Draft Statement of Accounts 2019/20 Subject to Audit

Total Page:16

File Type:pdf, Size:1020Kb

Draft Statement of Accounts 2019/20 Subject to Audit Draft Statement of Accounts 2019/20 Subject to Audit Contents: Page Narrative Report 1-17 Statement of Responsibilities 18 Main Accounting Statements 19 • Comprehensive Income and Expenditure Statement 20-21 • Movement in Reserves Statement • Balance Sheet 22 • Cash Flow Statement 23 Index of Notes to the Main Accounting Statements 24 Notes to the Main Accounting Statements 25-81 Supplementary Statements • Housing Revenue Account and Notes 82-88 • Collection Fund and Notes 89-92 Independent Auditor’s Report to Members 93 Cost Centres by Division 94 Glossary 95-101 Narrative Report 1. Introduction The Statement of Accounts summarises the authority’s transactions for the 2019/20 financial year and its position at the year-end of 31 March 2020. Figures for the previous year are included to assist in the interpretation of the accounting statements. The purpose of the Statement of Accounts is to give readers clear information about the authority’s finances. It shows the cost of the authority’s services in the year, where the money came from to pay for its services and what the assets and liabilities were at the year-end. The Narrative Report aims to provide a concise and understandable guide for readers of the accounts of the most significant aspects of the authority’s financial performance, year-end position and economy, efficiency and effectiveness in its use of resources over the year. Throughout the Narrative Report the authority outlines the value created to the community. The value added is considered to be the services delivered and the achievement and outcomes of the corporate priorities. The financial statements are prepared and presented based on material grounds taking into account the specific materiality for the authority as used by our Appointed Auditors. The authority uses rounding to the nearest thousand pounds in the financial statements; some notes and narrative are presented in millions of pounds as an aid to readability. 2. About the Authority Barrow-in-Furness Borough Council (Barrow Borough Council) is a North West non-metropolitan local government district situated in south Cumbria at the tip of the Furness peninsula, close to the Lake District; it is bordered by Morecambe Bay, the Duddon Estuary and the Irish Sea. It is the smallest geographic district in the County at just under 78 km2 but is the most densely populated with 886 people per km2 at the 2011 Census. Walney Island lies to the West of Barrow, and is separated from Barrow by the narrow Jubilee Bridge. Walney Island has two nature reserves, the 130 hectare South Walney Nature Reserve and 650 hectare North Walney Nature Reserve. Both nature reserves have national designations, as do the Duddon Estuary and Sandscale Haws to the north of the Borough. The Borough also includes 270 listed buildings, including 8 Grade I buildings of exceptional interest, including the medieval Furness Abbey and Piel Castle. Barrow is the most deprived district in the County and the 29th most deprived local authority district in England; this is based on income, employment, health, education, housing, crime and living environment. The dwellings in the Borough are primarily in council tax band A at 59%, with 30% in bands B and C, and 11% in bands D to F. Urban regeneration has been a major project in Barrow since the 1980s with developments on various former industrial sites in the centre of Barrow, including the dry dock, the Barrow Jute Works and Barrow Steel Works. Barrow’s most popular free-entry tourist attraction is the Dock Museum, built upon and around an old graving dock. Manufacturing is the largest employment sector, with BAE Systems being the single largest employer. The Borough and surrounding Furness area is on the verge of a sustained period of economic growth from BAE Systems’ submarine programme, GlaxoSmithKline’s biopharmaceutical plant, Orsted (formerly DONG Energy) offshore wind farm, Sellafield and other investments. Barrow Borough Council Draft Statement of Accounts 2019/20 Page 1 Narrative Report The Full Council comprises 36 elected Councillors and is responsible for taking all decisions, but to make this manageable it gives four committees covering planning, licensing, audit and governance, and finance and policy (executive) responsibility to carry out most of its functions. By law the authority is responsible for delivering housing services, revenues and benefits, planning and building control, environmental health and licensing services, refuse collection, street cleansing and waste collection services to the public. In addition the authority chooses to deliver leisure, economic development and regeneration services. All services are supported by finance, IT, HR, corporate, legal and other central support functions. The current management structure of the authority comprises the Chief Executive, 2 Directors, Head of Legal and Governance and 2 Assistant Directors who are responsible for delivery of local services; these officers are collectively the authority’s Management Team: 3. Corporate Aims and Achievements The authority delivers services to people who live in, work in and visit the Borough. The authority has an overarching Council Plan which sets the focus for the priorities and direction for the use of the available resources. The authority’s Local Code of Corporate Governance sets out the framework within which the authority conducts its business and affairs, and is based on the principles of good governance. The authority produces an Annual Governance Statement with the Statement of Accounts which reports on the extent of the authority’s compliance with its principles and practices of good governance, including the arrangements for monitoring effectiveness. In order to effectively implement corporate priorities and meet legal obligations, the authority must maintain a financially stable position, be able to demonstrate value for money, good governance, transparency and must establish values and behaviours. The authority has identified the following cross-cutting objectives that are being implemented: Barrow Borough Council Draft Statement of Accounts 2019/20 Page 2 Narrative Report • financial resilience and financial stability; • strong procurement and effective contract management; • organisational development; • customer focus; and • consistent and professional project management. Our values are set out below and our behaviours have been identified in terms of what our colleagues would see, hear and feel when those values were being displayed: • community focus – provide excellent service for all customers and colleagues; • honesty and integrity – do the right thing; we are open and confident to challenge and be challenged; • our team – all work together to achieve our shared vision and goals; • aim high – encourage creativity and embrace change; and • proud – celebrate who we are and our achievements. The authority’s vision is for our Borough to be a great place to live, work and visit. The priorities that will deliver tangible long term benefits to the community are focussed on the following themes; the Council Plan for 2020/24 can be viewed in full on the Council’s website at https://www.barrowbc.gov.uk/the-council/corporate-documents/: Priority 1: People Enabling residents to live happy, healthy productive lives. Putting people at the centre of all that we do is a key priority for the Council. We will do this by helping them to have the best start in life, enjoy healthy and active lifestyles, and have opportunities to improve their well-being by building strong communities. We will actively encourage people to work with us to design activities that meet their needs. We will work with our communities so that people can enjoy good health and live in a safe environment where they can be happy and reach their full potential. Priority 2: Place Creating a vibrant, safe & welcoming place where people want to live. Our Borough is a great place to live, work and have fun. There is an abundance of natural beauty and heritage but there is also an opportunity to offer people more. We want a varied housing offer to retain our residents and attract new people to settle here. We want to build on existing strengths and encourage more people to visit the town centres in Barrow and Dalton by making them more vibrant so that residents and visitors enjoy a positive and memorable experience. We want to protect our natural environment. Priority 3: Prosperity Supporting our economy to thrive and benefit all our residents. Barrow’s manufacturing heritage and its pivotal role in the defence industry is a source of local pride and tradition. Our world-class manufacturing expertise is recognised worldwide, however to enable inclusive growth we will seek to diversify our economy to secure opportunities for our residents by supporting other key industries including the growing renewable energy sector. In particular, we have the opportunity to secure continued investment in the Borough and ensure our residents have the skills and services to allow them to benefit from the growing economy. We will deliver our ambitions through effective joint working with public and private sector partners, by offering a clear policy framework, proactive steps to promote the role and opportunities within the Borough and by securing additional public and private investment. Barrow Borough Council Draft Statement of Accounts 2019/20 Page 3 Narrative Report Council Plan 2020/24 progress includes: • stronger links established with the community, third sector, health and police
Recommended publications
  • View Local Plan
    Barrow Borough Local Plan Publication Draft Barrow-in-Furness Borough Council July 2016 Contents 1. Local Plan Vision ......................................................................................................... 6 1.1 Objectives .............................................................................................................. 7 2. Introduction .................................................................................................................. 8 2.1. The Local Plan ........................................................................................................ 8 2.2. Producing the Local Plan ........................................................................................ 9 2.3. The Duty to Co-operate ........................................................................................ 13 2.4. Spatial Portrait: About Barrow-in-Furness ............................................................. 15 3. Development Strategy ............................................................................................... 30 3.1. Sustainable Development ..................................................................................... 32 3.2. The Development Strategy ................................................................................... 35 3.3. Regeneration ........................................................................................................ 37 3.4. Design .................................................................................................................
    [Show full text]
  • 11C14 Walney Island
    Cumbria Coastal Strategy Technical Appraisal Report for Policy Area 11c14 Walney Island (Technical report by Jacobs) © Copyright 2020 Halcrow Group Limited, a CH2M Company. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND Policy area: 11c14 Walney Island Figure 1 Sub Cell 11c Arnside to Hodbarrow Point Location Plan of policy units. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 1 CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND Figure 2 Location of Policy Area 11c14: Walney Island. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 2 CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND 1 Introduction 1.1 Location and site description Policy units: 11c14.1 South End Hawes to Biggar (east side) 11c14.2 Biggar to Lenny Hill (east side) 11c14.3 South End Hawes to Hare Hill (open coast) 11c14.4 Hare Hill to Hillock Whins 11c14.5 Hillock Whins to Nanny Point Scar 11c14.6 Nanny Point Scar to Mill Scar 11c14.7 Mill Scar to north of West Shore Park 11c14.8 North Walney – from north of West Shore Park to Lenny Hill (both coasts) Responsibilities: Barrow Council Cumbria Country Council Private landowners Location: The policy area covers the entire frontage of Walney Island, both open coast (west coast) and channel (east coast) shorelines.
    [Show full text]
  • Walney Island
    Cumbria Coastal Strategy Technical Appraisal Report for Policy Area 11c14 Walney Island (Technical report by Jacobs) CUMBRIA COASTAL STRATEGY - POLICY AREA 11C14 WALNEY ISLAND Policy area: 11c14 Walney Island Figure 1 Sub Cell 11c Arnside to Hodbarrow Point Location Plan of policy units. Baseline mapping © Ordnance Survey: licence number 100026791. 1 CUMBRIA COASTAL STRATEGY - POLICY AREA 11C14 WALNEY ISLAND 1 Introduction 1.1 Location and site description Policy units: 11c14.1 South End Hawes to Biggar (east side) 11c14.2 Biggar to Lenny Hill (east side) 11c14.3 South End Hawes to Hare Hill (open coast) 11c14.4 Hare Hill to Hillock Whins 11c14.5 Hillock Whins to Nanny Point Scar 11c14.6 Nanny Point Scar to Mill Scar 11c14.7 Mill Scar to north of West Shore Park 11c14.8 North Walney – from north of West Shore Park to Lenny Hill (both coasts) Responsibilities: Barrow Council Cumbria Country Council Private landowners Location: The policy area covers the entire frontage of Walney Island, both open coast (west coast) and channel (east coast) shorelines. Site Overview: Walney Island is composed of glacial deposits overlaying a rock platform; cliffs along the open coast are cut into these glacial sand and gravels, which provide little resistance to erosion. The two shorelines of Walney Island experience very different exposure conditions; the west coast is exposed to the Irish Sea whilst, in contrast, the east coast is sheltered from wave action. At either end of the Island, large sand and shingle spits extend towards the Duddon Estuary to the north and Morecambe Bay to the south.
    [Show full text]
  • Walney Island PHASE 1 CONSERVATION STATEMENT
    Walney Island PHASE 1 CONSERVATION STATEMENT Issue 4 October 2015 MORECAMBE BAY PARTNERSHIP NICHOLAS MENY On behalf of Purcell ® 16 Rutland Square, Edinburgh EH1 2BB [email protected] www.purcelluk.com DOCUMENT ISSUE All rights in this work are reserved. Reproduction of any part of this work should be fully referenced to Purcell and any third parties where necessary. Permission Issue 1 (July 2015) - Morecambe Bay Partnership to reproduce historic images and maps contained within this work must be sought from the relevant copyright holder(s). Issue 2 (August 2015) - Morecambe Bay Partnership Undertaking any unauthorised act in relation to this work may result in a civil claim for damages and/or criminal prosecution. Any materials used in this work which are subject to third party copyright have been reproduced under licence from the copyright owner except in the case of works of unknown authorship Issue 3 (August 2015) - Morecambe Bay Partnership as defined by the Copyright, Designs and Patents Act 1988. Any person wishing to assert rights in relation to works which have been reproduced as works of Issue 4 (October 2015) - Morecambe Bay Partnership unknown authorship should contact Purcell at [email protected]. Purcell asserts its moral rights to be identified as the author of this work under the Copyright, Designs and Patents Act 1988. Purcell® is the trading name of Purcell Miller Tritton LLP. © Purcell 2015 NM/CRo/01.236208 CONTENTS 1 INTRODUCTION 5 3 INITIAL ASSESSMENT OF SIGNIFICANCE 9 1.1 Reason for the Conservation Statements
    [Show full text]
  • X FINAL ISLANDS of BARROW MAP PHOTO SIDE COLOURWAY 2 Copy
    Prehistoric Islands An Industrial Revolution Barrow Airships Key Dates Prehistoric nds inc. axe heads have been discovered around the Islands of The expansion of Barrow-in-Furness was due to three men: Lord Cavendish, 7th 1911 Britains rst rigid airship HMA 1 ‘Mayy’, built in Barrow’s Cavendish 1127 Furness Abbey is established; The First Savignac Monastery in England The Islands of Barrow Barrow, many on Walney Island and Sandscale Haws. The coast oered stone age Duke of Devonshire (the nancier), Henry Schneider (local iron ore magnate) & Dock. 1134-1342 Furness Abbey becomes 2nd most powerful Cistercian Abbey in England communities, a wide range of foods and materials, often gathered during the James Ramsden (managing director of the Furness Railway Company). 1487 Lambert Simnal Lands on Piel Island & Claims English Throne hard winter months. It also oered opportunities for trade & communication via HMA 1 Mayy (named as such because “she may y” famously broke in two 1839 Henry Schneider a speculator & dealer in iron arrives during a test ight over Cavendish Dock but important lessons were learnt. sea-borne trac. Indeed, for much of prehistory, the sea was a link to the wider Ramsden built a ne house (now demolished) in Abbots wood above Furness Abbey. 1843 Only 32 dwellings & two pubs in the Hamlet of Barrow Later designs for rigid & non rigid airships were built by H.B. Pratt & Barnes world, rather than a barrier to it. Perhaps it is no surprise that the earliest cereal Some of Ramsden’s possessions & furniture were given to the Town Hall. Ramsden’s 1846 Furness Railway built by Schneider & James Ramsden to transport iron ore & slate Pictorial Wallis for the Vickers Airship Dept.
    [Show full text]
  • In and Around Barrow-In-Furness
    M o r e c a mb e Bay: nature on your doorstep In and around Barrow-in-Furness Welcome to Barrow -in-Furness where beaches and ancient woodlands meet industry past and present Barrow-in-Furness and the surrounding islands lie at the tip of the Furness Peninsula. The coast In this guide and islands are dotted with rich industrial and you will find... military heritage and wonderful wildlife. The · Seasonal highlights specially protected sand dune habitats here are · Three great days out perfect for rare natterjack toads, claimed to be · How to get around Europe's noisiest amphibian. don’t Miss… There’s so much to see and many on a rainy day… hidden corners to explore, but Pop into Barrow Dock Museum to these top 3 highlights are not to find out more about our maritime be missed! history, call 01229 876400, admission is free. Take shelter in 1 explore secluded beaches one of the hides at South Walney and watch grey seals on the nature reserve (one accessible by Isle of Walney wheelchair) open everyday, call 2 Visit sandscale Haws 01229471066. national nature reserve (nnr), spectacular sand dunes Fascinating fact with dramatic panoramas Look out for bee orchids at 3 Follow the footsteps of Sandscale Haws NNR (May – cistercian monks through June). These orchids mimic a bee natterjack toad ancient woodlands around to encourage bees to pollinate © Dave Talbot the ruins of Furness abbey them. seasonal Highlights This area is full of wildlife, with something spectacular and different to see whatever the time of year: Look out for: sprIng Regal eider ducks arriving at their most southerly breeding site at South Walney and orchids blooming at Sandscale Haws.
    [Show full text]
  • Places in Cumbria for Wildlife and People English Nature Research Reports
    Report Number 705 Places in Cumbria for wildlife and people English Nature Research Reports working today for nature tomorrow English Nature Research Reports Number 705 Places in Cumbria for wildlife and people Catherine Findlay and Catharine Ward Thompson OPENspace Research Centre You may reproduce as many additional copies of this report as you like for non-commercial purposes, provided such copies stipulate that copyright remains with English Nature, Northminster House, Peterborough PE1 1UA. However, if you wish to use all or part of this report for commercial purposes, including publishing, you will need to apply for a licence by contacting the Enquiry Service at the above address. Please note this report may also contain third party copyright material. ISSN 0967-876X © Copyright English Nature 2006 Project officer Erica Donnison, Cumbria Team Contractor(s) Catherine Findlay and Catharine Ward Thompson OPENspace Research Centre The views in this report are those of the author(s) and do not necessarily represent those of English Nature This report should be cited as: FINDLAY, C. & WARD THOMPSON, C. 2006. Places in Cumbria for wildlife and people. English Nature Research Reports, No 705. Acknowledgements This research was carried out by Catherine Findlay, for OPENspace research centre, with the assistance of Anne Boyle, Anna Orme, Elizabeth Payne, Jenny Roe, Sucharita Srirangam and Takemi Sugiyama and under the overall direction of Catharine Ward Thompson. The project manager at English Nature was Erica Donnison. Executive summary This study was carried out on behalf of English Nature to consider how people in Cumbria perceive local green spaces and nature reserves and their expectations of Local Nature Reserves.
    [Show full text]
  • HAVERIGG III WIND FARM LIFETIME EXTENSION Report to Inform a Habitats Regulations Assessment
    HAVERIGG III WIND FARM LIFETIME EXTENSION Report to Inform a Habitats Regulations Assessment Dr Steve Percival Ecology Consulting email: [email protected] 30 April 2020 Client: Windcluster Ltd Haverigg III Lifetime Extension ECOLOGY CONSULTING HABITATS REGULATIONS ASSESSMENT April 2020 Table of Contents EXECUTIVE SUMMARY ........................................................................................................................ 3 INTRODUCTION ................................................................................................................................... 5 SPECIAL PROTECTION AREAS CONSIDERED IN THIS REPORT ............................................................... 5 LEGISLATIVE FRAMEWORK ................................................................................................................. 7 SCOPE OF THIS REPORT ....................................................................................................................... 8 KEY ORNITHOLOGICAL INTERESTS: BASELINE CONDITIONS ................................................................ 8 HABITATS REGULATION TESTS .......................................................................................................... 24 ASSESSMENT OF ORNITHOLOGICAL EFFECTS ................................................................................... 25 CUMULATIVE EFFECTS ...................................................................................................................... 29 MITIGATION MEASURES ..................................................................................................................
    [Show full text]
  • Biodiversity & Development
    [Biodiversity & Development] Biodiversity & Development Draft Supplementary Planning Document – March 2018 Barrow Borough Council - Advice for developers Working together to support sustainable development within the Borough of Barrow-in-Furness 0 | Barrow Borough Council 2018 [Biodiversity & Development] 1 | Barrow Borough Council 2018 [Biodiversity & Development] Contents 1. Introduction .................................................................................................................... 4 2. Purpose of the SPD ....................................................................................................... 5 3. The Natural Environment: Barrow Borough .................................................................... 6 4. The Value of Biodiversity ............................................................................................. 10 5. Case Study: Biodiversity Benefits - Sandscale Haws Nature Reserve, Barrow ............ 13 6. Biodiversity Impacts ..................................................................................................... 14 7. Legislation and Policy .................................................................................................. 19 8. Further Guidance and Evidence ................................................................................... 28 9. Preparing Planning Applications .................................................................................. 34 10. Biodiversity Checklists ................................................................................................
    [Show full text]
  • 11C15 Walney Channel (Mainland)
    Cumbria Coastal Strategy Technical Appraisal Report for Policy Area 11c15 Walney Channel (mainland) (Technical report by Jacobs) CUMBRIA COASTAL STRATEGY - POLICY AREA 11C15 WALNEY CHANNEL (MAINLAND) Policy area: 11c15 Walney Channel (mainland) Figure 1 Sub Cell 11c Arnside to Hodbarrow Point Location Plan of policy units. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 1 CUMBRIA COASTAL STRATEGY - POLICY AREA 11C15 WALNEY CHANNEL (MAINLAND) Figure 2 Location of Policy Area 11c15: Walney Channel. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 2 CUMBRIA COASTAL STRATEGY - POLICY AREA 11C15 WALNEY CHANNEL (MAINLAND) 1 Introduction 1.1 Location and site description Policy units: 11c15.1 Rampside to Westfield Point 11c15.2 Westfield Point to Hindpool (Barrow in Furness) 11c15.3 Hindpool to Lowsy Point Responsibilities: Barrow Borough Council Cumbria County Council United Utilities ABP BAE National Trust Private landowners Location: The SMP policy area falls within Sub cell 11c and extends along the mainland shoreline of Walney Channel, behind Walney Island. It covers the frontage from Rampside, at the outer mouth of Morecambe Bay, to Lowsy Point, which is the start of Sandscale Hawes dune system at the mouth of the Duddon Estuary. Roa Island and causeway is included within a separate policy area: 11c13. Site Overview: Lying behind Walney Island, this frontage is relatively sheltered compared to the open coast, with only locally generated wave action affecting the frontages, although tidal flows are strong. At the northern end of the unit, the entrance of Scarth Channel into Walney Channel is constricted by the presence of spits: North End Hawes, which forms the northern extent of Walney Island, and Sandscale Hawes at the mouth of the Duddon Estuary.
    [Show full text]
  • Walney Island
    www.gov.uk/government/collections/ england-coast-path-improving-public-access-to-the-coast England Coast Path Walney Island Natural England’s Report to the Secretary of State: Overview S c a r th Map A: Key Map - Walney Island Ch North an nel End Haws Chapter number and title 1 Jubilee Bridge to Sandy Gap (Maps 1a to 1e) 0 9 Sandy Gap to Jubilee Bridge (Maps 2a to 2g) 5 2 A Newton 1 Dendron BARROW-IN- FURNESS North Walney North Scale Leece Roosecote Vickerstown Jubilee A 5 Sandy Gap 7 Bridge 0 8 8 0 7 5 Roosebeck A W a l n e y C h a n n e l Rampside WALNEY Biggar ISLAND Long Rein Pi Point el C ha nn 2 el Roa Island I R I S H Snab S E A Point Piel Island Foulney Island South End Haws Point Extent of proposals in 1 each chapter Extent of proposals N 0 1 2 3 Kms A road B road 0 1 2 Miles Based upon Ordnance Survey material on behalf of HMSO. Minor road © Crown copyright and database right 2016. All rights reserved. Natural England OS licence number 100022021 Railway & station 2 England Coast Path | Walney Island | Natural England’s Report to the Secretary of State | Overview Advice on reading the report This report sets out for approval by the Secretary of State our proposals for the England Coast Path and associated Coastal Margin on this stretch of coast. It is published on our web pages as a series of separate documents, alongside more general information about how the Coastal Access programme works.
    [Show full text]
  • Display PDF in Separate
    En v ir o n m e n t Ag en c y DEVELOPMENT OF DATA AND INFORMATION SOURCES ON NATURA 2000 ESTUARINE SITES IN THE N O R T H W E ST Morecambe Bay: Final Report 7 THE UNIVERSITY Centre for Marine and Coastal Studi of LIVERPOOL Morecambe Bay Information Collation Report Environment Agency Publishing Organisation Environment Agency Richard Fairclough House Knitsford Road Warrington Cheshire WA4 1HG Tel: 01925 653999 Environment Agency May 2003 All rights reserved. No part of this document may be produced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the Environment Agency. Research Contractor This document was produced by: Centre for Marine and Coastal Studies Environmental Research & Consultancy University o f Liverpool Vanguard Way Birkenhead CH41 9HX Contact: Dr Ian Gloyne-Phillips Tel: 0151 650 2275 Fax: 0151 650 2274 E-mail: [email protected] Environment Agency’s Project Manager The Environment Agency’s Project Manager is: Dr Sarah Peet, North West Region. ENVIRONMENT AGENCY CMACS/J2692-MB Final/vl .3/05-. 106965 Duddon Estuary Information Collation Report Environment Agency Contents 1 Introduction 1.1 Background to Project 1 1.2 Objectives 1 1.3 Duddon Estuary 3 2 Study Methods 2.1 Identification of Information Sources 5 2.2 Consultations 5 2.3 Information Directory 6 2.4 Summary of Key Studies 6 2.5 Identification of Gaps and Projects Required for Bridging 6 3 Database Information Directory 3.1 Overview of Database 7 3.2 Using the Database 3.2.1 Custom Search Functions 8 3.2.2 Access Search Functions 8 3.3 Hard Copy of the Database ^ ^ .
    [Show full text]