East Side Coastal Resiliency
Total Page:16
File Type:pdf, Size:1020Kb
East Side Coastal Resiliency Proposed Action Plan Amendment 20 Public Hearing Manny Cantor Center 197 East Broadway September 17, 2019 PROPOSED ACTION PLAN AMENDMENT 20 PUBLIC HEARING AGENDA 1. Action Plan Overview 2. ESCR Project Description 3. Public Outreach 4. Funding and Benefit Cost Analysis 5. Comment Process 2 1. Action Plan Overview 2. ESCR Project Description 3. Public Outreach 4. Funding and Benefit Cost Analysis 5. Comment Process 3 What is an Action Plan? • New York City received $4.2 billion from HUD for Hurricane Sandy disaster recovery • $338 million allocated for the East Side Coastal Resiliency (ESCR) Project • The Action Plan describes the City's plan for these funds 4 Why Are We Here Tonight? • Rebuild By Design (RBD) was an international resiliency competition; NYC was one of the recipients of the award • Community engagement is a critical component of that process • Per HUD requirements, an Action Plan Amendment that reflects the final designed RBD project must be submitted as a condition for release of funds for project construction 5 Why Are We Here Tonight? • Action Plan Amendment 13 was published for the ESCR project in 2017 based on the design at that time and was incorporated into the City’s Action Plan • Since then, an additional alternative has been identified as the new Preferred Alternative for the ESCR project, as presented in the Final Environmental Impact Statement (FEIS) • Proposed Action Plan Amendment 20 provides final RBD project design information for the ESCR project • Action Plan Amendments are subject to public review prior to HUD approval 6 What Does The Proposed Action Plan Amendment Contain? • Project Description • Implementation Partnerships • Outreach Plan • Project Timeline • Benefit Cost Analysis 7 1. Action Plan Overview 2. ESCR Project Description 3. Public Outreach 4. Funding and Benefit Cost Analysis 5. Comment Process 8 PROJECT GOALS & ORIGIN • Provide a reliable, integrated flood protection system; minimize use of closure structures • Improve waterfront open spaces and access 25TH STREET • Achieve implementation milestones and project funding allocations as established by HUD ESCR • Respond quickly to the urgent need for increased flood protection and MONTGOMERY resiliency STREET 9 12 13 IMPROVED RESILIENCY FOR COMMUNITY INTEGRATED FLOOD PROTECTION & INTERIOR DRAINAGE SYSTEM INTERCEPTOR GATE BUILDING FLOODWALL & GATES ELEVATED EAST RIVER PARK FLOODWALL & GATES INTERCEPTOR GATE BUILDING RAISED BULKHEAD AND SEEPAGE BARRIER (BELOW GROUND) 14 15 16 DELANCEY OVERLOOK FUTURE CONDITION 17 MONTGOMERY STREET FLOOD GATE IN OPEN POSITION FLOODWALL FLOODWALL TOP OF WALL: EL. +16.5 TOP OF WALL: EL. +16.5 WALL HT: APPROX. 1.5' WALL HT: APPROX. 4.5' FLOOD GATE IN OPEN POSITION DESIGN TEAM IS STUDYING FLOODWALL FINISHES 16 MONTGOMERY STREET FLOOD GATE IN CLOSED POSITION FLOOD GATE IN CLOSED POSITION 17 CORLEARS HOOK TO DELANCEY STREET FUTURE CONDITION RE-CONSTRUCTED DELANCEY ST. BRIDGE NATURE EXPLORATION MAINTENANCE AREA FIREBOAT HOUSE CORLEARS HOOK PARK BRIDGE BASKETBALL COURTS NEIGHBORHOOD GATHERING LAWN AMPHITHEATER EMBAYMENT BBQ SOLAR LIGHTING ALONG ESPLANADE 18 HOUSTON STREET FUTURE CONDITION FIELDS 5 & 6 FIELDS 3 & 4 MULTI-USE FIELD TENNIS HOUSE SOLAR LIGHTING TENNIS COURTS TENNIS COURTS ALONG ESPLANADE RECONSTRUCTED TRACK HOUSE & MANHATTAN ESPLANADE TRACK AND FIELD GREENWAY STEP DOWN RE-CONSTRUCTED DELANCEY ST. BRIDGE EMBAYMENT HOUSTON BASKETBALL LAWN COURTS 19 HOUSTON STREET FUTURE CONDITION 22 HOUSTON STREET FUTURE CONDITION 23 TRACK & EAST 10TH STREET FUTURE CONDITION SOLAR LIGHTING ALONG ESPLANADE RE-CONSTRUCTED E. 10TH STREET BRIDGE BASKETBALL MANHATTAN COURTS GREENWAY RE-CONSTRUCTED TRACK HOUSE E. 10TH ST. MAINTENANCE YARD PLAYGROUND & COMFORT STATION RECONSTRUCTED FIELD 7 TRACK & FIELD CHALLENGE COURSE FITNESS FIELD 6 E. 6TH ST. AREA BRIDGE BBQ STEP DOWN 22 FLYOVER BRIDGE FUTURE CONDITION STUYVESANT COVE PARK 20TH STREET FERRY MURPHY BROTHERS PLAYGROUND CON ED 23 PROJECT AREA 2 FUTURE CONDITION ASSER LEVY PLAYGROUND SOLAR ONE STUYVESANT COVE PARK 20TH STREET FERRY MURPHY BROTHERS PLAYGROUND CON ED FACILITY 24 STUYVESANT COVE PARK PRELIMINARY DESIGN 25 PROJECT SCHEDULE OVERVIEW GROUND DESIGN & CONSTRUCTION BREAKING CONCEPT PRELIMINARY DESIGN FINAL DESIGN PROCUREMENT CONSTRUCTION ENVIRONMENTAL REVIEW DEIS FEIS DRAFT SCOPE OF DRAFT DEIS PUBLIC REVIEW ISSUED HEARING ISSUED WORK EIS & FINAL EIS 4/5 APPROVALS & PERMITTING PDC CONCEPTUAL ULURP PDC PRELIMINARY JOINT PERMIT CITY COUNCIL PDC FINAL PREPARATION DESIGN CERTIFICATION DESIGN APPLICATION REVIEW ENDS DESIGN COMMUNITY ENGAGEMENT INTERACTIVE COMMUNITY CITY PLANNING COMMUNITY COMMUNITY MEETINGS & COMMISSION MEETINGS PUBLIC HEARING MEETINGS OPEN HOUSES OPERABLE FLOOD 7/31 PROTECTION BY HURRICANE SEASON 2023 COMMUNITY BOARD MEETINGS PROJECT CB3 & CB6 CB3 & CB6 CB3 & CB6 CB3 & CB6 CB3 & CB6 CB3 CB3 & CB6 COMPLETION IN COMMITTEES FULL BOARDS FULL BOARDS COMMITTEES FULL BOARDS COMMITTEE FULL BOARDS 2023 FALL 2018 WINTER2019 SPRING2019 SUMMER2019 FALL2019 WINTER2020 SPRING2020 26 1. Action Plan Overview 2. ESCR Project Description 3. Public Outreach 4. Funding and Benefit Cost Analysis 5. Comment Process 27 PUBLIC OUTREACH COMMUNITY MEETINGS NYCHA RESIDENTS MEETINGS CB3 MEETINGS OPEN HOUSES COMMUNITY BASED ORGANIZATIONS CB6 MEETINGS 28 STAKEHOLDER & COMMUNITY ENGAGEMENT MEETINGS TO DATE STAKEHOLDER STAKEHOLDER (continued) • LUNGS • Large-scale Public Engagement Meetings: Most recent • LES READY! meetings held 12/10/2018; 12/11/2018 • NYCHA Resident Association Leadership • Project Open Houses 05/14/2019 & 05/15/2019 • New Yorkers for Parks • Grand Street - Town Hall 06/03/19 • Lower East Side Power Partnership • Project Open Houses 06/05/19 & 06/06/19 • Regional Plan Association • Various other targeted Stakeholder Meetings • Gouverneur Gardens Co-Op Residents • NYCHA Riis Residents • NYCHA Baruch Residents • NYCHA Vladeck Houses TenantsAssociation ELECTED OFFICIAL AND COMMUNITY BOARD MEETINGS • NYCHA Smith Houses TenantsAssociation • Borough President Brewer • NYCHA LaGuardia Houses TenantsAssociation • Council Member Chin • East River Housing Corp, Board & Residents • Council Member Rivera • NYCHA LES II, V & Bracetti Plaza Residents • Council Member Powers • East River Alliance • Council Speaker Johnson • Friends of Corlears Hook Park • Assembly Member Niou • NYCHA Lillian Wald Residents • Assembly Member Epstein • GOLES • Assembly Speaker Heastie • LES Ecology Center • Senator Hoylman • Public School Athletic League (PSAL) • Senator Kavanaugh • Peter Stuyvesant Little League • Representative Maloney • Waterside Plaza Tenants Association Leadership • Representative Velazquez • Waterside Plaza Management • City Council Parks and Recreation Committee Public Hearing • Stuyvesant Town- Peter Cooper Village Tenants Association • CB3 Parks/Waterfront Committee • Knickerbocker Village • CB3 Full Board • Waterfront Alliance • CB6 Land Use/Waterfront Committee • Solar One • CB6 Parks Committee • Peter Cooper Village • CB6 Full Board • Stuyvesant Town • CB6 Working Group • Stuyvesant Town-Peter Cooper Village Management • CB3/CB6 Joint Waterfront Task Force • Design and Programming workshops for Murphy Brothers and Asser Levy Playgrounds • Multiple Asser Levy Alignment Meetings • VA Hospital • NYU Langone • Masaryk Towers Residents 29 1. Action Plan Overview 2. ESCR Project Description 3. Public Outreach 4. Funding and Benefit Cost Analysis 5. Comment Process 30 PROJECT FUNDING • To implement the proposed project, the City and its federal partners have committed approximately $1.45 billion in funding • Includes $338 million in HUD Community Development Block Grant- Disaster Recovery (CDBG-DR) funds. These funds are broken into: • Planning • Predevelopment Work • Project Construction • Administrative 31 BENEFIT COST ANALYSIS OVERVIEW What is a BCA? At a cost of $1.4 billion, the East Side A tool for comparing Coastal Resiliency Project will provide a project’s costs to a $2-$3 billion in benefits over its lifespan project’s benefits What types of costs? The costs to construct, maintain, and operate the project over its lifespan What types of benefits? Reduction in flood The benefit cost ratio (BCR) for ESCR is 1.47 risk, as well as additional This BCA was prepared in accordance with the project’s HUD funding. The total cost used for the BCA excludes supplemental project features outside the scope of HUD’s environmental, social, and review. Ranges reflect variance in benefits analysis. Numbers presented are net present value using a 7 percent discount rate. Numbers have been rounded for clarity. For more economic benefits detail and full methodology, refer to the Benefit Cost Analysis Report. 3232 BENEFITBENEFIT COST COST ANALYSIS ANALYSIS (BCA) OVERVIEW Over its projected lifespan, the project will prevent an estimated: $750 MILLION TO $1.4 $58 TO $230 MILLION BILLION IN PROPERTY LOSS IN PROPERTY DAMAGE VALUE $799 TO $857 MILLION IN $173 MILLION IN RELOCATION COSTS AND BUSINESS DISRUPTION DAMAGE TO PARK FACILITIES $183 TO $295 MILLION HUMAN HEALTH IMPACTS $20 TO $58 MILLION + IN THE LOSS OF AND LOST PRODUCTIVITY SERVICES The ESCR design team identified a 50-year project useful life for the integrated flood protection system (IFPS) based on FEMA standard values for major infrastructure improvements, though project is expected to remain effective beyond this period, particularly with appropriate maintenance and as needed upgrades. The system will be built to be adaptable, to enable modification for additional sea level rise in the future.