Delhi Jal Board Govt. of Nct of Delhi Summer Action Plan 2021
Total Page:16
File Type:pdf, Size:1020Kb
DELHI JAL BOARD GOVT. OF NCT OF DELHI SUMMER ACTION PLAN 2021 “STOP CORONA” Wear Mask, Follow Physical Distancing, Maintain Hand Hygiene” Page 1 of 32 INDEX S. No Contents Page No. 1 Production of Potable Water 3 2 Provision of Piped Water Supply network in Un-authorized/Regularized Colonies 4 and JJ Clusters 3 Distribution and Supply of Potable Water 5 4 Installation of Tube-wells 6 5 Water Augmentation Plan (April 2021 to March 2022) 7 6 Deployment of Water Tankers and Water ATM/E-Piaos 7 7 Water Quality Assurance 11 8 Assembly Constituency-wise Vulnerable Points 12 (i) Water Deficient Areas 13 (ii) Contamination of water 16 (iii) Sewers Overflow 19 9 Complaint Redress Mechanism 21 10 Water Emergencies 22 11 Sewage Treatment 25 12 Revenue Management System 25 13 Rain Water Harvesting 27 14 Water Bodies in Delhi 30 15 Facilitation for Treated Effluent Utilization 30 16 Tips to Conserve Water 32 Page 2 of 32 SUMMER ACTION PLAN-2021 1. PRODUCTION OF POTABLE WATER ▪ Water demand in the city reaches to its peak during the summers. Production of about 935 MGD of potable water is targeted to be achieved during the summer of 2021 by optimizing all the resources. ▪ Additional 116 tubewells will be installed at various locations in Delhi by June 2021 and total of about 4948 tube- wells will be in operation. ▪ Up-gradation of WTPs and associated pumping installations have been taken up through measures like replacement of old pumps/motors, old panels and other E & M accessories for their optimum performance. All preventive maintenance activities for water treatment plants and associated infrastructure including for standby arrangements will be completed by May 2021 and ordinarily there will not be any requirement for shutdown of water treatment plants and associated pumping installations during peak summer months. ▪ Continuous monitoring will be carried out in close coordination with Haryana to prevent shut down of the water treatment plants on account of high level of Ammonia in the raw water. ▪ Stock position of consumables such as disinfectants, coagulants, spares for pumps & motors for all the plants and pumping stations has been reviewed. Adequate availability of stocks of these critical items will be ensured for quality and efficient supply of water during the upcoming summer season. ▪ Details of Water Treatment Plants (WTPs) wise availability and from ground water sources for targeted peak production during the summer season of 2021 are given in Table 1. Table 1: Targeted Peak Water Production S. Name of WTP Targeted Production Source of Raw Water Supply No. including Recycling from process waste water (MGD) 1 Chandrawal 95 Wazirabad Pond 2 Wazirabad 132 Wazirabad Pond 3 Haiderpur 231 Delhi Branch/CLC Munak Canal 4 Nangloi 42 5 Okhla 21 Reclaimed water from Chandrawal Recycling Plant and water from ranney wells/CLC Munak Canal. 6 Dwarka 51 CLC MunakCanal 7 Bawana 20 CLC MunakCanal 8 Bhagirathi 112 Upper Ganga canal 9 Sonia Vihar 141 A Production from 845 WTPs B Ranney Wells & 90 Sub-surface water Tube Wells Total (A+B) 935 Page 3 of 32 2. PROVISION OF PIPED WATER SUPPLY NETWORK IN UN-AUTHORIZED/REGULARIZED COLONIES AND JJ CLUSTERS Piped water supply networks are being provided in un-authorized/regularized colonies in phased manner for improved supply of potable water supply. Piped water supply networks in 1333 colonies have been extended by December 2020. Piped water supply networks have been laid in 32 colonies and will be notified for supply of water on completion of all the works by 30/06/2021. Names of these colonies are given in Table -2. In 38 colonies, works for laying of piped water supply networks are in progress/awarded. Proposal for 24 colonies are in estimate/tender stage. Provision for piped water supply networks in the remaining 107 number of unauthorized colonies will depend on technical feasibility/NOC. Table-2: List of Unauthorized Colonies which will be notified for piped water supply by 30/06/2021 CE Concerned Colonies CE (East) SE (East): Nil SE (NE): 01 No. Name of Colonies 1. Kardam Farm RST Enclave, Johripur Extn., Delhi-94 (Regn. no.1204A) CE (West) SE (West): 01 No. Name of Colonies 1. (Trithankar Nagar , Jain Nagar)(AC-08) SE (North West): 01 No. Name of Colonies 1. Mamur Pur Krishna Nagar Singhu (Regn No. 153) CE (South) SE (South): 12 Nos. Name of Colonies 1. Nai Basti, (Harijan Basti) Okhla 2. Bhawani Kunj behind Sector D-II, Vasant Kunj, New Delhi-70 3. J-Block Prem Nagar, Lal Kuan, M.B.Road,Delhi-44 4. Batla House Okhla, Delhi 5. Old Village Jasola Extension, Delhi-44 6. Aali Vihar -(Block A B C D E F G & H ) 7. Old Jasola Village Badarpur N.D-25 8. Jonapur Bhim Basti Pahari, Delhi-42 9. Bhawani Kunj Near Vasant Kunj, Delhi-70 10. Madanpur Khadar Extn., New Delhi-44 11. Okhla Vihar, Jamia Nagar, New Delhi-25 12. Jaitpur Extn.Part-II Badarpur, New Delhi-44 SE (South- West): 6 Nos. Name of Colonies 1. Qutab Vihar Ph-I Najafgarh Delhi-71 2. Goyala Vihar, Najafgarh,Delhi 3. Qutab Vihar Ph-II, New Delhi-71 4. Shyam Kunj, Najafgarh, Delhi-71 5. Pankaj Garden near Ambarhai, Sec-19, Dwarka 6. Vasant Kunj Enclave, B-Block, Mlikapur Kohi, Village Rangpuri CE (C&N) SE (North): 01 No 1. West Kamal Vihar SE (Central) ): Nil Page 4 of 32 CE (Water) PPP Project Areas: 10 Nos. Project Name of Colonies: 1. Saiduljaib Extn., J Block, Prayavaran Complex, Delhi-30 (Regn No. 1415) 2. Sultan Apartment, Gali No.2, SaidullaJaib, M.B. Road, Delhi-30 (Regn No. 374) 3. Anupam Garden, Delhi-68 (Regn No. 519) 4. Neb Sarai Extn.Area Delhi-68 (Regn No. 978) 5. Neb Valley IGNOU Road, Neb Sarai, Delhi-68 (Regn No. 1119) 6. Saidulajaib Extn., Kohinoor Enclave, M.B.Road, Opp. CISF Complex. (Regn No. 1446) 7. Neb Sarai New Delhi 68 (Regn No. 108-(ELD)) 8. Saidulajaib Village Residance Welfare Association New Delhi (Regn No. 114-(ELD)) 9. Neb Sarai Extn. Area New Delhi 68 (Regn No. 31-(LOP) 10. Baba Hari Dass Nagar, Tikri Border( 775) ▪ All the JJ clusters have the facility of drinking water through public water hydrants/ water tankers. Works for piped water supply networks with individual water connections in JJ clusters will be taken up in phased manner as per the policy approved by the Government. DUSIB handed over Squatters Rehabilitation Colonies (SRC) on “As is, Where is Basis”. DJB is taking up for the matter of piped water supply in such colonies taken over from DUSIB. Scarcity of drinking water, if any, in these areas during the peak summer will be addressed in coordination with the area representatives /MLAs. 3. DISTRIBUTION AND SUPPLY OF POTABLE WATER ▪ Annual flushing of all the water storage structures like underground reservoirs/surface ground reservoirs for distribution of potable water, preventive maintenance of equipments, minor/major repair and replacement works including for standby arrangements shall be completed by June 2021. It will be ensured that all the pumps at Booster Pumping Stations are in working conditions. ▪ Details of UGR-BPS which will be commissioned by June 2021 are given in Table 3 which will benefit the colonies/ areas under their command with improved supply of water. Table-3: UGR-BPS to be commissioned by June 2021 S.NO. Name of UGR-BPS Storage Supply Capacity Assembly Constituencies with Capacity (MG) (MGD) Colonies/Areas benefited 1 Construction of 26.80 ML 5.90 17.70 Constituency covered: capacity UGR/BPS at Sonia 1 Karawal Nagar Vihar. 2 Mustafabad (Commissioned in March-21) 2 Construction of 29.50 ML 6.50 19.50 1.Mundka Constituency capacity UGR/BPS at Mundka 2.Part of Vikaspuriconstituency 3.Part of Nangloi Jat Constituency 3 25 No. Gali BPS Tughlakabad 0.10 As per availability Sangam Vihar (AC-49) Ext., Sangam Vihar of water/ site (The work has not be completed due to requirement. lockdown and Covid-19 situation. It may be commissionedby August 2021) 4 OHT Deoli BPS, Deoli Village 0.05 --do-- Deoli (AC-47) (The work has not be completed due to lockdown and Covid-19 situation. It may be commissionedby August 2021) Page 5 of 32 ▪ Intensive patrolling and repairs of leakages in the transmission and peripheral water mains are planned and executed before onset of summers. This will minimize/prevent shut down of the system from the water treatment plants during summer. ▪ To minimize physical losses and contamination of water, old water pipe lines have been replaced, minor/major leakages have been repaired and new water pipe lines have been laid for water distribution network. Preventive maintenance works and rational distribution of water would result in improved supply of water in colonies/areas during the upcoming summer season. ▪ Information about area wise time for supply of water will be made available on DJB website. 4. INSTALLATION OF TUBE-WELLS · In order to supplement water availability in the water deficient areas, 4832 numbers of tube-wells are functioning and 116 numbers of new tube-wells will be installed by June, 2021. Details are in Table-4. Table-4 : Details of Tube-Wells S. CE Concerned Number of Number of Divisions wise details for Additional Tube-Wells No. functional Additional Tube- tube wells wells 1 CE (WW) 160 22 Palla: 12 Haiderpur: 05 Chandrawal: 03 Sonia Vihar; 02 2 CE (West) 569 20 AC-24 (Patel Nagar): 04 AC-25 (Moti Nagar): 07 AC-26 (Madipur): 02 AC 28 (Hari Nagar): 05 AC-30 (Janak Puri): 02 3 CE (C&N) 594 01 North-II = 01 Nos AC 18 (Model Town): 01 4 CE (East) 156 11 North East-I: 04 Nos.