Features Departments
Total Page:16
File Type:pdf, Size:1020Kb
Load more
										Recommended publications
									
								- 
												
												The Vermont Management Plan for Brook, Brown and Rainbow Trout Vermont Fish and Wildlife Department January 2018
The Vermont Management Plan for Brook, Brown and Rainbow Trout Vermont Fish and Wildlife Department January 2018 Prepared by: Rich Kirn, Fisheries Program Manager Reviewed by: Brian Chipman, Will Eldridge, Jud Kratzer, Bret Ladago, Chet MacKenzie, Adam Miller, Pete McHugh, Lee Simard, Monty Walker, Lael Will ACKNOWLEDGMENT: This project was made possible by fishing license sales and matching Dingell- Johnson/Wallop-Breaux funds available through the Federal Sportfish Restoration Act. Table of Contents I. Introduction ......................................................................................... 1 II. Life History and Ecology ................................................................... 2 III. Management History ......................................................................... 7 IV. Status of Existing Fisheries ............................................................. 13 V. Management of Trout Habitat .......................................................... 17 VI. Management of Wild Trout............................................................. 34 VII. Management of Cultured Trout ..................................................... 37 VIII. Management of Angler Harvest ................................................... 66 IX. Trout Management Plan Goals, Objectives and Strategies .............. 82 X. Summary of Laws and Regulations .................................................. 87 XI. Literature Cited ............................................................................... 92 I. Introduction - 
												
												Progress of Stream Measurements
Water-Supply and Irrigation Paper No. 125 Series P, Hydrographic Progress Reports, 30 DEPARTMENT OF THE INTERIOR UNITED STATES GEOLOGICAL SURVEY CHARLES D. WALCOTT, DIRECTOR REPORT PROGRESS OF STREAM MEASUREMENTS THE CALENDAR YEAR 1904 PREPARED UNDER THE DIRECTION OF F. H. NEWELL BY R. E. HORTON, N. C. GROVER, and JOHN C. HOYT PART II. Hudson, Passaic, Raritan, and Delaware River Drainages WASHINGTON GOVERNMENT PRINTING OFFICE 1905 Water-Supply and Irrigation Paper No. 125 Series P, Hydrographic Progress Reports, 30 i DEPARTMENT OF THE INTERIOR UNITED STATES GEOLOGICAL SURVEY CHARLES D. WALCOTT, DIRECTOR REPORT PROGRESS OF STREAM MEASUREMENTS THE CALENDAR YEAR 1904 PREPARED UNDER THE DIRECTION OF F. H. NEWELL BY R. E. HORTON, N. C. GROVER, and JOHN C. HOYT PART II. Hudson, Passaic, Raritan, and Delaware River Drainages WASHINGTON GOVERNMENT PRINTING OFFICE 1905 CONTENTS. Letter of transmittal...................................................... 7 Introduction............................................................. 9 Cooperation and acknowledgments ...... ...^.............................. 18 Hudson Eiver drainage basin. ............................................ 19 Hudson Eiver at Fort Edward, N. Y .............................. 19 Hudson Eiver at Mechanicsville, N. Y............................. 22 Indian Eiver at Indian Lake, Hamilton County, N. Y.............. 24 Hoosic Eiver at Buskirk, N. Y .................................... 24 Mohawk River at Little Falls, N. Y................................ 26 Mohawk Eiver at Dunsbach Ferry Bridge, N. Y.................... 29 Oriskany Creek near Oriskany, N. Y .............................. 32 Starch Factory Creek near New Hartford, N. Y.................... 35 Sylvan Glen Creek near New Hartford, N. Y....................... 37 Graefenberg Creek near New Hartford, N. Y....................... 39 Eeels Creek and Johnston Brook near Deer-field, N. Y.............. 41 Nail Creek at Utica, N. Y......................................... 45 West Canada Creek at Twin Eock Bridge, N. Y................... - 
												
												Assessment of Public Comment on Draft Trout Stream Management Plan
Assessment of public comments on draft New York State Trout Stream Management Plan OCTOBER 27, 2020 Andrew M. Cuomo, Governor | Basil Seggos, Commissioner A draft of the Fisheries Management Plan for Inland Trout Streams in New York State (Plan) was released for public review on May 26, 2020 with the comment period extending through June 25, 2020. Public comment was solicited through a variety of avenues including: • a posting of the statewide public comment period in the Environmental Notice Bulletin (ENB), • a DEC news release distributed statewide, • an announcement distributed to all e-mail addresses provided by participants at the 2017 and 2019 public meetings on trout stream management described on page 11 of the Plan [353 recipients, 181 unique opens (58%)], and • an announcement distributed to all subscribers to the DEC Delivers Freshwater Fishing and Boating Group [138,122 recipients, 34,944 unique opens (26%)]. A total of 489 public comments were received through e-mail or letters (Appendix A, numbered 1-277 and 300-511). 471 of these comments conveyed specific concerns, recommendations or endorsements; the other 18 comments were general statements or pertained to issues outside the scope of the plan. General themes to recurring comments were identified (22 total themes), and responses to these are included below. These themes only embrace recommendations or comments of concern. Comments that represent favorable and supportive views are not included in this assessment. Duplicate comment source numbers associated with a numbered theme reflect comments on subtopics within the general theme. Theme #1 The statewide catch and release (artificial lures only) season proposed to run from October 16 through March 31 poses a risk to the sustainability of wild trout populations and the quality of the fisheries they support that is either wholly unacceptable or of great concern, particularly in some areas of the state; notably Delaware/Catskill waters. - 
												
												Courier Subject Index
New York State Covered Bridge Society Empire State Courier Subject Index Advertising signs June 1972, p 4 & 5; March 1975, p 6; November 1978, p 1 & 7; November 1979, p 1 & 3 (P); July 1980, p 8; November 1980, p 2 & 8 (P); March 1985, p 4 & 5; July 1986, p 6; July 1988, p 1 & 8 (P) Alaska 1st Judicial Div. Hyder September 1970, p 3 3rd Judicial Div. Afognak Island September 1970, p 1 Alaska's bridges September 1970, p 1 & 3 Allen, Richard Sanders November 1980, p 3 (P); March 1984, p 5 & 7 (P) Anderson, Stott October 1972, p 5 (P) Arizona November 1978, p 2 (P) Gila County Roberts Ranch June 1969, p 3 Maricopa County Tempe August 1967, p 5 Navajo County Maureta B. Thomas Memorial November 1978, p 2 Arizona bridges August 1967, p 5 (P); June 1969, p 3 (P) Arm chair covered bridging June 1973, p 3 & 5 Arson September 1966, p 1; August 1967, p 7 & 8; December 1967, p 4; June 1968, p 5 (P); February 1969, p 4; September 1970, p 2; November 1971, p 3 & 6; February 1972, p 2 (P); November 1976, p 3 (P); July 1978, p 7; July 1981, p 2 Auvil, Myrtle March 1986, p 5 (P) Books Alabama's Covered Bridges, past and April 1974, p 6 present by A.G. Prince Covered Bridges of Mass., A Guide by July 1978, p 7 A. R. Howard Covered Bridges of Somerset County, March 1980, p 2 PA by Sheldon Barkman Covered Bridges of the Middle Atlantic September 1966, p 8 States by R. - 
												
												Channel Management and River Corridor Protection Plan
Channel Management and River Corridor Protection Plan Walloomsac River and Roaring Branch, Bennington County, Vermont December, 2007 Prepared for: Town of Bennington, Vermont and Bennington County Conservation District Prepared by: In association with: Executive Summary The Roaring Branch and Walloomsac River in Bennington County, Vermont have historically presented extreme challenges related to erosion and flooding for the Town of Bennington and surrounding communities. To begin addressing these concerns, an assessment of the Walloomsac River watershed was conducted to determine the major conditions, both natural and human-related, that control river form and function in this watershed. The assessment concluded that the river system is in a state that has greatly departed from a stable condition and will therefore remain dynamic and pose a threat of further erosion and property damage during flood events. This Channel Management and River Corridor Protection Plan (Corridor Plan) was prepared to further examine the locations, types, and sources of stream channel instability along the Roaring Branch and Walloomsac River in order to develop management options throughout the corridor that will address these areas of instability. Historic manipulation of in-stream sediments through practices such as dredging and channelization, in association with artificial constraints (such as roads and berms) which influence natural river processes, are the primary factors causing the instability of these rivers. This river system contains a large supply of coarse sediment, primarily in the form of boulders, cobble, and gravel, and the presence of the numerous stream-side berms magnifies stream energy and prevents the river from accessing its floodplain under higher flows. - 
												
												Waterbody Classifications, Streams Based on Waterbody Classifications
Waterbody Classifications, Streams Based on Waterbody Classifications Waterbody Type Segment ID Waterbody Index Number (WIN) Streams 0202-0047 Pa-63-30 Streams 0202-0048 Pa-63-33 Streams 0801-0419 Ont 19- 94- 1-P922- Streams 0201-0034 Pa-53-21 Streams 0801-0422 Ont 19- 98 Streams 0801-0423 Ont 19- 99 Streams 0801-0424 Ont 19-103 Streams 0801-0429 Ont 19-104- 3 Streams 0801-0442 Ont 19-105 thru 112 Streams 0801-0445 Ont 19-114 Streams 0801-0447 Ont 19-119 Streams 0801-0452 Ont 19-P1007- Streams 1001-0017 C- 86 Streams 1001-0018 C- 5 thru 13 Streams 1001-0019 C- 14 Streams 1001-0022 C- 57 thru 95 (selected) Streams 1001-0023 C- 73 Streams 1001-0024 C- 80 Streams 1001-0025 C- 86-3 Streams 1001-0026 C- 86-5 Page 1 of 464 09/28/2021 Waterbody Classifications, Streams Based on Waterbody Classifications Name Description Clear Creek and tribs entire stream and tribs Mud Creek and tribs entire stream and tribs Tribs to Long Lake total length of all tribs to lake Little Valley Creek, Upper, and tribs stream and tribs, above Elkdale Kents Creek and tribs entire stream and tribs Crystal Creek, Upper, and tribs stream and tribs, above Forestport Alder Creek and tribs entire stream and tribs Bear Creek and tribs entire stream and tribs Minor Tribs to Kayuta Lake total length of select tribs to the lake Little Black Creek, Upper, and tribs stream and tribs, above Wheelertown Twin Lakes Stream and tribs entire stream and tribs Tribs to North Lake total length of all tribs to lake Mill Brook and minor tribs entire stream and selected tribs Riley Brook - 
												
												Town of Arlington Hazard Mitigation Plan Arlington, Vermont
Town of Arlington Hazard Mitigation Plan Arlington, Vermont April 8, 2019 Revised May 23, 2019 Revised July 15, 2019 Adopted August 26, 2019 Table of Contents List of Tables ........................................................................................... 2 List of Figures ......................................................................................... 3 I. Introduction ...................................................................................... 1 A. Purpose ............................................................................................................................................... 1 B. Mitigation Goals .................................................................................................................................. 2 II. Town Profile ...................................................................................... 2 A. Regional Context ................................................................................................................................. 2 B. Demography and Land Use ................................................................................................................. 2 C. Economic and Cultural Resources ....................................................................................................... 3 D. Critical Facilities .................................................................................................................................. 3 III. Planning Process .............................................................................. - 
												
												Empire Bridge Program Projects North Country
EMPIRE BRIDGE PROGRAM PROJECTS NORTH COUNTRY County Town Route Crossed Construction Status Essex Keene RTE 73 Johns Br Construction Complete Essex Keene RTE 73 Johns Br Construction Complete Overflow Essex Keene RTE 73 Beede Construction Complete Brook Essex Keene RTE 73 Beede Construction Complete Brook Essex Keene RTE 73 E Br Ausable River Construction Complete Essex Keene RTE 73 E Br Ausable River Construction Complete Essex Keene RTE 73 Cascade Lake Construction Complete Outlet Essex North Elba RTE 73 W Br Ausable Construction Complete River Essex North Elba RTE 73 W Br Ausable Construction Complete River Essex Jay RTE 9N W Br Ausable Under Construction River Clinton Peru I-87 SB Lit Ausable River Construction Complete Clinton Peru I- 87 NB Lit Ausable River Construction Complete Clinton Plattsburgh I- 87 SB Salmon Construction Complete River Clinton Plattsburgh I- 87 NB Salmon Construction Complete River Total: 14 Bridges CAPITAL DISTRICT County Town Route Crossed Construction Status Warren Thurman Rte 28 Hudson River Construction Complete Washington Hudson Falls Rte 196 Glens Falls Construction Complete Feeder Canal Washington Hudson Falls Rte 4 Glens Falls Construction Complete Feeder Saratoga Malta Rte 9 Kayaderosseras Construction Complete Creek Saratoga Greenfield Rte 9n Kayaderosseras Construction Complete Creek Rensselaer Nassau Rte 20 Kinderhook Creek Construction Complete Rensselaer Nassau Rte 20 Kinderhook Creek Construction Complete Rensselaer Nassau Rte 20 Kinderhook Creek Construction Complete Rensselaer Hoosick Rte - 
												
												122 Fish Management Rule Annotated
APPENDIX 122 TITLE 10 Conservation and Development APPENDIX CHAPTER 2. FISH Subchapter 2. Seasons, Waters, and Limits § 122. Fish Management Regulation. 1.0 Authority (a) This rule is adopted pursuant to 10 V.S.A. §4081(b). In adopting this rule, the Fish and Wildlife Board is following the policy established by the General Assembly that the protection, propagation, control, management, and conservation of fish, wildlife and fur-bearing animals in this state is in the interest of the public welfare and that the safeguarding of this valuable resource for the people of the state requires a constant and continual vigilance. (b) In accordance with 10 V.S.A. §4082, this rule is designed to maintain the best health, population and utilization levels of Vermont’s fisheries. (c) In accordance with 10 V.S.A. §4083, this rule establishes open seasons; establishes daily, season, possession limits and size limits; prescribes the manner and means of taking fish; and prescribes the manner of transportation and exportation of fish. 2.0 Purpose It is the policy of the state that the protection, propagation control, management and conservation of fish, wildlife, and fur-bearing animals in this state is in the interest of the public welfare, and that safeguarding of this valuable resource for the people of the state requires a constant and continual vigilance. 3.0 Open-Water Fishing, legal methods of taking fish 3.1 Definitions (a) Department – Vermont Department of Fish and Wildlife. (b) Commissioner –Vermont Department of Fish and Wildlife Commissioner. (c) Open-water fishing –Fishing by means of hook and line in hand or attached to a rod or other device in open water. - 
												
												Hazard Assessment of Storm Events for the Battery, New York
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/284359149 Hazard assessment of storm events for The Battery, New York ARTICLE in OCEAN & COASTAL MANAGEMENT · NOVEMBER 2015 Impact Factor: 1.75 · DOI: 10.1016/j.ocecoaman.2015.11.006 READS 32 4 AUTHORS, INCLUDING: José L. S. Pinho José S. Antunes do Carmo University of Minho University of Coimbra 88 PUBLICATIONS 142 CITATIONS 143 PUBLICATIONS 438 CITATIONS SEE PROFILE SEE PROFILE All in-text references underlined in blue are linked to publications on ResearchGate, Available from: José L. S. Pinho letting you access and read them immediately. Retrieved on: 04 April 2016 Dear Author, Please, note that changes made to the HTML content will be added to the article before publication, but are not reflected in this PDF. Note also that this file should not be used for submitting corrections. OCMA3821_proof ■ 11 November 2015 ■ 1/10 Ocean & Coastal Management xxx (2015) 1e10 55 Contents lists available at ScienceDirect 56 57 Ocean & Coastal Management 58 59 60 journal homepage: www.elsevier.com/locate/ocecoaman 61 62 63 64 65 1 Q4 Hazard assessment of storm events for the battery, New York 66 2 67 3 a a b, * b 68 Q3 Mariana Peixoto Gomes , Jose Luís Pinho , Jose S. Antunes do Carmo , Lara Santos 4 69 a 5 University of Minho, Braga, Portugal 70 b University of Coimbra, Coimbra, Portugal 6 71 7 72 8 73 article info abstract 9 74 10 75 Article history: The environmental and socio-economic importance of coastal areas is widely recognized, but at present 11 76 Received 1 October 2014 these areas face severe weaknesses and high-risk situations. - 
												
												Vermont Agency of Natural Resources Watershed Management Division Batten Kill Walloomsac Hoosic
Vermont Agency of Natural Resources Watershed Management Division Batten Kill Walloomsac Hoosic TACTICAL BASIN PLAN The Hudson River Basin (in Vermont) - Water Quality Management Plan was prepared in accordance with 10 VSA § 1253(d), the Vermont Water Quality Standards1, the Federal Clean Water Act and 40 CFR 130.6, and the Vermont Surface Water Management Strategy. Approved: Pursuant to Section 1-02 D (5) of the VWQS, Basin Plans shall propose the appropriate Water Management Type of Types for Class B waters based on the existing water quality and reasonably attainable and desired water quality management goals. ANR has not included proposed Water Management Types in this Basin Plan. ANR is in the process of developing an anti-degradation rule in accordance with 10 VSA 1251a (c) and is re-evaluating whether Water Management Typing is the most effective and efficient method of ensuring that quality of Vermont's waters are maintained and enhanced as required by the VWQS, including the anti-degradation policy. Accordingly, this Basin Plan is being issued by ANR with the acknowledgement that it does not meet the requirements of Section 1-02 D (5) of the VWQS. The Vermont Agency of Natural Resources is an equal opportunity agency and offers all persons the benefits of participating in each of its programs and competing in all areas of employment regardless of race, color, religion, sex, national origin, age, disability, sexual preference, or other non-merit factors. This document is available upon request in large print, braille or audiocassette. VT Relay Service for the Hearing Impaired 1-800-253-0191 TDD>Voice - 1-800-253-0195 Voice>TDD Hudson River Basin Tactical Plan Overview 2 | P a g e Basin 01 - Batten Kill, Walloomsac, Hoosic Tactical Basin Plan – Final 2015 Table of Contents Executive Summary .................................................................................................................................... - 
												
												Trenton, New Jersey (Assunpink)
Top10 Highest Historical Crests: Assunpink Creek at Trenton, NJ Latitude: 40.222 Period of Record: 1932-Present Longitude: -74.778 Flood Stage: 8.5 Last Flood: 11/25/2018 Number of Floods: 70 Date of Flood Crest (ft) Streamflow (cfs) Weather Summary 8/28/2011 15.12 5,820 Hurricane Irene brought heavy rains and flooding 26-28 August 2011. Area averaged rainfall from gauge and radar data indicated a broad swath of 3 to 10 inches with over 13” at a couple of spots. 7/21/1975 14.61 5,450 Low pressure off to the North, areas of New Jersey were sitting in a trough which brought more than 10 inches at several locations in New Jersey. 9/17/1999 14.01 4,510 Hurricane Floyd produced heavy rainfall from Virginia to Long Island. Rainfall totals ranged from 12 inches in Delaware to 16.57 inches in Newport News, Virginia. Two dams burst in New Jersey and several flood records were broken in New Jersey. 8/28/1971 13.46 3,920 Tropical Storm Doria dumped 3 to 7 inches of rain across the region. Localized rainfall amounts of 8 to 10 inches were reported in the Tidewater area, Eastern NJ and Eastern PA. 4/16/2007 13.28 4,050 Two low successive low pressure systems produced rain and snow that caused flooding. Warm temperatures after the passage of the second low led to snowmelt and additional flooding. 7/14/1975 11.71 3,180 A stationary front produced rainfall for the entire area from the 9th through the 16th.