EU 145S with TCCA Approvals
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
PRESS RELEASE Safran Announces the Availability of Its 2021 Interim
PRESS RELEASE Safran announces the availability of its 2021 Interim Financial Report Paris, August 4, 2021 Safran (Euronext Paris: SAF) has filed the French version of its 2021 Interim Financial Report (Rapport Financier Semestriel) with the French financial markets authority (Autorité des marchés financiers – AMF). From August 4 2021, this document (PDF) can be viewed on or downloaded from: Safran’s website, at www.safrangroup.com under the heading “Finance”/sub-heading “Publications”, The French Financial Markets Authority’s website, at www.amf-france.org Agenda Q3 2021 revenue October 29, 2021 Capital Markets Day 2021 December 2, 2021 2021 annual results February 24, 2021 * * * * * Safran is an international high-technology group, operating in the aviation (propulsion, equipment and interiors), defense and space markets. Its core purpose is to contribute to a safer, more sustainable world, where air transport is more environmentally friendly, comfortable and accessible. Safran has a global presence, with 76,000 employees and sales of 16.5 billion euros in 2020, and holds, alone or in partnership, world or regional leadership positions in its core markets. Safran undertakes research and development programs to maintain the environmental priorities of its R&T and Innovation roadmap. Safran is listed on the Euronext Paris stock exchange and is part of the CAC 40 and Euro Stoxx 50 indices. For more information : www.safran-group.com / Follow @Safran on Twitter Press Catherine Malek : [email protected] / T +33 (0)1 40 -
General Terms and Conditions of Elbe Flugzeugwerke Gmbh for Sales Abroad
General Terms and Conditions of Elbe Flugzeugwerke GmbH for Sales abroad 1 Scope of Application contract. Such trade term (hereinafter “Trade Term”) shall be interpreted in accordance with the 1.1 The general terms and conditions for sales INCOTERMS in force on the date the contract is contained herein (the "Terms") shall apply to all concluded. Prices are exclusive of any taxes or quotations and sales made by Elbe duties that may be levied in connection with the Flugzeugwerke GmbH, a Gesellschaft mit supply of Products or Services, and that shall be beschränkter Haftung (GmbH) created and paid by the Customer. existing under the laws of the Federal Republic of Germany, registered at the Local Court in 4.2 Unless quoted as a fixed price for a specific Dresden, Germany, under the Company period or agreed otherwise in writing, EFW may Registration No. HRB 1378, with its Head Office adjust all prices to the general cost trend (in at Grenzstrasse 1, 01109 Dresden, Germany particular to labour agreements, material and (hereinafter "EFW") concerning the products and manufacturing costs alteration as well as services directly or indirectly supplied by EFW significant exchange rate fluctuations). (the "Products" and "Services"). 1.2 The validity of any customer (the “Customer”) 5 Terms of payment general terms and conditions, especially Customer’s standard terms and conditions of 5.1 Payment shall be made no later than thirty (30) purchase, is herewith expressly refuted. calendar days from the date of invoice. All payments shall be deemed to have been effected 1.3 Deviations from these Terms require the explicit if and when they have been irrevocably credited written approval of EFW. -
Annual Report 2016, Registration Document 2016 and Financial
Annual Report 2015 Registration Document 2015 Financial Statements 2015 Q Financial Statements 2015 122334455 1 Information on Airbus Activities 1.1 Presentation of the Company Relationship between Airbus Group SE and Airbus In line with the previous organisational structure, Airbus management service agreements have been put in place with Group SE itself does not engage in the core aerospace, defence the subsidiaries and services are invoiced on a cost plus basis. or space business of Airbus but coordinates related businesses, For management purposes, Airbus Group SE acts through its sets and controls objectives and approves major decisions for Board of Directors, Group Executive Committee, and Chief Airbus. As the parent company, Airbus Group SE conducts Executive Offi cer in accordance with its corporate rules and activities which are essential to Airbus’ activities and which procedures as described below under “Corporate Governance”. are an integral part of the overall management of Airbus. In particular, fi nance activities pursued by Airbus Group SE are Within the framework defi ned by Airbus Group SE, each Division, in support of the business activities and strategy of Airbus. In Business Unit and subsidiary is vested with full entrepreneurial connection therewith, Airbus Group SE provides or procures responsibility. the provision of services to the subsidiaries of Airbus. General 1.1.2 Commercial Aircraft Airbus Commercial Aircraft is one of the world’s leading aircraft over the long-term and expanding its customer services offering. manufacturers of passenger airliners. Airbus Commercial To achieve these goals, Airbus Commercial Aircraft is actively: Aircraft helps to shape the future of air transportation and drive steady growth around the world. -
Landeszentrale Für Politische Bildung Baden-Württemberg, Director: Lothar Frick 6Th Fully Revised Edition, Stuttgart 2008
BADEN-WÜRTTEMBERG A Portrait of the German Southwest 6th fully revised edition 2008 Publishing details Reinhold Weber and Iris Häuser (editors): Baden-Württemberg – A Portrait of the German Southwest, published by the Landeszentrale für politische Bildung Baden-Württemberg, Director: Lothar Frick 6th fully revised edition, Stuttgart 2008. Stafflenbergstraße 38 Co-authors: 70184 Stuttgart Hans-Georg Wehling www.lpb-bw.de Dorothea Urban Please send orders to: Konrad Pflug Fax: +49 (0)711 / 164099-77 Oliver Turecek [email protected] Editorial deadline: 1 July, 2008 Design: Studio für Mediendesign, Rottenburg am Neckar, Many thanks to: www.8421medien.de Printed by: PFITZER Druck und Medien e. K., Renningen, www.pfitzer.de Landesvermessungsamt Title photo: Manfred Grohe, Kirchentellinsfurt Baden-Württemberg Translation: proverb oHG, Stuttgart, www.proverb.de EDITORIAL Baden-Württemberg is an international state – The publication is intended for a broad pub- in many respects: it has mutual political, lic: schoolchildren, trainees and students, em- economic and cultural ties to various regions ployed persons, people involved in society and around the world. Millions of guests visit our politics, visitors and guests to our state – in state every year – schoolchildren, students, short, for anyone interested in Baden-Würt- businessmen, scientists, journalists and numer- temberg looking for concise, reliable informa- ous tourists. A key job of the State Agency for tion on the southwest of Germany. Civic Education (Landeszentrale für politische Bildung Baden-Württemberg, LpB) is to inform Our thanks go out to everyone who has made people about the history of as well as the poli- a special contribution to ensuring that this tics and society in Baden-Württemberg. -
PRESS RELEASE Safran Appointments
PRESS RELEASE Safran appointments June 28, 2021 Two appointments to Safran's Executive Committee Effective July 1, 2021, Stéphane Cueille is named CEO of Safran Electrical & Power. He takes over from Alain Sauret, who is retiring. Olivier Andriès, CEO of Safran, said, “I would like to sincerely thank Alain Sauret, who joined the Group almost 40 years ago at our legacy company, Labinal. He went on to transform the company into a world-class center of electrical system excellence. Safran Electrical & Power is today a cornerstone of our decarbonized aviation roadmap.” Holding the rank of Ingénieur de l’Armement (defense scientist), Stéphane Cueille was seconded to Snecma1 from 1998 to 2001 to work on ceramic matrix composites (CMC). He returned to the French defense procurement agency DGA in 2001, taking various management positions in the aircraft propulsion sector. In 2005 he was placed in charge of the Missiles-Space unit in the industrial affairs department (S2IE). In 2008, he returned to Snecma, starting in the turbine blade quality department at the Gennevilliers plant. He was subsequently named repair general manager in Snecma’s Military Engine division, then director of the turbine blade center of excellence. / Safran Mereis / Capa/ Safran/ MereisCapa/ Safran / In May 2013 he was appointed Managing Director of Aircelle Ltd, the UK subsidiary of Aircelle2 based in Burnley. In January 2015 he was named head of Safran Tech, the Stéphanie Group's Research & Technology (R&T) center, and then in 2016 was appointed Senior Executive Vice President R&T and Christophe Innovation, also becoming a member of the Safran Executive © Committee. -
Safran Aircraft Engines Download
SAFRAN AIRCRAFT ENGINES This is a multi-site certificate, additional site details are listed in the appendix to this certificate 10 ALLEE DU BREVENT - COURCOURONNES 91019 EVRY CEDEX - FRANCE Bureau Veritas Certification certify that the Management System of the above organisation has been audited in accordance with the relevant Aerospace Supplier Quality system Certification Scheme EN 9104-001:2013 and found to be in accordance with the requirements of the management system standard detailed below: Standard EN 9100:2018 AS 9100:D - JISQ 9100:2016 Scope of certification DESIGN, DEVELOPMENT, PRODUCTION, DISTRIBUTION, TEST AND SERVICING OF CIVIL AND MILITARY AIRCRAFT ENGINES - DESIGN, DEVELOPMENT, PRODUCTION, DISTRIBUTION, TEST AND SERVICING SATELLITE AND SPACECRAFT PROPULSION SYSTEMS - ASSOCIATED SERVICES PROVIDED TO CIVIL AND MILITARY CUSTOMERS. Certification structure : Campus Certification Issue date: 15 September 2018 Subject to the continued satisfactory operation of the organization’s Management System, this certificate expires on (Certification Expiry date): 14 September 2021 Original certification date: 15 July 2004 Certificate : 7098050-Rev0 Date: 06 September 2018 File number : FR044707-1 Jacques Matillon – Managing DIrector Bureau Veritas Certification France 60, avenue du Général de Gaulle – Immeuble Le Guillaumet - 92046 Paris La Défense Further clarifications regarding the scope of this certificate the applicability of the management system requirements may be obtained by consulting the organization. To check this certificate validity, please call + 33(0) 1 41 97 00 60. APPENDIX SAFRAN AIRCRAFT ENGINES Standard EN 9100:2018 AS 9100:D - JISQ 9100:2016 Scope of certification Site Address Scope 10 ALLEE DU BREVENT COURCOURONNES SIEGE CENTRAL FUNCTIONS 91019 EVRY CEDEX, France RUE HENRI AUGUSTE INDUSTRIALIZATION AND MANUFACTURING OF PARTS AND EVRY-CORBEIL DESBRUÈRES - BP 81 COMPONENTS FOR AIRCRAFT ENGINES. -
GAM-2020-LPA Large Passenger Aircraft Innovative Aircraft
PROJECT GAM-2020-LPA Large Passenger Aircraft Innovative Aircraft Demonstrator Platform Funding: European (Horizon 2020) Duration: Jan 2020 - Dec 2021 Status: Ongoing Total project cost: €142,140,284 EU contribution: €106,688,121 Call for proposal: H2020-IBA-CS2-GAMS-2019 CORDIS RCN : 231017 Objectives: The main objective for the Clean Sky 2 Large Passenger Aircraft Programme (LPA) is to further mature and validate key technologies such as advanced wings and empennages design, making use of hybrid laminar airflow wing developments, the integration of most advanced engines into the large passenger aircraft aircraft design as well as an all-new next generation fuselage cabin and cockpit-navigation. Dedicated demonstrators are dealing with research on the best opportunities to combine radical propulsion concepts, and the opportunities to use scalled flight testing for the maturation and validation of these concepts via scalled flight testing. Components of hybrid electric propulsion concepts are developed and tested in a major ground based test rig. The LPA program is also contributing with a major work package to the E-Fan X program. The R&T activities in the LPA program is split in 21 so-called demonstrators. In the project period 2020 and 2021 a substantial number of hardware items ground and flight test items will be manufactured, assembled tested. For some large items like the Multifunctional Fuselage demonstrators or the HLFC wing ground demonstrator the detailed design and manufacturing of test items will be commenced. For the great majority of contributing technologies a Technology Readiness level (TRL) 3 or 4 will be accomplished or even exceeded. -
Bischoffbergersascha Ersatzteill
Hochschule Merseburg University of Applied Sciences Fachbereich Wirtschaftswissenschaften Fachgebiet Logistik Bachelorarbeit zur Erlangung des Grades Bachelor of Arts (B.A.) Ersatzteillogistik in der Luftfahrtindustrie vorgelegt bei Prof. Dr. rer. pol. Dirk Sackmann Zweitprüfer: Prof. Dr. rer. pol. Jörg Döpke eingereicht von: Sascha Bischoffberger Matrikel: BBW10 Kennnummer: 17902 Abgabetermin: 31.03.2016 Inhaltsverzeichnis Abbildungsverzeichnis........................................................................................................III Abkürzungsverzeichnis.......................................................................................................IV 1 Einleitung............................................................................................................................1 2 Literaturreview...................................................................................................................2 3 Logistik...............................................................................................................................6 3.1 Aufgaben und Prozesse...........................................................................................7 3.2 Logistikbereiche.......................................................................................................8 4 Ersatzteillogistik.................................................................................................................9 4.1 Definition Ersatzteil................................................................................................10 -
Gemeinde Schemmerhofen Landkreis Biberach Freitag, 28
Mitteilungsblatt Gemeinde Schemmerhofen Landkreis Biberach Freitag, 28. Februar 2020 • Nr. 9 • 48. Jahrgang Gemeinsame Bekanntmachungen und Informationen 14.03.2020 Jahreshauptversammlung Wichtiges in Kürze Liederkranz Schemmerberg 15.03.2020 Rotkreuzkurs Erste-Hilfe 28.02.2020 Blutspende-Aktion DRK-Ortsverein Schemmerhofen DRK-Ortsverein Schemmerhofen 15.03.2020 Schlemmerfest 28.02.2020 Obstbaum Schnittkurs Musikverein Schemmerberg e.V. Gartenbauverein Altheim 15.03.2020 Silvretta Montafon 29.02.2020 Funken Skiabteilung SV Schemmerhofen Förderverein Feuerwehr Ingerkingen e.V 21.03.2020 Mitgliederversammlung 29.02.2020 Generalversammlung VdK Schemmerhofen, Altheim, Ingerkingen Musikverein Schemmerhofen 21.03.2020 Erste Hilfe am Kind 29.02.2020 Generalversammlung DRK-Ortsverein Schemmerhofen Förderverein d. Musikvereins Schemmerhofen 23.03.2020 Jahreshauptversammlung 29.02.2020 Generalversammlung Gesangverein Alberweiler e.V. Förderverein für Musik und Jugend 23.03.2020 Jahreshauptversammlung 29.02.2020 Mitgliederversammlung Förderverein Gesangverein Alberweiler e.V. Obst- und Gartenbauverein Schemmerberg 27.03.2020 Jahreshauptversammlung 01.03.2020 Jahreshauptversammlung Sportverein Aßmannshardt Musikverein Aßmannshardt e. V. 28.03.2020 Babybasar 01.03.2020 Funkenringwürfeln Kinder- und Familienhaus & Kita Löwenzahn Gartenbauverein Aßmannshardt e. V. 29.03.2020 Jahreshauptversammlung 01.03.2020 Jahreshauptversammlung Obst- und Gartenbauverein Altheim e. V. Förderverein d. Musikverein Aßmannshardt e. V. 29.03.2020 Jahreshauptversammlung -
VI. Wednesday 19 April Meeting with General
Ref. Ares(2019)5332022 - 21/08/2019 V I. Wednesday 19 April Meeting with General Electric 10:15-12:00 GE HQ in Boston 41 Farnsworth St, Boston TABLE OF CONTENTS 0. AGENDA OF MEETING Page No 57 1. STEERING BRIEF Page No 58 2. SPEAKING POINTS Page No 60 3. BACKGROUND Page No 61 2/20 0. AGENDA OF MEETING 10:00 Meeting the of GE: ( ) ( ). 11:00 Meeting with of GE 3/20 1.2 Objectives This is a courtesy meeting aiming at maintaining good relations. • Confirming the importance of research and business relations between GE and their European-based companies (e.g. Italian AVIO, Czech Walter), as well their 43 and 57 year-old joint ventures/partnerships with French SAFRAN and German MTU respectively, in a mutual interest of Europe and the USA. 1.3 Line to take • To state that global aviation markets and global industrial supply chain will profit from targeted R&D collaboration in energy, transport and health sectors; • To explain the 3Os initiative and link it with the digital and data industrial transformation; • Regarding FP9 and future Clean Sky activities, explain that despite the political uncertainties and upcoming assessments and recommendations, FP9 would be strongly oriented to be open for collaboration with the USA and GE is very welcome in that context. • To share your views that USA-based European companies and EU-based USA companies should have a level-playing field, especially in IPR and transfer of knowledge issues; • To share your views on the role of the European Commission in public-private collaboration on research and innovation and in particular within Clean Sky, that such collaborations go beyond research funding and create business opportunities; • To explain that GE will have a greater role in Clean Sky 2, as following the 1st call for core partners, GE Aviation was selected. -
Ulm - Laupheim - Biberach - Friedrichshafen - Lindau
Bitte beachten Sie: Fahrplan gültig ab 22.12.2018, es finden unterjährige Fahrplanänderungen statt. Infos unter www.ding.eu R2 Ulm - Laupheim - Biberach - Friedrichshafen - Lindau Kundendialog DB Regio, Tel. (01806) 996633 [20 ct/Anruf Festnetz, max. 60 ct/Anruf Mobilfunknetz], E-Mail: [email protected] DB-Fahrplanauskunft Tel. (0800) 1507090 [kostenlos] Es gilt die baden-württembergische Ferienordnung. Zwischen Ulm und Aulendorf gilt der DING-Verbundtarif. Diese Tabelle enthält Auszüge aus der DB-Kursbuchstrecke 751. Fahrplan gültig ab 22.12.2018 Montag - Freitag ZUGGATTUNG BOB RE RB RB BOB RE RB RB RB RB BOB RB RE RB BOB IRE RE RB BOB ZUGNUMMER 87551 22745 22621 22623 87555 4203 22625 3254 22627 22629 87559 22603 4205 22633 87563 3042 4207 22637 87565 VON Stutt- Stutt- gart gart Ulm Hbf 04.55 05.40 05.50 06.14 06.23 06.34 07.02 07.13 07.30 08.05 08.15 08.34 Ulm-Donautal 05.45 06.19 06.28 06.39 07.07 07.35 08.39 Erbach (Württ) 05.03 05.49 05.58 06.24 06.33 06.44 07.11 07.40 08.43 Laupheim Westbahnhof (Hauptgleis) an 05.10 06.06 06.30 07.25 08.27 Laupheim Westbahnhof (Hauptgleis) ab 05.11 06.06 06.31 07.26 08.28 Laupheim Westbahnhof (Nebengleis) an 05.58 06.42 07.19 07.49 08.52 Laupheim Westbahnhof (Nebengleis) ab 05.18 05.59 06.34 06.43 07.22 07.49 08.53 Laupheim Stadtbahnhof an 05.21 06.02 06.37 06.46 07.25 07.52 08.56 Laupheim Stadtbahnhof ab 06.53 07.30 07.58 09.01 Schemmerberg 05.15 06.11 06.35 07.01 07.36 08.05 09.08 Warthausen 05.20 06.40 07.07 07.41 08.10 09.13 Biberach (Riß) an 05.23 06.18 06.43 -
PRESS-KIT-VV19-08122021-EN.Pdf
www.arianespace.com www.avio.com www.avio Arianespace’s seventh launch of 2021 with the second Vega of the year will place its satellite passengers into Sun-synchronous orbit. The launcher will be carrying a total payload of approximately 1 029 kg. The launch will be performed in Kourou, French Guiana. MISSION DESCRIPTION 2 PLÉIADES NEO 4 SATELLITE 3 Liftoff is planned on at exactly: FOUR AUXILIARY PAYLOADS 4 - 5 09:47 p.m. Washington, D.C. time, 10:47 p.m. Kourou time, VEGA LAUNCHER 6 01:47 a.m. Universal time (UTC), August 17, LAUNCH CAMPAIGN 7 03:47 a.m. Paris time, August 17, 10:47 a.m. Tokyo time, August 17. FLIGHT SEQUENCES 7 STAKEHOLDERS OF A LAUNCH 8 The nominal duration of the mission (from liftoff to separation of the satellites) is: 1 hour, 44 minutes and 59 seconds. Satellite: Pléiades Neo 4 Customer: Airbus Defence and Space - Intelligence Satellites: Four auxiliary payloads Cyrielle BOUJU [email protected] +33 (0)6 32 65 97 48 For Pléiades Neo For the four auxiliary payloads Francesco DE LORENZO • Perigee altitude: 614 km • Perigee altitude: 540 km [email protected] • Apogee altitude: 625 km • Apogee altitude: 554 km + 39 (0)6 97285317 • Inclination : 97.89 degrees • Inclination : 97.55 degrees First Pléiades Neo constellation satellites have been achieved within only five years, thanks to the hard work of over 500 people, across seven sites in Europe, to deliver first-class 14 km swath imagery at 30 cm native resolution, capable to daily collect up to 2 million km² and image the entire Earth landmass five times per year.