g. Yes the facilities developed/ to be floods, earthquakes, developed. landslides, cloudburst etc.)?

2 Activity Page 19

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate Information/Checklist quantities /rates, wherever S. No. Yes/No confirmation possible) with source of information data Lead to development of Induced development due to the supporting utilities, ancillary proposed project in the region, which development or development will create better infrastructure and will stimulated by the project which attract migration of people. could have impact on the environment e.g. Necessary supportive utilities, 1. Supporting infrastructure 9.1 Yes infrastructure, housing etc. to cater (roads, power supply, the requirements of the project would waste or wastewater be developed as a part of the project. treatment, etc.) 2. Housing development 3. Extractive industries 4. Supply industries 5. Other Lead to after-use of the site, This project would be a permanent 9.2 which could have an impact on No establishment the environment The project would increase the Set a precedent for later Yes 9.3 Commercial / Industrial activities in developments the region. As directed by NGT, Rapid Cumulative Environmental Impact Assessment (RCEIA) study over a 25 km radius was carried out by ITPCL and submitted to the MoEF&CC. After Have cumulative effects due due deliberations, the Expert Advisory Committee (EAC - Thermal), to proximity to other existing 9.4 Yes MoEF&CC has issued Corrigendum or planned projects with to EC (TPP) of ITPCL with additional similar effects conditions on 14th August 2012. However, major industries which were proposed to be developed in the area have not been developed (eg. BGR’s Cuddalore power plant, SRM Power and Nagarjuna oil refinery)

2 Activity Page 20

Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0

3 Environmental Sensitivity S. Name/ Aerial Distance (Within Areas No. Identity 15 km)7 Areas protected under international conventions, Chidambaram 1. national or local legislation for 15.1 km SW Temple their ecological, landscape, cultural or other related value

Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or Pitchavaram 2. 8.1 km SE other water bodies, coastal Mangroves zone, biospheres, mountains, forests

Areas used by protected, important or sensitive species Pitchavaram 3. of flora or fauna for breeding, 8.1 km SSE Mangrove Forests nesting, foraging, resting, over wintering, migration Perumal Eri 11.3 km WNW Inland, coastal, marine or Uppanar River 7.1 km WNW 4. underground waters Vellaru River 1.3 S Bay of Bengal Adjacent 5. State, National boundaries Nil - Routes or facilities used by the NH-45A 4.8 km W 6. public for access to recreation

or other tourist, pilgrim areas 7. Defence installations Nil -

Densely populated or built-up 8. area Details of study area village were provided during Areas occupied by sensitive EIA study. man-made land uses 9. (hospitals, schools, places of worship, community facilities) Areas containing important, high quality or scarce resources, (ground water 10. Nil - resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental 11. Nil - damage. (those where existing legal environmental standards

7 Aerial distances measured from the Captive Port Site. 3 Environmental Sensitivity Page 21

APPENDIX A ENVIRONMENTAL AND CRZ CLEARANCES AND THE STATUS OF COMPLIANCE

~ ~o iro "QS!o-33004/99 REGD.NO. D. L.-33004/99

:m:rrmrur EXTRAORDINARY m

Q4Tq,(OI, CR ~ \jj~q I~ Qf{qJ'1 ¥i'3l1~4

~~oq'1l

rr{~, 29 ~, 2015

GfiT.3lT1141{3T}.. ~ fHCflI,(, q~TCl'(OI (W~lOT)f.=rnr, 1986 ~ f.=rnr 5 ~ \3qffi4J1 (4) ~ m~~, q ~ TCl'(01 (W1!;f1JT) 31f'~, 1986 (1986 CfiT29) cfr 'UTD 3 cfr \3Cf'UTD (1) a.TR \3Cf'UTD (2) ~m (v) \ITa ~ ~IRd~.i'i CfiT~ ~~, ~ fWr it \3Ui f.=rnr ~ f.=rnr 5 ~ ~qffi~J1 (3) ~-&6 (Cfl) ~ 31m ~ cfr ar2rm iT ~ ~ q~~, ~ fl ,(Cfll'( ~ d(CflIJl'i q~TCl '(01 a.TR Cf'i" ~~ Ic1~ cfr ~«::iHI f118~jCfl CfiT.3lT. 1533 (31), crrth9 14 ruciGl(, 2006 it ffiHRrud a.TR ~~rrurrCfldr~, 31?Thr:-- " 0CfCf ~ «:q 'i I it,-

(i) q~TCl'(ofl~ 3l'ilqRl (tffi") cfr PcmiJ1lr~dl ~ ficfu it W 9 W ~flCj; W (i) ~ ~ it ¥:fil.s41fCf;d

~~;

(ii) W (i) ~ ~ fil8~ jfCf;d ~ ~,-

(Cfl) ua.TR B"m ~ q R~I \J'j'i 1* a.TR Rh4 ICfl<'11qj cfr ~~TT it crf:q crsf" ~~ ~ ~ Cf'( u3TR B"m ~ q n:~"'1\J'j'i 1* 3TR Rh~ ICfl(11qi' cfr ~~TT it mer crsf" ~I~~j CfiT"'("€fT ~;

(@") u(f~, ~ ~Cfllfl qR~I\J'j'i 1* a.TR ~ ~ cfr ~~TT it" ~~ ~ m~ mu~ 'B11T Cf'( a.TR "~?TTff~ R~ ~ ~ ~ ~ ~ R~ ~ ~ 1RT11~T" ~I~~i' ~ m~"ffl1ffi

~ "CfTir m

193 1 GI/20 15 (1) 2 THEGAZETTE

U(ii) $r fCl91lfl qfb~I':l1'iI* 3Th: ~ $r [lR 8(19)], eft ~~TTif fctf~ 3fCffu ~ ~ f#;~ 191~11q"'[(fCfitftf?r

~ ~ m fef; fClR <:i I+191~ 7:f~ fct~ ~ Bfi:rFcf ~ ~ ~ fct~ ~ Bfi:rFcf ~ fCl«11{ eft ~ ~ fu"Q: 1fUT1~Tm ~ ~ I

(Cf)) {ill eft ~ 3fCl""fu~ q-~ "CCCfi lffi1 ~ ~ ~ +11+1~11'~ fu"Q: ~ cpT~ fct~ ~ Bfi:rFcf (~) ~ ~ ~ ~ Bfi:rFcf (Qfl {QfA) 3Th: ~ m 'hI R~iT ~ amm: 'l1: 7:fW~ ~ ~ q~YCl{OI, Cf'1 3Th: ':l1~16111qRCld'i ~?ll~~ ~ ~ ~

~~ ~ ~ 'l1: m1:fi ~~;

(19) {ill eft fctf~ 3fCl""fu~ q-~ "CCCfi ~ it ~ ~ ~ fctf~ 3fCl""fu~ q-mq: cftrr l1"ru" it 3Pff ~ dT ~ ~ QJ1~QfA eft m 'hI n,~rr ~ arrm<: 'l1: 7:f~.:rfu q~YCI{Ol, CA' 3ih: ':l1~1611~ q fzCId'i )fmft ffi ~ 31~

[CfiT. 'fi'. ~-11013/12/2013-~-II(I)('miT)]

~¥R~,~~

~ : ~ ~ m& ~ {1':l1q?l, arBTURUT, 'miT II, m 3 ~ (ii) it aIT~ fi€J~iCf) CfiT.sn. 1533(31), ~ 14 mci'iH, 2006 GRT ~ eft 1li ~ 3Th: (R1l~~ ~ RlO'il7',lfl)j(1 GRT 'fi'~mmr ~ 1p:IT CfiT.arr.1737(31), ~ 11 ~, 2007 ; =r.sn. 3067(31), ~ 1 ~, 2009 ;CfiT.arr. 695(31), ~ 4 ~, 2011 ; CfiT.arr. 2896(31), ~ 13 ~, 2012 ; CfiT.arr.674(31), ~ 13~, 2013 ; CfiT.arr.2559(31), ~ 22 3Pffif, 2013 ; CfiT.arr.2731(31), ~ 9 mciCl{, 2013 ; CfiT.arr.562(31), crrfP9 26 'h{C1{l, 2014 ;CfiT.arr.637 (31), ~ 28 'h{C1{l, 2014 CfiT.arr. 1599(31), ~ 25 ¥, 2014; =t.sn. 2601(31), ~ 7 ~, 2014; ~ CfiT.arr.3252(31), ~ 22 RfiiiH, 2014 I

MINISTRY OFEVIRONMENT, FOREST A D CLlt"VIATECHANGE NOTIFICA TION New Delhi, the 29th April, 2015

S.O. 1141(E).-ln exercise of the powers conferred by sub-section (I) and clause (v) of sub-section (2) of Section 3 of the Environment (Protection) Act. 1986(29 of 1986) read with sub-rule(4) of rule 5 of the Environment(Protection) Rules, 1986, the Central Government hereby makes the following further amendments to the notification of the Government of India, in the erstwhile Ministry of Environment and Forests number S.O. 1533(E), dated the 14th September, 2006 after having dispensed with the requirement of notice under clauseia) of sub-rule(3) of rule 5 of the said rule, in public interest, namely:- ['lWTII-"@JS 3(ii)] 3

In the said notification,-

(i) Paragraph 9 relating to validity to Environment Clearance (EC) shall be re-numbered as paragraph (i) thereof;

(ii) in paragraph (i) as so numbered,-

(a) for, the words "and five years in the case of all other projects and activities", the words "and seven years in the case of all other projects and activities" shall be substituted;

(b) for the portion beginning with the words "However, in the case of Area Development projects and Townships" and ending with the words "consult the Expert Appraisal Committee or State Level Expert Appraisal Committee as the case may be." The following shall be substituted, namely:-

"(ii) In the case of Area Development projects and Townships [item 8 (b), the validity period shall be limited only to such activities as may be the responsibility of the applicant as a developer:

Provided that this period of validity may be extended by the regulatory authority concerned by a maximum period of seven years if an application is made to the regulatory authority by the applicant within the validity period. together with an updated Form I, and Supplementary Form lA, for Construction projects or activities (item 8 of the Schedule):

Provided further that the regulatory authority may also consult the Expert Appraisal Committee or State Level Expert Appraisal Committee, as the case may be, for grant of such extension.

(iii) Where the application for extension under sub-paragraph (ii) has been filed-

(a) within one month after the validity period of EC, such cases shall be referred to concerned Expert Appraisal Committee (EAC) or State Level Expert Appraisal committee (SEAC) and based on their recommendations, the delay shall be condoned at the level of the Joint Secretary in the Ministry of Environment, Forest and Climate Change or Member Secretary, SElAA, as the case may be; (b) more than one month after the validity period of EC but less than three months after such validity period, then. based on the recommendations of the EAC or the SEAC. the delay shall be condoned with the approval of the Minister in charge of Environment Forest and Climate Change or Chairman. as the case may be:

Provided that no condonation for delay shall be granted for any application for extension filed 90 days after the validity period of EC."

[F. No. J-l1 0 13/12/20 13-lA-II (1)(parn]

MANOJ KUMAR SINGH. Jt. Secy.

Note: The principal rules were published in the Gazette of India. Extraordinary. Part II, Section 3, Sub-section(ii) vide notification number S.O. 1533(E), dated the 14th September, 2006 and amended vide S.O.I737(E) dated the II th October. 2007, S.O. 3067(E) dated the 1st December, 2009, S.O. 695(E) dated the 4th April, 2011, S.O.2896(E) dated the 13th December, 2012 , S.O.674(E) dated the 13th March, 2013, S.O. 2559(E) dated the 22nd August, 2013, S.O. 273I(E) dated the 9th September. 2013, S.O. 562(E) dated the 26th February, 2014 . S.O. 637(E) dated the 28th February. 201"+,S.O. 1599(E) dated the 25th June, 2014, S.O. 2601 (E) dated 7th October. 2014 and S.O. 3252(E) dated 22nd December, 2014.

Printed by the Manager, Government of India Press, Ring Road, Mayapuri. New Delhi-II 0064 and Published by the Controller of Publications. Delhi-l10054.

Appendix A2

1. EC Conditions and Compliance Status for Captive Port and Desalination Plant

The condition wise compliance status for environmental and CRZ clearance issued for Captive Port and Desalination Plant at Kottattai, Cuddalore District vide order dated 29/10/2010 is given in Table below.

Sl. Environmental Clearance Conditions Compliance Status and Commitment No. A SPECIFIC CONDITIONS 1 "Consent for Establishment" shall be obtained "Consent for Establishment (CFE)" from Tamil Nadu Pollution Control Board has been issued by Tamil Nadu (TNPCB) under Air and Water Act and a copy Pollution Control Board (TNPCB) shall be submitted to the Ministry before start of on 14/06/2011 and submitted to any construction work at the site the Ministry on 29/06/2011, which was valid for a period of two years. Further Extensions of said CFE granted by TNPCB on August 16, 2013 and March 27, 2016. 2 No construction work other than those CRZ clearance was obtained on permitted in Coastal Regulation Zone 29/10/2010 (letter no: F 11- Notification shall be carried out in Coastal 43/2010-IA III) and the condition Regulation Zone Area would be complied 3 The area selected for dumping dredged material Construction of port is yet to be at the depth of 30m contour shall be adequate started. Condition would be to ensure that the reduction in depth is not complied more than 0.5m and appropriately demarcated during execution with follow up field monitoring. The suitable field monitoring shall be submitted. 4 Once the breakwater is constructed the Vellar Construction of port is yet to be river mouth is vulnerable to accretion and started. Condition would be mouth is likely to get closed due to prevailing complied coastal processes. The mouth also helps to drain large flood during northeast monsoon and cyclone. The tidal action of the Vellar river also help supports the Pichavaram mangroves. So the river mouth has to be maintained along with its natural hydrology and tidal prism and hence appropriate remedial action to keep the mouth open with regular monitoring and details shall be submitted to the Ministry of Environment and Forests

1

Sl. Environmental Clearance Conditions Compliance Status and Commitment No. 5 The volume of annual gross and net littoral drift Construction of port is yet to be reported for this coastal region where the started. Condition would be breakwaters are proposed appear to be very low complied and probably needs to be confirmed by actual field data on waves and other accepted software tools. It is suggested to undertake one year directional wave measurements to evaluate actual volume of littoral drift 6 Programme for preservation of existing Complied mangroves on the southern side of the plant area lying within 10km radius and proposed additional plantation shall be developed together with EMP and submitted 7 The present EIA Study is confined to the Complied proposed project and does not cover the possible environmental issues arising out of developments at the adjacent areas. So, a comprehensive EIA has to include the environmental issues of surroundings in each and every stage of expansion considering new developments in the close proximity of the ILFS project and project proponent shall initiate the action in this regard at the appropriate time. 8 Proponent shall explore the possibility of Noted. sharing the common facilities (Breakwater) with However, as on date, the immediate neighbour to optimize the resources, neighbour (Good Earth minimize the cost of development and impact Shipbuilding Private Limited) has of marine environment. The report shall be dropped the proposal of submitted within 3 months. developing the facility. Hence, the sharing of facility does not arise 9 The Project proponent confirmed that there is Noted. Will be complied no further developments apart from what has been shown in the layout plan (an approach trestle and two coal berths of 600m long on the seaward side within the enclosed basin formed be two breakwaters) and such no development will be allowed without the prior environmental clearances. 10 Wherever costal front is available adjacent to Construction of port is yet to be the project area, tsunami bund shall be started. Condition would be constructed with natural beach sand/dredged complied material to avoid flooding or any other natural causes. 11 Detailed monthly field monitoring shall be Will be complied. carried out on the coastal process and marine However as a part of Power Plant environment for 10km radius including Vellar compliance, National Institute of 2

Sl. Environmental Clearance Conditions Compliance Status and Commitment No. river during construction and operational stages. Ocean Technology (NIOT), Chennai has been engaged for marine monitoring on monthly basis since Jan 2014 and monitoring results are submitted to MoEF and TNPCB in six monthly report. 12 All the socio-economic factors like medical Complied. facilities, employment opportunities; educational facility for the local public shall be implemented fully and reported to the Ministry in its regular reports on six monthly basis. 13 There shall be no intermediate coal storage Construction of port is yet to be facility and the conveyor from the coal berths to started. Condition would be the plant site shall be enclosed conveyor system complied to ensure minimum pollution due to coal dust and other suspended matter. 14 All the recommendations of EIA, EMP, Risk Noted. Will be Complied. Assessment and Disaster Management shall be strictly comply with. 15 Separate Environmental cell for the stipulated Complied. Environmental safe guards with a Senior Separate Environmental Cell has Executive. been developed by ITPCL as a part of Power Plant compliance. 16 Sand bypass and nourishment of the coast on Noted. northern side shall be carried out periodically Construction of port is yet to be and monitoring shall be conducted on shoreline started. Condition would be changes. complied. 17 The project proponent shall take up mangrove Complied. plantation/green belt in the project area, ITPCL in association with CASMB wherever possible. Adequate budget shall be has established a mangrove provided in the EMP for mangrove development. nursery and 30,000 saplings and propagules were planted in area of 20,000 sq.ft. in Pichavaram area.

18 The funds earmarked for EMP shall be included Noted. Will be Complied in the budget and this shall not be diverted for any other purposes. B GENERAL CONDITIONS 19 Adequate provision of infrastructure and Noted. Will be Complied. sanitation facilities to construction worker to avoid any damage to the environment.

3

Sl. Environmental Clearance Conditions Compliance Status and Commitment No. 20 Full support shall be extended from the project Noted. Will be Complied. proponent during the inspection of Regional office for monitoring by furnishing full details of action plan for mitigation measures. 21 A six monthly monitoring report shall need to be Complied. submitted by the project proponent to the Construction of port is yet to be Regional Office, Bangalore regarding started. implementation of the stipulated conditions. 22 Ministry of Environment & Forest or any Other Noted. Will be Complied. competent authority may stipulate any additional conditions or modify the existing ones, if necessary in the interest of environment and the same shall be complied with. 23 The Ministry reserves the right to revoke these Noted clearances if any of the conditions stipulated are not complied with the satisfaction of the Ministry. 24 In the event of change in project profile or Noted. Will be Complied. change in the implementation agency, a fresh reference shall be made to MoEF. 25 Regional Office as well as MoEF will be Noted. informed of the date of financial closure, final approval of project and start date of land development work. 28 Stipulations would be enforced under the Noted following provisions: 1.The Water act, 1974 2.The Air Act, 1981 3.The Environment Protection Act, 1986 4.The Public Liability (Insurance) Act, 1991 5. EIA notification, 2006 6.Amendents and Rules made hereafter 29 Other Statutory Clearances : Approval for the storage of Diesel from Chief Will be Complied for Captive Port. Controller of Explosives For Power Plant, License is obtained from explosive department by ITPCL. For the storage license received from PESO (Petroleum and Explosives Safety Organisation), Nagpur. Licence No. P/HQ/TN/15/5125 (P329079), dtd. 23.06.2015 valid

4

Sl. Environmental Clearance Conditions Compliance Status and Commitment No. upto 31.12.2017 Fire department Will be Complied for Captive Port. For Power Plant, Fire License obtained from Tamil Nadu Fire and Rescue Services. License no. 4708/B2/2016 dtd: 02.08.2016 valid to 01.08.2017 Civil Aviation Department No Objection Certificate has been obtained from Airports Authority of India vide renewal letter no. AAI/20012/701/2008- ARC (NOC) dated 20/07/2015, valid till 15.07.2020 Forest Department (as per Forest Conservation Forest Department has accepted Act, 1980 and Wildlife Protection Act, 1972) that there is no wild life in the nearby reserved forest through letter ref. no WL5/44294/2008 dated 05/03/2010 30 Newspaper Advertisement of Clearance The Clearance was published on Certificate in atleast two dailies (one in the 04/11/10 in Dinamalar (Tamil vernacular language itself) within 10 days after Daily in ) and Times of getting the clearance from the Ministry and the India (English Daily in Chennai, same shall be reported to the Ministry. The published in TN edition) copies of Clearance letter will be available with TNPCB and MoEF website 34 Status of compliance of the stipulated EC The website is being updated conditions, including monitoring results shall be regularly. uploaded in their website with periodic updation Updation can be also sent to the Regional office, Report is being submitted since Zonal office of CPCB and SPCB (six monthly February 2012 for every six reports - both in hard and soft copy) months. 35 Environmental statement for each financial year Being Complied. in Form V is mandated and submitted to SPCB as prescribed under EPA act, 1986 Company website (status of compliance to the EC conditions) Regional Office of MoEF (by email)

5

APPENDIX B INTEGRATED LAYOUT SHOWING TPP & CAPTIVE PORT L:\Ports\2017\C1171304 -ITPCLPORTECEXTN-BIFURCATION\Working\Drawings\Appendixes 29.07.17\R2-Appendix-B andC.dwg,29/Jul/201712:20:24 PM,DWGToPDF.pc3 PUDUCHCHATRAM R.S

E 362000M N 1273000M N 1274000M N 1275000M N 1276000M N 1272000M RAILWAY SIDING

H

N

B E 363000M

D ASH POND

E 364000M

C

500m Line

200m Line

E 365000M HTL

INTEGRATED PROJECTLAYOUT SHOWINGTPP,DESALINATION LTL PLANT &ITSASSOCIATED FACILITIES AND CAPTIVE PORT CAPTIVE PORT PROPOSED

TIDAL FLAT E 366000M 38 BAY OFBENGAL

E 367000M APPROACH CHANNEL CHANNEL APPROACH E 364607.685 N 1274892.724 E 363346.547 N 1274669.481 E 364374.347 N 1275636.596 E 362991.425 N 1275369.502 E 362902.578 N 1274604.840 APPENDIX -B E 363374.892 N 1273261.122 E 362630.893 N 1273995.418 E 362790.317 N 1273336.237 E 364829.410 N 1273448.624 E 362830.592 N 1273184.893 E 364121.465 N 1273091.856 E 364121.465 N 1272411.880 E 362988.195 N 1272333.715 E 363618.479 N 1272441.350

E 368000M E 364795.520 N 1272411.880 E 364795.520 N 1272775.992 E 364496.339 N 1272775.992 E 364496.339 N 1273091.856

APPENDIX C LAYOUT SHOWING FACILITIES DEVELOPED AND YET TO BE DEVELOPED OF CAPTIVE PORT AND DESALINATION PLANT/TPP ASSOCIATED FACILITIES SUCH AS INTAKE/OUTFALL SYSTEM L:\Ports\2017\C1171304 - ITPCL PORT EC EXTN-BIFURCATION\Working\Drawings\Appendixes 29.07.17\R2-Appendix - C Final from Sumathy.dwg, 01/Aug/2017 9:44:22 AM, DWG To PDF.pc3 NOTE: FACILITIES DEVELOPED ARE INGRAY SCALE &TOBE DEVELOPED ARE INCOLOUR

F

E 365000M P3 P1 P2 15 19 CAPTIVE PORT 500m Line

200m Line

TIDAL FLAT E 366000M 14 HTL 38 LTL LAYOUT SHOWING FACILITIES DEVELOPED &YET TOBE DEVELOPED OF

CAPTIVE PORT, DESALINATION PLANT / TPP ASSOCIATED FACILITIES VELLAR RIVER BAY OFBENGAL

E 367000M NORTHERN LIMIT OF IL&FS CAPTIVE PORT CAPTIVE IL&FS OF LIMIT NORTHERN

PORT FACILITIES: SOUTHERN LIMIT OF IL&FS CAPTIVE PORT CAPTIVE IL&FS OF LIMIT SOUTHERN P3 P2 P1 P4 OPERATIONS /ADMINISTRATIONPARKING GATE COMPLEX/SECURITY SUB-STATION UG TANK/PUMPHOUSE

E 368000M 500m Line 200m Line HTL LTL N 1274000M N 1273000M APPENDIX -C

APPENDIX D LOCATION MAP JAMMU & KASHMIR

HIMACHAL PRADESH PUNJAB UTTARANCHAL HARYANA ARUNACHAL PRADESH SIKKIM

RAJASTHAN UTTAR PRADESH ASSAM PORT LOCATION NAGALAND BIHAR MEGHALAYA MANIPUR GUJARAT JHARKHAND MADHYA PRADESH WEST BENGAL

TRIPURA MIZORAM MAHARASHTRA CHATTISGARH ORISSA

GOA ANDHRA PRADESH

A R A B I A N KARNATAKA B A Y O F B E N G A L B A Y O F B E N G A L S E A

KERALA TAMILNADU ANDAMAN AND LAKSHADWEEP NICOBAR ISLANDS

SRILANKA

ATRANADHAPURAM

PARIYAPATTU SIRUPALAIYAR SAMIYARPETTAI

SILAMBIMANGALAM PUDUCHCHATTRAM STATION BAY OF BENGAL VALIIYANALLUR VELINGARAYAMPETTAI

TOPPIRUPPU PORT LOCATION

SOUTHERN RAILWAY SOUTHERN CHINNUR KOTTATTAI CANAL BUCKINGHAM

VATHIYAPALLI

NH 45A PORTO NOVO PERIYAKUMMATT LEGEND: TACHACHAKHADU NH 45 A

SH 70 C.MANAMBADY VELLARU RIVER OTHER ROAD AYIPURAM PORTONOVO STATION RAILWAY LINE

MARINE CONTOUR ANJAKKARANCHATTRAM SANGALANKUPPAM WATER BODY

0 0.5 1 1.5 NH 45A PICHAVARAM TO NAGAPATTINAM MANGROVES SCALE IN KM THAIKKAL LIKKAI APPENDIX - D

L:\Ports\2017\C1171304 - ITPCL PORT EC EXTN-BIFURCATION\Working\Drawings\ANNEXURE-D-Location Map A4P.dwg, 26/Jul/2017 12:26:18 PM, DWG To PDF.pc3 LOCATION MAP L&T Infrastructure Engineering Limited 6-3-1192/1/1, 5th Floor, Block No.3, White House, Kundan Bagh, Begumpet, Hyderabad – 500 016 Ph: 91-040-40354444; Fax: 91-040-40354430