Il&Fs Tamil Nadu Power Company Limited
Total Page:16
File Type:pdf, Size:1020Kb
IL&FS TAMIL NADU POWER COMPANY LIMITED ENVIRONMENTAL/CRZ CLEARANCE VALIDITY EXTENSION FOR ITPCL CAPTIVE PORT AND OTHER FACILITIES CUDDALORE DISTRICT, TAMIL NADU UPDATED FORM 1 JULY 2017 Submitted By L&T Infrastructure Engineering Limited C1171304 RP001, Rev.0 L&T Infrastructure Engineering Ltd. Client: IL&FS Tamil Nadu Power Company Limited Project: Environmental/CRZ Clearance Validity Project No.: Extension for Captive Port and Other C1171304 Facilities of ITPCL Title: Document No.: Rev.: Updated Form 1 RP001 0 This document is the property of L&T Infrastructure Engineering Ltd. (formerly File path: known as L&T-Rambøll Consulting Engineers Limited) and must not be l:\ports\2017\c1171304 - itpcl port ec extn-bifurcation\working\reports\001 - passed on to any person or body not authorised by us to receive it nor be copied ec validity extension application\updated form 1 28.07.2017\updated form 1 or otherwise made use of either in full or in part by such person or body without - itpcl captive port ec ext 29.07.17.doc our prior permission in writing. Notes: 1. Revision Details: 0 29.07.2017 First Submission ALJ BRT CVS Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved TABLE OF CONTENTS Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0 TABLE OF CONTENTS 1 Basic Information ........................................................................................................................ 1 2 Activity ......................................................................................................................................... 7 3 Environmental Sensitivity ........................................................................................................ 21 LIST OF APPENDICES Appendix A: Environmental and CRZ Clearances and the status of compliance Appendix B: Integrated Layout Showing Thermal Power Plant (TPP), Desalination Plant & its associated facilities and Captive Port Appendix C: Layout Showing Facilities Developed and yet to be Developed of Captive Port and Desalination Plant’s/TPP’s associated facilities such as Intake/Outfall System Appendix D: Location map Table of Contents Page i UPDATED FORM 1 Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0 FORM 1 1 Basic Information S. No. Item Details 1. Captive Port and Desalination Plant’s/Thermal Power Plant’s (TPP) associated facilities such as Intake/Outfall System at Kottatai, Cuddalore district, Tamil Nadu Name of the Project Application is for Extension of Validity of Environmental and CRZ Clearance upto October 28, 2020 (three more years) for the facilities yet to be developed. 2. S. No. in the schedule Captive Port included as Item 7(e) in the Schedule of the Notification. Captive Desalination Plant’s/ Thermal Power Plant’s associated facilities such as intake and outfall system does not attract EIA Notification. 3. Proposed Environmental and CRZ Clearance was capacity/area/length/tonnage to be obtained in October 29, 2010 and copy of handled / command area/lease EC/CRZ clearance and its latest area/number of wells to be drilled compliance report submitted to MoEF&CC, regional office is given in Appendix A. (I) As per the clearance obtained, the following major Project components of Captive Port along with Desalination Plant’s/ TPP’s associated facilities have been permitted: A. Captive Port: To handle the coal requirement for the 3600 MW (2x600 MW and 3X800 MW) Thermal Power Plant1, a captive port with enabling infrastructure has been proposed: 1 The details of the facility/systems developed by ITPCL under MoEF&CC granted Thermal Power Plant EC, Corrigendum and amendments are given below: 2 x 600 MW (1200 MW): Boiler, turbine and generator for 2 units of 600 MW each; Fuel oil system; ESP; 1x275m stack; cooling towers; Fire protection system; Power evacuation (transmission lines); FGD system; Ash handling system; Seawater intake and outfall system; Other utilities (Desalination plant, DM plant etc.); Environment Management System; Rail line for coal transport For the entire 3180 MW: (2X600 MW and 3X660 MW) - Revised configuration as per EC amendment letter no: J- 13012/34/2008-IA.II(T) dated February 04, 2014) Rainwater disposal system; Coal handling system and coal stockyard; Ash pond; Intake system for drawal of seawater 1 Basic Information Page 1 Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0 S. No. Item Details Handling Capacity – 15.0 MMTPA Two (02) Coal Berths – Total length of 600m and depth of (-) 15.5m CD Two (02) Breakwaters – Northern breakwater of 2100m and Southern breakwater of 1150m Approach Channel – 3300m long, 160m wide, (-) 16.1m CD to cater 80,000 DWT and facilities enhanced in future to receive 200,000 DWT vessels Turning Circle – 500m Diameter and depth of (-) 15.5m CD Mechanical unloaders – 4000 TPH capacity on each berth Evacuation/conveying of coal to power plant Capital Dredging – 11 MCM (out of which ~1 MCM will be used along the waterfront for leveling purpose and balance will be disposed to identified offshore location at 30m contour). Buildings associated with Captive port including utility buildings etc. B. Captive Desalination Plant (302 MLD - Reverse Osmosis) and TPP associated facilities: Intake System: ~34,1003 m3/hr of seawater for thermal power and desalination plant will be sourced from intake proposed in between breakwaters towards northern side along with essential systems such as Desilting Basin, Pump House etc. Outfall System: ~25,8864 m3/hr of return cooling water and reject brine will be discharged at the outfall proposed towards north of northern breakwater, more than 1500m distance into the sea For the balance capacity of 1980 MW (i.e. 3 x 660 MW), the facilities are yet to be developed are: Boiler, turbine and generator for 3 units of 660 MW each; 1x275m stack; Intake pump house & outfall pipes; Captive port and external coal handling system; Cooling towers and water systems (Desalination plant & DM plant) and Power evacuation. 2 Desalination Plant (within power plant premises): Capacity has been revised to 40 MLD as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter dated February 04, 2014. 3 Intake quantity has been optimised to 33,000 m3/hr as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter No: as per EC amendment letter dated February 04, 2014 4 Outfall quantity has been optimised to 24,062 m3/hr as committed during TPP EC amendment and MoEF&CC accorded EC amendment Letter No: as per EC amendment letter no: J-13012/34/2008-IA.II(T) dated February 04, 2014 1 Basic Information Page 2 Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0 S. No. Item Details Integrated layout showing approved TPP, captive Desalination Plant & its associated facilities and Captive Port facilities are given as Appendix B. (II) The Project components along with its associated facilities developed/constructed so far at site are as follows: A. Captive Port: No Facilities pertaining to captive port have been constructed. B. Captive Desalination Plant (10 MLD - Reverse Osmosis) and TPP (2X600 MW) associated facilities have been developed/constructed. Intake System: About 700m long to draw Seawater for the entire 3180 MW capacity till desilting basin and Pump House for 1200 MW Outfall System: > 1500 m from Shore to discharge return cooling and reject brine (III) The components along with its associated facilities to be developed at site are as follows: A. Captive Port: Handling Capacity – 15 MTPA Two (02) Coal Berths – Total length of 600m and depth of (-) 15.5m CD Two (02) Breakwaters – Northern breakwater of 2100m and Southern breakwater of 1150m Approach Channel – 3300m long, 160m wide, (-) 16.1m CD to cater 80,000 DWT and facilities enhanced in future to receive 200,000 DWT vessels Turning Circle – 500m Diameter and depth of (-) 15.5m CD Mechanical unloaders – 4000 TPH capacity on each berth Evacuation/conveying of coal to power plant 1 Basic Information Page 3 Environmental/CRZ Clearance Validity Extension for Captive Port and Other Facilities of ITPCL C1171304 Updated Form 1 RP001 rev. 0 S. No. Item Details Capital Dredging – 11 MCM (out of which ~1 MCM will be used along the waterfront for leveling purpose and balance will be disposed to identified offshore location at 30m contour). Buildings associated with Captive port including utility buildings etc. B. Captive Desalination Plant (30 MLD - Reverse Osmosis) and TPP (3X660 MW) associated facilities. Intake System: Augmentation of intake pump house to pump about 33,000 m3/hr (Total) Outfall System: Augmentation of outfall pipelines to discharge about 24,062m3/hr (Total) No changes in The Project configuration, activity, capacity and facilities remain same as for which Environmental/CRZ clearances and amendments (in TPP EC) have been granted. The facilities to be developed will be in line with the clearances granted. Captive Port and Desalination Plant’s/TPP’s associated facilities Layout showing existing and to be developed facilities are given as Appendix C. Extension of validity of Environmental and 4. New/Expansion/Modernisation CRZ Clearance 47.35 Ha (~117 acres) of land allotted for development of Captive port and Captive Desalination