Government of

OUTCOME BUDGET 2016-17

Rural Development Department

Outcome Budget: DoRD for 2016-17 Page 1

CONTENTS

Sl. No. Contents Page No.

1. EXECUTIVE SUMMARY 3-8

2. CHAPTER-I Introduction 9-25

3. CHAPTER-II Outcome Budget 26-121 2016-17 Statement (Plan & Non-Plan)

4. CHAPTER-III Reform Measures 122-123 & Policy Initiatives

5. CHAPTER-IV Past performance 124-134 of prgammes and schemes

6. CHAPTER-V Financial Review 135-145

7. CHAPTER-VI Gender and SC/ST 146 Budgeting

Outcome Budget: DoRD for 2016-17 Page 2 EXECUTIVE SUMMARY

The Outcome Budget of Rural Development Department broadly indicates physical dimensions of the financial outlays reflecting the expected intermediate output. The Outcome Budget is a tool to monitor not just the immediate physical "outputs" that are more readily measurable but also the "outcomes" which are the end objectives.

2. The Outcome Budget 2016-17 broadly consists of the following chapters:

 Chapter-I: Brief introduction of the functions, organizational set up, list of major programmes/schemes implemented by the Department, its mandate, goals and policy frame work.

 Chapter-II: Tabular format(s)/statements indicating the details of financial outlays, projected physical outputs and projected outcomes for 2016-17 under Plan and Non-Plan.

 Chapter-III: The details of reform measures and policy initiatives taken by the Department during the course of the year.

 Chapter-IV: Write-up on the past performance of the year 2014-15 and 2015- 16 (up to March-2016).

 Chapter-V: Actual of the year preceding the previous year, Budget Estimates and Revised Estimates of the previous year, Budget Estimates of the Current Financial year.

 Chapter-VI: Highlights of the outlays provided for the schemes benefiting Women, ST and SC groups along with the corresponding physical output.

Outcome Budget: DoRD for 2016-17 Page 3 Monitoring Mechanism of Rural Development Department

The establishment of the Millennium Development Goals has significantly reinforced the concerns about non-income poverty. With the paradigm shift in economic development from growth to broadly defined “development”, the concept of rural development has begun to be used in a broad sense. The concept now encompasses “concerns that go well beyond improvement in growth, income and output”. Connectivity – physical like roads, water and sanitation services to our people in rural areas is not an administration but a mission.

Road transport is vital for the economic development and social integration of the country. Easy accessibility, flexibility of operations, door-to-door service and reliability have earned road transport an increasingly higher share of both passenger and freight traffic vis- à-vis other transport modes. Transport sector accounts for a share of 6.4 percent in ’s Gross Domestic Product (GDP). The Road Transport Sector has grown significantly during the past five decades. Road Transport has deep linkages with the rest of the economy and a strong multiplier effect. Transport is essentially a derived demand depending upon the size and structure of the economy and the demographic profile of the population. Greater the share of commodity-producing sectors like agriculture and manufacturing, higher is the demand for transport. Orissa’s surge in growth and expansion in public spending in the past decade has created new possibilities for its social protection system. Social protection strategy must aim at mitigating water poverty in rural areas. The Government is firmly committed to the goal of providing safe drinking water and sanitation facilities to the entire population of the State. The Government is equally committed to the objective of ensuring source and system sustainability. Despite the efforts put forth in the past, there is a growing concern over the widening gap between the expectations of the people and the achievements. Paucity of funds, over-exploitation of water resources, degradation of water recharge structures, competing demand on the available water resources, depleting water availability due to continuous failure of monsoon are some of the factors that cause concern on the supply front.

There is an inbuilt monitoring mechanism in the guidelines of each scheme of the Department so as to ensure that the objectives are achieved by their implementation.

Outcome Budget: DoRD for 2016-17 Page 4 The Department has 13 Sections. Two sections namely (1) Budget and (2) PMGSY are headed by one F.A.-cum-Addl. Secretary with support of one AFA-cum-Under Secretary. Eleven sections like (1) Office Establishment, (2) RWS&S (Scheme), (3) RWS&S (Field Establishment), (4) RW (Scheme), (5) RW (Field Establishment), (6) e-Governance, (7) Legal Cell, (8) RTI/PMU, (9) Bill and Cash, (10) Coordination and (11) DAK are being headed by One Additional Secretary supported by One Joint Secretary, One Deputy Secretary, Two Under Secretaries, One Law Officer and Two Consultants.

The Department has a huge field formation with 2 EICs, 6 Chief Engineers at Heads of Dept. level (1 EIC & 4 Chief Engineers in Rural Works Organization and 1 EIC & 2 Chief Engineers in Rural Water Supply and Sanitation Organization), 23 circles headed by S.Es at Circle level (15-RW + 8-RWS&S) and 103 Divisions headed by Executive Engineers at District level ( 65-RW and 38-RWS&S) and 321 Sub-Divisions (RW- 228+ RWS&S-93)headed by Deputy Executive Engineer (DEE)/Asst. Executive Engineers (AEE) at Sub-Division level, 1064 Sections (RW- 678 + RWS&S-386) headed by DEEs/AEEs and AEs/JEswho are looking after the functioning of this Department. This is in addition to 314 JEs engaged for O&M and sanitation work in each Panchayat Samiti/Block. There are two Agencies namely (i) Odisha State Rural Road Agency (OSRRA)- chaired by Hon'ble Minister RD, to monitor the PMGSY works and (ii) Odisha State Water & Sanitation Mission (OSWSM) - chaired by the Chief Secretary, to monitor/execute the Swachha Bharat Abhiyan (Gramin) (previously known as Nirmal Bharat Abhiyan/Total Sanitation Campaign programme). Apart from continuous monitoring through periodical progress reports received from the office of EICs on both the financial and physical progress of the programmes, Principal Secretary monitors the progress of the schemes through Video Conference regularly. The Department also emphasizes on eGovernance. Emphasis is being given on both quality and quantity of physical progress. For effective monitoring of quality of works for non-PMGSY works Third Party Quality Monitoring System is being established. To monitor the physical progress of each project, provision has been made in WAMIS for uploading the geo-tagged photographs of works. This system will facilitate the high level officers to monitor both the physical as well as financial progress of projects. The Department is also planning to have a Web GIS Asset Management Information System taking all Roads, Buildings, Bridges/culverts and PWS installations with the help of C-DAC and ORSAC.

Outcome Budget: DoRD for 2016-17 Page 5 Furnishing of statement of expenditure, Utilization Certificates, Audited Accounts and other requisite reports are submitted for the release of subsequent installments.

The officer dealing with the implementation of the programmes visits regularly the site to ensure that the programmes are being implemented satisfactorily.

Officers visit their assigned districts at regular intervals and the important observations of such teams are shared with the Department advising them to take appropriate corrective measures, wherever shortcomings are noticed.

A Performance Review Committee under the chairmanship of Principal Secretary reviews the performance of various programmes being implemented by the districts and recommends corrective action wherever found necessary.

With a view to fulfilling the objective of ensuring quality in implementation, particularly in the context of large public funds being spent under all the programmes of the Department the Monitoring Committees are constituted.

Work Plan for DoRD for the Financial Year 2015-16 was prepared with due consultation of all stake holders. The work plan was drawn up taking into account the annual budget provisions and past performance of respective areas of work. The Chief Engineers were asked to draw up similar month wise and head of expenditure wise financial and physical plans for all the Divisions to enable field functionaries to appreciate the purpose and benefit of Results Framework Approach. Evaluation has been made basing on the scheme-wise weightage provided to physical targets. It is found that during the financial year 2015-16, the achievement was about 91.42% (State Plan-93.56%, Non-Plan-81.85%).

Public Information System

Information, Education and Communication (IEC) plays a vital role in creating awareness, mobilizing people and making the development participatory through advocacy and by transferring knowledge, skills and techniques to the people. Moreover, IEC plays two most important roles – informative and persuasive and as such is crucial for bringing about requisite social mobilization and facilitating participatory development.

The following strategy that has been adopted by the Department would be continued to ensure maximum benefits out of the programmes of the Department.

Outcome Budget: DoRD for 2016-17 Page 6 Sanjog Initiative

Sanitation is essential to ensure a better quality of life among all sections of people in rural and urban areas. 80% of common diseases are caused by lack of sanitation and personal hygiene practices. Swatchha Bharat Mission (SBM)-Gramin(G) does not limit itself to safe disposal of human excreta; it forms a comprehensive concept that includes safe disposal of solid and liquid waste, domestic and personal hygiene. SBM in Odisha is being implemented in all the 30 districts of the State. The Programme is “community-led” and “people-centered” with increased stress on awareness creation and demand generation from people for sanitary facilities in householdsfor cleaner environment. The present Operational Guidelines and booklet on Technology Options are developed to guide district as well as field functionaries and core team members in smooth implementation of the programme. This is necessary because of low coverage of IHL construction and less involvement of Panchayati Raj Institutions specifically Gram Panchayats in the program.

The Sarpanch will monitor the progress of the household, school and anganwadi sanitation in the GP. He /she will be supported by a team of AWWs, ASHA, SEM and village motivators to make household visits, and assess the participation of the households, installation of complete and usable toilets, technologically appropriate and fitted correctly to ensure best benefits to the community. An appropriate superstructure should also be done to render the toilet usable immediately. The completed toilets will be verified by a two member team consisting of SEM and AWW, AWW and ASHA or the SEM and ASHA. The implementing agency, SHGs, the AWWs, ASHA, and Sarpanch will continue to advocate the use of toilets after the installation is complete.

They should also emphasize the importance of other associated hygiene practices, hand washing with soap after defecation and before handling food, safe disposal of child fecal, safe disposal of waste water and solid waste, cleanliness around hand pumps, clean tube well platforms etc.Nirmal Gram Puraskar has been awarded to 236 Gram Panchayats for achieving total sanitation and open defecation free environment by HE President of India e-Initiatives

Efficiency of delivery is increasingly becoming the focus of governmental programmes. This is both on account of an explicit recognition of sub-optimal achievements in reaching the targeted beneficiaries in many of the schemes as well as in curbing wasteful

Outcome Budget: DoRD for 2016-17 Page 7 expenditure. Realizing this, new tools, particularly application of modern technology are being resorted to in achieving governance and delivery efficiency.

As per section 4 of Right to Information Act, 2005 every public authority shall maintain all its records duly catalogued and indexed in a manner and the form which facilitates the right to information under this Act and ensure that all records that are appropriate to be computerized are, within a reasonable time and subject to availability of resources, computerized and connected through a network all over the country on different systems so that access to such records is facilitated. The Act U/S 4-4 further says that all materials shall be disseminated taking into consideration the cost effectiveness, local language and the most effective method of communication in that local area and the information should be easily accessible, to the extent possible in electronic format with the Central Public Information Officer or State Public Information Officer, as the case may be, available free or at such cost of the medium or the print cost price as may be prescribed.

The e-Initiatives of RD department were meant to answer the above need and convert this threat into an opportunity to automate the processes that can be done using latest technology platforms. e-Dispatch, iOTMS, e-Procurement, LMS, OMMAS, IMIS, WAMIS, e-Abhiyog, Sanjog Helpline and OSWAS were major steps, taken. In addition to the above the website of RD Department are maintained and updated regularly.

Road Ahead Rural Development Department is in charge of construction and maintenance of rural roads, rural Govt. buildings (both residential and non-residential) and water supply installations. We have got plan to connect habitations with population 250 and above in 18 IAP districts and habitations with population 500 & above in plain areas and 250 and above in schedule area for balance 12 Non-IAP districts in phased manner. During 2015-16, approx. 500 habitations were targeted to be provided with all-weather connectivity. Out of such habitations, connectivity has been provided to 418 unconnected habitations. Similarly we have less than 2% rural house hold with tap-water in their household. 74 lakh rural household require 3-taps (kitchen bathroom and toilet) in their households to enjoy water security at household level. Sanitation coverage among BPL is encouraging but the same among APL is not so. This may require more intensive and extensive IEC campaign for times ahead.

Outcome Budget: DoRD for 2016-17 Page 8 CHAPTER-I

INTRODUCTION

The concept of rural development has changed significantly during the last 3 decades. Until the 1970s, rural development was synonymous with agricultural development and, hence, focused on increasing agricultural production. This focus seems to have been driven primarily by the interests of industrialization to extract surpluses from the agriculture sector to reinforce industrialization. Four major factors appear to have influenced the change: increased concerns about the persistent and deepening of rural poverty; changing views on the meaning of the concept of development itself; emergence of a more diversified rural economy in which rural non-farm enterprises play an increasingly important role; and increased recognition of the importance of reducing the non-income dimensions of poverty to achieve sustainable improvements in the socio-economic well-being of the poor. The establishment of the Millennium Development Goals has significantly reinforced the concerns about non-income poverty. With the paradigm shifts in economic development from growth to broadly defined “development,” the concept of rural development has begun to be used in a broader sense. The concept now encompasses “concerns that go well beyond improvements in growth, income, and output. The concerns include an assessment of changes in the quality of life, broadly defined to include improvement in health and nutrition, education, environmentally safe living conditions, and reduction in gender and income inequalities.” Today there seems to be a universal consensus that the ultimate objective of rural development is to improve the quality of life of rural people. This makes it essential to go beyond the income-related factors such as prices, production, and productivity to a range of non-income factors that influence quality of life and hence inclusiveness. Inclusive rural development is a more specific concept than the concept of rural development. Rural upliftment requires strong commitment, patience and perseverance. It is a challenging but interesting task. The Govt. can not by itself provide the required services/comforts without the cooperation of the all stake-holders Physical connectivity like construction of roads and bridges and providing adequate safe drinking water as well as sanitation services to our rural population is indeed a mission and not a mere administrative function. With this concept, R.D. Department was created on 1st July, 1990 to look after sectors like construction of rural roads, buildings construction & maintenance of rural water

Outcome Budget: DoRD for 2016-17 Page 9 supply projects and implementation of sanitation programmes to enhance the quality of life of rural population of the State. Work Plan for DoRD for the Financial Year 2015-16 is prepared with due consultation of all stake holders.The work plan was drawn up taking into account the annual budget provisions and past performance in respective areas of work. The Chief Engineers were asked to draw up similar month wise and head-wise financial and physical plans for all the divisions to enable field functionaries to appreciate the purpose and benefit of Results Framework Approach. We propose to continue this in current financial year.

The Rural Development Department in its present form consists of two organisations namely (i) Rural Works (R.W.) (ii) Rural Water Supply & Sanitation (RWS&S).

Organisational Setup:

The Department has 13 Sections. Two sections namely (1) Budget and (2) PMGSY are headed by one F.A.-cum-Addl. Secretary with support of one AFA-cum-Under Secretary. Eleven sections like (1) Office Establishment, (2) RWS&S (Scheme), (3) RWS&S (Field Establishment), (4) RW (Scheme), (5) RW (Field Establishment), (6) e-Governance, (7) Legal Cell, (8) RTI/PMU, (9) Bill and Cash, (10) Coordination and (11) DAK are being headed by One Additional Secretary supported by One Joint Secretary, One Deputy Secretary, Two Under Secretaries, One Law Officer and Two Consultants.

The Department has a huge field formation with 2 EICs, 6 Chief Engineers at Heads of Dept. level (1 EIC & 4 Chief Engineers in Rural Works Organization and 1 EIC & 2 Chief Engineers in Rural Water Supply and Sanitation Organization), 23 circles headed by S.Es at Circle level (15-RW + 8-RWS&S) and 103 Divisions headed by Executive Engineers at District level (65-RW and 38-RWS&S) and 321 Sub-Divisions (RW-228 + RWS&S-93) headed by Deputy Executive Engineers (DEE) at Sub-Division level, 1064 Sections (RW- 678 + RWS&S- 386) headed by AEEs and AEs/JEs who are looking after the functioning of this Department. This is in addition to 314 JEs engaged for O&M and sanitation work in each Panchayat Samiti/Block. There are two Agencies namely (i) Odisha State Rural Road Agency (OSRRA)- chaired by Hon'ble Minister RD, to monitor the PMGSY works and (ii) Odisha State Water & Sanitation Mission (OSWSM) - chaired by the Chief Secretary, to monitor/execute the Swachha Bharat Abhiyan (Gramin) (previously known as Nirmal Bharat Abhiyan/Total Sanitation Campaign programme)Principal Secretary is the Chief Executive Officer to monitor the work of the Department.

Outcome Budget: DoRD for 2016-17 Page 10

ORGANISATIONAL STRUCTURE

SECRETARIAT ESTABLISHMENT

PRINCIPAL SECRETARY

ADDITIONAL SECRETARY FINANCIAL ADVISOR - cum - ADDITIONAL SECRETARY Deputy Secretary Joint Secretary AFA-CUM-UNDER SECRETARY Under Secretary Under Secretary (1) Bill and Cash (1) RWS&S (1) Office (1) RW (Field 1. Budget Section (2) Coordination (Field Est.) Establishment Est.) (Audit Report, (2) RWS&S (2) RTI/IMU (2) RW (Scheme) compliance (Scheme) (3) Legal Cell to SVP Report, (3) e-Gov. Cell Inspection (4) DAK Report, Efficiency Audit Section Report) (Despatch, 2.PMGSY Diary and Distribution)

Outcome Budget: DoRD for 2016-17 Page 11 RURAL WORKS ORGANISATION

1.ENGINEER-IN-CHIEF,R.W 2.CHIEF ENGINEER,PMGSY 3.CHIEF ENGINEER,Buildings 4.CHIEF ENGINEER,Scheme 5.CHIEF ENGINEER,Plan Roads (Bridges,Road Maint., Establishment & (PMGSY Programme) (RuralBuildings of RD & other Deptt. (MMSY,Bailey Bridges & SARCA) (RD roads Const. & Improvement) CEO,OSRRA)

CIRCLES DIVISIONS CIRCLES DIVISIONS CIRCLES DIVISIONS CIRCLES DIVISIONS

1.S.E., 1. 4. S.E. 1. KEONJHAR 7. S.E., 1. -I 10. SE, 1.-I RW CIRCLE, ANGUL 2. NORTH EASTERN 2. KEONJHAR-II RW CIRCLE 2. GANJAM-II RW CIRCLE, 2.CUTTACK-II 3. CIRCLE, 3. 3.GAJAPATI CUTTACK 3. KEONJHAR 4. 5. 4. -I

6. 5. JAJPUR-II 7.MOHANA8.BALIGUDA

2.S.E. 1. 5. SE 1. 8. SE, 1. 11. S.E. ELECT., 1.ELECT. BHUBANESWAR CENTRAL CIRCLE, BBSR 2. RW CIRCLE 2. MALKANGIRI-I RW CIRCLE 2. BBSR 2.ELECT. SAMBALPUR 3. 3. MALKANGIRI-II SAMBALPUR 3. 3.ELECT. BERHAMPUR 4.NAYAGARH-II 4.-I 4. 4. MECH. BBSR 5. NIMAPARA 5.NABARANGPUR-II 5. DEOGARH 6. 7. SUNABEDA 8.JAYPUR9.

3.SE, 1. -I 6. SE, 1. 9. SE, 1. BOLANGIR 12. S.E. P.H., BBSR 1. PH, BBSR RW CIRLCE, BALASORE 2. BALASORE-II RW CIRCLE 2. RW CIRCLE 2. TITILAGARH 3. JALESWAR BHAWANIPATNA 3. DHARMAGARH BOLANGIR 3.SONEPUR 4. -I 4. 4.PATNAGARH

5. BHADRAK -II 5.KHARIAR

13.SE, 1. 14.SE, 1. SUNDARGARH-I 15.SE, 1.-I RW CIRLCE, BARIPADA 2. RW CIRLCE, 2. RW CIRLCE, 2.KENDRAPARA-II 3.RAIRANGPUR SUNDARGARH 3. KENDRAPARA

EIC OFFICE ENGINEERS 8 POSTS OF SUPERINTENDING ENGINEERS 11 POSTS OF EXECUTIVE ENGINEERS

Outcome Budget: DoRD for 2016-17 Page 12 RURAL WATER SUPPLY & SANITATION ORGANISATION

ENGINEER-IN-CHIEF CHIEF ENGINEER CHIEF ENGINEER (Overall charge of Rural Water Supply (Water Supply) (Rural Sanitation) Establishment, Budget,installation, repair & ( In charge of PWS and deposit works) ( In charge of Swachha Bharat Mission(G)) maintenance of spot sources) 1. S.E. 2. S.E. 3. S.E. 4. S.E. 5. S.E. 6. SE 7. SE BOLANGIR 8. SE BALASORE BHUBANESWAR CUTTACK SAMBALPUR BERHAMPUR KORAPUT PLANNING MONITORING, DESIGN & INVESTIGATION, BBSR

DIVISION DIVISION DIVISION DIVISION DIVISION DIVISIONS DIVISIONS DIVISIONS 1. PURI 1. CUTTACK 1. SAMBALPUR 1. BERHAMPUR 1. KORAPUT 1. MECH., BBSR 2. Khurda 2. KENDRAPARA 2. BARGARH 2. BHANJANAGAR 2. NAWARANGPUR 1. BOLANGIR 1. BALASORE 3. NAYAGARH 3. JAJPUR 3. JHARSUGUDA 3. GAJAPATI 3. MALKANAGIRI 2. MECH., SAMBALPUR 2. NUAPADA 2. BARIPADA 4. DHENKANAL 4. JAGATSINGHPUR 4. SUNDARGARH 4. KANDHAMAL 4.RAYAGADA 3. BHAWANIPATNA 3. RAIRANJGPUR 5. ANGUL at 5. ATHAGARAH 5. ROURKELA 5. BOUDH 4. SONEPUR 4.KEONJHAR 6. DEOGARH 5. KHARIAR PROJ. 5.BHADRAK DIVISION 6.ANANDPAUR

OFFICCE OF THE ENGINEER-IN-CHIEF/OSWSM Executive Engineer (Asst. to CE) Executive Engineer (Design) Executive Engineer - MC-II Executive Engineer -MC-I Executive Engineer – (Tubewell Planning)

Outcome Budget: DoRD for 2016-17 Page 13 Funding

The activities of the DoRD are supported by financial outlays in the Plan and Non-Plan Budget of the State Govt.Besides the grants received from the Central Govt through ministry of Rural Development for implementation of National Rural Drinking Water project on the sharing basis 50:50 in Coverage,Operation & Maintainence and Water Quality programme.Further Govt. of India have provided 100% funds for implementation of Pradhan Mantri Gram Sadak Yojana for construction of all-weather connectivity to all unconnected habitations in rural area of the State having more than or equal to The existing PMGSY scheme aims for providing connectivity to the unconnected habitations of 500 + population in general area and 250+ population in 18 IAP districts & upto 100+ population in 38 LWE blocks.

The funds were previously released by the Govt. of India under PMGSY not routed through State Govt. Budget and the same is directly released to the implementing agency i.e. OSRRA(Odisha State Rural Road Agency). Govt. of India launched “Swachh Bharat Mission (Gramin)” with effect from 2nd October 2014. It aims to achieve Swachh Bharat by 2019, as a fitting tribute to the 150th Birth Anniversary of Mahatma Gandhi. The National Flagship programme of GoI for sanitation i.e. Nirmal Bharat Abhiyan has been restructured and renamed as “Swachh Bharat Mission” (Gramin). The concept of Swachh Bharat encompasses ways to access every person with sanitation facilities including toilets, solid & liquid waste disposal systems, village cleanliness and provision of adequate drinking water. In line with the national goal, Govt. of Odisha has also taken strong initiatives and strives to make Odisha Open Defecation Free (ODF) by 2019 by ensuring construction and use of Individual Household Latrine (IHHL) alongwith environmental cleanliness. Previously, to achieve the above targets, the above mission was addressed tothrough the centrally sponsored “Nirmal Bharat Abhiyan"(NBA) previously known as "Total Sanitation Campaign" (TSC). The SBM programme is being implemented in all the 30 districts of the State. Government of India releases funds through State Govt. budget and the State Govt. releases funds as matching state share after making appropriate provision in the state budget.The entire operation under this campaign is being looked after by the OSWSM of RD Department and the District Water and Sanitation Missions.

Outcome Budget: DoRD for 2016-17 Page 14

The Scheme-wise provision under State Plan for 2016-17 ( in TRS) Sl. Scheme Head of Account BE 2016-17 No. 1 NRDWP 28-2215-01-102-2477-37285 3103200 28-2215-01-789-2477-37285 879240 28-2215-01-796-2477-37285 1189560 SUB TOTAL 5172000 2 Capacity Building 28-2215-01-102-2604-37180 200000 3 NBA 28-2215-02-105-2940-41417-918 4442580 28-2215-02-789-2940-41417-918 1258731 28-2215-02-796-2940-41417-918 1702989 SUB TOTAL 7404300 4 Off.BUILDINGS 28-4059-01-051-2148-37114 102000 28-4059-01-789-2148-37114 28900 28-4059-01-796-2148-37114 39100 SUB TOTAL 170000 5 RES. BUILDINGS 28-4216-01-106-2148-37114 108000 28-4216-01-789-2148-37114 30600 28-4216-01-796-2148-37114 41400 SUB TOTAL 180000 6 Rural Water Supply 28-4215-01-102-0007-37182 2106000 28-4215-01-789-0007-37182 596700 28-4215-01-796-0007-37182 807300 SUB -TOTAL 3510000 7 RIDF 28-4215-01-102-2161-37182 600000 28-4215-01-789-2161-37182 170000 28-4215-01-796-2161-37182 230000 SUB TOTAL 1000000 8 Completion of incomplete 28-5054-04-800-1230-37158 520000 Roads and &Bridges under 28-5054-80-789-1230-37158 119000 different tranches of RIDF 28-5054-80-796-1230-37158 161000 and other schemes SUB- TOTAL 800000 10 Improvement of existing RD 28-5054-04-800-1230-37247 300000 roads 28-5054-80-789-1230-37247 85000 28-5054-80-796-1230-37247 115000 SUB- TOTAL 500000 11 B S Y 28-5054-04-800-2161-37257 2400000 28-5054-80-789-2161-37257 680000 28-5054-80-796-2161-37257 920000 SUB -TOTAL 4000000 12 Dev. of Rural Road 28-5054-04-800-1230-37287 6000 Connectivity 28-5054-80-789-1230-37287 1700 28-5054-80-796-1230-37287 2300 SUB -TOTAL 10000 13 Capacity Building 28-5054-04-800-2604-37180 100000

Outcome Budget: DoRD for 2016-17 Page 15

14. PMGSY 28-5054-04-337-1077-37114 23000000 15. RIDF 28-5054-04-789-2161-37107 127500 28-5054-04-796-2161-37107 172500 28-5054-04-800-2161-37107 450000 SUB -TOTAL 750000 16. MMSY 28-5054-04-800-2161-37286 2250000 28-5054-80-789-2161-37286 637500 28-5054-80-796-2161-37286 862500 SUB- TOTAL 3750000 17 CWA 28-5054-04-789-0906-37107 48280 28-5054-04-796-0906-37107 65320 28-5054-04-800-0906-37107 170400 SUB- TOTAL 284000 18 Biju KBK Yojana 28-5054-04-800-1860-37107 270000 28-5054-80-789-1860-37107 76500 28-5054-80-796-1860-37107 103500 SUB -TOTAL 450000 20 Decretal Dues 28-5054-04-800-2373-14001 2000 21 Construction of Bailey 28-5054-04-101-1230-37281 420000 Bridges 28-5054-04-789-1230-37281 119000 28-5054-04-796-1230-37281 161000 SUB -TOTAL 700000 TOTAL 51982300

The details are as follows:

A. STATE PLAN

(i) Rural Works

A total outlay of 345960.00 lakh has been provided in the year 2016-17 under the roads & bridge sector/building sector of Rural Works Organisation Schemes to be implemented as follows.

1) Construction of R.D.Deptt. Buildings (Non-Residential) ( 1200.00 lakh) A sum of 1200.00lakh has been provided in the year 2016-17 for construction of office buildings for different offices of Rural Development Department. With this allocation it has been proposed to take up office building for different offices such as section offices/sub-division offices/division offices/circle offices for smooth functioning of Rural Works Organisation.

2) Construction of R.D.Deptt. Buildings (Residential) ( 1300.00 lakh) A sum of 1300.00lakh has been provided for construction of residential buildings under Rural Development Department during the year 2016-17. With this allocation it has been proposed to take up residential quarters for those staffs having no residential quarters

Outcome Budget: DoRD for 2016-17 Page 16 of different offices of Rural Works Organisation such as section offices/sub-division offices/division officers/circle offices.

3) Rural Roads and Bridges (NABARD Assisted Project) ( 7500.00 lakh) A sum of 7500.00 lakh has been provided in the year 2016-17 for construction of bridges & roads under NABARD scheme. Through the NABARD assistance, all-weather connectivity in interior rural areas is being made.

4) Road Works (PMGSY) ( 230000.00 lakh) A sum of 230000.00 lakh has been provided for construction of roads & bridges under this scheme during 2016-17. Out of this, 150000.00 lakh have been allocated as Central Share and 80000.00 lakh have been allocated as State Share. Besides this, 1000.00 lakh have been provided under the scheme "Completion of incomplete roads and bridges under different tranches of RIDF & Other Schemes" towards State Contribution to meet the excess cost of construction of bridges, tender premium & labour escalation etc. 5) CWA (Constituency-wise Allocation) ( 2840.00 lakh) 20.00 lakh have been provided for each Assembly constituency (except five urban constituencies) in the budget for the year 2016-17 for improvement of Rural Roads. The works are been taken up on receipt of the work proposals from Hon’ble MLAs.

6) Completion of incomplete roads & bridges under different tranches of R.I.D.F& Other Schemes. ( 7000.00 lakh) A sum of 7000.00 lakh has been earmarked for completion of incomplete roads and bridges under different trenches of RIDF& other schems during the year 2016-17. The incomplete projects taken under different schemes are being undertaken for completion.

7) Capacity Building(Resource & Infrastructure Development) ( 1000.00 lakh)

A sum of 1000.00 lakh has been provided under Capacity Building for Survey Expenses, Survey Equipment, Technical Training,Consultancy Charges-PMU & Quality Monitoring of important roads, bridges & building projects, DPR preparation, Computerisation of offices, WAMIS,GIS, exposure visit inside/outside country etc.during the year 2016-17. 8) Decretal dues ( 20.00 lakh) A sum of 20.00 lakh has been provided to defray the expenses towards payment of compensation as per the award of the court during the year 2016-17. 9) Biju Setu Yojana ( 40000.00 lakh)

40000.00 lakh have been provided for construction of bridges on rural roads under Biju Setu Yojana during 2016-17. Biju Setu Yojana has been launched with a view to provide all-weather connectivity in rural areas. In the initial stage, Government have planned to construct 600 briedges under this scheme. The total cost of 600 bridges has been estimated to 2102.12 crore. This includes 436 bridges on RD roads and 164 on important PS roads. In addition to the above 600 projects, 203 new bridges have been included under BSY during 2015-16.

Outcome Budget: DoRD for 2016-17 Page 17

10) Improvement of existing RD roads. ( 5000.00 lakh) There is a provision of 5000.00 lakh for improvement of existing important R.D. Roads. 11) Biju KBK Yojana. ( 4500.00 lakh) There is a provision of 4500.00 lakhs for improvement of arterial roads in KBK districts during 2016-17. It has been proposed for construction/improvement of rural ruads to provide better communication facilities to the tribal people in the KBK districts. 12) Construction of Bailey Bridges. ( 7000.00 lakh) There is a provision of 7000.00 lakh for construction of 103 Bailey Bridges in inaccessible areas of IAP districts during 2016-17. During 2013-14, RD Deptt has taken up construction of Bailey Bridges in inaccessible areas, where construction of conventional RCC bridges is found difficult. For the purpose, two CPSUs having expertise in this are being entrusted. 13) Mukhya Mantri Sadak Yojana. ( 37500.00 lakh) There is a provision of 37500.00 lakh for improvement of important RD roads under Mukhya Mantri Sadak Yojana during 2016-17. This programme was launched to provide all- weather connectivity to unconnected habitations having population from 499 to 100 in Non- IAP districts and 249 to 100 in IAP districts and left out unconnected habitations up to 100 populations those are not connected under PMGSY. 14) Development of Rural road connectivity. ( 100.00 lakh) There is a provision of 100.00 lakh for development of rural road connectivity during 2016-17. This is for construction and improvement of existing RD roads.

(ii) Rural Water Supply The availability of safe drinking water is an important role in the health and wellbeing of the people. Rural Development Department is the nodal department for providing safe drinking water in rural population. 1. NRDWP ( 51720.00 lakh)

The rural water supply and sanitation organisation is functioning under the Rural Development Department primarily aims at providing safe drinking water to the rural people of the State. From the year 2009-10, rural water supply is carried out as per the new guideline of GOI on National Rural Drinking Water Programme (NRDWP). The goal of the programme is to provide every rural person with adequate water for drinking, cooking and other domestic basic needs on a sustainable basis. There is a paradigm shift in coverage from habitation to household. To meet the emerging challenges in the rural drinking water sector relating to availability of sustainable and qualitative drinking water supply, the components covered under the program are NRDWP-Coverage, Sustainability, Water quality, operation & maintenance and Support activities. The proposed fund includes provision to address water quality related issues in the fluoride affected districts particularly Nuapada.

Outcome Budget: DoRD for 2016-17 Page 18

To meet the above needs an amount of 51720.00 lakh has been provided during the year 2016-17 against anticipated GoI allocation of .35000.00 lakh. Target has been fixed to take up 500 PWS schemes and 9000 spot sources under coverage during the year-2016-17. 2. Capacity building ( 2000.00 lakh) An amount of 2000.00 lakh has been provided under Capacity Building in the in the year 2016-17. The scope of the works include survey & investigation, source finding and preparation of detailed project reports for new rural PWS Schemes, procurement of survey equipments, training, exposure visit inside and outside India, consultancy charges, PMU establishment charges, quality monitoring, computerisation, WAMIS & GIS etc. 3. Construction of R.D. Deptt. Buildings ( 1000.00 lakh) A sum of 1000.00 lakh has been proposed in the year 2016-17 for construction of both office and residential buildings of RWSS Organisation and Govt residential buildings. 4. Rural Water Supply ( 35100.00 lakh) A sum of 35100.00 lakh has been allocated under to cover PWS projects as well as spot sources in villages and habitations where it is not possible to cover those locations under NRDWP. State specific projects can be taken up to meet the demand of public on priority basis.

5. RIDF ( 10000.00 lakh) As a long term sustainable measure, to mitigate the presence of Fluoride and Chloride in drinking water in the district of Nuapada and Puri, Rs.10000.00 lakhs have been provided during 2016-17.

One Mega PWS project covering 59 villages of Bramhagiri Block in the district of Puri with an estimated cost of 1920.00 lakh is under progress.

(iii) Nirmal Bharat Abhiyan ( akh) In order to address the rural sanitation needs through community empowerment, the centrally sponsored scheme “Nirmal Bharat Abhiyan”/ “Swachha Bharat Mission” (Gramin) previously known as TSC is being implemented in all the 30 districts of the State. The entire operation under this campaign is being looked after by “Orissa State Water & Sanitation Mission (OSWSM)” of RD Department and the District Water and Sanitation Missions (DWSMs). In the Annual Plan for the year 2016-17, an amount of 74043.00 lakh has been provided against anticipated GOI allocation of 48900.00 lakh.

B. NON- PLAN

(I) RURAL WORKS ORGANISATON: A total outlay amounting to 107541.77 lakh has been proposed under Non-Plan for Rural Works Organization during 2016-17.

Outcome Budget: DoRD for 2016-17 Page 19

Maintenance of Roads and Bridges: 53448.23 lakh have been proposed for repair, maintenance and mprovement/ widening of R.D. roads and bridges during 2016-17. Besides this, 10000.00 lakh have been provided for periodical maintenance of 5year completed PMGSY roads.

Maintenance of Buildings:

26059.64 lakh has been proposed during 2016-17 towards maintenance of residential and non-residential buildings including 2100.00 lakh for maintenance of 20 years old, 1400.00 Lakh for 30year old and 50.00 lakh for maintenance of 50 years old

Govt. School and College Buildings borne in the books of R.D. Department.

(II) RURAL WATER SUPPLY AND SANITATION:  Office Building - Maintenance of Water Supply and Sanitary installations - 5,50.00 lakh  Residential Building - Maintenance of Water Supply and Sanitary installations - 3,60.00 lakh  Direction and Administration - 72,76.41 lakh  Machinery and Equipment - 1,24.08 lakh  Maintenance and Repair - 31,54.20 lakh  Wages / Work Charged Salaries - 97,52.21 lakh  Suspense - 0.01 lakh  Decretal Dues - 10.00 lakh  Other Charges - 0.01 lakh  Sanitary Technitians' Training - 7.23 lakh  Labour and Employment - 16.00 lakh Total - 212,50.15 lakh

(III) SECRETARIAT ESTABLISHMENT - 6,21.23 LAKH

Outcome Budget: DoRD for 2016-17 Page 20

RURAL DRINKING WATER SUPPLY (RWS&S ORGANISATION)

The role of drinking water for individual's survival, reducing illness, enhancing economic growth and improving peoples’ quality of life has acquired prominence in the process of the development agenda in recent years. The 10th Plan accorded topmost priority to provision of stipulated quantity of safe drinking water to "Not Covered" (NC) habitations, followed by coverage of “Partially Covered” (PC) and the quality affected habitations (having contaminated water). In previous years, the habitations were mostly covered by installation of hand pump tube wells and sanitary wells. But it is found that these sources do not attend to the desired level of sustainability. Hence it is decided that desired goal can be achieved by providing water to rural habitations through Piped Water Supply (PWS) schemes. The State Government has a clear mandate to cover all uncovered rural habitations and Government & Government aided schools. As on 31.3.2016, there are 1,57,158 habitations (129447-FC+228064-PC+4847-WQ affected) have been provided with drinking water facility through 430717 spot sources (hand pump Tube Well and Sanitary Wells) and 10228 Piped Water Supply projects commissioned in the State.

National Rural Drinking Water Programme

National Rural Drinking Water Programme (NRDWP) is being implemented w.e.f. 1.4.2009. Under this programme, provision of drinking water supply to the rural population is made through hand pump tube wells and piped water supply schemes. As per the new guidelines under NRDWP, there has been a shift in approach of coverage which aims at household level water security. The State Government provides a matching share of Central Assistance released for implementation of NRDWP scheme. Under the modified NRDWP programme, the drinking water supply projects are implemented with the following broad components:

Coverage - 47% Priority has been given to provide safe drinking water to "Not Covered (NC)" habitations followed by coverage of "Partially Covered (PC)" habitations. (matching share 50:50)

Water Quality - To provide safe alternative sources of drinking water supply 20% in quality affected habitations except for capital investment priority has been given for Fluoride affected habitations followed by Iron & salinity problems. (Matching share - 50:50)

Outcome Budget: DoRD for 2016-17 Page 21

Sustainability To encourage community participation for sustainability of (Swajaladhara water supply sources and systems, these schemes are mode) - 10% implemented in broad Swajaladhara principle. (No matching share is required from State but contribution from village community is the essence.)

Support activities Communication and capacity development (CCDU), - 5% Management Information System (MIS) and Computerisation are to be taken up on priority.

Water quality Services of Asha, Angawandi workers, School Teachers, GP Monitoring & members, Social workers etc. will continue to be utilized for Surveillance –3% Surveillance programme. Monitoring is to be done by entering the test result of all sources tested by the Labs. The habitation and household data must be collected by two village level members i.e. VWSC members selected in the Gram Sabha and fully accountable to the Panchayat. They will also authenticate the test results of field test kits used in the village.

Operation and Government of India has provided 15% of funds to the State Maintenance - Govt. for operation and maintenance of existing rural water 15% supply system. (matching State share - 50:50) Rural Water Quality Monitoring and Surveillance

Govt. has made significant interventions to improve the availability of drinking water in rural areas. Activities relating to water quality were limited to testing of water sources at the time of commissioning the PWS projects and provision of alternative water supply through sub-mission projects for areas where occurrence of Fluoride, salinity and Iron in ground water is beyond the permissible limit. The above programme would be implemented at three levels consisting of the State level, District level and grass root level.

Water Quality Problem Mitigation

As a long term sustainable measure the State has taken up several Mega Piped Water Supply Schemes in the State to cater the drinking water needs as detailed below.  Piped Water Supply Schemes covering all the uncovered habitations including Fluoride Affected Habitations of will be taken up.  To overcome the situation of saline water in Brahmagiri Block of Puri District one Mega Piped Water Supply Schemes with an estimated cost .19.20 Crore is under progress with RIDF Assistance.  Seven numbers of Mega Piped Water Supply Schemes in Phase-I & Phase-II with an estimated cost of .277.59 Crore & .275.31 Crores respectively are being taken up with 4th

Outcome Budget: DoRD for 2016-17 Page 22

SFC funding. In Phase-I it is proposed to cover different villages of Balasore, Bhadrakh, Keonjhar, Puri & Bolangir District while Cuttack & are included in Phase-II.

3. ODISHA STATE WATER & SANITATION MISSION (OSWSM)

Sanitation is an important aspect of human life. Absence of proper sanitation facilities holds back poverty reduction and economic growth, thus affecting the quality of life, particularly of women and children. Provision of good sanitation facilities and a clean environment are therefore vital to improve the health of the people and reduce incidence of disease and death. The Infant Mortality Rate (IMR) & Maternal Mortality Rate (MMR) are largely attributed to poor sanitation.

To improve the sanitation status of the country, Total Sanitation Campaign (TSC), a demand driven integrated National Flagship Programme on sanitation was came into force in the year 1999 with an objective to accelerate sanitation coverage by demand generation in rural areas and thereby bring about an improvement in the general quality of life of rural mass. The approach emphasized more on Information Education & Communication (IEC) and Capacity Building activities to increase awareness among the rural people about sanitation facilities. An innovative and incentive based scheme, “Nirmal Gram Puraskar” was introduced to encourage the PRIs for promotion of sanitation.

To boost the Campaign, Govt. of India renamed the campaign as Nirmal Bharat Abhiyan” (NBA) with effect from 1st April 2012. The campaign aimed to transform rural India into ‘Nirmal Bharat’ by adopting the ‘community led’ and ‘people centered’ strategies and community saturation approach. The provision of incentive under NBA for construction of IHHL was enhanced to .10,000/- (NBA- .4600/- + MGNREGA- .4500/- + Beneficiary- .900/-). Under NBA, the incentive for toilet construction was extended to Identified APL families too. However there were implementation difficulties in convergence of NBA with MGNREGA as funding from different sources created delays at the implementation mechanism.

So to accelerate the efforts to achieve universal sanitation coverage and to put focus on sanitation, Govt. of India launched “Swachh Bharat Mission (Gramin)” with effect from 2nd October 2014. It aims to achieve Swachh Bharat by 2019, as a fitting tribute to the 150th Birth Anniversary of Mahatma Gandhi. The National Flagship programme of GoI for

Outcome Budget: DoRD for 2016-17 Page 23 sanitation i.e. Nirmal Bharat Abhiyan has been restructured and renamed as “Swachh Bharat Mission” (Gramin). The concept of Swachh Bharat encompasses ways to access every person with sanitation facilities including toilets, solid & liquid waste disposal systems, village cleanliness and provision of adequate drinking water. In line with the national goal, Govt. of Odisha has also taken strong initiatives and strives to make Odisha Open Defecation Free (ODF) by 2019 by ensuring construction and use of Individual Household Latrine (IHHL) alongwith environmental cleanliness.

Major features of SBM  Swachh Bharat Mission will have two sub-missions- Swachh Bharat Mission (Gramin) for rural areas and Swachh Bharat Mission (Urban) for urban areas.  The Unit cost of the Individual Household Latrine has been enhanced from .10,000/- to .12,000/- so as to provide water availability, including storing, hand washing and cleaning of toilets. However no fixed amount has been kept for beneficiary contribution but it is suggested that it should be encouraged to ensure ownership of the HH.  The entire funding for incentive for construction of IHL i.e. 12,000/- will be met from Swachh Bharat Mission with share of both GoI & GoO.  The responsibility of construction of all School Toilets and Anganwadi Toilets which was rendered to R.D.Deptt. is transferred to S&ME and W&CD Deptt. respectively.  The strategy of implementation of the sanitation programme will focus on behavior change with regard to toilet construction as well as its use.  Emphasis on Solid & Liquid Waste Management for an amount of 7.00 lakh to 20.00 lakh as per HH (150- more than 500 HH).  Provision of Community Sanitary Complex with an estimated cost of 2.00 lakh with 10% public contribution However, to ascertain the actual number of HHs to be benefitted by SBM (G), a state wide Base Line Survey has been conducted and on-line entry of the HHs has been completed. As per the Base line data, it is determined that:- Total No. of HHs : 9020100 HHs having Toilet : 1038127 Toilets to be constructed : 7659231 Information, Education & Communication (IEC) is continued to be a very important component of the programme. It strives to bring about community wide behavior change and trigger demand for sanitation facilities in Household, School, AWC, as well as promote Community toilet and Solid & Liquid Waste Management through provision of information & awareness generation.

Outcome Budget: DoRD for 2016-17 Page 24

To generate critical mass awareness, intensive IEC activities from state to GP/village level with special focus on Inter-personal Communication (IPC) activities were implemented. State wide IEC campaign was also organized to sensitize rural mass about the importance of sanitation, construction and use of toilets, hand washing, safe drinking water etc. using different Medias. To trigger the implementation process, a no. of Community led Total Sanitation (CLTS) trainings were organized and as a result, a cadre of motivators and resource persons are created who will in turn motivate the community to adopt correct hygiene practice, construct and use toilet and make their village/GP open defecation free. Appropriate convergence has been made with SANJOG partner Depts. like: W&CD, H&FW, PR, S&ME to make the programme success. Current year (2016-17) it has been targeted to construct 21 lakh IHHLs by mobilizing community through individual as well as community approach. Swachh Bharat Mission is gaining impetus and become a movement. The state is also striving to achieve the mission and determined to make Odisha Open Defecation Free as well as clean environment by the year 2019. Rural Sanitation & Funding: In order to address the Rural Sanitary needs through community empowerment, the centrally sponsored “Swachha Bharat Mission (Gramin)” [SBM (G)] is being implemented in all the 30 districts of the State. Government of India releases funds through the State Budget from 2014-15 under State Plan and the State Govt. releases funds to Odisha State Water & Sanitation Mission along with matching state share after making appropriate provision in the state budget. The entire operation under this campaign is being looked after by the OSWSM and the District Water and Sanitation Missions (DWSMs). Nirmal Gram Puraskar In order to achieve desirable impact on disease prevention as well as for ensuring minimum standard of living to the entire rural population, it is essential that every household in any particular area has access to sanitation facilities and has also to adopt hygienic practices. To promote such full coverage as well as to ensure total stoppage of the practice of open defecation and to maintain cleanliness, the Govt. of India have launched the Nirmal Gram Puraskar (NGP) from October, 2003. The NGP is awarded to Gram Panchayats, Blocks and Districts where there is no open defecation and access of toilets in all households as well as institutions like Schools, Anganwadi centers etc. So far 287 Gram Panchayats of the State have been bestowed with Nirmal Gram Puraskar at national level. Now the NGP Award scheme has been dropped by the GoI.

Outcome Budget: DoRD for 2016-17 Page 25

CHAPTER-II

Outcome Budget for 2016-17

The exercise is primarily meant for converting financial outlays into measurable and monitorable outcome. It is a performance measurement tool that helps in better service delivery, decision making, evaluating programme performance and results and improving programme effectiveness.

The Outcome Budget is also aimed at changing the outlook of the agencies entrusted with the responsibility of programme execution and implementation. The idea is to make the programme implementing agencies more result oriented by shifting the focus from “Outlays” to “Outcomes”.

The scheme-wise details for the year 2016-17 are indicated in the attached statement.

Outcome Budget: DoRD for 2016-17 Page 26

STATE PLAN (2016-17) RURAL WORKS ( in TRS ) Sl. Name of the Financi Broad objective Quantifiable Project Processes/ Remarks No Schemes/ al / Deliverable Outcome Timelines / Risk Programme Outlay Physical Factors Outputs 1 2 3 4 5 6 7 8 Better Construction of working Non- Construction of 146 Res. Availabili condition and Residential and new and ongoing Buildings & ty of living Residential office building 118 Non- Land, 1 250000 condition for 12 months buildings of and residential Res. Non the officials R.D. buildings of Rural Buildings. response working in Department R.D. Department tenders Rural Works

Organizations. Survey Expenses, Survey Equipment, Survey and Tech. Training, investigation Consultancy & conducting Capacity charges-PMU & technical Building Quality Monitoring seminars, important roads, (Resources & Not workshops, 2 100000 bridges & building 12 months --- Infrastructure projects, DPR quantifiable procurement Development) preparation, of modern Computerisation of survey offices, WAMIS,GIS equipments exposure visit for capacity inside/ outside building country etc. 12 months The Minimum Improve Implement Rural roads proposal Needs All-weather roads critical roads ed through in 142 s are Programme- to rural in the rural Chief Assembly furnished 3 Constituency- 284000 habitations in 142 area for better Engineer Constituenc by Wise allocation constituencies of connectivity RW-I and y in the Hon'ble (CWA) the State. to the rural field State MLAs, habitations functionari

es. Land Construction of Through acquisiti Bridges under Construction of Completion To improve tender 9 on, 400000 4 Biju Setu bridges on rural of 100 rural months to difficult 0 Yojana roads bridges connectivity 30 months site in some cases. Improvement Completion Improving To improve rural 5 of existing R.D 500000 of 20 nos of riding quality 12 months --- connectivity roads RD roads of roads Completion of incomplete roads & 30 nos. Completion of To improve bridges under roads & 5 6 700000 incomplete roads rural 12 months different nos. of & bridges connectivity tranches of bridges RIDF & other schemes

Ooutcome Budget : DoRD for 2016-17 Page27

Limited Rural no. of Infrastructure Completion To improve 11 months Bridge To improve road 7 Development 750000 of 20 bridges rural to 30 contract infrastructure Fund &10 roads connectivity months ors in the State.

Construction of Road Work PMGSY Roads & 1.(PMGSY) Construction Bridges,State To provide Large (5054-1077- (1)2300 of 3200 kms share for constn rural number 37114) 0000 of roads . 8 of bridges,Tender connectivity 12 months of non- 2.Completion (2)1000 Premimum, by way of all- response of incomplete 00 Labour Escalation weather road tender roads & etc. bridges

To clear the Payment of liability of Not Disposal of 9 decretal dues 2000 12 months --- contractors as per quantitiable Court’s Order

Court disposal Improve Impvt of rural Improving Biju KBK Yojana Completion ment of 10 450000 roads in KBK riding quality 12 months of roads arterial districts of roads roads Providing connectivity to unconnected New To start 700 habitations Mukhya Mantri scheme 375000 Impvt of rural km. road to upto 11 Sadak Yojana 12 months introduc 0 roads be population of ed constructed 100 & above

(which are not covered under other schemes) New Development scheme To improve of rural road Development of introduc 12 10000 --- road 12 months connectivity rural roads ed in connectivity 2014-15

Balance fund of Construction of TRs.2000 Construction of bailey bridges Completion To improve of 00 13 Bailey Bridges 700000 ininaccessible of 130 nos rural 12 months required area of IAP dist. Bailey bridge connectivity for completi on of works

Ooutcome Budget : DoRD for 2016-17 Page28

Rural Water Supply ( in TRS) Name of the Financial Quantifiable/Deli Processes Sl. Broad Project Remarks/Risk Scheme/Pro Outlay verable Physical / No objective Outcome Factors gramme Outputs Timelines 1 2 3 4 5 6 7 8 Providing Availability of safe National Rural Providing drinking water Availability of drinking water / Drinking safe to rural potential Source 5172000 Coverage of 6000 Water drinking habitations with quality 1 rural habitations 12 months Programme water to through water water, through 9000 spot (NRDWP) and rural supply electricity and sources , 500 PWS Sate Plan people projects under Govt. land. Schemes NRDWP 50 new PWS Providing schemes, Construction safe augmentation of of water Rural Water drinking existing PWS supply 2 Supply 3510000 12 months water to Schemes, projects not

rural Construction of 600 covered under people OHTs in Existing NRDWP PWS Schemes. Survey & Investigation work State Plan – Skill including Source Capacity 3 Capacity 200000 developme finding of new 12 months building Building nt PWS schemes proposed to be taken up in 2016-17 Construction of Water Providing Installation of Supply safe Water Supply Projects in drinking 4 RTDF 1000000 Projects in chloride Nuapada 12 months water to / fluoride affected district and rural areas Brahmagiri people block of Puri district Construction and Providing Construct completion of better State Plan – ion of Departmental working and 12 4 Building 100000 res./non- Office Building – living months Programme res. 25 Nos.and condition to buildings Residential the officials Building – 40 Nos. Grand Total: 9982000

Ooutcome Budget : DoRD for 2016-17 Page29

Rural Sanitation ( in TRS) Name of the Financial Quantifiable/Deliver Sl. Broad Project Processes/ Remarks/Ris Scheme/Progr Outlay able Physical No objective Outcome Timelines k Factors amme Outputs 1 2 3 4 5 6 7 8 To improve the quality Swachh Construction of Creation of Achieveme 7404300 of life in Bharat 2100000 IHHLs and open nt depends 1 rural areas 12 months Mission 181 Community defacation upon through (Gramin)/NBA Sanitary Complex free State resources. better sanitation

Ooutcome Budget : DoRD for 2016-17 Page30

Work list under D.No.28-4059-COL on Public Works-SP-DS-01-Office Buildings- 051-Construction/789-SCP for SC/796-TASP-2148-Construction of Buildings-R.D.Deptt.- 37114-Public Works for the year 2016-17 Financial outlay Sl. Name of the Name of the Work ( in TRS) No. District

1 2 3 4 01-051-Construction 1 Constn. of 1 No. Addl. Room of R.W. Sub-Division, Talcher Angul 300 Constn. of 2 nos. Addl. Rooms & Changing of GCI sheet roof to RCC 2 Angul 1800 roof of R.W. Division, Angul 3 Constn. of Addl. Room of R.W. Circle office at Angul Angul 400 4 Constn. of Computer room R.W. Division, Balasore Balasore 300 5 Constn.of Computer Room R.W. Sub-Division,Balasore Balasore 300 6 Constn. of Computer room R.W. Sub-division, Basta Balasore 300 7 Constn. of Computer room R.W.Sub-division, Balasore 300 8 Constn. of Addl Room for computer of R.W. Section office, Kanpur Balasore 300 9 Constn. of R.W. Section office at Khantapada Balasore 500 10 Constn. of Conference Hall of Circle office at Balasore Balasore 400 11 Constn. of R.W. Section office at Remuna Balasore 400 12 Constn. of 1 no. of Addl. Room & renovation of R.W. I.B. at Soro Balasore 1000 13 Constn. of 1 no. of Addl. Room & renovation of R.W. I.B. at Simulia Balasore 1000 14 Constn. of Computer Room at R.W. Division, Balasore-II Balasore 400 Constn. of Record room & additional room for J.E. N.H.M. at first 15 Balasore 500 floor of R.W. Division, Jaleswar 16 Constn. of Computer Room at R.W. Sub-Division, Baliapal Balasore 500 17 Constn. of R.W. Section-II office building at Bhatli Bargarh 500 18 Constn. of R.W. Section office (Elect.) at Baragarh Bargarh 600 19 Constn. of R.W. Section office-I at Attabira Bargarh 400 20 Constn. of 1 no. of section office for J.E. R.W. Section at Padampur Bargarh 500 21 Constn. of R.W. Section office I & II at Bijapur Bargarh 500 22 Constn. of R.W. Section office at Gaisilet Bargarh 300 23 Constn. of R.W. Section office at Pirahat Bhadrak 700 24 Constn. of Addl. Room & Renovation of R.W. Division office Bhadrak Bhadrak 400 25 Constn. of Computer Room at R.W. Sub-Division office, Bonth Bhadrak 400 26 Constn. of Computer Room at R.W. Sub-Division office, Tihidi Bhadrak 300 27 Constn. of Computer Room at R.W. Sub-Division office, Bhadrak Bhadrak 300 28 Constn. of R.W. Sub-Division, Chandbali Bhadrak 700 29 Constn. of R.W. Section-I & II, Chandbali Bhadrak 1000 30 Constn. of Addl. Computer Room at R.W. Section office, Basudevpur Bhadrak 300 Constn. of Addl. Room & Compound wall of R.W. Section office, 31 Bhadrak 400 Dhusuri Constn. of Addl. Room Ruarl Works Division-II office Building, 32 Bhadrak 600 Bhadrak 33 Construction of Sub Division office at Deogaon Bolangir 500 34 Construction of Sub Division office at Loisingha Bolangir 500 35 Renovation to old R.W. Sub-Division & Section office at Boudh Boudh 500 36 Renovation to R.W. Division Office at Boudh (Conference hall) Boudh 500 37 Constn. of Addl. Room to R.W. Section office building at Manmunda Boudh 300 38 Constn. of R.W. Division office building at Cuttack includuing Cuttack 1000

Ooutcome Budget : DoRD for 2016-17 Page31

Computer room 39 Conference hall at R.W. S.E. office, Cuttack Cuttack 500 40 Construction of laboratory hall at Cuttack Cuttack 500 41 Constn. Of R.W. Section office at Kasarda Cuttack 300 42 Constn. Of R.W. Mechanical Section office at Cuttack Cuttack 300 43 Constn.Of Watchman shed in R.E.O.Colony, Cuttack Cuttack 300 44 Constn. of J.E. R.W. Section office at Nuapatna Cuttack 500 45 Constn. of JE RW Section-II, Narasinghpur Cuttack 600 46 Constn. of Addl. Room & Renovation of R.W. Sub-Division, Athagarh Cuttack 400 47 Constn. of Addl. Room & Renovation of R.W. Section Baramba Cuttack 400 48 Construction of R.W. Section at Baranga Cuttack 300 49 Construction of R.W. Section at Gurudijhatia Cuttack 400 50 Constn. of Computer room to R.W. Sub-Division, Banki Cuttack 300 51 Constn. of Computer room to R.W. Sub-Division, Dampada Cuttack 300 52 Constn. of Computer room to R.W. Sub-Division, Baramba Cuttack 300 53 Constn. of Addl. Room R.W. Section office at Kalapathar Cuttack 300 54 Constn. of Addl. Room R.W. Section office at Baranga Cuttack 300 55 Constn. of Computer room at Sub-Division-I & II, Dhenkanal Dhenkanal 500 56 Constn. of R.W. Section office (Elect.) at Dhenkanal Dhenkanal 600 57 Constn. of Addl. Room of R.W. Division, Dhenkanal Dhenkanal 800 58 Constn. of R.W. Sub-division office at Rayagada Gajapati 1200 59 R.W.Division office at Bhanjanagar Ganjam 800 Constn. of Addl. Room & Renovation of R.W. Section office at 60 Ganjam 400 Constn. of Addl. Room & Renovation of R.W Sub-Division, 61 Ganjam 400 Berhampur 62 Constn. of 1 no addl. Room at R.W. Sub-Division office Chatrapur Ganjam 400 63 Constn. of Addl. Room & Renovation of section office at Gopalpur Ganjam 400 64 Constn. of Addl. Room & Renovation of section office at Ganjam Ganjam 400 65 Constn. of Computer Room R.W. Sub Division, at Ganjam 400 66 Constn. of Addl. Room & Renovation of Section office at K.S.Nagar Ganjam 400 67 Constn. of Addl. Room & Renovation of R.W. Section, Tagiria Ganjam 400 Constn. of Addl. Room & Renovation of conference Hall of R.W. 68 Jagatsinghpur 600 Division, Jagatsinghpur Constn. of Addl. Room and Renovation of R.W. Section office 69 Jagatsinghpur 400 Jagatsinghpur Constn. of Addl. Room & Renovation of R.W. Sub-Division office at 70 Jagatsinghpur 400 Kujanga 71 Construction of R.W. Section office at Naugaon Jagatsinghpur 400 72 Constn. Of R.W. Section office at Balikuda-II Jagatsinghpur 400 73 Constn. Of R.W. Section office at Erasama-II Jagatsinghpur 400 74 Constn. Of 1st floor to R.W. Section office at Raghunathpur Jagatsinghpur 400 75 Constn. Of R.W. Section office-II at Jagatsinghpur Jagatsinghpur 400 76 Constn. of R.W. Section office, Sukinda Jajpur 500 77 Constn. of R.W. Section-II office, Bari Jajpur 500 78 Constn. of R.W. Section, Korei Jajpur 500 79 Constn. of R.W. Section office at Panikoili Jajpur 1000 80 Constn. of R.W. Section office, Duburi Jajpur 500 Constn. of Addl. Room & Renovation of R.W. Sub-Division office , 81 Jajpur 500 Duburi Constn. of Addl. Room & Renovation of R.W. Sub-Division office , 82 Jajpur 600 Jajpur

Ooutcome Budget : DoRD for 2016-17 Page32

83 Constn. of R.W. Section , Tomka Jajpur 500 84 Constn. of Addl. Room of R.W. Division office at Jajpur Jajpur 500 85 Constn. Of R.W. Section-III office at Jajpur Jajpur 400 86 Constn. Of R.W. Section-I office at Bari Jajpur 400 87 Constn. Of R.W. Section office at Dasarathapur Jajpur 400 88 Constn. Of R.W. Section office at Singhpur Jajpur 400 89 Constn. Of R.W. Section office at Mangalpur Jajpur 400 90 Constn. Of R.W. Section office at J.K. Road Jajpur 400 91 Constn. of addl room for Computer R.W. Sub-division, Chandikhol Jajpur 300 92 Constn. of Addl. Room of R.W. Division office Building at Jaraka Jajpur 300 93 Constn. of R.W. Rest shed at Chandikhol Jajpur 800 94 Constn. of R.W. Sub-Division office building at Th. Rampur Kalahandi 800 95 Constn. of R.W. Section office building at Purunagumma Kalahandi 600 96 Constn. of Addl. Room & Renovation of R.W. Section Kalahandi 400 97 Constn. of Additional room of R.W. Circle office Bhawanipatna (F.F.) Kalahandi 400 98 Construction of R.W. Circle office at Bhawanipatna Kalahandi 1000 99 Construction of R.W. Sub-Division office at Junagarh Kalahandi 500 100 Renovation of R.W. Section office, Kalahandi 300 101 Extension & renovation of R.W. Sub Division office, Dharmagarh Kalahandi 400 102 Constn. of R.W. Rest shed at Jaipatna Kalahandi 400 Constn. of R.W. Section office building for J.E. R.W. Section-II, 103 Kalahandi 300 Jaipatna Constn. of R.W. Section office building for J.E. R.W. Section-II, 104 Kalahandi 300 Golamunda Constn. of Addl. Room & Renovation of Old existing building of R.W. 105 Sub Division, Baliguda now functioning as R.W. Division, office, Kandhamal 600 Baliguda 106 Sub-Division office at Kotagarh Kandhamal 500 107 Constn. of Computer room of R.W. Division, Kendrapara Kendrapara 400 108 Constn. of RW Section office at Marshaghai Kendrapara 500 109 Constn. of R.W. Section office Kendrapara Kendrapara 500 110 Construction of R.W. Section office, Ramnagar Kendrapara 500 111 Construction of Addl Room at R.W Division, Kendrapara Kendrapara 400 112 Construction of R.W Electrical Section Office, Kendrapara Kendrapara 400 113 Constn. of Computer room at R.W. Sub Division , Kendrapara 400 114 Constn. of Computer room at R.W. Sub-Division, Aul Kendrapara 400 115 Constn. of Computer room at R.W. Sub-Division, Rajkanika Kendrapara 400 116 Constn. of Computer room of R.W. Sub-Division, Rajnagar Kendrapara 300 Constn. of Addl. Room & Renovation of R.W. Sub-Division office, 117 Keonjhar 400 Champua Constn. of Addl. Room & Renovation of R.W. Sub-Division office 118 Keonjhar 400 building at Jhumpura 119 Constn. of Addl. Room & Renovation of R.W. Section office Banspal Keonjhar 300 120 Constn. of R.W. Section office at Bologarh Khurda 600 121 Constn. of R.W. Section office at Khurda 600 122 Constn. of Conference hall of E.I.C. office at Unit-IV, BBSR Khurda 1500 123 Strengthing & renovation of R.W. I.B at Khurda 400 Constn. of R.W. Section office at of R.W. Sub-Division-II, 124 Khurda 400 Bhubaneswar 125 Constn. of 6 passenger lift for R.W. Division at BBSR Khurda 1000 Upgradation of 100 KVA sub-Station to 250 KVA of R.W. Division, 126 Khurda 600 BBSR 127 Constn. of Division office at Koraput 1000

Ooutcome Budget : DoRD for 2016-17 Page33

128 Construction of R.W. Division office at Nayagarh-II Nayagarh 500 129 Constn. of R.W. Section office at Bhapur Nayagarh 400 130 Constn. of R.W. Section office-II at Nayagarh 400 131 Constn. of R.W. Section office-I, Daspalla Nayagarh 400 132 Constn. of R.W. Section office-II, Daspalla Nayagarh 400 133 Constn. of R.W. Section office, Gania Nayagarh 400 134 Constn. of R.W. Section office-II, Nuagaon Nayagarh 400 135 Constn. of Computer Room for R.W. Division-II office, Nayagarh Nayagarh 300 Constn. of Addl. Room & Renovation of R.W. Sub-Division office at 136 Puri 350 Kakatpur Constn. of Addl. Room & Renovation of R.W.Sub-Division office at 137 Puri 350 138 Constn. of Addl Room of R.W. Division office at Nimapara Puri 300 139 Constn. of Addl Room of R.W. Section office at Gop Puri 300 140 Constn. of R.W. Section office at Brahmagiri Puri 500 141 Constn. of R.W. Section office at Mandarabasta Puri 300 142 Provision of Lift & Lift room in R.W. Rest shed at Puri Puri 500 Completion of incomplete old R.W. Buildings 3000

142 TOTAL 72000

01-789-SCPSC Constn. of Addl. Room & Renovation of R.W. Division Office Building, 1 Bolangir 500 Patnagarh Constn. of Addl. Room & Renovation of Old rest shed to be used for 2 Bolangir 300 Deptt. Labortatory at Kantabanji Constn. of Compound wall & approach road to newly constructed 3 Bolangir 700 section office building at Tureikela 4 Construction of R.W. Seciton office at Muribahal Bolangir 400 5 Constn.of Addl.Room of R.W.Sub Division,Kantabanji Bolangir 500 6 Constn. of Addl. Room of R.W.Section Bangomunda Bolangir 300 7 Constn. of Addl. Room of R.W.Section Tureikela Bolangir 300 8 Construction of R.W. Division office at Kesinga Kalahandi 800 9 Construction of R.W. Sub-Division office at Kalahandi 500 10 Constn. of R.W. Sub-Division office for R.W. Sub-Division Phulbani-II Kandhamal 500 11 Constn. of R.W. (P.H.) Section, Keonjhar Keonjhar 500 12 Constn. of R.W. Section office at -II Keonjhar 500 13 Constn. of Addl. Room for Computer for R.W. Section office , Keonjhar 300 14 R.W. Section office, Telkoi Keonjhar 300 Constn. of Addl. Room of Computer at R.W. Division, Koraput and 15 Koraput 500 R.W. Sub Division, Koraput 16 Construction of R.W. Sub-Division office at Koraput 300 17 Construction of R.W.Sub-Division office at Dasmantapur Koraput 500 18 Construction of R.W. Division office at Khariar Nuapada 800 19 Constn. of R.W. Sub-Division office with garage at Komna Nuapada 400 20 Constn. of R.W. Section office-II at Komna Nuapada 400 21 Constn. of office building for R.W. Sub-Division, Kuchinda-II Sambalpur 500 22 Constn. of R.W. Section office Building at Fashimal Sambalpur 400 23 Renovation of division office building at Sambalpur Sambalpur 600 24 Construction of R.W. Division office at Kuchinda Sambalpur 600 25 Constn. of Addl. Room & Renovation of R.W. Division, Sonepur Subarnapur 800 26 Construction of R.W. Section office Tarva-II Subarnapur 400 27 Constn. of Addl Room of R.W. Sub-Division office at Sonepur Subarnapur 400 28 Constn. of R.W. Section-II office at Ullunda Subarnapur 400

Ooutcome Budget : DoRD for 2016-17 Page34

Constn. of R.W. Sub-division office Sundargarh at R.W. Division, 29 Sundargarh 800 sundargarh Constn. of R.W. Section office of Sundargarh at R.W. Division, 30 Sundargarh 400 Sundargarh 31 Constn. of Laboratory office at R.W. Division, sundargarh Sundargarh 500 32 Constn. of R.W. Sub-Division office at Kutra Sundargarh 600 Constn. of Addl. Room & Renovation of R.W. Section office at 33 Sundargarh 400 Hemgiri Constn. of Addl. Room & Renovation of R.W. Section offoce at 34 Sundargarh 400 Subdega 35 Constn. of Addl. Room & Renovation of Rest Shed, Sundargarh Sundargarh 400 Constn. of Addl. Room & Installation of external EI & PH works of 36 Sundargarh 400 R.W. Section office at Kinjirkela-I & II 37 Constn. of R.W. Section office at Balisankara Sundargarh 400 Constn. of Annex including conference hall at 3rd floor of R.W. 38 Sundargarh 1300 Division, Rourkela 39 Constn. of Addl. Room of Rest Shed at R.W. Sub-Division, Bonai Sundargarh 1000 40 Constn. of R.W. Section office at Lathikata Sundargarh 400 40 TOTAL 20400

01-796-TASP 1 Constn. of R.W. Division office, Gajapati 600 2 Constn. of R.W. Sub-Division office at R.Udayagiri Gajapati 500 3 Constn. of R.W. Section-I office at R.Udayagiri Gajapati 500 Constn. of Addl. Room & Renovation of R.W. Sub-Division office, 4 Keonjhar 300 Telkoi 5 Renovation & extension of R.W. Sub Division office, Laxmipur Koraput 300 6 Constn. of R.W. Section office at Semeliguda Koraput 400 7 Constn. of R.W. Section office building at Koraput 400 8 Constn. of office building for J.E. Zonal Laboratory at Sunabeda Koraput 400 Constn. of Conference Hall & Addl. Room of R.W. Division-I, 9 Malkangiri 1200 Malkanagiri 10 Construction of R.W. Section office-II at Mathili Malkangiri 500 11 Constn. of R.W. Section office Podia-II Malkangiri 1000 12 Constn. of Addl. Room & Renovation of R.W. Division-II, Malkanagiri Malkangiri 800 Constn. of Addl. Room & Renovation of R.W. Sub-Division office, 13 Malkangiri 300 Kalimela Constn. of Addl. Room & Renovation of R.W. Sub-division office, 14 Malkangiri 400 Podia 15 Constn. of R.W. Section office building at Korukodna Malkangiri 400 16 Constn. of R.W. Section office building Malkangiri 500 17 R.W. Section Office building Kalimela-II at Mottu Malkangiri 400 18 R.W. Section offfice Building Podia at Podia Malkangiri 400 19 Constn. of Computer room of R.W. Sub-Division Udala Mayurbhanj 300 20 Constn. of R.W. Section office building at Manatri Mayurbhanj 500 21 Constn. of R.W. Section office building at Saraskona Mayurbhanj 500 22 Constn. of R.W. Section office building at Morada Mayurbhanj 500 23 Constn. of R.W. Section office at K.C. Pur Mayurbhanj 500 24 Constn. of SE.RW Circle office (1st Floor), Baripada Mayurbhanj 800 Constn. of Addl. Room & Extension of testing laboratory at R.W. 25 Mayurbhanj 400 Section office Udala 26 Constn. of R.W. Rest shed at Baripada Mayurbhanj 800

Ooutcome Budget : DoRD for 2016-17 Page35

27 Constn. of Testing lab of S.E. R.W. Circle Office, Baripada Mayurbhanj 1200 28 Extension & renovation of R.W. Division office, Baripada Mayurbhanj 600 Constn. of Proposed S.E. office for R.W. Circle, Baripada 29 Mayurbhanj 600 (Administrative Block) 30 Construction of R.W. Section office-II at Karanjia Mayurbhanj 400 Constn. of Addl. Room & Renovation of RW Sub Division-I at 31 Mayurbhanj 400 Rairangpur 32 Constn. of R.W. Section office at Bijatala Mayurbhanj 300 Constn. of office buildings for R.W.Section, Bahalda-II at Bahalda 33 Mayurbhanj 400 (Over 1st floor of R.W.Section Bahalda-I Building) 34 Constn. of R.W. Section office at Gorumahisani Mayurbhanj 300 35 Constn. of Internal Road & Drain for R.W. Division-II at Nabarangpur 600 36 Constn. of Computer Room at R.W. Sub-Division, Chandahandi Nabarangpur 300 37 Constn. of Computer Room at R.W. Sub-Division office, Raighar-I Nabarangpur 300 Constn. of Addl. Room, Computer Room & Renovation of 38 Nabarangpur 800 R.W.Division office, Umerkote 39 Constn. of R.W.Sub-Division office building at Sinapali Nuapada 700 40 Constn. of R.W. Section office building at Boden Nuapada 500 Constn. of Addl. Room & Renovation of R.W. Sub-Division office 41 Nuapada 500 Building at Khariar 42 Constn. of Addl. Room for computer at Rayagada Division Rayagada 400 43 Constn. of Addl. Room for Computer at B. Cuttack Sub-Division Rayagada 300 44 Constn. of Addl. Room for computer at Kasipur sub-division Rayagada 300 45 Constn. of Addl room for computer at Padmapur sub Division Rayagada 300 46 Constn. of Addl. Room for computer at Ramanaguda sub-Division Rayagada 300 47 Constn. of Addl. Room for computer at Rayagada Sub-Division-I & II Rayagada 600 48 Constn. of Addl. Room for computer at Gunupur Sub Division Rayagada 300 49 Construction of R.W.Division office at Gunupur Rayagada 500 50 Construction of R.W. Sub-Division office at Ramanguda Rayagada 500 51 Construction of R.W. Section office-II at Gunpur Rayagada 500 52 Construction of R.W. Sub-Division office-II at Rayagada Rayagada 500 53 Construction of R.W. Section office-III at Rayagada Rayagada 400 54 Construction of Section office at Padmapur-II Rayagada 400 55 Construction of Section office at Ramanaguda-II Rayagada 400 56 Construction of Section office at Kasipur-II Rayagada 400 56 TOTAL 27600

238 GRAND TOTAL 120000

N.B. The Work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page36

Work list under D.No.28-4216-COL On Houshing-SP-DS-01-Govt.Residential Buildings-106- General Pool Accomodation /789-SCP for SC/796-TASP-2148-Construction of Buildings - R.D.Deptt.-37114-Public Works for the year 2016-17

Sl. Name of the Financial outlay Name of the Work No. District ( in TRS) 1 2 3 4 01-106-GPA 1 Constn. of 1 no. F type quarter at Talcher Sub-Division(F.F.) Angul 250 2 Constn. of 2 nos. F type quarter at Old R.W. Colony, Angul for Staff Angul 500 of Circle Office (Block-I) 3 Constn. of 2 nos. F type quarter at Old R.W.Colony, Angul for staff Angul 500 of Division office (Block-II) 4 Constn. of 1 no. of E type quarter at Old R,W. Colony (F.F.) Angul 350 5 Construction of 'F' type Qtrs. at Athamallik Angul 250 6 Constn. of 2 Nos. of 'F' type Qtrs. at Athamallik Angul 300 7 Constn. of 2 Nos. of 'F' type Qtrs. at Boinda Angul 300 8 Constn. of 1 No. 'F' type Qtr. at Talcher Angul 300 9 Constn. of 'D' type Qtr. for A.E.E. at Nilagiri Balasore 400 10 Constn. of 'E' type Qtr. for J.E.R.W. Section-II, Basta Balasore 300 11 Constn. of 'E' type Qtr. for J.E.R.W. Section, Khantapada Balasore 300 12 Constn. of 'D' type Qtr. for D.A.O. at Balasore Balasore 400 13 Constn. of 'E' type Qtr. for J.E.R.W. Section, Markona Balasore 300 14 Constn. of 'E' type Qtr. for Cashier of R.W. Sub-Division, Markona Balasore 300 15 Constn. of 'F' type Qtr. for Class-IV employees of R.W. Sub-Division, 300 Balasore Markona 16 Constn. of 'F' type Qtr. at 1st floor for Staff of R.W. Division, 200 Balasore Jaleswar 17 Constn. of 2 Nos. 'E' type Qtr. for Division Estimators of R.W. 400 Balasore Division, Jaleswar 18 Constn. of E type quarter of R.W. Section-II, Bhatli Baragarh 350 19 Constn. of E type quarter of R.W. Electrical Section, Bargarh Baragarh 350 20 Construction of 'E' type Qtrs. for J.E. at Bheden-II at Bheden Baragarh 250 21 Constn. of 'E' type Qtr. for J.E.R.W. Section-I, Attabira Baragarh 300 22 Constn. of 'E' type Qtr. for J.E.R.W. Section-II, Sohela Baragarh 300 23 Constn. of 1 no. C type quarter for EE R.W. Division at Padampur Bargarh 600 24 Constn. of 1 No. D type quarter for DAO R.W. Division, at Bargarh 450 Padampur 25 Constn. of Two nos. E type quarters for Estimators R.W. Division Bargarh 500 office at Padampur (Twin) 26 Construction of 2 nos. 'F' type Qtrs. at Bijepur Bargarh 400 27 Constn. of 1 No. 'E' type Qtr. for J.E. at Gaisilet Bargarh 250 28 Constn. of 2 Nos. 'F' type Qtrs. at Gaisilet Bargarh 300 29 Constn. of Twin 'F' type Qtr. (1st floor) at R.W. Division office at Bargarh 300 Padampur 30 Constn. of D type Qtr at R.W. Sub-Division, Tihidi Bhadrak 400 31 Constn. of E type Qtr at R.W. Section , Tihidi Bhadrak 350 32 Constn. of Twin F type Qtr. At R.W. Sub-Division, Tihidi Bhadrak 500 33 Constn. of F type quarter at R.W. Sub Division, Bonth Bhadrak 250 34 Constn. of D type quarter AEE, chandbali Bhadrak 400 35 Constn. of E type quarter , J.E. Chandbali-II Bhadrak 350 36 Constn. of 'D' type Qtrs. for P.A. to S.E. R.W. Circle, Bolangir Bolangir 350

Ooutcome Budget : DoRD for 2016-17 Page37

37 Construction of D type quarter for SDO R.W.Sub Division, Deogaon 400 Bolangir at Deogaon 38 Construction of D type quarter for SDO R.W.Sub Division, Loisingha 400 Bolangir at Loisingha 39 Constn. of 1 no. D type quarater at Patnagarh Bolangir 300 40 Constn. of 2 nos E type quarter at Patnagarh Bolangir 300 41 Constn. of 2 nos F type quarter at Patnagarh Bolangir 300 42 Constn. of twin D type staff quarter at R.W. Division, Patnagarh 800 Bolangir (D2, D3) 43 Constn. of twin E type staff quarter at R.W. Division, Patnagarh (E3, 500 Bolangir E4) 44 Constn. of 2 nos. F type staff quarter at R.W. Division, Patnagarh 400 Bolangir (F3, F4) 45 Constn. of Twin D type quarter (Including stair case & Two nos. of Cuttack 800 Garage) at 46 Constn. of E type quarter R.W. Section at Kasarda Cuttack 350 47 Constn. of F type quarter at R.W. Section at Kasarda Cuttack 250 48 Constn. of Twin F type quarter triple storied at REO Colony at Cuttack 1000 Cuttack (6 Nos.) 49 Constn. of Staff quarter at R.W. Section Office at Choudwar (F type) Cuttack 250 50 Constn. of E type quarter R.W. Section at Kantapada Cuttack 350 51 Constn. of F type quarter R.W. Section at Kantapada Cuttack 250 52 Twin F type Qtr. R.W. Circle, Cuttack Cuttack 300 53 Construction of 'E' type Qtrs.at R.W.Section, Kishannagar Cuttack 250 54 Construction of 'E' type Qtrs. at REO Colony (triple storied) at Cuttack 400 Cuttack, Block-2 (6 Nos.) 55 Construction of 'F' type Qtrs. at REO Colony (3rd floor) at Cuttack, Cuttack 300 (2 Nos.) 56 Constn. of twin 'E' type Qtrs. Cuttack 300 (1st floor, 2nd floor) in REO Colony, Cuttack 57 Constn. of E & F type qtr. at R.W. Section, Kotapada Cuttack 400 58 Constn. of E type qtr. at R.W. Section-III, Salipur Cuttack 300 59 Construction of E type quarter J.E. R.W. Section-II, Narasinghpur Cuttack 350 60 Construction of E type quarter R.W. Section, Banki Cuttack 350 61 Construction of E type quarter R.W. Section, Nuapatna Cuttack 350 62 Constn. of of D type quarter at Banki Cuttack 400 63 Construction of 1 no.'E' type Qtrs.R.W. Section office at Baranga Cuttack 300 64 Construction of 1 no.'F' type Qtrs.R.W. Section office at Baranga Cuttack 250 65 Construction of twin 'F' type Qtrs. at R.W. Section, Gurudijhatia Cuttack 250 66 Construction of 'F' type Qtrs. at Kanpur Cuttack 250 67 Construction of 'E' type Qtrs. at Gurudijhatia Cuttack 300 68 Constn. of New C type Quarter at R.W. Colony, Deogarh Deogarh 700 69 Constn. of twin E type quarter at R.W. Colony, Deogarh Deogarh 600 70 Constn. of twin F type quarter at R.W. Colony, Deogarh Deogarh 500 71 Constn. of twin E type quarter at R.W. Colony, Barkote Deogarh 600 72 Constn. of 2 Nos. 'E' type Qtr. at Deogarh Deogarh 400 73 Constn. of 1 No. 'D' type Qtr. at Deogarh Deogarh 400 74 Constn. of 1 No. 'E' type Qtr. at Barkote Deogarh 200 75 Constn. of 'F' type Qtr. at Odapada Dhenkanal 200 76 Constn. of 2 nos. 'F' type Qtrs. at Hindol Dhenkanal 200 77 Consn. of 1 No. D type quarter at Rayagada Gajapati 400 78 Consn. of 1 no E type quarter at Rayagada Gajapati 350 79 Consn. of 1 no F type quarter at Rayagada Gajapati 250

Ooutcome Budget : DoRD for 2016-17 Page38

80 ‘E’ type quarter for J.E., R.W. Section, Jeerango Gajapati 250 81 Two nos. of 'F' type staff Qtr at Ganjam 350 82 Constn. of 'D' type Qtrs. for SDO at Bellaguntha Ganjam 350 83 Constn. of 'D' Staff Qtr at Bhanajnagar(1No.) Ganjam 350 84 Constn.of 'F' Type Staff Qtr at Bhanjanagar (4 Nos.) Ganjam 350 85 Constn. of 'C' type Qtrs. for E.E. at Bhanajnagar Ganjam 350 86 Constn. of 2 nos F type Staff quarter at R.W. Division, Berhampur Ganjam 500 87 Constn. of 2 nos. E type quarter at R.W. Division, Berhampur Ganjam 600 88 Consn. of SDO quarter at Chatrapur (D type) Ganjam 400 89 Consn. of J.E. Quarter at (E type) Ganjam 350 90 Renovation of J.E. quarter R.W. Section at Sheragada (E type) Ganjam 350 91 E type Qtr. for J.E. R.W. Section, Nuapada Ganjam 250 92 Constn. of 1 No. 'E' type Qtrs. at Hinjili Ganjam 300 93 Constn. of 'F' type Qtr. for R.W. Sub-Division, Chhatrapur Ganjam 250 94 Constn. of 'F' type Qtr. for R.W. Sub-Division, Ganjam Ganjam 250 95 Constn. of 'F' type Qtr. for R.W. Sub-Division, Gopalpur Ganjam 250 96 Constn. of 'F' type Qtr. at R.W. Sub-Division office, Digapahandi Ganjam 250 97 Constn. of 'E' type Qtr. for J.E.R.W. Sub-Division, Ganjam 250 98 Constn. of 2 Nos. 'F' type Qtr. for R.W. Sub-Division, Khallikote Ganjam 400 99 Consn. of 1 no E type quarter and 1no. F type quarter of R.W. Sub- Jagatsinghpur 600 division at Kujanga 100 Consn. of E type quarter for J.E. Of R.W. Section, Raghunathpur Jagatsinghpur 350 101 Constn. of Watchman shed of newly constructed staff quarters of Jagatsinghpur 250 R.W. Division, Jagatsinghpur (F type) 102 Construction of 2 nos.'D' type Qtrs. at Jagatsinghpur Jagatsinghpur 400 103 Construction of 4 nos.'E' type Qtrs. at Jagatsinghpur Jagatsinghpur 800 104 Construction of 1 No. 'C' type Qtrs. at Jagatsinghpur Jagatsinghpur 500 105 Construction of 1 no. 'E' type Qtrs. at Naugaon Jagatsinghpur 300 106 Constn. Of 4 nos. 'F' type Qtrs. at Jagatsinghpur Jagatsinghpur 500 107 Constn. of 1 No. 'E' type Qtrs. at Paradeepgarh Jagatsinghpur 200 108 Constn. of E type Qtr. For J.E. At Biridi Jagatsinghpur 250 109 Constn. of E type Qtr. For J.E. At Balikuda-II Jagatsinghpur 250 110 Constn. of E type Qtr. For J.E. At Erasama-II Jagatsinghpur 250 111 Constn. of Addl. Room of A.E.E. Qtr. R.W. Sub-Division, Tirtol Jagatsinghpur 200 112 Constn. of D type quarter 1 no. of R.W. Division, Jajpur Jajpur 400 113 Constn. of 2 nos E type quarter of R.W. Division, Jajpur (Block-II) E3, E4 Jajpur 600 114 Constn. of 2 nos F type quarter of R.W. Division,Jajpur (Block-II) F3, F4 Jajpur 500 115 Constn. of E type quarter for J.E. R.W. Section-III, Jajpur Jajpur 350 116 Constn. of E type quarter for J.E. R.W. Section , Mangalpur Jajpur 350 117 Constn. of E type quarter for J.E. R.W. Section, Singhpur Jajpur 350 118 Constn. of E type quarter for J.E. R.W. Section, Panikoili Jajpur 350 119 Constn. of E type quarter for J.E. R.W. Section, duburi Jajpur 350 120 Constn. of E type quarter for J.E. R.W. Section-II, Bari Jajpur 350 121 Constn. of 'C' type Qtrs. for E.E.R.W. Division, Jajapur Jajpur 400 122 Constn. of 2 Nos. 'E' type Qtrs. at Jajpur Jajpur 400 123 Constn. of 2 nos.E type Qtrs. at R.W. Division,Jajpur Jajpur 400 124 Constn. of 2 nos.F type Qtrs. at R.W. Division,Jajpur Jajpur 300 125 Constn. of 1 no.D type Qtrs. at R.W.Division, Jajpur Jajpur 400 126 Constn. of E type qtr. For J.E. R.W. Section, Dasarathapur Jajpur 250 127 Constn. of Addl. Room of D type Qtr. At R.W. Sub-Division, Jajpur 250 Binjharpur 128 Constn. of E type Qtr. For J.E. R.W. Section, J.K.Road Jajpur 250

Ooutcome Budget : DoRD for 2016-17 Page39

129 Constn. of E type Qtr. For J.E. R.W. Section, Korei Jajpur 250 130 Constn. of E type Qtr. For J.E. R.W. Section,Sukinda Jajpur 250 131 Consn. of C type quarter of R.W. Division, Jaraka Jajpur 650 132 Consn. of 1 no. D type quarter of R.W. Sub-division, Chandikhole Jajpur 400 133 Consn. of E type quarter for R.W. Section-I, Chandikhole Jajpur 350 134 Consn. of E type quarter for R.W. Section-II, Chandikhole Jajpur 350 135 Consn. of E type quarter for R.W. Section,Chhatia Jajpur 350 136 Constn. of F type Qtrs. at Kuakhia Jajpur 250 137 Constn. of D type quarter of AEE R.W. Sub-Division, Th. Rampur Kalahandi 400 138 Constn. of 1 no. f type quarter of R.W. Section Langigarh at Kalahandi 250 Langigarh road 139 Constn. of 1 no. E type quarter at Purunagumma Kalahandi 350 140 Constn. of 1 no F type quarter at Purunagumma Kalahandi 250 141 Construction of 1 No. 'C' type Qtrs. for E.E. at Kesinga Kalahandi 250 142 Construction of 2 Nos. 'E' type Qtrs. for J.E. & Staff at Kesinga Kalahandi 250 143 Constn. of D type Qtrs. for A.E.E.R.W. Sub-Division, Junagarh Kalahandi 400 144 Constn. of E type Qtr. for J.E. R.W. Section-II, Junagarh Kalahandi 300 145 Constn. of D type Qtr. for A.E.E. R.W. Sub-Division, Bhawanipatna Kalahandi 400 146 Constn. of 2 Nos. E type Qtrs. for R.W. Division office Staff at Kalahandi 400 Bhawanipatna 147 Constn. of 'E' type Qtrs. for J.E. R.W. Section, Kusumkhunti Kalahandi 300 148 Construction of 'C' type Qtrs. for E.E. at Dharmagarh Kalahandi 350 149 Constn. of 'E' type Qtr. for J.E. R.W. Section, Kalahandi 300 150 Constn. of 'E' type Qtr. for J.E. R.W. Section-II, Jaipatna Kalahandi 300 151 Constn. of 2 Nos. 'F' type Qtr. for R.W. Sub-Division, Kalahandi 400 152 Constn. of 2 Nos. 'E' type Qtr. for R.W. Section-I & R.W. Section-II, Kalahandi 400 Dharmagarh 153 Constn. of 2 Nos. 'D' type Qtrs. for A.E.E., R.W. Sub-Division-I & II, Kalahandi 400 Dharmagarh 154 Constn. of 2 Nos. 'F' type Qtrs. for Staff of R.W. Sub-Division-I & II, Kalahandi 400 Dharmagarh 155 Constn. of 1 No. 'E' type Qtr. for J.E.R.W. Section-II, Golamunda Kalahandi 250 156 Construction of 'C' type Qtrs. for E.E. at Balliguda Kandhamal 400 157 Construction of 'D' type Qtrs. for D.A.O at Balliguda Kandhamal 400 158 Constn. of 1 No. 'F' type Qtrs. for Electrical Staff at R.W. Division, Kandhamal 300 Phulbani 159 Consn. of E type quarter for JE R.W. Section , Patkura Kendrapara 350 160 Consn. of E type quarter for J.E. R.W. Section, Indupur Kendrapara 350 161 Consn. of E type quarter for J.E. R.W. Section , Ramnagar Kendrapara 350 162 Consn. of E type quarter for J.E. R.W. Section, Marshaghai Kendrapara 350 163 Construction of 'E' type Qtr. for J.E R.W Section-II, Mahakalpada Kendrapara 250 164 Construction of 'E' type quarter for R.W Division, Kendrapara Kendrapara 250 165 Consn. of J.E. Quarter at Pattamundai (E type) Kendrapara 350 166 Constn. of A.E. Quarter at R.W. Sub-Division, Pattamundai (D type) Kendrapara 400 167 Consn. of J.E. Quarter at R.W. Section, Gunthi (E type) Kendrapara 350 168 Constn. of 'E' type Qtr. at R.W. Sub-Division, Rajnagar Kendrapara 250 169 Constn. of 'F' type Qtr. at R.W. Sub-Division, Rajnagar Kendrapara 200 170 Constn. of F type quarter at RDC, Tangi Khurda 250 171 Constn. of 2 nos. Staff quarter at R.W. Section office Bologarh (F Khurda 500 type) 172 Constn. of 2 nos. 'F' type Qtrs. at Balugaon Khurda 350 173 Constn. of 2 Nos. F type Qtr. R.W. Section office at Balugaon (New) Khurda 400

Ooutcome Budget : DoRD for 2016-17 Page40

174 Constn. of 1 No. D type Qtr. at Begunia Khurda 300 175 Instaliation of 1 no.of Transfermer for R.W. Residential colony at Khurda 200 Khariar 176 Consn. of twin E type Staff quarters at Koraput Koraput 600 177 Constn. of 2 Nos. of 'E' type Qtrs. of R.W. Division, Nayagarh Nayagarh 400 178 Constn. of 2 Nos. 'E' type Qtr. at Nayagarh 400 179 Constn. of 1 No. 'E' type Qtr. at Bhapur Nayagarh 250 180 Constn. of 1 No. 'E' type Qtr. at Ranpur Nayagarh 250 181 Constn. of 1 No. 'F' type Qtr. at Ranpur Nayagarh 200 182 Constn. of 1 No. 'E' type Qtr. at Odagaon Nayagarh 250 183 Constn. of 'E' type Qtr. for J.E. R.W. Section-I, Daspalla Nayagarh 250 184 Constn. of 2 nos. 'F' type Qtrs. for Staff of R.W. Division-II, Nayagarh 300 Nayagarh 185 Construction of 2 Nos. 'F' type Qtrs. for Staff at Nuapada Nuapada 400 186 Constn. of 2 nos. 'D' type Qtrs. for D.A.O., Nuapada & S.D.O., Nuapada 400 Komna 187 Constn. of 'E' type Qtrs. for J.E.R.W. Section-II Komna Nuapada 200 188 Constn. of 'E' type Qtrs. for Cashier R.W. Sub-Division, Komna Nuapada 250 189 Constn. of 2 nos. 'F' type Qtrs. for Staff Nuapada & R.W. Sub- Nuapada 400 Division, Komna 190 Construction of 'D' type Qtrs. for A.E. at Nimapara Puri 400 191 Constn. of 2 Nos. D type Qtrs. at R.W. Division office, Nimapara Puri 500 192 Constn. of 2 Nos. E type Qtrs. at R.W. Division office, Nimapara Puri 400 193 Constn. of 2 Nos. F type Qtrs. at R.W. Division office, Nimapara Puri 300 194 Constrution of 4 nos. E type quarter for R.W.Division, Puri (G+1) twin Puri 1100 195 Constrution of 4 nos. F type quarter for R.W. Division, Puri (G+1) twin Puri 800 196 Constn. of 2 Nos. 'E' type Qtrs. for Staff of R.W. Division, Puri Puri 400 197 Constn. of 2 Nos. 'F' type Qtrs. for Staff of R.W. Division, Puri Puri 400 198 Constn. of 2 Nos. F Type Quarter for Staff at Gunupur Division. Rayagada 400 199 Constn. of E Type Quarter for Staff at Gunupur Sub-division. Rayagada 250 200 Constn. of E Type Quarter for Staff at Ramanaguda Sub-division. Rayagada 250 201 Construction of 1 no. 'E' type Qtrs. at Bhojpur Sambalpur 300 202 Construction of 1 no. 'C' type Qtrs. at Kuchinda Sambalpur 400 203 Constn. of 'E' type Qtr. at Fashimal for J.E. R.W. Section, Fashimal Sambalpur 250 204 Constn. of 2 Nos. 'D' type Qtr. for DAO & AE (Estimator) at 400 Sambalpur Kuchinda 205 Constn. of 2 Nos. 'E' type Qtr. at Kuchinda for J.E. (Estimator) & 400 Sambalpur Head Clerk 206 Constn. of 2 Nos. 'F' type Qtr. for Class-IV Staff Sambalpur 300 207 Constn. of 1 No. 'F' type Qtrs. at Dhama Sambalpur 300 208 D type Qtr. for A.E.R.W. Division (Estimator) Sonepur Subarnapur 350 209 Construction of 'D' type Qtrs. for A.E. B.M pur Subarnapur 400 210 Cosntruction of D type quarter for Asst. Engineer (Estr) at Sonepur Subarnapur 300 211 Construction of Twin 'E' type Class-III Staff Quarter at Sonepur Subarnapur 300 212 Cosntruction of Twin 'F' type Class-IV quarter at Sonepur Subarnapur 200 Completion of incomplete old R.W. Residential Buildings 2000 212 TOTAL 78000 01-789-SCPSC 1 Constn. of D type quarter at Titilagarh Bolangir 400 2 Constn. of 1 No. F type quarter at Tureikela Bolangir 250 3 Constn. of 1 no. F type quarater at Bangomunda Bolangir 250 4 Construction of 'E' type Qtrs. at Muribahal Bolangir 300

Ooutcome Budget : DoRD for 2016-17 Page41

5 Cosntn. of 2 Nos. twin 'E' type Qtrs. R.W. Section-I & II, Titilagarh Bolangir 400 6 Constn. of 'D' type Qtr. at R.W.Sub-Division, Kantabanji Bolangir 400 7 Constn. of 'E' type Qtr. at R.W.Sub-Division, Kantabanji Bolangir 300 8 Constn. of 1 no. 'D' type Qtr. for D.A.O. of R.W. Division, Mohana Gajapati 400 9 Constn. of 4 nos. 'F' type Qtrs. for Staff of R.W. Division, Mohana Gajapati 800 10 Constn. of 1 no. 'E' type Qtr. for J.E. of R.W. Sub-Division, 250 Gajapati Chandragiri 11 Twin 'E' type Qtrs. for J.E. Estimator of R.W. Division, Keonjhar Keonjhar 400 12 Consnt. Of 2 nos. 'E' type Qtrs. for J.E. R.W. Section, Keonjhar Keonjhar 400 13 Constn. of Twin F type quarter for R.W. Section-I, Champua Keonjhar 500 14 Constn. of 1 no. F type quarter at Jhumpur R.W. Sub-Division for 250 Keonjhar electircal Staff 15 Constn. of 1 no. F type quarter at Bansapal Keonjhar 250 16 Constn. of 'F' type Qtr. for R.W. Section Bhanda Keonjhar 200 17 Constn. of 'F' type Qtr. for R.W. Section, Joda Keonjhar 200 18 Constn. of 'F' type Qtr. for R.W. Section, Kaliahata Keonjhar 200 19 Consn. of Twin E type Staff quarters at Jeypore (Clerical-2 nos) Koraput 600 20 Consn. of 2 Nos. E type Staff quarters at Jeypore for Driver & Peon Koraput 600 21 Construction of 'D' type Qtrs. for A.E. Boipariguda Koraput 400 22 Construction of 'D' type Qtrs. for A.E. Dasmantapur Koraput 400 23 Constn. of twin 'E' type Qtrs. at Nabarangapur Nabarangpur 300 24 Constn. of twin 'F' type Qtrs. at Nabarangapur Nabarangpur 300 25 "E" type quarter for J.E at Dabugam-I Nabarangpur 350 26 Constn. of 'E' type Qtr. for J.E. at Kosagumuda-I Nabarangpur 250 27 Constn. of 2 nos. E type quarter at Umerkote (E4, E5) Nabarangpur 600 28 Constn. of 1 No. F type Qtr. for Electrical Staff at Umerkote Nabarangpur 250 29 Constn. of 2 Nos. E type Qtrs. at Umerkote Nabarangpur 600 30 Construction of twin 'E' type Qtrs. for staff at Division-II, Umerkote Nabarangpur 400 31 Constn. of 2 Nos. 'F' type Qtrs.at R.W. Division, Nabarangapur-II Nabarangpur 400 32 Construction 'D' type Qtrs. at Umerkote Nabarangpur 400 33 Constn. of twin 'E' type Qtrs. at Raighar Nabarangpur 400 34 Constn. of 2 Nos. 'E' type Qtrs. for J.E. at R.W. Division at Umerkote Nabarangpur 400 35 Constn. of 2 Nos. 'F' type Qtrs. for J.E. at R.W. Division at Umerkote Nabarangpur 300 36 Constn. of 1 No.'F' type Qtr. at R.W. Section,Dhodra Nabarangpur 200 37 Consn. of 4 nos. of E type quarter at Khariar twin (G+1) Nuapada 1100 38 Consn. of 4 nos. F type quarter at Khariar twin (G+1) Nuapada 800 39 Consn. of 1 no. D type quarter at Sinapali Nuapada 400 40 Consn. of 1 no. E type quarter at Sinapali Nuapada 350 41 Consn. of twin F type quarters at Sinapalli Nuapada 500 42 Consn. of 2 nos. E type quarter at Boden Nuapada 600 43 Consn. of 2 nos. E type quarters (G.F.) at Khariar Nuapada 600 44 Consn. of 2 nos. F type quarters at Khariar Nuapada 500 45 Consn. of Peripherail compound wall for R.W. Residential Colony at Nuapada 250 Khariar (1550 Feet) 46 Construction of 1 No.'C' type Qtrs. for E.E.at Khariar Nuapada 400 47 Construction of 2 Nos. 'D' type Qtrs. for A.E. & Estimator at Khariar Nuapada 400 48 Construction of 2 Nos. 'E' type Qtrs. for J.E. & Staff at Khariar Nuapada 400 49 Construction of 1 no. 'C' type Qtrs. at Sundargarh Sundargarh 400 50 Constn. of 1 No. 'D' type Qtr. at Sundargarh Sundargarh 300 51 Constn. of 1 No. 'E' type Qtr. at Subdega Sundargarh 300 52 Constn. of E type quarter at Lathikata (JE Quarter) Sundargarh 350 53 E type Qtr. for R.W. Section, Gurundia Sundargarh 250 54 Constn. of twin 'D' type Qtrs. at Panposh Sundargarh 400

Ooutcome Budget : DoRD for 2016-17 Page42

55 Constn. of 2 Nos. 'D' type Qtr. at Rourkela Sundargarh 500 55 TOTAL 22100 01-796-TASP 1 Constn. of 1 no. D type quarter at Laxmipur Koraput 400 2 Constn. of 2 nos. F type quarter at Laxmipur Koraput 500 3 Constn. of 2 Nos. 'F' type Qtrs. at R.W. Division, Sunabeda Koraput 400 4 Constn. of E type Qtrs. for R.W. J.E. at Narayanpatna Koraput 300 5 Constn. of 'E' type J.E. Qtr. at Sunki Koraput 300 6 Constn. of 2 Nos. 'E' type Clerical Qtr. at Sunabeda Koraput 350 7 Consn. of F type Peon quarter at Mathili-II Malkangiri 250 8 Consn. of F type quarter for Peon at Govindapalli (F2) Malkangiri 250 9 Consn. of D type for AE (Estimator) (F.F.) quarte at Malkanagiri Malkangiri 400 10 Consn. of 2 nos E type for Clerical (FF) at Malkanagiri Malkangiri 600 11 Construction of 'E' type Qtrs. for J.E. Mathili-II Malkangiri 300 12 Construction of 'D' type Qtrs. for A.E. Estimator at Malkangiri-I Malkangiri 400 13 Constn. of 2 Nos. 'F' type Qtrs. at R.W. Division, Malkangiri-I Malkangiri 400 14 Constn. of 'F' type Qtrs. at Govindpalli Malkangiri 200 15 Constn. of 'F' type Qtrs. at Mathili-I Malkangiri 200 16 Constn. of 'F' type Qtrs. at Khairput Malkangiri 200 17 Constn. of 2 Nos. 'E' type Qtr.for Clerical at Malkangiri Malkangiri 400 18 Constn. of 2 Nos. 'F' type Peon Qtrs. at Malkangiri Malkangiri 400 19 Consn. of D type DAO quarter at Malkanagiri Malkangiri 400 20 Consn. of twin E type Quarter at Kalimela Malkangiri 600 21 Consn. of E type J.E. Quarter R.W. Section, Chitrakonda at Malkangiri 350 Chitrakonda 22 Consn. of E type J.E. Quarter R.W. Section, Balimela at Balimela Malkangiri 350 23 Constn. of E type J.E. Quarter R.W. Section, Korukonda t Korukonda Malkangiri 350 24 Constn. of E type J.E. Quarter R.W. Section, Podia-I at Podia Malkangiri 350 25 Constn. of E type J.E. Quarter R.W. Section, Podia-II at Podia Malkangiri 350 26 Constn. of E type Senior Clerk quarter at Malkanagiri Malkangiri 350 27 Constn. of E type Drafts Man quarter at Malkanagiri Malkangiri 350 28 Constn. of F type Peon quarter at Malkanagiri Malkangiri 250 29 Construction of twin 'E' type Qtrs. for Staff at Malkangiri-II Malkangiri 400 30 Construction of twin 'D' type Qtrs. for Staff at Malkangiri-II Malkangiri 400 31 Construction of 'C' type Qtrs.for E.E. at Malkangiri-II Malkangiri 400 32 Constn. of E type quarter of R.W. Section at Manatri Mayurbhanj 350 33 Constn. of E type quarter of R.W. Section at K.C. Pur Mayurbhanj 350 34 Constn. of E type quarter of R.W. Section at Saraskona Mayurbhanj 350 35 Constn. of E type quarter of R.W. Section at Moroda Mayurbhanj 350 36 Constn. of E type quarter for staff of R.W.Sub-Division, Khunta-I at Mayurbhanj 350 Dukura 37 Constn. of F type quarter for staff of R.W.Division, Udala-I Mayurbhanj 250 38 Constn. of F type quarter for staff of R.W.Division, Kaptipada-I Mayurbhanj 250 39 2 Nos. F type Qtrs. for Staff at S.E. office at Baripada Part-I Mayurbhanj 350 40 2 Nos. F type Qtrs. for Staff at S.E. office at Baripada Part-II Mayurbhanj 350 41 Constn. of 'C' type Qtr. for S.E. R.W. Circle, Baripada Mayurbhanj 500 42 Construction of twin 'E' type Qtrs. R.W. Division, Baripada Mayurbhanj 250 43 Construction of 'D' type Qtrs. for P.A. of S.E.R.W. Circle, Baripada Mayurbhanj 350 44 Construction of twin 'F' type Qtrs. for S.E.R.W. Circle, Baripada Mayurbhanj 250 45 Constn. of 'D' type Qtrs. for S.E.R.W. Circle, Baripada Mayurbhanj 400 46 Constn. of 'E' type Qtrs. for S.E.R.W. Circle, Baripada Mayurbhanj 300 47 Constn. of 'F' type Qtrs. for S.E.R.W. Circle, Baripada Mayurbhanj 300

Ooutcome Budget : DoRD for 2016-17 Page43

48 Constn. of 'C' type Qtr. for S.E. R.W. Circle, Baripada Mayurbhanj 400 49 Constn. of F type quarter at R.W. Section, Tiring Mayurbhanj 250 50 Constn. of E type quarter at R.W. Sectiion, Moranda Mayurbhanj 350 51 Constn. of F type quarter at R.W. Sectiion, Moranda Mayurbhanj 350 52 Constn. of E type quarter at R.W. Sectiion, Gorumahisani Mayurbhanj 350 53 Constn. of F type quarter at R.W. Sectiion, Gorumahisani Mayurbhanj 250 54 Constn. of F type quarter at R.W. Section, Bijatala Mayurbhanj 250 55 Constn. of E type quarter at R.W. Section, Patpur Mayurbhanj 350 56 Constn. of F type quarter at R.W. Section, Kusumi Mayurbhanj 250 57 Constn. of F type quarter at R.W. Section, Jamda Mayurbhanj 250 58 Construction of 3 Nos. 'E' type Qtrs. for Staff at R.W. Division, Mayurbhanj 300 Rairangpur 59 Constn. of 1 no. 'F' type Qtr. for Peon of R.W. Sub-Division, Bahalda Mayurbhanj 200 60 Constn. of 1 no. 'E' type Qtr. for Cashier of R.W. Sub-Division, Mayurbhanj 250 Bahalda 61 Constn. of 1 no. 'E' type Qtr. for J.E.R.W. Section, Tiring Mayurbhanj 250 62 Constn. of 2 nos. 'E' type Qtrs. at R.W. Division, Rairangpur Mayurbhanj 300 63 Constn. of 2 nos. F type quarter at Umerkote (F4, F5) Nabarangpur 500 64 Constn. of Twin F type quarter at Chandahandi (G+1) Nabarangpur 800 65 Constn. of D type quarter for D.A.O. at R.W. Sub-Division, Nabarangpur 450 Umerkote 66 Constn. of E type quarter for JE R.W. Section , Chandrapur Rayagada 350 67 Constn. of F type quarter for R.W. Staff at Chandrapur Rayagada 250 68 Constn. of E type quarter for J.E. RW section Ramanaguda Rayagada 350 69 Constn. of F type quarter for R.W. Staff at Ramanaguda Rayagada 250 70 Constn. of E type quarter for JE. R.W. Gumuda Rayagada 350 71 Constn. of F type quarter at R.W Staff at gumuda Rayagada 250 72 Constn. of E type quarter for JE RW Section Gudari Rayagada 350 73 Constrution of F type quarter for R.W. Staff at Gudari Rayagada 250 74 Constn. of E type quarter for JE RW Section K.Singhpur Rayagada 350 75 Constrution of F type quarter for R.W. Staff at K.Singhpur Rayagada 250 76 Constn. of 2 nos. E type quarter for Staff at R.W. Sub-Division, Rayagada 600 Padampur 77 Constn. of F type quarter for R.W. Staff at Padampur Sub-Division Rayagada 250 78 Constn. of C type Qtr. for EE at Rayagada Division Rayagada 700 79 Constn. of F type quarter for PH Staff at Rayagada Rayagada 250 80 Construction of 'D' type Qtrs. for D.A.O. Gunpur Rayagada 300 81 Construction of twin 'F' type Qtrs. for Staff R.W. Division, Gunpur Rayagada 300 82 Constn. of 'D' type Qtrs. at Ramanguda Rayagada 400 83 Construction of 2 E Type Quarter for Staff at Rayagada Division. Rayagada 300 84 Construction of 2 F Type Quarter for Staff at Rayagada Division. Rayagada 300 85 Construction of E Type Quarter for Staff at Kasipur Sub-division. Rayagada 250 86 Construction of E Type Quarter for Staff at B.Cuttack Sub-division. Rayagada 200 87 Construction of 2 F Type Quarter for Staff at Kasipur Sub-division. Rayagada 300 88 Construction of E Type Quarter for J.E. Section Rayagada 200 TOTAL 29900 GRAND TOTAL 130000 N.B. The Work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page44

Work list under D.No.28-5054-COL On R&B-SP-DS-04-DOR-789-SCP for SC/ 796- TASP/800-OE-2161-RIDF-37107-Major Works for the year 2016-17

Sl Name of the Scheme /Project/Work District which Financial No implemented outlay (in TRS) (including Normal, SCP & TASP) 1 2 3 4 04-789-SCPSC 1 H.L. bridge over Chilanti nallah at 7th km. on Rengali-Kuluma via Nailu road Angul 1 H.L. bridge over Chilanti nallah at 8th km. on Bajrakote-Baliposi road 4 x 2 Angul 1 9.77m. 3 H.L. bridge over Khairasahi nallah at 1st KM on Thakurgarh-Kantapal road Angul 1 4 Kasafal Chandanpalihari Chhak to Nuakundi via Sahu Chhak project Balasore 1 5 Talakurunia to Arhua bad via –Dolpur Balasore 800 6 Anantapur to Bakeswarpur via Patimunda & Palapur Balasore 7000 7 Benuda- Nimapouhari to Kulida PMGSY road via Darhha Patrasahi road Balasore 7000 Mahagah PMGSY road to Kuliha via Kiagadia Kalyanpur Kaisa & Karihandu 8 Balasore 1963 road 9 Bada Mahisahi Chhak to S.R. College Road Balasore 1000 H.L. bridge over Jhainjore at 2nd km. on Kadobahal-Jhilminda road 5 x 10 Baragarh 1 30.63m. 11 Bridge over river Jeera at 10th km. on PWD road-Kusanpur-Baramkela road Bargarh 1 H.L. bridge over river Genguti at 10/10 km. on Mangarajpur-Kampada- 12 Bhadrak 2000 Iswarpur road 2x 0.63m. 13 Manjuri Gobindapur Road (Phylin) Bhadrak 1 H.L. bridge over river Reba near Patuli on Bhandaripokhari-Patuli road 14 Bhadrak 1 alongwith long approach 15 Hatapada Senyata road Bhadrak 5000 16 Tailu to Mahagupur via Gotsira Bhadrak 5000 17 Bridge over Tendiapali nallah at 13th KM on Sonepur PWD road to Tendipali Bolangir 1 H.L. bridge over Laxmipur nallah at 21st km. on Boudh-Dhalpur road 3 x 18 Boudh 1 25.35m 19 H.L. bridge over river Bagh at 25th km. on Manmunda-Sagada road Boudh 1 20 H.L. bridge over Kapakhai nallah on 2nd km. on Baghiapada-Birigada road Boudh 1 21 Bridge over Meherruni nallah at 10th KM on Khaliapali-Lamsori road. Boudh 1 H.L. bridge over river Kathjodi near Kaijanga at 18th km. on Jhinkiria-Bentaka- 22 Cuttack 1 Chanduli road 21x30.63m 23 Telengapentha-Sainda road (0/0 - 4/0 km.) Cuttack 1 24 Panimando to Ratilo road Cuttack 1 25 Majhikandei- Bilasuni Cuttack 3000 26 Karilo Panchgochia road Cuttack 2000 27 R.D. road to Oringabandi via Dandapadia Talupadia road Cuttack 5000 28 Dhaipur Kaitha Chhak to Kantol PWD road Cuttack 1 29 Bridge over Lunibandha nallah at 8th KM on Bidharpur-Joranda -Kaluria road Dhenkanal 1 30 Golabandha-Buguda road (8.10 km.) Ganjam 1

Ooutcome Budget : DoRD for 2016-17 Page45

Talasakara Antarpada Road ( Sankula to Manibandha to Pdpur Sasan from 31 Ganjam 500 0/0 to 2/100 km ) 32 Dholpita Domuhani road Ganjam 1500 33 Chopra to Nada road Ganjam 2000 34 Purushottampur-Bhimpur via Kulasingh road Ganjam 1 35 Khandadeuli via Nimisola Ganjam 1 H.L. bridge over Kharikhari nallah at 5th km. on Santoshpur-Umari-Barpali 36 Ganjam 13000 road 37 Sikharpur-Sahapur road Ganjam 1 38 Kaleswar-Pandia-Jaugada road Ganjam 1 39 9th Distribution Embankment road Ganjam 1 40 H.L. bridge over river Devi on Devidola connecting to Gada village Jagatsinghpur 1 41 Dhanipur Mandasahi Bhokanji road. Jagatsinghpur 7500 42 Chasikhanda-Gelpur road (7.80 km.) Jagatsinghpur 1 43 Tandikula to Champahat Jagatsinghpur 7500 44 Rahama Pandua ( R&B) road Purudi via Napanga Jagatsinghpur 7500 45 Bridge over river Hansua on Katra-Kutilo road Jagatsinghpur 1 46 Kamarpada-Gadama road Jagatsinghpur 1 47 H.L. bridge over river Nuanai at 2nd km. on Bari-Binjharpur road Jajpur 5000 S.B. over Benga nallah at 8th km. on B.C.J. High School-Badakunal- 48 Jajpur 1 Naragochha road 4x10.77m 49 Sasanpada Sayedpur road Jajpur 3000 50 Bridge over Tenta nallah on Sayedpur-Sanpada road Jajpur 1 51 Sukinda Duburi mundapandu road Jajpur 4000 52 NH5 to Kolha via Haridaspur Railway station from 0/750 km to 9.00 km Jajpur 1 53 R & B road to Budha Kendua Jajpur 7500 54 N.H.5 to Sidhipur Jajpur 7500 H.L. bridge over river Udanti at 2nd km. on Udsurang-Kuhura road 7 x 55 Kalahandi 1 30.63m 56 Bridge over Kalabila nallah at 2nd KM on Kadua-Bhagirathipur road Dhenkanal 1 57 Gochhapada-Balandapada-Malikikud road 14 km. Kandhamal 1 58 Pasina Linepada road Kandhamal 7000 59 Ayeba Nembura road Kendrapara 7200 60 Khariar- Dumerjhor Nuapada 7000 Box cell bridge over river Kadua at 8th km. on Roulpatana-Dhantri- 61 Puri 1 Panichhatra road 6 x 8m x 3.91 H.L. bridge over Tangarjore nallah at 4th km. on Garposh-Nuapali road 3 x 62 Sambalpur 1 25.35 m 63 H.L. bridge over Harada nallah on PWD road-Themra (extension to NH 6) Sambalpur 1 Total : 127500

04-796-TASP 1 Bridge over Ghagara nallah on Anandapur-Goyalmunda road Keonjhar 1 2 Batipal Talakanendi road Keonjhar 1 3 Ramachandrapur to Balibarun road Keonjhar 7000 4 Bataguda Rutungia via Pusungia road. Kandhamal 10000 5 Daringabadi-Partmaha road (0 to 7 km.) Kandhamal 1963 6 Baliguda-Budaguda road Kandhamal 7000 S.B. over river Kushabhadra at 3rd km. on Kaptipada-Padadiha via Kulialam- 7 Mayurbhanj 1 Sanadei

Ooutcome Budget : DoRD for 2016-17 Page46

8 Jharpokharia-Sankhabhanga road Mayurbhanj 1 9 Betnoti-Dahikoti-Merda Road (9.910 km) Mayurbhanj 1 10 SH-19(Sankerko) to to Jadunathpur road Mayurbhanj 3000 11 Biswanathpur Bijepur road (27/0 to 38/0 Km.) Kalahandi 5000 12 NH6 to Rengalbeda via Gohira road Deogarh 1 13 Saida-Purunapani road Deogarh 1 14 Joranda Vegibola road Dhenkanal 1 15 Tilapada Nathua Chuli road Dhenkanal 500 16 Bridge over river Devi at 3 Km on Bhokanji-Mundilo road (600m) Jagatsinghpur 20000 H.L. bridge over river Telingiri at 4th km. on Mundaguda-Somilaguda- 17 Koraput 1 Nakulguda road 4 x 30.63m 18 H.L. bridge over river Kurla at 4th km. on Kundra-Lima road Koraput 1 19 Bridge over river Kolab on Ramgiri-Raniguda road Koraput 2000 20 Kotpad- Chirmandi ghat (5.8 km) Koraput 1 21 Sashapur - Malidihi Road Jharsuguda 10000 22 Bridge over Ektali Nallah at 7.2 km. on Bisoi-Mahubhandar road (45m) Mayurbhanj 6000 23 Kadadihi-Mikdih-Thakumapatna road Mayurbhanj 1 24 Vegidiha to Surat road Mayurbhanj 10000 25 Jaldiha to Sadheikala Mayurbhanj 2500 26 Bridge over river Sunder Gouduni nallah on Arsala-Chauthia road (40m) Keonjhar 1 27 Mangalpur-Bhimkund Road (10 to 15 Km.) Keonjhar 1000 H.L. bridge over river Samakai nallah at 16th km Telkoi-Madhusudanpur- 28 Keonjhar 1 Talapada road ( 1x30.63 m) S.B. over Perencho nallah at 5th km. alongwith Talapada-Barbandha road 29 Kalahandi 1 (0/0 to 12.00 km) H.L. bridge over river Deogarh & Muran at 8th & 10th km. on Dasmantapur- 30 Koraput 1 Lulla road 2 x 24.75m & 4 x 30.63m 31 Koraput Mahadeiput-Panasaput ( 8.9 Km) Koraput 1 32 Birikote Guluba Road Gajapati 3000 H.L.Bridge over river Indrabati at 8th km. on Rajoda- Benia Nadighat road 9 x 33 Nabarangapur 20000 30.63m H.L. bridge over river Bhaskel at 2nd km. on RD road-Ghodakhunatia road 34 Nabarangapur 1 7x30.63 35 Tikabali-Chakapada-Nediguda-Badangi road Kandhamal 1 36 Raikia-Simanbadi road 4 km. Kandhamal 1 37 Raikia Badajahari road Kandhamal 12000 38 Masaripada-Kelapada-Sadingia-Balandapada road Kandhamal 1 39 Bridge over Balisutra Nallah at 2nd km. on Jamada-Hensda road (45 m) Mayurbhanj 5000 40 Gorumahisiani to Chandipahandi Mayurbhanj 12000 41 Baghia Tanpur to Barakati Mayurbhanj 1000 42 H.L. bridge over river Bansadhara on Dangosorada-Piskapanga road 4x30.63 m Rayagada 1 H.L. bridge over river Nagavali at 2nd k.m. on Jimidipeta-Pipalguda road 4 x 43 Rayagada 1 30.63m 44 H.L. bridge over river Nagabali on Kotapeta-K.Malegaon road Rayagada 1 H.L. bridge over river Jhajabati at 1st km. on near Serikana on PWD road- 45 Rayagada 1 Malipada-Tadama road alongwith long approach. H.L. bridge over river Nagavali at 4th km. on Antamada-Denduli-Therubali 46 Rayagada 1 road H.L. bridge over Phalphalia nallah at 50th km. on Padmapur-Gudari-Raibiji 47 Rayagada 1 road

Ooutcome Budget : DoRD for 2016-17 Page47

48 Jimidipeta -Champikota road (11.25 km) Rayagada 1 49 Hatibandha Dalakudar road Sundargarh 1 50 Pandrisila road Sundargarh 500 51 Rungaon Sahajbahal road Sundargarh 1000 52 Junadihi-Laida road Sambalpur 1 H.L. bridge over Surubalijore nallah at 1st km. on Tribenipur Chhaka- 53 Sambalpur 1 Badkhola via Bharatpur road. 54 Bridge over Kardapal Nallath at 13th km. on Padabalanda - Badmal road (60m) Sambalpur 1 55 Bridge over Champali nallah at 10th KM on PWD road to Rail road Sambalpur 1 H.L. bridge over river at 6th km. on Sambalpur-Sonepur to 56 Sonepur 4000 Chadheipanka-Binka road 57 Bridge over Bhitarli nallah at 2nd KM on Nandapur-Sarabati road Sunabeda 1 58 HL bridge over river Ichha at 8th km on Mahulpali Surda Road Sundaragarh 13000 Bridge over Basundhara Nallah at 7th km. on Duduka-Barapali via Kuisara 59 Sundargarh 15000 road (60m) 60 H.L.bridge over river Safei at 2nd km. on Talsara-Bijadihi road 6x30.63 1 S.B.over Udayapur nallah at 3rd km. on Pourabela-II to Udayapur road ( 61 Nabarangapur 1 4x10.77 m ) 62 PL road to Kumuli, Chattibeda, Bharsundi to PL road. (18 Km) Nabarangapur 1 Total : 172500

04-800-Other Expr. Bridge over Hatigenja nallah at 16.20 km. on Sanahula-Paikasahi-Kantapada 1 Angul 1 road 3x25.35 m 2 Bridge over Aunli on Bagedia Sarpa road (150m) Angul 15000 3 Somanathpur Ankula Gopinathpur Road (5.520 Km) Angul 2000 4 Jharbeda Jambua Road (8.0 Km) Angul 1 5 Boinda Makarmunda Road Angul 1000 6 Bridge over Local nallah at 1st km. on Gopinathapur-Mandarpur road Balasore 1 7 Kantapada Railway station to Srijanga Road. Balasore 10000 8 Silda Mahadev Temple to Padabadagaon Rly gate road Balasore 1 Bridge over Local & Genguti Nallah at 4.5 Km & 5.6 km. on N.H.5 to Mulising 9 Balasore 1 (15m & 25m) 10 Bridge over Digiripada nallah at 9th km. on Nuagaon-Kudutuli-Sainipada rd Kandhamal 1 Bridge over Badmal Nallah-I&II at 14.1 & 14.375 Km on Ambabhona-Dunguri 11 Bargarh 100 road (25m & 20m) 12 Bhatli-Nuagarh-Sulsulia road Bargarh 100 13 Dolasahi Guamal Tihidi road from 0/0 km. to 3/700 km Bhadrak 1 Bridge over Palasahi & Chingadanashi nallah at 2nd Km & 5th km. on 14 Bhadrak 11000 Doharasahi-Paramandapur via-Chingadanashi Palasahi rd (32m & 21m) 15 Bridge over river Kapali at 0.7 Km on RD Road to CS Nandoor (50m) Bhadrak 1500 16 Ganijanga-Ramakrishnapur Bhadrak 1 HL Bridge over river Mantei at 4.800 km. on BC road to Bahabalapur with 17 Bhadrak 11000 approaches 18 Manjuri-Govindapur Road.(RIDF) Bhadrak 2000 H.L. bridge over river Reba at 4th km. on Jhatiasahi-Mangalpur road 2 x 19 Bhadrak-II 1 25.35m 20 Bridge over river Udanti (Tel) on Dokripada-Atigaon road (150m) Kalahandi 30000 21 Gurujanga - Kajalaganda road Khurdha 1 22 Gayabandha- Olasingh road Khurdha 1500

Ooutcome Budget : DoRD for 2016-17 Page48

S.B. over river Malaguni (Mandakini) & river Khatial on Kaipadar-Siko- 23 Khurdha 1 Gadamantri road alongwith long approach H.L. bridge over Kusabhadra at 14/990 km. connecting Sisu Ananata Pitha- 24 Khurdha 7000 Jayadev Pitha 25 Impvt. to NH 203 to Gangotri nagar Lane-I to Lane -III BBSR Khurdha 16500 26 Atri jakara road Khurdha 1 27 Bolagada Dalei sahi road Khurdha 5000 28 Biribandha Retanga road Khurdha 2500 S.B. over river Nuapali nallah at 10th km on Deogaon-Nuapalli road( Jarasingh 29 Bolangir 1 Athagaon) H.L. bridge over river Baurijore nallah at 10th km. near Kudasingha on 30 Bolangir 1 Singhkhaman-Kudasingh road 31 S.B. over Lanth at 3rd km. on PWD road-Pallimal road 9 x 10.77m. Bolangir 1 32 S.B. over Sakam nallah at 2nd km. on Fasad-Fatabahal road Bolangir 1 33 Rajendra Chhaka-NH 201 via Women's College road Bolangir 1 34 Chahapada-Kanpur road (3.795 - 9.60 km.) Cuttack 1 Bridge over River Badagenguti at 2nd Km on Basudevpur Madhupur Jayapur 35 Cuttack 33000 Via-Dobandia road (300m) 36 Alarpur - Kateni road (4.07 km) Cuttack 5000 37 Katikata – Tilanga Cuttack 8000 38 Sauri Ramaswar Cuttack 4000 39 Bridge over Teljdi nallah on Patsundarpur-Mahura road Cuttack 1 40 Godibandha Dasrathipur road Cuttack 5000 H.L. bridge over river Brutanga at 10th km. on Andarikote-Ghugudupada road 41 Nayagarh 1 3 x 30.63m 42 Bhogar Tendabadi road Nayagarh 4000 S.B. over Kuanria nallah at 9th km. Pingua-Laulai road alongwith 6 km. 43 Dhenkanal 1 approach road H.L. bridge over river Mahendratanaya at 3/80 km. on Gosani-Gurandi- 44 Gajapati 1 Lingipur-Upalada road. 4 x 30.63m 45 Gorabandha Kichling Kainpur road Gajapati 1 46 S.B. over Bantadhara nallah at 19th km. on -Gereda-Lembhei road Ganjam 1 S.B.over river Bodanadi at 2nd km. on PWD Road to Malingi via Routi road 47 Ganjam 1 (6x10.77 mtr ) 48 S.B.over Banta nallah at 3rd km. on Gereda-Khetamundali road (6x10.77 mtr ) Ganjam 1 HL Bridge over river Baghua at 2nd km on PWD road to Bhagabanpur road 3 49 Ganjam 1 x 30.63m 50 Bridge over Bada Nallah at 5.1 km. on NH-217 (NH-59) to Surekhadeipur road (45m) Ganjam 1 51 Chakundapalli-Dhumakumpa Road (6KM) Ganjam 8000 Talasakar-Antarapada road from Pump House-Sakaleswar Pitha-P.D.Pur 52 Ganjam 1 Sasan Chhaka & Sanakulai 53 Janivilli road Ganjam 12000 S.B. over Kokolaba nallah near Manapur at 20th km. on Belaguntha-Gereda- 54 Ganjam 1 Lambee road 55 Gundurisahi-Gayaganda road Ganjam 1 H.L. bridge over river Badanadi at 10th km. on Dholpita-Domuhani road 3 x 56 Ganjam 1 30.63m H.L. bridge over river Padma at 7th km. on Baradi-Lokamari-Amrutulu road 3 57 Ganjam 500 x 30.63m 58 Raipali to Gopinathpur road (7 km.) Ganjam 1

Ooutcome Budget : DoRD for 2016-17 Page49

59 Kendupadar-Pailipada road Ganjam 7000 Buguda, Polasara PWD road to Ganjam Border Via- Chirikipada & Maa 60 Ganjam 8000 singhasini Pitha 61 Jhadabhaumi-Kadapada Ganjam 4000 62 Kulangi K Banpur via Budhanta Ganjam 1000 63 Moritana Chilikhana Ganjam 500 64 Balia Aladigaon road Ganjam 2000 65 R.D. road Kudutei to Samaabandha via Badakhanda Tulasipalli & Narayanpalli road Ganjam 500 66 Approch road to JN Sagar MIP Polsara via JN Pur Ganjam 1 67 Khajapalli-Satanalla via Kalimeghi Beruanbadi road (8.43 km.) Ganjam 1 H.L. bridge over Kharkhari nallah at 2nd km. on Sama-Phasipada road 2 x 68 Ganjam 1 30.63m. 69 Badamahuri-Samantaratnapalli via Bauribagadia road (6.90 km.) Ganjam 1 70 Sheragada-Kumarpani Karadakara road (0/0 to 7.80 km.) Ganjam 1 H.L. bridge over river Bahuda connected to village Parsambha ( block) 71 Ganjam 15000 to Badabaranga, Andra pradesh Chandrapur Sasan H.L. bridge over river Bahuda connected to village Jagannathpur-Turibodi 72 Ganjam 4000 (Patrapur block) H.L. bridge over river Bahuda connected to village Pandri (Chikiti block) to 73 Ganjam 12000 Chaitanya Chandrapur sasan Bridge over Local Nallah at 0.8,0.9 & 1.2 Km on PWD road-Kusapada, Potanda 74 Ganjam 4000 Via,Kamapadia,Kedarpur (8m,24m&16m) 75 Sikiri MDR 64-P.Ramchandrapur Ganjam 4000 76 Berhampur Medical Chhaka-G.Jagannathpur via Bhabinipur road (5.30 km.) Ganjam 1 77 Darubhadra-Gandala via Maruapali road Ganjam 1 78 H.L. bridge over river Rushikulya on Tahara-Vetasingi road Ganjam 8500 79 R.Subani to Haripur via Jhatipadara Khuntapali from 0 km to 16 km Ganjam 1 80 Chaittanyapada-Dayapali via Godarapali & Drubandha Ganjam 1 81 Dharampur-Gopalpur chhaka via Venkatrapur-New Boxpalli road Ganjam 1 82 Khajipalli-Kanchuru via Mohanpali road Ganjam 1 83 Punarkhundi to Sasan Ambagaon via saru Ganjam 1 84 PWD road ( Harina )to Pudomari Ganjam 1 85 H.L. bridge over river Bahuda at 1st km. on K.Nuagaon-BSNL Pur road Ganjam 1 86 Hinjili-Khirida road (0/0 to 2.65 km.) Ganjam 1 87 Gandala-Sadasivpur-Chandipadar road (0/0 to 4.80 km.) Ganjam 1 88 Locha padi PWD road to Saktinagar via Lamanagar Merisahi Badasahi rd Ganjam 1 89 Mahulipala- Boripadar raod Ganjam 1 90 Jakari PWD road to Komaradi raod Ganjam 1500 91 Surangi-Nuapada via Rajapur-Pitigovindapur and Subalya (0/0 to 15/6 km.) Ganjam 8000 Digapahandi PWD road to Gokarnapur PWD road via Jakarpali, Sanaboreda, 92 Ganjam 1 Bada Barada, Kankeri 93 Jarada-Sunakhala via Ghati Mukundapur (0/8 km.) Ganjam 8000 Construction of Bridge over Jaunli nallah at 9/000 KM on Talapada PWD road to 94 Ganjam 1500 Hukuma via Palashapur Titigaon -Haradamara-Mahalimba -Mandarada road 95 Talapada to Hukuma road Ganjam 7000 96 Badabaranga-Mahisanpur road Ganjam 6000 97 Sunepur PWD road to Surala road Ganjam 3001 98 Nuapada Kabulpur road Jagatsinghpur 500

Ooutcome Budget : DoRD for 2016-17 Page50

Expressway Kaijhar Chhaka to Ostapal Bramhanipal road from 0/0 Km to 99 Jajpur 500 6/300 Km H.L. bridge at Namitikiri over HLC Range-II at 9th km. & Jamuna nallah at 7th 100 Jajpur 1 km. on Ankula-Panikoili road 2 x 25.35m & 4 x 30.63m HL Bridge over river Baitarani at 8th km on Barundei-Mathurapur road 24 x 101 Jajpur 1 30.63m 102 Bridge over Ganda Nallah at 2nd km. on Gobardhanpur Ostapla road (30m) Jajpur 1 103 Malanandapur to Adanga Bridge (6.33Km) Jajpur 4000 104 Duburi Expressway to Patapur via Nakadei and Sorisiapada Jajpur 4000 105 Paresnar pur Kutepur road Jajpur 4000 106 Bridge over river Birupa at 3rd km. on Bahujanga-Dhaudiapada road (150m) Jajpur 7000 107 NH-5 to Sunguda via Khosalpur Jajpur 1 108 Achutapur- Badabarisahi road Jajpur 15000 H.L. bridge over river Badagenguti near Biramalpur at 3rd km. on Udayagiri- 109 Jajpur 5000 Majhipada road Bridge over Chetei Nallah-I&II at 0.4 & 0.03 km.on Bayanighat-Mohagab Via- 110 Balasore 10000 Ramchandrapur Madhupur,Kusuti road (30m&30m) 111 S.B. over Pandra nallah at 12th km. on Anantapur-Balibo-Mahulpal road Dhenkanal 1 112 Chandar Ektali road Dhenkanal 7000 113 Bridge over Brahmani drainage cut at 8th km. on Dobandha-Ghagara road Kendrapara 3000 114 Benabandha Kendrapara 500 H.L. bridge over Guptagiri nallah at 4th km. on Gojabandha-Ramnagar road 115 Kendrapara 1 2x30.63m H.L. bridge over river Birupa at Benipur-Kampagarh on Laxminarayanpur- 116 Kendrapara 1 Balikuda road 117 Narayanpur to Ajgarpatia Kendrapara 4000 118 Nayadia ghat to Singhayada via krushnadaspur Kendrapara 11227 119 Gobindpur Thakur patna road Kendrapara 7000 120 H.L. bridge over river Dahuka at 4th km. on Tulasipur-Khadugaon RD Nayagarh 7502 121 H.L. bridge over river Kusumi at 5th km. on Kadalibandha-Gunthasahi road Nayagarh 1 122 Nuagaon-Naitalia road Nayagarh 2000 123 Jamujhari to Golapokhari road Nayagarh 3000 124 Dighalo Chhaka-Terundia via Musunupur road. Puri 1 125 Charichhak Gop road to Temple Chhak Puri 4000 126 Ottar Balikanda to Silei road Puri 7000 127 Nuapada-Kuliabandha road 17.57 km. Nuapada 1 128 H.L. bridge over river Sunder at 1st km. on Komana-Bhela road Nuapada 1 129 Salepali (PWD) road to Babejuri via Chakamal Bolangir 1 HL Bridge over river Balighai nallah I & II at 13/900 km & 14/300 Km on 130 Puri 1500 Jankia-Kanasa road 131 Mandarbasta - Kalyanpur road Puri 1 132 Gorual to Balipada Sandhapur road Puri 3000 133 Danda Mukunda pur to Delanghat road Puri 1 134 NH 203 to Basudevpur via Dubu Duba Puri 1 135 Approach road to Bridge over river Daya on Kalyanpur- Mandarabasta Road Puri 7000 136 H.L. bridge over river Suktel at 1st km. on Pua-Deulapadar road Sonepur 1 137 H.L. bridge over river Nibruti at 1st km. on Ghatkaintara-Maradiguchha road Sonepur 1 138 S.B. over Ichhapada nallah at 0.500 km. on PWD road-Ichhapra road Bolangir 1

Ooutcome Budget : DoRD for 2016-17 Page51

Bridge over Ghagarajore nallah at 3td km. on Turekela to Badabanki road 139 Bolangir 6000 (50m) 140 H.L. bridge over river Tel at 14th km. on Titilagarh-Lutharbandha road Bolangir 25000 Total : 450000

Grand Total : 750000

N.B. The work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page52

PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

PMGSY programme, a Govt. of India sponsored scheme, aims at providing all-weather connectivity to all unconnected habitations in rural areas of the State upto population 500 and above for 12 Non-IAP districts and 250 and above in 18 IAP districts and population 100 and above in 38 blocks of IAP districts. Accordingly, GoI has so far sanctioned projects worth

.17815.38 crore for construction of 11649 nos. of roads with a length of 45190.14 Km. in different phases with construction of 292 missing link bridges on PMGSY roads for providing connectivity to 16392 habitations. Funds of .13310.37 Cr. have been received from MoRD, GoI. till end of February’2016, .14578.19 crore has been utilised for construction of 35428 Km. of roads including 134 missing link bridges for providing connectivity to 12660 habitations. Excess fund utilized has been met from State’s contribution.

During the year 2015-16 state has programmed to utilize .2238.33 crore for construction of roads of 3055 Km. Till end of Feb.’16 MoRD has provided funds of .1382.70 Cr and State has provided .955.63 Cr. towards state share. By end of February’2016, .1917.91 Crore has been incurred by constructing 3040 Km. of roads for providing connectivity to 1691 habitations.

During the year 2016-17, it has been programmed to utilize .2300 Crore for construction of roads of 5500 Km. Out of .2300 Cr., .1380 Cr. will be received from MoRD, GoI and balance

.920 Crore will be provided by the State towards construction of bridges & tender premium.

Ooutcome Budget : DoRD for 2016-17 Page53

Work list under PMGSY programme for the year 2016-17 (Roads & Bridges)

No. of No. of road on- Expenditure to KMs to be achieved Sl. bridges on- Name of the District going/ to be made No. going/ to be be taken during 2016-17 BT CC takenup. up 1 2 3 4 5 6 7 1 Angul 16 2 Balasore 162 261.95 29.11 3 Baragarh 35 49.70 5.52 4 Bhadrak 76 162.67 18.07 5 Bolangir 98 213.31 23.70 6 Boudh 25 48.29 5.37 7 Cuttack 71 144.91 16.10 8 Deogarh 24 50.67 5.63 9 Dhenkanal 26 28.49 3.17 10 Gajapati 110 370.71 41.19 11 Ganjam 112 262.04 29.12 12 Jagatsinghpur 44 82.56 9.17 13 Jajpur 42 80.38 8.93 14 Jharsuguda 10 7.93 0.88 15 Kalahandi 116 230000.00 193.92 21.55 16 Kendrapara 57 lakh 145.10 16.12 17 Keonjhar 124 315.50 35.06 18 Khurda 41 56.75 6.31 19 Koraput 148 300.14 33.35 20 Malkangiri 168 376.96 41.88 21 Mayurbhanj 104 243.58 27.06 22 Nawarangpur 66 152.73 16.97 23 Nayagarh 68 162.26 18.03 24 Nuapada 54 139.12 15.46 25 Phulbani 91 196.35 21.82 26 Puri 167 262.01 29.11 27 Rayagada 57 148.65 16.52 28 Sambalpur 74 112.78 12.53 29 Sonepur 69 101.28 11.25 30 Sundergarh 152 256.91 28.55 Total : 2407 1950.00 550.00

Ooutcome Budget : DoRD for 2016-17 Page54

Work list under D.No.28-5054-COL On R&B-SP-SS-04-DOR/80-General-800-OE/789-SCP for SC/796-TASP-2161-RIDF-37257-Biju Setu Yojana for the year 2016-17 Sl No Name of the Work Name of the Financial District outlay ( in TRS) 1 2 3 4 80-789-SCPSC

1 Bridge over Singada Nallah on Badatribida-Chandrabil-Soloda Angul 10000 Road 2 H.L. bridge on Singada Nallah at 1st Km on Baghabaspur- Angul 10000 Ranjagoda Road 3 Bridge over Singada Nallah on Kuskila Kosala via Barpada Angul 953 Chankundapal Road 4 Bridge on Nandira Nallah on Angul Kalamchhuin Road Angul 452 5 Bridge over Lingara nallah on Jorapada-Purunakote road Angul 1 6 HL bridge over Tikira nallah at 2nd km on Bijigol - Karadi Road Angul 1 7 HL Bridge over Chilanti nallah on Sujhari-Denali via Olanda village Angul 3000 road 8 HL Bridge over Ghumudra nallah at 7th KM on Kantiaposi- Angul 1 Sankhamura road 9 Bridge over Ghagara nallah connecting Kesura-Ringpur road Balasore 5000 10 H.L. bridge over Dhali nallah on Baunsakhunti - Dhana road Balasore 1 11 Bridge over Khaparapada Nallah at 6.800 Km. on R.D.road to Balasore 6173 Sankarpada Via- Bagada, Alda Road. 12 Constn. of bridge over Reba Nallah at 8th Km. on Bariha to Balasore 2822 Nuabaj road 13 Bridge over river Gangahar on Remuna Palasia road. Balasore 10000 14 HL bridge over Sunghamunha nallah at 1st km on Jamkunda F.E. Balasore 1 to Choudhurikudi road 15 HL bridge over river Sono on Begunia - Totapada to Dumgandira Balasore 1 road 16 Bridge over Chhapulia Nallah at 0.722 Km. on Kuruda to Ainiri Balasore 1 road 17 Bridge over Chikiti nallah on PWD road-Thalabartana road Balasore 1 18 Bridge over Local Nallah at 2nd km. on Khaira to Oupada Via- Balasore 7150 Kukudia road 19 HL bridge over river Kansabansa branch on R.D.Road to Balasore 1 Baunshakhunta road 20 H.L. Bridge over Coast canal at 2nd km on Kulhadnada to Balasore 1000 Badatalapada road. 21 Bridge over Chitei nallah at 8th km. on Baharada-Bhuatentuli- Balasore 1 Laxmipatna road. 22 HL bridge over Coast canal at 4th km on Jaleswarpur - Batagraon Balasore 1 road 23 HL bridge over river Jeera at 3rd km on Srigida to Bhadigaon road Bargarh 1

Ooutcome Budget : DoRD for 2016-17 Page55

24 Bridge over Kharmunda Jore on Kalangapali to main canal road Bargarh 1 25 Bridge over Matuali jore on Lastala Dangarla road Bargarh 1 26 Bridge over Hirapur nallah on Paikamal-Jhadabandha road. Bargarh 1 27 Bridge over Kuliarijore nallah on Kaisira Urduna via Beherapali Bargarh 1 road. 28 Bridge over river Ranj on Barguda to Bhatigaon road Bargarh 4193 29 H.L. bridge over river Uttali at 9th km. on Petupali - Saipali road Bargarh 5000 30 HL bridge over river Ong at 6th km on Kendubhatta chhak to Bargarh 1 Ganiapali road via Jamutpali Gaisilat block 31 Bridge over Salandi River at 2.100 km on PWD Road to Bentala Bhadrak 100 Road(55 m) 32 Bridge over Hansdia Nallah on Shyamsundarpur Upper Dumka to Bhadrak 8000 taladumka road 33 Bridge over Kapali on RD Road to Khaparapada at Chainage Bhadrak 1580 0/900Km 34 Bridge over Kandia nallah at Nadigaon on Dhusuri-Nadigaon Bhadrak 1500 road. 35 HL bridge over river Salandi at 8.5km on RD road to Naripur road Bhadrak 1 36 Bridge over River Kochila at 1.42 KM. on RD Road to Balipatana Bhadrak 10903 road. 37 Bridge over river Barakolimahara at Chiainage 3/100 Km on Bhadrak 5000 Dhamangar Falapur road 38 Bridge over river Biruan Mahara at Chiainage 3.500 Km on Bhadrak 5000 Dhamangar Falapur road 39 H.L. bridge over river Baitarani at Hasanabad-Pallhasahi uner Bhadrak 10000 Hasanabad G.P. 40 H.L. Bridge over Chhatra jore nallah on Karanjamal to Bhuansul Bhadrak 4000 road 41 H.L. bridge over river Mantei on Gadi - Panchutikiri road Bhadrak 1 42 HL bridge over river Genguti at 2.0km on Aradi Nandapur road Bhadrak 1 43 Bridge over Chinched nallah on PWD road to Chinched road Bolangir 1 44 Bridge over Kusangi nallah on Bolangir-Chandanabhati road Bolangir 1 45 H.L. bridge over Lanth on Badimunda PMGSY road to Saintala Bolangir 20000 46 H.L. bridge over Kasangijore on Pandrani to Manhira Bolangir 5398 47 Bridge over Nibrutijore on Jaljodipali to Kulegarh road.(Span- Bolangir 1934 8x10.77mtr)open 48 HL bridge over LaxmiJore nallah at 3.100km on Budhisindol- Bolangir 1 Jamgaon Road (Puintala Block). 49 HL bridge over Kharkhari nallah at 1st km on Sargipali - Bolangir 1 Tambipadar road 50 HL bridge over Under nallah at 1.5km on MDR 40 (Kholan) to Bolangir 1 Limpada road 51 Bridge over Kusasinga Nallah on R.D Road Boudh 3000 52 Bridge over Kutijhar Nallah on Bukasinga to Kutijhar Road Boudh 6000 53 Bridge over Somapaju nallah at 7/100 KM on Baghiapada- Boudh 1500 Somapaju-Panisal road 54 Bridge over Somapaju nallah at 8/100 Km on Baghiapada- Boudh 6000 Somapaju-Panisal road.

Ooutcome Budget : DoRD for 2016-17 Page56

55 Bridge over Local Nallah at 15th on Baghiapada- Sagada road Boudh 5000 56 Bridge over Local Nallah at 3rd Km and at 4th Km on Narayan Boudh 5000 Prasad Landapalli road. 57 Bridge over river Salki on PWD road to Olanda -Kamira road. Boudh 3000 58 Bridge over Local nallah (3 Nos) including approach on PGBM Boudh 1600 road 59 Bridge over Karadakatha nallah on Kusanga Mahalikpada- Boudh 8000 Talsona road 60 HL bridge over river Tel at 2.1km on Ghantapada to Basasankar Boudh 1 road 61 Bridge over Gobari nallah Drainage cut on -Haribhaktapur Cuttack 1 road. 62 Bridge over Teljodi nallha on Patasundarpur-Mahura road Cuttack 1 63 Bridge over Arkhei Nallah at 4th Km on S.H to Jadagola road Deogarh 1 (8x10.77m) 64 Bridge over Siaria nallah at 2nd KM on Basantapur-Gundiapali Deogarh 1 road 65 S.B over Andhari Nallah at 5th Km on Santhapur-Marthapur road Dhenkanal 1 66 Bridge over Lingara Nallah on Khajuriakata-Sanjapada R.D road Dhenkanal 6600 to Rakala P.S road 67 Bridge over Bhagiagoda Nallah at 3rd km. on Nadhar- Dhenkanal 4900 Ramachandi road 68 H.L. Bridge overDamsala nallah at Baruan on Badanali to Dhenkanal 5000 Nuagaon road via Kolodiha,Jhinkargoda 69 H.L. bridge over Kantei Nallah on Balsar to Sudhakantamila Dhenkanal 15000 P.R.road 70 H.L. bridge over Regidi nallah on Badkalakote to Rigidi road Gajapati 10000 71 HL bridge over Ragidi Nallah at 0.500km on Linga- Madhaval Gajapati 1000 road in Gumma Block. 72 HL Bridge over Baghua at 3/4Km on Polosara Bartini via Ganjam 18000 Belaqgam Dimiria Road . (HL:4 x 30.63M) 73 SB over Kaliamba Nallaha at 3/3 Km on Nunipada to Ganjam 1160 Sanadodanga Road (SB (6 x 10.77 M) 74 Bridge over Kharkhari Nallah on Badarampalli Bilaspur Road Ganjam 10000 Road 75 Bridge over Angu Nallah on Sunathara - Angu - Hindula Road Ganjam 1 76 Bridge over Swapenaswar Nallah at 5th K.M. of Sadara - Ganjam 1 Golapada road (SB 4 X 10.77) 77 Box cell Bridge over Natchuni Nallah at 2nd K.M. of Budurungu Ganjam 1 R.D. Road to Chellakhai PWD Road vide Sisunda Charichhaka road (Box cell 3 x 8m x 4 M) 78 SB over Loharkhandi Nallah at 3/6 Km on Mujagada to Ganjam 1 Rambhapalli Road SB (5 x 10.77 M) 79 H.L. bridge over river Padma on Madhabapur-Dhanapur road Ganjam 3000 80 Bridge over Jarau nallah on Badgada-Mohana road at 21st Km Ganjam 100 81 Bridge over Jarau nallah at 31st Km on Badgada - Mohana road. Ganjam 1 82 HL bridge over river Rushikulya at 0.50km on NH-59 to Nuagaon Ganjam 1 via Kesara 83 Bridge over Bandhaghatnallah on Kirtipur Hatipada Golabandha Ganjam 3489

Ooutcome Budget : DoRD for 2016-17 Page57

road 84 HL bridge over Salt Canal at 2nd km on NH-5 to Ghakharkuda Ganjam 1 road 85 HL bridge over Bahana nallah at 2nd km on Bhabinipur main Ganjam 1 road to Laxminarsingha Nagar 2nd lane 86 Bridge over Kela Nallah Erasama Champahat via Kothinimol Jagatsinghpur 3000 87 Bridge over river Biluakhai on Dhanipur-Gelapur road via Kantilo Jagatsinghpur 40000 Well foundation Span 10 x 30.63 mtr 88 Bridge over river Alaka at 7th Km. on Salijanga PMGSY road Jagatsinghpur 10000 Khaleri via-Agarpur, Alijanga, Tanduani and Godida road 89 Bridge over Canal at 0/00 Km on Dhanipur - Kantilo Road. Jagatsinghpur 7000 90 H.L. bridge on Deulisahihat to Dhaulikuda road Jagatsinghpur 1 91 H.L. bridge on Hansra to Kalikuda road Jagatsinghpur 1 92 Bridge over Hansua on Alana - Rankei road Jagatsinghpur 9282 93 HL bridge over Brudha river on Nausara to Manitira road Jagatsinghpur 1 94 Bridge over Adan nallah on 10th km on Bari Binjharpur road Jajpur 3000 95 Bridge over local nallah at 8th km on Bari Binjharpur road Jajpur 3000 96 Bridge over Safai at 4.400 KM on Katia Ahiyas Bainsipan Raod Jajpur 1 97 Bridge on River Kharasrota at 0.00 Km. on Kamalpurghat to Jajpur 30000 Dhaudibandhaghat 98 Bridge over Kharasrota at 3rd Km. on Mainda Ghantiali road Jajpur 15000 99 Bridge over Gadagadi nallath at 2.15 Km and Nuamahara nallah Jajpur 1000 at 5.10 Km on BCJ High School to Badakuanla road. 100 H.L. bridge over Jamuna nallaha on R.D. Road to Ghanashyampur Jajpur 8000 Sasan road. 101 H.L. bridge over Ganda nallaha on R.D. Road (Mulasara) to Olala Jajpur 1000 road. 102 H.L. bridge over Katha nallaha & Gadabandha nallaha on Jajpur 1000 Gadabandha to Jundupur road 103 Bridge over Dudheinalla on MDR 14 to Dihasahi road for 2011-12 Jajpur 8000 104 Bridge over Banapur nallah on Bari Binjharpur road Jajpur 360 105 Bridge over Kuanria Nallah on Taranjia to Parikheta road Jajpur 1 106 HL Bridge over Kanchangadia nallah at 1st KM on Bari-Binjharpur Jajpur 1 road to Kanharakhanda road 107 HL bridge over Local nallah at 2nd km, over Bharati Muhan at Jajpur 1 2.5km & over Ostadandi nallah at 3rd km on Nuagaon Guhali road 108 HL bridge over Nuadiha nallah at 0.50km on Bandhaguan - Jajpur 1 Nuadiha road 109 Bridge over Kainbila Nallah at 4th KM on NH-5 to Kantigadia via Jajpur 6000 Sidhipur Road 110 Bridge over Gohira Tikira Nallah at 0.5 KM on Kabatabandha Jajpur 1 Rekhideipur Road 111 Bridge over River Badagenguti at 11th KM on Nuahata to Jajpur 40000 Khadianga Road 112 Bridge over Baunsa -Anta nallah on RD road to Panturi Road Jajpur 1 113 Bridge over Hatianallah on Ramachipidihi to Routbahal Road. Jharsuguda 4562

Ooutcome Budget : DoRD for 2016-17 Page58

114 H.L. bridge over river Saraswati nallah on 1st km of NH 49 to Jharsuguda 1 Betajharam 115 Bridge over Bungaberna Nallah on Deopan Bhimjore Road. Jharsuguda 1000 116 HL bridge over Sukhasudha nallah on Sukhasadha to Kakeimuhan Jharsuguda 1 road 117 H.L Bridge over Rahul River on PWD Road to Benaguda Road Kalahandi 1 118 S.B.over Local Nallah (Turupi ) at 7/0 Km on Maddingpadar - Kalahandi 2653 Singhjharan Road 119 Minor Bridge over Bijepur nallah on Biswanathapur-Bijepur road Kalahandi 1 at 37/300 KM 120 Bridge over Lakhabahali Nallah at 24 km. on Biswanathpur- Kalahandi 1400 Bijepur Road 121 Bridge over Local Nallah at 17th km on Biswanathpur-Bijepur Kalahandi 5000 Road 122 Bridge over Ambaguda nallah on -Bijepur road. Kalahandi 1 123 HL bridge over river Sandul at 1.200km on Madhupur- Kalahandi 1 Gobardhanpur road 124 H.L Bridge over Udanti River on Artal to Dumeria Road Kalahandi 1 125 H.L. bridge over river Hati on Patrabasa - Badkutru G.P. Road Kalahandi 35000 126 Bridge over Kamal on Badakutru-Sanakutru road . Kalahandi 3794 127 Bridge over Mudra on Siliguda-Phupgaon Road Kalahandi 794 128 HL bridge over river Tel at 1.800km on Makhla - Pondigaon road Kalahandi 1 129 HL bridge over river Hati at1st km on Temra to Kadopadar road Kalahandi 1 130 HL Bridge over river Kamal on Ainli-Kuismal Chowk road Kalahandi 1 131 Bridge over Sandul at Bramhanighat on Balipada-Ghodapokhari Kalahandi 155 road 132 Bridge over Perenchu nallah on Bhanpur-Upher road Kalahandi 3309 133 Bridge over river Utei on -Joradobra road Kalahandi 15132 134 HL bridge over Local Nallah at 0.900km on N.H.-201 to Themra Kalahandi 1 road 135 HL bridge over river Tel at 2nd km on Belkhandi temple to Kansar Kalahandi 1 road 136 Bridge over Kutrasingi nallah on SH-1 to Pankua Nuagaon road Kandhamal 1 137 Box cell bridge on Subarnagiri Budaguda road Kandhamal 1 138 H.L. bridge over Local nallah on Taladandikia-Akapratha road. Kandhamal 2500 139 H.L Bridge over river Gobari on Raghudeipur - Raitundi road Kendrapara 5000 (2span of 30.63mtr.) 140 Bridge over Khola nallha Khamosi to Barakolia Khala road. Kendrapara 15000 141 Bridge over Hansua Creek on Sidhamula Baunsanali road Kendrapara 5000 142 HL bridge over river Brahmani at 5th km on Keradagarh - Kendrapara 1 Chandanpur road 143 Bridge over Remal river on keshdurapal- Brahmanipal Road at Keonjhar 5000 R.D 14/800 km 144 Bridge over Local Nallah on Santoshpur- Singnali Road Keonjhar 1000 145 Bridge over on Ambo-Batto Road Keonjhar 5000 146 Bridge over Baunsa Nallah at 3rd Km on Banapur Ayatpur road in Khurdha 1 the Dist. of Khurda.

Ooutcome Budget : DoRD for 2016-17 Page59

147 Bridge over Daya West Branch Canal on Nandankanan to Khurdha 1 Jaripatna Via Injana road 148 HL bridge over Salia water channel at 2nd km on Tumuraput to Khurdha 1 Sahaspur road 149 Bridge over Padmapur Nallaha on Pedakonda Sindhrimal Road Malkangiri 1200 150 Bridge over Boilapari Nallaha on Goudaguda Tamasa Road Malkangiri 1700 151 H.L. bridge over Kenduguda nallah at 2nd km on Kenduguda Malkangiri 1 Darkajodi road 152 HL bridge over Local nallah on Rabanaguda - Kacheli road Malkangiri 500 153 Bridge over river Poteru on Old Chitapari -Balimela township Malkangiri 1 road 154 Bridge over Potteru Nallah at 23rd km on Podia to Pusuguda Malkangiri 1 road 155 HL bridge over Local nallah on Putumpali to MV-79 road Malkangiri 1 156 HL bridge over Local nallah on Rakhelguda to MV-26 road Malkangiri 1 157 HL bridge over Local nallah on Kamaliguda - Pitagatta road Malkangiri 1 158 Bridge over Budhabalanga on Khuntapal-Darkhuli road Mayurbhanj 20000 159 Bridge over river Turi at Ist Km on Kodinga Chatthandi Road Nabarangapur 1 160 H.L. bridge over river Dahuka on Manipur Sampada road Nayagarh 15230 161 H.L. bridge over river Kuanria on Sardhapur-Dholamara road. Nayagarh 5000 162 H.L. Bridge over river Kusumi on Baghuapalli-Boragaon Road Nayagarh 5864 163 H.L. Bridge over river Dahuka on Hatadwar-Dhenkena Road Nayagarh 2455 164 Bridge over Local nallah (Dahuka) near Anlamoda on Nayagarh 490 Krushnaprasad-Anlamada 165 Bridge over Kuanria on ODR 18 - Duargaon road. Nayagarh 224 166 HL bridge over Rampalli Nallah at 1.8km on Balanda Gundurisahi Nayagarh 1 road 167 S.B. over Gurmajore Nallah at 1st Km on Tikrapada-Reng Road Nuapada 1 168 Bridge over river Dahanapali on Kulekela-Dahanapali road Nuapada 5000 169 Bridge over Mugei Nallah on -Andhera-Ichhapur Puri 1 road at R.S.-4.95 KM 170 Bridge over Balia Chatara Nallah at 0.50 km on Barimendei Sairi Puri 1 road 171 Bridge over Local Nallah on Parakena-Padmapur road Puri 1 172 H.L. bridge over river Kadua on Mandupada Chitra to Gorual Puri 5000 Panchana road 173 HL bridge over river Kadua at 0.300 km on Santarasha to Puri 1 Kantimala road in Kakatpur block 174 Bridge over river Bhargabi on RD road to Bindheibasta. Puri 1 175 HL Bridge over river Luna at 9th km on Siruli - Karamal road Puri 1 176 HL bridge over river Sankhabhaguni at 3rd km on Deogaon- Sambalpur 1 Jharaniktimal road 177 Bridge over Basupali Nallah on Basupali Laumal Road Sambalpur 1 178 Bridge over Ranjan nallah on Goudpali Saplat road Sambalpur 1 179 Bridge over Barhiasahi nallah on Charmal Khasua road at 4.40 Sambalpur 10600 Km 180 Bridge over Local Nallah at 9/05 km on Charmal Khasua road Sambalpur 5000

Ooutcome Budget : DoRD for 2016-17 Page60

181 Bridge over Amjhuri Nallah on Batagaon Salebhata road at 8.850 Sambalpur 10000 km 182 Bridge over Haradjore nallah at 4th km on Sadasinga to Nuapali Sambalpur 1500 road 183 H.L. bridge over Kerandijore nallah at 0.400 km on SH- 24 Sambalpur 2000 (Raikhol) to Purunagarh road 184 Bridge over Maltijore Nallah on Padiabahal-Panposi Road Sambalpur 1000 185 Bridge over Badkhol Nallah on Tribanpur Chhak to Badkhol Road Sambalpur 500 186 Bridge over Porpetta Nallah on Anladhipa Baliturei Road Sambalpur 6200 187 HL bridge over Haradjore nallah at 2nd km on Kaleshwar Tikira - Sambalpur 1 Pithampur road 188 S.Bridge over Cherupali nallah at 2nd km on Cherupali Agalpur Sonepur 1 road ( 3x10.77 Mtr) 189 H.L. bridge over Chouki Jore on Jamchhapur-Bhramarapali road Sonepur 18000 190 Bridge over Hariharjore at 3rd km on Mendhamal Barjhola road Sonepur 9000 (13x10.77) 191 HL bridge over Kerandijore nallah on Thakurpur to Sankhamal Sonepur 1 road under Pitamahul G.P. 192 HL bridge over Nahana nallah on Sargipali to Kurobaga road Sundargarh 1 Total : 680000

80-796-TASP

1 Bridge over Baliapita nallah at 1st KM on Suguda-Gunduriposi Deogarh 1 road 2 Bridge over Hinjuli Nallah at 8th Km on NH 200 to Gadamal Road Deogarh 1 (6x10.77m) 3 S.B. over Maajhia Nallah on Tusula Phulpathar Road (4x10.77m) Deogarh 1 4 Box Cell Bridge at 7/500 KM on Odasingi-Kinchilingi road Gajapati 23 5 Box cell Bridge over Loba nallah on Anukurada-Labaguda road (2 Gajapati 3000 x 8x 5 Mtr) 6 Bridge on R.Udayagiri Sambalpur road at 2/260 Km Gajapati 2000 7 Bridge over Bariabandha nallah at 16th. Km on Chandragiri- Gajapati 1 Antaraba-Chudangapur road 8 Bridge over local nallah at 0/0 Km on Nuagada Keradanga road Gajapati 1 9 Bridge over local nallah on Hadubhangi-Gaiba-Gumma road (1 Gajapati 49 span of 8.77 C/C ) 10 H.L. bridge over Mahendratanaya river on Laxmipur to Kinada PR Gajapati 5000 road 11 Steel Bridge over Kamalpadar nallah on Kamalpadar Kendupadar Gajapati 4167 road (Span 1x59.872 m) 12 Bridge over Athara nallah on Mohana-Kirtongi PMGSY road Gajapati 1 13 Bridge over Jamudihi nallah at 13th km.on Chandragiri- Gajapati 2000 Antarabat-Chudangapur road 14 HL bridge over river Harabhangi on PWD road to Bhaliasahi road Gajapati 1 15 Bridge over Kalijharan nallah on Bhusenpali to Indarpada Road Jharsuguda 1000 16 Bridge over Kukerama nallah on Laikera-Sahaspur-Bamra road. Jharsuguda 1 17 H.L. bridge over river Safei at 0/500 km. on Bhuara - Kinjirima Jhasuguda 3000

Ooutcome Budget : DoRD for 2016-17 Page61

road 18 Bridge over Pipal Nallah on PWD Road to Bhikajharan Road Kalahandi 1 19 Bridge over river Andrajore on Pipalbhadi-Kutingpadar road Kalahandi 1 20 H.L Bridge over Sandul River on Balipada - Rupra Road Kalahandi 40 21 H.L. bridge over river Khapaar Nallah on Kulihari to Budhidar via Kalahandi 5000 Brahmaniguda 22 S.B over Bhatrajore at 2/00Km on Karlabeda to Kulihari Road Kalahandi 20 23 S.B.over Bhatrajore Nallah at 1/0Km on Kupagaon to Paduapada Kalahandi 300 Road 24 S.B.over Local Nallah Tajabaju Nallah at 4/0 Km on Pajibahal - Kalahandi 4000 Mohangiri Road 25 Bridge over Local Nallah (Haridajore) on Kenduguda Sariguda Kalahandi 1 Road. 26 Bridge over Jampada Nallah on -Dulkibandh Road. Kalahandi 1 27 Bridge over Local Nallah on Kalampur -Mandal Road. Kalahandi 966 28 Bridge over Mudra on Gambhariguda-Chikili Road Kalahandi 8460 29 Bridge over River Hati Talmala Bainriguda Road Kalahandi 15000 30 S.B.over Kataki Nallah on Bhurtigarh - Kadamguda junction Road Kalahandi 1 31 S.B.over Perenchu Nallah at 9/750Km on Tulapada - Panga Road Kalahandi 10000 32 HL bridge over river Chauldhua at 1st km on Rodiguma - Judabali Kandhamal 1 road via Gumapadar near Jamghat 33 Bridge over Local nallah on Temangi Sadingia road Kandhamal 577 34 Bridge over Gadadi nallah on Raikia Simanbadi at 19th Km Kandhamal 3500 35 Bridge over Gadagadi nallah , Mankadachua nallah ,Lahabadi Kandhamal 20000 nallah,Kusupani nallah & Sirsingi nallahat 9/060Km ,6/760Km.11/280Km,12/630Km & 13/150Km on Pasara Linepada road 36 Bridge over local nallah at 2nd Km of Parampanga Gugurumaha Kandhamal 5000 road 37 Bridge over local nallah at 3/480 Km on Pakangaon Balaskumpa Kandhamal 5000 Dutimendi Kerandimaska road 38 Bridge over Local nallah at 4th Km on Sombapadar Nuagaon Kandhamal 770 road. 39 H.L. bridge over local nallah at 1st Km on PWD road to Bakingia Kandhamal 1000 road 40 H.L. bridge over Raula to Tumudibandha-Sirala road Kandhamal 5000 41 HL bridge over Giruti nallah on Gardingia - Giruti - Katadi road Kandhamal 1 42 HL bridge over Nandangi Nallah at 39/130km on Machhiripada - Kandhamal 1 Kalapada - Sadingia - Palandiapada road 43 SB over Baibali nallah at 1st Km on Indragada to Baibali road Kandhamal 1 44 H.L. bridge over Binajodi nallah on Irrigation embankment - Keonjhar 1 Sadanga road 45 Bridge over Bonda nallah on Badabandhapada -Nahuraniposi via Keonjhar 1 Gudadhia road 46 Bridge over Ghagara nallah on Khadipala Kathakata road. Keonjhar 1 47 Bridge over Sendhei on Bhandaridiha to Toranipal road. Keonjhar 1 48 HL bridge over river Salandi at 1st km near Hadagarh Keonjhar 1

Ooutcome Budget : DoRD for 2016-17 Page62

Mandir to Kusatikiri road 49 Bridge over Aradei Nallah on Karanjia-Remuli road Keonjhar 15000 50 Bridge over Aradei on NH-215-Silisuan Via-Bishnupur road. Keonjhar 10000 51 Bridge over Aradei River on Raisuan-Sahadapur road at 3rd. km Keonjhar 5000 52 Bridge over Dhenka Nallah on Bancho-Panchagochhia road. Keonjhar 1 53 Bridge over Ghagara nallah at 11.4 Km. of Dadhibamanpur- Keonjhar 1 Tartara-Kantipal road. 54 Bridge over Kachhimajodi Nallah at 0.775 Km. on Khajuridiha Keonjhar 5000 Beghna road. 55 Bridge over Kasia nallah at 9th KM on PWD road -Kumudabahal Keonjhar 5000 road. 56 Bridge over Kukurkata Nallah on Ghatagaon to Chinamaliposhi Keonjhar 1540 road. 57 Bridge over Local (Aradei) Nallah at 2nd Km. on Jamudiha- Keonjhar 1 Bistapal road. 58 Bridge over Purujoda nallah on Telkoi-Akula road. Keonjhar 1 59 Bridge over river Baitarani on Chilida-Rajnagar road. Keonjhar 10000 60 Bridge over Sita Nallah at 5th km & Kasia Nallah at 7th. km on Keonjhar 1 P.W.D.-Bhimkunda road 61 Bridge over Tel on Saharpada-Machhagarh road Keonjhar 4000 62 Bridge over Tigiria Nallah on Nudurpada-Kaliahata road Keonjhar 1 63 H.L.Bridge over Machhakandana on N.H.-215 to Ambuapada via Keonjhar 5000 Valiadiha 64 H.L.Bridge over Neulijodi nallah Putugaon to Chemna road Keonjhar 3000 65 H.L.Bridge over Sita nallah on Kashibeda to Baghaghar road Keonjhar 4000 66 HL bridge over river Baitarani at 2nd km on Tando Keonjhar road Keonjhar 1 67 HL bridge over Sita nallah on Danguaposi to Sita binj road Keonjhar 1 68 H.L. bridge over river Baitarani at 8th km. near Satighat on Keonjhar 1000 Bamebari-Jhumpura road 69 Bridge over Aradei on Kalikaprasad-Urti via Gambharia road. Keonjhar 7262 70 Bridge over Batanai on Raisuan to Samakuda road. Keonjhar 1 71 Bridge over Bhaluka nallah on Karanjia-Remulei road Keonjhar 10000 72 Bridge over Goda nallah on Gumura-Amlaniguda road. Keonjhar 1 73 Bridge over Karrow on Lasarda to Dhanurjay road. Keonjhar 8000 74 Bridge over river Baitarani on Kutraposi-Champua road. Keonjhar 9500 75 Bridge over river Baitarani on Uchabali-Uttarposi road Keonjhar 30000 76 Bridge over river Samarsinga nallah at 21st KM on Pithagola to Keonjhar 4000 Telkoi road 77 Bridge over Samantamundi nallah on Nudhurpada to Kaliahata Keonjhar 1 road. 78 H.L.Bridge over Katrajodi Nallah on Telkoi-Kaliahata road Keonjhar 1 79 H.L.Bridge over river Baitarani at 1.50km on Patua Kandra- Keonjhar 5000 Basantapur road 80 HL bridge over river Baitarani at 1.5km on Kasia Kendughati road Keonjhar 1 81 HL bridge over river Baitrani at 0.5km on Uchhabali - Purunapani Keonjhar 1 road, Joda block in Keonjhar district.

Ooutcome Budget : DoRD for 2016-17 Page63

82 HL bridge over river Kalinjar at 3rd km on Junga to Thakur- Keonjhar 1 Kalimati road

83 HL bridge over Jahara nallah at 1st km on Bhars i- Machhahandi Koraput 1 road 84 HL bridge over river Teluguni at 1st km on Kurukuti-Gujuniguda Koraput 1 road 85 Bridge over Biriguda Nallah on Jeypore-Balia-Boipariguda Road Koraput 1 (3.00 x 8.77mtr.) 86 Bridge over Brahmanajodi Nallah on Jamakanadi-Bhejahandi Koraput 1 Road (4.00 x 10.77) 87 Bridge over Kurlu River on Jamakanadi-Bhejahandi Road Koraput 8000 88 Bridge over Local nallah on Admunda-Lulla road Koraput 1 89 Bridge over Local Nallah on at 11th Km on Dasmantapur-Murkar Koraput 1 Road (4 x 10.77mtr.) 90 Bridge over Local Nallah on Murkar-Autodora Road Koraput 3504 91 Bridge over Putra nallah on Ambaguda-Hadia -Putra -Telia - Koraput 2588 Jamunda road 92 Bridge over Putra Nallah on at 3/900 Km on Bada Kaudi to Sana Koraput 316 Kaudi road (5 x 10.77) 93 Bridge over Putra Nallah on Solpa-Dharanahandi -Khairimundi- Koraput 1 Hadia road (12x10.77m) 94 Bridge over Sindhigaon nallah on Ambaguda-Hadia-Putra-Telia- Koraput 1 Jamunda road. 95 H.L. bridge over Kurli Nallah at 4th km on Kenduguda Baligam Koraput 1 road under Boipariguda Block 96 H.L. bridge over Porli nallah at 1/700 km on Porli-Nandarla road Koraput 1 97 H.L. bridge over Teluguri River at 3rd km on Nuagam-Narigam Koraput 1 road 98 HL bridge on Jhadidhar at 5th km on Chipakpur to Dholpur road Koraput 1 99 Bridge over Champi Nallah on Champi Godagade road Koraput 1 100 Bridge over Hanjaraguda nallah on Semiliguda Hanjaraguda road Koraput 7000 (P.S Road) 2 spans of 30.63mtr 101 Bridge over Local Nallah at 1st km on Umbel to Paliva Road Koraput 4000 102 Bridge over local nallah on Dolaguda Mantriput Road Koraput 7000 103 H.L. bridge over Local nallah on Kadamguda to Phuldoba Koraput 1 104 H.L. bridge over Local nallah on Khalkona to Baghmari Koraput 3000

105 HL bridge over Kerandi Nallah at 2nd km on Ghataguda to Koraput 1 road 106 HL bridge over river Jhanjabati on RD road to Kanaka road Koraput 1 107 Bridge over Ambaguda Nallah on Amlabhatta-Ambaguda Road Malakangiri 5000 108 Bridge over Local Nallaha on Kukuguda- Biralaxmanpur Road Malakangiri 1800 109 Bridge over Madakapadar Nallah on PWD Road-Disariguda Malakangiri 4000 110 Bridge Over Tamasa Nallah at 3rd Km on Korukonda to Kotapalli Malakangiri 4000 Road 111 HL bridge over Local nallah at 1.50 km on Pedaguda to Malakangiri 1 Dhoudaguda road

Ooutcome Budget : DoRD for 2016-17 Page64

112 HL bridge over Local nallah on Atalguda - Sarangpally road Malakangiri 500 113 HL bridge over Local nallah on Badaguda - Chaulamendi road Malakangiri 500 114 HL bridge over Local nallah on Dyke-III -Nakamamudi road Malakangiri 500 115 HL bridge over Local nallah on K.Gumma - Naliguda road Malakangiri 500 116 HL bridge over Local nallah on Kandel - Simagandhi road Malakangiri 500 117 HL bridge over Local nallah on Premarasi - Bedurupalli road Malakangiri 500 118 HL bridge over Nuaguda nallah on Bandhamamudi - Malakangiri 500 Nakamamudi road 119 Bridge over Tamasa nallah on MV 5- MV44 via MV1 & MV4 at Malakangiri 1 3rd km. 120 HL bridge over Danguskhal nala near Danguskhal to matapaka Malakangiri 1 road in Challanguda G.P. 121 Bridge over Badjore Nallah at 4th km on paunsia- patrapada- Mayurbhanj 18000 silaghaty Road 122 Bridge over Baunsha Nallah on N.H.-5 Dahria via Kathapal road. Mayurbhanj 2100 123 Bridge over Chepti Nallah at 14th on Maitrapur-kuliana Road Mayurbhanj 9000 124 Bridge over Chhakakhala nallah on kalajhinei-Kuabuda road. Mayurbhanj 5000 125 Bridge over Dariakundi Nallah at 8th km on N.H-5 Bishrampur- Mayurbhanj 1 patalipura Road 126 Bridge over Dudhiasole Nallah on Jaibilla-Dudhiasole road. Mayurbhanj 850 127 Bridge over Gabadiha Kuchila Nallah on Jharpokharia- Mayurbhanj 5000 Sankhabhanga Road. 128 Bridge over Jambhira nallah on Gadia-Bharbadi-Kendudiha road Mayurbhanj 10000 129 Bridge over Kalo on Kaptipada Podadiha road. Mayurbhanj 1500 130 Bridge over Kuchila Nallah. (Kuldiha Chhak) at 8th km on Mayurbhanj 5000 Jharpokharia- Sankhabhanga Road 131 Bridge over Local Nallah at 1st km on Gandipani- Mayurbhanj 5000 Nabinmundhakata- pahadour Road 132 Bridge over ltajodi Nallah at 2nd km on Samakhunta-Ambaduvi Mayurbhanj 1 Road 133 Bridge over Mendhamundia Nallah at 13th km on Maitrapur- Mayurbhanj 10000 kuliana Road 134 Bridge over Panijia Nallah on Saraskona-Dighi Road Mayurbhanj 1000 135 Bridge over Panpik Nallah on Nachhipur-Kulialam Sandhei Road Mayurbhanj 5000 at 5th Km. 136 Bridge over Rajabandha nallah on Jharpokharia-Sankhabhanga Mayurbhanj 300 road. 137 Bridge over Ranaposi Nallah at 0/400 th km on Kaptipada- Mayurbhanj 5000 Chuinposi Road 138 Bridge over river Gangahar on Nunukua-Bhurudia road Mayurbhanj 1 139 Bridge over River Jambhira on Kanimahuli-Jambhirapal Road at Mayurbhanj 10000 2nd Km. 140 Bridge over river Jambhira on Kendudiha-Bhairangi-Ektaili road Mayurbhanj 10000 141 Bridge over River Jarali on Station Bazar to Baghara Road. Mayurbhanj 3000 142 Bridge over River Kalapani Nallah on Khunta-Bholagadia Road. Mayurbhanj 250 143 Bridge over River Kalo on Nachhipur-Kulialam Sandhei Road at Mayurbhanj 4000 5th Km.

Ooutcome Budget : DoRD for 2016-17 Page65

144 Bridge over River Nalua on S.H-19 to Nalua-Karkachia Road. Mayurbhanj 5000

145 Bridge over river Sono at 4th Km on Udala Teldehudi- Dimagadia Mayurbhanj 1 R.D. Road 146 Bridge over Seula Nallah at 5th km on Betnoti-Manatri Road Mayurbhanj 15000 147 Bridge over Siltia Nallah on Dumurdiha-Nodhana Road. Mayurbhanj 600 148 Bridge over Suhagi Nallah at 5th km on Panasia-anla Road Mayurbhanj 1 149 Bridge over Sukhilakatra Nallah at 28th km on Jharpokharia- Mayurbhanj 1 Sankhabhanga Road 150 Bridge over Tangna on Udala-Mouda Pahanda Sasan road. Mayurbhanj 8000 151 H.L. bridge over river Arikul Nallah on Tadiki-Kusagadia-Raigadi- Mayurbhanj 5000 Salbani road 152 H.L. bridge over river Budhabalanga at 3rd km on Itamundia to Mayurbhanj 2000 Paikabasa road 153 H.L. bridge over river Budhabalanga at 1st km on Bartana- Mayurbhanj 15000 Nischintapur road 154 H.L. bridge over river Gangahar & Arikul Junction at 9th km on Mayurbhanj 1 PWD road to Gendagadia via Bhandagaon-Sinduria road 155 H.L. bridge over river Jambhira on Musamari-Sanmandia road at Mayurbhanj 1 4th km 156 H.L. bridge over river Katra at 1st km on Upperbeda-Ambadiha Mayurbhanj 5000 road 157 HL bridge over Nuani nallah at 0.500km near Bhangaghat on Mayurbhanj 1 Dasanapada-Chadalda road 158 HL bridge over river Budhabanaga at 9.75km on NH-5 - Mayurbhanj 1 Buddhikhamari - Jamdapal road 159 HL bridge over river Gangahar at 3rd km on PWD road (Jadida Mayurbhanj 1 Chhak) - Dumuria road 160 HL bridge over river Jambhira at 1st km on Gholmuhan - Mayurbhanj 1 Khuntapal road 161 S.B over Chitat Nallah at 3rd km on N.H-5 to Jhinei Road Mayurbhanj 7000 162 S.B over river Hadagada at 22nd km on Kaptipada Sarat Road Mayurbhanj 5000 163 Bridge over Asana Nallha on Kasipani Approach Road at 1.45 km Mayurbhanj 3000 164 Bridge over Baunsadiha nallah on Bharandia-Baunsadiha road. Mayurbhanj 982 165 Bridge over Budhabalanga on Golamunda-Kanchinda road. Mayurbhanj 20000 166 Bridge over Budhi nallah at 2.5 Km. on Salarpada-Panaspal road. Mayurbhanj 4000 167 Bridge over Chautia Nallah on Raruan Naksara Road. Mayurbhanj 100 168 Bridge over Chautia nallah on Tingria-Purunia road. Mayurbhanj 3490 169 Bridge over Dapani Nallah on Salabani Chhak to Taradapal Road Mayurbhanj 2000 at 3.90 km 170 Bridge over Dhodibahali Nallah on Satkosia Nada Road at 8.70 Mayurbhanj 1 km 171 Bridge over Fulcomp Nallah on Fulcomp to Panpataria road. Mayurbhanj 1 (Balance Work) 172 Bridge over Gobarjoda Nallah on Jarka-Jamunalia road. Mayurbhanj 709 173 Bridge over Jamuti Nallah on Raruan Naksara Road. Mayurbhanj 670 174 Bridge over Jhadgosda Nallah on Tangia- Deuli- Jhadgosda Road Mayurbhanj 1 at 3.00 km

Ooutcome Budget : DoRD for 2016-17 Page66

175 Bridge over Joka Nallah on Jaldiha Masinabilla Road Mayurbhanj 1 176 Bridge over Kulgidihi Nallah on Bisoi Mohubhandar Road at 8.00 Mayurbhanj 1 km 177 Bridge over Local Nallah at 2.275 km. 3.12 Km., 5.0 Km. on Mayurbhanj 11306 Sunaposi-Bisipur-Baliposi road. 178 Bridge over Local Nallah Dolaposi Naibhanga road. Mayurbhanj 1 179 Bridge over Local Nallah Hatabhadra-Kusumi road. Mayurbhanj 1 180 Bridge over local nallah on Bisipur approach road. Mayurbhanj 2715 181 Bridge over Local Nallah on Dhobadiha Jamuriposi Road at 0.90 Mayurbhanj 1500 km 182 Bridge over Local Nallah on Parabeda Panpatria road. Mayurbhanj 4000 183 Bridge over local nallah on Tato-Pichuli-Jhatiali road. Mayurbhanj 3500 184 Bridge over Naujore nallah on Badada to Kusumi Road Mayurbhanj 1 185 Bridge over Nitei Nallah on Mangod to Nitei Road Mayurbhanj 1 186 Bridge over Sankarei Nallah on Shyamsundarpur-Pursoattampur Mayurbhanj 5000 Road. 187 Bridge over SIM River on Talapada to Road Mayurbhanj 1 188 H.L.Bridge over Kanta Khairi nalla at 3rd km on RD road to Deuli Mayurbhanj 2000 189 H.L.Bridge over Salandi at 2nd Km Nuagoan to Mulapal road Mayurbhanj 3000 190 HL bridge over river Khairi Bhandan at 0.400km on Kapanda to Mayurbhanj 1 Suanpal road 191 HL bridge over river Budhabalanga at 1st km on Hijili-Basantpur Mayurbhanj 1 Road 192 HL bridge over river Deo at 2.200km on PWD road to Baikala via Mayurbhanj 1 Bhanraposi road 193 Bridge over Arikul Nallah on Mahibasa-Agnikumari road Mayurbhanj 1300 194 Bridge over Brahmanmara nallah on Kosta-Kaduani-Nuajhalia Mayurbhanj 200 road. 195 Bridge over Handibhanga nallah on Suliapada-Chaksuliapada Mayurbhanj 100 road. 196 Bridge over Kanthala Nallah on Jamdiha-Badkhaman road. Mayurbhanj 850 197 Bridge over Katra Nallah on N.H-5 Kuliana to Jagannathkhunta Mayurbhanj 1100 Road. 198 Bridge over Local nallah at 2.01Km on Jamunalia-Kasiabeda Mayurbhanj 1 road. 199 Bridge over Madhabi Nallah on Naupal-Rout Sahi road. Mayurbhanj 1500 200 Bridge over river Bankabal on Bankati Bharandia road Mayurbhanj 2311 201 Bridge over river Baunsa Nallah on NH-5 Chhurunia-Mantapal Mayurbhanj 300 road. 202 Bridge over river Deo at 3rd Km.on Udala-Amadiha road. Mayurbhanj 300 203 Bridge over river Deo on Kundabai-Manikpur road. Mayurbhanj 1 204 Bridge over river Khadakhai on Kumudasole Jonti road Mayurbhanj 5000 205 Bridge over river on Gangahar on Deuli-Balichilima road. Mayurbhanj 3000 206 Bridge over Salandi on Jamda to Bagdafa road. Mayurbhanj 1 207 Bridge over Sim Nallah on Simdiha Boring road. Mayurbhanj 1 208 Bridge over Chapal nallah on Jampani-Kuleisila road. Mayurbhanj 1

Ooutcome Budget : DoRD for 2016-17 Page67

209 Bridge over local nallah at 1st KM on Guhaldunguri-Mahadevdihi Mayurbhanj 3000 road 210 Bridge over local nallah at Lipighutu on Jamda-Rangamatia- Mayurbhanj 1143 Ulidihi road. 211 Bridge over Local Nallah on Jhardihi-Badkedam road. Mayurbhanj 1 212 H.L. bridge over Chhamdadihi Nallah on Kuleisila to Udayapur Mayurbhanj 3000 road 213 HL bridge over Tendra nallah at 5th km on Jamda - Tendra road Mayurbhanj 1 214 HL bridge over Andhajori nallah at 0/300 KM on Budhikhamari- Mayurbhanj 1 Chandripahali road 215 HL bridge over Local nallah at 1st km on Anchala to Kadamali Koraput 1 (C.G.) 216 HL bridge over river Nagi at 1st km on Janiguda -Talpadar road Koraput 1 217 Bridge Over River Bhaskel at 2nd Km. on Dhodra to Telkonadi Koraput 14000 Road 218 Bridge over river Bhaskel on Umerkote-Badabasini road Koraput 1 219 Bridge over river Tel on Koilimunda to Chhatisgarh Boarder road Koraput 1 220 Bridge over river Tel on Octasil-Nagalsis road Koraput 15000 221 Bridge over river Tel on Sandhimunda -Kharipokhana road Koraput 1500 222 H.L. bridge over Chitrangi Nallah at 1st Km of Mahuli to Koraput 15000 Khutuguda 223 H.L. Bridge over Bhandari Nallah on Sardhapur to Motigaon Road Koraput 30000 224 H.L. bridge over Tumuda Nallah at 2nd km of Pakhanaguda Jn. To Koraput 8000 Simuda 225 Bridge over Angi on B.M. Semla leading to Dabugaon road. Nabarangapur 5000 226 Bridge over Bellari Nallah on Junapani to Koilari Road Nabarangapur 3150 227 Bridge over Gunighat Nallah at 9th Km on Podalguda to Patraput Nabarangapur 3500 Road 228 Bridge over Local nallah at 1st km. on RD. road-Gadigaon road. Nabarangapur 1 229 Bridge over Local Nallah Sanoloma to Chelipetha Road Nabarangapur 500 230 Bridge over Mokiya Nallah on Mokiya to Sindhikaguda Road Nabarangapur 1 231 Bridge over Panditguda Nallah at 3rd KM on Dabugam to Nabarangapur 1 Maidalpur Road 232 Bridge over Turi nallah on Nabarangapur-Ambadola road. Nabarangapur 10000 233 H.L. bridge over river Indrabati at 18th km. on Kodinga - Chirma - Nabarangapur 1 Nadighat RD road 234 SB Over Phatojodi Nallah at 10th KM on Chikili Phatakote Road Nabarangapur 20 235 HL bridge over river Bhaskel at 5th km on Ekori to Jhatiaguda Nabarangpur 1 road. 236 HL bridge over river Indravati river at 0.500km on Dudriguda to Nabarangpur 1 Ghatarla road 237 Bridge over Kurubella Nallah at 13th K.M. of PL Road to Nabarangpur 1 Dumurimunda Road 238 Bridge over local Nallah on Nuagaon-Naitaila Road Nayagarh 1000 239 H.L. bridge over local nallah on NH-224 to Raita - Odasara Nayagarh 3000 240 Bridge over Nagabali on Rayagada to Baisingh via Chekaguda Rayagada 15000 road.

Ooutcome Budget : DoRD for 2016-17 Page68

241 Bridge over kamper Nallah at 1st km on PWD Road to Kamper Rayagada 1 ( 4x 9.77mtr) 242 Bridge over kanijodi nallah on B.Cuttack-Kutraguda road.(6 x Rayagada 800 10.77mtr) 243 Bridge over karanja nallah on Kutraguda-Jagadalpur-Anbodala. Rayagada 1 (5x 10.77mtr) 244 Bridge over river Sananai at 6th km on Khaira-Jhumpapur- Rayagada 5000 Phulphuti road. ( 5 x 30.63mtr) 245 Bridge over Ambabadi nallah on Chalkamba-Bhimpur Titimiri Rayagada 1 Road. 246 Bridge over Baldia nallah at 1/200 KM on Sikarpai to Seriguma Rayagada 1 road 247 Bridge over Bansadhara river on Naira-Bainiguda road. Rayagada 20000 248 Bridge over Haduguda nallah at 1st km. on PWD road-Haduguda Rayagada 1000 road. 249 Bridge over Karanja Nallah on Jagadalpur-Janaballi road ( 6 Rayagada 1200 Spans of 10.77mtr) 250 Bridge over local nallah 3rd km on Naira-Bainaguda road ( 1 Rayagada 1500 Span of 8.77 mtr) 251 Bridge over local nallah at 12th km on Ambodala-Dharanimaska Rayagada 1 road (Steel Decking Span 39.680m) 252 Bridge over local nallah at 1st km on K.Dhamini-Bethiapada road. Rayagada 1000 (Steel Decking Span 39.680mt) 253 Bridge over local nallah at 3rd km on Putasingi-Sagada road. Rayagada 800 (Steel Decking Span 39.68mt) 254 Bridge over local nallah at 4th km on Kulusingi-Engaraba road.( 6 Rayagada 3000 Spans of 10.77mtr) 255 Bridge over local nallah on Gudari-Dhepaguda-Karlaghati road. Rayagada 1000 (Steel Decking Span 21.39mt) 256 Bridge over Local nallah on Kasipur-Mandibisi-Sikarpai road Rayagada 1 257 Bridge over local nallah on Munikhol-Sakata road. (Steel Rayagada 5000 Decking Span 39.624mt) 258 Bridge over local nallah on Telengapadar-Dangasorada- Rayagada 10000 Chandrapur road.(Steel Decking Span 21.392m) 259 Bridge over Polama Nallah at 1st KM on Rekahlaguda Papikona Rayagada 1 Road 260 H.L. bridge over Dimiriguda nallah on Dimiriguda to Kalahandi Rayagada 1 border road 261 H.L. bridge over Gulusunda nallah on Ghotona to Gulusunda Rayagada 3500 road 262 H.L. bridge over Jhanjabati river on PWD road to Bhatakhal road Rayagada 3500 263 HL bridge over Local nallah at 3.0km on Maring to Sampini road Rayagada 1 264 HL Bridge over river Jhanjabati at 1st km on P.W.D. Road to Rayagada 5000 Halwa.( 3 Spans of 30.63mtr) 265 HL bridge over river Bansadhara at 1.00km on Karamuhana - Rayagada 1 road 266 HL bridge over river Nagabali at 0.700km on Hatseshkhal to Rayagada 1 Khilmisguda road 267 H.L. Bridge over Veden nallah at 3rd km on Kuchinda to Satkama Sambalpur 20000

Ooutcome Budget : DoRD for 2016-17 Page69

268 Bridge over Bausen Nallah on Salad Thutikatarbaga Road Sambalpur 1 269 Bridge over Bhalijore Nallah on Padiabahal Tampergarh Road Sambalpur 2400 270 Bridge over Budhakata Nallah on Batgaon Salebhata Road Sambalpur 1 271 Bridge over Maltijore nallah on Padiabahal Tampergarh road Sambalpur 2500 272 Bridge over Nuaburda Nallah on Falsabahal Padhanpali Road Sambalpur 500 273 Bridge over Sialjore Nallah on Tamperkela Orampada Rengalpali Sambalpur 350 Road 274 Bridge over Surubali Nallah on Podabalanda Badmal Road Sambalpur 1500 275 HL bridge over river Tikira at 3rd km on Jharbeda to Kutasinga Sambalpur 1 road 276 Bridge over Amrudi Nallah on Gopana-Hatikucha Road ( 5x10.77 Sundargarh 1 Span ) 277 Bridge over Bagdiha Nallah on KBK Waterfall Road Sundargarh 5000 278 Bridge over Chandri Nallah of Tainsar-Musapali Road Sundargarh 5400 279 Bridge over Chhinda Nallah on Sahajbahal Kulmindra Road ) Sundargarh 5000 280 Bridge over Kacheru nallah at 4th km on Kuarmunda Kacharu Sundargarh 1000 Road 281 Bridge over Laba Nallah at 7.23 on Jamudihi- Chordhara Road ( Sundargarh 1800 4x10.77 Span ) 282 Bridge over Local nallah at 3/400 km on Kumakela Chandra Road Sundargarh 2000 283 Bridge over Mundajore nallah at 2/000 km on Dilkudar- Sundargarh 3000 Bardhanmunda Road 284 Bridge over Propetta Nallah at Kello Road ( 4x10.77 Span ) Sundargarh 1 285 Bridge over Rukuda (Lima nallah) on RD road to Bhadimarah Sundargarh 130 road. 286 Bridge over Samtha nallah on Jareikela Kopsingha Road at 0/500 Sundargarh 15000 km 287 Bridge over Suidihi Nallah on Dalakudar-Kankusuan Nallah Sundargarh 675 288 Bridge over Turturi Nallah at 0.350 Km Lathikata -Girjatola ( Sundargarh 1 3x10.77 Span ) 289 HL bridge over Bankasal nallah at 0.700km on Mahuldiha - Sundargarh 1 Talbahali RD road 290 HL bridge over river Brahmani near Jalda-A Block to Birual ghat Sundargarh 1 291 HL bridge over river Deo at 1st km on Semerta - Mitkundri road Sundargarh 1 292 Bridge over Ahida Nallah on Kanika Julumbahal road (4 spans of Sundargarh 4797 10.77 mtr) . 293 Bridge over Kenti Nallah on Khatkurbahal Amgova road. (5 spans Sundargarh 1070 of 10.77 mtr) 294 Bridge over Kudaboga nallah on PWD road to Kudaboga Road Sundargarh 3000 295 Bridge over Kukuda Nallah at 1 st K.m. on PWD road to Sundargarh 1 Dhaniapunji. 296 Bridge over Local nallah at 9th. Km on Sundargarh-Gadiajore Sundargarh 15000 Road 297 Bridge over river Safei on Sulei-Kantapali-Kinjirma road. Sundargarh 18500 298 Bridge over Safei Nallah at 3 rd Km. on Deuli-Bhalugard road. Sundargarh 18500 299 Bridge over Safei on Bargaon Bhoipali Kureiboga road. Sundargarh 18000 300 Bridge over Satabari Nallah on Kurumkel Deogaon road. Sundargarh 3500

Ooutcome Budget : DoRD for 2016-17 Page70

301 Bridge over Sathi nallah at 5th. Km on Sahajbahal-Rungaon Road Sundargarh 4000

302 Bridge over Tambu Nallah at 6th Km on Jouramunda Tarkera Sundargarh 721 road. 303 Bridge over Tambu nallah at 7th Km on Sanbarsa-Tarkera Road Sundargarh 3000 304 Bridge over Thinthin Nallah at 3rd Km on Nuadihi Pandiapali Sundargarh 4000 road. 305 H.L. bridge over Deo at 1st km on Khuntgaon Lankoi road Sundargarh 1 306 H.L. bridge over Iccha nallah on Surguda to Dalkijharan via Sundargarh 3000 Bargamal road 307 H.L. bridge over River Safei in Medha to Jarmal road Sundargarh 1 308 H.L.bridge over Budhikudar nallah at 2nd km on R.D.road- Sundargarh 1 Potobeda rd 309 H.L.bridge over Sapiata nallah at 1st km on Jamdhar- Sundargarh 1 Dharaniprasad rd 310 HL bridge over Basundhara Nalla at 4th km on Baladbandha to Sundargarh 1 Bileibahal road in. Lephripada block 311 HL bridge over Daku Nallah at Gangajal on SH 10 to Gangajal Sundargarh 1 Kushamdegi road 312 Sanbondajore nallah at 2nd km.of Subdega-Damkuda road Sundargarh 1 (3.1km) (5 x10.77 mtr) 313 H.L. Bridge over Brahmani nallah at 1st km on Duduka - Barapali Sundergarh 1 road via Kuisira Total : 920000 04-800-Other Expr. 1 Bridge over Sanjamara Nallah on Raniakata-Sanjamara Road Angul 4000 2 Bridge over Samakoi Nallah on Injidi-Alluri Road Angul 15000 3 Bridge over Ulani Nallah at 4th km on Derenga-Ghantianali Road Angul 801 4 Bridge over river Bauli on Khalgoan Talgarh Road Angul 1 5 Bridge over Katrapali Nallah on Kantrapali-Naktideol Road Angul 1177 6 Bridge over Naktideol Nallah on Kantrapali-Naktideol Road Angul 199 7 Bridge over Bauli Nallah at 2.700th KM on Sankhapur Kaleipada Angul 1 Road 8 Bridge over Nadaka Nallah at 3.700 KM on Sankhapur Kaleipada Angul 1 Road 9 Bridge over Rukuna Nallah at 0.750th KM on Kaleipada Maranda Angul 1 Road 10 Bridge over Kumbharia Nallah at 2nd KM on Chhendipada Angul 1 Chhandipada(J) Road 11 Bridge over Ghodadian nallah on Kumursingha-Inkarbandha- Angul 1 Pondapur road 12 H.L. bridge over Badajora Nallah at 2nd Km on Kurumtap- Angul 8000 Gundurikhali- Similia road 13 S.B. over Balasingha Nallah at 5th Km on Kumursingha- Angul 6000 Inkarbandha- Pondapur Road 14 H.L. bridge over river Oreda Jore at 6/500 Km on Tusara-Oreda- Angul 12000 Kadaligarh road 15 H.L. bridge over Aunli Nallah at 2nd km on Magarmuhan to Angul 3000

Ooutcome Budget : DoRD for 2016-17 Page71

Hansala via-Sandhamunda road

16 H.L. bridge over Lingara Nallah at 3rd km on Khandahata- Angul 7000 Angarabandha-Barasingha road 17 H.L. bridge over river Badjura Nalla on the road from Podapada Angul 275 to Govindpur 18 Bridge over Himtira Nallah on Himtira-Sanjamura Road Angul 5000 19 Bridge over Nandira Nallah at 5th km on Sathapada-Lingrakata Angul 2529 Road 20 Bridge over Angapada Nallah on Urukula Serenda-Khamara Angul 1547 Angapada Road 21 HL bridge over Bauli nallah at 0.150km on Phulpada -Soantrapur Angul 1 road 22 HL bridge over Sandhapal Nallah at 3.200km on Himitira to Angul 1 Dohali via Sandhapal Road 23 HL bridge over river Aunli at 0.600km on Dangapal -Bhejidiha - Angul 1 Gadamandal road 24 HL bridge over Jautak Nallah at 2nd km on Phapand to Angul 1 Jeyporeroad 25 HL Bridge over Lingara nallah near Jarada on Paripada-Jarada Angul 1 road 26 Bridge over Coast Canal on Tiakhia Gopinathpur Balasore 1 27 Bridge over Ghagara Nallah at 3rd Km. on R.D. Road (Tarini Balasore 2120 Chhack) to Malyani Via Kharadia 28 Bridge over Kamala Nallah at 10th Km. on Bhalukasuni Matiali Balasore 1 Road 29 Bridge over river Jalaka on Badadhanadi to Koilisahi Road Balasore 1 30 Bridge over Dubdubi nallah on Lumnakhundi Kasafal Balasore 1 Ghamagadia Via Sahu Chhak Ferry Ghat road 31 Bridge over Penjwara Nallah on Nalabhar to Sarthamuhan Road Balasore 8000 32 Bridge over Baharda on Baliapala -Ghungi road Balasore 1 33 Bridge over Palpala Nallah at 1.900 KM on Langeswar PWD Road Balasore 1 at Balipati to Irda Road 34 Bridge over Baunsamukha Nallah at 0.260 KM on NH-60 Balasore 1 (Gandhichhak) to Sadanandapur Road 35 Bridge over Sindhua Nallah at 1.600 KM on Ajodhya Baliapal Balasore 1 Road 36 Bridge over Kudia nallah on PWD road to Basuchakari road Balasore 1 37 H.L. bridge over Sagakhanallah on P.W.D. Road to Bankisahi Balasore 4000 38 H.L. bridge over Bankatira nallah on NH-5 to Ambulakuda road Balasore 5000

39 Bridge over Prasanna Nallah at 1/100 Km. on Durgadevi R.D. Balasore 3000 Road to Gududa Road 40 Bridge over Budhabalanga on Ambulkuda-Gandara road Balasore 25000 41 Bridge over Budhabalanga on Kasimpur-Haldia road Balasore 16000 42 Bridge over river Sono on Sajanagarh-Ajodhya-Tindesh road Balasore 15000 43 H.L. Bridge over river Budhabalanga on Kashipur - Kosimila road Balasore 1 44 HL bridge over river Sono at 3rd km on Nuapadhi PWD road to Balasore 1

Ooutcome Budget : DoRD for 2016-17 Page72

Ghungi road via-Boitabank

45 Bridge over Chhapulia (Chikidi) Nallah on N.H.5 to Mulising road Balasore 1 (4 x 8.77m) 46 Bridge over Kanchudi Nallah at 8th Km. on Godipokhari to Andrei Balasore 748 road (3 x 8.77m ) 47 Bridge over river Kansabansa Nallah on Agnipur- Amaria road (3 Balasore 350 span of 8.77m each) 48 Bridge over Begunia nallah at 7th KM on Ojhapokhari-Saradanga Balasore 1 road 49 HL bridge over Kansabansha nallah at 3rd km on Bhatapada to Balasore 1 Bauripada via Kasimpur & Taranga 50 H.L. bridge over Kapasia nallah on Bhuabandha - Banabadi road Balasore 1 51 Bridge over Andia Nallah at 1.000 Km. on Uttarpada-Namkana Balasore 1 Road. 52 Bridge over Andia nallah at 0/550 KM on Kalikapur-Chhotkanpur Balasore 1 road 53 Bridge over Hanskura Nallah at 3rd km. on Anirudha Chhak to Balasore 7500 Chaulti Via- Kalsimuli road 54 S.B. over Khalajodi Nallah at 11th km. on Nahara Balim to West Balasore 1 Bengal Border road 55 Bridge over Chitei nallah on Batagram Chitrarekha Pond-Putina Balasore 1 Via- Chakaisab & Naradiha U.P. School 56 Bridge over Chitei nallah (Near Nilipura village ) at 7th KM on Balasore 1 Baharda-Bhuatentuli & Nilipura via Chirkul road 57 Bridge over Subarnarekha river at 14th Km on Raibania O.T. road Balasore 10000 58 H.L. Bridge over Gobara Nallah at 1.5 km on Salsanda to Balasore 8000 Palsankasids road 59 H.L. Bridge over Birlkiti nallah at 5.28 km on Kirtania to Balasore 10000 Basudevpur road 60 HL bridge over river Subrnarekha at 1st km on Churmara- Balasore 1 Chaughari road 61 HL bridge over river Banjari on Gudesira to Sauntpur road Baragarh 1 62 HL bridge over river Kuliarijore at 1st km on Andharipali to Bargarh 1 Charpali in Attabira block 63 H.L. bridge over river Koliari Jore connecting Haladipalli to Bargarh 2000 tunda 64 Bridg over Jeera river on Ruhunia to Khuntpali Bargarh 5000 65 Bridge over Jeera river on Jamdol to Dubenapali Bargarh 10000 66 Bridge over Pathurimunda Nallah on NH6 to Bhoipura PMGSY Bargarh 1 road 67 Bridge over Banjari nallah on Gudesira NH6 via Saiyan road Bargarh 900 68 Bridge over Arjunda nallah on Thuapalli-Arjunda PMGSY road Bargarh 1 69 Bridge over Burogarh Nallah at 2.7 Km on phulapali Bandhapali Bargarh 1 road 70 Bridge over river Jeera on RD road-Launsara via Malipali road Bargarh 30000 71 Bridge over Jhainjore on Tope Pithapotala road Bargarh 5500 72 H.L. bridge over river Ranj Nadi on Kumbhari G.P. To Bargarh 1 Patakulunda G.P.

Ooutcome Budget : DoRD for 2016-17 Page73

73 H.L. bridge over river Danta on Kalmenda - Remenda road Bargarh 10000 74 Bridge over Jhitiki Nallah on Mandosil- Amethi road Bargarh 1 75 Bridge over Kukuri Nallah on Tumuripani-Nityanandpur road Bargarh 1 76 Bridge over Kuliarijore on Nuagarh-Urduna via Hatisar road Bargarh 860 77 Bridge over Pandakipalli Nallah on Loharachoti Machimora Bargarh 1 78 Bridge over river Ong on PWD road at Manlpada, to Bolangir Bargarh 4000 Border via Dharol, Malpada, Chhindeikela, Patraguda, Temrimal, Menkamunda road 79 Bridge over Kapati Nallah on R.D. road at Sargul chhak-Kapati Bargarh 4000 Chhatishgarh border via- Bhainsadarah 80 Bridge over river Uttali on Patharla-Tuhilamal road Bargarh 13000 81 Bridge over at 3rd km. on SH13-Jamsesh-Chindukela Bargarh 1 road 82 H.L. Bridge over Local nallah on Jatesira - Kumil road Bargarh 1 83 Bridge over Kumudi nallah on Kansar-Darliguda Padmapur road Bargarh 1764 84 HL bridge over river Ong on Deuli to Nagenamal road of Bargarh 1 Padmapur block 85 Bridge over Baitali Nallah on Baitali-Adapani road Bargarh 1 86 Bridge over river Ong on Jamala Khuntpali road Bargarh 2000 87 Bridge over river Ong on PWD road to Brahmandihi via Koknara Bargarh 1694 road 88 Bridge over river Uttali on Talpadar-Bijepur via Sanbaunsen, Bargarh 1 Barguda, Bandupali road 89 Bridge over Salandi River at 5.200 km on B.C. Road to Bhadrak 3200 Nuabandha Road(70 m) 90 Bridge Over Khandia Nallah at 1.500 km on PWD Road to Bhadrak 1 Goramati Road (35 m) 91 Bridge over River Dhala on Natiapal to Padmapur Birasa PWD Bhadrak 500 Road via Mathurapur 92 Bridge Over Chhelia Nallah at 14th km on B.C. Road to Bhadrak 2500 Taladumuka Road (40 m) 93 Bridge over Nalia Nallah at 0.400 km on T5 to Langudi Road Bhadrak 1 (50m) 94 Bridge over River Dhala Nallah at 3/10 K.M. on Bounsbag to Bhadrak 7000 Sanandapur Road 95 Bridge over River Kapali Nallah at 2/00 K.M. on Balabhadrapur Bhadrak 4900 Ultanga Road 96 Bridge over River Sanakapali on Ramakrushnapur-Kenduapada Bhadrak 300 Road 97 Bridge over Salandi on L54 to Deulipal at 2.40 K.M Bhadrak 10000

98 H.L. Bridge over Salandi river at 1st K.M. On P.W.D road to Bhadrak 10000 Srirampur 99 H.L.Bridge over Nua Mantei river at 3rd km on Nischintapur- Bhadrak 10000 Padmapur Birasa PWD road via Madhupur 100 S.B over Janta Mahara nallah on Dhamnagar to Falapur Road Bhadrak 3000 101 Bridge over river Sanakapali on Aluti Ramapur road Bhadrak 800 102 Bridge over River Salandi on Charigaon Chakrapadhi Road Bhadrak 8000

Ooutcome Budget : DoRD for 2016-17 Page74

103 Bridge over River Sanaseulia jore on R.D Road to Hansapat Road Bhadrak 2500 104 S.B Bridge over River Gamei on Brahmanogaon to Pandasunighat Bhadrak 7046 Road. 105 Bridge over River Kochila at 1.800 KM on PWD Road to Astak Bhadrak 1366 Road 106 Bridge over river Mantei on BC road-Matiasahi-Saya-Nandapur Bhadrak 15000 road. 107 Bridge over River Nalia on PWD Road to Bhatpur Bhadrak 500 108 HL bridge over river Nalia at 1.50km on PWD road to Langudi Bhadrak 400 Mahadev Sahi road 109 Bridge over River Reba on Manjuri to Gobindpur Road. Bhadrak 1 110 Bridge over Hasnabad Nallah at 3.40 KM. on RD Road to Bhadrak 1614 Pangata Road 111 Bridge over River Genguti at 1st KM. on Biroli-Sathagaon Road Bhadrak 851 112 Bridge over Kapali Nallah at 5.500 KM on Jhatiasahi Mangalapur Bhadrak 1 Road 113 Bridge over Galia nallah on B.C.Road (Kuansar) to Chardhia Bhadrak 1 114 Bridge over river Salandi on Motto-Aradi road Bhadrak 16000 115 Bridge over Sarta nallah at 2.200Km on Biroli Sathagaon Road Bhadrak 5000 116 H.L. Bridge over Dhanantori Nallah on R.D. Road to Jaguali Bhadrak 6000 Chhanda road 117 Bridge over Baitarani connecting R.D.Road to Balipatna and Bhadrak 12000 Ahias Kamalpur rd. 118 HL bridge over river Nuanai at 5.80km on PWD road to Ajodhya Bhadrak 1 119 HL bridge over river Baitarini at 4.70km on Khadipada- Bhadrak 1 Anandapur road 120 SB over Kusangi nallah at 5th Km on Hirapur Keutipali road Bolangir 1 under BSY(Span-6x10.77mtr) 121 Bridge over Kultapada nallah on PWD road to Kultapada via Bolangir 1 Kumuria Khairguda road.(4x8.77m) 122 Bridge over Luhurapali Nallah on Luisingha Badibahal road Bolangir 1 123 Bridge over Amaghat nallah on Ramachandrapur-Ghatuldunguri Bolangir 1 road 124 H.L. bridge over Suktel nallah on Kubrimahul PMGSY road to Bolangir 4297 Barghati road 125 H.L. bridge over river Sonegarh on Antarla - Pipalpadar road Bolangir 25000 126 SB over Bourijore nallah on Nuapada Sahajbahal road under Bolangir 1 BSY(Span-6x10.77mtr) 127 SB over Dhanpur nallah at 8th Km on Jamut Dhanpur road under Bolangir 1 BSY(Span-6x10.77mtr) 128 H.L. bridge over Katangi nallah on Khaprakhol-Juria road. Bolangir 1 129 Bridge over river Sonegarh on Tepren-Bandhapada Bolangir 2800 road,Deogaon Block. 130 Bridge over river Sonegarh on Kuthurla -Seletkani road Bolangir 650 131 Bridge over Jalbang nallah at 1st KM on Banabahal-Bandhapada Bolangir 1 road 132 HL bridge over Dantia nallah at 1st km on rinbanchan to Bolangir 1 Budhisindol road

Ooutcome Budget : DoRD for 2016-17 Page75

133 SB over Suktel nallah on Patrapali Baliabhata road. Bolangir 1 134 H.L. bridge over Jamjore nallah on Dalapali PWD road to Bolangir 17073 Khuntsamalie 135 Bridge over Suktel on Tamia Mudalsar road. Bolangir 1 136 Bridge over Suktel on Bagmud-Hirli to Luhasingha road Bolangir 1 137 Bridge over Lanth nallah on Mandal Madhyapur road Bolangir 3000 138 Bridge over river Suktel on Bagmunda-Leheret road Bolangir 1 139 Bridge over Satabahani nallah on Titilagarh Muribahala road. Bolangir 1 140 HL bridge over Kankadajore Nallah at 0.5km on Lenjha - Bolangir 1 Bhatipada road 141 S.B.over Nehera Nallaha at 11 th K.M. on Bhatipada-Lebda road Bolangir 1 142 Bridge over Bagbahal nallah on PWD road to Bhuslad road Bolangir 1 143 Bridge over Tentulikhunti nallah on Haldi Muribahal via Bolangir 1 Tentulikhunti road 144 H.L. bridge over Suapada nallah on Suapada to Dumerbahal P.R. Bolangir 3000 Deptt. road 145 Bridge over Tangjore nallah on Sindhekela Themra road Bolangir 5000 146 Bridge over Arjuni nallah on Biripur-Tetelapada road Bolangir 1 147 Bridge over Nangamanijore nallah on Lebda-Temera road Bolangir 1 148 Bridge over local nallah on Similijhore - Ambagaon via N. Prasad Boudh 700 Road at 10th Km 149 Bridge over local nallah on Similijhore - Narayanprasad - Boudh 1 Dedhenimal -Ambagaon Road 150 Bridge over Local Nallah at 0/900 Km on Sainipada - Sundhipadar Boudh 5000 Road 151 Bridge over Nenon Nallah at 3rd Km on R.D. Road - Karadapadar Boudh 1 via Pabulipada Barakoda road. 152 Bridge over Sakusinga Nallah at 4th Km and Kusuma nallah at Boudh 1 5th. km on Dhalpur-Kharasankulei. 153 Bridge over Bankamunda Nallah at 3rd Km and Kukupetswar Boudh 5000 Nallah at 5th km on R.D. road-Khandahata 154 Bridge over Local Nallah at 1st Km on Boudh Dhalpur road. Boudh 5000 155 Bridge over Local Nallah at 7th Km on Rugudikanapada-Rd road. Boudh 1 156 Bridge over Local Nallah at 6th Km on PWD road to Tundumal Boudh 1 via Ratakhandi. 157 Bridge over Local Nallah at 7th Km & 13th. Km on Similijhar Boudh 5000 Narayan Prasad road 158 H.L. bridge over river Khadanga from Khunti Gura to Jamuta Boudh 5000 159 Bridge over local nallah on Baragaon - Kunasila road Boudh 7000

160 Bridge over Local Nallah ( 3 Nos) on Dahya - Talpadar - Sagada Boudh 5000 Road 161 Bridge over Badajhar Nallah at 0/240 Km on Purumunda- Boudh 4000 Turuguda- Sagada Road 162 HL Bridge over river Tel connecting Tarva -Kantamal road. Boudh 35000 163 HL bridge over Sagadia nallah at 1stkm on Bhaliaguda- Boudh 1 Thakurmunda P.R.road

Ooutcome Budget : DoRD for 2016-17 Page76

164 Bridge over Sankulai nallah on RD road to MSG to Purunapalli Boudh 5000 road 165 Bridge on Kendrapara Canal at 4th Km. on Nandol Tentol Road Cuttack 1 166 Bridge over River Prachi at 1st Km. on Adaspur Kasarada Road to Cuttack 3000 Banamalipur 167 H.L.bridge over Dead Paika at Raghunathpur on Hanuman Cuttack 7000 Mandir Chhak-Kalarabanka via-Neutiakana road 168 H.L. bridge over river Kandal from Pahanga to Kalakha Cuttack 1 169 H.L. bridge over Local nallah at on Singhala to Cuttack 1 Purusottampur road 170 Bridge over Jhaarana Nallah on Nuataila- Bangirisinga road at Cuttack 13000 3.00km 171 Bridge over Chatara nallah on Dhobani Nallah Karada Road at Cuttack 8000 0/500 Km. 172 Bridge over Kandal river at 3rd Km on Patasundarpur-Badamulei Cuttack 50000 road 173 Bridge over Jahalnai on Chapada-Kanpur road Cuttack 10000 174 Bridge over High Level Canal on Sanachancho Badachancho Cuttack 1500 Road. 175 Bridge over Taladanda Canal on Alarpur Sidheswarpur Road. Cuttack 1 176 Bridge over Sukanai on Triveniswar Mouda Road. Cuttack 2000 177 Bridge over Mendhakhai Jora on NH-5 to Champapur Cuttack 1 Anandabazar Road. 178 Bridge over Ganda Nallah on Agrahat Bisinahakani Road. Cuttack 1 179 Bridge over Kendrapada Canal at Salipur PHC road. Cuttack 4000 180 H.L. Bridge over Pattamundai canal on Mahanga - Bagsarpur Cuttack 1 road 181 Bridge over Chindanala river at 3rd km on Patrakana village Cuttack 1 Road. 182 S.B. over Gobari on Chahapada Kanpur Road at Jankoti of Cuttack 5000 Rs.276.00 lakhs. 183 S.B. over Gobari on Badheichhanda Manitri Road of Rs.290.00 Cuttack 2000 lakhs. 184 Bridge over Chandipur nallah on Chandipur Rajib road. Cuttack 6200 185 HL Bridge over Dhania nallah on Mitikapur Hatibari road Cuttack 4000 186 SB over river Finga on KaraKamal to Udayapur-Dal road. Cuttack 300 187 SB over river Lesma on Danda padia-Ostapur-Santanibati road Cuttack 6000 188 Bridge over river Kathajodi near Paramahansa at 8th KM on Cuttack 1 Kadampada-Kharipadia-Dahigaon-Routraypur road 189 Bridge over Sedhua nallah on Khurunti Khalarda Road Cuttack 100000 190 Bridge over river Gobari on Baradiha-Jaleswarpur road Cuttack 9000 191 HL bridge over Gandha nadi at 3rd km on Agrahat Bisinahakani Cuttack 1 road to Petkarandi road via Purohitpur & Talapada 192 HL bridge over river Mahanadi at 0.300km on Sirlo to Sahukheta Cuttack 1 road 193 HL bridge over Chitroptola at 10th km on Barkolia-Nagaspur RD Cuttack 1 road 194 HL bridge over river Devi at 16th km on Mahidharpada to Cuttack 1

Ooutcome Budget : DoRD for 2016-17 Page77

Govindpur road 195 HL bridge over river Birupa at 7th km on Souri - Rameswar road Cuttack 1 196 Bridge over Pokhara Nallah on Sunapal Mangarajpur road at Cuttack 8000 3/800 Km. 197 Bridge over Khajuripada Nallah at 15/00 Km. on Ramachadrapur- Cuttack 9000 Kalapathar Road 198 Bridge over Local Nallah at 13th Km. on Damapada Haladia Road. Cuttack 1 199 H.L. bridge over Siaria nallah on Deuli Bisambarpur road Cuttack 10000 200 H.L. bridge over Balichaturi nallah on R.D. Road to Berhampura Cuttack 7300 201 H.L. bridge over Nuabandha nallah on Mahuladhipa to Paikara Cuttack 5000 road 202 Bridge over Junia nallah on Kalipoi- Balipahad road Cuttack 1 203 S.B. over Benga & Sapua at 0/825 Km. & 1/305 Km. on Cuttack 5700 Achalakota Village to Old Cuttack & Sambalapur Road 204 S.B. over River Sapua at 5/900 Km. on Jenapada Arakhapatana Cuttack 1 Road 205 S.B. over Khaira nallah at 1st K.m on Ichhapur Jhajia road. Cuttack 500 206 Bridge over Puri main Cenal on Ratagarh Godisahi Road(6x10.77 Cuttack 10000 mtr) 207 Bridge over Sapua nallah on Katakisahi-Balisahi road Cuttack 20000 208 Bridge over river Sapua near Regadapada at 3/500 KM on Cuttack 1 Nuabandha ( PWD road) to Sankarpur Chhaka road 209 HL bridge over Dampatipur nallah at 0.580km on Sanatanibati - Cuttack 1 Mahuria road 210 HL bridge over river Rana at 3.200km on Haldipada to Cuttack 1 Karabaroad 211 HL bridge over Khali Nallah at 1.100 km on Ekdal - Ganagana Cuttack 1 road 212 S.B. over Beluam Nallah at 4th Km on Tikilipada-Sodo road Deogarh 1 (5x10.77m) 213 Bridge over Lambodara Nallah at 1st Km on Jharasahi to Deogarh 3800 Ardabahal Road 214 Bridge over Baliapita nallah at 3rd KM on RD road to Kalanda Deogarh 1 road 215 Bridge over Jautak nallah on Surubali -Madalia road Deogarh 1 216 H.L. Bridge over Mangalabuda nallah at village Lalaposi under Deogarh 1 Kaliapal GP, Block Barkote 217 HL bridge on Ghogijori nallah at 1st km on Landijhari to Deogarh 1 Madhyapur road 218 Bridge over Daunri Nallah at 1st Km on Santhapur-Raitala road Dhenkanal 1 219 Bridge over Lingara nallah on Nuagaon-Kankalu road Dhenkanal 2200 220 HL bridge over Ostia nallah at 1.56okm on Gondia to Santhasar Dhenkanal 1 road 221 HL bridge over Badajora Nallah at 1.25km on Bedapada - Dhenkanal 1 Ghodadian road 222 HL bridge over Badajore nallah at 1.050km on Mandapal- Kotpal Dhenkanal 2000 road 223 H.L. bridge over Badajore nallah on Govindpur -Hundisahi Dhenkanal 6500

Ooutcome Budget : DoRD for 2016-17 Page78

P.R.Road 224 S.B over Analei nallah at 1st km on Chandpur Gurujaguli road Dhenkanal 1 225 HL bridge over Mahapatia nallah at 2nd km on Khajuria- Dhenkanal 1 Makuakateni road 226 Bridge over Damasal nallah on NH-200 to patapur road Dhenkanal 100 227 S.B over Batajanla nallah on Gelhikateni Saranga Road Dhenkanal 693 228 Bridge over Badajore nallah on Kalapani Banasingh road. Dhenkanal 100 229 Bridge over Badajore on Tarabha-Sankulei road. Dhenkanal 1 230 Bridge over river Ramial on Khatakhura-Bhairipur road Dhenkanal 15000 231 Bridge over river Ramial on Hatuary-Jagannathpur road Dhenkanal 15000 232 Bridge over Gotiadandi nallah at 2/0 km on Roda Renthapat Dhenkanal 1 Road 233 H.L. bridge over Badajore nallah at 1st km on on P.W.D. road Dhenkanal 13000 (Paribesha Vihar) to Tipeijharana via Madarangamunda road 234 HL Bridge over Mahendratanaya river Bagasala Badagam road at Gajapati 20000 5.4 Km of PWD road to Bagasala Agarkhandi road. 235 Bridge on Padmapur Jeeba RD road at 0/750Km Gajapati 5000 236 SB over Kaliamba Nallaha at 3rd Km on Binchana Badaborsingi Ganjam 5000 Road 237 Bridge over Makhana Nallah at 3/244 Km on Sorala to Sunapur Ganjam 5797 Via: Krupanidhi Pentho road 238 Bridge over Dengapara Nallah at 3/500 Km & Khari Nallah at Ganjam 2960 4/600 Km on Bhismagiri RD road to Baramunduli road 239 Bridge over Routray nallah at 2nd KM on SH17 -Chhanameri Ganjam 5000 (Nuasahi ) road 240 Bridge over Local Nallah (Patharabandha) at 3rd Km on Ganjam 1 Sasanpadar Mantridi road 241 Bridge over Local Nallah on Sikharpur Sahapur (Khajapalli) road Ganjam 1143 242 Bridge over Local Nallah on Chaitanapada to Dayapali Via: Ganjam 1 Godarapalli 243 Bridge over Sagadia Nallah on Sundarpur Duanpalli road Ganjam 1 244 Bridge over Salt canal on NH-5 to Gokharakuda road Ganjam 1946 245 Bridge over Sulia Nallah on Moulabhanja to Khuludi Nuagada Ganjam 1834 road 246 Bridge over Sulia Nallah on PWD road to Harina to Podamari Ganjam 367 247 Bridge over river Bahuda on Sanakelajhali Dauni road Ganjam 15000 248 Bridge over Nandini Nallah at 2nd Km on Kurula chhaka to Ganjam 6000 Gothagam via Mahurikana road 249 Bridge over Local Nallah or Kaliaballi Chaka to Madhabapur Ganjam 184 250 Bridge over Badabandha Nallah on Burukudi to Phulta Ganjam 1186 Dumudumi road 251 Bridge over Tota Nallah at 2nd Km Turuburai M.Jaganathapur Ganjam 1 road 252 Bridge over Local Nallah on 1st Km Khirida to Hadachira Ganjam 2907 253 Bridge over Local nallah on Dengapadar Indirabbas to Rohigam Ganjam 1 road. 254 Bridge over Raoutray Nallah at 4/00 Km on Podamari Borigaon road Ganjam 6000

Ooutcome Budget : DoRD for 2016-17 Page79

255 H.L. bridge over Padmatala nallah at 0/5 km on Chiripadi to Ganjam 3000 Gudiapadar road & Iskapada nallah at 1/5 Km on Madarajpur- Dankalpada road 256 H.L. bridge over Nandini nallah Raktapata to Gambhariguda road Ganjam 6000 257 H.L. bridge over Rusikulya Canal at 4th Km on Bhaliajholo PWD Ganjam 1 road to Erenda PWD road via Patharapunji road 258 H.L. bridge over Ramanadi at 9/3 km on Dengaosta PWD road to Ganjam 1 Kaithakhandi via N.K.Pintha. 259 H.L. bridge over river Bodanadi at 3rd km. on Chamunda RD road Ganjam 10000 to Nada road 260 Bridge over Loharkhandi at 4th km. on SH7-Badakodanda road. Ganjam 1 261 Bridge over Kokolaba nallah on Manapur-Tarasingi road Ganjam 943 262 Bridge over on NH-217 to Jhagdei Jahal road Ganjam 20000 263 Bridge over river Baghua on Mandar-Bellagam Via.Sodaka- Ganjam 2536 Budhesuni road 264 HL bridge over river Badanadi at 5.0km on Maharajpur to Ganjam 1 Jagdalpur road 265 HL bridge over Mandiaghai nallah at 1st km on R.D. road to Ganjam 1 Chitipalli via Gambharigocha road 266 HL bridge over Ludubudi nallah at 2nd km on SH-30 to Ganjam 1 Beruanbadi road 267 HL bridge over river Baghua at 2nd km on Balichai- Ghodapalana Ganjam 1 road 268 HL bridge over river Rishikulya at 4th km on Pratapur-Handighar- Ganjam 1 Achuli Jn. Road 269 HLBridge over river Baghua at 1st KM on Bhamasiali-Golia road Ganjam 4000 270 SB over Loharakhandi at 4/9 Km of Bhanjanagar PWD Road to Ganjam 1600 Bhaliakhai PWD Road via Gamundi 271 Bridge over Jamakunda Nallah on Bhetanai - Badagada road Ganjam 1 272 Bridge over Renguti Nallah on - Renguti - Somma - Achuli Ganjam 1 Jn. Road 273 Bridge over Sandhi Nallah at 5th Km. of PWD road-Bhagabanpur Ganjam 1 (Box cell 3 x 8m x 4m at 1st Km & 2 x 8m x 4m at 2nd Km.) 274 Bridge over Rushikulya Tributarty on Ranjhalli - Hundata - Ganjam 1 Hottapur Road 275 H.L. Bridge over Loharakhandi at 2nd K.M. of Bahadapadar - Ganjam 1 Nandinipalli via Gurabadi - Chadheyapalli road (3 X 25.35) 276 Box Cell Bridge over Kothia Nallah on MDR-62( NH-217)- Ganjam 151 Ghasibilli road 277 Bridge over Kokalaba Nallah at 1/3 Km on Jadadhara - Masabadi Ganjam 1 Road 278 Bridge over Kokalaba Nallah on Gayaganda - Nabagochha Road Ganjam 1 279 Box cell Bridge over Kadamba Nallah on Kodala - Mardamekha- Ganjam 300 Ghodapada Road 280 Bridge over Sitamba Nallah at 10/650 Km on Janivilli - Sorada - Ganjam 20 Badagada Road 281 Bridge over Satrusola Nallah at 6th K.M. of Katakala- Bhamasiali Ganjam 1 Road 282 S.B. over Sara Nallah on K.Barapur - Ustia Road Ganjam 9

Ooutcome Budget : DoRD for 2016-17 Page80

283 S.B. Bridge over Boda Nadi at 2nd K.M. of Adheigam - Nimapadar road Ganjam 1 284 Box Cell Bridge over Gahanju Nallah at 8/150 KM on Babanapur- Ganjam 1 Maharajpur Road 285 SB over Sana nadi at 1/5 KM on PWD Road to Rangameru Road Ganjam 1 286 Box cell Bridge over Boda nadi at 2nd Km on J.N.Prasad- Ganjam 1 -Alsu Road 287 H.L. Bridge over Rushikulya at 3/8 KM on NH-217 to Genja via Ganjam 15000 B.Kotibadi 288 H.L. bridge over Badanadi at 1st. Km on Turumu - Berhambadi Ganjam 18000 road 289 H.L. bridge over Badanadi at 1st. Km on Kulada - Dhananjaypur Ganjam 1 Sasan road 290 H.L. bridge over Local nallah on Jholori to Manikpur road, Ganjam 2000 Gorumatia nallah on Mala tentulia to Khajuria road & Pokosunga nallah on Bhabarada to Gopiapalli road 291 H.L. bridge over Chatura Nallah on RD road to Ranigaon via Ganjam 1 Baragaon road, Baragaon to Gothiali road,Jayamangala nallah on RD road to Kusapur road & Sunathara to Mahanandapur road 292 Bridge over Rangei nallah on Mandarajpur-Ekasingi via Ganjam 236 Parapentho road 293 Bridge over Nandini nallah on PWD road-B.Berhampur via Ganjam 1 Serampada road 294 Bridge over river Bahuda on Sonepur to Patisonepur road Ganjam 25000 295 Bridge over river Baghua at 2/500 KM on Bolasara-Betasingi road Ganjam 1 296 Bridge over Sapua nallah at 1st KM on Lathi-Bendali road Ganjam 1 297 HL bridge over river Bahuda at 0.500km on Puhundi Belapada Ganjam 1 road 298 HL bridge over river Rama nadi at 11.00km on Dengawasta to Ganjam 1 Sindhaba via Nimakhandi Pentha 299 HL bridge over Pilli Nallah at 2.9 km on Khajaplli Kanchudu via- Ganjam 1 Mahanaplli road 300 HL bridge over river Ghoadahada at 3.850km on Erenda to Ganjam 1 Patharapunji road 301 Bridge over Hansua (Ratanjodi) on Kaijanga Parabil Road Jagatsinghpur 1 302 Bridge over river Jatadhari near Baliamara on Manapur Kandha Jagatsinghpur 30000 road to Gadakujnga via Bhuinpal 303 Bridge over river Brudhanallah on Rahama Sariki Nuapokhari Jagatsinghpur 1 Rosd 304 Bridge over river Hansua on Kaijanga Parabili road Jagatsinghpur 1 305 Bridge over Gobari on Biribati - Alipingal road connecting to Jagatsinghpur 1 Patasara road. 306 Bridge over river Madhapur Safei (Hansua) at 4th Km on Sampur Jagatsinghpur 5000 Nuapada Road . 307 H.L. bridge on Bansa to Salijanga road Jagatsinghpur 5000 308 H.L. bridge on Borikina-Sumuda road at Balisahi Jagatsinghpur 8500 309 Bridge over river Potanai Pokamul Devi Right Canal Jagatsinghpur 1500 Embankment 310 Bridge over river Devi near Dahanikhia on Machhagaon Asilo Jagatsinghpur 45000 road

Ooutcome Budget : DoRD for 2016-17 Page81

311 Bridge over river Adsanga Nallah Erasama Pokhariapada Road Jagatsinghpur 1000 312 HL bridge over Saunlia nallah at 2.500km near Barakolianta on Jagatsinghpur 1 Gobindapur - Sompur road 313 HL bridge over river Gobari at 4th km on Osakana to Dhuanpada Jagatsinghpur 1 road 314 HL bridge over Hadua Nallah at 1st km on Guamunda - Gada Jagatsinghpur 1 Kujanga road 315 H.L. Bridge over Naka nallah on Tandra - Barei road Jajpur 1 316 Bridge over Kani nallaha at 0.35km on Ahiyas Kamalpur road for Jajpur 2850 2011-12 317 Bridge over Chingudia nallah on Bari Binjharpur road Jajpur 3000 318 Bridge over Kusi nallah on Panasa GP Jajpur block via Beleswar Jajpur 2200 road 319 Bridge over Kantapal nallah on Sukinda Kuhika road Jajpur 1 320 Bridge over Ordapal nallah on TISCO gate to Deogaon road Jajpur 1 321 Bridge over river Bramhani near Chandanpur on Golakunda Jajpur 10000 Indupur road 322 Bridge over Kani Nallah on Baulanga Patri Kamalpur road Jajpur 5000 323 Bridge over Kaliapola nallah on Kadamachhaka to Godarapal Jajpur 7800 nallah 324 Bridge on River Sankhua at 6th Km.on Mangalpur Dandisahi road Jajpur 5000 325 Bridge over Sankhua nallah at 3rd Km. on Boulanga Akhusahi Jajpur 1 road 326 Bridge over Mainsipahara Nallah at 7th Km. on TISCO gate to Jajpur 5000 Deogaon road 327 Bridge over Dudhei nallah at 0.3 Km on Sujanpur- Rudrapur road. Jajpur 5000 328 2 nos H.L. bridges over river Brahamni on Jhalpada Jajpur 1000 Brahamabrada G.P. Routarpur G.P, Samantrapur G.P 329 H.L. bridge over river Budha on Champa - Chanda road Jajpur 15000 330 H.L. bridge over river Brahmani on Golkunda - Indupur road Jajpur 1 331 Bridge over Jamuna nallah on Beruda to Jalahara road Jajpur 700 332 Bridge over Kaliapani nallah on Ranapur Odapada road Jajpur 8000 333 Bridge over Pandara nallah on Bambilo Kuhika road Jajpur 1 334 Bridge over Dappa Nallah on Haripur to Karjanga road Jajpur 1 335 Bridge over river Sanagenguti at 3rd km. on N.H-5 to Jajpur 8000 Sakuntalapur 336 Bridge over river Budha at 6th km. on RD road- Uasahi road. Jajpur 13000 337 Bridge over Local(Tenta) nallah on Kapila Barapada Chilapadia Jajpur 8000 via Nagapura road 338 Bridge over Ganda nallah on RD road-Baghabindha road Jajpur 8000 339 Bridge over Kharastrota on Maheswarpur-Jahalaghata road. Jajpur 18000 340 Bridge over Balangapatia at 4th km on Bari -Binjharpur road. Jajpur 17000 341 HL bridge over Brahmami on Banababati to Nuapada R.D.road Jajpur 1 342 HL bridge over Kani nallah at 0.700km & Bhatia nallah at Jajpur 1 2.500km on RD road to Sadabrata PMGSY road 343 HL bridge over river Baitarani at 7.00km on Barundei to Bandalo Jajpur 1 road

Ooutcome Budget : DoRD for 2016-17 Page82

344 Bridge over Rasuna Nallah on Narasinghpur Sikchilabag Rasuna Jajpur 1 road 345 Bridge over Kelua Nallah on Talua Musatikiri road Jajpur 100 346 Bridge over Anjiara Nallah on N.H-5 to Balangia road Jajpur 1 347 Bridge over River Sanagenguti at 3rd KM on NH-5 Sukadeipur to Jajpur 10000 Dihakaranda 348 Bridge over river Sagadia on Chakrada to Sundaria road Jajpur 1 349 Bridge over Charbatia nallah on Haridaspur to Kolha road Jajpur 1 350 Bridge over Gudipania Nallah at 3/500 Km.on Haripur to Jajpur 8000 Karajanga road 351 Bridge over river Dappa at 1/500Km.on Chandipur to Kolathala Jajpur 10000 road 352 Bridge over river Kuanria at 6/000 Km. on Rahadpur to Kampalu Jajpur 5000 road 353 H.L. bridge over Rahasola Nallah on the Nuasunguda Khetrapal Jajpur 5000 road at 0.50 km 354 H.L. bridge over river Kelua from Arabal to Rambhapur road. Jajpur 25000 355 H.L. Bridge over high level canal on Khaira - Dhanamandal via Jajpur 3000 Sasan Purusottampur road 356 Bridge over Keluo on Kadampal-Udayapur road. Jajpur 14500 357 HL bridge over river Kuanria Nallah near village Kolha on the Jajpur 1 Road Champapur to Kolha via Siaria purnachandrapur, Samia G.P. 358 HL bridge over Sagadia nallah at 1st km on Narasinghpur - Jajpur 1 Pipalidiha road 359 Bridge over Local Nallah on Perifery - Sunary Road. Jharsuguda 1 360 H.L. bridge over river Bheden Hirma to Malda road Jharsuguda 1 361 HL bridge over Local nallah at Rangia-Tikira on Bagdihi - Kirmira Jharsuguda 1 road 362 Bridge over local nallah on PWD road to Siripur road Kalahandi 2500 363 Bridge over river Udanti on PWD road-Kanduljore road. Kalahandi 6350 364 H.L. bridge over river Ret on Bachaka Chhak to Kankutru ( Kalahandi 15000 Kankutru G.P) 365 H.L. bridge over river Pipal nallah on Kamthana to Ghusurigudi Kalahandi 15000 366 Bridge over Kukudi nallah at 13th km. on Badakarkote- Kalahandi 1 Badapujariguda road 367 Bridge over Nuapada nallah at 16th km. on Badakarlakote- Kalahandi 1 Badapujariguda road 368 H.L. bridge over river Tel near Badachergaon on Badachergaon - Kalahandi 30000 Tentelpada - Themra road 369 Bridge over river Sandul on Balipada-Lupra road Kalahandi 1 370 H.L. bridge over river Mangalijore nallah on Jogipala to Sahajpati Kalahandi 15000 371 Bridge over Kumbherjori nallah on R.D. road to Ranipanga Kandhamal 2094 372 S.B. over Budhajore nallah at 10th Km on Chakapada Archangi Kandhamal 1 road. 373 HL bridge over Damdei nallah on Barakhama Sitapadi road Kandhamal 42 374 Bridge over Badabanga nallah at 16th Km on Raikia Simanbadi Kandhamal 2500 road.

Ooutcome Budget : DoRD for 2016-17 Page83

375 Bridge over Gandharaguda nallah at 8/6th km.on Subarnagiri Kandhamal 10000 Budaguda road. 376 Bridge over river Birupa at 1st KM on Chhoti-Mugabari road Kendrapada 15000 377 Bridge over river Luna & Karandia near Dihabalarampur on Kendrapada 1 Tikanpur-Dalanta-Bilabalarampur road 378 Bridge over Gobari dead channel on Bagadia Dasipur PMGSY Kendrapara 2000 Road 379 H.L. bridge over Ashrunkhala Nallah at Mantei on Nuapada Antei Kendrapara 1 R.D. Road to Manikpur Batira R.D. Road 380 H.L. bridge over Gobari on Khairbad Allijanga to Chakada Kendrapara 1000 Baranga Nagapura P.R. road 381 Bridge over Machha Bandha Nallah on Gobara Chhak to - Chaulia Kendrapara 1000 - Bamara road. (Boxcell 4span of 6.14mtr.) 382 Bridge over Kharianga dead river on Podal to Jamdhar road. Kendrapara 2000 383 Bridge over Patanallah on Manikpur Batira road. Kendrapara 5000 384 Bridge over Chandal Patanallah Nallah on Cuttack Chandabali R Kendrapara 2500 & B Road (Ramachandi Thakurani) to R & B Ganeswarpur road. 385 Bridge over river Gobari on Kupuni to Gandakhia road (1span of Kendrapara 15000 30.63mtr.) 386 Bridge over Sarumuhin Nallah on Adoi to Sarumuhin road (1span Kendrapara 2000 of 25.35mtr.) 387 Bridge over Tantiapal Nallah on Gunthi-Tantiapal road (1span of Kendrapara 3000 25.35mtr.) 388 Bridge over Ambura Nallah on Belarpur High School to Kendrapara 3000 Laxmanjew Temple Office road. (3span of 10.77mtr.) 389 HL Bridge over river Brahmani Creek on Kerdagarha to Chandan Kendrapara 8000 pur road (1 span of 25.35mt) 390 Bridge over Luna nallah on Duhudipur to Badamohanpur road Kendrapara 1 391 Bridge over river Gobari on Pehenta-Pesta road Kendrapara 10000 392 Bridge over Babar Creek on Bijaya nagar-Badhi road. Kendrapara 4000 393 HL bridge over river Luna at 5th km on Belar Nuagaon - Teragaon Kendrapara 1 - Mahakalpara road 394 HL bridge over river Paika at 5.00km on Talakusuma - Lankapada Kendrapara 1 RD road 395 Bridge over Seuladanda Nallah at 3rd Km.on Chandigadi- Kendrapara 1000 Mahasahani road 396 Bridge over Kolathia Nallah at 3rd Km on Penthapal Balikira road Kendrapara 1 397 HL Bridge over river Baitarani at 7th Km.on Pegarapada Manpur Kendrapara 1 road

398 H.L. bridge over Kharasrota Sakha Nallah on Habalaganda Patna Kendrapara 15000 Chhal to Boulajodidia roat at 1st km 399 H.L. bridge over river Patsala at Gupti-Jhunus nagar Kendrapara 1 400 HL Bridge over river Brahmani Creek on Angadaghat to Kendrapara 2500 Nangadaghat road (span of 30.63 mtr) 401 Bridge over Peta nallah at 5th km on Domunda to Kanpur road Kendrapara 20000 402 Bridge over Sarajori Nallah on Govindpur Thakurpatana road Kendrapara 5429 403 H.L. bridge over river Karandia to connect Sanakora - Hurasahi Kendrapara 1 (RD road) to Naukar - Jalpok (RD road)

Ooutcome Budget : DoRD for 2016-17 Page84

404 Bridge over Peta on Singhpur Rajkanika (R&B) Road to Hatasahi Kendrapara 5000 via-Agaada Gahampal Batapada 405 Bridge over river Kani on PWD road-Padinipal road. Kendrapara 20000 406 Bridge over river Kharasrota on Nuabazar-Balitarghat road. Kendrapara 30000 407 HL bridge over river Brahmani on Nilakanthapur - Jagannathpur Kendrapara 1 road 408 HL bridge over river Kani on Pattamundai - Gobindapur road Kendrapara 1 409 Bridge over Kusei on Daradipal-Jalasuan road. Keonjhar 5808 410 Bridge over Kusei-Salapada-Sarei-Madanpur road. Keonjhar 40000 411 Bridge over Bahutia Nallah on Badakhamandra-Mishramala Road Keonjhar 1000 at R.D. 4/648 km 412 Bridge over river Kusei on Irrigation embankment connecting Keonjhar 1 PMGSY road Ghasipura 413 Bridge over Baghira nallah at 3/8 km on Sunapentha to Keonjhar 1 Gopinathpur road 414 Bridge over river Remal at 5th KM on Harichandanpur-Daitary Keonjhar 1 road 415 Bridge over Handibhanga nallah on Kalimati-Handibhanga road. Keonjhar 10000 416 Gop Branch Canal at 4.660 Km on Athantar to Nuagaon ( up to Khurdha 1 Banamalipur) road 417 Bridge over Barabatia nallah on Prataprudrapur Kenduli road Khurdha 1 418 Bridge over Kanheidanda nallah on Malipada-Hadapada road Khurdha 1 419 Bridge over Hada nallah on - Dhalapathar road Khurdha 1 420 Bridge over Balia nallah on RD road Parabola-Nimuna road Khurdha 4000 421 Bridge over Hada nallah on Nayapatna - Belapadar road Khurdha 1027 422 Bridge over river Prachi on Ramachandrapur Chitalpur road Khurdha 826 423 Bridge over Daya Canal on Nandankanan to Kendupatna via Khurdha 5475 Padasahi road at 1/300 Km 424 Bridge over river Kansari at 1st Km of N.H.5 (Bankiapalli) to Khurdha 10758 Lambodarpur road 425 Bridge over river Hada on PWD road to Asanapali Khurdha 929 426 Bridge over river Kusumi (Mahujharanallah) at 1st Km on Khurdha 8100 Singarama to Panasapur. 427 H.L. bridge over river Kuakhai on Jhinkiridihi to Pratapnagar Khurdha 10000 road. 428 H.L. bridge over Gangua nallah on Bikipur to Kuha road. Khurdha 5000 429 H.L. bridge over Prachi on Bhanara to Kudapatna road. Khurdha 12000 430 H.L. bridge over river Malaguni on Nirakarpur to Talapada road Khurdha 15000 431 H.L. bridge over Local nallah on Retang Railway station on Khurdha 10000 Panchupalli village road 432 H.L. bridge over river Hadanala from Bankoi to Binodpada via Khurdha 10000 Kanteilo of Block. 433 Bridge over Chatura nallah at 3rd km. on Baghamari-Atri road. Khurdha 1 434 Bridge over Dhanua on Madhuban-Darada road Khurdha 10000 435 HL bridge over Kochiakhala nallah at 4th km on Gadamanitir - Khurdha 1 Chhiam Kurum road 436 HL bridge over Kalajhari nallah (Pandara Fuka) at 4.04 km on Khurdha 1

Ooutcome Budget : DoRD for 2016-17 Page85

Daya west Branch canal - Padasahi Chhak to Bhotapada Road 437 HL bridge over river Gangua on embankment - Khurdha 1 Tikarapada-Panchagaon R.D. road 438 HL bridge over river Rana at 3rd km on Haladiagada to Hatasai Khurdha 1 road in block 439 HL bridge over Dhanua nallah at Achutpur Escape channel on Khurdha 1 Bhargavi left Embankment 440 HL bridge over Baunasalanallah at 0.700 km on P.W.D road Khurdha 1 (Mangalajodi) to Tarimi road 441 Bridge over Mahujhara nallah (Kusumi nallah) on N.H.5 to Khurdha 3590 Pariorada Via Orada road 442 Bridge over river Gangua Nallah on N.H.203 to Mohavirnagar Khurdha 2500 road 443 Bridge over river Kolab on Murtahandi-Ghodaghat-Gupteswar Koraput 11000 road 444 Bridge over Raju Shankar Nallah at 2nd km on Pukali Sambai Koraput 2700 Road 445 Bridge over Local Nallah on Mattamput P.W.D. Road to Udapada Koraput 4000 Road. (2 x 30.63mtr.) 446 Bridge over Sobhaput nallah on Hataguda-Pantalung road Koraput 10000 447 H.L. bridge over river Turi on Bhatrasiuni - Bhatrasirsi road Nabarangapur 3000 448 H.L. bridge over river Bhaskel at 2nd Km on Badagumuda to Nabarangapur 4000 Kottagam road 449 Bridge over Bangiri Nallah on Nanda Dahana via Ekamba road Nabarangapur 17000 450 H.L. Bridge over river Kusumi on Mardarajpur-Bodasa Road Nayagarh 13000 451 Bridge over Lunijhar nallah on -Balikudia Road Nayagarh 10000 452 Bridge over river Kusumi on Angisingi-Dhusuma Road Nayagarh 10000 453 Bridge over river Kusumi on Khandapada-Banamalipur road Nayagarh 10000 454 Bridge over Nagajhar nallah on 4th Km of Godipada Kakalaipalli Nayagarh 1500 road 455 H.L. bridge over river Duanto on Sanagorada to Bhaliadihi via. Nayagarh 3000 Bilagorada road 456 H.L. bridge over river Sulia on Udayapur Pallisasana road Nayagarh 1500 457 Bridge over river Duanto on Nandighar-Laudaput road Nayagarh 5000 458 Bridge over local nallah (2nos ) on Banthapur-Rohibanka road Nayagarh 1 459 H.L. bridge over river Kusumi at 1st km on Pantikhari - Nayagarh 5000 Barapurikia road 460 H.L. Bridge over river Duanto on Panchrida-Rohibanka- Nayagarh 4881 Banthapur Road 461 H.L. Bridge over local Nallah on Sulia-Kantilo Road Nayagarh 935 462 H.L. Bridge over river Malaguni on Natim-Mayurjhalia Road Nayagarh 3566 463 Bridge over river Kusumi on Bhadikila-Ostia Road Nayagarh 9423 464 Bridge over Lunijhar nallah on Itamati-Khedapada road. Nayagarh 691 465 Bridge over Kusumi on Magarbandha-Gunduribadi road Nayagarh 1 466 HL bridge over river Kuanria at 0.600km on Giridipalli - Nayagarh 1 Mangarajpur road 467 HL bridge over river Lunijhara on Khedabarana -Saluni road Nayagarh 1

Ooutcome Budget : DoRD for 2016-17 Page86

468 HL Bridge over Hada nallah at 1st km on Katakpada - Chuda road Nayagarh 1 469 Bridge over Brutanga river on Banigochha to Dasanipada Road Nayagarh 8000 470 Bridge over Dahuka on PWD road to Gateri road. Nayagarh 2223 471 HL bridge over river Sunder at 1st Km on Gordhuapadar to Nuapada 1 Birighat road 472 H.L. bridge over River Udanti on Kopia to Hatibandha road Nuapada 15000 473 H.L.Bridge over River Sananadi at 2nd Km near Baghiharan on Nuapada 10000 Tukla Plasakhanda Road 474 S.B. over Local (Dhobenjore) Nallah at 2 Km on Sindursil-Talakot Nuapada 1 Road 475 S.B. over Kusumtala Nallah at 1st Km Budhikomna-Dhumabhata Nuapada 1 Road 476 Bridge over river Sunder on Kutribahal-Kumutimunda road Nuapada 1 477 HL bridge over river Jonk at 2nd km on Khutamanbhera to Torra Nuapada 1 Road 478 Box Cell Bridge on Nuapada-Kuliabandha Road Nuapada 1 479 H.L. bridge over Jonk at 1st Km Bhalwsar to C.G. Boarder (REWA) Nuapada 11000 road 480 S.B over Kadua Branch Canel on Sukapokhari Santrash Via Puri 1 Kajalapatia road 481 H.L. Bridge over River Devi at 0.00 Km on Talada - Dihakarada Puri 90000 road 482 H.L. bridge over river Kushabhadra on Dalanai Balikapileswar Puri 5000 road 483 Bridge over Dhanua nallah on Bamanal-Balanga via-Baku road. Puri 5962 484 HL bridge over Dhanua at 0.350km on Dekhanta- Dihasahi- Puri 1 Ankusapur road 485 Box Cell Bridge over Local Drainagecut at 1/00 Km. on Puri 1 Dandamakundapur Delanghat road 486 Bridge over Dhanua on Sanapalli Podapada Road Puri 28000 487 Bridge over Ratnachira on N.H 203 to Puri 1 Biraramachandrapur(Kadua-Banapur) Road 488 Bridge Over river Luna on Dandamakundapur to Delanghat Road Puri 6700 489 Bridge over river Dhanua on Nalihana- Gaindol Road Puri 15000 490 H.L. bridge over local nallah at 1st Km on Maligaon Puri 1 Singhberhampur road 491 H.L. bridge over local nallah on Brahmanpada Atheisa road Puri 5800 492 H.L. bridge over river Bhargavi on NH-203 TO Kanchi Bridge Puri 3000 approach road 493 H.L. bridge over river Luna on Nikhila Govindpur Majhipaida Puri 1 494 H.L. Bridge over River Kadua on Palabasta Tellkud road under Puri 10000 Biju Setu Yojana 495 H.L.Bridge over River Prachi on Somanathpur Tavagorada road Puri 18000 under Biju Setu Yojana. 496 H.L.bridge over river Makara on Badakharad- Badal road at 5.7 Puri 1 Km road. 497 H.L. bridge over river Bhargavi at 4th Km. on Biswanathpur- Puri 15000 Panibhandar - B.Gadadharpur.

Ooutcome Budget : DoRD for 2016-17 Page87

498 Bridge over Daya on Mandarabasta Trilochanpur road. Puri 1 499 Bridge over Ratnachira on Siruli Karamala Road Puri 15000 500 HL Bridge over river Bhargavi at 1st km on Tinikudi to Balikera - Puri 15000 Rahadamala road 501 HL bridge over river Daya at 5th km on Kumudal - Basantpur Puri 1 road to Aragad road of Delanga block 502 HL Bridge over Mangalanadi at 0.500km on NH-316A - Puri 1 Uppergolasahi road 503 HL bridge over river Malaguni at 2nd km on N.J. Sadak to Puri 1 Kesharpur road. of Kanas block 504 S.Bridge over Murmuri nallah at 7th km on Davla Akhidadar Sonepur 1 road ( 5 x10.77 Mtr) 505 Bridge over Dahukbed nallah on Cherupali Mahada road ( Sonepur 1 3x8.77 Mtr) 506 Bridge over river Tel at 4th km. on Hardakhole- Baidyanath road Sonepur 25000 507 H.L. bridge over Local Nallah at 1st km on Bandhapali-Jhulpiapali Sonepur 6000 road 508 HL bridge over Gurandi Nallah at 1st km on Kainskanda - Sonepur 1 Kapasira road 509 Bridge over Chouki & Panikhai nallah at 9/7 km & 10/200 KM on Sonepur 3500 MDR 39 to Nandanmal road (6x10.77 m) 510 Bridge over Nibrutijore on Sargaj Jurabandh road(7x10.77 Mtr) Sonepur 2840 511 H.L. Bridge over Haradjore nallah on Durjantaila - Sarguna road Sonepur 1 512 H.L. Bridge over river Suktel on Kumunde - Bileisarda road Sonepur 1 513 Bridge over Dalposh Nallah on Jhirpani - Dalposh Road Sundargarh 20000 514 Bridge over river Brahmani at 0/500 km on Bonei Jangara Road Sundargarh 30000 515 Bridge over Brahmani nallah on Lathikata Timjore road Sundargarh 45000 516 H.L. bridge over Lamloi nallah at 2nd km on Lamloi to Luhakhan Sundargarh 2500 road 517 Bridge over Hutupani Nallah on 8th Km on Rouldega to Sundargarh 3000 Tangargaon road. 1022 Total : 2400000 Grand Total : 4000000 N.B. The work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Work list under D.No.28-5054-COL On R&B-SP-SS-04-DOR/80-General-800-OE/789-SCP SC/ 796-TASP-1230-rural roads-37247-Impvt.of Existing R.D.Roads for the year 2016-17 Sl Name of the Work Name of the Financial outlay No District ( in TRS) 1 2 2 4 80-789-SCPSC Kanapada R.D.road to Mukundapur via-Ningadi and 1 Bhadrak Gudupalu 10 2 Andola to Kuali Road Bhadrak 1000

Ooutcome Budget : DoRD for 2016-17 Page88

3 Karanjiakata- Kitangpada road via Tilkup Boudh 10 Mankadchuan PWD Road to MSG Project Road via 4 Jogendrapur Road Boudh (From 5.00 Km to 10.00 Km) 10 5 Utarsasan to Allando road Jagatsinghpur 15000 6 Dhenkanal to Kalakala Boarder road Jajpur 20690 7 Indragada Sahajakhole road. Kandhamal 14000 8 Pakanguma Balaskumapa Dutimundi Karandimaska road Kandhamal 1220 9 Gobara chhak to Bamara via Diminia Chaulim road Kendrapara 10 10 Kholapa to Dudurpal Keonjhar 8000 11 NH-5 to Mantridi via Kanisi village & Chikarda Ganjam 8000 Kurunti Chhak to Kapileswarpur via Amuri, Banastapada 12 Puri 8000 & Patharpada 13 Batagaon Salebhata RD Road Sambalpur 10 14 Charmal Khasua road Sambalpur 10 Narayanpur to Mukundapur Road 15 Sonepur (From 0/00 to 5/00 Km) 10 Putupali Chowk to Kapasira via Jagannathpalli Road 16 Sonepur (From 1/5 to 7/5 Km) 10 Aienlachhat PWD road to Krushnapur via:Jaunra Bhaunra- 17 Sonepur Sujia 10 18 Tileimal- Lachhipur Road Sonepur 9000 85000 Total : 80-796-TASP Arakhapata Rahunichhak Mamuni Jharan Adeswar Angul 20000 1 Bandhegam Road 2 PWD road to Ganjaguda via Barihapali road Bargarh 8360 3 Dhamara Road to Luna Bandha Via Budhi Chhak Bhadrak 10 4 Naikhandi to Bhagabanpur via Andala Bhadrak 10000 Bohira to Dumuduma road Boudh 5 (From 5/200 to 7/600 Km and 10/500 Km to13/700 Km) 10 6 Barapadar to Khamanamunda via Deuli Boudh 20000 7 Banki-Baideswar-Kalapathar road Cuttack 10 8 Jalarpur to Podana Cuttack 16700 9 Chhatabar Khilei Road Deogarh 10 10 PWD road to Kanabindha via Banjarasahi and Darapangia Ganjam 10 Dharamapur chaka to Podamari Khandadeuli Talapur Pendrakhalli Gokanaperipalli Padmapur touching to Ganjam 11 Podamari road 10 12 Pentualaz to Chakuliapada via kantunia & Sunthal Road Jagatsinghpur 15000 13 Moter to Ladugaon Road Kalahandi 10 14 Phiringia Nuapadar road. Kandhamal 11500 15 Raikia Manikeswari Karada Road Kandhamal 100 16 Ramachandrapur-Gadabandhagoda road Keonjhar 100 17 Gadabandhagoda-Sapuasahi road Keonjhar 100

Ooutcome Budget : DoRD for 2016-17 Page89

18 Bidyadharpur to Kanpur via Soso Road Keonjhar 100 19 Uadayapur to Khajuridiha Keonjhar 10000 Daya West Branch Canal Road to padasahi Chhak to Khurda 20 Bhatapada Road 10 21 Bhagabati Temple to Bhuskapada Khurda 10 22 Pandripani to Pedakonda Road Malkangiri 2400 23 Malkangiri to Chatishgarh Border via Chalnguda road Malkangiri 400 24 Jahrigam to Dhamnaguda Road Nabarangapur 10 25 Umerkote Maligaon Road Nabarangapur 10 26 Jeeraguda to Podaguda Road Nabarangapur 10 Paika Sahi to Sankarpur Temple via Parbatipur Road Puri 27 Samanga G.P. road. 10 28 Naira - Bainaguda Road Rayagada 100 29 Tuniapali Balia Road Sundargarh 10 29 Total : 115000

04-800-Other Expr. 1 Ghosar to Angapada via Kardongbahal road Angul 11500 2 Benuda to Kalyanpur Road Balasore 10 3 Simulia to Mandhata road Balasore 5200 4 Jugala Irda Baliapal Balsore 16000 5 Petuapalli to Saipai Road Bargarh 10 Padampur Gaisilet Road 6 Bargarh (From 5/30 Km to 10.00 Km) 10 7 Impvt. To Bhadra Badipada road Bolangir 12500 8 Bhutiarbahal to Dhandamal road Bolangir 11200 9 RD road-Karadapadar via Pabulipada-Barapada road Boudh 20000 10 Jhinkiria Bentakar Chanduli Road Cuttack 10 11 Nukhapada Riverghat Via-Dhanipur Cuttack 7000 12 Raghunathpur-Hamalpur Cuttack 13200 13 Khatakhura to Bhairapur Road Dhenkanal 10 14 Mohana Badagada Road Gajapati 10 15 Bellaguntha Gereda Lembhei Road (From 4/0 to 18/0 Km) Ganjam 10 16 PWD road to Paitagaon via Dadaralunda village Ganjam 10 17 Karapalli Golabandha Road Ganjam 10 18 Takarada Chikili Bhusandapur Sagarpali Road Ganjam 15000 19 Tirtol Kolara Road Jagatsinghpur 22000 20 N.H.5A to Siju via Kodogola and Chunabelari road. Jagatsinghpur 10 21 Jagannathpur to Garam road Jagatsinghpur 2990 RD road to Naula to Dihasahi via Sorisa Pokhari & Serapur Jagatsinghpur 22 10000 Road 23 Gadamadhupur Dankari Turanga Road Jajpur 12500 24 Sankhamatha to Alapua road Jajpur 12500 25 Palda R&B road to Deulibag via Rambag post office Jajpur 15000

Ooutcome Budget : DoRD for 2016-17 Page90

26 Expressway to Mahulkoli Jajpur 21270 27 Aul - Bhuin Pur Road Kendrapara 10 28 Narayanpur to Ajgarpatia road Kendrapara 10 Tilang RD road to Ananta Gopal Narasinghpur via Kendrapara 29 10000 Mundilo Village road 30 Magakani R&B to Badi via Paripangara Gokhani Kendrapara 15000 31 Raisuan Sahadapur Road Keonjhar 8400 32 Naradapur to Jodipada Road Keonjhar 10 33 Kesudurapal to Brahmanipal Road Keonjhar 30000 34 Subai Bhairaguda Road Koraput 10 Purosottampur Notar Road 35 Nayagarh (From 6/0 Km to 10 Km) 10 36 Rajasunakhala Surkabadi road Nayagarh 10 Kushabhadra Bridge to GP Sadar via Benipur, 37 Madhagadia, Ichhapur, Adangasahi, Ali and Madamatha Puri Road 10 38 Approach road to Beleswar Temple Puri 10 39 Kakatpur Konark road Puri 10 40 Sailo Niali Road Puri 4000 41 Balidokana to Kunjamatha road Puri 7000 Sailo-Niali road -Link road to Itapokhari via Sahupada & 42 Puri Satakapada road 12500 43 Gopalpur-Muraripur road Puri 10 44 Puri Arakhakuda Road Puri 10 R.D.Road (Chotapur) to Haridasa via Rampur Bhoi Sahi, 45 Puri Bhubanpati adhaghai, Kusubenti road 10 46 Teisipur to pidhapatna Road Puri 10 Padmapur Gudari Raibiji Road (52 Km) From 0/00 to 47 Rayagada 12/00 Km) 10 48 to Kurli road Rayagada 5000 48 Total : 300000 95 Grand Total : 500000 The Work / Scheme / Project wise allocation is tentative & may be varied in keeping with the N:B progress of work during the course of the financial year. Work list under D.No.28-5054-COL On R&B-SP-SS-04-DOR/80-General-800-OE/789-SCPSC/796- TASP-1230-rural road-37158-Completion of incomplete roads & bridges under different tranches of RIDF & other schemes for the year 2016-17 Sl Name of the Work Name of the Financial outlay No District ( in TRS) 1 2 3 4 80-789-SCPSC 1 H.L.bridge over Subarnarekha on OT road-Chaffla Balasore 20284 2 H.L. Bridge over over river Ong at 2nd km. on Bargarh 1 P.W.D.road to Munikela road 5x25.35

Ooutcome Budget : DoRD for 2016-17 Page91

3 H.L. bridge over Ghesali nallah on Agalpur-Nuagaon Bargarh 1 via-Mahakhanda road. 4x24.75 m 4 Mangarajpur to Kampada road (Upper Dumka to Bhadrak 120 Taladumka portion) 5 Nalabanka to Nualunabandha via Gothadia Bhadrak 1 6 Improvement Mundapadar to Jharial road Titlagarh 1 7 S.B. over Mayabati at 1st. Km. on Sarmuhana- Bolangir 1 Sunamudi road 4 x 30m. 8 H.L. bridge over river Rahul at 1st km. near Gudvella Bolangir 1 on Gudvella-Jammut road 5 x 30.63m. 9 H.L. bridge over Lanth on Ampali-Belagaon road Bolangir 1 11x30.63m 10 S.B. over Bounsajore nallah at 3rd. km. on Taranga Deogarh 1 Tuhilamal road 2x30.63 mtr 11 Const. of HL bridge over river Tikira on Kundheigola Deogarh 1 Nuapada road 12 Sahadabedi PMGSY road to Siali Via-Mathasahi Jagatsinghpur 20000 Kalavedi Road 13 Improvement to PWD Road (Gopalpur Chhak) to Jagatsinghpur 11300 Nasik via pitting binala kutia 14 Sukala Mahakalapada road Jajpur 1 15 Majhipada Sidhagumpha to Nahakani via Manduka Jajpur 40000 16 Impvt. to Palei to Dangi Jajpur 11100 17 N.H.-5 to Bhalukhiai (via Deuli Hilltop & kumari Jajpur 700 village(link Gokarneswar Temple) road 18 Barabati Rasulpur road Jajpur 1 19 Damodarpur-Bilikkana road Jajpur 7000 20 H.L. bridge over river Khadaga on Baliguda-Katikia- Kandhamal 1 Sindhigam road 4x30.63 m 21 H.L.bridge over river Salki at 2nd. Km. on Kainjhar- Kandhamal 1 Gutingia via-Katadi road 3x 30.63 m 22 Cuttack Chandabali R&B road (Ramachandi Kendrapara 1 Thakurani) to R&B Ganeshpur road via Ishandia Kendrapara canal near Sorisia connected to Gahanaga Narasinghpur RD road Danpur GP Office, Society Office Paniola 23 S.B. over Beda nallah at 6th km. on Subei-Kunduli Koraput 1 road 3 x 8m x 3 m 24 S.B. over Lamtaguda nallah at 3rd. km. on Kumarput Malkngiri 1 Mathili road 3x8.77 m 25 Const. of Minor bridge over local nallah at 2.00km Malkngiri 4000 on BM road to MV 108 road 26 H.L. bridge over Sono on Jaipur-Baradhi -Debagaon Mayurbhanj 1 road 7x 30.63 m 27 S.B. over river Tentua at 3rd km on Anlabeni- Mayurbhanj 1 Baunsanali road 6 x 8.77 mtr. raft foundation. 28 S.B. over river Kanhu at 12th km. on Jamda- Mayurbhanj 1 Hensada road 13 x 10.77m

Ooutcome Budget : DoRD for 2016-17 Page92

29 S.B. over Chitrangi nallah at 15th km. on Jharigam Nawarangapur 1 Dhamanaguda road 7x8.77 m 30 S.B. over Amrali nallah at 7th km. on Jharigam- Nawarangapur 1 Dhamanaguda road 5x8.77 m 31 HL bridge over river Sunder at 5th km. on Khariar Nuapada 1 Dumerjore road 5 x 30.63m. 32 H.L. Bridge over over Kularijore nallah at 2nd K.M. Sambalpur 1 on Bhaliapali- Dalbi road 2x 24.75 m 33 H.L. bridge over river Tulub at 12th km. on Sambalpur 1 Bhanjapur-Zaminkera road 1 x 30m.+2 x 20m. 34 Impvt. to PWD road to Mukteswar temple Sambalpur 1 35 S.B. over Murmuri nallah at 18th K.M. on MDR 39 to Sonepur 1 road 6x8.77m 36 H.L. bridge over Uttali nallah at 1st. Km. on Sonepur 1 Lachhipur-Kutasinga road 5x 30.63 mtr 37 Improvement to Malikunda to Baidynath road Sonepur 2467 38 Improvement to to Chandilpat Road Sonepur 2000 39 Papakhaya Charda road Sonepur 1 40 S.B. over Chandiposh Nallah on Dumerjore- Sundargarh 1 Kuarmunda Via Jagdishpur road 9x10.77mtr Total 119000 80-796-TASP 1 Const. of minor bridge over local nallah at 5.4 km on Bolangir 2500 Muribahal to Kantabanji via Jamutijhula road 2 NH-57 (Harekrushnapur) to Shyamsundarpur via Boudh 3500 Pargalpur 3 SB over Salki nallah at 1st km on Baghiapada Sagada Boudh 2000 road 12x10.77mtr 4 Odasingi Kinchilingi road Gajapati 3000 5 Const. of minor bridge over local nallah at 3.25km Gajapati 2500 on Gosani Gurandi Uppalada road 6 PWD Road to Kadal Asurgarh Kalahandi 1 via- Nunpur 7 HL bridge over river Kusei at 16th km on Keonjhar 1 Harichandanpur Daitary raod 2x21.75mtr 8 Badel Attenda road Koraput 20000 9 Maitripur to Kuliana Mayurabhanj 47300 10 Impvt. NH-5 (Jharpokharia) to Rajaloka up to Mayurabhanj 10000 Simileswar Mahadevpitha 11 Kendujuani to Bhimkund Road Mayurabhanj 35098 12 RD Road to Nedam Dam Mayurabhanj 2100 13 Mahiskudar to Suleipat Dam Site Mayurabhanj 16000 14 H.L.Bridge over Guria Nallah at 4th km on Mayurabhanj 5000 Gorumahisani Guhaldunguri road 15 PMGSY Road (Amsena) to Saliha upto Patparpali Nuapada 9000 viaThelkobeda, Mahattamtora

Ooutcome Budget : DoRD for 2016-17 Page93

16 Rouldega Tangargaon road Sundargarh 3000 Total 161000 04-800-Other Expr. 1 Const. of minor bridge over local nallah at 1st km on Angul 4000 Dhaurapali Jairat road 2 S.B. over Chilanti nallah at 7th km. on Rengali- Angul 1 Kuluma via Nailu road 5 x 8m x 4.05m 3 Bagdia Gadamandal Patrapada Road Angul 1 4 Const. of minor bridge on Kudia nallah at 0.1km on Balasore 4000 Basta Baliapal PWD road Kudia to Basuchakuri road 5 Const. of minor bridge Paga Nallah at 1th km on Balasore 4000 Sargaon Nimak Chhak to Nuapur PMGSY raod via Genguti road 6 Const. of minor bridge over Local Nallah on Salt Balasore 4000 road to Saun 7 Const. of Bridge over Local Nallah at Near Mala on Balasore 4000 the RD from Mala tou Nuapur via palasapur 8 Const. of Bridge over local nallah at 1st km on NH-5 Balasore 4000 to Baulagadia Road 9 Const. of minor bridge over Handibasa Nallah at Balasore 4000 11th km On Langaleswar to Kasafal via Salt Factory road 10 PWD road to Mahisasuri via Manatri Balasore 1 11 Improvement to Jirtal to Shamsundurpur Road. Balasore 10000 12 Baliapal Choumukh (Dagara Sea Beach road) Balasore 1 13 Const. of minor bridge over local nallah at 8.5km on Baragarh 4000 Ambabhona to Dunguri Road 14 H.L. Bridge over over river Ranj at 5th K.M. on Bargarh 1 Kainsir-Patkulunda road 5x30.63 15 Impvt. to PWD road to Kasati via Koru Bhadrak 5000 16 Const. of minor bridge over Karanjei nallah at 1.5km Bhadrak 4000 on Padmapur Birasa PWD road via Mathurapur Bahakola road 17 Const. of minor bridge over Local Nallah at 2.2 km Bhadrak 4000 on PWD road to Katasahi Via Lunia road 18 Approach road to bridge over Laxminallah on Boudh Boudh 4500 Dhalpur road 19 Const. of Brige over Siaria Nallah on Nuatalia Cuttack 4500 Bangirisinga road 20 Const of Bridge over river Kandal on Salei Baharana Cuttack 1 road 21 Approach road to Kandal bridge on Salei Bharana Cuttack 17000 Road. 22 H.L.bridge over river Birupa at 2nd km. near Cuttack 1 Jasarajpur on Bheda-Anandabazar road. 11 x 30.63m. 23 Madhab to Binishpur road Cuttack 1 24 Jenapada Arakhapatna Cuttack 1

Ooutcome Budget : DoRD for 2016-17 Page94

25 Improvement to RD road to Ramanath Temple Cuttack 2000 26 Impvt to Olaba to Deondarjhara Cuttack 6000 27 Impvt to Pratapnagar to Khalarda road Cuttack 16024 28 Const. of minor bridge over Local Nallah at 2.6 km Dhenkanal 4000 on Pingua to Laulai road 29 S.B. over Benga nallah at 6th K.M. on Bhapur- Dhenkanal 1 Abhimanapur road 6x8.77m 30 NH 23 to Anatasayan Dhenknal 1 31 Const. of minor bridge over Local Nallah at 2/6 km Ganjam 4000 on Lembhei Raipalli Road 32 Const. of minor bridge over local nallah at 5.6 km on Ganjam 4000 Jarada PWD to Bhairapur road 33 Const. of minor bridge over local nallah at 0.7km on Ganjam 4000 Salia Sumandal Bhatapada road 34 Const. of minor bridge over local nallah at 0.9km on Ganjam 4000 PWD road to Ghodahada via Odasingi road 35 Const. of minor bridge over local nallah at 1.4km on Ganjam 4000 Barasing R.D road to Vetasingh road 36 Const. of minor bridge over local nallah at 1.9 km on Ganjam 4000 Barasing R.D road to Vetasingh road 37 Construction of Box Cell Culvert at 4/500 Km on Ganjam 5000 Talasakara-Antarapada via Godia Borda road 38 Buguda to Budhakhole Hill top road Ganjam 1 39 Improvement to Budhamba-Polosara PWD road Ganjam 1 (MDR-72) to Marda Temple 40 Taratarini Ring road Ganjam 1 41 Improvement to Sorada Kantipalli PWD road (ODR) Ganjam 5000 to Panchanan Temple 42 Improvement to NH 217 to karanje temple Road Ganjam 3500 43 Impvt. to Vegiput to Pathara via Gorapali - Alarpur Ganjam 12600 road. 44 Construction of Box Cell Culvert on Bhatsarasingi - Ganjam 1500 Mathasarasingi road 45 Improvement to NH5 to Mantridi via Kanisi village & Ganjam 5000 Chikarada road 46 Gaineilo Bridge to Tanra Jagatsinghpur 2300 47 Nuapada to Chhapada via Ganello Jagatsinghpur 1000 48 Kabatabandha-Rekhideipur road 6.703 km. Jajpur 1 49 NH 200- Hatibari road 11.5 km. Jajpur 1 50 Udayagiri Majhipada R.D road to P.W.D. road via Jajpur 2100 Talachandia road 51 Improvement to Chandimandir to Mahabinayak via Jajpur 2400 Darpani Road 52 Khadagpur to Charinangala Alasahi Ambasouri via Jajpur 3400 kalashree Gajendrapur road 53 Const of Bridge over Kusi nallah on PWD road to Jajpur 9347 Panas G.P 54 Const of HL bridge over river Kharasrota on Bari Jajpur 4000 Binjharpur road

Ooutcome Budget : DoRD for 2016-17 Page95

55 Laikera - Sahaspur-Bamara road 18.33 km. Jharsuguda 1 56 Dalgaon- Tilia Road Jharsuguda 1 57 Bhatangpadar (R.D. Road) to Rabandhar Kalahandi 6000 58 Khajurpada Turkel via Kikia road Kalahandi 1 59 Const. of minor bridge over Local Nallah at 3.50km Kalahandi 4000 on Parla to Beheraguda road 60 Const. of Bridge over river Hati on Kalampur Mandal Kalahandi 11610 road 61 H.L. Bridge over over river Kusei at 16th K.M. on Keonjhar 4000 Harichandanapur- Daitary road 2 x 21.75m 62 Hatadihi Podasingidi road Keonjhar 2000 63 NH-53 (Salabani Chhack) to Chakra tirtha via Keonjhar 10000 Kathakata 64 Melana to Dargudisila Keonjhar 15000 65 NH-215 (Katrabeda) to Sitabindi Keonjhar 13000 66 Katrabeda - Sitabinjhi Road Keonjhar 1 67 Kapasapada to Vimkund Keonjhar 700 68 PWD road to Khandadhar Keonjhar 2000 69 H.L. bridge over Dhanua at 5th km. on Narada- Khurda 1 Dalaksati-Rajas rd 3x30.63m 70 Hantuada -Dhumala road (3.69 km.) Khurda 1 71 Banamalipur Jaydevpitha via Poijhari road Khurda 1 72 Simor-Banki-Malipadar Road Khurda 1 73 Nirakarapur Bhusandapur road Khurda 16890 74 Const. of minor bridge over local nallah at 3.0km on Koraput 4000 Danguri to S.Kuhudi via Pachia road 75 Const. of minor bridge over local nallah at 7.7km On Koraput 4000 Nandapur Banamaliput Lamtaput Road 76 Const. of minor bridge over local nallah at 1.125 km Malkangiri 4000 on RD road from MV-56 to MV-125 road 77 Kuliana Digarstia road Mayurabhanj 200 78 SH-19 to at Ganjam Chhack to Gobindpur Mayurabhanj 30900 80 Const. of minor bridge over Local nallah at 1.7 km Mayurbhanj 4000 km on Sono bridge to Sanbisole Badbisole R.D Road 81 Approach road to Baunsa nallah bridge on Chhuruni Mayurbhanj 5000 Mantapal road 83 Improvement to Dahana to Jagannathpur Road Nabarangpur 2000 B.M. Semla to P S. leading Dabugaon road Nabarangpur 4000 84 Const. of Bridge over river Tel on Salebhatta Nabarangpur 15000 Jhiliapada road 85 Sidhamula to Akurananda road connecting Nayagarh 16000 Gokulananda 86 MDR -68 to Tarabala Nayagarh 13000 87 PWD road to Jogi jogini pitha Nayagarh 5000 Impvt. To Gotisahi to road Nayagarh 13500 89 Gotma Bhainsmundi road Nuapada 1

Ooutcome Budget : DoRD for 2016-17 Page96

90 H.L. bridge over Dhanua Nalla near Boitabhanga on Puri 3000 Subarnapur-Gabakunda road 3x 24.75 m 91 Const. of extension of HL bridge over river Dhanua Puri 1 at 3rd km on Sanapali Podapada road in the district of Puri 92 Kalyansinghpur to Debagiri hill Rayagada 1 93 Sakata Ambodhani Rayagada 1 94 RD road to Minajhola Rayagada 1 95 B.Cuttack to Chatikona via Badamotokabadi Rayagada 9000 96 Bridge over local nallah at 15.00km on Rayagada 8000 Kumardhamini Bethiapada road 97 Const. of minor bridge over local nallah at 11.0km Sambalpur 4000 on Garposh to Nuapali road Total 420000 Grand Total 700000 NB The Work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page97

Work list under D.No.28-5054-State Plan-State Sector-04-DOR / 80-General-800- OE/789-SCPSC/796-TASP-2161-RIDF-37286-Mukhy Mantri Sadak Yojana for the year 2016-17

Sl Name of Financial outlay Name of the Work No. the District ( in TRS) 1 3 2 4 80-796-TASP 1 Mangalmunda Chhak to Benubahal Road Bolangir 200 2 Ramsingha to Simulia Bolangir 600 3 PWD road to Talijharan Bolangir 200 4 PWD road to Khairtikra Via Purunapani Bolangir 1000 5 Jogimara to Karlakhaman road Bolangir 3500 6 RD road to Bhalupali road Bolangir 900 7 RD road to Jhankarpali road Bolangir 600 8 Mundpadar to Godaramunda road Bolangir 9000 9 L-58 to Sagunamunda Bolangir 3600 10 MDR-40 to Gudguda Bolangir 1500 11 Haldi to Pudisara Bolangir 2500 12 Karlapatia to Malisira Via Dangarbanji Bolangir 7800 13 RD road to Jhaptupali road Bolangir 600 14 PWD road to Gundichadihi road Bolangir 10000 15 Tendapadar to Colonypara-2 road Bolangir 5500 16 R.D.Road to Niktimal Deogarh 5000 17 Tabada to Bijaberni Deogarh 5000 18 Jamudan to Sirigida Deogarh 1800 19 RD road to Adharijhola-Chintapalli Gajapati 5700 20 RD road to Dalimbapur Gajapati 2500 21 PWD Road to Chandrarao Peta Gajapati 4500 22 Parmanandapur to Mendha Kusabata Jajpur 12500 23 DIHAPAL TO METRASENPUR Jajpur 8500 24 MDR-14 TO RAMPA HARIJANSAHI Jajpur 5600 25 KANTIPUR TO NARANPUR Jajpur 25000 26 PWD ROAD TO KARANDIPUR Jajpur 11000 27 PWD ROAD TO BOTALTANGI Jajpur 10000 28 Arua to Naranpata Jajpur 4000 29 ANKULA-PANIKOILI RD ROAD TO BAJRAPADA Jajpur 14000 30 GOHIRAGADIA TO MANDAPADA Jajpur 2000 31 PWD Road to Paramanandpur Kalahandi 12000 32 NH-201 to Kasakendu Kalahandi 12500 33 Charbahal To Ghumerguda Kalahandi 10000 34 Maichala to Limpada Kalahandi 3900 35 Mundraguda To Kandripadar Kalahandi 10500 36 PWD Road to Karlapat Kalahandi 15000 37 PWD Road to Karlapada Kalahandi 200 38 RD road to Bijapada road Kalahandi 3000 39 NH-201 to Gadramal road Kalahandi 2000 40 Panigaon Barchi Chak to Barchi road Kalahandi 6000 41 Dulkibanda to Dokelpada road Kalahandi 10000 42 Pipalbhadi to Kutingpadar Kalahandi 8700

Ooutcome Budget : DoRD for 2016-17 Page98

43 Harlanga to Khaliamunda Kalahandi 4200 44 Nunpur to Urlupi Kalahandi 1200 45 NH217 to Nagjhari Kalahandi 30000 46 PWD Road to Cherka Jn. Via. Baligam. Koraput 11500 47 PWD Road to Kuspar. Koraput 13000 48 Marchiguda to Tikarpada Road Koraput 13000 49 RD Road (Kodikipadar) to Haridaput. Koraput 5500 50 RD Road to Punjhariput. Koraput 2600 51 S.H-4 (Dangri) to Haridiput Via. Bandalitiguda. Koraput 27000 52 Kumuli to Semla Koraput 9500 53 Kotpad to Sadarnga-Sutipadar Koraput 21000 54 Gadapadar to Hardali Koraput 7500 55 Jiraguda to Dangarpaunsi Koraput 14000 56 PWD Road to Haradaput Koraput 4500 57 Construction of Jalahanjar to Gelaguda via Chapadi road Koraput 8000 58 Construction of NH 26 to Khirajhola Koraput 16000 59 Kotiya to Tadivalsa Koraput 41500 60 PWD road to Mathalamba Koraput 29000 61 BM Road to Tentuliguda Malkangiri 12000 62 BM Road to Goudaguda Malkangiri 18000 63 PWD Road to Batrital Malkangiri 1500 64 Gadbakatra to Chechraguda Nabarangpur 14000 65 Hirmimunda to Jhadiaguda Road Nabarangpur 7000 66 Maliguda to BheluagudaRoad Nabarangpur 2000 67 Mudinayakguda to Pakhnadangriguda Road Nabarangpur 2600 68 Bhatra to Durkiguda Road Nabarangpur 6000 69 CPikaddhanua to Limaguda Road Nabarangpur 5500 70 Ankabeda to Ghungutipada Nabarangpur 3500 71 Pujariguda to Rautoguda Nabarangpur 9500 72 Kusumi to Jamuguda Nabarangpur 7000 73 L-10024 to Dangabahal Nabarangpur 5500 74 Chandiabeda to Naikguda Nabarangpur 1500 75 Durkaguda to Maripara Nabarangpur 7000 76 Gandamel to Babupali road Nuapada 11000 77 PWD road to Damjola Road Nuapada 7500 78 SH-3 to Salebhata Road Nuapada 7000 79 NH-217 to Kumjori via Bendrabahal and Bargaon Nuapada 5500 80 Nilzee PWD Road to Karlakhamar Nuapada 7300 81 Khalna to Tileimal Nuapada 16500 82 PWD ROAD TO RELIBADIGAN Rayagda 12500 83 RD ROAD TO KINAM Rayagda 32000 84 PS ROAD TO MANDARA Rayagda 18000 85 PS ROAD TO BAJRAGUDA Rayagda 6000 86 P.S. ROAD TO BASANGAMALI Rayagda 27000 87 P.W.D. ROAD TO TIKIRAPADAR Rayagda 19500 88 RD ROAD TO MAKAGUDA Rayagda 11000 89 PMGSY ROAD (SITAPUR) TO SIDDHAMGUDA Rayagda 17500 90 132 KV LINE ROAD TO GUNjiguda Rayagda 13000 91 MDR 39 to Gadgadbahal Sonepur 2700 92 Kendupali to Borghat Sonepur 8500 93 Tarva-Brahmni RD road Tentulimunda Sonepur 10000 94 Balipatha (Rugdipali) to Jadapal Sonepur 3500

Ooutcome Budget : DoRD for 2016-17 Page99

95 MJRD road to Masinapali Sonepur 3000 96 Tarva- Brahmni RD road to Tentulikhunti Sonepur 3500 Total 862500 80-789-SCPSC 97 Sarupata to Badapichula road Keonjhar 10000 98 Kathabaunsuli to Fakirpur road Keonjhar 13500 99 Kenduposi to Narasinghpur road Keonjhar 11500 100 N H 215 to Nischintapur road Keonjhar 6000 101 Muktapur to Raghunathpur road Keonjhar 2500 102 Damahuda to Sunaposi Road Keonjhar 8200 103 Goras to Kucheibeda road Keonjhar 9500 104 RD Road to Rangamatia Road Keonjhar 11500 105 Sananai to Badabaliasahi Road Keonjhar 10500 106 Jamunaposi (Satighat) to Gurutuan Road Keonjhar 8000 107 Panasadiha to Asanbani Keonjhar 6000 108 Panasadiha to Andharajhari Keonjhar 4000 109 Tartara to Mathianendi Keonjhar 6500 110 Asanbahali to Batasahi Keonjhar 24500 111 NH-215 to Jatrakusuma Keonjhar 8300 112 RD. Road to Palabani Keonjhar 12000 113 RD Road (Khutabandha) to Tonkajoda Keonjhar 19500 114 Mishramal to Gopinathpur Keonjhar 1500 115 PWD road (Jadida Chhak) to Dumuria-Bhurudia Mayurbhanj 4500 116 NH 5 to Khairabani-Kainfulia Mayurbhanj 10000 117 Kunchisole to Khadisoel road Mayurbhanj 13500 118 RD Road to Akhirsole road Mayurbhanj 9500 119 Katharama to Barudihi Mayurbhanj 10500 120 MDR-4 to Tadkisole Mayurbhanj 1200 121 Badabrahmanmara to Sanabrahamanmara Mayurbhanj 6000 122 MDR-4 to Basantpur Mayurbhanj 13000 123 PWD road to Khejuria Road Mayurbhanj 7500 124 Kanthi (PWD road) to Narangbaz road Mayurbhanj 7000 125 RD road to Sanjumpal road Mayurbhanj 9500 126 Galagadia to Baghabasa road Mayurbhanj 7500 127 Nuagaon to Tampada road Mayurbhanj 100 128 PWD road to Uchhabali Mayurbhanj 4500 129 Brahmanbose - Tangorjoda via Bhaludihi - Pithakutuni Mayurbhanj 15500 130 Brahmanbose to Kantasole Mayurbhanj 4500 131 Kuldiha to Bheludihi road Mayurbhanj 6000 132 Merudihi to Arjunpani road Mayurbhanj 7500 133 NH 6 to Bhudrikela Road Mayurbhanj 1000 134 NH 6 to Chandripahadi Road Mayurbhanj 2500 135 Sorisapal to Chakdi Road (0/0 to 3/0 km) (A) Mayurbhanj 15000 136 Sorisapal to Chakdi Road ( 3/0 to 9/700 km) (B) Mayurbhanj 15000 137 Ramsahi to Mandam road Mayurbhanj 9000 138 S.H-49 to Tuntuna road Mayurbhanj 13000 139 RD Road to Guhalchatua Mayurbhanj 12500 140 S.H-53 to Hatisalbeda road Mayurbhanj 11500 141 P.W.D Road to Bhanraposi Mayurbhanj 9500 142 Neduapal to Madarangajodi Mayurbhanj 10000 143 NH-42 to Bisitikra Sambalpur 800 144 Podakhol Chhak to Panduakhol Sambalpur 6500

Ooutcome Budget : DoRD for 2016-17 Page100

145 RD road to Manikmunda Sambalpur 4000 146 PWD road to Ailajharan Sambalpur 6000 147 PWD road to Thepapali Sambalpur 2500 148 Salad to Turitikira Sambalpur 1500 149 Kuturachuan to Kuleigarh Sambalpur 100 150 PMGSY road to Kharsanmal Sambalpur 7500 151 Tainsar to K.Jamnkira Sambalpur 4500 152 RD road to Bijidihi Sundargarh 1000 153 MDR-27 Mahulpali to Kadalimunda Sundargarh 11000 154 Kanika to Kusumel road Sundargarh 6000 155 RD road to Kerajore Road Sundargarh 5000 156 ODR road at Kiralaga to Tedikaha Sundargarh 18000 157 RD road to Darupisa Sundargarh 13000 158 Musabira to Surulata Via Budupadar Sundargarh 12000 159 RD road to Churichakula Sundargarh 12500 160 RD road to Bhuyanpara Sundargarh 100 161 Amjharan to Betjharan Sundargarh 15000 162 RD road to Potobeda Sundargarh 34000 163 NH-143 to Turibaran Sundargarh 6500 164 Baghiajore to Girijapada Sundargarh 1000 165 Kacharu-Harpali (Barakatola) Sundargarh 2000 166 NH-23 to Badsahajbahal Sundargarh 20000 167 PWD road to Kadalikucha Sundargarh 10000 168 NH-23 to Sanjharan Sundargarh 15000 169 Kalosaria to Sagabeda Sundargarh 11700 Total 637500 04-800-Other Expr. 170 Talmul to Similichuini Angul 100 171 Budhapanka to Apartipur Angul 10000 172 Bantala to Badakanjini Angul 9000 173 Anlabereni to Khandabar road Angul 15000 174 NH 42 to Pitabaliagaruda road Angul 10000 175 Bandhupali Digpadar road Angul 4500 176 Bakala (Durgapur Chhak) to Badamul road Angul 20000 177 Kamasala to Mandua Via Haribereni Angul 9000 178 Badabereni to Kankurapal Angul 9000 179 R.D.Road (jumpei nallah) to Panihara Angul 6000 180 Khandbeda to Jharkilinda Angul 10000 181 R.D.Road to Jharalo Angul 100 182 Gopalprasad to Malibandha Road Angul 9000 183 Dharampur to Khairipal Angul 9000 184 Harichandanpur to Barihapur road Angul 7000 185 PWD Road to Rajuapada to Naikudi Road Balasore 6000 186 N.H-60 to Duburi Road Balasore 5500 187 Barunasingh to Uttarachaka Road Balasore 9000 188 R.D. Road (Remuna-Palasia) to Mahantipada Balasore 6000 189 Janakipal to Pandua Road Balasore 5000 190 Jauria (RD Road) to Kalabudhi Road Balasore 9500 191 R.D. Road to Narasinghdiha Road Balasore 4000 192 Dandkut to Tentula Road Balasore 6000 193 Gangpur to Badahata Road Balasore 5000 194 R.D. Road to Bedei Road Balasore 9000

Ooutcome Budget : DoRD for 2016-17 Page101

195 NH-60 to (Narsingpur Via-Palasia) to Jhinkiria Road Balasore 5500 196 N.H.5 to Bhagatpur Balasore 7500 197 ITR road (Rupkhanda) to Brajadeuli Balasore 5500 198 Thaneswar to Uchhabpur Balasore 100 199 Hensaguda to Sarupada Balasore 11000 200 Betada - Haripur to Maliberhampur Balasore 11000 201 Nandoor to Sunguda Balasore 1500 202 Jhatia to Nuasahi Balasore 2000 203 Ulinda to Jaleswarpur Road Balasore 1500 204 PWD Road to Matikhana Road Balasore 8500 205 Kachuadi to Dakhinnadbani Road Balasore 8000 206 Raniguda to Demuria Road Balasore 1000 207 Salikotha to Mahisamunda Road Balasore 10000 208 Simulia Mandhata Road to Nachhinda Road Balasore 11000 209 Baragarh Main Canal to Godgoddalla Baraharh 7500 210 Gandturum Mrahmanturum Baraharh 300 211 SH-54 to Kujapalli Baraharh 2000 212 Baragarh Bheden Canal Road to Mataritikira Via Saharapali Baraharh 8500 213 NH-06 to Sastupali (Via Kalanga Pali) Baraharh 7500 NH -6 (Chakrakenda Chhak) to Salepali & Link Road to 214 Baraharh 8000 Rangatikra 215 Jarmunda Chhak to San Amlipali Baraharh 4500 216 Kandpala to Jampali Baraharh 12000 217 Jhar to Jhagadjhal Baraharh 4000 218 RD road to Sardhapali & Link road Jhulpiapali Baraharh 11000 219 Kumbhari to Bedipali Baraharh 2000 220 Turcha to Saidunguripali Baraharh 8500 PWD road at Mithapali to Laudmal Via Manbhang, 221 Baraharh 8000 Kudhariphasa 222 Kurlupali to Beheradubri Baraharh 5000 223 Luharpali to Kabilpur Baraharh 10000 224 RD Road to Belagadia Bhadrak 100 225 PWD Road (Barapada) to Katuni Bhadrak 6000 226 Chunida Balabhadrapur PMGSY Raod to Ultunga Bhadrak 5500 227 RD Road to Erjhatia Bhadrak 3500 Nayananda chhabhgia sasan to Tarinichhak Via 228 Bhadrak 18000 Ramanujavidyapith & Biranchinarayan Temple 229 RD Road to Dharmagatpur Bhadrak 6000 230 Defence Road to Gokulpur Bhadrak 14000 231 Defence Road to Kansaripur Bhadrak 11000 232 T6 to Palatpur Bhadrak 9000 233 BC Road to Chalunia Bhadrak 10000 234 T2 to Mahamadpur Bhadrak 15000 235 Ranital Rly station to NH5 via. Baragadia Bhadrak 100 236 RD Road to Ghothina Bhadrak 3500 237 PWD Road to Kanjikhia Bhadrak 13000 238 BC Road to Chhatrapada Bhadrak 10000 Telibandha Barapugoda RD Road Tulasipur to Gochhapada 239 Boudh 3000 Road 240 NH-224 to Tatarkela Road Boudh 7000 241 Balakaira Bridge Chhak to Jaloei Road Boudh 6000 242 Butapali to Narayanpur Road Boudh 11000 243 NH-224 to Pipalkata Road Boudh 3000

Ooutcome Budget : DoRD for 2016-17 Page102

244 NH-224 to Bhurkipada Road Boudh 2500 245 Mahishalanda to Banto Cuttack 13500 246 Govindapur to Sahanajpur Road Cuttack 9000 247 Nurtanga to Inda Road Cuttack 7500 248 Govindpur to Simalda road Cuttack 20500 249 Sarakor to Sutinda Road Cuttack 20500 250 Adikundi to Netakundi Road Cuttack 8000 251 Salipur Chhatia PWD Road to Madhanga Road Cuttack 15000 252 Pattamundai Canal embankment to Mukundpur Road Cuttack 15000 253 R.D. Road to Bodhasara Road . Cuttack 11000 254 PWD Road to Nakhara Road Cuttack 9000 255 Cuttack Sambalpur road to Nuapatna Road Cuttack 4000 256 NH-55 to Indranipatna Road Cuttack 3500 T2 to Kulagaon Isalo to Santhakana Karandia Branch Canal 257 Cuttack 24500 from Sahadevpur Road 258 Bandhupur to Dudum road from 0/00 to 7/00 km Cuttack 15000 259 Bandhupur to Dudum road from 7/00 to 15/00 km Cuttack 12000 260 RD Road (Sabalpur) to Tailipada Road Cuttack 16000 261 Kakatapur Branch Canal to Arada Road Cuttack 16000 262 PWD road to (Baselihata) to Kimbhiritala Cuttack 13500 263 RD road (Alara) to Nandakishorpur Via Lembo & Mahurakhia Cuttack 14000 PWD road to (Guhalsahi) to Kathaukhaja, Mathurapur, 264 Cuttack 14000 Ransinghpur 265 PWD road to Sukhuakhala Cuttack 16000 266 RD road to Dengamba Cuttack 8000 267 RD road to Manipur Cuttack 10500 268 Naimalia to Balipur Cuttack 8500 269 PWD road to Nuabandha Cuttack 1500 270 Barada to Bhojadeipur Dhenkanal. 3500 271 RD Road to Goradapal Road Dhenkanal. 1000 272 L-22 to Badapokharia Dhenkanal. 3000 273 Kantamila to Gobardhanpur Dhenkanal. 5000 274 L-43 to Bachhuribanka Dhenkanal. 6500 275 Biswanathpur to Jondaposi Dhenkanal. 1500 276 T-2 to Pasasingh Dhenkanal. 2000 277 Kansaragoda to Maluagoda Dhenkanal. 100 278 PWD Road to Jamujhara Dhenkanal. 1000 279 PWD Road to Tampei Dhenkanal. 2000 280 NH-200 to Jautukapasi Dhenkanal. 11000 281 NH-23 to Raghunathpur via jharanbahal (Patra Sahi) Dhenkanal. 3000 282 Talasakara - Pangidi Via Belapur - Chakrapalli Road Ganjam 11500 283 Jamadeipur - Bhatakhalli Road Ganjam 7000 284 PWD Road to Jilunda- Beleijhuri Road Ganjam 3000 285 PWD Road to Purunapani via Budiamba Road Ganjam 12000 286 PWD Road to Baradanda Road Ganjam 7000 287 PWD Road to Kalingapadar Road Ganjam 16000 288 SH-7 to K. Sundarapalli Via Landajuali Road Ganjam 8500 R.D. Road to K. Raisingipur Via Titipalli Road 289 Ganjam 9500 290 SH-7 to Ranakuda - Ramanpalli Road Ganjam 6500 291 NH-59 to Hirakhandi Road Ganjam 3000 292 Badanai Canal to Badula Road Ganjam 9000 293 Ghodapada - Padapada - Nuasahi- Dhobabania Road Ganjam 12000

Ooutcome Budget : DoRD for 2016-17 Page103

294 R.D. Road to Hukuma Road Ganjam 14500 Kullada Chakka NH-59 Via Bhagabanpur - Padarsuni - 295 Ganjam 25000 Maniakathi & Gobindapur Village Road 296 PWD Road to Bankaladi Via Sanaborasingi Road Ganjam 14000 297 RD Road to Sitarampalli Road Ganjam 10000 298 PWD Road to Barabara - Jokalundi Road Ganjam 12000 299 PMGSY Road (Tentuliapalli) to Chillipoi via. Singadapalli. Ganjam 9500 300 RD Road to Laxmipur Ganjam 1000 PWD Road to Danapur via Gopinathpur - Hinjiligaon of Chikiti 301 Ganjam 18000 Block PWD Road to Katuru via Aruasunapur - Aladpur of Katuru GP 302 Ganjam 15000 of Chikiti Block 303 P.W.D. Road to Patrapada Ganjam 15000 304 RD. Road to Arakhapada Ganjam 35000 NH-5 TO RAULIBANDHA(PORTION FROM BORODA TO 305 Ganjam 4500 ROURIBANDHA) 306 Mayurapada to Niladripur Ganjam 18000 307 Badapalli to Mareinuagaon Ganjam 15000 308 Badapalli to B.Bhaliapadar Ganjam 9500 309 Dengapadara to Nuapada road Ganjam 2500 PWD Road to Khadanga Rajendrapur (Tutipur to Khadanga 310 Ganjam 14000 Rajendrapur) PWD ROAD (MAJHIGAON CHHAKA )TO GUNUPUR VIA 311 Ganjam 6000 PADMAPUR 312 BOXIPALLI (SANTINAGAR) TO KARAPALLI VIA BIKRAMPUR Ganjam 10000 PWD ROAD KANIS TO RALABA VIA ELECTRICITY OFFICE& 313 Ganjam 8000 GANESH NAGAR ROAD PWD Road (P. Jagannathpur) to Sunaripalli via Bhalupalli - 314 Ganjam 30000 Harichandanpur - Krushnapur 315 Alarigada to Khairabethi Road Ganjam 7000 316 PWD IB to Harikrushnapur Road Ganjam 200 317 Badapahada to Kirtipur via Chatradhepa Dhabalapur Road Ganjam 10000 318 Alabole to Kanti Jagatsinghpur 9000 319 Nuadhana to Mahatola Jagatsinghpur 9500 320 Paladhuabandha Gadahirispur RD road to Gateswarpur Jagatsinghpur 12000 321 Ersama Chatua RD road Palikanta Via Dhuansahi Jagatsinghpur 10000 322 Odisagarh Puran Jagatsinghpur 12000 323 Jankoti Korakora Jagatsinghpur 7000 324 Pandua Ibrisingh to Alukholanga Jagatsinghpur 10000 325 Baulanga to Balipari Jagatsinghpur 10000 326 Cuttack road to Chhotibar via Totasahi Jagatsinghpur 8000 327 Arakhakud to Pohal Jagatsinghpur 5000 328 Gopalpur to Saralapur road Jagatsinghpur 12000 329 SH-12 to Dharadharpur road Jagatsinghpur 12000 330 SH-56 TO MATABAJ Jajpur 10000 331 SANKHACHILA TO JANAHA Jajpur 10000 332 NH-5 to Khajuripur Jajpur 7000 333 RD road to Giridhari dahi Jajpur 9500 334 KUHIKA TO BAMBILO Jajpur 7500 335 KHAPURIAPADA TO BRAHMANGAON Jajpur 3000 336 Utarapratap to Rakhipatana road Jajpur 3000 337 RD Road to Satamana road Jajpur 2500 338 RD Road to Totakana road Jajpur 13000

Ooutcome Budget : DoRD for 2016-17 Page104

339 RD Road to Jhatiapada road Jajpur 2000 340 N.H-5 A to Rukutipata via Patrajpur, Nanpur road Jajpur 9000 341 Kalakala Dhenkanal Border road to Purnachandrapur road Jajpur 20000 342 Sahaspur to Chandrimal Baramusa road Jharsuguda 9000 343 RD road to Dumermunda road Jharsuguda 100 344 Nindrimal to Talchanki road Jharsuguda 7000 345 NH-200 to Kutrapali road Jharsuguda 9000 346 RD road to Gopipali road Jharsuguda 5500 347 Dudulsingha to Vejikud road Jharsuguda 18000 348 SH-9A to Koltire Kendrapara 8000 349 SH-9A to Poipat Kendrapara 6000 350 Hariabanka to Babanamber Kendrapara 8500 351 RD Road to Sankhapada Kendrapara 12000 352 Bhopal to Ostariya Kendrapara 6000 353 Kabilpur to Tirinia Kendrapara 10500 354 NH 5A Balabhadrapur Chhak to Satabatia Kendrapara 8000 355 Chandol Village to Annantapur Kendrapara 10000 356 Panasganda to Fazilpur road Kendrapara 15000 357 P.W D road to Balibandha road Kendrapara 10000 358 Ektal to Badhia road Kendrapara 1500 359 P.W D road to Balikuda to Gopalpur via Pokharikul road Kendrapara 9500 360 Palapatana to Kadamdandi road Kendrapara 10000 361 Malipur to Udayapur road Kendrapara 9500 362 R&B road to Dakhinaveda road Kendrapara 12000 363 RD road at Kuradhilo to Chiramaru Khurda 11000 364 Sanakadaba to Bagalpur Khurda 13000 365 Bankoi to Sahajpur Khurda 15000 366 Khanata to Dikhitpada Khurda 2000 367 Bheseri to Dolamundai Khurda 14000 368 N.H-5 to Rahanabeli Khurda 11500 369 PWD road to Budhangara Khurda 8000 370 RD road to Alkar Khurda 4000 371 PWD road Kapilaswarpur to Khurda 8500 372 Puranpradhan to Puransasan Khurda 12500 373 Narada to Indolkusiary Khurda 10000 374 Basantamala to Badalapachimakhanda Khurda 20000 375 Pariorad - Kandagadia to Naramanabi Khurda 12000 376 RD road KaIpadar to Madhapur Via-Saanta Khurda 10000 377 PWD road to Gudabadi Khurda 14000 378 R D road to Krushnasapur Khurda 10000 379 MDR-68 (BAHAPUR) TO Kainfulia Nayagarh 8000 380 MDR-68(Gadia Sahi) to Kadua Nayagarh 9800 381 ODR (Singhibadi) to Pathara via Pankhal Nayagarh 9000 382 Karadbani to Biradisahi Nayagarh 9000 383 PWD Road to Piasalia Nayagarh 8000 384 Jaymangalaprasad to Dhuanurjayapur Nayagarh 10000 385 Badakutuni to Simili Nayagarh 10000 386 PWD Road to Bilagadia via Sankhamula Nayagarh 10000 387 RD Road (Brajarajpur)-Bamada-Gadabanikila Road Nayagarh 14000 388 MDR 18 to Madanpur Nayagarh 8000 389 Kaptapalli to Makarapalli Nayagarh 17000 390 PWD road to Dimiripadar Nayagarh 7000

Ooutcome Budget : DoRD for 2016-17 Page105

391 Bandhagada chhak to Dalibali road Kandhamal 11000 392 Bhatalpadar to Kanibali Kandhamal 11000 393 SH-1 to Jhadapadar road Kandhamal 9000 394 Kainjhar road to Nuasahi Kandhamal 13000 395 RD road to Malansuga road Kandhamal 10000 396 Ratingia to Sarusungia road Kandhamal 8000 397 Jalaspeta to Birimela road Kandhamal 20000 398 Belghar to Gurlimaska road Kandhamal 20000 399 Desughati to Sanjhiripani road Kandhamal 12000 400 L-63 to Janala Puri 10000 401 Ola to Jatipur Puri 5000 402 T-4 to Buali Puri 10000 403 PWD Road to Uthanikuda Puri 10000 404 L-45 to Manijipur Puri 5000 405 N.J Sadak to Botalma Puri 2000 406 Subudhipada to Paikapada Puri 2000 407 T-5 to Paripotali Puri 10000 408 East Kania emb.to Paikasahi,K.Harichandrapur Puri 5000 409 Satipur to Bagha Puri 7000 410 T-1 to Garailo Puri 8000 411 PWD Road to Baulasahi Puri 7000 412 Chhurina to Daluakani Puri 12000 413 Kaniha to Bania Puri 7000 414 Tentulia to Bandalo Puri 3500 415 Bhuan to Baulapada via Sunogoradi Puri 21000 416 FNM Road to Basantapur Puri 16000 417 MB ROAD – LUNAHAR Puri 15000 Total 2250000 Grand Total 3750000

N.B. The Work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page106

Work list under D.No.28-5054-COL On R&B-SP-SS-04-DOR/80- General -800-OE /789-SCP SC /796 -TASP -1860-Biju KBK Yojana-37107-Major Works for the year 2016-17

Sl. Name of the Work Name of the Financial outlay No District ( in TRS) 1 2 3 4

80-789-SCPSC

1 Baldas road to Mangulipara road Bolangir 10 2 Luthorbandha to Majhipada road Bolangir 200 3 Titilagarh to Binekela via Sihini Bolangir 10000 4 Darlipada to Nuapada (Pujaharipada-II) Kalahandi 400 5 Rahul bridge to Sargipada Kalahandi 460 6 Tushra Gajabahal road Kalahandi 10 7 Tulapada Panga road Kalahandi 10 8 Kesinga Joradobra road Kalahandi 10 9 Kusurpada to Singjharam Kalahandi 10 10 Biswanathpur to Bijepur road 0/0 km to 15 km Kalahandi 12000 11 NH-201 to Goudachhendia via Habaspur Kalahandi 14000 12 Pradhaniput to Sundhiguda Road Koraput 500 13 Mundiguda to Doraguda Koraput 10 14 M.D.R. to Muliaput road Koraput 500 15 R.D. Road (A. Malkangiri) to P. Suku via Goradamunda Koraput 16000 16 BM Road to MV-32 (Constn of Bituminous Macadam) Malkanagiri 20 17 Venketapalam to Panimetla Malkanagiri 20 18 MM road to MPV.83 Malkanagiri 7500 19 Spillway to Popular Malkanagiri 10000 20 Hirapur to Nagjodi road Nabarangpur 10 21 Furusund to Kandulkona Nuapada 4800 22 Algingiguda to Pradhaniguda Rayagada 10 23 Bahirkhaman to Bandhapali Subarnapur 10 24 Kamsara Balikhamar to Kulthiapadar Subarnapur 10 Total 76500

80-796-TASP 1 PWD road to Damnimal road Bolangir 10 2 MDR 40 to Suhagpur road Bolangir 1000 3 Lakhabahahali to Sialjore Kalahandi 1000 4 P S Road to Tendapani Via Mimiri Kalahandi 500 5 Patrabasa- Jhulenbar Kalahandi 2000 6 NH-201 to Kuturu Kalahandi 10 7 Musapali to Dalguma Kalahandi 8010 8 Kesinga to Joradogra Kalahandi 10000 9 Karlamunda to Joradobra Kalahandi 14500 10 R.D. Road (PMGSY) to Sorisapadar Koraput 5000 11 Machara to Khaparaput Road Koraput 1000

Ooutcome Budget : DoRD for 2016-17 Page107

12 R.D. Road to Podapadar Koraput 1000 13 PWD Road Raisil Koraput 2300 14 NH-43 to Chikalmari via Gangarajpur Koraput 10000 15 NH-43(Miriguda) to Phupugaon via, Nehrupali Koraput 10000 16 Sindhiguda to Chitapari Malkangiri 1500 17 Chataguda Adibasi to Nirundia RD road Nabarangapur 8400 18 Digi Aunliguma Nabarangapur 10000 19 Dabugaon to Borigaon 8/0 to 13/0 km. Nabarangapur 10000 20 Hardoli to Budaguda Road Nabarangpur 500 21 RD road Jn to Bagniguda Road Nabarangpur 10 22 Kondagam Road to Sankarada Silati Nabarangpur 10 23 Silati to Rajpur via Benora Nabarangpur 10 24 Motigam to Dhepaguda Road Nabarangpur 10 25 Phupugam to Dengaguda road Nabarangpur 10 26 Brahamaniguda to Kuliharibahal Nuapada 10 27 Kereda Bilesu road Rayagada 10 28 Rayagada to Baisingi via Chekaguda Rayagada 10 29 PWD Road to Royalpadar Biripadar Rayagada 10 30 PWD Road to Ghodabadi Rayagada 4000 31 PWD road to Krushnapali Subarnapur 1500 32 Jujistipur chowk to Basudevpur Subarnapur 600 33 NK RD road to Chuhanpali Subarnapur 10 34 BARD road to Bajikhol Subarnapur 570 Total 103500

04-800-Other Expr. 1 Talgaj RD road to Kundeigad road Bolangir 10 2 Kudasingha to Siris road Bolangir 10 3 Ingsa to Nagraj road Bolangir 10 4 Kansapala Matikhai road Bolangir 10 5 Belgaon Ampali RD road to Deuli road Bolangir 10 6 Bhadra Badipara RD road to Dedhel road Bolangir 10 7 Jharphatamunda to Satchun road Bolangir 10 8 PWD road to Khiarpali via Bagalabandh Bolangir 10 9 L95 to Gailmara Bolangir 10 10 Maharapadar Kandarbhata Bolangir 10 11 Sireikella Goudtola RD road to Khalipara road Bolangir 10 12 Burdipara to Kumbhipada road Bolangir 10 13 PWD road to Bagbel road Bolangir 10 14 Rigdol Lutherbandh RD road to Ghisirmal Bolangir 10

Ooutcome Budget : DoRD for 2016-17 Page108

15 Sonepur PWD road to Daspur road Bolangir 18000 16 Balgoan Ampali RD road to Chilibahal Bolangir 10000 17 Deogaon Nuapalli Bolangir 8960 18 Belgoan Ampali road to Chandanpada Bolangir 12000 19 Adamunda Bahabahala road Bolangir 8000 20 Batia Sunamundi Lathor road Bolangir 14000 21 Titilagarh Muribahal- Gulmi road Bolangir 16000 22 R.D Road to Kutenpadar Kalahandi 10 23 R.D. Road to Sarlanji Kalahandi 400 24 NH201 to Suruguda Kalahandi 800 25 PWD Road to Gundri Kalahandi 4500 26 jaipatana to Chhatapadar (Nuapada) Kalahandi 10 27 RD Road to Hernapada Kalahandi 10 28 RD Road to Latabanji Kalahandi 500 29 Kotagaon to Bindhaniguda Kalahandi 10 30 RD Road to Chokobahali Kalahandi 10 31 PWD Road to Machapadar Koraput 10 32 Umbel to Dumuriput Road Koraput 10 33 Guneipada-Areipada Koraput 14000 34 OMC camp to Bangargadi Koraput 20000

35 PWD road to Damaput via, Sargiguda, Koraput 20000 Sunariguda, Samdaput. 36 GB Road to Talagudaput Malkangiri 500 37 MV-86 to Padmapur Malkangiri 10 38 Gotijodi to Gajuguda Malkangiri 500 39 Meka to Dauduguda Malkangiri 300 40 MV 10 to MV 09 road Malkangiri 300 41 BM road to Mahulput Malkangiri 300 42 Underukonda to Similibancha roads Malkangiri 10 43 Podia to MV 66 road Malkangiri 10 44 Inglahandi to Raghudongri Nabarangapur 20000 45 B. Debtaguda to Podapala Road Nabarangpur 2000 46 Bharanpur jn (T-0907) to Bhimaguda Road Nabarangpur 10

Ooutcome Budget : DoRD for 2016-17 Page109

47 Silati Rajpur via Benora raod Nabarangpur 10 48 Tohra to Keripadar Nabarangpur 10 49 Nirundi to Dabriguda road Nabarangpur 10 50 Chalanpara to Handikadara Road Nabarangpur 10 51 Gharachapara jn to Bijilipara Road Nabarangpur 500 52 Sana Temera to Mundkhaguda road Nabarangpur 10 53 PS Road to Haldikhol Nuapada 10 54 SH-3 to Padampuri Road Nuapada 10 55 Barnapat to kunjarpada via Chhata Nuapada 15000 56 Jimidipeda Pipalguda road Rayagada 10 57 PS Road to Sikajhila Rayagada 500 58 Butingi Jn. To Alamguda Rayagada 1000 59 RD Road to Chiligudi Rayagada 2000 60 PWD road to Khilapadar Rayagada 15000 61 Kumardhamini Betiapada Rayagada 15000 62 Disariguda to Khajuriguda Rayagada 15000 63 Kamsara Surda (0/0 to 1/2 Km.) Subarnapur 10 64 RD road to Indiranagar Subarnapur 500 65 T.L.RD road to Pipilipali Subarnapur 2000 66 Khuntulapali to Kulhapara Subarnapur 10 67 Lakhani chowck to Teleimal Subarnapur 1000 68 Pankel to Jogipara Subarnapur 10 69 PWD road (Gumurdala )to Nachipadar Subarnapur 1000 70 RD road to Fakirmunda Subarnapur 10 71 Khuntulapali to Kulhapara (Balance length) Subarnapur 10 72 B.A.RD road to Purusotampur Subarnapur 10 73 Naikpada Kapasira to Mundoghat via Palasbadhila Subarnapur 12000 74 Ghat Kaintara to Maraduguchha Subarnapur 18000

Total 270000 Grand Total 450000

N.B. The Work/Scheme/Projectwise allocation is tentative & may be varied in keeping with the progress of work during the course of the financial year.

Ooutcome Budget : DoRD for 2016-17 Page110

Work list under D.No.28-5054-COL on R&B-SP-DS-04-DOR-101-Bridges/ 789-SCP SC/796 –TASP- 1230-Rural Roads-37281-Construction of Bailey Bridges for the year 2016-17

Name of the Financial outlay Sl.No Name of the Work District ( in TRS)

04-789-SCP SC Construction of Bailey Bridge over local nallah on Binjiri - Deopur 1 Road, G.P.- Gosani, Block- Gosani. Gajapati 8000 Construction of Bailey Bridge over local nallah on Anukundaguda - 2 Jeeba, G.P.- Gumma, Block- Gumma. Gajapati 7792 Construction of Bailey Bridge over local nallah on Padursingh- 3 Sulsulada , G.P.- Gumma, Block- Gumma. Gajapati 1 Construction of Bailey Bridge over local nallah on Anukundaguda - 4 Radhakantpur , G.P.- Gumma, Block- Gumma. Gajapati 1 Construction of Bailey Bridge over local nallah on Balipanka - 5 Chandiput , G.P.- Mohana, Block- Mohana. Gajapati 6976 Construction of Bailey Bridge over local nallah on Analaguda - 6 Mohana , G.P.- Mohana, Block- Mohana. Gajapati 1 Construction of Bailey Bridge over local nallah on Hundipadar - 7 Pinkidi , G.P.- Mohana, Block- Mohana. Gajapati 1 Construction of Bailey Bridge over local nallah on Ramchandrapur 8 - Luhagudi , G.P.- Mohana, Block- Mohana. Gajapati 1 Construction of Bailey bridge over local nallah on Dasamantpur- 9 angipur road,G.P.- Dasamantpur, Block- Dasamantpur. Koraput 9703 Construction of Bailey bridge over local nallah on Kiramba - 10 Jamuru road,G.P.- Dasamantpur, Block- Dasamantpur. Koraput 9703 Construction of Bailey bridge over local nallah on Gadikhal- 11 Kalijhola road,G.P.- Laxmipur, Block- Laxmipur. Koraput 9703 Construction of Bailey bridge over local nallah on Sipurijholla - 12 Lugum road, G.P.- Nandapur, Block- Nandapur Koraput 9703 Construction of Bailey bridge over local nallah on Kedupati - 13 Bagmari road,G.P.- Laxmipur, Block- Laxmipur. Koraput 9703 Construction of Bailey bridge over local nallah on Odiapentha - 14 Bisampur road, G.P.- Laxmipur, Block- Laxmipur. Koraput 9704 Construction of Bailey bridge over local nallah on Girliput - Jogiput 15 road, G.P.- Nandapur, Block- Nandapur Koraput 9703 Construction of Bailey bridge over local nallah on Majhiguda - 16 Kusumi road, G.P.- Chitra, Block- Kotpad. Koraput 1 Construction of Bailey bridge over local nallah on Raikundra - 17 Kenduguda road, G.P.- Kundra, Block- Kundra. Koraput 1

Ooutcome Budget : DoRD for 2016-17 Page111

Construction of Bailey bridge over local nallah on P.Mundiguda - 18 Bhusangaguda road,G.P.- Kusumi, Block- Kotpad. Koraput 1 Construction of Bailey bridge over local nallah on Basuaput - 19 Purimunda road, G.P.- Dasamantpur, Block- Dasamantpur. Koraput 1 Construction of Bailey bridge over local nallah on Tamaksil - 20 Tamaksil road, G.P.- Dasamantpur, Block- Dasamantpur. Koraput 1 Construction of Bailey bridge over local nallah on Tema - Kirajholla 21 road, G.P.- Pottangi, Block- Pottangi. Koraput 1 Construction of Bailey bridge over local nallah on Hataguda - 22 Gadikhamara road,G.P.- Similiguda, Block-Similiguda Koraput 1 Construction of Bailey Bridge over Local nallah on Oreepul- 23 Rayalpadu road, GP-Sagada, Block-Gunupur Rayagada 494 Construction of Bailey Bridge over local nallah on Elrnanguda to 24 Bada barida road Rayagada 500 Construction of Bailey Bridge over local nallah on Uapuchi - 25 Nudraguda road. Rayagada 500 Construction of Bailey Bridge over local nallah on B.K.ltamana to 26 Labs road, GP-Dambosara, Block-Gunupur Rayagada 1 Construction of Bailey Bridge over local nallah on Buvalkul- 27 Anjarbaising road, GP-Kulusing, Block-Gunupur Rayagada 1 Construction of Bailey Bridge over local nallah on Kadasi-Ajingtal 28 road, GP-Kulusing,Block-Gunupur Rayagada 1 Construction of Bailey Bridge over local nallah on Saisingi-Gudi 29 road, GP-Kutusing, block-Gunupur Rayagada 1 Construction of Bailey Bridge over local nallah on Plolour Nalls- 30 Borel road, GP-Puttasing,Block-Gunupur Rayagada 1 Construction of Bailey Bridge over local nallah on Kimjhola- 31 Deriguda road, GP-Deriwun, Block-Padmapur Rayagada 1 Construction of Bailey bridge over local nallah on Limaguda to 32 Putagaon road at Ch. 0/ 900 km Malkanagiri 18206 Construction of Bailey bridge over local nallah on MV 117 to 33 Kaldapali at RD 5/760Km Malkanagiri 8592 Total 119000

04-796-TASP Construction of Bailey Bridge on local nallah on Rengalpadu - 1 Mirabali road, G.P.-Mirabali, Block- Rayagada. Rayagada 4037 Construction of Bailey Bridge over Local nallah on Kabatsil- 2 Gumudisupel road, GP-Manusgaon, Block-Kasipur Rayagada 495 Construction of Bailey Bridge over local nallah on RD Road to 3 Kutinga. Rayagada 495 Construction of Bailey Bridge over local nallah on RD Road to 4 Deranja Rayagada 494

Ooutcome Budget : DoRD for 2016-17 Page112

Construction of Bailey Bridge over local nallah on Badalijharana to 5 Dhadapas road Rayagada 500 Construction of Bailey Bridge over local nallah on Kumbharasil to 6 Katali road. Rayagada 500 Construction of Bailey Bridge over local nallah onKendili - 7 Laktiguda road, G.P.-Bethiapada, Block- Rayagada 1 Construction of Bailey Bridge over local nallah on Putupadar - 8 Bhatapur road, G.P.-Bhatapur, Block-Bissam Cuttack Rayagada 1 Construction of Bailey Bridge over local nallah on Paridi - Marama 9 road, G.P.-Moroma, Block- Gunpur Rayagada 1 Construction of Bailey Bridge over local nallah on Panchapadava - 10 Goudapadar rroad, , G.P.-Pendili, Block- Gudari. Rayagada 1 Construction of Bailey Bridge over local nallah on Thurudi - 11 Luhamunda road, G.P.-Pendili, Block- Gudari. Rayagada 1 Construction of Bailey Bridge over local nallah on Khamariguda- 12 Dakorama road, G.P.-Tembaguda, Block- Padmpur. Rayagada 1 Construction of Bailey Bridge over local nallah on Hasku - Bada 13 Erukubadi road, G.P.-Bada Erukubadi, Block- Rayagada. Rayagada 1 Construction of Bailey Bridge over local nallah on Kopadango- 14 Bada Erukubadi road, G.P.-Bada Erukubadi,Block- Rayagada. Rayagada 1 Construction of Bailey Bridge over local nallah on Balput - 15 Banikona road, G.P.-Baising, Block- Rayagada Rayagada 1 Construction of Bailey Bridge over local nallah on B.K.Padar - Arabi 16 road, G.P.-Karagudi Rayagada 1 Construction of Bailey Bridge over local nallah on Karapa - 17 Landabali road, G.P.-Karapara, Block- K.Singhpur Rayagada 1 Construction of Bailey Bridge over local nallah on Kalakani - 18 Kumbharasila road, G.P.-Kashipur, Block- Kashipur. Rayagada 1 Construction of Bailey Bridge over local nallah on Lekapai-Champia 19 road, G.P.-kolnara, Block- kolnara. Rayagada 1 Construction of Bailey Bridge over local nallah on Balungi - 20 Kumbhikota road, G.P-Kumbhikota, Block- Rayagada. Rayagada 1 Construction of Bailey Bridge over local nallah on Raghunathpur- 21 Majhiguda road, G.P.-Majhiguda, Block- K.Singhpur. Rayagada 1 Construction of Bailey Bridge over local nallah on Mirabali - 22 Rachapaka road, G.P.-Mirabali, Block- Rayagada. Rayagada 1 Construction of Bailey Bridge over Daya Nallah on road from 23 Panasijharan to Singnali Keonjhar 20904 Construction of Bailey Bridge over Barbank Nallah on Marshapal to 24 Bad Ektali road via Tangar. Keonjhar 14321 Construction of Bailey bridge over local nallah on Sundiguda- 25 Chitrapari-Laktuguda road at Ch. 3/ 300 km Malkanagiri 17187

Ooutcome Budget : DoRD for 2016-17 Page113

Construction of Bailey bridge over local nallah on Khairput to 26 Mudulipada road at Ch. 9/ 500 km Malkanagiri 10741 Construction of Bailey bridge over local nallah on Khairput to 27 Mudulipada road at Ch. 12/ 170 km Malkanagiri 10741 Construction of Bailey bridge over local nallah on Canal bank to 28 Cheriguda at 2nd Km Malkanagiri 7523 Construction of Bailey bridge over local nallah on MV 104 to MV 29 122 at 2nd Km Malkanagiri 16115 Construction of Bailey bridge over local nallah on Telarai chowk to 30 Koimetla via MV 63 at 5th Km Malkanagiri 21482 Construction of Bailey bridge over local nallah on Peta to 31 Tandabahal via Muraliguda at Ch. 2/800Km Malkanagiri 19334 Construction of Bailey bridge over local nallah on Sangel to 32 Chitrangapally at 1/200Km Malkanagiri 16115 Total 161000

04-101-Bridges Construction of Bailey bridge over local nallah on Perigaon 1 Junction to Kalingi Rayagada 500 Construction of Bailey bridge over local nallah on Pendili to 2 Kerikhal Rayagada 500 Construction of Bailey bridge over local nallah on Achaba to 3 Jangesu (GPGajigaon) Rayagada 500 Construction of Bailey bridge over local nallah on Khamanpada to 4 Rpyalpenth. Rayagada 500 Construction of Bailey bridge over local nallah on PWD Road to 5 Champadora Rayagada 15330 Construction of Bailey bridge over local nallah on lswarguda- 6 Bahpanga road, GP-Kadama, Block-Padmapur Rayagada 1 Construction of Bailey bridge over local nallah on Mardipuda- 7 Kumbhikota road, GP-Kumbhikota, Block-Rayagada Rayagada 1 Construction of Bailey bridge over local nallah on Badamanadhar- 8 Kutuli road, GP-Kutuli, Block-Rayagada Rayagada 1 Construction of Bailey bridge over local nallah on Kisankedi-Adajor 9 road, GP-Adajor, Block-Kasipur Rayagada 1 Construction of Bailey bridge over local nallah onKantrabali- 10 Kamalabadi road, GP-Muniguda, Block-B.Cuttack Rayagada 1 Construction of Bailey bridge over local nallah on Dumriguda- 11 Khedapada road, GP-Khedapada, Block-Kolnara Rayagada 1 Construction of Bailey bridge over local nallah on Halam-Kaju 12 road, GP-Kariaghati, Block-Gudari Rayagada 1

Ooutcome Budget : DoRD for 2016-17 Page114

Construction of Bailey bridge over local nallah on Kandapendili- 13 Gurutha road, GP-Khariguda, Block-Gudari Rayagada 1 Construction of Bailey bridge over local nallah on Bangarada to 14 Ramana GP-Chandrapur) Rayagada 1 Construction of Bailey bridge over local nallah on Pipalguda- 15 Uapaka road, G.P.-Pipalguda, Block- Rayagada. Rayagada 1 Construction of Bailey bridge over local nallah on Didwa - 16 Kornaopadu road, G.P.-Poloma, Block- K.Singhpur Rayagada 1 Construction of Bailey bridge over local nallah on Dibalpadu - 17 Pujariguda road, G.P-Pujariguda, Block- K.Singhpur. Rayagada 1 Construction of Bailey bridge over local nallah on Dimiribadi - 18 Pujariguda road, G.P.- Pujariguda, Block- K.Singhpur. Rayagada 1 Construction of Bailey bridge over local nallah on Balipur - 19 Karadang road, G.P.- Seriguma, Block- K.Singpur. Rayagada 1 Construction of Bailey bridge over local nallah on R.D. Road - 20 Delibadi road, G.P.- Sikarapai, Block- K.Singpur. Rayagada 1 Construction of Bailey bridge over local nallah on Boriguda -Singari 21 road, G.P.- Sikarapai, Block- K.Singpur. Rayagada 1 Construction of Bailey bridge over local nallah on Khambaribhatta 22 - Singari road,G.P.- Singari, Block- K.Singpur. Rayagada 1 Construction of Bailey bridge over local nallah on Paduguda - 23 Singari road, G.P.- Singari, Block- K.Singpur Rayagada 1 Construction of Bailey bridge over local nallah on Palakhaman - 24 Singari road, G.P.- Singari, Block- K.Singpur Rayagada 1 Construction of Bailey bridge over local nallah on Palligaon- Sarati 25 road,G.P.- Sunakhandi, Block- K.Singhpur Rayagada 1 Construction of Bailey Bridge over Local nallah on Antapali - 26 Kukudapli road, G.P.-Batemura, Block-Maneswar Sambalpur 12270 Construction of Bailey Bridge over Kalpa nallah, G.P.- 27 Nuabarangamal, Block-Jujumura Sambalpur 3332 Bridge over Local nallah on Luhapank to Gadmunda road, G.P.- 28 Luhapank, Block- Sambalpur 2982 Construction of Bailey Bridge over Cuttack nallah on Badmal to 29 Brahmani road, G.P.-Ghosaramal, Block-Naktideul Sambalpur 2832 Construction of Bailey Bridge over Local nallah on Betghar to 30 Kusumkhol road, G.P.-Luhapank, Block-Jamankira Sambalpur 2832 Construction of Bailey Bridge over Pitha nallah, G.P.-Luhapank, 31 Block-Rairakhol Sambalpur 8154 Construction of Bailey Bridge over Kendukupali nallah, G.P.- 32 Luhapank, Block-Rairakhol Sambalpur 2982 Construction of Bailey Bridge over Local nallah on Betghat to 33 Kosali road, G.P.-Luhapank, Block-Rairakhol Sambalpur 2882

Ooutcome Budget : DoRD for 2016-17 Page115

Construction of Bailey Bridge over Tileising nallah on Landimal to 34 Dhatukimal road, G.P.-Ghosaramal, Block-Naktideul Sambalpur 8155 Construction of Bailey Bridge over Ranja nallah on Mura to 35 Kanibandhali road, G.P.-Nuatihura, Block-Maneswar Sambalpur 11595 Construction of Bailey Bridge over Mahulpali nallah, G.P.-Tabla, 36 Block-Maneswar Sambalpur 3182 Construction of Bailey Bridge over Chandraposi river on Kausipal - 37 Daneimunda road, G.P.-Panimura, Block-Naktideula Sambalpur 10922 Construction of Bailey Bridge over Jarasinga nallah at Gidmal, G.P.- 38 Kesapali, Block-Jujumara Sambalpur 16626 Construction of Bailey Bridge over Bhalukhol nallah, G.P.-Kisinda, 39 Block-Naktideula Sambalpur 2982 Construction of Bailey Bridge over Rantal nallah, G.P.-Meghpal, 40 Block-Jujumara Sambalpur 7566 Construction of Bailey Bridge over Marangabahal nallah, G.P.- 41 Meghpal, Block-Jujumara Sambalpur 6445 Construction of Bailey Bridge over Mayapal nallah at Gidmal, G.P.- 42 Kesapali, Block-Jujumara Sambalpur 2832 Construction of Bailey Bridge over Local nallah on Bijaguda to 43 Damagaon road, G.P.-Kenadhipa, Block-Jamankira Sambalpur 9027 Construction of Bailey Bridge over Local nallah at Fulchangudi , 44 G.P.-Kenadhipa, Block-Jamankira Sambalpur 11022 Construction of Bailey Bridge over Gantab nallah, G.P.-Badrama, 45 Block-Jamankira Sambalpur 18074 Construction of Bailey Bridge over Chigunikhol nallah, G.P.- 46 Badrama, Block-Jamankira Sambalpur 12375 Construction of Bailey Bridge on Bingipali to Khurabola, G.P.- 47 Mahada, Block-Jamankira (1) Sambalpur 7363 Construction of Bailey Bridge over Local nallah at 2nd km on PWD 48 road to Kanika road, Block - Hemagiri Sundergarh 6174 Construction of Bailey Bridge over Local nallah on Kankutura to 49 Latakhandi road, Block - Hemagiri Sundergarh 8264 Construction of Bailey Bridge over Sonal nallah on Sargigarh to 50 Badindupur road under Malda G.P., Block - Koida Sundergarh 9033 Construction of Bailey Bridge over Tetrabahal nallah on 51 Tetrabahal to Linetoli road under Undali G.P., Block - Kuanramunda Sundergarh 8982 Construction of Bailey Bridge over Sundar nallah on Ratakhandi to 52 Surli road under Kukundubahal G.P., Block - Kuanramunda Sundergarh 8832 Construction of Bailey Bridge over Sundar nallah on Kukundubahal to Nandatoli road under Kukundubahal G.P., Block - 53 Kuanramunda Sundergarh 8783 Construction of Bailey Bridge over Bada Nallah on Kadabahali to 54 Daragudisila Road Keonjhar 12388

Ooutcome Budget : DoRD for 2016-17 Page116

Construction of Bailey Bridge over BadNallah on Kumunia to 55 Talgaon. Keonjhar 20793 Construction of Bailey Bridge over Barbank on Dhakotha- 56 Salukdahi road Keonjhar 8033 Construction of Bailey Bridge on Remal on TikarSahi (Barigan) to 57 Golagadia (Harishandanpur) Keonjhar 21653 Construction of Bailey Bridge over Mushal at Satyapal 58 (Harichandanpur) Keonjhar 21641 Construction of Bailey Bridge over Mushal on road from 59 Tangarpada to Bada Palaspal via Bandhapada Keonjhar 8780 Construction of Bailey Bridges on Bada Nallah on Melan to 60 Daragudisila Keonjhar 6385 Construction of Bailey Bridges on Bada Nallah on Melan to 61 Daragudisila Keonjhar 6314 Construction of Bailey Bridge over Mushal at Gundichaghadi 62 tourism spot Keonjhar 10536 Construction of Bailey Bridge over Kukurkata on Badjamposi to 63 Tikira via Medinpur Road. Keonjhar 20289 Construction of Bailey Bridge over Kukurkata on Barahatipura to 64 Bhanjtipura Road Keonjhar 20081 65 Construction of Bailey Bridge over River Sona at Joda Market Keonjhar 29257 Total 420000 Grand Total 700000

Ooutcome Budget : DoRD for 2016-17 Page117

TARGET & ACHIEVEMENT OF SPOT SOURCES FOR THE YEAR 2016-17

SI No Name of District/ Division Target 1 2 3 1 Angul 337 5 Bolangir 405 3 Bargarh 269 4 Bhadrak 262 2 Balasore 339 6 Boudh 116 7 Cuttack 230 7a. Atthagarh 88 8 Deogarh 82 9 Dhenkanal 250 10 Gajapati 356 11 Ganjam(Berhampur) 270 11a Ganjam(Bhanjanagar) 278 12 Jagatsinghpur 213 13 Jajpur 287 14 Jharsuguda 100 15 Kalahandi 322 16 Kandhamal 400 17 Kendrapara 250 18 Keonjhar(Keonjhar) 410 18a Keonjhar(Anandpur) 240 19 Khurda 393 20 Koraput 213 21 Malkangiri 270 22 Mayurbhanj(Baripada) 310 22a Mayurbhanj(Rairangpur) 212 23 Nawarangpur 152 24 Nayagarh 217 25 Nuapada 257 26 Puri 300 27 Rayagada 150 28 Sambalpur 265 29 Subarnpur 144 30 Sundargarh(Raurkella) 313 30a Sundergarh(Sundargarh) 300 Total 9000

Ooutcome Budget : DoRD for 2016-17 Page118

NON-PLAN (2016-17) ( in TRS) Sl. Name of the Financial Broad Quantifiable Project Outcome Processes/ Remarks/Risk Factors No. Scheme/Programme Outlay/ objective of /Deliverable Timelines Non-Salary the Scheme Physical (Deliverable Outputs outputs)

1 2 3 4 5 6 7 8

RURAL WORKS ORGANISATION To Improve Can not be 12 months Physical output can Repair, the working assessed Maintenance of not be quantified as Maintenance of 1 1683634 condition of being Office Buildings in these are operation Non-Residential officials in repair Rural Areas and maintenance Buildings rural areas. work works. 12 months Physical output can i. To maintain Repair and not be quantified as approx. 1025 nos. renovation of old Improveme these are operation Can not be old High School & Govt. High School nt of and maintenance assessed College Buildings and College Educational works. 2 being which are 30 years Buildings (i)210000 infrastructu repair ii. Maintenance of (i) above 20 years (ii)140000 re work E.I. & PH works of (ii) above 30 years (iii)50.00 506 nos. of High (iii) above 50 years School Buildings

Improveme 12 months Physical output can Repair and nt of living Can not be not be quantified as maintenance of condition of assessed Maintenance of these are operation 3 Residential 567330 officials being Government and maintenance Buildings working in repair Residential Buildings works. rural areas. work

Can not be Physical output can Upkeeping Repair and assessed not be quantified as the rural Maintenance of Maintenance of being these are operation 4 5344823 road Rural Roads and 12 months Rural Roads and repair and maintenance infrastructu Bridges. Bridges nature of works. re work Upkeeping 12 months Physical output can Repair & Periodical the rural not be quantified as Maintenance of RD 5. Maintenance 1000000 road 2289 Km. these are operation & PMGSY roads & (PMGSY) infrastructu and maintenance CD works re works. 12 months Physical output Upkeeping Can not be could not be Grant –in-Aid the rural assessed Maintenance of quantified as these 6 General (Non- 450000 road being PMGSY Roads. are operation and salary) infrastructu repair maintenance works. re work

TOTAL 9400787

Ooutcome Budget : DoRD for 2016-17 Page119

Rural Water Supply & Sanitation ( in TRS) Sl. Name of the Financial Broad Quantifiable/ Project Process Remarks/Risk No. Scheme/Progr Outlay/ objective of Deliverable Outcome es/Time Factors amme with Non-Salary the scheme Physical lines Budget Head (Deliverabl Outputs e outputs) 1 2 3 4 5 6 7 8 12 Physical Maintenance Repair, To Improve months output can not of Ext W/S & Maintenance the working Can not be be quantified S/I of Govt 1 of Non- 55000 condition of assessed being as these are Office Residential officials in repair work operation and Buildings in Buildings rural areas. maintenance Rural Areas works. 12 Physical Maintenance To Improve months output can not Repair and of Ext W/S & the working Can not be be quantified maintenance S/I of Govt 2 36000 condition of assessed being as these are of Residential residential officials in repair work operation and Buildings Buildings in rural areas. maintenance Rural Areas works. Repair and 12 Physical maintenance a months output can not nd POL for be quantified Maintenance Can not be running of as these are Machinery & 3 12408 of Machinery assessed being Machinery & for Equipment & Equipment repair work Equipment maintenance including and running of Vehicles and vehicles. Rigs Repair and Maintenance 12 Physical maintenance To keep thw of existing months output can not of Rural Water Rural Water Can not be 402590 Spot be quantified 4 Supply System 315420 Supply assessed being Sources, 9752 as these are including tube System in repair work rural piped operation and wells and order. water supply maintenance sanitary wells schemes works. Total 418828 418828

Ooutcome Budget : DoRD for 2016-17 Page120

ABSTRACT STATE PLAN in TRS) Sl No Name of the Scheme / Programme Financial Outlay Physical Outputs / Number (Provisional) of Beneficiaries 1 National Rural Drinking Water Programme 5172000 (NRDWP) Piped water supply, sopt sources, sustainability etc. 2 Rural Water Supply 3510000 3 Capacity Building 200000 4 Building Programme 100000 Rural infrastructure Development fund 1000000 (RIDF) Total 9982000

NON PLAN 1 Repair, Maintenance of Non- Residential 55000 Building 2 Repair and maintenance of Residential 36000 buildings 3 Machinery & Equipment 12408 4 Repair and maintenance of Rural Water Supply System including tube well and 315420 sanitary wells Total 418828

Ooutcome Budget : DoRD for 2016-17 Page121

CHAPTER-III Reform Measures and Policy Initiatives

R.D. Department has taken many e-initiatives to monitor and maintain transparency in the works being implemented by the Department. The provision of basic public services being provided through electronic mode is: (i) Department Website: The information relating to R.D. Department is being uploaded to the State Govt. website i.e. http://rd.odisha.gov.in/. The website of the department acts as an index of all activities relating to R.D. Department. Links have been provided to all other e-activities undertaken by this Department. The information on important schemes undertaken by this Department like Pradhan Mantri Gram Sadak Yojana (PMGSY), Mukhya Mantri Sadak Yojana (MMSY), Drinking Water Supply and Swachh Bharat Mission (Gramin) are being updated in the website. The letters dispatched through e-Dispatch by the Department are also being webhosted. (ii) Online RTI The applications being recived under Right to Information Act are being updated in the online RTI web portal, developed by I&PR Department, i.e. http://rtiodisha.in/Departments/28. (iii) e-Desptch: Starting from the R.D. Department at Secretariat, a webbased integrated platform (http://odisha.edespatch.in) for dispatching and receiving letters is in use up to Division level since 2009. All letters are being despatched through the e-Despatch system and placed in the Department Website for public view for transparency, quick transmission and easy access. (iv) Integrated Management Information System (IMIS): A web-based system (http://indiawater.gov.in/IMISReports/) for management & monitoring of drinking water supply system has come into force with effect from 1st April, 2009. It is made accessible to Officials as well as public for knowing every detail of drinking water sources available in their habitation, the cost of the project, year of installation etc. (v) Online Monitoring and Management of Accounts System (OMMAS): To make it transparent and proper monitoring of both physical and financial progress,of PMGSY work, C-DAC, Govt. of India have developed a web-based software for online monitoring and management namely OMMAS. The URL of OMMAS site is http://www.pmgsy.nic.in/. By accessing this site, the public can see the details of roads taken up under PMGSY, its executing agency, the cost of the roads, the length of roads and it's physical & financial progress. (vi) Swachh Bharat Mission (Gramin): The information on Swachh Bharat Mission (Gramin) is also being monitored online. The URL of the NBA website is http://sbm.gov.in/sbm/. The details of Individual Household Latrines, Anganwadi Toilets, Village Sanitary Complex constructed under TSC/NBA/SBM(G) are available in the website.

Ooutcome Budget : DoRD for 2016-17 Page122

(vii) Integrated Grievance Redressal System (IGRS): An IGRS named as Sanjog Helpline (http://www.sanjoghelpline.in) is an IT solution which informs about the grievance of a common man to the right authority in real time via SMS and email. A toll-free number i.e. 155335/18003456770 has been provided for the public to register their complaints. IGRS is activated and operated towards the goal for smooth redressal of public grievances on Rural Water Supply and Sanitation (RWSS) and Pradhan Mantri Gram Sadak Yojana (PMGSY). (viii) e-Procurement: It is carrying out traditional tendering process in an electronic form (through internet). It connects the procuring organization with the bidders through electronic exchange of tender. It is a management and reform program in the procurement field. e-Procurement and iOTMS/iFMSis done with a software application that includes features for supplier management and complex auctions. Here in the electronic tendering process both the Govt. and the contractors will be benefited. (ix) WAMIS: Works and Accounts Management Information System (WAMIS), a web-based application (http://www.wamis-odisha.gov.in), is being developed by C-DAC, Pune. It is a Division Automation System integrated with MIS features. WAMIS has 4 modules such as : 1) Accounting Management System (AMS) 2) Works Management System (WMS) 3) Budget Management System (BMS), 4) Billing Module, and 5) Integration with iFMS/iOTMS and AG Accounting Sysem. By using this application, Divisions are generating their Monthly Accounts and submitting these to AG online. Not only R.D. Deptt, but also all engineering departments of the State like Works, Water Resources and H&UD Departments are now using WAMIS.For better monitoring of physical progress of works, it provision has been made for uploading geo-tagged photographs of the works through mobile application. (x) Web GIS-based Asset Management System (WGAMS)- It has been decided in a high level meeting to Develop a Comprehensive State-wide Web GIS based Asset Management System (WGAMS) focusing on long term assets managed by R.D. Departments. This will have realtime integration with WAMIS for monitoring, management and planning of departmental works. (xii) OSWAS Odisha Secretariat Workflow Automation System, an e-fileing system has been implemented in Rural Development Department since January, 2012. Now all files are being processed through OSWAS, which not only eases the movement of files but also tracking of Daks and files has become much easier. OSWAS is also now integrated with e-Despatch, which facilitates in receiving and sending letters to the line offices electronically. This makes the Department a Less Paper Office. 

Ooutcome Budget : DoRD for 2016-17 Page123

CHAPTER-IV

Past performance of programmes and schemes The performance of DoRD at a glance is as follows :

Statement of Expenditure – 2015-16 and Budget Provision-2016-17

State Plan

( in TRS)

Budget Budget Provision Expenditure upto C.O. Provision 2015-16 March’2016 2016-17 EIC,RW 39341700 38057877 34346000 CERW-I 321625 317519 250000 RWSS 8417656 6692584 9982000 OSWSM 10270000 9524963 7404300 Total 58350981 54592943 51982300

Non-Plan

( in TRS) Budget Provision Budget Expenditure upto C.O. 2015-16 Provision March’2016 2016-17 EIC,RW 8616124 7019145 8048743 CERW-I 2701597 2632156 2705434 RWSS 1655052 964010 2125015 Sectt. Estt. 57745 50702 62123 Total 11535651 5749633 12941315

Ooutcome Budget : DoRD for 2016-17 Page124

2014-15 Rural Works

Sl.No. Scheme Total Expenditure Target for 2014-15 Achievement till Remarks Budget till Mar.’2015 provision March.’2015 Roads Bridges/ Roads Bridges/ 2014-15 (Nos./Km) Buildings (Nos./Km) Buildings (Nos.) (Nos.) State Plan

1 NABARD assisted RIDF 4260000 4269202 Roads-8 Bridges-46 Roads-6 Bridges- scheme for Constn of Nos Nos Nos 40 Nos roads & bridges

2 Completion of 704000 702212 100 14 86 nos 12 incomplete roads & bridges

3 Constituency wise 284000 276615 allotment

4 Road works (PMGSY) 18000001 11515001 Constn of 49 3842.69 40 4500 km of roads

5 Mukhya Mantri Sadaka 1100000 0 Yojana

6 Biju Setu Yojana 1870003 1869564 Bridges-149 Bridges- Nos 120 Nos

7 Impvt of Existing RD 596000 571899 42 53 nos roads

Ooutcome Budget : DoRD for 2016-17 Page125

8 Special programme for 967300 941326 90 100 nos KBK districts

9 One Time ACA 1043300 646482 40 41 nos

10 Bailey bridges 440000 438127 50 28

11 Constn of RD Deptt. 250000 232544 342 284 buildings

Non-Plan

12 Repair & Maint. of Non- 1502704 1486512 Operation & 3288 Res buildings Maintenance

13 Repair of 30 years old 340000 340000 -do- 1375 Govt school buildings

14 Repair of 50 years old 1000 9993 -do- 506 Govt school buildings

15 Repair & Maint. of 515062 498191 -do- 1223 Residential buildings

16 Maint. Of Roads including 6149465 6062398 -do- 5052 km. 13thFCA

17 Grant-in-Aid (OSRRA) 480000 480000 -do-

Ooutcome Budget : DoRD for 2016-17 Page126

2015-16 Rural Works

Sl.No. Scheme Total Expenditure Target for 2015-16 Achievement till Remarks Budget till March.’2016 (Reasons of shortfall in provision March.’2016 Roads Bridges/ Roads Bridges/ achieving the financial/ 2015-16 (Nos./Km) Buildings (Nos./Km) Buildings physical target) (Nos.) (Nos.) State Plan

1 NABARD assisted 5702900 5691572 Roads-13 Bridges- Roads-10 Bridges- Delay by the contractor RIDF scheme for Nos 15 Nos Nos 14 Nos Constn of roads & bridges

2 Completion of 1239600 1234250 60 Km 5 60 Km 5 Delay by the contractor incomplete roads & bridges

3 Constituency wise 284000 272399 Non receipt of work allotment proposals from Hon’ble MLAs in time

4 Road works (PMGSY) 22383300 22383300 3055 Km Nil 3055

5 Biju Setu Yojana 2300000 2300000 Bridges- Bridges- Delay by the contractor 115Nos 114 Nos

6 Mukhya Mantri 1950000 1929551 500 Km 136.14 Delay by the contractor Sadaka Yojana Km

7 Impvt of Existing RD 530400 473015 40 15 nos Non availability of roads materials

Ooutcome Budget : DoRD for 2016-17 Page127

8 Special programme 475874 472551 100 87 nos Delay by the contractor for KBK districts

9 Biju KBK Yojana 450000 423135 Delay by the contractor

10 Bailey bridges 1800000 1799698 92 41 Delay by the CPSUs

11 Constn of RD Deptt. 321625 317519 209 Res 84 Res Delay by the contractor buildings 118 NR 47 NR

Non-Plan

12 Repair & Maint. of 1653634 1635713 Operation 2998 Non-Res buildings & Maint.

13 Repair of 20 years 230000 227835 -do- 290 old Govt school buildings -do- 14 Repair of 30 years 150000 148550 1775 old Govt school buildings -do- 15 Repair of 50 years 5000 4997 old Govt school buildings -do- 16 Maint. Of Rural 5624823 5488894 4574 Roads -do- 17 Grant-in-Aid 530000 530000 (OSRRA)

Ooutcome Budget : DoRD for 2016-17 Page128

2014-15

RURAL WATER SUPPLY AND SANITATION STATE PLAN ( in TRS) Remarks Total (Reasons of Sl. Budget Flow to Flow to Expenditure upto Physical Achievement shortfall in Name of the Scheme / Programme Physical Target 2014-15 No. Provision SCSP TASP March 2015 upto March, 2015 achieving the 2014-15 financial/ physical target) 1 2 3 4 5 6 7 8 9 Due to Assembly Coverage Activity- 13500 Coverage Activity- 20521 election Model Water Quality - 2200 Water Quality - 1367 1 NRDWP 4407800 749326 1013794 4271964 Code of conduct P.W.S.Schemes-1300 P.W.S.Schemes-589 was in enforce for 6 Spot Sources- 32450 Nos Spot Sources- 29753 months Rural infrastructure development

2 fund(RIDF) 100000 17000 23000 12931 3 Capacity Building 70000 - - 68500

4 Works-PWS Scheme 600000 125000 115000 512463

5 Construction of Office Building 50000 8500 11500 26859

6 Construction Res. Building 60000 10200 13800 55963

7 MIS/ Computerisation 556 - - -

Total 5288356 910026 1177094 4948680

Ooutcome Budget : DoRD for 2016-17 Page129

NON PLAN Maintenance Ext W/S & S/I 8 Office Buildings - M/R 56587 of Govt Office Buildings in 48300 Rural Areas Repair and maintenance and POL for running of 9 M & E 133845 122711 Machinery & Equipment including Vehicles and Rigs Maintenance and upkeep of existing 316281 Spot 10 M/R of Rural Water Supply 578172 504488 Sources, 7693rural piped water supply schemes. Payment of Decretal dues 11 Decretal Dues 550 - to staff Maintenance Ext W/S 12 Residential Buildings - M/R 35510 & S/I of Govt Office 28995 Buildings in Rural Areas Direction & Administration including Salaries & Allowances of 13 506456 482119 Sanitary Technicians’ Training Staff 14 Others 1102 1066 Total 1312222 1187679

Ooutcome Budget : DoRD for 2016-17 Page130

2014-15 Rural Sanitation ( in TRS)

Sl. Name of the Total Budget Physical target 2014-15 Actual expenditure Physical achievement on each scheme/work No. Programme Provision for each under Normal, TASP and SCSP upto March,2015 2014-15 scheme/works upto March 2015 1 Swachha Bharat 7797670 IHL 700200 1949370 IHL School AWC Mission (Gramin)/ toilets NBA CSC 181 Normal 130925 AWC 1840 TASP 30112 SCSP 22257

CSC - Community Sanitary Complex

Ooutcome Budget : DoRD for 2016-17 Page131

2015-16

RURAL WATER SUPPLY AND SANITATION STATE PLAN ( in TRS)

Total Expenditure Physical Achievement Sl. Budget Flow to Flow to Name of the Scheme / Programme Physical Target 2015-16 upto March’ upto March, 2016 Remarks No. Provision SCSP TASP 2016 2015-16

1 2 3 4 5 6 7 8 9

Coverage Activity - 7851 Coverage Activity- 11810 Less achievement NRDWP- Piped water supply, spot Water Quality - 769 Water Quality - 525 due to reductions 1 3800000 797481 778944 3000000 sources & sustainability etc P.W.S.Schemes - 955 P.W.S.Schemes -378 of GoI Share under Spot Sources - 25000 Spot Sources- 20886 NRDWP.

Capacity Building, Resources and

2 infrastructure development 80000 - - 42767 Rural infrastructure development 3 fund (RIDF) 467110 44500 - 19377 4 Works PWS 3350000 569500 770500 2255869 5 Construction of Office Building 50000 8500 11500 24569 6 Construction Res. Building 70000 11900 16100 22418 Management information system and 7 computariasation 556 - - - Total 7817656 1431881 1577044 5365027

Ooutcome Budget : DoRD for 2016-17 Page132

NON PLAN Maintenance Ext W/S 8 Office Building - M/R 61193 & S/I of Govt Office 22602 Buildings in Rural Areas Repair and maintenance and POL for running of 9 M & E 160881 110599 Machinery & Equipment including Vehicles and Rigs Maintenance and upkeep of existing 10 M/R of Rural Water Supply 804147 296512 Spot Sources, 431762 7383 rural piped water supply schemes. Payment of Decretal dues 11 Decretal Dues 550 - to staff Maintenance Ext W/S 12 Residential Building - M/R 38118 & S/I of Govt Office 13489 Buildings in Rural Areas Direction & Administration including Salaries & Allowances of 13 588861 385139 Sanitary Technicians’ Training Staff 14 Others 1302 419 Total 1655052 964010

Ooutcome Budget : DoRD for 2016-17 Page133

2015-16 Rural Sanitation ( in TRS)

Sl. Name of the Total Physical target Actual expenditure for Physical achievement on each scheme/work No. Programme Budget 2015-16 each scheme/works up under Normal, TASP and SCSP upto March,2016 Provisin to March 2015 2015-16 1 Swachha Bharat 10270000 IHL 1200000 9524963 IHL Schoo AWC toilets Mission l (Gramin)/NBA CSC As per Normal 1254487 requireme TASP 288532 nt SCSP 213262

CSC- Community Sanitary Complex

Ooutcome Budget : DoRD for 2016-17 Page134

CHAPTER-V Financial Review In this chapter, actuals of the Financial Year 2014-15, Budget Estimate & Revised Estimate for the year 2015-16 and Budget Estimate for the year 2016-17 are detailed in tabular form for better assessment of financial outlay and review of schemes implemented through R.D. Department. TABLE-A State Plan RURAL WORKS ORGANISATION ( In TRS) Actual Head of B.E. R.E. B.E. Sl.No Name of the Scheme Expenditure Account 2015-16 2015-16 2016-17 2014-15 1 2 3 4 5 6 7 Construction of RD Deptt. 1 4059-2148 115703 50000 95000 120000 Buildings(Non Residential) Construction of RD Deptt. 2 4216-2148 Buildings 116841 150000 226625 130000 (Residential) Completion of Incomplete roads & bridges under different 3 5054-1230 702212 1200000 1200000 700000 tranches of RIDF and other schemes 4 5054-2161 RIDF (NABARD) 4269202 4500000 4720000 750000 5 5054-0906 CWA 276615 284000 284000 284000 6 5054-1077 Road works (PMGSY) 11515001 18000000 22383300 23000000 Completion of Incomplete roads & bridges under different 7 5054-1230 0 1000000 1000000 100000 tranches of RIDF and other schemes -PMGSY (State Share) 8 5054-1860 Biju KBK Yojana 0 0 450000 450000 9 5054-2373 Land Acquisition Charges 3931 5000 10500 0 10 5054-2373 Decreetal Dues 0 1000 1000 2000 11 5054-1230 Incentive to Contractors 5000 30000 30000 0 12 5054-1230 Impvt. of existing R.D Roads 571899 570000 570000 500000 13 5054-1230 Construction of Bailey Bridges 438127 2500000 2500000 700000 14 5054-1230 Biju Setu Yojana 1633523 0 0 0 15 5054-2161 Biju Setu Yojana 0 1500000 2300000 4000000 SCA for Special Programme for 16 5054-2526 941326 850000 850000 0 KBK dist. 17 5054-2006 One time ACA 646482 0 0 0 18 5054-2604 Capacity Building 58061 80000 80000 100000 19 5054-2161 Mukhya Mantri Sadak Yojana 0 2500000 2500000 3750000 Development of Rural Road 20 5054-1230 0 30000 30000 10000 Connectvity Total 21293923 33250000 39230425 34596000

Ooutcome Budget : DoRD for 2016-17 Page135

TABLE-B NON-PLAN RURAL WORKS ORGANISATION ( In TRS)

Actual Sl. Head of B.E. R.E. B.E. Name of the Scheme Expenditure No Account 2015-16 2015-16 2016-17 2014-15 1 2 3 4 5 6 7 1 2059 Salaries (Direction & Administration) 629480 971535 971646 920476

2 2059 Machinery and Equipment 54803 72970 74496 81041

3 3054 Maintenance Works 1222994 400000 400000 480000 4 3054 Maintenance of Critical Roads 337183 385000 385000 385000 Improvement / Widening & 5 3054 Completion of Roads, Bridges & 346942 385000 385000 385000 nallahs Maintenance of Roads constructed 6 3054 550469 610000 610000 610000 under plan schemes 7 3054 Special Repair of Roads & Bridges 180401 200000 200000 200000

8 3054 Periodical Maintenance 173756 1200000 1200000 1200000

9 3054 Maintenance of Roads & Bridges 1936868 2084823 2084823 2084823 Maintenance of Roads & Bridges 10 3054 897575 8200000 0 0 under 13th F.C Award Maintenance of Roads & Bridges 11 3054 410856 360000 0 0 under 13th F.C Award (PMGSY) 12 3054 Periodical Maintenance (PMGSY) 0 0 360000 1000000 13 3054 Grant to OSRRA 480000 530000 530000 450000

14 3054 Work Charged/Wages Salaries 186024 223778 233159 249403

15 2230 Labour & Employment 1672 2000 2000 3000 Maintenance of Non Residential 16 2059 1834940 2038634 2038634 2038634 Building Wages /Work Charged Salaries 17 2059 47197 69657 73150 76871 (Non Res Buildings) Maintenance of Residential 18 2216 496431 567330 567330 567330 Buildings 19 2216 Municipality Tax 23 200 200 200 Wages /Work Charged Salaries 20 2216 17209 20778 22283 22399 (Residential Buildings) Total 9804823 10941705 10137721 10754177

Ooutcome Budget : DoRD for 2016-17 Page136

TABLE – C STATE PLAN RURAL WATER SUPPLY & SANITATION ORGANISATION ( in TRS) 2014-15 B.E. R.E. B.E. Sl.No Name of the Scheme (Actuals) 2015-16 2015-16 2016-17 1 2 3 4 5 1 4059-2148-Office Buildings 26859 50000 50000 50000 4216 –2148- Residential 2 55963 70000 70000 50000 Buildings 2215 –0871- MIS and 3 - - 556 - Computerisation 4 2215- 2604-Capacity Building 68427 80000 80000 200000 5 2215-2477-NRDWP 4271964 4691062 3800000 5172000 6 4215-0007-Rural Water Supply 512260 1000000 3350000 3510000 7 4215-2161-RIDF 12931 1500000 1500000 1000000 Total 4948404 7391062 8850556 9982000

Outcome Budget :DoRD for 2016-17 Page 137

TABLE –D NON-PLAN RURAL WATER SUPPLY & SANITATION ORGANISATION ( in TRS) 2014-15 B.E. R.E. B.E. Sl. No Name of the Scheme (Actuals) 2015-16 2015-16 2016-17 1 2 3 6 1 2059- Office Buildings –M/R 48153 61193 61193 61795 2 2215 – Dir. & Admn. 481430 553843 587892 727641 2215 – Machinery and 3 123961 151970 160881 192143 Equipment 2215- Maintenance and 4 Repair of Rural Water 501675 654421 804147 1101869 Supply 5 Decretal Dues 108 550 550 1000 5 2215 - Suspense - 1 1 1 2215-Other Charges - 1 1 1 2215- Sanitary 6 565 969 969 723 Technicians’Training 2216 – Resdential Buildings- 7 28745 38118 38118 38242 M/R 2230-Labour & Employment 8 1066 1100 1300 1600 - Stipend

Total 1185703 1462166 1655052 2125015

Outcome Budget :DoRD for 2016-17 Page 138

TABLE – E STATE PLAN Odisha State Water and Sanitation Mission ( in TRS) 2014-15 B.E. R.E. B.E. Sl.No Name of the Scheme (Actuals) 2015-16 2015-16 2016-17 1 2 3 4 5 2215-2940-Swachh Bharat 1 877800 6667000 10270000 7404300 Mission(G)/NBA

Outcome Budget :DoRD for 2016-17 Page 139

TABLE – F NON-PLAN

Secretariat Establishment

( in TRS) Actual Sl. Head of B.E. R.E. B.E. Name of the Scheme Expenditure No Account 2015-16 2015-16 2016-17 2014-15 1 2 3 4 5 6 7 1 3451 Salaries 40156 54395 53491 59262

2 3451 Travel Expenses 352 215 468 230

3 3451 Leave Travel Concession 19 120 120 120

4 3451 Office Expenses 883 1045 1596 1127

5 3451 Salaries for Consolidated Pay Posts 1403 1769 1769 1050

6 3451 Upgradation of Computer facilities - 30 30 32

7 3451 Computer consumables 85 90 191 150

8 3451 Spare and Services - 50 50 122

9 3451 Legal Charges 2 30 30 30

Total 42900 57744 57745 62123

Outcome Budget :DoRD for 2016-17 Page 140

TABLE-G SURRENDERS/SAVINGS – 2014-15 RURAL WORKS ( in TRS)

Sl.No Scheme Original grant Total grant Surrender/ Savings(-) Non- Plan Controlling Officer-II 1 2059-Salaries (Direction & Administration) 788561 812522 186430 2 2059-M&E repair & carriage 10000 10000 989 3 2059-Work Charged/Wages Salaries 51683 54739 8495 4 2059-New Supply 500 500 500 5 3054-Maintenance Works 1200000 1200000 2741 6 3054-Maintenance of Critical Roads 350000 350000 9259 3054-Improvement / Widening & Completion of Roads, Bridges 7 350000 350000 4233 & nallahs 8 3054-Maintenance of Roads constructed under plan schemes 560000 560000 8733 9 3054-Special Repair to Roads & Bridges 180000 180000 433 10 3054-Periodical Maintenance 180000 180000 6141 11 3054-Maintenance of Roads & Bridges 1968021 1968021 8569 12 3054-13th F.C Award (Road) 1361444 1361444 46958 13 3054-Work Charged/Wages Salaries 192397 204819 19058 14 40008-Labour & Employment 1800 1800 132 Total 302671

Controlling Officer-IV 1 2059-Maintenance of Non Residential Building 1502704 1502704 16192

2 2059-50 yrs School Building 10000 10000 7

3 2059-Wages /Work Charged Salaries 60496 64148 16679

4 2216-Maintenance of Residential Buildings 515062 515062 16871

5 2216-Municipality Tax 150 150 127

6 2216-Wages /Work Charged Salaries 18152 19297 2096

Total 51972

Grand Total 354643

Outcome Budget :DoRD for 2016-17 Page 141

State Plan Controlling Officer-II 5054-Completion of Incomplete roads & bridges under different 1 700000 704000 5974 tranches of RIDF and other schemes 2 5054-RIDF (NABARD) 4100000 4260000 2505

3 5054-CWA 284000 284000 11098

4 5054-Tender Premium (PMGSY Works) 18000001 18000001 6485000

5 5054-Mukhya Mantri Sadak Yojana 1500000 1100000 1100000

6 5054-Capacity Building 80000 60000 1349

7 5054-Land Acquisition Charges 5000 5000 1149

8 5054-Decreetal Dues 5000 5000 4764

9 5054-Impvt. To existing R.D Roads 570000 596000 24369

10 5054-Biju Setu Yojana 1630000 1870003 3722

11 5054-One Time ACA 700000 1043300 394654

12 5054-SCA for KBK 850000 967300 25875

13 5054-Beily Bridges 440000 440000 44

Total 8060503

Controlling Officer-IV

1 4059-Construction of RD Deptt. Buildings 130000 130000 14419

2 4216-Construction of RD Deptt. Buildings 120000 120000 2168

Total 16587

Grand Total 29129001 29589604 8077090

Outcome Budget :DoRD for 2016-17 Page 142

TABLE-H

RURAL WATER SUPPLY & SANITATION Controlling Officer-III ( in TRS)

Sl Scheme Original grant Total grant Surrender/ No. Savings(-) STATE PLAN 1 28-2215-NRDWP 4407800 4407800 135836 2 28-2215-SP-Capacity Building 70000 70000 1500 3 28-2215-MIS-Computerisation 0 556 556 4 28-4215-RIDF 100000 100000 87068 5 28-4215-Works-PWS Scheme 500000 600000 87537 6 28-4059-Office Buildings 50000 50000 23139 7 28-4216- Res Buildings 60000 60000 4035 TOTAL 339671

NON PLAN 1 28-2059-M/R-Office Building 56587 56587 8285 2 28-2215--Direction & Administration 505543 505593 24103 3 28-2215-Machinery & Equipment 131795 133845 11128 4 28-2215-Maintenance & Repair 566546 578172 73675 5 28-2215-Decretal Dues 550 550 441 6 Other charges-charged 1 1 1 7 28-2215-Suspence 1 1 1 8 28-2216- M/R of Res. Buildings 35510 35510 6512 9 28-2215-Sanitary Technician 863 863 297 10 28-2230-Lab. & Employment 1000 1100 33 TOTAL 124476

GRAND TOTAL 464147

Outcome Budget :DoRD for 2016-17 Page 143

TABLE-I

Odisha State Water and Sanitation Mission ( in TRS)

Sl Scheme Original grant Total grant Surrender/ No. Savings(-) STATE PLAN 1 28-2215-NRDWP 1000000 7797670 6919870

Outcome Budget :DoRD for 2016-17 Page 144

TABLE-J Secretariat Establishment Controlling Officer-I ( in TRS)

Sl.No Unit Original grant Total grant Surrender/ Savings(-) Non- Plan Controlling Officer-I 1 3451-136-Pay 17000 15979 3107 2 3451-855-Arrear Pay 1 1 1 3 3451-147-D.P. 1 1 1 4 3451-156-D.A. 17850 17850 4315 5 3451- 403-H.R.A. 900 900 85 6 3451-523-O.A. 110 119 1 7 2451-06001-T.E. 215 356 4 8 3451-07001-L.T.C. 120 120 101 9 3451-154-T.C. 195 205 64 10 3451-505-M.V.-Scett. Estt. 520 520 108 11 3451-01004-Salaries for Consolidated Pay Posts 720 1582 28 12 3451-12003-Legal Charges 30 30 28 13 3451-78118-Upgradation of Computer facilities 30 25 25 Total 7868

Outcome Budget :DoRD for 2016-17 Page 145

CHAPTER-VI Gender and SC/ST Budgeting

As per the Plan ceiling communicated by P&C Department for the financial year 2016-17, 1149.40 crore under Transport Sector Schemes and 1708.63 crore under Social Services Sector Schemes have been provided. Out of this, 657.3469 crore towards TASP and 485.8651 crore towards SCPSC have been earmarked for implementation of following schemes in scheduled areas.

( in TRS) Sector Major Head/Minor Resourc Proposed Outlay/Plan Ceiling of Annual Plan 2016-17 Head of Development e Head District State Total TASP out SCSP out Sector Sector of total of total Social NRDWP(2215-2477- CSS 5172000 - 5172000 1189560 879240 Services 37285) Rural Water Supply Others 3510000 - 3510000 807300 596700 (4215-0007-37182) Rural Water Supply RIDF 1000000 - 1000000 230000 170000 (4215-2161-37182) Rural Sanitation CSS 7404300 - 7404300 1702989 1258731 Transport Rural Roads & Bridges RIDF 750000 - 750000 172500 127500 (5054-2161-37107) CWA (5054-0906-37107) Others 284000 - 284000 65320 48280 Non-Res Building (4059- Others 170000 - 170000 39100 28900 2148-37114) Res. Building (4216- Others 180000 - 180000 41400 30600 2148-37114) Completion of Others - 700000 700000 161000 119000 incomplete roads & bridges under different tranches of RIDF and other schemes (5054- 1230-37158) Improvement of existing - 500000 500000 115000 85000 RD roads (5054-1230- 37247) Biju Setu Yojana (5054- RIDF - 4000000 4000000 920000 680000 2161-37257) Biju KBK Yojana (5054- - 450000 450000 103500 76500 Others 1860-37107) Mukhya Mantri Sadak RIDF - 3750000 3750000 862500 637500 Yojana (5054-2161- 37286) Construction of Bailey Others 700000 - 700000 161000 119000 Bridges(5054-1230- 37281) Development of rural Others - 10000 10000 2300 1700 road connectivity(5054- 1230-37287)

Outcome Budget :DoRD for 2016-17 Page 146

Hon'ble CM inaugurates the new logo of Biju Setu Yojana and dedicates 100 BSY projects & 100 PWS on the auspicious occasion of observing 100 birth Anniversary of Late Biju Pattnaik.

Outcome Budget :DoRD for 2016-17 Page 147