Schlink Hut Walk (Ngarigo Country)

Total Page:16

File Type:pdf, Size:1020Kb

Schlink Hut Walk (Ngarigo Country) Schlink Hut Walk (Ngarigo Country) 7 h, 11 h to 2 days 4 22.2 km ↑ 801 m Hard track Return ↓ 801 m This full day (or overnight) walk visits a series of interesting huts whilst exploring some open alpine country and parts of the Snowy Mountains Scheme. Starting at the Guthega / Munyang Power station, you climb up the steep old road to find some great views down the valley. Optional side trips visit the Gate House, Horse Camp Hut and White's River Hut. The alternate exit via Disappointment Spur gives some variety on the return journey and the chance to visit another historic hut. Let us begin by acknowledging the Ngarigo people, Traditional Custodians of the land on which we travel today, and pay our respects to their Elders past and present. 1,880 1,768 1,656 1,544 1,432 1,320 0 m 5 km 10 km 560 m 1.1 km 1.7 km 2.2 km 3.3 km 4.4 km 5.6 km 6.1 km 6.7 km 7.2 km 7.8 km 8.3 km 8.9 km 9.4 km 5x 2.8 km 3.9 km 10.5 km 11.1 km Class 4 of 6 Rough track, where fallen trees and other obstacles are likely Quality of track Clear and well formed track or trail (2/6) Gradient Very steep (4/6) Signage Minimal directional signs (4/6) Infrastructure Limited facilities, not all cliffs are fenced (3/6) Experience Required Moderate level of bushwalking experience recommended (4/6) Weather Foretasted & unexpected storms and severe weather may impact on navigation and safety (4/6) Getting to the start: From Barry Way Turn on to Kosciuszko Road then drive for 12.4 km Keep left and drive for another 255 m Turn slight left onto Kosciuszko Road and drive for another 8.9 km Turn right onto Guthega Road and drive for another 4.7 km Keep left onto Guthega Road and drive for another 8.3 km Turn right onto Guthega Powerstation Access and drive for another 285 m Keep right onto Guthega Powerstation Road and drive for another 65 m Turn right and drive for another 25 m Before you start any journey ensure you; • Tell someone you trust where you are going and what to do if you are late returning • Have adequate equipment, supplies, skills & knowledge to undertake this journey safely • Consider weather forecasts, park/track closures & fire dangers • Can respond to emergencies & call for help at any point • Are healthy and fit enough for this journey Share If not, change plans and stay safe. It is okay to delay and ask people for help. Bushwalk.com /j/49892B Bushwalking is fun but also can be dangerous. All information here is general and your personal and specific situation needs to be considered. You need to be prepared to cope with all kinds of errors and/or omissions. Neither the authors nor publishers accept responsibility or liability for any inconvenience, loss or injury sustained. © bushwalk.com. The maps and some text in this document are generated using Open Database Licenced data © OpenStreetMap contributors and other sources. 0 1 3 5 km 0 0.5 1 2 km 0 1 3 5 km 5x 5x Start Start 1,320 1,432 1,544 1,656 1,768 1,880 1,320 1,432 1,544 1,656 1,768 1,880 Bridge W Bridge W 0 m Toilet N N S S P 560 m Car park P ←135 m→ ←135 m→ E E W W Building 1.1 km S S N N Gate Gate ←2.3 km→ 1.7 km ←2.3 km→ E E E E S 2.2 km S N N W 2.8 km W ←1.4 km→ ←1.4 km→ FORD FORD W 3.3 km Ford W S S N 3.9 km N E E 4.4 km Bridge 5 km ←3 km→ ←3 km→ W 5.6 km W S S 6.1 km N N E E ←800 m→ ←800 m→ W 6.7 km W S S 7.2 km N 7.2 km N ←410 m→ ←410 m→ E E 7.8 km W W S S 8.3 km N N E ←3.1 km→ E ←3.1 km→ 8.9 km W W S S 9.4 km N N E E ←30 m→ ←30 m→ 10 km S S E E 10.5 km W W N 11.1 km N Getting started: From the Munyang Start of an alternate route: Alternate route via After another 115 m find the "Disappointment Disappointment Spur Spur Hut" (15 m on your left). (Guthega Power Station) car park, this N walk heads along the short driveway and To take the alternate route continue across the large bridge over the Snowy To take the alternate route continue W straight here. Start heading along E straight here. Start heading along River, heading towards the power station. Disappointment Spur Trail. At the fence (on the other side of the bridge), this walk turns left to head around S FORD to the other side of the power station. Just After 255 m cross the ford. past the concrete building, this walk Disappointment Spur Hut was built in the 1950's passes the two large feeder pipes and EE out of two standard accommodation modules, to support workers on the Snowy Mountains continues, soon finding an intersection N After another 25 m continue Scheme. The hut is in a small clearing on the with two management trails marked with a straight, to head along Disappointment Spur Trail. side of Disappointment Spur Trail (aka Aqueduct 'Schlink'Schlink Trail'Trail' sign.sign. SS track). There is a supply of water from the N WW nearby aqueduct and a flat area for camping (no After another 25 m head through/around the toilet). The hut is made from weatherboard with Start heading along Guthega gate. a flat tin roof, has a timber floor and three W W E Powerstation Road. N windows. There is a bunk bed and a table inside, and a fire circle outside. W After another 3.1 km veer left, to and a fire circle outside. W S head along Disappointment Spur Trail. N After another 20 m cross the bridge (about 40 m After another 315 m continue long)long) E straight, to head along Disappointment S Spur Trail. There is a toilet (about 70 m back from the S There is a toilet (about 70 m back from the After another 215 m continue straight, to After another 215 m continue straight, to E start)., not equiped with Handwashing basin. head along Disappointment Spur Trail. After another 180 m continue straight, to W There is a car park (about 25 m back from the W head along Disappointment Spur Trail. P start). S S After another 230 m continue N After 135 m find the "Guthega Power Station straight, to head along Disappointment E N N After another 750 m veer left, to (Munyang)" (25 m on your right). Spur Trail. head along Disappointment Spur Trail. E E W S W N After another 210 m continue straight, to head along Disappointment Spur Trail. This was the first power station of the Snow S Mountains Hydro Electric Scheme, completed in E 1955. It is also known as Munyang, as the After another 255 m continue straight, to station sits just west of the confluence of the head along Disappointment Spur Trail. Munyang and Snowy Rivers. The station boasts W two 30MW turbine and generator combinations, N two 30MW turbine and generator combinations, After another 1.1 km come to the end. providing peak power to the eastern states. The turbines are powered from the water in two largelarge pipespipes thatthat formform partpart ofof thethe GuthegaGuthega S Pressure Tunnel, fed by Guthega Dam. The dam E isis aboutabout 260m260m higherhigher thanthan thethe powerpower station.station. N At the end of this alternate route, rejoin the After another 510 m come to "Horse Camp Hut". main route. After another 120 m come to the end. W The alternate route finishes here. Continue The alternate route finishes here. Continue E straight to rejoin the main route at the 6.8 km waypoint. S Turn around and retrace your steps back the N 470 m to the main route. After another 7 m continue straight. Back at the main route turn sharp left and follow Horse Camp Hut is found beside a trail linking W Keep left. E the old Munyang-Geehi Rd with an aqueduct E Keep left. on from the 2.4 km waypoint. the old Munyang-Geehi Rd with an aqueduct trail on the western side of the valley. Still in good condition, this hut was built for surveyors S S S inin thethe 1950s1950s asas partpart ofof thethe SnowySnowy MountainsMountains W After another 140 m head through/around the W After another 2.2 km continue Scheme effort. The hut has a distinctive red gate. straight, to head along Schlink Pass door and two rooms. The smaller room contains Road. bunk beds and a stove and the larger room has E E N Start of an optional side trip: An optional side trip N a fire place, table and sitting area. The hut has a to Gate House. FORD timber floor and the outer walls and roof are S S After another 890 m cross the ford. W W made of corrugated iron. There is a creek To start this optional side trip continue nearby for water and a pit toilet is available.
Recommended publications
  • Download Brochure
    When is Turnak available? How to book Turnak? Turnak is available to book from 1st Nov to 31st May Our accommodation fees suit group bookings and each year. To our knowledge it’s the only facility of its allow an attractive arrangement for corporate, kind available in the Kosciuszko National Park. social or family events. Turnak Features: • 5 En-suite bedrooms, sleeping up to 18 guests in numerous configurations • Spacious modern appointed kitchen, all new facilities such as power and charging points • Private and common areas with plenty of room to relax and enjoy the natural surroundings. Private Catering can be organised if required and; Local tour guides are available to help plan your activities. Contact: Roger Lucas – [email protected] M: 0418497747 Your summer mountain hideaway to enjoy Chris Douglas – [email protected] • Road bike riding M: 0438258729 • Sightseeing 6 Farm Creek Place, Guthega Village NSW 2624 • Hiking POSTAL: TURNAK CO-OPERATIVE SKI CLUB LTD • Fishing 19 Carlton Street, Freshwater NSW 2096 • Kayaking Phone: 61 2 9907-1554 Email: [email protected] Web: www.turnak.com.au • Mountaineering Turnak Adventure Sports Lodge • Mountain bike trail riding and much more! Turnak Cooperative Ski Club Ltd ABN 52 403 835 543. Doc ID: TDL 20180530 Turnak Adventure Sports Lodge is a beautifully appointed mountain hideaway, situated above the snowline at Island Bend Activities Guthega Village in the Kosciuszko National Park, NSW. The Lodge offers picturesque and dramatic views over For that perfect family picnic, meet at Island Bend off the Guthega Guthega Dam towards the snowcapped ridge line of the Road.
    [Show full text]
  • 1Dc96b7f5bcdac018f76
    THE CANBERRA BUSHWALKING CLUB INC. NEWSLETTER it GPO Box 160, Canberra ACT 2601 VOLUME 40 December 2004/January 2005 NUMBER 12 PRESIDENT’S ❆ ❇ ❈ ❉ ❊ ❋ ❃ ❄ ❅ ❃ ❄ ❅ ❆ ❇ ❅ ❆ ❆ ❇ ❈ PRATTLE CHRISTMAS The year’s end leads inevitably to PARTY retrospection. Certainly, this year began better than last. At least there 6pm, Sunday were no fires. It has been a good year and our appreciation goes 12 December especially to the leaders on whom the club has depended over the year. At the home of Michelle Weston and Barry Keeley, It takes effort to generate walks – they don’t just happen. 32 Arndell St, Macquarie Roger Edwards was one of the first Fully catered, all you need to leaders I met on joining the club in bring is $15 and drinks 1995. I have done many of his walks P.S. Don’t forget a fold-up chair – and bottle opener! over the years. Roger frequently leads off track – he particularly enjoys ❆ ❇ ❈ ❉ ❊ ❋ ❃ ❄ ❅ ❃ ❄ ❅ ❆ ❇ ❅ ❆ ❆ ❇ ❈ climbing things and exploring rocky outcrops - so his walks are secretary himself, Rob Horsfield. Bay and home. Ross may put more always different and new. I thought Rob, who often co-leads with his coast walks on the program from it quite an achievement last year to wife, Jenny, has a relaxed approach time to time, keep an eye out for take him to a place he had never which masks a superb set of bush them if you like the coast. seen before. Roger started leading skills which are always in play I have immensely enjoyed the club walks in 1990 and has just ticked when we head off on a walk.
    [Show full text]
  • Inquiry Into Proposed Sale of Snowy Hydro Limited
    Supplementary Submission No 23a INQUIRY INTO PROPOSED SALE OF SNOWY HYDRO LIMITED Organisation: Name: Mr Lance Endersbee Telephone: Date Received: 31/05/2006 Theme: Summary ATSE - Endersbee Page 1 of 22 Home Conferences and THE SPIRIT OF THE SNOWY - FIFTY YEARS ON Events Home › Publications › Symposia Proceedings › 1999 › Endersbee President's Welcome About ATSE Academy Symposium, November 1999 Divisions The Snowy Vision and the Young Team - The First Decade of Engineering for the Snowy Committees Mountains Scheme Publications Annual Reports Em Professor L A Endersbee AO Special Reports SYNOPSIS Symposia Proceedings The concept of the Snowy Mountains Scheme captured the imagination of all those involved. ATSE Focus From the beginning, the challenges of the project attracted young and capable people. They were supported by wise Government leadership, and encouraged to accept tasks to the full limit of their capacity. They had access to the best world Statements experience. Occasional Papers As the work proceeded, new challenges arose. Problems were being solved as they arose in practice, and innovations Orations were being adopted without any delays to the overall progress. There was excellent co-operation within the Snowy team of engineers involved in investigation, design, and contract administration, geologists and laboratory scientists, IRC Publications and with the contractors. There was a united focus on achievement. Academy Policies and Submissions The scheme evolved in overall concept and was improved in detail. The project was finally completed not only on time and within the original estimate, but with much greater installed capacity and electricity output, and with much Projects greater water storage. That ensured secure water releases for irrigation in long term drought.
    [Show full text]
  • Work Commences for Snowy 2.0
    Autumn 2019 Work commences for Snowy 2.0 In this edition: Snowy 2.0 gets the green light Tailem Bend powers up Mick Edwards wins Apprentice of the Year Tumut's Gadara School gets a new bus WE WELCOME YOUR FEEDBACK: [email protected] 1800 623 776 ISSUE 44 Wallaces Creek Lookout Work commences for Snowy 2.0 CEO Paul Broad provides an update on our key achievements at Snowy Hydro in the last few months... What a few months it has been since our last ageing fleet of thermal power stations. In short, it edition of Snowy Hydro NEWS. Since December will keep our energy system secure. we have named our preferred tenderers for Snowy 2.0, received the NSW Government's Snowy 2.0 is not only a sound business planning approval for the Exploratory Works investment for Snowy Hydro, with more than 8% program, achieved shareholder approval of the return on investment. It also represents the most project and following all of that we commenced cost-effective way to ensure a reliable, clean construction. power system for the future. At Snowy we have a proud history and a strong When it is completed, Snowy 2.0 will be able to vision. Snowy Hydro, supercharged by Snowy 2.0, deliver 2000 megawatts (MW) of on-demand will underpin Australia’s renewable energy future generation, up to 175 hours of storage, and deliver and keep the lights on for generations to come. more competition that will keep downward pressure on prices. It’s an exciting time for our Company.
    [Show full text]
  • Chapter 8A Version 7 Participant Derogations
    NATIONAL ELECTRICITY RULES CHAPTER 8A VERSION 7 PARTICIPANT DEROGATIONS CHAPTER 8A Page 568 NATIONAL ELECTRICITY RULES CHAPTER 8A VERSION 7 PARTICIPANT DEROGATIONS 8A. Participant Derogations Purpose of the Chapter This Chapter contains the participant derogations for the purposes of the National Electricity Law and the Rules. Page 569 NATIONAL ELECTRICITY RULES CHAPTER 8A VERSION 7 PARTICIPANT DEROGATIONS Part 1 - Derogations Granted to South Australian Generators [Deleted] Page 570 NATIONAL ELECTRICITY RULES CHAPTER 8A VERSION 7 PARTICIPANT DEROGATIONS Part 2 - Derogations Granted to EnergyAustralia 8A.2 Derogation from clause 3.18.2(g)(2) - Auctions and eligible persons 8A.2.1 Definitions In this participant derogation, rule 8A.2: commencement date means the day the National Electricity Amendment (EnergyAustralia Participant Derogation (Settlement Residue Auctions)) Rule 2006 commences operation. EnergyAustralia means the energy distributor known as EnergyAustralia and established under the Energy Services Corporations Act 1995 (NSW). 8A.2.2 Expiry date This participant derogation expires on the earlier of: (1) 30 June 2009; (2) the date that EnergyAustralia's retail business is transferred to a new legal entity pursuant to a NSW Government restructure of EnergyAustralia or by any other means; (3) the date that EnergyAustralia ceases to engage in the activity of owning, controlling or operating a transmission system; (4) the first date after the commencement date on which EnergyAustralia engages in the activity of owning, controlling or operating a transmission system that NEMMCO determines, in accordance with the criteria developed pursuant to clause 5.6.3(i), is capable of having a material impact on interconnector capability; or (5) the date that EnergyAustralia is not excluded from entering into SRD agreements under clause 3.18.2(g)(2).
    [Show full text]
  • Snowy 2.0 Update - Exploratory Works Underway
    6/23/2021 All systems go - latest news from Snowy Hydro Snowy 2.0 update - Exploratory Works underway The Snowy 2.0 Exploratory Works are well underway and there has been plenty of progress on the project. Roads contractor Leed Engineering and Construction has forged ahead with upgrades to Lobs Hole Ravine Road, despite some periods of wild winter weather, and these are due to be completed by the end of the year. A temporary pedestrian bridge is also being installed across Wallace Creek to enable our principal contractor Future Generation access to the exploratory tunnel portal site. When access is completed, the first tunnel construction will get underway with drill and blast methodology. This exploratory tunnel will allow further geological investigations to be carried out at the underground cavern location, with horizontal core hole drilling conducted in-situ. This work is very important as it provides us with information needed to finalise the technical design of the power station cavern, which will be located hundreds of metres below ground. Construction of the first workers’ accommodation camp is due to start in coming months and should be finished early next year. Initially, during the Exploratory Works phase, the accommodation units will be home to around 150 people. Each single bedroom unit will contain an ensuite, bed, desk, television, small refrigerator and reverse-cycle air conditioner. The Exploratory Camp will also have a gym, recreational facilities, dining area and kitchen. Given the project’s location in the Snowy Mountains, all of these buildings are built to withstand up to three metres of snow! Snowy Hydro hosted its latest round of community consultations in July and August, with staff from Future Generation also attending.
    [Show full text]
  • Future Generation and Voith Hydro. SNOWY
    ISSUE 45 WINTER 2019 ALL SYSTEMS ARE G ! Introducing Future Generation Guthega Station gets an upgrade Celebrating 70 years of Snowy Out and about in the community INSIDE CEO UPDATE 3 CEO UPDATE CEO Paul Broad gives an update on our key 4 SNOWY 2.0: PROJECT UPDATE achievements at Snowy Hydro in the last few months. 6 INTRODUCING FUTURE GENERATION JOINT VENTURE AND VOITH HYDRO 8 SNOWY 2.0: FEEDBACK SURVEY elcome to the 45th edition In April, we appointed the Future Generation of Snowy Hydro NEWS, Joint Venture as principal contractor to 9 DISCOVER THE SNOWY SCHEME which features a fresh new construct Snowy 2.0. Increasingly you will see 10 GUTHEGA CONTINUES TO MAKE HISTORY look and the latest news and Future Generation staff around the region and information about Snowy there is an introductory story about them in this 12 OUR PROUD HISTORY WHydro, especially for the Snowy Mountains newsletter. community. 13 70 YEARS OF SNOWY Later this month, the Snowy team will once It has been 70 years since the first blast marked again be hosting Snowy 2.0 community 14 PART OF THE COMMUNITY the start of the Snowy Scheme. Since then, information sessions across Snowy Mountains investment in and maintenance of our assets towns. We look forward to seeing you there has ensured we can help keep the lights on with the first session on June 25. across the National Electricity Market. On the retail front, Red Energy’s award- Renewal and upgrade works are ongoing on winning service and commitment to delivering the Scheme, with the current works including a additional value for customers is highlighted by major operation at our inaugural power station, passing the one-year mark with our Red Energy Guthega, to replace the generator in Unit 1 after Qantas Frequent Flyer offer.
    [Show full text]
  • Snowy Hydro Water Operations Reference Report
    SNOWY HYDRO WATER OPERATIONS REFERENCE REPORT Snowy Hydro Limited ABN 17 090 574 431 Level 37, AMP Centre, 50 Bridge Street, Sydney NSW 2000, GPO Box 4351 Sydney NSW 2001 Telephone: 02 9278 1888 Facsimile: 02 9278 1879, www.snowyhydro.com.au Snowy Hydro Water Operations Reference Report TABLE OF CONTENTS GLOSSARY.....................................................................................................................................................................1 INTRODUCTION...........................................................................................................................................................4 2. PURPOSE OF THIS DOCUMENT......................................................................................................................4 2.1 STATEMENT OF PURPOSE ..................................................................................................................................4 THE WATER OPERATIONS OF THE SNOWY SCHEME.....................................................................................5 3. SNOWY HYDRO ...................................................................................................................................................5 4. THE SNOWY SCHEME .......................................................................................................................................5 4.1 INTRODUCTION .................................................................................................................................................5
    [Show full text]
  • Hydropower and Dams
    Hydropower and Dams Capability Statement Contents Capability Statement: Hydropower and Dams For further information please contact: Global . Jacques du Plessis – Knowledge Manager: Hydropower and Dams . T: +27 (0) 36 342 3159 . M: +27 (0) 83 656 0088 . E: [email protected] Indonesia . Hille Kemp or Yuliant Syukur . T: +62 (0) 21 750 4605 . M: +62 811 9624 192 . E: [email protected] . E: [email protected] Philippines . Rudolf Muijtjens – Project Manager . T: +63 2 755 8466/67 . M: +63 915 7712200 . M: +31 6 29376569 . E: [email protected] Netherlands/Belgium . Leon Pulles – Investment Consultant / Investment Services . M: +31 6 4636 3481 . E: [email protected] . ir. Tom Van Den Noortgaete - Project Manager / Consultant Sustainable Energy . M: +32 494 84 72 14 . E [email protected] Poland . Ryszard Lewandowski – Technical Director Poland . T: +48 (0) 22 531 3403 . M: +48 (0) 604 967 855 . E: [email protected] South Africa . Jan Brink . T: +27 (0) 44 802 0600 . M: +27 (0) 84 723 1141 . E: [email protected] Copyright © June 2016 HaskoningDHV Nederland BV Project details throughout this document may have been utilised the services of companies previously acquired by Royal HaskoningDHV. Hydropower & Dams © Royal HaskoningDHV 1 Contents 1 Contents 1 Introduction ................................................................................................................. 3 1.1 Introduction to Hydropower ...............................................................................................................................
    [Show full text]
  • Kosciuszko National Park Closed Areas Date: 16 February 2020 at 10:55 To: [email protected]
    From: Brindabella Ski Club [email protected] Subject: Kosciuszko National Park Closed Areas Date: 16 February 2020 at 10:55 To: [email protected] Sections of Kosciuszko National Park have been reopened, but areas which have been burnt or have ongoing fire suppression operations remain closed. Areas Recently Opened: • All areas south of Mt Jagungal and east of the following roads / trails are open to the public: Khancoban – Cabramurra Rd, Alpine Way and Cascade Trail (refer to map). This includes all backcountry areas which have not been impacted by fire. Overnight camping is permitted in these areas. This includes: o Kosciuszko Road - Jindabyne to Charlotte Pass o Guthega Road - Kosciuszko Road to Guthega Village o Charlotte Pass, Perisher Valley, Smiggin Holes, Guthega, Diggers Creek, Wilsons Valley, Sawpit Creek, Waste Point – visitors need to check whether resort facilities and hospitality venues are open for business o Alpine Way between Jindabyne and Thredbo Village o Thredbo Village and Thredbo resort lease area o Ngarigo, Thredbo Diggings and Island Bend campgrounds - for day use and overnight camping o Snowy Mountains Highway – visitors must stay within the road corridor and be aware of hazards such as damaged buildings and burnt trees o Blowering campgrounds - Log Bridge, The Pines, Humes Crossing and Yachting Point o All walks on the Main Range, including to Mt Kosciuszko and surrounding the alpine resort areas o Barry Way – open to the Victorian border. Lower Snowy picnic and campgrounds are open and include; Jacobs River, Halfway Flat, No Name, Pinch River, Jacks Lookout and Running Waters o Schlink Pass trail and associated huts (Horse Camp Hut, White River Hut, Schlink Hut, Valentine Hut) o Mt Jagungal.
    [Show full text]
  • Chapter 11 Version 58 Savings and Transitional Rules
    NATIONAL ELECTRICITY RULES AS IN FORCE IN THE NORTHERN TERRITORY CHAPTER 11 VERSION 58 SAVINGS AND TRANSITIONAL RULES SAVINGS AND TRANSITIONAL RULES CHAPTER 11 Page 927 NATIONAL ELECTRICITY RULES AS IN FORCE IN THE NORTHERN TERRITORY CHAPTER 11 VERSION 58 SAVINGS AND TRANSITIONAL RULES 11. Savings and Transitional Rules Parts A to ZZI, ZZK, ZZL, ZZN (except for clause 11.86.8), ZZO to ZZT, ZZV and ZZX have no effect in this jurisdiction (see regulation 5A of the National Electricity (Northern Territory) (National Uniform Legislation) (Modification) Regulations). The application of those Parts may be revisited as part of the phased implementation of the Rules in this jurisdiction. Part ZZJDemand management incentive scheme 11.82 Rules consequential on making of the National Electricity Amendment (Demand management incentive scheme) Rule 2015 11.82.1 Definitions (a) In this rule 11.82: Amending Rule means the National Electricity Amendment (Demand Management Incentive Scheme) Rule 2015. commencement date means the date Schedules 1, 2 and 3 of the Amending Rule commence. new clauses 6.6.3 and 6.6.3A means clauses 6.6.3 and 6.6.3A of the Rules as in force after the commencement date. (b) Italicised terms used in this rule have the same meaning as under Schedule 3 of the Amending Rule. 11.82.2 AER to develop and publish the demand management incentive scheme and demand management innovation allowance mechanism (a) By 1 December 2016, the AER must develop and publish the first: (i) demand management incentive scheme under new clause 6.6.3; and (ii) demand management innovation allowance mechanism under new clause 6.6.3A.
    [Show full text]
  • Transgrid Transmission Annual Planning Report 2014
    NEW SOUTH WALES Transmission Annual Planning Report 2014 Disclaimer The New South Wales Transmission Annual Planning Report 2014 is prepared and made available solely for information purposes. Nothing in this document can be or should be taken as a recommendation in respect of any possible investment. The information in this document reflects the forecasts, proposals and opinions adopted by TransGrid as at 30 June 2014 other than where otherwise specifically stated. Those forecasts, proposals and opinions may change at any time without warning. Anyone considering this document at any date should independently seek the latest forecasts, proposals and opinions. This document includes information obtained from AEMO and other sources. That information has been adopted in good faith without further enquiry or verification. The information in this document should be read in the context of the Electricity Statement of Opportunities and the National Transmission Network Development Plan published by AEMO and other relevant regulatory consultation documents. It does not purport to contain all of the information that AEMO, a prospective investor or Registered Participant or potential participant in the NEM, or any other person or Interested Parties may require for making decisions. In preparing this document it is not possible nor is it intended for TransGrid to have regard to the investment objectives, financial situation and particular needs of each person or organisation which reads or uses this document. In all cases, anyone proposing to rely on or use the information in this document should: 1. Independently verify and check the currency, accuracy, completeness, reliability and suitability of that information; 2.
    [Show full text]