Record of the Discussion of Responses to Current Planning

Total Page:16

File Type:pdf, Size:1020Kb

Record of the Discussion of Responses to Current Planning Record of the discussion of Responses to Current Planning Applications of the Planning and Infrastructure Committee via Video Conferencing at 7.00pm on Monday, 6th April 2020 as per our Rapid Response Protocol and Planning Committee Terms of Reference Present: Councillors – Diana Harvey (Chairman), Dorothy Harvey, Ian Wilson, Chris Farrance & Roger Robertson In attendance: Karyn Reid (Executive Clerk) Cllr – Councillor HCC – Hampshire County Council HDC – Hart District Council Item no. 19/20 Pl 161. PLANNING DISCUSSION OF CURRENT PLANNING APPLICATION REQUIREING A RESPONSE. There was no Open Forum There were no Apologies for Absence. Any absence was assumed to be caused by a software issue. There is an ongoing dispensation under S33 of the Localism Act. Councillor Dorothy Harvey declared an interest in the planning application 20/00633/FUL in Whinchat Close. There were no Minutes to be approved. The Clerk plans to circulate Minutes from all recent committee meetings. Current Planning & Licensing Applications incl Tracked Applications 20/00603/FUL Conversion of dwelling into two self-contained dwellings (1x3 bed and 1x4bed) with associated internal/external alterations and subdivision of curtilage into two and associated parking facilities. | Thackhams Barn Thackhams Lane Hartley Wintney Hook Hampshire RG27 8JG No Objection 20/00604/LBC Construction of an internal wall, and a brick wall and post and rail fence boundary in the rear garden (to facilitate the conversion of the building into two dwellings as per application ref: 20/00603/FUL) Thackhams Barn Thackhams Lane Hartley Wintney Hook Hampshire RG27 8JG The current application seeks to return the building to its original state and therefore there is no objection. However in other applications where a new autonomous dwelling has been created, HWPC has asked the LPA to tie the new dwelling to the host dwelling so that it shall be occupied only in conjunction with the main dwelling and at no time shall a separate dwelling be established. This measure has been implemented previously and in discussing this application HWPC would ask that consideration be given to putting such a condition in place. 20/00633/HOU pg 1 of 3 Erection of a two storey side extension, single storey front extension and part garage conversion into habitable accommodation. 3 Whinchat Close Hartley Wintney Hook RG27 8TT No Objection 20/00433/LBC Erection of a single storey side extension, insertion of ground floor front window, replacement of ground floor rear window with french doors and internal alterations including removal and addition of partitioning Cowslade Farm West Green Road Hartley Wintney Hook RG27 8JN No Comment. This is a large house set in its own ground and the footprint remains largely the same. 20/00763/HOU Proposed alterations to an existing outbuilding including insertion of a pair of French doors and new window to the rear elevation. Hazeley House Hazeley Heath Hartley Wintney Hook RG27 8LT No Objection 20/00761/LBC Proposed alterations to an existing outbuilding including insertion of a pair of French doors and new window to the rear elevation. Hazeley House Hazeley Heath Hartley Wintney Hook RG27 8LT Alterations are minor and will not be visible from the front of the main building. The window being removed matches the one in the front elevation and is to be relocated and therefore not lost to the character of the building. The new French doors should reflect the painted timber construction of the doors on the front elevation. The alterations do not harm the appearance or character of the building but improve the access to the rear garden. No Objection. 20/00330/FUL Demolition of the existing Grey House School and ancillary buildings and erection of 22 new extra care apartments and a 25 bed care home with associated landscaping and parking. Grey House Mount Pleasant Hartley Wintney Hook RG27 8PW Councillors discussed the best way forward. The application has only just been lodged and requires detailed examination on the part of the Council. The expiry date is 1st May and therefore Councillors would be interested to review any weight of feeling from the local community. Therefore it was agreed to discuss this application at the next meeting of the Planning Committee scheduled for 27th April. TRACKED APPLICATIONS 20/00295/HOU 7 Franklin Avenue, Hartley Wintney RG27 8RB Grant – HWPC comment that this represented yet another loss of medium sized family houses and an increase in the number of large family houses out of the financial reach of many. The response was that the size of buildings was only relevant to new developments. A note was made to highlight this in the HWNP review as it is a misinterpretation of wording. HWPC also requested that working hours should be conditioned rather than a suggestion. The response was that the work being undertaken was not of sufficient significance to warrant this. Councillors felt that the two construction sites No. 7 & 9 had probably not been looked at together and would bear this in mind in the future. 20/00203/HOU 9 Franklin Avenue, Hartley Wintney RG27 8RB Grant – same comments as above 20/00289/HOU Ash Cottage Cricket Green HW RG27 8PJ pg 2 of 3 Grant 20/00269/FUL The Homestead, Thackhams Lane, Hartley Wintney RG27 8JG Grant – HWPC requested that a condition be included that the annexe should not become a separate dwelling. This was actioned. 20/00299/LBC The Lamb Hotel High Street HW RG27 8NW This application has been withdrawn. It was agreed that contact should be made with Clynt Wellington to enquire what his next steps will be. ACTION: KR/DEH Chairman’s Announcements – the Chairman wished to express huge thanks and gratitude to Cllr Dorothy Harvey and all involved in the network set up to provide necessary provisions, prescriptions and support to the vulnerable members of our community. The next meeting will be on Monday 27th April 2020, 7.00pm via VC subject to Social Distancing measures There being no further business the meeting closed at 8.44pm. ……………………………………..Chairman Date ……………………………….. pg 3 of 3 .
Recommended publications
  • Hunters Lodge Hunts Common, Hartley Wintney, RG27 8AA
    Hunters Lodge Hunts Common, Hartley Wintney, RG27 8AA SALES | LETTINGS | LAND AND NEW HOMES v • Ideally situated on the fringes of the rural village of Hartley Wintney • Within a conservation area hosting the River Hart • Great road connections via the A30 • Exceptional four double bedroom Georgian house • Close proximity to village amenities • Additional self-contained one bedroom cottage • Swimming pool with conservatory style enclosure • Enclosed rear garden with multiple terraces • Brick paved driveway with ample parking • Master suite with dressing area and en suite shower • Guest room with contemporary en suite • Quality kitchen/breakfast room • Stunning drawing room with high ceilings and an open fireplace • Generous reception hall, dining room, morning room, study and cellar A truly unique property, Hunters Lodge presents a The generous kitchen/breakfast room features wide variety of features perfect for a large family. French doors leading to the rear terrace, with Offering Georgian character combined with a Karndean floor tiling flowing through a large contemporary living style throughout, this property archway, separating the breakfast area from the benefits from having been sympathetically restored kitchen. The luxury fitted kitchen area features and maintained to a high standard by the current sleek, dark toned granite work surfaces, with owner. an expansive range of light toned, fitted A bright, spacious reception hall welcomes you into the cabinets. property, featuring attractive Travertine stone flooring. Upstairs, a spacious central landing leads to all This generous space, in tasteful light décor, offers of the main rooms, which include four light and plenty of standing and seating room, creating an ideal airy double bedrooms, featuring the master and place for greeting guests.
    [Show full text]
  • NOTICE of POLL Notice Is Hereby Given That
    HAMPSHIRE COUNTY COUNCIL Election of County Councillor for the YATELEY EAST, BLACKWATER & ANCELLS Division NOTICE OF POLL Notice is hereby given that: 1. A poll will be held on Thursday, 2nd May 2013 between 7am and 10pm. 2. Number of councillors to be elected is ONE. 3. The following people stand nominated: SURNAME OTHER ADDRESS OF DESCRIPTION (if NAMES OF ASSENTERS TO THE NOMINATION NAMES CANDIDATE any) (PROPOSER (P) AND SECONDER (S) LISTED FIRST) Collett Adrian 47 Globe Farm Lane, Liberal Democrat DAVID E SIMPSON(P), DAVID J MURR(S), JOHN W Darby Green, Blackwater, KEANE, GILLIAN E A HENNELL, ROBERT E HARWARD, Hampshire, GU17 0DY STUART G BAILEY, BRIAN F BLEWETT, COLIN IVE, MARGUERITE SIMPSON, ELOISE C ESLAMI Dickens Shawn Meadowcroft, Chequers Conservative Party EDWARD N BROMHEAD(P), STEPHEN A GORYS(S), Lane, Eversley, Hampshire, Candidate JULIET M BOWELL, FREDERICK G BAGGS, RG27 0NY CHRISTOPHER W PHILLIPS-HART, SHANE P M MASON, EMMA MASON, SUSAN H LINDEQUE, COURTNEY-TYLA LINDEQUE, PAMELA M MEDLEY Lawrie Les 106 Kingsway, Blackwater, Labour and Co- PATRICIA D DOWDEN(P), KEITH CARTWRIGHT(S), Hants, GU17 0JD operative Party NICHOLAS C J KAY, HARRY A R HAMBLIN, MAUREEN D Candidate HAMBLIN, CHARLES E LINGS, MICHAEL T STEWART, ISMAIL KESENCI, SYLVIA M RHODES, KENNETH B RHODES Tennison Stanley John 51 Stratfield Road, UKIP KAREN RICHMOND(P), EMMA RICHMOND(S), Basingstoke, RG21 5RS DOUGLAS J ATTWELL, KEITH E SANTON, RALPH D CANNON, BRIAN J BISHOP, ROYSTON F PACKMAN, ANTHONY J F HOCKING, KATHLEEN AUSTIN, STEPHEN M WINTERBURN Situation of
    [Show full text]
  • Unit 10 Murrell Green Business Park, London Road, Hook, RG27 9GR Self-Contained Warehouse/Workshop Facility with Parking
    Industrial / Warehouse TO LET UNDER OFFER Unit 10 Murrell Green Business Park, London Road, Hook, RG27 9GR Self-contained warehouse/workshop facility with parking Summary Key Points Popular Business Park location ■ 4.5 metre clear height Tenure To Let ■ Available Size 2,530 sq ft / 235.04 sq m ■ Full height loading door ■ Extensive parking area Rent £25,000 per annum exclusive ■ 3 phase power supply Rates Payable £10,368 per annum Rateable Value £20,250 EPC Rating C (64) hollishockley.co.uk Unit 10 Murrell Green Business Park, London Road, Hook, RG27 9GR DESCRIPTION Unit 10 is an industrial/warehouse unit of block and facing brick and tiled roof construction with decorative timber cladding at high level. The internal production/warehouse space is column free. The office and WC facilities are situated to the rear of the workshop area and include a further office on the first floor. The height to the eaves within the unit is approximately 4.5 metres. The unit incorporates 3 phase power, central heating system and full height loading door located on the south western elevation opening out to the parking apron. LOCATION Murrell Green Business Park is situated adjacent to the A30 (London Road) north of Hook and south of Hartley Wintney village. The park is located approx 1 mile from Junction 5 and 4 m from Junction 4a of the M3 motorway. The M4 motorway is accessed at Junction 11 via the A33. There are rail stations at Winchfield and Hook (South West Trains London Waterloo service) which are both situated approximately 1 mile away from the Business Park.
    [Show full text]
  • The Rotherwick News January 2018 Volume 30 Edition 1 Church Warden Richard Blackmore 01256 762571
    USEFUL CONTACTS Parish Priest Rev Marion de Quidt 01256 763211 The Rotherwick News January 2018 Volume 30 Edition 1 Church Warden Richard Blackmore 01256 762571 Church Warden Sarah Moore 01256 761876 Hook Surgery 01256 762125 Happy New Year to you all! Hook Care Group 08450 941549 Whitewater School Head – Lucy Edwards 01256 762637 Whitewater School PTA Chair - Kate Watts 07979 860042 Group Scout Leader Richard Whistler 01256 763118 © 2010 Rotherwick News 1st Rotherwick Brownies Caroline Brown 01256 760730 [email protected] Badminton Club Richard Burke 01256 761013 [email protected] Cricket Club Jonathan Wheeler, Secretary 07788 722771 Tuesday Evening Cricket James Butler [email protected] Tennis Club Quentin Sharp, Memb. Sec. 01256 762912 Hook & Odiham RFC Carl Wadmore [email protected] Village Hall Bookings Sue Whistler 08456 099877 [email protected] Parent & Toddler Group Melissa Wilson 07900 927599 Rotherwick News Editor Sarah Moore 01256 761876 R’wick News Advertising Melissa Wilson 01256 768988 R’wick News Distribution Lottie Girling 01256 760022 Parochial Ch’ch Coun. Carolyn Hazell 01252 844198 [email protected] Hampshire C Councillor Cllr Jonathan Glen 01962 847322 Hart District Councillors Cllr Robert Leeson TBC Cllr Mike Morris 01256 763313 Cllr Brian Burchfield 01256 767946 Rotherwick Parish Council Susan Richardson [email protected] Aldershot Police (non urgent) 0845 0454545 © Matt Sheppard Page 20 of 16 Page 1 of 16 SUMMARY MINUTES FOR THE MEETING OF ROTHERWICK PARISH Dates for
    [Show full text]
  • Final Recommendations on the Future Electoral Arrangements for Hart in Hampshire
    Final recommendations on the future electoral arrangements for Hart in Hampshire Report to the Secretary of State for the Environment, Transport and the Regions July 2000 LOCAL GOVERNMENT COMMISSION FOR ENGLAND LOCAL GOVERNMENT COMMISSION FOR ENGLAND This report sets out the Commission’s final recommendations on the electoral arrangements for the district of Hart in Hampshire. Members of the Commission are: Professor Malcolm Grant (Chairman) Professor Michael Clarke CBE (Deputy Chairman) Peter Brokenshire Kru Desai Pamela Gordon Robin Gray Robert Hughes CBE Barbara Stephens Chief Executive © Crown Copyright 2000 Applications for reproduction should be made to: Her Majesty’s Stationery Office Copyright Unit. The mapping in this report is reproduced from OS mapping by the Local Government Commission for England with the permission of the Controller of Her Majesty’s Stationery Office, © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: GD 03114G. This report is printed on recycled paper. Report no: 163 ii LOCAL GOVERNMENT COMMISSION FOR ENGLAND CONTENTS page LETTER TO THE SECRETARY OF STATE v SUMMARY vii 1 INTRODUCTION 1 2 CURRENT ELECTORAL ARRANGEMENTS 3 3 DRAFT RECOMMENDATIONS 7 4 RESPONSES TO CONSULTATION 9 5 ANALYSIS AND FINAL RECOMMENDATIONS 13 6 NEXT STEPS 29 APPENDICES A Final Recommendations for Hart: Detailed Mapping 31 B Draft Recommendations for Hart (January 2000) 37 A large map illustrating the proposed ward boundaries for Fleet and Yateley is inserted inside the back cover of the report. LOCAL GOVERNMENT COMMISSION FOR ENGLAND iii iv LOCAL GOVERNMENT COMMISSION FOR ENGLAND Local Government Commission for England 25 July 2000 Dear Secretary of State On 20 July 1999 the Commission began a periodic electoral review of Hart under the Local Government Act 1992.
    [Show full text]
  • Fleet to Winchfield
    Introduction Both Fleet and Winchfield have railway stations, with a frequent train service between them. There are also regular week day buses to Hartley Wintney. Always check the latest times at www.travelinesw.com. Parking is limited at both ends, particularly at the railway stations, although there is a public car park on the north east side of Fleet Pond. Part of this second section of the Brenda Parker Way, between Fleet and the Blackbushes Road, crosses land used by the Army at Aldershot but which has public access along many tracks and paths open to walkers but where there are few official public rights of way shown on the map. Defence Estates (Ministry of Defence, MOD) have given permission for the Brenda Parker Way to pass through this land on the basis that users understand that military training takes precedence over public access and that you may be asked by the military to make a deviation from the route. Walkers should read the note below and take a moment to read one of the official notices sited at the entrances to the military land. Users of the route should stay on the paths as they cross the training area. A consequence of the long-term military use is that a large area of land has been protected from development and the training area forms a significant part of the Thames Basin Heaths Special Protection Area (SPA). This is a habitat virtually unique in Europe, which explains its current high level of conservation protection. Of particular concern is possible disturbance of ground-nesting birds.
    [Show full text]
  • A Settlement Hierarchy for Hart District
    Local Development Framework Background Paper A Settlement Hierarchy for Hart District January 2010 (updated August 2010) - 2 - Contents 1 Introduction …………………………………………………………... 2 2 The Local Plan Approach ……………………………………………... 3 3 Core Strategy Preferred Options (2006) approach ………………….. 6 4 Policy Context ………………………………... ……………………… 8 5 Profile of Rural Hampshire …………………………………………… 10 6 Analysis of settlements ………………………………………………... 12 7 Formulating a new settlement hierarchy……………………………… 12 Appendices Appendix 1: Breakdown of settlements by population, facilities and services……................. 18 Appendix 2: Map of road and rail network in Hart District ………………………………. 21 Figures Figure 1: Map of the Settlement Boundaries in the Adopted Local Plan (1996-2006) .……. 5 Figure 2: Map of Hampshire County Council Rural and Urban Classification…….................. 11 Figure 3: Map of the Proposed Settlement Hierarchy …………………………….................. 16 - 1 - 1. Introduction 1.1 Following the revocation of the Regional Spatial Strategies by the new Conservative – Liberal Democrat Coalition Government in June 2010 it is considered necessary to update the original Settlement Hierarchy Background Paper (January 2010) in light of the changes. 1.2 Hart District contains a number of towns and villages that vary in size. It is useful for plan-making purposes to group these settlements into a hierarchy based on an understanding of their current size and level of service provision. 1.3 It is important to note that the hierarchy does not in itself amount to a spatial strategy and does not dictate the levels of growth that will go to different settlements. It is a hierarchy based on the settlements as they are now, rather than as they might look in the future. It is merely a framework around which one or more options for a spatial strategy can be articulated.
    [Show full text]
  • Morning and Evening Coaches Odiham,Hook,Hartley Wintney AM PM
    YATELEY MANOR SCHOOL – COACH PICK UP LOCATIONS, September 2019 Route 1: Morning and Evening coaches Odiham,Hook,Hartley Wintney AM PM Fountains Mall, High St, Odiham 7.55 6.15 North Warnborough Village Hall 6.10 Opposite the Hogget lay by, A30, Hook 8.04 The Hogget lay by, A30, Hook 6.05 Old White Hart, A30, Hook 6.00 Opposite White Hart, A30, Hook 8.06 Opposite The Shack Café, A30 8.09 Outside The Shack Café, A30 5.55 Outside Phoenix Inn, A30 8.12 5.52 Swan Court, A30, Hartley Wintney 8.14 Methodist Church, A30, Hartley Wintney 5.50 Yateley Manor 8.30 5.40 Route 2: Morning and Evening Coaches Ewshot, Fleet, Farnborough AM PM Reading Road South bus stop by Vertu 7.58 6.13 Building Reading Road South / Prince of Wales 8.01 6.10 Albert Street / Upper Street 8.05 6.08 Bus Stop outside Sainsbury's, Fleet Road 8.08 (Am Only) Fleet Road Outside Hamptons (Pm Only) 6.05 Fleet Road / Kings Road 8.10 6.03 Fleet Road / Avondale Road 8.11 6.02 Ancells Road Bus Stop, Just after Hanover 8.15 6.00 Drive Elvetham Heath Way (bus stop between Minley Road & first roundabout in Elvetham 8.20 5.55 Heath) Yateley Manor 8.35 5.40 Route 3: Morning and Evening Coaches Farnborough, Frimley, Camberley AM PM Alexander Road, Northcamp (bus stop just before Playdays Nursery, towards the 7.38 6.18 Technical College Opposite Spectrum Point Offices 7.45 Bus Stop, Farnborough Road, Before Clock 6.12 House Roundabout Shell Petrol Station, Farnborough Road 6.10 Lyon Way Bus Stop, Outside VMwear 7.55 (GU16 7ER) Frimley Road / James Road 7.55 Frimley High Street (Station
    [Show full text]
  • Upton Grey Place Upton Grey, Hampshire
    Upton Grey Place Upton Grey, Hampshire Upton Grey Place Upton Grey Odiham 4 miles, Basingstoke 6 miles (London Waterloo 43 minutes), Hartley Wintney 9 miles, Farnham 12 miles, M3 (J5) 4 miles (all distances and times are approximate) Spacious family living in a much sought after and convenient Hampshire village. Ground Floor: Vestibule| Entrance hall | Drawing room | Sitting room| Dining room | Study | Garden Room Kitchen/breakfast room| Larder | Boot room | Cloakroom | Boiler room First Floor: Principal bedroom with adjoining bathroom and dressing room with separate shower | 5 additional bedrooms 2 bathrooms (one adjoining) | Laundry room | Separate WC Second Floor: 2 bedrooms | Shower room | Store room and under eaves storage Swimming pool | Tennis court | Potting shed| Glass house | Pool/plant machine room | Generator room Garden store with WC and cold store Double garage with workshop Mature formal garden, Orchard and paddock, approximately 3.67 acres Odiham Country Department Basingstoke Country Department 82 High Street 13 Hill Street Matrix House, Basing View 55 Baker Street Odiham, RG29 1LP London, W1J 5LQ Basingstoke RG21 7PG London, W1U 8AN Tel: 01256 702892 Tel: 020 7318 5156 Tel: +44 1256 350 600 Tel: 020 7861 1080 [email protected] [email protected] [email protected] [email protected] struttandparker.com knightfrank.co.uk Situation The property is set in an elevated position, Alton providing a broader range of shopping, close to the Village centre and set within a recreational and educational facilities. Conservation Area. Upton Grey Place offers Independent Schools in the area include a rare opportunity to purchase a fine village Daneshill, Cheam, Lord Wandsworth house with superb views over the village and College, Bradfield, Wellington College, St.
    [Show full text]
  • Little Orchard Hartley Wintney, Hampshire Little Orchard Hartley Wintney, Hampshire
    LITTLE ORCHARD HARTLEY WINTNEY, HAMPSHIRE LITTLE ORCHARD HARTLEY WINTNEY, HAMPSHIRE Exceptional family home with versatile accommodation, located in a premier village setting Entrance hall • Drawing room • Dining room Snug • Kitchen/breakfast room • Utility room Wine cupboard • 2 Cloakrooms Master bedroom with dressing room and en suite bathroom Guest bedroom with en suite bathroom 2 further bedrooms • Family bathroom Office with kitchenette and cloakroom, with potential to create annexe/secondary accommodation Double garage • Workshop • Shed Private and secluded gardens ﴿In all about 0.15 hectare ﴾0.37 acre Winchfield 2 miles • Fleet 4 miles Basingstoke 10 miles • Reading 13 miles M3 ﴾Junction 5﴿ 5 miles • M4 ﴾Junction 11﴿ 12 miles London Waterloo via Winchfield, Fleet or Basingstoke stations from 44 minutes London Paddington via Reading station from 29 minutes ﴿All distances and times are approximate﴾ These particulars are intended only as a guide and must not be relied upon as statements of fact. Your attention is drawn to the Important Notice on the last page of the text. Situation Little Orchard is situated in a premier setting, a short walk away from the centre of the thriving village of Hartley Wintney. The village has an excellent range of amenities, including a post office and convenience store, antique shops, boutiques, bakeries, cafes, restaurants, public houses, doctors, dental and veterinary surgeries, golf and cricket clubs. The market town of Fleet and the larger centres of Basingstoke and Reading provide a more comprehensive range of shopping, recreational and educational facilities. Communication links are excellent with the M3 being within five miles. Winchfield Station, within two miles, provides fast and regular services to London Waterloo and Reading Station, 13 miles, to London Paddington.
    [Show full text]
  • 15 – Version 1.0
    Hart District Council Local Plan Site Assessment: Stage 2 – High Level Site Assessment – SHL086 Site of Old Brick Works, Rotherwick Confidential Draft – 25/02/2015 – Version 1.0 High Level Site Assessment Proforma Site Reference SHL086 Site Name Site of Old Brick Works Parish Rotherwick Site Address Reading Road, Rotherwick Capacity Assessment and Categorisation Site Size (ha) 7.2 Estimated Capacity 130 Comments on capacity Housing Strategy Category(s) 6 (Other) or 3 (Strategic Urban Land Supply Category D (Site not adjoining existing urban areas) or E (Strategic Extension) as part of STR002 urban extension) as part of STR002 Key to Site Assessments: No overriding constraint to development of the site Constraint requiring further detailed assessment Major constraint undermining suitability of site Site Assessment Assessment Criteria Assessment comments Coloured assessment Accessibility to • Bus Stop (A30/Griffin Way no. 1/2, 65X, 83 and 421) – 1,900m. All services provide only one or two buses a Employment and day. services • Railway Station (Hook) – 2,500m • Employment (Hook Business Parks) – 2,700m • Public Open Space (Hartlettʼs Park, Hook) – 2,000m. • Health facility (Hook Surgery) – 2,100m. • Primary School (Hook Junior School) – 2,400m. • Secondary School (Robert Mayʼs School, Odiham) – 6,100m • Supermarket (Tesco, Hook) – 2,700m Infrastructure • Schools: There is a projected (2018) surplus of 16% for Infant/Junior schools in the Hook/Odiham/Hartley provision Wintney area, including the planned expansion of Hook Infants by 1FE and Hook Junior School by 0.5 FE. However, this surplus will not be sufficient to provide school places for any significant development at Hook, and the HDC Infrastructure Delivery Plan (IDP) indicates that additional provision within Hook is required.
    [Show full text]
  • How to Get Your Child to Yateley School Students
    HOW TO GET YOUR CHILD TO YATELEY SCHOOL Free travel will be provided for Hampshire children in the following circumstances: • if they attend the nearest catchment school OR one that is nearer to your home, AND • the distance (measured by the shortest available walking route) is more than three miles, OR • Where parents name the designated catchment school as one of their 3 preferences and a place is not available, assistance may be offered to the next closest school, using the three mile distance in the previous paragraph • Children entitled to free school meals or whose parents (with whom they live) are in receipt of the maximum level of working tax credit have enhanced entitlement. If your child does not qualify for travelling expenses, you may apply for him/her to be a 'privilege' passenger on school transport. This will depend on whether there are spare seats and only applies if the vehicle is contracted by Hampshire County Council to transport children. The privilege place can be withdrawn at short notice if it is needed for a child who qualifies for free transport. There is a flat-rate charge for privilege seats which is the same for all children whatever their age, the distance travelled or the number of days used per week. If your child qualifies for free school meals due to low income, the fee may be waived. The coach runs from Hartley Wintney through Eversley to Yateley School. For further details please contact Passenger Transport on 01962 846924 or 845332 or email [email protected] .
    [Show full text]