Avalon Peninsula 17 Long Pond, Conception Bay 18

Total Page:16

File Type:pdf, Size:1020Kb

Avalon Peninsula � 17 Long Pond, Conception Bay � 18 DFO — Library I N1P01 I I I Fisheries and Oceans Canada II III I II08026149 I I a 7 JUN 2037 NAFC Library - NL Region ,71•M ••••••■•••••••ffii1011MII............ FINAL FIELD REPORT W. R. CURRAN NEWFOUNDLAND REVISORY SURVEY 2006 May 23 to November 22, 2006 Document Reference #: 2600314 HICs: David Street / Joseph Manning Department of Fisheries and Oceans Newfoundland and Labrador Region Science Branch Hydrographic Division VK Canadian Hydrographic Service (Atl.) 597 .C3 Newfoundland and Labrador Office S78 P.O. Box 5667 2006 80 East White Hills Road St. John's NL A1C 5X1 ell Fisheries and Oceans Peches et Oceans • • Canada Canada Canad'A TABLE OF CONTENTS INTRODUCTION 3 LIST OF STAFF (SURVEY OPERATIONS) 4 LIST OF EQUIPMENT 5 PLANNING 7 CHRONOLOGY OF EVENTS 7 PROJECTS 11 PROJECT SUMMARY AND STATISTICS 12 W. R. CURRAN TIME UTILIZATION RECORD 12 DISCOVERIES AND DETAILS 14 FAIR HAVEN, PLACENTIA BAY 14 BELL ISLAND FERRY TERMINAL, CONCEPTION BAY 15 PORT DE GRAVE, CONCEPTION BAY 16 FERMEUSE HARBOUR, AVALON PENINSULA 17 LONG POND, CONCEPTION BAY 18 DELIVERABLES 19 RECOMMENDATIONS 19 CONCLUSIONS 20 2 2006 Final Field Report — W. R. Curran (May-Nov 2006) INTRODUCTION The 2006 revisory field season for the Canadian Hydrographic Service (CHS) was tasked to complete a number of high priority hydrographic surveys throughout the island portion of Newfoundland and Labrador. The purpose of these surveys was to acquire hydrographic data for use in updating existing CHS nautical products and production of new products, with the desired end result of increasing marine safety. All projects were established as part of the CHS Level of Service commitment to assess Charts on a cyclic basis and in response to client established priorities identified through the ISO Client Feedback Process. The program was financed and completed through the High Risk Charting Fund. Due to hydrographic staff members having commitments with other on-going hydrographic programs, this program was completed over two time periods. The first from May 23 to July 18 with Joseph Manning as Hydrographer in Charge (HIC) and the second from Sept 10 to Nov 22 with David Street as HIC. The Canadian Coast Guard (CCG) provided the survey crew with a coxswain for both periods. The survey launch W. R. Curran was utilized as the platform to collect bathymetry. The W. R. Curran is a 7.6 meter Rosborough model RF-246 vessel with a draft of 0.7 meters. It was an ideal platform for this program as it can be transported between locations on a trailer and is easily launched and recovered. It is also highly maneuverable with a shallow draft making it ideal for harbour surveys. W. R. Curran 3 2006 Final Field Report — W. R. Curran (May-Nov 2006) LIST OF STAFF (SURVEY OPERATIONS) Staff Organization Dates Remarks Joseph Manning CHS May 23 - July 18 Hydrographer In Charge David Street CHS Sept 10 - Nov 22 Hydrographer In Charge Multi-Disciplinary David Sinnott CHS May 23 - July 18 Hydrographer May 23 - July 18 Multi-Disciplinary Lizabeth Cuff CHS Sept 10 - Oct 17 Hydrographer Michael Multi-Disciplinary CHS Sept 10 - Sept 12 Nickerson Hydrographer May 23 - July 18 John Parsons CCG Coxswain Sept 10 - Oct 17 Gary Smith CHS Nov 7 - Nov 22 Sailing Directions Officer Coxswain John Parsons 4 2006 Final Field Report — W. R. Curran (May-Nov 2006) LIST OF EQUIPMENT Equipment W. R. Curran Single Beam Echo Sounder Knudsen 320 B/P with hull mounted transducer Frequency: 200 KHz Side scan Echo Sounder Knudsen 320 B/P with pole mounted side scan staves Frequency: 200 KHz Motion sensor I Honeywell HMR3000 Velocity Profiler I Applied Microsystems SVP-16 Velocimeter. Positioning system Global Positioning System (GPS) in Real Time Kinetic mode (RTK) using Trimble 5700 receivers and Pacific Crest PDL 4535 radio modems. Tide Gauge I Sutron 8210 Acquisition Hardware I HP workstation xw 8200 Acquisition / Navigation Software HypackMax v4.3 Knudsen EchoContol v1.73 Trimble Geomatics Office v1.50 Processing Software "Bathymetry" I HIPS/SIPS v6.0 sp2 Processing Software "Miscellaneous" CARIS GIS v4.4a Trimble Geomatics Office v1.50 Miscellaneous hardware/software Toshiba 4600 laptop equipped with Trimble Geomatics Office v1.50 and Sutron software. Leica NA2 level Trimble RTK backpack for shorelining 4 tripods and 2 level rods 5 2006 Final Field Report — W. R. Curran (May-Nov 2006) Differential Global Positioning System (DGPS) reference station Temporary tide gauge installation 6 2006 Final Field Report — W. R. Curran (May-Nov 2006) PLANNING Planning commenced shortly after the Field Project Instructions were released. This involved acquiring the necessary data and documents for each survey project. Searches for existing documents were done utilizing the CHS Meta data database (CHSDIR). The searches were reviewed and all relevant documents were ordered for validation purposes Existing horizontal control was obtained from both the Geodetic Survey of Canada (GSC) and the Newfoundland and Labrador Provincial Government (NLPG) databases. Tidal and benchmark information was obtained from the Marine Environment Data Services (MEDS) database and from the Tidal Section of the CHS Atlantic Region. Digital shoreline at best scale was obtained from the NLPG Environment and Conservation, Surveys and Mapping Division. Improvements to resolve some of the W. R. Curran' s mechanical and hardware problems noted in the previous year's Final Field Report Document # 2600312 were also undertaken. The engine overheating problem was resolved by changing the engine's cooling system intake from the outboard leg to the launch's hull. An engine service was also done at this time. The mount for the hull mounted transducer was repaired and a new transducer was installed. The GPS antenna was moved directly above the transducer. Existing cabinets in the W R. Curran were modified and repaired to accommodate new equipment. A new computer and equipment interface box was installed and configured. A motion sensor was also installed and configured. CHRONOLOGY OF EVENTS May 23 — June 23 Mobilization of W. R. Curran which involved re-routing the engine cooling system, repairing the transducer mounting system, installing a new transducer, repositioning the GPS antenna and modifying cabinets. In addition a new computer and motion sensor were installed. June 26 Launched the W. R. Curran at St. Phillips and began trials. A temporary tide gauge was installed at Bell Island. This gauge would be used for reducing soundings on both the Bell Island and Port de Grave surveys. June 27 Established a horizontal control point on Bell Island for the RTK GPS reference station. June 28 Encountered a power loss problem onboard the W. R. Curran. This was attributed to batteries not being properly charged due to a worn alternator belt. Problem was rectified. June 29 Commenced Bell Island survey. 7 2006 Final Field Report — W. R. Curran (May-Nov 2006) June 30 — July 5 A power surge onboard the W. R. Curran damaged a circuit board in the Knudsen sounder. The sounder was shipped to Knudsen for repairs and returned on July 5. July 6 Bell Island survey was completed. W. R. Curran was steamed to St. Phillips were it was secured. July 7 The W. R. Curran was transported from St. Phillips to Fair Haven. by trailer. Fair Haven survey commenced. A temporary tide gauge was not installed for this project as soundings were reduced from the permanent tide gauge at Argentia. July 8 Fair Haven survey completed and the W. R. Curran was transported by trailer to St. John's. July 11 The W. R. Curran was transported by trailer from St. John's to Port de Grave. The survey crew met with the Port de Grave Harbour Authority to discuss which areas of the harbour had recently changed and required surveys. A plan was developed on how to move vessels around so as to provide access to required survey areas. Survey at Port de Grave commenced. July 12-13 Surveying at Port de Grave. July 14 Survey crew met with Port de Grave Harbour Authority to discuss and review the results of the survey. The Harbour Authority was pleased and did not see any reason for additional work. July 15 Completed survey at Port de Grave and returned the W. R. Curran to the CCG base in St. John's by trailer. July 18 Recovered the temporary tide gauge from Bell Island. July 18 — Sep 10 Survey was suspended as hydrographic staff was involved with other hydrographic field programs. September 10-12 W. R. Curran was launched in St. John's for trials to ensure it was operating properly for the upcoming Fermeuse project. Mechanical problems that were found and resolved included a faulty engine temperature sensor and a loose alternator belt. Repairs were also made to the trailers lights and rollers. Mike Nickerson trained David Street in the basic operations of the W. R. Curran. Data was collected and processed which verified the equipment was operational. W R. Curran was recovered and stored at the CCG base on September 12. 8 2006 Final Field Report — W. R. Curran (May-Nov 2006) September 13 Field operations were temporarily suspended due to poor weather and sea conditions. Survey crew spent day at the office planning for the up-coming Fermeuse project. September 14 A reconnaissance survey was done at Fermeuse. This involved recovering and leveling two benchmarks. Two horizontal control monuments were also located. The nearest suitable launching site for the W. R. Curran was determined to be a launching ramp at Cape Broyle which was a 1.5 hour steam from Fermeuse. September 15 The W. R. Curran was transported from St. John's to Cape Broyle by trailer and launched at Cape Broyle. The W. R. Curran was steamed from Cape Broyle to Fermeuse.
Recommended publications
  • Historical Statistics of Newfoundland and Labrador
    Historical Statistics of Newfoundland and Labrador GOVERNMENT OF NEWFOUNDLAND AND LABRADOR HISTORICAL STATISTICS OF NEWFOUNDLAND AND LABRADOR Published under the Authority of The Honourable Winston Baker President of Executive Council Prepared by Newfoundland Statistics Agency Executive Council Government of Newfoundland and Labrador Printed by Division of Printing Services Department of Works, Services & Transportation December 1990 Volume II (VI) TABLE OF CONTENTS PREFACE LIST OF SYMBOLS LIST OF TABLES CENSUS MAP A. POPULATION AND VITAL STATISTICS B. HEALTH AND WELFARE C. LABOUR FORCE D. WAGES AND WORKING CONDITIONS E. EDUCATION F. PRODUCTION AND INCOME G. PROVINCIAL GOVERNMENT FINANCE H. BANKING AND FINANCE I. PRICE INDEXES J. AGRICULTURE K. FISHERIES L. FORESTRY M. MINING N. MANUFACTURING 0. INVESTMENT P. CONSTRUCTION AND HOUSING Q. TRANSPORTATION R. COMMUNICATIONS S. ENERGY T. TRADE AND SERVICES U. TOURISM V. POLITICS AND GOVERNMENT W. JUSTICE X. ENVIRONMENT PREFACE This publication is a collection of the commonly used statistical series on Newfoundland and Labrador. In order to keep the publication at a reasonable size monthly and subprovincial data are not included. As well only a small number of census tables have been included. The following should be noted when using the publication: i) The publication is arranged into 24 sections and the headings of these sections are given in The Table of Contents ii) Each section contains notes and explanations on the tables. iii) The source of the data is indicated at the foot of each table. iv) Also at the foot of each table is a heading called "Additional Data". This indicates when the data are available more frequently than annually (such as monthly); for a smaller geographic area; or in greater detail.
    [Show full text]
  • Municipal Backyard Compost Bin Program Participants 2011-Present 2018
    Municipal Backyard Compost Bin Program Participants 2011-Present 2018 Baie Verte Bay St George Waste Management Committee Cape St George Channel Port au Basques City of St John's Gander Greens Habour Lourdes New-Wes-Valley Northern Peninsula Regional Service Board Paradise Pasadena Sandy Cove Trinity Bay North Twillingate 2017 Baie Verte Carbonear Corner Brook Farm and Market, Clarenville Grand Falls-Windsor Logy Bay-Middle Cove-Outer Cove Makkovik Memorial University, Grenfell Campus Paradise Pasadena Portugal Cove-St. Phillips Robert's Arm Sandy Cove St. Lawrence St. John's Twillingate 2016 2015 Brigus Baie Verte Burin Corner Brook Carmanville Discovery Regional Service Board Comfort Cove - New Stead Happy Valley - Goose Bay Fogo Island Logy Bay - Middle Cove - Outer Cove Gambo Sandy Cove Gander St. John's McIver’s Sunnyside North West River Witless Bay Point Leamington 2014 Burgeo Carbonear Conception Bay South (CBS) Lewisporte Paradise Portugal Cove - St. Phillip’s St. Alban’s St. Anthony (NorPen Regional Service Board) St. George’s St. John's Whitbourne Witless Bay 2013 Bird Cove Kippens Bishop's Falls Lark Harbour Campbellton Marystown Clarenville New Perlican Conception Bay South (CBS) NorPen Regional Service Board Conne River Old Perlican Corner Brook Paradise Deer Lake Pasadena Dover Placentia Flatrock Port au Choix Gambo Portugal Cove-St. Phillips Grand Bank Springdale Happy Valley - Goose Bay Stephenville Harbour Grace Twillingate 2011 Botwood Conception Bay South (CBS) Cape Broyle Conception Harbour Gander Conne River Glovertown Corner Brook Sunnyside Deer Lake Harbour Main – Chapel’s Cove – Gambo Lakeview Glenwood Holyrood Grand Bank Logy Bay Harbour Breton Appleton Heart’s Delight - Islington Arnold’s Cove Irishtown – Summerside Bay Roberts Kippens Baytona Labrador City Bonavista Lawn Campbellton Leading Tickles Carbonear Long Harbour & Mount Arlington Centreville Heights Channel - Port aux Basques Makkovik (Labrador) Colliers Marystown 2011 cont.
    [Show full text]
  • Thms Summary for Public Water Supplies in Newfoundland And
    THMs Summary for Public Water Supplies Water Resources Management Division in Newfoundland and Labrador Community Name Serviced Area Source Name THMs Average Average Total Samples Last Sample (μg/L) Type Collected Date Anchor Point Anchor Point Well Cove Brook 154.13 Running 72 Feb 25, 2020 Appleton Appleton (+Glenwood) Gander Lake (The 68.30 Running 74 Feb 03, 2020 Outflow) Aquaforte Aquaforte Davies Pond 326.50 Running 52 Feb 05, 2020 Arnold's Cove Arnold's Cove Steve's Pond (2 142.25 Running 106 Feb 27, 2020 Intakes) Avondale Avondale Lee's Pond 197.00 Running 51 Feb 18, 2020 Badger Badger Well Field, 2 wells on 5.20 Simple 21 Sep 27, 2018 standby Baie Verte Baie Verte Southern Arm Pond 108.53 Running 25 Feb 12, 2020 Baine Harbour Baine Harbour Baine Harbour Pond 0.00 Simple 9 Dec 13, 2018 Barachois Brook Barachois Brook Drilled 0.00 Simple 8 Jun 21, 2019 Bartletts Harbour Bartletts Harbour Long Pond (same as 0.35 Simple 2 Jan 18, 2012 Castors River North) Bauline Bauline #1 Brook Path Well 94.80 Running 48 Mar 10, 2020 Bay L'Argent Bay L'Argent Sugarloaf Hill Pond 117.83 Running 68 Mar 03, 2020 Bay Roberts Bay Roberts, Rocky Pond 38.68 Running 83 Feb 11, 2020 Spaniard's Bay Bay St. George South Heatherton #1 Well Heatherton 8.35 Simple 7 Dec 03, 2013 (Home Hardware) Bay St. George South Jeffrey's #1 Well Jeffery's (Joe 0.00 Simple 5 Dec 03, 2013 Curnew) Bay St. George South Robinson's #1 Well Robinson's 3.30 Simple 4 Dec 03, 2013 (Louie MacDonald) Bay St.
    [Show full text]
  • Geology Map of Newfoundland
    LEGEND POST-ORDOVICIAN OVERLAP SEQUENCES POST-ORDOVICIAN INTRUSIVE ROCKS Carboniferous (Viséan to Westphalian) Mesozoic Fluviatile and lacustrine, siliciclastic and minor carbonate rocks; intercalated marine, Gabbro and diabase siliciclastic, carbonate and evaporitic rocks; minor coal beds and mafic volcanic flows Devonian and Carboniferous Devonian and Carboniferous (Tournaisian) Granite and high silica granite (sensu stricto), and other granitoid intrusions Fluviatile and lacustrine sandstone, shale, conglomerate and minor carbonate rocks that are posttectonic relative to mid-Paleozoic orogenies Fluviatile and lacustrine, siliciclastic and carbonate rocks; subaerial, bimodal Silurian and Devonian volcanic rocks; may include some Late Silurian rocks Gabbro and diorite intrusions, including minor ultramafic phases Silurian and Devonian Posttectonic gabbro-syenite-granite-peralkaline granite suites and minor PRINCIPAL Shallow marine sandstone, conglomerate, limey shale and thin-bedded limestone unseparated volcanic rocks (northwest of Red Indian Line); granitoid suites, varying from pretectonic to syntectonic, relative to mid-Paleozoic orogenies (southeast of TECTONIC DIVISIONS Silurian Red Indian Line) TACONIAN Bimodal to mainly felsic subaerial volcanic rocks; includes unseparated ALLOCHTHON sedimentary rocks of mainly fluviatile and lacustrine facies GANDER ZONE Stratified rocks Shallow marine and non-marine siliciclastic sedimentary rocks, including Cambrian(?) and Ordovician 0 150 sandstone, shale and conglomerate Quartzite, psammite,
    [Show full text]
  • (PL-557) for NPA 879 to Overlay NPA
    Number: PL- 557 Date: 20 January 2021 From: Canadian Numbering Administrator (CNA) Subject: NPA 879 to Overlay NPA 709 (Newfoundland & Labrador, Canada) Related Previous Planning Letters: PL-503, PL-514, PL-521 _____________________________________________________________________ This Planning Letter supersedes all previous Planning Letters related to NPA Relief Planning for NPA 709 (Newfoundland and Labrador, Canada). In Telecom Decision CRTC 2021-13, dated 18 January 2021, Indefinite deferral of relief for area code 709 in Newfoundland and Labrador, the Canadian Radio-television and Telecommunications Commission (CRTC) approved an NPA 709 Relief Planning Committee’s report which recommended the indefinite deferral of implementation of overlay area code 879 to provide relief to area code 709 until it re-enters the relief planning window. Accordingly, the relief date of 20 May 2022, which was identified in Planning Letter 521, has been postponed indefinitely. The relief method (Distributed Overlay) and new area code 879 will be implemented when relief is required. Background Information: In Telecom Decision CRTC 2017-35, dated 2 February 2017, the Canadian Radio-television and Telecommunications Commission (CRTC) directed that relief for Newfoundland and Labrador area code 709 be provided through a Distributed Overlay using new area code 879. The new area code 879 has been assigned by the North American Numbering Plan Administrator (NANPA) and will be implemented as a Distributed Overlay over the geographic area of the province of Newfoundland and Labrador currently served by the 709 area code. The area code 709 consists of 211 Exchange Areas serving the province of Newfoundland and Labrador which includes the major communities of Corner Brook, Gander, Grand Falls, Happy Valley – Goose Bay, Labrador City – Wabush, Marystown and St.
    [Show full text]
  • D' an Examination of 17Th-Century British Burial Landscapes in Eastern
    ‘Here lieth interr’d’ An examination of 17th-century British burial landscapes in eastern North America by Robyn S. Lacy A thesis submitted to the School of Graduate Studies in partial fulfilment of the requirements for the degree of Master of Arts Department of Archaeology Memorial University of Newfoundland September 2017 Abstract An archaeological, historical, and geographical survey-based examination, this research focuses on the first organized 17th-century British colonial burial grounds in 43 sites in New England and a further 20 in eastern Newfoundland, and how religious, socio- political, and cultural backgrounds may have influenced the placement of these spaces in relation to their associated settlements. In an attempt to locate the earliest 17th-century burial ground at Ferryland, Newfoundland, this research focuses on statistical analysis, and identifying potential patterns in burial ground placement. The statistical results will serve as a frequency model to suggest common placement and patterns in spatial organization of 17th-century British burial grounds along the eastern seaboard of North America. In addition, text-based and geochemical analyses were conducted on the Ferryland gravestones to aid in determining age and origin. ii Acknowledgments I would like to thank everyone who has provided their support and guidance throughout the course of this project. First, I’d like to thank Dr. Barry Gaulton for his endless assistance and support of my ever-growing thesis. I could not have asked for a better supervisor throughout this project, and I hope his future students know how lucky they are. Secondly, I’d like to thank my reviewers, Dr.
    [Show full text]
  • MINUTES Upper Island Cove Town Hall Thursday, January 26, 2017 @ 7:30 P.M
    JOINT COUNCIL OF CONCEPTION BAY NORTH MINUTES Upper Island Cove Town Hall Thursday, January 26, 2017 @ 7:30 p.m. IN ATTENDANCE: MEMBER NAME TOWN/ORGANIZATION Gord Power, Chair/Treasurer Cupids Elizabeth Moore Clarke's Beach Frank Antle, Secretary Victoria George Simmons Bay Roberts Philip Wood Bay Roberts Wade Oates Bay Roberts Walter Yetman Bay Roberts Dean Franey Bay Roberts Wayne Rose Brigus Ralph Trickett Brigus Lorne Youden Brigus George Butt Carbonear Wayne Snow Clarke's Beach Joan Wilcox Clarke's Beach Christine Burry Cupids Kevin Connolly Cupids Terry Barnes Harbour Grace Gordon Stone Harbour Grace Blair Hurley North River Marjorie Dawson South River Bev Wells South River Joyce Petten South River Arthur Petten South River Lewis Sheppard Spaniard’s Bay Tony Dominix Spaniard's Bay Tracy Smith Spaniard's Bay George Adams Upper Island Cove Brian Drover Upper Island Cove Aubrey Rose Victoria Others: Ken McDonald Member of Parliament Pam Parsons Member of the House of Assembly Ken Carter Parliamentary Staff Sgt. Brent Hillier RCMP Kathleen Parewick Municipalities NL Bradley Power Eastern Regional Service Board Andrew Robinson The Compass 2 PROCEEDINGS: 1. WELCOME FROM HOST MUNICIPALITY - Mayor George Adams from the Town of Upper Island Cove welcomed everyone to his community and invited guests to stay after the meeting for a small reception. 2. WELCOME FROM THE CHAIRPERSON - Chairperson Gordon Power welcomed everyone and called the meeting to order at 7:34 p.m. 3. ADOPTION OF THE AGENDA MOTION: Moved by Mr. G Stone, seconded by Mr. W. Yetman, that the Agenda of the JCCBN meeting of January 26, 2017 be adopted as tabled.
    [Show full text]
  • Council Delegate Name(S)
    DELEGATES AND FUNDED ALTERNATES TO THE 2019 BGM Branch/ Delegate Funded Branch/ Delegate Funded Council Name(s) Alternate Council Name(s) Alternate Appalachia Jeff Blundon, Darlene Greenham, Northern Light Maurice Smith Amanda Audrey Fortune Anthony-Chubbs Aurora Sharon Young Michelle Tucker Notre Dame Ambrose Patterson Baccalieu Marlene LeShane Nutak Labradorimi Tony Tibbo Deidre Barney Baie Verte Peninsula Amanda Milley Courtney Kirby Placentia Sheldon Slaney Bay d’Espoir Rebecca Parsons-Burden Gwen Goodyear Port aux Basques Shonna Ingram Bay Roberts Paul Sheppard, Jennifer Pilgrim Rameaux Catherine Cutler Bell Mer Della Way Lois Applin Rushoon-Terrenceville Patrick Whiffen Belleoram-Wreck Cove Derrick Baker Andrea Penny St. John’s Centre Angela Dawe, Genevieve Gauci, Bremco Hollis Cull Megan Fleming Karen Yetman Burgeo Wayne Vivian St. Mary’s Bay Patti Corcoran Burin-Marystown Heidi Bradbury, Tanya Cusick Seagaulher unavailable at time of printing Carbonear Gordon King, Brent Davis Southern Shore Geri-Lynn Devereaux Churchill Falls Christopher Ryan Table Mountain Heather Brake Courtney Williams Clarenbridge Heather Wells, Jolene Primmer Taylor’s Brook Natalie Jackson Donna Fudge Coastal Labrador South Mary Ward Ian Spencer Trinity-Deadman’s Bay unavailable at time of printing Conception Bay Centre Tyson Bennett Trinity, Trinity Bay Peggy Sacrey Stephanie Fleming Conception Bay South Danielle Stanley, JoAnne Taylor, Upper Trinity South Kim Siegfriedt Robyn Norman Scott Fifield, Jacinta Morgan, Waterford Valley Kimberly Fifield, Jeffrey
    [Show full text]
  • Chapter 2. the Slender Thread Cast Off: Migration & Reception
    The Slender Thread Chapter 2 Willeen Keough Chapter 2 The Slender Thread Cast Off Migration and Reception in Newfoundland When Michael and Mary Ryan were coming from County Wexford Ireland to Nfld. their first child was Born at sea. It was the year 1826. The boy was named Thomas Ryan… Michael Ryan… was drowned near Petty Harbour Motion, in the year 1830 on a sealing voyage. His wife Mary Ryan was left with 3 young children, Thomas who was born at sea, Michael and Thimothy Ryan. After some years Mary Ryan Married again. Edward Coady also a native of County Wexford. They had a family of 2 sons and 1 daughter… They have many decendents at Cape Broyle, many places in Canada and also in the United States. Audio Sample These homespun words, transcribed from the oral tradition by an elderly community historian in 1971, provide a skeletal story of an Irish woman who came to Cape Broyle on the southern Avalon in the early nineteenth century.1 It is a sparse and plainspoken chronicle of her life, but Mary Ryan's story could be the stuff of movie directors' dreams. A young Irish woman leaves her home in Wexford to accompany her husband on a perilous journey that will bring her to a landscape quite different from the green farmlands of her home country. There has been some urgency in their leaving, for Mary is well into her pregnancy upon departure, and the transatlantic crossing, difficult at best, will be a dangerous venture for a woman about to give birth.
    [Show full text]
  • Summary of Polling Divisions HARBOUR MAIN
    Summary of Polling Divisions HARBOUR MAIN Total Number of Polling Divisions in District: 40 Total Number of Registered Electors in District: 11004 Polling Division Boundary Descriptions Registered Electors 1. CONCEPTION BAY SOUTH: ANTHONYS ROAD (ODD NUMBERS 9 TO 59, THE WEST SIDE OF 393 ANTHONYS ROAD INCLUDING ADMIRALS' COAST RETIREMENT CENTRE, 29 ANTHONYS ROAD); CONCEPTION BAY HIGHWAY (ODD NUMBERS 943 TO 1061, SOUTH PORTION OF CONCEPTION BAY HIGHWAY FROM LOWER GULLIES RIVER TO SCOTTS ROAD SOUTH, EVEN NUMBERS 1020 TO 1090, FROM ANTHONY'S ROAD TO SCOTTS ROAD NORTH INCLUDING MORGANS COMMUNITY CARE HOME, 1028 CONCEPTION BAY HIGHWAY); DECIMA PLACE; HOLLOWAY PLACE; ISRAEL PLACE; MACMAR LANE; PICCOS ROAD; RED OAKE PLACE; ROBERTS ROAD NORTH; AND UPSHALL PLACE. 2. CONCEPTION BAY SOUTH: BEACON PLACE; BIRCHY HOLLOW; CRAIG NEWMAN WAY (ALSO 361 KNOWN AS CLOVER LANE); FOREST ROAD; GREENRIDGE PLACE; LARCH GROVE PLACE; QUIET WAY; ROBERTS ROAD SOUTH; ROCK VIEW ROAD; RONALD DRIVE; SCOTTS ROAD SOUTH; SOPER PLACE; AND UPPER GULLIES ELEMENTARY ROAD. 3. CONCEPTION BAY SOUTH: AGUSTUS AVENUE; ANDREWS ROAD; BIRCHMOUNT PLACE; 470 CHATWOOD CRESCENT; COLE THOMAS DRIVE; COLLEY ROAD; COMERFORDS ROAD; CONCEPTION BAY HIGHWAY (ODD NUMBERS 1063 TO 1231, INCLUDING WINDY HILL MANOR, 1197 CONCEPTION BAY HIGHWAY, THE SOUTHERN PORTION OF CONCEPTION BAY HIGHWAY FROM SCOTT'S ROAD TO PETTENS ROAD); COURTELL HEIGHTS; DOMINIC DRIVE; GARRETT STREET; MAUREEN CRESCENT; MAYA PLACE; SAMUEL DRIVE; SHETLAND PLACE; ST. PETERS ROAD; AND TAMARA PLACE. 4. CONCEPTION BAY SOUTH: CASEYS ROAD; COATES ROAD; CONCEPTION BAY HIGHWAY (EVEN 337 NUMBERS 1100 TO 1256); DAWES HILL ROAD; HERITAGE ROAD; JASMINE PLACE; KENNEDYS ROAD; LIONS HOUSING ROAD; LUSHS ROAD; SCOTTS LANE NORTH; SCOTTS ROAD NORTH; AND WARFORDS ROAD.
    [Show full text]
  • Student Handbook
    Students Against Drinking & Driving (S.A.D.D.) Newfoundland & Labrador Student Handbook I N D E X SECTION 1: CHAPTER EXECUTIVE INFORMATION (WHITE PAGES) 1. EXECUTIVE FUNCTIONS .............................................................................. 1 A) Election ................................................................................................... 1 B) Roles - President ..................................................................................... 2 - Vice-President ............................................................................. 3 - Vice-President of Finance ........................................................... 3 - Vice-President of Public Relations ............................................. 4 - Secretary ..................................................................................... 5 - Junior Rep .................................................................................. 6 - Teacher / Advisors ...................................................................... 7 C) Planning a Chapter Meeting .................................................................... 8 Sample Meeting Agenda .................................................................... 10 D) How to Write Minutes ............................................................................. 11 Sample Minutes Sheet ........................................................................ 12 Sample Monthly Report ..................................................................... 13 2. HOW TO PLAN A PROVINCIAL
    [Show full text]
  • The Pattern of Glaciation on the Avalon Peninsula of Newfoundland L’Histoire De La Glaciation De La Presqu’Île D’Avalon, À Terre-Neuve
    Document généré le 26 sept. 2021 05:31 Géographie physique et Quaternaire The pattern of glaciation on the Avalon Peninsula of Newfoundland L’histoire de la glaciation de la presqu’île d’Avalon, à Terre-Neuve. Das Schema der Vereisung auf der Avalon-Halbinsel in Neufundland. Norm R. Catto Volume 52, numéro 1, 1998 Résumé de l'article L'histoire de la glaciation de la presqu'île d'Avalon a été établie à partir de URI : https://id.erudit.org/iderudit/004778ar l'étude des caractéristiques géomorphologiques, des stries et de la provenance DOI : https://doi.org/10.7202/004778ar des blocs erratiques. On distingue trois phases dans un continuum de glaciation. Pendant la première phase, il y a eu accumulation et dispersion de Aller au sommaire du numéro la glace à partir de plusieurs centres. Au cours de la deuxième période, qui correspond au Wisconsinien supérieur, les glaciers ont atteint un maximum en étendue et en épaisseur. Le niveau marin abaissé a permis la formation d'un Éditeur(s) centre glaciaire à l'emplacement de la baie St. Mary. Le glacier en provenance de la partie continentale de Terre-Neuve a fusionné avec celui de la presqu'île Les Presses de l'Université de Montréal d'Avalon dans la baie de Plaisance, sur l'isthme et dans la baie de la Trinité. La troisième phase, caractérisée par la remontée du niveau marin et déclenchée ISSN par le recul de l'Inlandsis laurentidien au Labrador, a déséquilibré la calotte glaciaire de St. Mary. La déglaciation finale de la presqu'île d'Avalon a 0705-7199 (imprimé) commencé avant 10 100 ± 250 BP.
    [Show full text]