Gordon Dam National Engineering Landmark

Total Page:16

File Type:pdf, Size:1020Kb

Gordon Dam National Engineering Landmark GORDON DAM NATIONAL ENGINEERING LANDMARK Location: On the Gordon River in south-west Tasmania beyond Strathgordon. GORDON DAM Owner: Hydro Tasmania Completed in 1974 this 140 m high concrete arch dam was built by the Hydro-Electric Commission. It is the highest arch The plaques are located on the dam and Lake Gordon is the largest storage in Australia dam parapet. (12.4 million ML). The use of double-curvature enabled the dam's concrete volume, and therefore the cost, to be The dam significantly reduced. The dam and power station are The deep narrow gorge was associated with the construction of the first road into south- ideally suited to an arch dam. west Tasmania, and with the controversy over the flooding of Lake Pedder. Using the Commission's arch dam stress analysis program, Dedicated by The Institution of Engineers, Australia 2001 Hydro engineers progressively refined the shape until it met all the structural requirements with a minimum volume of concrete. The dam is a spectacular and popular tourist destination. Engineers The dam has a direct association with an eminent dam building authority. The principal design engineer Sergio Giudici reported to Mike Fitzpatrick, Bill Mitchell and John Wilkins. The dam construction engineer was Alan Varty reporting to Ted Hofto and Guy Ward. Access The dam site is in a very remote location. Site investigations for the dam were carried out using Bombadier and helicopter access until the 80 km long Gordon River Road was completed. Heritage Dams Project Gordon Dam is one of the 25 dams selected in a national survey to find those with the highest heritage values. Gordon Power Development The headwaters of the Huon and Serpentine rivers are captured in Lake Pedder and diverted into Lake Gordon via McPartlans Pass Canal. The Gordon Power Station is located underground below the lake and discharges back into the river via a 3 km long tailrace tunnel. The station contains three 150 MW Francis turbines with space for two more. Twin transmission lines carry the output to Hobart and the State grid. The scheme is a major component of the State's electricity generating system. Gordon Dam .
Recommended publications
  • The Evolution of Tasmania's Energy Sector
    Electricity Supply Industry Expert Panel The Evolution of Tasmania’s Energy Sector Discussion Paper April 2011 The Evolution of Tasmania’s Energy Sector Discussion Paper Electricity Industry Panel - Secretariat GPO Box 123 Hobart TAS 7001 Telephone: (03) 6232 7123 Email: [email protected] http://www.electricity.tas.gov.au April 2011 © Copyright State of Tasmania, 2011 Table of Contents Glossary ..................................................................................................................................................... 5 Foreword ................................................................................................................................................... 1 1. Highlights ........................................................................................................................................... 3 2. The Tasmanian Electricity Market - Agents of Change ............................................................. 7 3. A New Strategic Direction for Tasmania’s Energy Market – the 1997 Directions Statement ....................................................................................................................................... 12 4. Delivering the Reform Framework .............................................................................................. 14 4.1. Structural Reform of the Hydro-Electric Commission ....................................................... 14 4.2. The Development of Supply Options ................................................................................
    [Show full text]
  • Rapid Reserve Generation from a Francis Turbine for System Frequency Control
    energies Article Rapid Reserve Generation from a Francis Turbine for System Frequency Control Dean R. Giosio 1,*, Alan D. Henderson 2, Jessica M. Walker 1 and Paul A. Brandner 1 1 Australian Maritime College, University of Tasmania, Launceston 7250, Tasmania, Australia; [email protected] (J.M.W.); [email protected] (P.A.B.) 2 School of Engineering & ICT, University of Tasmania, Hobart 7005, Tasmania, Australia; [email protected] * Correspondence: [email protected]; Tel.: +61-3-6324-9489 Academic Editor: K.T. Chau Received: 24 February 2017; Accepted: 31 March 2017; Published: 7 April 2017 Abstract: The increase in contributions from non base load renewables, such as wind and solar, can have adverse effects on the stability of an electrical grid. In this study, the possibility of rapidly loading a Francis turbine from a tail water depression (TWD) mode for providing additional system frequency control is investigated. Based on the analysis of full-scale TWD test results and key findings from the transient testing of a micro-hydro scale turbine unit, a detailed description of the TWD transition process is given. The formulation of an improved turbine model for use in one-dimensional hydro-electric plant models is presented with simulation results compared to full-scale data. The analytical model, which calculates output power according to the conservation of angular momentum and identified sources of loss, is used in parallel with full-scale and model scale test observations to elucidate the events and mechanisms occurring during this proposed transition. The output response, in terms of active power, was found to be highly dependent on guide vane opening rate in both full-scale and model tests.
    [Show full text]
  • The Environmental Impact of Building Dams Aswan Dam the Aswan Dam, Built on the Nile River, Was an Enormous Feat of Engineering and Planning
    The Environmental Impact of Building Dams Aswan Dam The Aswan dam, built on the Nile River, was an enormous feat of engineering and planning. Lake Nasser was created as a result of the ooding of the dam’s catchment area. Some important cultural heritage sites were taken apart, and rebuilt at Abu Simbel in order to avoid them being ooded by the project. Other sites were not saved and remain under the water. The Gordon Dam Gordon River in Tasmania, Australia. Built in 1974 The Gordon Dam was built for the purpose of providing hydroelectric supply. Water is fed down a 183 m drop to turn turbines that are located under the ground below the dam wall. A proposed second dam on the Gordon River, the Franklin Dam, was never built due to strong opposition from community and environmental groups. The Tasmanian Wilderness Society ran a campaign from 1976 -1983 to save the pristine wilderness from environmental damage. The leader of the Tasmanian Wilderness Society, Dr Bob Brown, later became a member of the Tasmanian Parliament, an Australian Senator and the Parliamentary Leader of the Australian Greens political party. Murray River The Murray River ows for over 2500 km across eastern Australia to its outlet on the coast in South Australia. It forms part of the border between New South Wales and Victoria. During the early to mid 1900s, a series of dams, locks and weirs were built on the river. These disrupted the natural ow of the river and allowed fresh water to be available for irrigation to Australia’s largest food growing region.
    [Show full text]
  • Water Management in the Anthony–Pieman Hydropower Scheme
    Water management in the Anthony–Pieman hydropower scheme Pieman Sustainability Review June 2015 FACT SHEET Background The Anthony–Pieman hydropower scheme provides a highly valued and reliable source of electricity. The total water storage of the hydropower scheme is 512 gigalitres and the average annual generation is 2367 gigawatt hours. Construction of the Anthony–Pieman hydropower scheme has resulted in creation of water storages (lakes) and alterations to the natural flow of existing rivers and streams. The Pieman Sustainability Review is a review of operational, social and environmental aspects of the Anthony–Pieman hydropower scheme that are influenced by Hydro Tasmania. This fact sheet elaborates on water management issues presented in the summary report, available at http://www.hydro.com.au/pieman-sustainability-review Water storage levels in the Anthony–Pieman Water levels have been monitored at these storages since hydropower scheme their creation in stages between 1981 and 1991. The Anthony–Pieman hydropower scheme includes eight Headwater storages: Lake Mackintosh and Lake water storages, classified as headwater storages (Lakes Murchison Mackintosh and Murchison), diversion storages (Lakes Lakes Mackintosh and Murchison are the main headwater Henty and Newton and White Spur Pond) and run-of-river storages for the Anthony–Pieman hydropower scheme. storages (Lakes Rosebery, Plimsoll and Pieman). Lakes The water level fluctuates over the entire operating range Murchison, Henty and Newton and White Spur Pond do not from Normal Minimum Operating Level (NMOL) to Full release water directly to a power station; rather they are Supply Level (FSL) (Figures 1, 2). used to transfer water to other storages within the scheme.
    [Show full text]
  • Implications for Tasmanian Electricity System of The
    Backroad Connections Pty Ltd ABN: 64 090 245 382 [email protected] (0407) 486-651 www.backroad.com.au Implications for the Tasmanian electricity system of the proposal to restore Lake Pedder July 2019 Overview The paper analyses the implication for the Tasmanian electricity system of the proposal by the Lake Pedder Restoration Committee (LPRC) to restore the original Lake Pedder. It provides information on the current contribution of the Gordon Scheme to Tasmanian electricity generation and energy storage and provides some information and estimates on alternatives to replace this generation if the original Lake Pedder was restored. Background The original Lake Pedder was flooded in 1972 as part of an expansion of the Tasmanian hydro-electric scheme. The flooded area created is still officially known as Lake Pedder although the LPRC prefer the name Huon- Serpentine Impoundment. In this paper we will use the term ‘new Lake Pedder’. The new Lake Pedder at 242 sq km is vastly bigger than the original Lake Pedder at 10 sq km. The new Lake Pedder does not have its own hydro-electric generation. Its purpose is to trap and raise the level of the water that would otherwise flow down the Huon and Serpentine rivers. The water is raised to the level where it flows through a channel created at McPartlan Pass into the Gordon Dam and contributes to the storage and generation of the Gordon Scheme. As a result the level of the new Lake Pedder does not vary more than a few metres. This makes it more visually attractive and more suitable for recreational use than the adjacent Gordon Reservoir.
    [Show full text]
  • 2011 Annual Report
    directors’ statement To the Honourable Bryan Green, MHA, Minister for Energy and Resources, in compliance with requirements of the Government Business Enterprises Act 1995. In accordance with Section 55 of the Government Business Enterprises Act 1995, we hereby submit for your information and presentation to Parliament the report of the Hydro-Electric Corporation for the year ended 30 June 2011. The report has been prepared in accordance with the provisions of the Government Business Enterprises Act 1995. David Crean Chairman Hydro-Electric Corporation October 2011 Roy Adair CEO Hydro-Electric Corporation October 2011 Hydro-Electric Corporation ARBN 072 377 158 ABN 48 072 377 158 contents page 1 Our vision: Introduction 3 About this report 5 Australia’s leading clean About Hydro Tasmania 8 energy business, inspiring Achievements and challenges 2010-2011 10 Progress against 2010 commitments 11 pride and building value for Chairman’s review 12 our owners, our customers CEO’s report 15 and our people Statement of corporate intent 18 Independent assurance statement 21 Annual Report 2011 Tasmania Hydro Performance 25 Sustainability 27 Our values: Economic performance 30 Momentum 36 • We put people’s health Entura 38 and safety first Roaring 40s 41 Assets and resource use 43 • We always behave with Governance 49 The Board 52 honesty and integrity Executives 55 • We work together, People 57 respect each other and Employees 59 External stakeholders 66 value our diversity Environment 73 • We strive to deliver Ecosystems and heritage 75 Financial
    [Show full text]
  • Hydro Tasmania 4 Elizabeth Street Hobart TAS 7000
    Certificate of Registration ENVIRONMENTAL MANAGEMENT SYSTEM - ISO 14001:2015 This is to certify that: Hydro Tasmania 4 Elizabeth Street Hobart TAS 7000 Holds Certificate Number: EMS 603522 and operates an Environmental Management System which complies with the requirements of ISO 14001:2015 for the following scope: Operation, maintenance and management of electricity generation facilities including power stations (hydroelectric, solar, diesel and wind), distribution network, associated lakes and waterways. For and on behalf of BSI: Chris Cheung, Head of Compliance & Risk - Asia Pacific Original Registration Date: 1998-05-15 Effective Date: 2018-11-12 Latest Revision Date: 2018-11-16 Expiry Date: 2021-11-28 Page: 1 of 3 This certificate was issued electronically and remains the property of BSI Group ANZ Pty Limited, ACN 078 659 211 and is bound by the conditions of contract. This certificate can be verified at www.bsi-global.com/clientdirectory. Printed copies can be validated at www.bsi-global.com/ClientDirectory. Further clarifications regarding the scope of this certificate and the applicability of ISO 14001:2015 requirements may be obtained by consulting the organization. This certificate is valid only if provided original copies are in complete set. Information and Contact: BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 345 080 9000 BSI Assurance UK Limited, registered in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK. Information and Contact: BSI Group ANZ Pty Limited, ACN 078 659 211: Suite 2, Level 7, 15 Talavera Road, Macquarie Park, NSW 2113 A Member of the BSI Group of Companies.
    [Show full text]
  • Hydro 4 Water Storage
    TERM OF REFERENCE 3: STATE-WIDE WATER STORAGE MANAGEMENT The causes of the floods which were active in Tasmania over the period 4-7 June 2016 including cloud-seeding, State-wide water storage management and debris management. 1 CONTEXT 1.1 Cause of the Floods (a) It is clear that the flooding that affected northern Tasmania (including the Mersey, Forth, Ouse and South Esk rivers) during the relevant period was directly caused by “a persistent and very moist north-easterly airstream” which resulted in “daily [rainfall] totals [that were] unprecedented for any month across several locations in the northern half of Tasmania”, in some cases in excess of 200mm.1 (b) This paper addresses Hydro Tasmania’s water storage management prior to and during the floods. 1.2 Overview (a) In 2014, Tasmania celebrated 100 years of hydro industrialisation and the role it played in the development of Tasmania. Hydro Tasmania believes that understanding the design and purpose of the hydropower infrastructure that was developed to bring electricity and investment to the state is an important starting point to provide context for our submission. The Tasmanian hydropower system design and operation is highly complex and is generally not well understood in the community. We understand that key stakeholder groups are seeking to better understand the role that hydropower operations may have in controlling or contributing to flood events in Tasmania. (b) The hydropower infrastructure in Tasmania was designed and installed for the primary purpose of generating hydro-electricity. Flood mitigation was not a primary objective in the design of Hydro Tasmania’s dams when the schemes were developed, and any flood mitigation benefit is a by-product of their hydro- generation operation.
    [Show full text]
  • Background Report
    Gordonvale World Heritage Area Reserve Background Report www.tasland.org.au Tasmanian Land Conservancy (2015). Gordonvale World Heritage Area Reserve Background Report. Tasmanian Land Conservancy, Tasmania Australia 7005. Copyright ©Tasmanian Land Conservancy The views expressed in this report are those of the Tasmanian Land Conservancy and not the Commonwealth Government, State Government or any other entity. This work is copyright. It may be reproduced for study, research or training purposes subject to an acknowledgment of the sources and no commercial usage or sale. Requests and enquires concerning reproduction and rights should be addressed to the Tasmanian Land Conservancy. Front Image: Gordonvale homestead (archive photo) and the Vale of Rasselas landscape © Grant Dixon Contact Address Tasmanian Land Conservancy PO Box 2112, Lower Sandy Bay, 827 Sandy Bay Road, Sandy Bay Tasmania, AUSTRALIA 7005 | p: 03 6225 1399 | www.tasland.org.au | Contents Page Acknowledgments 2 Acronyms and Abbreviations 3 INTRODUCTION 4 Gordonvale Fundraising Campaign 4 Location and Access 5 BIOREGIONAL AND LANDSCAPE CONTEXT 7 WORLD HERITAGE AREA STATUS 7 IUCN Protected Area Management Category 7 Legal Status and Compliance 8 NATURAL VALUES 9 GEO-CONSERVATION VALUES 12 WILDERNESS VALUES 12 INDIGENOUS VALUES 12 EUROPEAN HERITAGE 13 INVASIVE PESTS, WEEDS AND DISEASES 13 SCIENTIFIC STUDIES 13 MANAGEMENT STRATEGY 14 REFERENCES 15 APPENDIX A – Gordonvale ‘For Sale’ 16 APPENDIX B - Bushwalking tracks into Gordonvale 18 APPENDIX C - History of Ernie Bond at Gordonvale 21 1 Acknowledgements The Gordonvale World Heritage Area Reserve was secured by the Tasmanian Land Conservancy (TLC) in 2013 after a successful public fundraising campaign to purchase this private freehold block of land.
    [Show full text]
  • Tas Talk… the Movie the Cast, Their Stories and the Best Supporting Actress…Tasmania
    TAS TALK… THE MOVIE THE CAST, THEIR STORIES AND THE BEST SUPPORTING ACTRESS…TASMANIA Kayaking on the Pieman River © Michael Walters Photography Behind the Scenes, Hobart © HypeTV –––– A journey to Tasmania is a rare chance to disconnect from stress and reconnect with the things that matter. Geographic isolation has contributed to unique biodiversity, and it has also fostered a rare community of creative, down-to-earth, resourceful people with time to make you feel welcome. We are all working in unusual circumstances and although this year we were unable to deliver our much sought after TasTalk trade event in its standard format, we know you need to connect with Tasmanian tourism operators. So, we are bringing the TasTalk trade event experience to you! This is TasTalk...The Movie, an opportunity for you to listen and connect with Tasmanians over a live platform. Featuring the stars of our tourism industry, this is set to be a movie like you have never seen before. One of the joys of travelling in Tasmania is not just the chance to taste produce straight from the farm and ocean, but the ease of meeting the makers at cellar doors, farm gates and local markets. And with four distinct seasons, there’s always something new to see, taste and feel. TasTalk...The Movie will speak to all of this and more. Tasmania is a place for adventure, however, you define it. Whether the view is from the privacy of a hot tub in a forest, or from a kayak for two, or fireside with Tassie whisky and friends, the world looks different from Tasmania.
    [Show full text]
  • January 2020
    DERWENT VALLEY COUNCIL NEWS Issue 6 - January 2020 COMMUNITY GRANTS Each year, Council provides funding to community CONGRATULATIONS TO groups through its Community Grants Program, Round One of the Community Small Grants Program awarding more than $230,000 since the Community 2019/2020 awarded seven grants to community groups Small Grants Program started in 1997. and organisations, with $14,000* of budgeted funds remaining for Round Two. Grants are available to Derwent Valley based, not for profit organisations for projects that provide a benefit Lachlan Hall Committee - $792 for the replacement of within the local community. Council encourages groups kitchen floor coverings who are completing an application to read the policy guidelines, ensure they have no outstanding acquittals Derwent Valley Choir - $400 for new music scores due, complete all sections of the application form and include letters of support. Upper Derwent United Hall Inc. - $500 for whipper snipper Round Two closes 5pm Tuesday, 11 February 2020. Derwent Valley State Emergency Service - $2,000 to To assist applicants with Grant policy, guidelines and purchase a rescue training dummy applications, Council will be running a free info session. This session is for both new and previous applicants, and Westerway Primary School for $1,000 for 100th is an opportunity to ensure your submissions are strong Anniversary event activities and ask any questions you may have. Derwent Valley Arts - $1,199 for an outdoor data This session will be held from 12.30pm - 1.30pm, Tuesday projector 21 January in the Council Social Rooms. Registration is not necessary. *New Norfolk Neighbourhood Watch were previously approved for a grant of $3,025, with the condition that further funding was Questions and enquiries about applications can be acquired.
    [Show full text]
  • A Review of Natural Values Within the 2013 Extension to the Tasmanian Wilderness World Heritage Area
    A review of natural values within the 2013 extension to the Tasmanian Wilderness World Heritage Area Nature Conservation Report 2017/6 Department of Primary Industries, Parks, Water and Environment Hobart A review of natural values within the 2013 extension to the Tasmanian Wilderness World Heritage Area Jayne Balmer, Jason Bradbury, Karen Richards, Tim Rudman, Micah Visoiu, Shannon Troy and Naomi Lawrence. Department of Primary Industries, Parks, Water and Environment Nature Conservation Report 2017/6, September 2017 This report was prepared under the direction of the Department of Primary Industries, Parks, Water and Environment (World Heritage Program). Australian Government funds were contributed to the project through the World Heritage Area program. The views and opinions expressed in this report are those of the authors and do not necessarily reflect those of the Tasmanian or Australian Governments. ISSN 1441-0680 Copyright 2017 Crown in right of State of Tasmania Apart from fair dealing for the purposes of private study, research, criticism or review, as permitted under the Copyright act, no part may be reproduced by any means without permission from the Department of Primary Industries, Parks, Water and Environment. Published by Natural Values Conservation Branch Department of Primary Industries, Parks, Water and Environment GPO Box 44 Hobart, Tasmania, 7001 Front Cover Photograph of Eucalyptus regnans tall forest in the Styx Valley: Rob Blakers Cite as: Balmer, J., Bradbury, J., Richards, K., Rudman, T., Visoiu, M., Troy, S. and Lawrence, N. 2017. A review of natural values within the 2013 extension to the Tasmanian Wilderness World Heritage Area. Nature Conservation Report 2017/6, Department of Primary Industries, Parks, Water and Environment, Hobart.
    [Show full text]