<<

A (ULA) 411 the that permeates the whole solar MISSION rocket will deliver the system and influences the within it. to an interplanetary trajectory to the . Liftoff By researching the mechanism behind the will occur from Space Launch Complex-41 at acceleration of the , Solar Orbiter is Cape Canaveral Air Force Station, Florida. contributing essential science that could one day lead to a space-weather forecasting service MISSION Solar Orbiter addresses big questions in solar that will allow us better to protect our essential system science to help us understand how technology on and humans in space. our star creates and controls the , a giant bubble of charged particles blown by Solar Orbiter is an international cooperative OVERVIEW mission between the (ESA) and NASA. The spacecraft, developed by , carries a suite of ten scientific instruments built in Europe and the United States that are designed to provide close-up, high-latitude images of the sun. Solar Orbiter will reach its highly elliptic operational orbit nearly two years after launch by using assist maneuvers (GAMs) around Earth and . Subsequent GAMs around Venus will increase its inclination to the solar equator over time, reaching up to 33 degrees in 2029. The European Space Operations Center ATLAS V The Atlas V 411 rocket, a unique (ESOC) in Germany will operate Solar Orbiter configuration that includes just one after launch. solid rocket booster, provides the Spacecraft Image Courtesy of NASA/ATG MediaLab/NASA optimum performance to precisely deliver a range of mission types. In its nearly 15 years of service, Payload Fairing (PLF) ola the 411 rocket has completed five LAUNCH The spacecraft is encapsulated in the 4-m (14-ft) acca flights, including NASA’s OSIRIS- VEHICLE diameter large payload fairing (LPF). The LPF is REx mission. a bisector (two-piece shell) fairing consisting of aluminum skin/stringer construction with First Launch: Apr. 20, 2006 vertical split-line longerons. The vehicle’s height m aloa Launches to date: 5 with the LPF is approximately 57.6 m (189 ft). an Performance to GTO: 5,950 kg Centaur ayload Adapter (13,110 lb) The Centaur second stage is 3 m (10 ft) in diam- eter and 12.6 m (41.5 ft) in length. Its propellant Performance to LEO-Reference: tanks are pressure-stabilized and constructed of 12,030 kg (26,530 lb) corrosion-resistant stainless steel. Centaur is a cryogenic vehicle, fueled with liquid hydrogen nau and liquid oxygen, powered by an RL10A-4-2 engine producing 10,115 kg (22,300 lb) of thrust. The cryogenic tanks are insulated with a com- bination of helium-purged blankets, radiation nn shields and spray-on foam insulation (SOFI). The At tu Adapter Centaur forward adapter (CFA) provides struc- tural mountings for the fault-tolerant avionics nterstage system and structural and electrical interfaces Adapter MISSION With more than a century of with the spacecraft. combined heritage, ULA is the SUCCESS world’s experienced and reli- Booster able launch service provider. ULA The booster is 3.8 m (12.5 ft) in diameter and has successfully delivered more than 32.5 m (106.5 ft) in length. The booster’s tanks 135 missions to orbit that provide are structurally rigid and constructed of isog- Earth observation capabilities, en- rid aluminum barrels, spun-formed aluminum able global communications, unlock domes and intertank skirts. Booster propulsion is oo provided by the RD-180 engine system (a single the mysteries of our and support life-saving technology. engine with two thrust chambers). The RD-180 ol oc burns RP-1 (Rocket Propellant-1 or highly puri- oo fied kerosene) and liquid oxygen and delivers 390,180 kg (860,200 lb) of thrust at sea level. One solid rocket booster (SRB) generates the additional power required at liftoff, providing 158,077 kg (348,500 lb) of thrust. The Centaur avionics system, provides guidance, flight con- trol and vehicle sequencing functions during the nn booster and Centaur phases of flight. ulalaunch.com Copyright © 2020 United Launch Alliance, LLC. All Rights Reserved. CAPE DELTA IV M+ (5,2) CAPE DELTA IV M+ (5,4) CAPE DELTA IV HEAVY CAPE DELTA IV M+ (4,2)

1 Second 1 Second 1 Second Solid Rocket Stage Solid Rocket Stage Second Solid Rocket Stage Motors Motors 1 Stage Motors Booster Booster Booster Booster(s)

2 Fairing 1 Delta Operations Center 2 Fairing 1 Delta Operations Center 2 Fairing 1 Delta Operations Center Halves Mission Director’s Center & Halves Mission Director’s Center & Fairing Halves Mission Director’s Center & Second Stage Processing Second Stage Processing Halves Second Stage Processing 2 Receipt Inspection Shop 2 Receipt Inspection Shop 2 Receipt Inspection Shop Receiving, Inspection, Staging Receiving, Inspection, Staging 1 Delta Operations Center Receiving, Inspection, Staging Payload & Final Processing Payload & Final Processing Payload Payload & Final Processing Attach Mission Director’s Center & 3 Attach 3 Attach Second Stage Processing 3 Attach Fitting 3 Horizontal Integration Facility Fitting 3 Horizontal Integration Facility Fitting Fitting 3 Horizontal Integration Facility 5 Receiving, Inspection & Vehicle 5 Receiving, Inspection & Vehicle 2 2 Horizontal Integration Facility 5 Receiving, Inspection & Vehicle Integration Integration 4 Receiving, Inspection & Vehicle Integration Integration 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility 4 Spacecraft Processing, Testing 4 Spacecraft Processing, Testing 3 3 Spacecraft Processing Facility 4 Spacecraft Processing, Testing DELTA II & Encapsulation ATLAS V 401 & Encapsulation ATLAS V 411 Spacecraft Processing, Testing ATLAS V 421 & Encapsulation ATLAS V 431 Spacecraft Spacecraft PRODUCTION & Encapsulation FLIGHT Spacecraft 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower Launch Integration & Launch Launch Vehicle Integration & 4 Mobile Service Tower PROFILE Launch Launch Vehicle Integration & Table Testing, Spacecraft Mate & Table Testing, Spacecraft Mate & Launch Vehicle1 Sacramento, Integration CA & Table 1 Sacramento,Testing, CA Spacecraft Mate & 1 Sacramento, CA Integrated Operations Integrated Operations Spacecraft Integrated Operations Testing, Spacecraft Solid Rocket Mate Booster & Fabrica- Solid Rocket Booster Fabrica- Solid Rocket Booster Fabrica- Payload Payload Payload Payload Integrated Operationstion at Aerojet Rocketdyne tion at Aerojet Rocketdyne tion at Aerojet Rocketdyne Transporter Transporter Transporter Transporter 1 Denver, CO 2 Denver, CO 2 Denver, CO 2 Denver, CO ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design 1 Sacramento, CA Center Engineering Center Engineering Center Engineering Center Engineering RS 27A and AJ10 118K Engine 2 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX Fabrication at Aerojet Rocketdyne Payload Fairing, Payload Payload Fairing, Payload Payload Fairing, Payload Payload Fairing, Payload 1 2 2 Magna, UT Fairing Adapter, Booster 1 Fairing Adapter, Booster 1 Fairing Adapter, Booster 1 Fairing Adapter, Booster 3 Graphite Epoxy Motor Fabrication 1 2 2 2 Adapter & Centaur Adapter & Centaur Adapter & Centaur Adapter & Centaur at Northrop Grumman Adapter Fabrication Adapter Fabrication Time Adapter Fabrication Adapter Fabrication 3 Denver, CO 3 Decatur, AL 4 Decatur, AL Event (hr:min:sec) 4 Decatur, AL 4 Decatur, AL 4 ULA Headquarters & 3 Booster Fabrication & Final 4 Booster Fabrication & Final 1 RD-180 Engine Ignition -00:00:024 .7 Booster Fabrication & Final 4 Booster Fabrication & Final 5 Design Center Engineering Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank 4 Iuka, MS Liftoff (Thrust to Weight > 1) 00:00:00.0 Fabrication & Centaur Fabrication & Centaur Fabrication & Centaur Fabrication & Centaur Payload Fairing Fabrication at Mach 1 00:00:57.6 Final Assembly Final Assembly Final Assembly Final Assembly Northrop Grumman 4 4 West Palm Beach, FL 5 5 West Palm Beach, FL Maximum Dynamic Pressure 00:01:09.2 5 5 West Palm Beach, FL 5 5 West Palm Beach, FL 5 Decatur, AL 6 5 RL10C 1 Engine Fabrication RL10A 4 2 Engine Fabrication 6 2 SRB Jettison 00:02:19.8 RL10C 1 Engine Fabrication 6 RL10C 1 Engine Fabrication Booster, Payload Fairing & 2 3 3 3 at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne Second Stage Fabrication 3 Atlas Booster Engine Cutoff 00:04:03.4 5 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia 4 Atlas Centaur Separation 00:04:09.4 RD 180 Engine Fabrication at RD 180 Engine Fabrication at 5 RD 180 Engine Fabrication at RD 180 Engine Fabrication at NPO Energomash NPO Energomash 5 Centaur First Main Engine Start (MES-1) 00:04:19.4 6 NPO Energomash NPO Energomash SPACE 6 Payload Fairing Jettison 00:04:27.4 7 DELTA II VAFB, CA CAPE ATLAS V 401 CAPELAUNCH ATLAS V 411 CAPE7 Centaur ATLAS First Main Engine V 421 Cutoff (MECO-1) 00:12:14.1 CAPE ATLAS V 431 CAPE ATLAS V Starliner COMPLEX-41 8 Centaur Second Main Engine Start (MES-2) 00:42:57.9 ATLAS V 501 ATLAS V 511 ATLAS V 521 ATLAS V 9531Centaur Second Main Engine Cutoff (MECO-2) 00:49:50.8 ATLAS V 541 PROCESSING 1 10-ft Payload 10 Solar OrbiterSolid Separation Rocket 00:52:39.9 Solid Rocket 1 Fairing Interstage Solid Rocket 1 Boosters 1 Solid Rocket 1 Start Blowdown 01:18:59.9 10 Boosters Adapter 1 Sacramento, CA Booster 1 Sacramento, CA 11 Booster 1 Sacramento, CA 1 Sacramento, CA Boosters Second Booster Booster Booster Booster Boattail Solid Rocket Booster Fabrication Boattail Solid Rocket Booster Fabrication 12 End of Mission 01:53:59.8 BoattailPark Orbit Solid Rocket Booster9 Fabrication Solid Rocket Booster Fabrication Stage 1 Denver, CO Boattail Boattail Graphite Epoxy ISA at Aerojet Rocketdyne ISA at Aerojet Rocketdyne TransferISA Orbitat Aerojet Rocketdyne8 at Aerojet Rocketdyne ULA Headquarters & Design ISA ISA Motors 2 Denver, CO 2 Denver, CO 2 Denver, CO 2 Denver, CO Centaur Center Engineering Booster ULA Headquarters & Design ULA Headquarters & Design Solar Orbiter Orbit at Separation ULA Headquarters & Design ULA Headquarters & Design 2 Harlingen, TX C3: 31.05 km2/s2 | Right Ascension: 56.22 deg Aeroskirt 1 Centaur Center Engineering Centaur Center Engineering CenterCentaur Engineering Center Engineering Payload Adapter, Booster Declination: 28.54 deg Centaur 2 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX Adapter & Centaur 2 2 2 2 2 Payload Adapter, Booster Payload Adapter, Booster Payload Adapter, Booster Payload Adapter, Booster1 Atlas Adapter Fabrication Longitude deg Adapter & Centaur Adapter & Centaur Adapter & Centaur Adapter & Centaur Operations Center (ASOC) 3 Decatur, AL 1 Atlas Spaceflight Launch Control Center & Adapter Fabrication Adapter Fabrication 80 Adapter Fabrication Adapter Fabrication Booster Fabrication & Final Operations Center (ASOC) Mission Director’s Center Payload 4 Decatur, AL Payload 4 Decatur, Launch Control AL Center & Mission Payload 4 Decatur, AL 4Payload Decatur, AL 1 Assembly, Centaur Tank 1 2 Adapter 1 2 1 2 1 2 Adapter Booster Fabrication & Final Adapter BoosterDirector’s Fabrication Center & Final Adapter Booster Fabrication & Final Booster Fabrication & Final2 Delta Operations Center Starliner Fabrication & Final Assembly Spacecraft 60 Spacecraft Payload 1 Atlas Spaceflight Assembly, Centaur Tank Spacecraft Assembly, Centaur Tank Spacecraft Assembly, Centaur1 Atlas Tank Spaceflight Assembly, Centaur Tank ISA, Centaur, Boattail & 1 Building 1670 4 West Palm Beach, FL 2 Delta Operations Center Payload Vertical Integration Receiving, Inspection, Staging, Fairing Operations Center Fabrication (ASOC) & Final Assembly Fabrication & Final Assembly FabricationFairing & FinalOperations Assembly Center (ASOC) Fabrication & Final Assembly RL10C 1 Engine Fabrication at Halves ISA, Centaur, Boattail & Vertical 40 3Final Processing & Material Stores 4 Launch Control5 WestCenter Palm & Beach, FL 4 5 WestIntegration Palm Beach, FL 4 5 WestHalves Palm Beach, Launch FL Control Center & 4 5 West Palm Beach, FL Aerojet Rocketdyne Mission Director’s Center Mission Director’s Center 3 Spacecraft Processing Facility Payload RL10C 1 Engine Fabrication at RL10C 1 Engine Fabrication at 5 RL10C 1 Engine Fabrication at RL10C 1 Engine Fabrication Spacecraft at Processing, Testing 3 2 Building 836 12 1 Atlas Spaceflight Adapter 5 Khimki, Russia 3 Spacecraft Processing Facility 20 & Encapsulation 5 Fitting Receiving, Inspection & Booster 6 2 Delta Operations Aerojet Center Rocketdyne 6 Payload Aerojet Rocketdyne 6 7 Aerojet Rocketdyne2 Delta Operations Center 6 Aerojet RocketdynePayload Operations Center (ASOC) RD 180 Engine Fabrication at Spacecraft Processing, Testing & Fairing Transfer ISA, Centaur, 6Boattail Khimki, & VerticalRussia Fairing 6 Khimki,Encapsulation Russia 6 Khimki, Russia ISA, Centaur, Boattail & Vertical 6 Khimki, Russia Launch Control Center & 5 NPO Energomash Integration Integration Halves 4 Vertical Integration Facility 4 5 RD 180 Engine Fabrication at 5 Halves RD 180 Engine Fabrication at TDRS 041 5 RD 180 Engine Fabrication at 5 RD 180 Engine Fabrication at Mission Director’s Center 6 Zurich, Switzerland 0 TDRS 275 Launch Vehicle Integration & 6 2 3 Hazardous Processing 7 3 NPO Energomash 7 3 4 NPO Vertical Energomash Integration Facility 7 3 NPO Energomash 7 3 NPO Energomash Testing, Spacecraft Mate & Receiving, Inspection, Destruct 5-m Payload Fairing 3 Spacecraft Processing Facility Launch Vehicle Integration & 3 Spacecraft Processing Facility 2 Delta Operations Center 4 Spacecraft Processing,7 Zurich, SwitzerlandTesting 7 Zurich, Switzerland 7 Zurich, Switzerland Spacecraft Processing, Testing 7 Zurich, Switzerland Integrated Operations Installation & Second Stage Nozzle Fabrication at RUAG Space Testing, Spacecraft Mate & -20 ISA, Centaur, Boattail & Spacecraft & Encapsulation Mobile 10 & Encapsulation Mobile Mobile Installation Mobile 3 5-m Payload Fairing 3 5-mIntegrated Payload Operations Fairing 3 5-m9 Payload Fairing 5-m3 Payload Fairing Aeroskirt Vertical Integration Launch Geodetic Latitude deg Launch Launch Launch Crew Fabrication at RUAG Space Fabrication at RUAG Space Fabrication at RUAG Space Fabrication at RUAG Space Crew 4 Vertical Integration Facility Mobile Platform Crew 8 4 Vertical Integration Facility Platform Crew Platform 4 Spacecraft Processing Platform Access -40 Access Access 3 Vertical Integration Facility Spacecraft Processing, Testing & 4 Launch Vehicle Integration & 4 Launch 4 Launch Vehicle Integration & 4 Access 3 Tower Tower Tower Tower Launch Vehicle Integration & Encapsulation Testing, Spacecraft Mate & Platform Testing, Spacecraft Mate & Testing, Starliner Mate & Integrated Operations -60 Integrated Operations Integrated Operations Fixed Umbilical 5 Mobile Service Tower Tower (FUT) Crew Launch Vehicle /Spacecraft Groundtrack Launch Vehicle Integration & TDRS Asset Geostationary Orbital Position Access -80 ATLAS V STARLINER Testing, Spacecraft Mate & DELTA IV HEAVY DELTA IV 5,2 Tower DELTA IV 5,4 ATLAS V 551 Integrated Operations -135 -90 -45 0 45 90 135 All Values Approximate 1 Sacramento, CA 1 Sacramento, CA Solid Rocket Booster Fabrication Solid Rocket Booster Fabrica- at Aerojet Rocketdyne tion at Aerojet Rocketdyne 2 Denver, CO 2 Denver, CO ULA Headquarters & Design ULA Headquarters & Design Center Engineering Center Engineering 3 Harlingen, TX CAPE ATLAS V 501 3 Harlingen, TX CAPE ATLAS V 511 1 Canoga Park, CA CAPE ATLAS V 521 1 Canoga Park, CA CAPE ATLAS V 531 1 Canoga Park, CA CAPE ATLAS V 541 Payload Adapter, Booster CAPE ATLAS V 551 Booster Adapter & Centaur RS 68A Engine Fabrication at RS 68A Engine Fabrication at RS 68A Engine Fabrication at Adapter & Centaur Adapter 1 2 Adapter Fabrication Aerojet Rocketdyne 2 Aerojet Rocketdyne 2 Aerojet Rocketdyne Fabrication 4 Decatur, AL 2 2 Denver, CO 3 2 Brigham City, UT 3 2 Brigham City, UT 1 2 4 Decatur, AL Booster Fabrication & Final ULA Headquarters & Design Solid Rocket Motor Fabrication at Solid Rocket Motor Fabrication at Booster Fabrication & Final Assembly, Centaur Tank 1 Center Engineering 1 1 Northrop Grumman 1 1 Northrop Grumman 1 Assembly, Centaur Tank 1 1 1 3 Decatur, AL Booster 3 Denver, CO Booster 3 Denver, CO Booster Booster Booster 4 Fabrication & Centaur Final Booster Fabrication & Final Assembly Assembly, Aeroskirt 3 Booster, Payload Fairing and Solid Rocket 4 Boattail ULA Headquarters & Design Solid Rocket 4 Boattail ULA Headquarters & Design Solid Rocket 4 Boattail Solid Rocket Boattail Boattail Solid Rocket Boattail Boosters Boosters Boosters 5 West Palm Beach, FL Boosters Fabrication Boosters Second Stage Fabrication CISA Center Engineering CISACenter Engineering RL10C 1 EngineCISA Fabrication at CISA CISA CISA 5 West Palm Beach, FL 4 West Palm Beach, FL CFLR 4 Decatur, AL 4 Decatur,CFLR AL 6 Aerojet RocketdyneCFLR CFLR CFLR 5 RL10A 4 2 Engine Fabrication CFLR RL10 Engine Fabrication at Aerojet ULA Booster, Payload Fairing and ULA Booster, Payload Fairing and 6 Khimki, Russia at Aerojet Rocketdyne 4 Rocketdyne 5 Second Stage Fabrication 5 Second Stage Fabrication 5 RD 180 Engine Fabrication at 6 3 Centaur Centaur Centaur Centaur 6 Khimki, Russia 5 West Palm Beach, FL 5 West Palm Beach, FL NPO Energomash Centaur Centaur 2 2 7 3 2 2 2 RD 180 Engine Fabrication at 2 RL10 Engine Fabrication at Aerojet RL10 Engine Fabrication at Aerojet 7 Zurich, Switzerland 1 Atlas Spaceflight NPO Energomash Rocketdyne Rocketdyne 5-m Payload Fairing 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Fabrication at RUAG Space Operations Center (ASOC) Launch Control Center, Mission Director's Center, Mission Support Launch Control Center & Mission Launch Control Center & Payload Launch Control Center & Mission Payload Launch Control Center & Launch Control Center & Payload Payload Director’s Center Mission Director’s Center Director’s Center Mission Director’s Center Payload Mission Director’s Center Teams, Launch Vehicle Horizontal Payload Adapter Adapter Adapter Adapter Adapter Adapter Processing & Ordnance Installation Spacecraft Spacecraft Spacecraft Spacecraft Spacecraft 2 Delta Operations Center Spacecraft 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical 2 Delta Operations Center Integration Integration Integration Integration current as of 1.31.18 Integration Interstage Adapter, Centaur, Boattail, Base Module Vertical 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility DELTA IV 4,2 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility Integration Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Transporter Transporter Transporter Transporter Transporter 3 Spacecraft Processing Facility & Encapsulation Transporter & Encapsulation Payload & Encapsulation Payload & Encapsulation Payload & Encapsulation Payload Payload Payload Fairing Halves Fairing Halves Spacecraft Processing, Testing Fairing Halves Fairing Halves Fairing Halves 4 Vertical Integration Facility Fairing Halves 4 Vertical Integration Facility 4 Vertical Integration Facility 4 Vertical Integration Facility 4 Vertical Integration Facility & Encapsulation Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & 4 Vertical Integration Facility Launch Vehicle Integration & Mobile 3 Integrated Operations Integrated Operations Mobile Integrated Operations Mobile Integrated Operations Integrated Operations Launch Mobile 3 3 3 Mobile 3 Mobile 3 Testing, Spacecraft Mate & Crew Launch Launch Launch Launch Launch Platform Crew Platform Crew Crew Crew Crew Integrated Operations 4 Access Platform Access Platform Platform Platform Access Tower 4 Access 4 Access Access 4 Tower Tower Tower 4 Tower 4 Tower 1 Canoga Park, CA RS 68A Engine Fabrication at 2 Aerojet Rocketdyne 3 2 Brigham City, UT Solid Rocket Motor Fabrication at 1 Northrop Grumman 3 Denver, CO 4 ULA Headquarters & Design Center Engineering 4 Decatur, AL ULA Booster, Payload Fairing and 5 Second Stage Fabrication 5 West Palm Beach, FL RL10 Engine Fabrication at Aerojet VAFB ATLAS V 401 VAFB ATLAS V 411 VAFB ATLAS V 421 VAFB ATLAS V 431 Rocketdyne VAFB DIV_5Œ2 VAFB DIV_5Œ4 VAFB DELTA IV HEAVY

Graphite/Epoxy Graphite/Epoxy Motors (GEM) Motors (GEM) 1 1 1 1 1 1 Remote Launch Control Center 1 Remote Launch Control Center Second (RLCC) 2 Launch Control Center & Mission Second (RLCC) Second Centaur Centaur Centaur Centaur Stage Booster 2 Booster Stage Director’s Center Stage Launch Control Center & Mission 1 Boosters Fairing Director’s Center 2 Building 945 Fairing 1 Boattail Solid Rocket Boattail Solid Rocket Boattail Solid Rocket Boattail Halves Payload Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Receiving, Inspection, Staging Halves 2 Building 945 Boosters ISA Boosters ISA Boosters Mobile 3 Mobile 3 Receiving, Inspection, Staging Attach ISA (RLCC) (RLCC) (RLCC) ISA (RLCC) & Final Processing Mobile Fitting Assembly Assembly & Final Processing Assembly 1 Remote Launch Control Center Launch Control Center & Launch Control Center & Mission Launch Control Center & Launch Control Center & Mission Payload 2 Mission Director’s Center Director’s Center Mission Director’s Center Director’s Center Shelter 3 Horizontal Integration Facility Shelter Payload Shelter (RLCC) 5 Adapter 5 Attach 3 Horizontal Integration Facility Launch Control Center & Mission 2 Centaur 2 Centaur 2 Centaur 2 Centaur Fittings Receiving, Inspection & Second 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center Stage Integration Fitting Receiving, Inspection & Second Director’s Center Receiving & Inspection Receiving & Inspection Receiving & Inspection Receiving & Inspection Stage Integration 4 4 Spacecraft Processing Facility 2 Horizontal Integration Facility 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 Spacecraft Processing, Testing & 4 Spacecraft Processing Facility Receiving, Inspection & Second 5 5 5 5 Encapsulation Spacecraft Processing, Testing & Stage Integration Spacecraft PLF/Adapter Receiving & Spacecraft PLF/Adapter Receiving Spacecraft PLF/Adapter Receiving & Spacecraft PLF/Adapter Receiving & Inspection & Inspection Inspection Inspection 4 4 Encapsulation 5 Mobile Service Tower 3 Spacecraft Processing Facility 5 Mobile Service Tower 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility Launch Vehicle Integration & Testing, 3 Spacecraft Processing, Testing & Spacecraft Processing, Testing Spacecraft Processing, Testing Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Mate & Integrated Launch Vehicle Integration & Encapsulation Fairing Fairing Fairing Testing, Spacecraft Mate & Halves & Encapsulation Fairing & Encapsulation & Encapsulation Encapsulation Operations Payload Payload Halves Payload Halves Payload Halves Integrated Operations Spacecraft 4 Mobile Service Tower Spacecraft Fixed Spacecraft Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Fixed Payload Launch Payload Launch Vehicle Integration & Testing, 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & Launch Transporter Platform Transporter Fixed Spacecraft Mate & Integrated Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Platform Launch Payload Operations Integrated Operations Integrated Operations Integrated Operations Integrated Operations Platform Transporter Fixed Fixed Fixed Fixed Launch Launch Launch Platform Launch Platform Platform Platform

VAFB ATLAS V 501 VAFB ATLAS V 511 VAFB ATLAS V 521 VAFB ATLAS V 531 VAFB ATLAS V 541 VAFB ATLAS V 551

1 1 1 1 1 Centaur Centaur Centaur Centaur Centaur Centaur

Booster Booster Booster Booster Booster Booster CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center 1 Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Launch Control Center & Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Mission Mission Director’s Center Boosters Director’s Center Boosters Director’s Center Boosters Mission Director’s Center Boosters Director’s Center Boosters Director’s Center Centaur Centaur Centaur Centaur Centaur Centaur 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection

3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & 5 Inspection 5 Inspection 5 Inspection 5 Inspection 5 Inspection 5 Inspection Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & & Encapsulation Encapsulation Encapsulation Encapsulation Encapsulation Encapsulation 4 4 4 4 4 4 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations

Fixed Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fairing Halves, Fairing Halves, Fixed Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Launch Base Modules, CFLR Launch Base Modules, CFLR Launch Launch Launch Launch Platform Platform Platform Platform Platform Platform