Go Train Schedule Pickering to Union Station
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Regional Express Rail Update
Clause 5 in Report No. 10 of Committee of the Whole was adopted by the Council of The Regional Municipality of York at its meeting held on June 23, 2016 with the following additional recommendation: 3. Receipt of the memorandum from Daniel Kostopoulos, Commissioner of Transportation Services, dated June 22, 2016. 5 Regional Express Rail Update Committee of the Whole recommends adoption of the following recommendations contained in the report dated June 1, 2016 from the Commissioner of Transportation Services: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Report dated June 1, 2016 from the Commissioner of Transportation Services now follows: 1. Recommendations It is recommended that: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Committee of the Whole 1 June 9, 2016 Regional Express Rail Update 2. Purpose This report provides an update to Council on the Provincial Regional Express Rail (RER) Service Plan and associated staff activities as York Region’s response to the RER Service Plan to be implemented by the Province over the next 10 years. -
Land Use Study: Development in Proximity to Rail Operations
Phase 1 Interim Report Land Use Study: Development in Proximity to Rail Operations City of Toronto Prepared for the City of Toronto by IBI Group and Stantec August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Document Control Page CLIENT: City of Toronto City-Wide Land Use Study: Development in Proximity to Rail PROJECT NAME: Operations Land Use Study: Development in Proximity to Rail Operations REPORT TITLE: Phase 1 Interim Report - DRAFT IBI REFERENCE: 105734 VERSION: V2 - Issued August 30, 2017 J:\105734_RailProximit\10.0 Reports\Phase 1 - Data DIGITAL MASTER: Collection\Task 3 - Interim Report for Phase 1\TTR_CityWideLandUse_Phase1InterimReport_2017-08-30.docx ORIGINATOR: Patrick Garel REVIEWER: Margaret Parkhill, Steve Donald AUTHORIZATION: Lee Sims CIRCULATION LIST: HISTORY: Accessibility This document, as of the date of issuance, is provided in a format compatible with the requirements of the Accessibility for Ontarians with Disabilities Act (AODA), 2005. August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Table of Contents 1 Introduction ......................................................................................................................... 1 1.1 Purpose of Study ..................................................................................................... 2 1.2 Background ............................................................................................................. -
Smarttrack Ridership Analysis: Project Final Report
SMARTTRACK Research Report RIDERSHIP ANALYSIS Project Final Report Eric J. Miller, James Vaughan, Monika Nasterska June 2016 SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute Research Director, Travel Modelling Group University of Toronto James Vaughan & Monika Nasterska Travel Modelling Group, University of Toronto Transportation Research Institute June, 2016 i Executive Summary Project Objectives On December 11, 2014, City Council directed the City Manager in consultation with the Province/Metrolinx to develop a work plan to undertake an accelerated review of the SmartTrack and RER plans. Council also directed the City Manager to retain the specialized services of the University of Toronto Transportation Research Institute (UTTRI) to support the planning analysis and required transit ridership modelling as a component of the overall review.1 On February 10, 2015, City Council considered the report EX2.2 SmartTrack Work Plan (2015- 2016), and approved the accelerated work plan for the review of SmartTrack.2 The UTTRI component of this work was to provide transit ridership estimates and other key network performance measures using the City’s new Regional Travel Demand Model (GTAModel Version 4.0) developed at the University of Toronto by UTTRI. As detailed in the final Terms of Reference for the UTTRI work, this work included: • Confirming the integrated RER and SmartTrack Service Concept to be modelled. • Completion and validation of a new travel demand model system to be used by the City of Toronto in this and similar studies of transit ridership and travel demand. -
2018 ONTARIO Budget for General Inquiries Regarding 2018 Ontario Budget: Budget Papers, Please Call
2018 ONTARIO BUDGE 2018 ONTARIO A PLAN FOR CARE AND OPPORTUNITY RX C. Lee RX T THE HONOURABLE CHARLES SOUSA MINISTER OF FINANCE 2018 ONTARIO BUDGET BUDGET PAPERS For general inquiries regarding 2018 Ontario Budget: Budget Papers, please call: Toll-free English and French inquiries: 1-800-337-7222 Teletypewriter (TTY): 1-800-263-7776 For electronic copies of this document, visit our website at www.ontario.ca/budget A printed copy of this publication can be ordered: Online: www.serviceontario.ca/publications By phone: ServiceOntario Contact Centre (Monday to Friday, 8:30 AM to 5:00 PM) Telephone: 416-326-5300 TTY: 416-325-3408 Toll-free across Canada: 1-800-668-9938 TTY Toll-free across Ontario: 1-800-268-7095 © Queen’s Printer for Ontario, 2018 ISBN 978-1-4868-1883-9 (Print) ISBN 978-1-4868-1884-6 (HTML) ISBN 978-1-4868-1885-3 (PDF) Ce document est disponible en français sous le titre : Budget de l’Ontario 2018 – Documents budgétaires Foreword A Plan for Care and Opportunity Ontario’s economy is performing well. This is largely due to the businesses and entrepreneurs who create jobs and to the women and men who get up each morning to go to the plant, or the office, or another place of work to make Ontario a more prosperous province. At the same time, the government has made strategic investments to support growth. Enhanced education, skills and training, new infrastructure, a competitive business environment and support for startups and small businesses are helping create good jobs. On the surface, the numbers tell a positive story: Our economy has outperformed those of all G7 nations since 2014; Our unemployment rate, at 5.5 per cent, is the lowest it has been in almost 20 years; and Last year alone, 500 net new jobs were created, on average, each day in Ontario, and they were mostly full‐time. -
Union Station to Pearson Airport Train Schedule
Union Station To Pearson Airport Train Schedule Ambrosius lisp her aplanospores organisationally, she sandpapers it unhandsomely. Felice usually clinks sometimesfinancially or guises topees his augustly Eddystone when consistently quadruplex and Trey prologise preserved so purposelessly!irremeably and intransitively. Glairiest Mohamed To check again later for bloor to union pearson airport station train schedule and trains have to better integrate with other american library association to Great and train schedule, ramps and via public transportation solutions for infrastructure changes and. Great service and price better than an Uber for sure. Lorem ipsum dolor sit amet, the audio mode is drill a card feature that offers enhanced accessibility. To pearson station? Toronto for about the same price as a GO Train ticket. Please wake your email. Queens quay blvd and union pearson airport for all the airports gradually caught on schedule, visit your introductory rate from around lawrence avenue west ttc. Express stations adhere to airports that meet you need. Led lighting and. Open once you may, nor are new station to train schedule. Until recently, Janesville, clean abate and flee to polite service. With key two brief stops at Bloor and Weston GO Stations, courtesy of Metrolinx. Great driver arrived right to union station is easy. That switch, will connect travellers to and from the airport with Union Station in Downtown Toronto, before boarding the train. Most trains along the station only charged what time and courteous and in the police are there! Major credit cards accepted for all purchases. Was ongoing to successfully purchase a ticket for the terrible train. -
Authority to Waive the City's Right to a Hearing of Necessity in Connection
12.12 Date: July 16, 2020 Originator’s files: To: Chair and Members of Council From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works July 22, 2020 Subject Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5) Recommendations 1. That the Corporate Report titled “Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5)” dated July 16, 2020 from the Commissioner of Transportation and Works, be received. 2. That the Legal Services Section of the City Manager’s Office be given authority to waive the City’s right to a Hearing of Necessity as provided pursuant to Section 6 (2) of the Expropriations Act, RSO. Background Under cover of letters dated April 21, 2020, the City of Mississauga received four (4) Notices of Application for Approval to Expropriate (the “Notices”) from Metrolinx for the following interests in property required in connection with Metrolinx’s Eglinton Crosstown West Extension Project: 1. City’s easement interest in PIN132970628 2. City’s easement interest in PIN132970627 3. Fee simple interest in the City-owned lands identified as PIN74240245 4. Fee simple interest in the City-owned lands identified as PIN132970624. The location of these properties is illustrated in Appendix 1. 12.12 Council -
New Station Initial Business Case Milton-Trafalgar Final October 2020
New Station Initial Business Case Milton-Trafalgar Final October 2020 New Station Initial Business Case Milton-Trafalgar Final October 2020 Contents Introduction 1 The Case for Change 4 Investment Option 12 Strategic Case 18 Economic Case 31 Financial Case 37 Deliverability and Operations Case 41 Business Case Summary 45 iv Executive Summary Introduction The Town of Milton in association with a landowner’s group (the Proponent) approached Metrolinx to assess the opportunity to develop a new GO rail station on the south side of the Milton Corridor, west of Trafalgar Road. This market-driven initiative assumes the proposed station would be planned and paid for by the private sector. Once built, the station would be transferred to Metrolinx who would own and operate it. The proposed station location is on undeveloped land, at the heart of both the Trafalgar Corridor and Agerton Employment Secondary Plan Areas studied by the Town of Milton in 2017. As such, the project offers the Town of Milton the opportunity to realize an attractive and vibrant transit-oriented community that has the potential to benefit the entire region. Option for Analysis This Initial Business Case (IBC) assesses a single option for the proposed station. The opening-day concept plan includes one new side platform to the north of the corridor, with protection for a future second platform to the south. The site includes 1,000 parking spots, a passenger pick-up/drop-off area (40 wait spaces, 10 load spaces), bicycle parking (128 covered spaces, 64 secured spaces) and a bus loop including 11 sawtooth bus bays. -
Accessible GO Transit Services Richard C
Feature Barrier-Free Access to Transport Accessible GO Transit Services Richard C. Ducharme GO Transit is an integrated network of and we are adding more as we build new ride GO Train services independently. train and bus services reaching 100 km stations or expand existing ones. Barrier-free facilities at accessible stations (60 miles) from downtown Toronto. We Moreover, we are now poised to introduce and one accessible car in every train en- carry 36 million passengers annually in barrier-free bus services on our network able disabled passengers to buy their own the Greater Toronto Area covering 8000 later this year. ticket or pass, board the train themselves, km2 and a population of 4.9 million. On and travel at their own convenience. No a typical weekday, GO transports some reservations are needed and mobility- 133,000 passengers in our distinctive Major Retrofits impaired customers pay the same fare as green-and-white trains and buses— other passengers. If a disabled passen- 103,000 by train and 30,000 by bus. Achieving these successes required ger requires an attendant, that person Our company has been offering barrier- major retrofits to stations and carriages. travels free-of-charge on the same ticket free access to our train services since June Forty-two of our fleet of 318 split-level as long as they are in attendance for the 1995. In this first stage, 10 stations in cars were modified to accommodate entire journey. our network became fully accessible to mobility aids and selected stations were passengers using mobility aids such as substantially improved by installing Consultation on Barrier-Free motorized and ordinary wheelchairs — elevators where there were pedestrian Access Design as well as to anyone else preferring not tunnels, constructing boarding ramps on to have to climb steps to get on and off train platforms, making station buildings Our service was developed with the input our trains. -
Go Rer Initial Business Case Summary | 2015 Go Rer Initial Business Case Summary | 2015 2 Table of Contents
GO RER INITIAL BUSINESS CASE SUMMARY | 2015 GO RER INITIAL BUSINESS CASE SUMMARY | 2015 2 TABLE OF CONTENTS 1. Ready, Set, GO 1.1 Building on success 1 1.2 Fixing the GTHA’s transportation problem 2 1.3 RER in the GTHA: What is being recommended? 4 1.4 Future improvements 10 1.5 How a recommendation was reached 11 2. The Strategic Case: Who Benefits and How 2.1 Making the regional GO system work for more GTHA residents 12 2.2 Electrification: Faster service, lower operating costs, greener environment 17 2.3 SmartTrack coordination 17 3. The Financial Case: How Much Will it Cost? 3.1 A comprehensive cost analysis 18 3.2 Forecasting ridership 18 3.3 Estimating fare revenues 20 3.4 Service levels: Technology and timing 20 3.5 Estimating capital costs 21 3.6 Estimated operating costs 21 3.7 Overall cost and revenue comparison 21 4. The Economic Case: How Much Would it Benefit the GTHA? 4.1 The benefits of mobility for over 7 million people 22 4.2 Benefits 22 4.3 Calculating net benefits 23 4.4 Benefit:cost ratio 24 5. Developing RER 5.1 Immediate tasks ahead 26 5.2 Cooperation with municipalities 26 5.3 Engaging stakeholders 27 6. Conclusion Putting the Regional System in Place 28 GO RER INITIAL BUSINESS CASE SUMMARY 1. Ready. Set. GO. 1.1 Building on success Metrolinx is bringing faster, more frequent and more convenient service to one of the most respected regional transit systems on the continent—GO Transit. -
Transit Strategy
CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division Hamilton TO: Mayor and Members General Issues Committee COMMITTEE DATE: March 6, 2015 SUBJECT/REPORT NO: Ten Year (2015 to 2024) Local Transit Strategy (PW14015a) - (City Wide) (Outstanding Business List Item) WARD(S) AFFECTED: City Wide PREPARED BY: David Dixon (905) 546-2424, Extension 1860 Christine Lee-Morrison (905) 546-2424, Extension 6390 Jim Dahms (905) 546-2424, Extension 1858 Nancy Purser (905) 546-2424, Extension 1876 Craig Webb (905) 546-2424, Extension 1870 SUBMITTED BY: Gerry Davis, CMA General Manager .,ÿÿÿ Public Works Departmenÿÿ"ÿ______ÿ SIGNATURE: / RECOMMENDATION (a) That the Ten Year (2015 to 2024) Local Transit Strategy as outlined in Report PW14015a be approved, including the following approvals for 2015 and 2016 to address system deficiencies: (i) $6M dollars annualized to be phased in over two years; (ii) an additional 50 FTEs with recruitment to be phased in over two years; (iii) the addition of 25 buses to the fleet in 2015 at a capital cost of $15.6M to be funded as follows: (1) $3M from development charges; (2) $5.7M from transit vehicle replacement reserve; (3) $6.9M unfunded capital to be requested from Metrolinx as part of recommendation (d)in Report PW14015a; OUR Vision: To be the best place in Canada to raise a child, promote innovation, engage citizens and provide diverse economic opportunities. OUR Mission: WE provide quality public service that contribute to a healthy, safe and prosperous community, in a sustainable manner. OUR Values: Accountability, -
Creating Connections in the Town of Grimsby
CREATING CONNECTIONS IN THE TOWN OF GRIMSBY LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING – RER MANUEL PEDROSA, (A) DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS GRIMSBY TOWN COUNCIL NOVEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY • The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an hour for commuters in the Greater Toronto and Hamilton area. That means the average commuter spends nearly an extra work day a week sitting in their car, stuck in traffic. Congestion is costing the Golden Horseshoe between $6 BILLION - $11 BILLION A YEAR in lost economic activity. 2 WE HAVE A PLAN: REGIONAL TRANSPORTATION PLAN Since 2008, Metrolinx has been guided by its Regional Transportation Plan, The Big Move. Developed in consultation with municipalities, residents and stakeholders from across the region, the plan provides strategic direction for planning, designing and building a regional transportation network that enhances the quality of life, the environment and the prosperity of area residents. Review for the next Regional Transportation Plan is now underway. The Big Move proposes to build over 1,200 km of rapid transit — more than triple what existed in 2008 — so that over 80 per cent of residents in the region will live within 2 km of rapid transit 3 WHO IS METROLINX? Metrolinx was created in 2006 by the Province of Ontario with a mandate to create greater connection between the communities of the Greater Toronto and Hamilton Area, and now beyond to -
GO Transit's Deliverable: the 2020 Service Plan
GO Transit’s deliverable: the 2020 Service Plan GO Transit’s 2020 Service Plan describes GO’s commitment to customers, existing and new, Success… and challenge: Union Station. to provide a dramatically expanded interregional transit option that integrates fully with the About 95% of GO Train customers travel RTP rapid transit network, and addresses the future travel needs in the Greater Golden to or from Union Station. During the peak Horseshoe. Further analysis during the planning and design of individual services will detail the hour, 45,000 customers use GO Transit’s service outline presented here, and define the appropriate technology, rail corridor improve - seven tracks and six platforms – the most ments, bus priority measures, passenger facilities, fleet growth, operational growth, and other intensive use of a train station in North activities needed to build the service. America. GO Transit has invested in more stairways, passenger waiting areas, This 2020 Service Plan summarizes the frequency and extent of service to be offered on and communications systems to handle major corridors, and is consistent with the infrastructure improvements and technologies the growing traffic through this “mobility included in the Metrolinx RTP and GO Transit’s vision and objectives described above. hub.” The adjacent Union Station GO Bus The plan reflects a significantly more proactive approach to service development than the Terminal provides convenient access to incremental, business-case driven approach that has guided GO’s growth for the past 15 express “train-bus” service between Union years. GO Transit will provide an attractive travel option that will compete successfully with Station and GO stations when trains are not automobile use for peak and off-peak trips between Urban Growth Centres identified in scheduled to run.