2021 Catalog Bc Reg
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Canmore Highland Games and the Canmore Ceilidh – at the Canmore MIKE HURLEY Was Elected the Highland Games at Canmore, Alberta on August 31-September 1
ISSUE 28 VOLUME 4 Proudly Serving Celts in North America Since 1991 MAY/JUNE 2019 Inside This Issue PHOTO: Creative Commons/Flickr CIARÁN CANNON (R) the Irish Minister of State at the Depart- ment of Foreign Affairs and Trade, Diaspora and International De- velopment, was in western Canada and Washington State for the St. Patrick’s Day celebrations this March. He met with Premier John Horgan (L) in Victoria while in British Columbia to discuss common priorities and bi-lateral cooperation. [Full coverage of the Minister’s visit pages 7, 18, 19] SHOCK and sorrow across Ireland and the U.K. following news of the tragic death of 29-year-old journalist Lyra McKee. She was killed by dissident republicans while covering a disturbance in the ARTWORK by Wendy Andrew Creggan area of Derry on the evening of Thursday, April 18. BELTANE – Rhiannon-the lover, dances the blossoms into being. The white horse maiden brings joy, [Read more on page 27] creativity and a lust for life...a time of love and celebration. Beltane or Beltaine is the Gaelic May Day festival. Most commonly it is held on May 1, or about halfway between the spring equinox and the summer solstice. Historically, it was widely observed throughout Ireland, Scotland and the Isle of Man. In Irish the name for the festival day is Lá Bealtaine, in Scottish Gaelic Là Bealltainn, and in Manx Gaelic Laa Boaltinn/Boaldyn. It is one of the four Gaelic seasonal festivals—along with Samhain, Imbolc and Lughnasadh – and is similar to the Welsh Calan Mai. -
Southwest Region
SOUTHWEST REGION By Jamie Pardy, PGeo Regional Geologist, Vancouver SUMMARY AND TRENDS Orca Sand and Gravel Ltd (Polaris Minerals Corp) received environmental certification and other The Southwest region hosts one metal mine, one coal authorizations including a mining permit to place its 4 to mine and numerous industrial mineral and aggregate 6 million tonne per year Orca sand and gravel project quarries and sand and gravel operations. near Port McNeil into production. Exploration activity indicators for Southwest British There are three projects in the Environmental Columbia are positive for 2005. The total exploration Assessment pre-application stage: the Cogburn expenditures, number of major exploration projects Magnesium project of North Pacific Alloys Limited started during the period and total metres of drilling are (Leader Mining International Inc) with the company now all up from the previous year (Figures 6.1 and 6.2). looking for a project owner/operator, the Sechelt Exploration spending for 2005 is estimated to be $10.5 Carbonate project of Pan Pacific Aggregates Ltd that million, up significantly over the 2004 estimate of $4 entered the preparatory stage in late November, and the million. Three 2005 projects had budgets greater than $1 Hills Bar Aggregate project of Qualark Resources Inc that million compared to only one project in 2004 and nine entered December 2003. 2005 projects had budgets greater than $250 000 compared to only four in 2004. 15 MINES AND QUARRIES SUMMARY 10.5 There are a variety of mines and quarries in 10 8.5 southwestern British Columbia, including a number of industrial mineral mines, numerous aggregate operations, 6 5.5 6 4 one metal and one coal mine (Figure 6.3 and Table 6.1). -
Strathcona Park Trails Guide Special
STRATHCONA PARK TRAILS GUIDE SPECIAL Hiking Guide NootkaWILDWILD Island ISLEISLE Canada’sCanada’s WestWest CoastCoast AdventureAdventure MagazineMagazine ININ THETHE WAKEWAKE OFOF CAPTAINCAPTAIN VANCOUVERVANCOUVER A CLIMBER’S LIFELIFE CAVINGCAVING ININ THAILANDTHAILAND 3Chancesto WIN Apairoftickets to FREE ISSUE #12 AUGUST-SEPTEMBER, 2000 see page 26 for details www.wildislemagazine.bc.ca HIKE NOOTKA ISLAND The Resort at Cape Mudge Quadra Island BEACHFRONT CABIN . Only Getaway .95* September 16 - 30, 2000 $119 * based on quad occupancy 2 Bedroom With Jacuzzi Bathtub Gas Fireplace Kitchenette Us! 1-800-665-7745 [email protected] Tel: (250) 285-2042 Fax: (250) 285-2532 CCONTENTONTENTSS Cover: Curtis Lyon, South Ridge of Victoria Peak. Photo: Philip Stone BC Parks View Point p9 Volunteering in Paradise Gabe Jutras, Kwisatz Haderach 5.11d, Crest Creek Photo: Josie Boulding Linvin’ the Dream p10 Contents: The life of the Surfer at Long Beach. unsponsored climber Photo: Corrie Wright Strathcona Park p13 An overview of the hiking trails in BC’s oldest park Thai Caves p17 Islanders Abroad Underground adventure in Thailand Mt Colonel Foster p19 Guide to Vancouver Island’s alpine climbing mecca Benighted on Mt Klitsa p21 A lesson earned and a lesson learned In the Wake of Vancouver p22 The explorations of Cpt Vancouver on BC’s west coast. Happenings p26 Coming events on the west coast 3Chancesto WIN Apairoftickets to see page 26 for details west coast adventure magazine • www.wildislemagazine.bc.ca • CENTRE PULLOUT - NOOTKA ISLAND - HIKING -
Environmental Plans Volume 8 Environmental
ENVIRONMENTAL PLANS VOLUME 8 ENVIRONMENTAL ALIGNMENT SHEET PACKAGE FOR THE TRANS MOUNTAIN PIPELINE ULC TRANS MOUNTAIN EXPANSION PROJECT NEB CONDITION 72 October 2017 REV 4 687945 01-13283-SG-0000-CHE-DWG-0001 R4 Prepared for: Trans Mountain Pipeline ULC Kinder Morgan Canada Inc. Suite 2700, 300 – 5th Avenue S.W. Calgary, Alberta T2P 5J2 Ph: 403-514-6400 Visual Guide to TMEP’s Environmental Plans to the NEB Conditions Related to the Environmental Protection Plan Trans Mountain’s environmental program during construction is presented in ten volumes of the Environmental Plans as shown in the visual guide below. The Environmental Plans will be implemented by contractors and Environmental Inspectors during all phases of construction. Consequently the ten volumes of plans cover all aspects of Environmental Management. To demonstrate compliance with NEB Conditions, Trans Mountain will file the Environmental Plans with the NEB. To clarify how TMEP’s Environmental Plan Volumes relate to Condition documents filed with the NEB please see the table below. Trans Mountain Expansion Project Guide to the Environmental Plans Environmental Plans NEB Condition and Filing ID Volume 1 – Temporary Construction Lands and 78 Facilities Environmental Protection Plan Infrastructure Environmental Protection Plan Volume 2 – Pipeline Environmental Protection Plan 72 Pipeline Environmental Protection Plan Volume 3 – Facilities Environmental Protection Plan 78 Facilities Environmental Protection Plan Volume 4 – Westridge Marine Terminal Environmental 81 Westridge Environmental -
Bcts Dcr, Dsc
Radio Channel Assignment Map DCR, DSC, DSI Version 10.8 BCTS January 30, 2015 BC Timber Sales W a d d i Strait of Georgia n g t o n G l a 1:400,000 c Date Saved: 2/3/2015 9:55:56 AM i S e c r a r Path: F:\tsg_root\GIS_Workspace\Mike\Radio_Frequency\Radio Frequency_2015.mxd C r e e k KLATTASINE BARB HO WARD A A T H K O l MTN H O M l LANDMAR K a i r r C e t l e a n R CAMBRIDG E t e R Wh i E C V A r I W R K A 7 HIDD EN W E J I C E F I E L D Homathko r C A IE R HEAK E T STANTON PLATEAU A G w r H B T TEAQ UAHAN U O S H N A UA Q A E 8 T H B R O I M Southgate S H T N O K A P CUMSACK O H GALLEO N GUNS IGHT R A E AQ V R E I T R r R I C V E R R MT E H V a RALEIG H SAWT rb S tan I t R o l R A u e E HO USE r o B R i y l I l V B E S E i 4 s i R h t h o 17 S p r O G a c l e Bear U FA LCO N T H G A Stafford R T E R E V D I I R c R SMIT H O e PEAK F Bear a KETA B l l F A T SIR FRANCIS DRAKE C S r MT 2 ke E LILLO OE T La P L rd P fo A af St Mellersh Creek PEAKS TO LO r R GRANITE C E T ST J OHN V MTN I I V E R R 12 R TAHUMMING R E F P i A l R Bute East PORTAL E e A L D S R r A E D PEAK O O A S I F R O T T Glendale 11 R T PRATT S N O N 3 S E O M P Phillip I I T Apple River T O L A B L R T H A I I SIRE NIA E U H V 11 ke Po M L i P E La so M K n C ne C R I N re N L w r ro ek G t B I OSMINGTO N I e e Call Inlet m 28 R l o r T e n T E I I k C Orford V R E l 18 V E a l 31 Toba I R C L R Fullmore 5 HEYDON R h R o George 30 Orford River I Burnt Mtn 16 I M V 12 V MATILPI Browne E GEORGE RIVER E R Bute West R H Brem 13 ke Bute East La G 26 don ey m H r l l e U R -
WSC 5-2012 Future Water Source Options
r: Abbotsford rr ¢VI/ Mission Water & Sewer Ser vices REPORT To: Abbotsford Mission Water & Sewer Commission From: Tracy Kyle, Director of Water & Solid Waste Date: February 22, 2012 Subject: Future Water Source Options - Next Steps File: 5330-60 Report No.: WSC 5-2012 UTILITY MANAGEMENT COMMITTEE (UMC) RECOMMENDATION THAT Report No. WSC 5-2012, dated February 22, 2012, from Tracy Kyle, Director of Water & Solid Waste, regarding the Water Source Options - Next Steps, be received. BACKGROUND Future Abbotsford-Mission water source planning has been an ongoing process for over 20-years (as summarized in Attachment A). Up until November 2011 , the AMWSC intended to develop Stave Lake as a new water source by 2016. However, following the public referendum outcome on November 19, 2011, all work on Stave Lake ceased. Both Abbotsford and Mission are growing. Even with a water conservation program and existing system improvements, a new water source will eventually be needed to meet future demands and provide water system redundancy. DISCUSSION Future Water Source Timing Staff propose to update water demand projections in 5-year increments between 2012 and 2037, along with those for 2062 and 2112 (i.e. 50-year and 100-year planning horizons). The timing for a new water source will be clarified from the projections compared against the known system capacity. This work will be completed in-house. Water demands are calculated by: Total Demand = Total Equivalent Population x Per Capita Consumption Where: "Total Equivalent Population" is the sum of the residential population plus a conversion of water needed by non-residential sectors into 'equivalent numbers of people'. -
Transportation Committee
GREATER VANCOUVER REGIONAL DISTRICT TRANSPORTATION COMMITTEE REGULAR MEETING Wednesday, October 9, 2013 9:00 a.m. 2nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia. A G E N D A1 1. ADOPTION OF THE AGENDA 1.1 October 9, 2013 Regular Meeting Agenda That the Transportation Committee adopt the agenda for its regular meeting scheduled for October 9, 2013 as circulated. 2. ADOPTION OF THE MINUTES 2.1 June 20, 2013 Regular Meeting Minutes That the Transportation Committee adopt the minutes of its regular meeting held June 20, 2013 as circulated. 2.2 July 23, 2013 Joint Meeting Minutes That the Transportation Committee adopt the minutes of its joint meeting with Regional Planning and Agriculture Committee held July 23, 2013 as circulated. 3. DELEGATIONS 3.1 Mayor John Douglas, City of Port Alberni Zoran Knezevic, CEO, Port Alberni Port Authority Subject: Development of a New Container Port in the Alberni Inlet 1 Note: Recommendation is shown under each item, where applicable. September 17, 2013 Transportation Committee Regular Agenda October 9, 2013 Agenda Page 2 of 4 4. INVITED PRESENTATIONS 4.1 Peter Xotta, Vice President, Planning and Operations, Port Metro Vancouver Subject: Smart Fleet Trucking Action Plan 4.2 Bob Paddon, TransLink Subjects: · Consultation on Pattullo Bridge Replacement Project · Regional Transportation Strategy Implementation Plan Update · Draft 2014 Base Plan and Outlook 5. REPORTS FROM COMMITTEE OR STAFF 5.1 Comments on TransLink’s Draft 2014 Base Plan and Outlook Designated Speaker: Ray Kan, Senior Regional Planner, Planning, Policy and Environment Department That the Board convey its support for the 2014 Base Plan and Outlook to the TransLink Board and Mayors’ Council on Regional Transportation. -
Snow Survey and Water Supply Bulletin – January 1St, 2021
Snow Survey and Water Supply Bulletin – January 1st, 2021 The January 1st snow survey is now complete. Data from 58 manual snow courses and 86 automated snow weather stations around the province (collected by the Ministry of Environment Snow Survey Program, BC Hydro and partners), and climate data from Environment and Climate Change Canada and the provincial Climate Related Monitoring Program have been used to form the basis of the following report1. Weather October began with relatively warm and dry conditions, but a major cold spell dominated the province in mid-October. Temperatures primarily ranged from -1.5 to +1.0˚C compared to normal. The cold spell also produced early season low elevation snowfall for the Interior. Following the snowfall, heavy rain from an atmospheric river affected the Central Coast and spilled into the Cariboo, resulting in prolonged flood conditions. Overall, most of the Interior received above normal precipitation for the month, whereas coastal regions were closer to normal. In November, temperatures were steady at near normal to slightly above normal and primarily ranged from -0.5 to +1.5˚C through the province. The warmest temperatures relative to normal occurred in the Interior, while the coldest occurred in the Northwest. Precipitation was mostly below normal to near normal (35-105%) with the Northeast / Peace as the driest areas. A few locations, e.g. Prince Rupert and Williams Lake, were above 130% due to a strong storm event early in the month. Temperatures in December were relatively warm across the province, ranging from +1.0 to +5.0˚C above normal. -
Determining Contemporary and Historical Sediment Sources in A
Journal of Soils and Sediments https://doi.org/10.1007/s11368-019-02299-2 SEDIMENT FINGERPRINTING IN THE CRITICAL ZONE Determining contemporary and historical sediment sources in a large drainage basin impacted by cumulative effects: the regulated Nechako River, British Columbia, Canada David Gateuille1,2 & Philip N. Owens1,3 & Ellen L. Petticrew1,4 & Barry P. Booth1 & Todd D. French3,4 & Stephen J. Déry1,3 Received: 31 August 2018 /Accepted: 3 March 2019 # The Author(s) 2019 Abstract Purpose Sediment dynamics in most large river basins are influenced by a variety of different natural and anthropogenic pressures, and disentangling these cumulative effects remains a challenge. This study determined the contemporary and historical sources of fine-grained (< 63-μm) sediment in a large, regulated river basin and linked changes in sources to activities in the basin. The river has seen declines in chinook salmon, sockeye salmon, and the endangered Nechako white sturgeon populations, and sediment (both fine-grained and sands) transport and deposition have been identified as potential causes of these declines. Materials and methods Samples of suspended sediment and potential source materials were collected from numerous sites distributed throughout the upper Nechako River Basin in British Columbia, Canada. A floodplain sediment core was also collected in order to reconstruct sediment sources over the last ~ 70 years. Discriminating fingerprint properties were used within the MixSIAR model to apportion sources among sub-basins and land-use types. Results were compared to records of precipi- tation and Nechako River discharge trends, and to changes in landscape development. Results and discussion Contributions from the erosion of channel banks dominated the suspended sediment load at most sites. -
BC Hydro-Party Response
BC Hydro—Party Response A14/SEM/97-001/05/RSP DISTRIBUTION: General ORIGINAL: English EXECUTIVE SUMMARY On April 2, 1997, the Sierra Legal Defence Fund and the Sierra Club Legal Defense Fund (the "submitters") made a submission under Article 14 of the North American Agreement on Environmental Cooperation (NAAEC) alleging that the Government of Canada is failing to enforce its environmental law effectively. Specifically, the submission asserts that Canada fails to enforce s.35(1) of the Fisheries Act and fails to utilize its powers pursuant to s.119.06 of the National Energy Board Act to protect fish and fish habitat from damage caused by hydroelectric power generation in British Columbia by BC Hydro (BCH), a provincial Crown corporation. CANADA'S POSITION Canada supports the NAAEC process for submissions on enforcement matters, and considers Articles 14 and 15 to be among the most important provisions of the treaty. Canada submits that it is enforcing its environmental laws, and is in full compliance with its obligations under the NAAEC. Therefore, Canada submits that, in this instance, the development of a factual record is unwarranted as: · the assertions concerning the enforcement of the Fisheries Act are the subject of pending judicial or administrative proceedings within the meaning of Article 14(3)(a); · Canada is fully enforcing the environmental provisions of the Fisheries Act, and the National Energy Board (NEB) has properly exercised its power under the National Energy Board Act; · the provisions of the NAAEC cannot be applied retroactively to assertions of a failure to effectively enforce environmental laws prior to the coming into force of the NAAEC on January 1, 1994. -
Hayward Lake Reservoir Recreation Area Winter Vegetation and Wildlife Use Survey Hayward Lake Reservoir Recreation Area Winter Vegetation and Wildlife Use Survey
Hayward Lake Reservoir Recreation Area Winter Vegetation and Wildlife Use Survey Hayward Lake Reservoir Recreation Area Winter Vegetation and Wildlife Use Survey Abstract A winter vegetation inventory and presence/not detected wildlife use survey was completed of BC Hydro’s Hayward Lake Reservoir Recreation Area from October 1999 to March 2000. This study was done to provide BC Hydro with baseline data on the vegetation and wildlife found during the winter period at Hayward Lake. Aerial photographs and maps were used to stratify BC Hydro’s property around the lake into four vegetation strata: • Old Growth: Areas displaying complex structure, mature trees and no evidence of logging • Second Growth: Areas displaying evidence of past logging activity • Riparian: Areas paralleling water courses; streams, creeks • Wetland: Areas with water as the dominant ecosystem feature. The site was visited by car, canoe and on foot to verify these strata. Four plots in each of the strata were randomly selected to complete sixteen vegetation and wildlife use plots. The site was visited bi-weekly, on Wednesday mornings to complete these surveys. From the plot centre, four levels of vegetation were identified and surveyed: • Moss Layer: Vegetation within 2.50 metres of plot centre; vegetation from 0m- 0.5m high • Herb Layer: Vegetation within 5.64 metres of plot centre; vegetation from 0.5m - 1.0m high • Shrub Layer: Vegetation within 5.64 metres of plot centre; vegetation from 1.0m - 10m high • Tree Layer: Vegetation within 10 metres of plot centre; vegetation over 10 metres Wildlife or wildlife use seen in each of the 10 metre radius plots was recorded. -
Stave Falls WUP Monitoring Program Synthesis Report
Stave River Water Use Plan Monitoring Program Synthesis Report • SFLMON 1 Pelagic Monitor (Nutrient Load/Total Carbon Levels) • SFLMON 2 Littoral Productivity Assessment • SFLMON 3 Fish Biomass Assessment • SFLMON 4 Limited Block Load as Deterrent to Spawning • SFLMON 5 Risk of Adult Stranding • SFLMON 6 Risk of Fry Stranding • SFLMON 7 Diel Pattern of Fry Out-migration • SFLMON 8 Seasonal Timing and Assemblage of Resident Fish • SFLMON 9 Turbidity Levels in Hayward Reservoir • SFLMON 10 Archaeological Management Draft Report Author: Katy Jay, Alexis Hall, BC Hydro Fish and Aquatic Issues September 2019 Stave River Water Use Plan Monitoring Program Synthesis Report DRAFT September 2019 EXECUTIVE SUMMARY The Stave River Water Use Plan (WUP) was initiated in 1997 and finalized in 2003. The Stave River WUP was initiated as a result of Condition 14 of the Stave Falls Powerplant Replacement Energy Project Certificate, which allowed BC Hydro to construct and operate the power facilities at Stave Falls in Mission, BC. This condition required BC Hydro to undertake a water use planning process for both Alouette River and Stave River systems, including Alouette, Stave Falls and Ruskin dams and Generating Stations. Two separate consultation processes were conducted to complete the Alouette and Stave River Water Use Plans. The initial Alouette Water Use Plan was submitted to the Comptroller of Water Rights in September 1996, with the current Alouette WUP submitted in April 2009 and summarized in a separate report. In 2004, the Comptroller of Water Rights (CWR) issued Orders under the Water Act in response to the Stave River WUP (BCH 2003).