1 1. Company Introduction

Summarize

company/establishment WORLD E&C Co., Ltd / March 20, 1999

• Absorption Chiller : Double life hot water, Single effect hot water, Steam fired absorption chiller, Heat Pump Item • Absorption chiller and heater : Gas/Oil, Exhaust gas, (Integrated type, Multi type) • Screw chiller, Condensing unit • Air Handling Unit : Exhaust heat recovery type, standard type

• Total asset: USD 12 Million(2017) Finance • Annual sale : USD 18 Million(2017)

Plottage 10,500㎡ • Factory Factory 4,500㎡ Factory scale (Hwasung-si) Office/R&D center 750㎡

• Anyang branch 165㎡ 662, Seokpo-ri, Jangan-myeon Hwaseong-si, Kyeonggi • Head office / factory Province, Republic of Korea Address • Sales/CS 1207, Digital empire B, 906-4, Gwanyang-dong, Dongan-gu, (Anyang branch) Anyang-si, Kyeonggi Province, Republic of Korea

Homepage http://www.worldenc.com/

2 Company History 2009 Development of exhaust gas absorption chiller-heater 2017 Initiate national project of development of Heat pump and transformer 2007 Registration of patent (Double Lift Hot water Driven Absorption Chiller) Initiate national project of development of Adsorption Chiller 2006 Development of Double lift Hot water Absorption Chiller 2016 Certificate of Designation of Excellent Product by Public Procurement Development of Single Effect Hot water Driven Absorption Chiller Service Registration of Direct Fired Absorption Chiller & Heater in Certificate INNO BIZ by SMBA Korea Public Procurement Agency Certificate of green technology 2005 Registration license for making specific facility, Certificate of venture company (Double Lift Hot water Driven Absorption Chiller) Establish research affiliated with World E&C Co., Ltd. Certificate of high efficiency energy material (Korea industrial technology promotion association ) (Double Lift Hot water Driven Absorption Chiller) 2001~2003 Certificate ISO 9001/9002 New business for Screw chiller and Absorption heat pump 1999 Establish World E&C Co., Ltd. 2015 Start to develop absorption heat pump for nation project Business for high temperature generator in Direct Fired Absorption Chiller & Heater Development of Air Handling Unit for exhaust heat recovery 2014 Registration Air Handling Unit(AHU) in Public Procurement Agency CE : Double-Effect Direct Fired Absorption Chiller & Heater Single-Effect, Double Lift Hot water Driven Absorption Chiller (WDL 71~975 Series) 2013 Certificate ISO 14001 Build a new factory for Air Handling Unit(AHU) 2011 Development of High-efficiency Direct Fired Absorption chiller & heater (COP 1.36, 1.51(LHV)) 2010 Registration of Double Lift Hot water Driven Absorption Chiller as excellent product by Korea Public Procure Agency

3 View of factory and office building Outside view of factory Office and R&D building

Inside view of factory

Factory Unit Scale Factory site m2 10,500

Factory building m2 4,500

Office and m2 750 R&D building

4 2. Factory Facilities Main facility(1)

SHEARING Machine

Classification Equipment Description Unit

Processing SHEARING M/C etc. 12T×4000×40HP etc. 8

Molding ROLLING M/C etc. 12T×3500 etc. 4

Welding TIG WELDING M/C etc. WAT-300N etc. 32

Inspection He leak Detector etc. Alcatel etc. 15

Handling OVER HEAD CRANE 20T+20T etc. 22

BENDING Machine ROLLING Machine HELIUM Leak Detector

5 Main facility(2)

Testing

Classification Model Description Unit

Direct Fired Absorption Chiller & Heater ~ 1500RT Performance Steam Fired Absorption Chiller ~ 1000RT Test Facility Single effect hot water absorption chiller ~1000RT Surface AIR BLAST ROOM 7.5M×5M×5.5M 1 set Treatment

Paint PAINTING ROOM 8M×5M×5.5M 1 set

Cooling Tower Air Blast Room Painting Room

6 Processing Welding

No. Equipment Description Unit Quantity No. Equipment Description Unit Quantity

12TХ4000 1 Shearing M/C EA 1 1 STUD Welding M/C ALPHA 850 EA 1 Х40HP 2 Plasma Cutting M/C 500A(TC-12P) EA 1 2 Radial Drilling M/C 2000 EA 1 3 TIG Welding M/C WAT-300N EA 1 3 Bench Drilling M/C EA 1 4 TIG Welding M/C HP 500P EA 1 4 Up Right Drilling M/C CUD-560 EA 1 5 CO2 Welding M/C DC 500A EA 12 5 High Speed Beveling M/C 6t ~12t EA 1 2 6 Circular Cutting M/C Φ360Х3TХΦ40 EA 2 6 CO Welding M/C DC 350A EA 5

7 AIR BLAST & PAINTING ROOM SET 1 7 AC ARC Welding M/C 40KW EA 5 8 AC ARC Welding M/C 30KW EA 3 9 ARC Welding M/C 5KW EA 2 Test, Inspection 10 OIL ARC Welding M/C 450A EA 1

No. Equipment Description Unit Quantity 1 He Leak Detector Alcatel EA 4 Molding 2 Water Pressure Test M/C 150kg/cm2 EA 1 3 Torque Wrench Dial 120DB EA 1 No. Equipment Description Unit Quantity Air Measuring 4 KANOMAX EA 1 1 Rolling M/C 12TХ3500 EA 1 instrument 5 Clampmeten ST3236A EA 1 2 Bending M/C 12TХ4000 EA 1 6 Manometer M-1000W/M EA 1 3 Expander TR-506H EA 1 50~1300℃ / 7 Digital thermometer EA 1 4 Expander TR-502H EA 1 -58~200℉

7 3. License Business & Factory registration license

Business license Factory registration license Construction registration license

Certificate of enterprise Certificate of promising small research laboratory INNO-BIZ and middle sized company 8 Certificate

ISO 9001:2008 ISO 14001:2004 Certificate of Designation of Certificate of green technology Quality management system Environmental Excellent Product management systems by Public Procurement Service

CE : Double-Effect Direct CE : Single-Effect, Double-Lift Q-Mark Certificate of KARSE association Fired Absorption Chiller & Hot water Driven Absorption (Double-Lift Hot water (Single Effect Double-Lift Hot water Heater Chiller Driven Absorption Chiller) Driven Absorption Chiller 9 Patent & Utility model patent

Patent Patent Patent Patent Patent : Double-Lift Hot water Driven : Double Stage generation :Double-Lift Hot water Driven :Absorbent cooling device : Vacuum valve for pressure relief Absorption Chiller Absorption Chiller Absorption Chiller(with water heating system)

Patent Patent Patent Patent Utility model patent : Safety valve : Air handling unit : Air handling unit : Heat exchanger for : Air Handling Unit (Attached multiple heat exchanger (Absorption Chiller & Heater) (Attached multiple heat exchanger) exhaust heat recovery) (Attached heat exchanger) for exhaust heat recovery)

10 Certificate of high efficiency energy material Certificate of high efficiency energy – Hot Water Absorption Chiller

600RT, IPLV 0.945 440RT, IPLV 0.95 340RT, IPLV 0.956 300RT, IPLV 0.942 250RT, IPLV 0.94

240RT, IPLV 0.92 190RT, IPLV 0.94 140RT, IPLV 0.94 110RT, IPLV 0.962 440RT, IPLV 0.84 11 고효율에너지기자재인증서

Certificate of high efficiency energy – Hot Water Absorption Chiller

190RT, IPLV 0.94 90RT, IPLV 0.95 420RT, IPLV 0.84 180RT, IPLV 0.86

12 고효율에너지기자재인증서

Certificate of high efficiency energy – Direct Fired Absorption Chiller 24 Models ( HHV_COP 1.2 – 9 units, COP 1.34- 10 units, IPLV 1.42 – 11units)

320RT, IPLV 1.462 300RT, IPLV 1.46 280RT, IPLV 1.42 270RT, COP 1.34 240RT, IPLV 1.42 220RT, COP 1.39

210RT, COP 1.38 190RT, COP 1.38 180RT, COP 1.38 170RT, COP 1.39 160RT, COP 1.38 150RT, COP 1.38

13 고효율에너지기자재인증서

Certificate of high efficiency energy – Direct Fired Absorption Chiller 24 Models ( HHV_COP 1.2 – 9 units, COP 1.34- 10 units, IPLV 1.42 – 11units)

140RT, COP 1.38 130RT, COP 1.38 100RT, IPLV 1.424 70RT, IPLV 1.42 360RT, COP 1.26 260RT, COP 1.20

250RT, COP 1.20 240RT, COP 1.20 230RT, COP 1.20 160RT, COP 1.20 140RT, COP 1.20 120RT, IPLV1.41

14 고효율에너지기자재인증서

Certificate of high efficiency energy – Direct Fired Absorption Chiller 24 Models ( HHV_COP 1.2 – 9 units, COP 1.34- 10 units, IPLV 1.42 – 11units)

150RT, IPLV 1.41 180RT, IPLV 1.41 280RT, IPLV1.42 70RT, IPLV1.42

15 Absorption Chiller & Heater

Double Lift Hot Water Absorption Chiller Single Effect Hot water Absorption Chiller Absorption Heat Transformer(Heat Pump)

Direct Fired Absorption Chiller-Heater Exhaust Gas Absorption Chiller-Heater Steam Fired Absorption Chiller-Heater

16 Screw Chiller & AHU

Water Type Screw Chiller Air Cooling Screw Chiller Condensing Unit

Air Handling Unit(AHU) Fan Coil Unit(FCU) Cooling Tower

17 Hot Water Absorption Chiller (WDL Serise) Hot Water 95℃ -> 55℃

75RT ~ 1,300RT 27Model

18 Hot Water Driven Absorption Chiller

Non-carbon eco-friendly chiller • Use of regional heating hot water(Energy use efficiency 84%. The ratio of incineration heat of the combined waste heat-74%) • Use of natural refrigerant water instead of Freon refrigerant destroying ozone layer • No CO2 and Nox which cause the global warming

Zero explosive danger by vacuum operation • Internal pressure vacuum. • No danger of gas explosion by use of hot water • Safety from danger of high pressure damage.

The excellent partial load part-load value • Auxiliary cycle auto stop if the cooling load is below 80% • Energy saving by 25% per chilled ton due to the increase in the efficiency by 25%

Low noise & Low vibration Micro processor control with only start-up signal for automatic • Noise level : Below 75dB at 1m distance operation • Precise control of start-up , stop, capacity control, abnormal Economic air-conditioning stop, etc. • Easy to handle due to the touch screen Chiller type Hot water temp change • Control of auxiliary cycle, self-diagnostic function & other controls Conventional 95℃ -> 80 ℃ 15℃ Saving maintenance cost • Leakage per month : 3cc or below. High vacuum condition. WORLDENC 95℃ -> 55℃ 40℃ • Auto steam extraction. Non-condensing gas storage. • Optimal condition of the operation. • Operating with only minimum purging

19 Hot Water Absorption Chiller

Cycle Diagram

Intermediate solution pump Main cycle solution flow

Low-temp heat high-temp heat Absorber Diluted solution pump 1st generator exchanger exchanger Low-temp heat Concentrated solution high-temp heat Intermediate solution 2nd generator exchanger pump exchanger pump Aux cycle solution flow Aux. diluted solution Aux heat exchanger Aux. generator pump Aux concentrated Aux heat exchanger Aux. absorber solution pump 20 High-efficiency Hot Water Absorption Chiller Cycle

Cooling water outlet

Condenser 2nd generator Aux. absorber

Concentrated Aux. Solution cooled absorber solution pump weak solution pump Drive hot water outlet Aux. generator

Aux. Aux. heat concentrated Chilled water outlet exchanger solution pump

Chilled water inlet Evaporator

Absorber 1st generator Drive hot water inlet Double stage Tray Refrigerant solution Diluted solution intermediate solution Concentrated solution Cooling water Aux. weak solution inlet Aux. concentrated solution Chilled water Cooling water Drive hot water Refrigerant pump Diluted solution pump Low temp. High temp. Intermediate solution pump heat exchanger heat exchanger

21 Hot Water Absorption Chiller Strong Point

1. The first development and commercialization of Double lift Hot Water Driven Absorption Chiller Cooperation development with Korea district heating corporation

2. Patent possession of Double lift Hot Water Driven Absorption Chiller Patent allowance by the grant of a non-exclusive license to 5 companies

(Patent number : 10-074621) 3. Mass production and supply reference in Double lift Hot Water Driven Absorption Chiller Supply 500 chiller and Heater at 230 place in domestic and overseas market(2008~2015) (75usrt ~ 1,300usrt) 4. Certificate 1) Certificate of Designation of Excellent Product by Public Procurement Service 2) Certification of Green Technology

3) Certificate of high efficiency energy material

4) Certificate of KARSE (Korean Association of Air Conditioning Refrigerating and Sanitary Engineers)

5. Patent for improving safety and coefficient of performance

1) Coefficient of performance is improved by Solution cooled absorber in Absorption Chiller Patent number : 10-1402277

2) Application of vacuum pump safety valve as bleeding device Patent number : 10-1474239

3) Safety Port : Prevent from modification by pressure even though heat transfer tube would be burst Patent application number : 10-2014-0173585

6 production of High Efficiency Double lift Hot Water Driven Absorption Chiller and Heater heat exchanger of Alfa Laval plate type

: Application of Solution cooled absorber and Double stage Tray

7. World E&C itself possess painting and test facilites

8. Maximize convenience by application of MICOM Controller

1) Color, Touch Screen

2) Display status of temperature in the form of diagram Check status of input and output for each part(Analog, Digital)

3) Decrease of electricity consumption by low load control system Stop cooling pump according to chilled water outlet temperature

4) Check products for defects before operating chiller by self diagnosis

5) Conformability is increased by capacity control valve at the change of season

6) Prevent from crystallization by control of absorption concentration

7) Application of Various dilution routine according to abnormal situation Quick load response in reoperation by minimum of dilution time

: Suitable dilution logic in abnormal situation 8) Alarm motor changing time by calculation for operating time of chiller, absorption pump and

refrigerant pump 9) Support for long distance control function(Modbus, Ethernet)

22 Hot Water Absorption Chiller

Structure Comparison

Double Lift Hot Water Driven Absorption Chiller Single Effect Hot Water Driven Absorption Chiller

Condenser

Aux. absorber

Aux. generator Generator

2nd generator Evaporator

1st generator Absorber

Drive hot water inlet : 95℃ Drive hot water inlet : 95℃ ▶ 40℃ ▶ 15℃ Drive hot water outlet : 55℃ Drive hot water outlet : 80℃

23 Pressure Safety Valve (registered Patent)

Freeze and Burst will not be occurred by safety equipment during operation. This valves prevents deformation of the chiller by pressure when an inner heat tube is damaged by abnormal operation. Structure Cover

Pressure Relief Vent Body Packing Disk

Operational principle of a Vacuum Valve ☞ Release internal pressure when Disk & Cover ascend up to head of the volt as ascending pressures of main body.

24 Low load control system

Decrease of electricity consumption by stopping pump in low load operation

Low load control logic

Unnecessary electricity consumption would be decreased by stopping refrigerant pump, absorbent pump, cooling water pump and cooling tower fan when outlet temperature of chilled water is under the settled temperature and it doesn’t increase above settled temperature for a period of time .

Effect and Validity of Low load control system logic

◎Low load control logic maintains under 25% of Chiller low load until midnight from late night in complex building and officetel that operates for 24 hours a day. ⇒ Controller of Double Lift Hot Water Absorption Chiller decreases unnecessary electricity consumption by stopping unnecessary pump after checking temperature and time in the period of low load ⇒ System against low load by restarting when outlet temperature of chilled water arrives at the settled temperature

25 Hot Water Absorption Chiller (WSL Serise) Hot Water 95℃ -> 80℃

Compact and Energy saving Design With using high efficiency heat tube, smaller and lighter design to conventional things. Installation space also gets decreased.

Easy operation and convenience Full automatic system with up-to-date control technology such as operation, setting, monitoring, and control flow chart.

Safe and efficient chiller Being operated in vacuum condition, it keeps internal pressure in vacuum status even in stop mode. With 2 pumps for solution and refrigerant, it is totally quiet. No noise and No vibration.

Maintenance cost reduction and only one purging during a season Optimized operation condition and trouble –free system under strict manufacturing standard : 1 x 10 -6atm.cc/sec leakage for a month.

High performance Automatic purge system An automatic purge unit to collect into a purge tank remaining Non-condensable gases in system and purge tank for storing Non- condensable gases make long time operation without manual purging

26 Hot Water Absorption Chiller Cycle (WSL Serise) Hot Water 95℃ -> 80℃

Steam Fired Absorption Chiller

80RT ~ 1500RT 24Model High temperature generator Cooling water Steam outlet inlet

Low temperature generator Chilled Condenser water inlet

Absorber Control panel Evaporator

Inverter panel Refrigerant Pump Chilled water outlet Cooling water inlet 28 Steam Fired Absorption Chiller Cycle Direct Fired Absorption Chiller & Heater

High reliability • Designed to enhance the reliability and durability • Robust structure through the perfect reliability test for long time and higher reliability by adopting high quality components Perfect vacuum • High performance & purge system. Efficient operation • Cost-efficiency for maintenance • Energy saving and efficiency realized • Leakage for one month at below 3cc. • Optimal control for the solution cycling volume by inverter • High vacuum condition depending on the cooling load • Auto purge. Non-condensing gas storage • Optimal PID control by sensing the operating condition with the • Maintaining optimal operating condition. level sensor • Operation with only minimum seam extraction. • Minimized power consumption due to precise operation and partial load operation Enough capacity [Option] Early reduction, Anti-freezing, Refrigerant generation, • Heating capacity increase system Solution refining , Tube ball clean, Crystal forming prevention from • Designed to increase up to 3 stages from the standard power failure. • Designed to increase up to 3 stages from the standard Convenient partition • Repair and maintenance is easy. Multi-partition structure Latest operation • Mounting/detaching structure for easy repair and maintenance • Latest MICOM, remote control and BAS compatible. • Partial incoming to make it possible for field work such as • Self-diagnosis, 16-bit Micro Process to ensure precise and safe remodeling at narrow space. Assembling at field is possible operation. • Simple operation. Easy MICOM setting designed with algorithm Low noise and low vibration allowing automatic operation • Below 75dB at 1m distance for noise level • Customer’s convenience for operation due to remote control function along with the operating condition record and schedule operation [Operation] Monitoring system

30 Direct Fired Absorption Chiller-Heater Strong Point

1. Production Experience for high temperature regenerator for 30 years Supply for LG electronics

2. Certificate

1) Certificate of high efficiency energy material

2) CE

3) Registration of Multiple Award Schedule by Korea Publiec Procurement Agency

3. Patent for improving safety and coefficient of performance Patent number : 10- 1) Coefficient of performance is improved by solution cooled absorber in Absorption Chiller and Heater 1402277 Patent number : 10- 2) Application of vacuume pump safety valve as bleeding device 1474239 3) Safety Port : Prevent from modification by pressure even though heat transfer tube would be burst Patent application number : 10-2014-0173585 4. production of High Efficiency Direct Fired Absorption Chiller and Heater heat exchanger of Alfa Laval plate type : Application of Solution cooled absorber, Double stage Tray and Exhaust heat recovery system 5. World E&C itself possesses painting and test facilites

6. Maximize convenience by application of MICOM Controller

1) Color, Touch Screen

2) Display status of temperature in the form of diagram Check status of input and output for each part(Analog, Digital)

3) Decrease of electricity consumption by low load control system Stop cooling pump according to chilled water outlet temperature

4) Check products for defects before operating chiller by self diagnosis

5) Conformability is increased by capacity control valve at the change of season

6) Prevent from crystallization by control of absorption concentration

7) Application of Various dilution routine according to abnormal situation Quick load response in repoeration by minimum of dilution time

: Suitable dilution logic in abnormal situation

8) Alarm motor changing time by calculation for operating time of chiller, absorption pump and refrigerant pump

9) Support for long distance control function(Modbus, Ethernet) 31 Direct Fired Absorption chiller & heater(COP 1.1)

Low temp. Cooling Cycle Condenser 응축기 저온재생기generator High고온재생기 temp. generator

Cooling냉각수 water 출구 outlet 배기가스Exhaust gas출구 outlet

농액펌프

냉난방 Chilled water냉수 outlet 출구 전환밸브Valve A (닫힘)

냉난방 Chilled water냉수 inlet 입구 Evaporator증발기 흡수기 Absorber 전환밸브Valve B (닫힘)

Fuel연료공급 inlet Cooling냉각수 water inlet 입구

냉매 펌프 희액 펌프 Refrigerant Diluted solution 저온 고온 Pump Pump Low temp. High temp. heat열교환기 exchanger heat열교환기 exchanger

32 Cycle Diagram

High-efficiency Direct Fired Absorption chiller & heater(COP 1.51) - Cooling Cycle

Low temp. Exhaust gas 응축기Condenser generator저온재생기 고온재생기 배기가스 출구 High temp. generator outlet Exhaust 냉각수 출구 배가스 Cooling water outlet gas heat exchanger열교환기

Solution cooled absorber Refrigerant냉매 drain드레인 heat 열교환기exchanger

Chilled냉수 water 출구 outlet

밸브AValve A 냉수 입구 밸브BValve B Chilled water inlet Evaporator증발기

Absorber흡수기

농액 펌프

Cooling냉각수 water 입구 inlet 냉수Chilled water 냉각수Cooling water 스팀Steam Refrigerant Diluted solution 냉매 펌프 희액 펌프 Low저온 temp. High고온 temp. 냉매액Refrigerant Pump Pump heat열교환기 exchanger heat열교환기 exchanger 연료공급Fuel inlet 희액Diluted Solution

33

High-efficiency Direct Fired Absorption chiller & heater(COP 1.51)

Low temp. Exhaust Heating Cycle Condenser 응축기 generator저온재생기 High temp.고온재생기 generator 배기가스gas outlet 출구

냉각수 출구 Exhaust배가스 gas Cooling water outlet heat exchanger열교환기

Refrigerant냉매 drain드레인 heat 열교환기exchanger

온수 출구 Hot water outlet

밸브AValve A 온수 입구 밸브BValve B Hot water inlet Evaporator증발기

Absorber흡수기

농액 펌프

Cooling냉각수 water 입구 inlet

온수Hot water 스팀Steam Refrigerant Diluted solution 냉매 펌프 희액 펌프 저온 High고온 temp. 냉매액Refrigerant Pump Pump Low temp. heat열교환기 exchanger heat열교환기 exchanger 연료공급Fuel inlet 희액Diluted solution

34 Absorbent Liquid cooling device to Absorb air conditioning and heating apparatus Purpose This device is to enhance absorption performance on absorber and regeneration on generator. In other words, this improves the performance of absorber and generator of the chiller by minimizing the separation distance between diluted solution heat transfer tube and cooling water transfer tube in order to prevent the concentrated solution being scattered.

Those red circles above on the right are fundamental factors of increasing it high efficiency(COP 1.51 LHV). This cycle with the systematic structure is developed by WORLD EnC only.

35 COP(LHV) 220RT, COP 1.51 COP Component 1.1 1.36 1.51 Evaporator & absorber Arrangement of Heat Low Bundle height Low Bundle height high Bundle height transfer tube Heat evaporator General-type General-type High-efficiency type transfer tube absorber General-type General-type High-efficiency type Low Temperature Application Application Application regenerator Condenser Application Application Application High temperature Application Application Application regenerator High temperature Shell and Tube Plate-type Plate-type heat exchange Low temperature Shell and Tube Plate-type Plate-type heat exchange Refrigerant drain Plate-type Plate-type Cooper brazing Refrigerant heat exchange plate-type heat drain heat Evaporator & absorber Absorbent cooling exchanger exchanger performance improvement Shell and Tube condenser Exhaust-gas Pin-Tube type Pin-Tube type heat exchanger Circulation rate of High Medium Low absorbent Concentration difference of 5~6% 7~8% About 10% absorbent Fuel usage in cooling 28.8 24.2 Below 21.7 period(100RT) Fuel usage comparison 100% 84% Below 75% Operating fee Exhaust-gas High efficiency Solution cooled 21,139 17,763 15,928 heat exchanger heat transfer tube absorber per year[USD]

1.1 1.36 1.51 36 Exhaust Gas Absorption Chiller-Heater

1. Waste exhaust gas can be used for drive heat source. 4. Increase in the efficiency of total energy 2. Convertible use of cooling and heating 5. No power overload in summer season

3. Energy saving product 6. Environment-friendly to use water as refrigerant

Generator Development of diverter valve Exhaust Gas Absorption Chiller-Heater Working at high temp 500℃ Maximum flow for exhaust gas : 90kg/min

Exhaust gas Exhaust gas 576℃ 526℃

Exhaust Gas inlet Chilled water : 12->7℃

Exhaust Gas outlet 150℃ 37 Multi-Fuel Absorption Chiller & Heater

Gas & Ex. Gas Fired (Dual Fuel)

Exhaust Gas Outlet Evaporator Condenser

Low Temp Generator

Cooling Water Outlet Driving Exhaust Gas Inlet Chilled Water Outlet

Chilled Water Inlet

Cooling Water Inlet

Absorber Control Panel Gas Burner

38 5. Control System (MICOM Controller)

Control System (MICOM)

1. Displayed on one screen in the form of a flow diagram

2. Can check the status of each part

3. motor replacement time alert by integrating the driving time

4. Check a different status of the Chiller with self-diagnostic function

5. Remote control function is supported

39 Operation Screen

Input/Output Status Screen(DIGITAL Signal)

40 Screen structure

Status Alarm message Date/Time

Stop Normal

Status of operation Cold water Cold water Control Inlet Outlet Modification Status of In/out let Chilled water Chilled water Inlet Outlet User set up

Hot water Hot water Run Inlet Outlet Operating Record Solution liquid High Temp concentration Stop Generator

Management Condenser Evaporator Refrigerant Refrigerant Reset

41 User Setting

42 Temperature Trend Screen

Running Record Screen(Alarm Record)

43 Control function & Menu structure

Operating Inlet & Outlet Operating Administrator User Set Conditions Condition Record Set

OPERATING HISTORY TEMPERATURE SETTING SENSOR CORRECTION P&ID TYPE DIGITAL I/O INFORMATION

TEMPERATURE DILUTION TIME TABLE TYPE ANALOG I/O PID setting TRANSITION SETTING

PUMP HAND-CONTROL ALARM HISTORY INVERTOR SETTING

OPERATION DELAY CONTROL VALVE SETTING SETTING

OPERATING RESERVATION SETTING IDEAL POINT SETTING

SYSTEM SETTING SIGNAL STATE SELECTION

44 Screen structure

Provide Super high speed Multiple Of CPU system Languages

Operation temperature (0℃ to 60℃) Easy to structure powerful network

Strong Security System Provide variety of library

Function of XPANEL self Various ways of project transmission diagnosis

Provide variety external device High Performance Resistive type Display touch

45 5. Controller system(MICOM Controller)

Construction and Specification

CONTROLLER COMPACT !

Controller size can be changed by PORT when PLC is applied

◇ Temperature sensor : 14 PORT(PT100Ω) ◇ Analog Input : 4 PORT(4~20mA) ◇ Touch Screen & Color Monitor ◇ MICOM Control Program is composed of single-effect and double-effect ◇ Analog Output : 4 PORT(4~20mA) ◇ single-effect standard Logic : Base on Double-lift Hot Water Absorption Chiller ◇ Digital Input : 20 PORT(Maximum 40 PORT) ◇ double-effect standard Logic : Base on Direct Fired Absorption Chiller and Heater ◇ Digital Output : 20 PORT(Maximum 40 PORT)@Relay output ◇ Tough program is constructed by each model ◇ Communication Port : RS-485C, RS-232C, Ethernet

46 6. Reference

No Date Customer Product Quantity No Date Customer Product Quantity Sejong multifunctional 1 201112 WDL 600USRT 8 26 201102 Dongtan Dow Research Institute WDL 675RT 2 administrative city 2 201510 Lotte chemical Daesan factory WDL 1200RT*3, 975RT*1 4 27 201104 Pangyo MTech IT Vision Tower WDL 600RT 3 WDL 825RT*5, 270RT*2, 3 201205 Heungdeok IT valley 8 28 201205 Suwon Homaesil Home-plus WDL 600RT 2 155RT*1 29 201106 Pangyo Woolim W-City WDL 600RT 2 4 201101 Pangyo Korea venture town WDL 340RT, 300RT 10 Jukjun Shinsegae department 30 201202 WDL 600RT 1 5 201409 Gwangmyeong Lotte outlet WDL 600RT*7, 135RT*2 9 store

6 201412 Songdo M1 complex building WDL 459RT*2, 334RT*4 6 31 201008 Pangyo Korea bio park WDL 600RT 3 Munjungdong knowledge 7 201511 WDL 800RT 5 32 201203 Asan Baebag Emart WDL 575RT 2 industry center 33 201109 Songdo I Tower WDL 525RT 3 8 201210 Pangyo N-Square WDL 525/375RT 5 34 201309 Naju Kepco KPS head office WDL 525RT 2 9 201206 Pangyo NC soft WDL 600RT 4 Samsung / Seocheon Training 35 201203 Songdo Yonsei 2stage WDL 525RT 2 10 201307 WDL 600RT 5 center 36 201103 Paju woonjun Emart WDL 525RT 2 11 201510 Posco kwanggyo M3 WDL 525*3,135*2 5 Hanshin three kinds of 37 201309 WDL 525RT, 300RT 2 12 201111 Pangyo Samwhan High-fax WDL 525RT 4 condominium Dongtan Hallym University 38 201209 Pangyo World mark WDL 470RT 2 13 201111 WDL 900RT 2 Hospital Cheonan Baeksuk Cultural 39 201010 WDL 470RT 2 14 201007 Pangyo LIG Laboratory WDL 825RT 2 Centre 40 201301 Daegu cummunication center WDL 420RT 2 15 201401 Korea Institute of Brain Research WDL 825RT 2 Daegu Regional Joint 41 201110 WDL 420RT 2 16 201109 Hyoseong Suseo Office WDL 675RT*3 3 Government

17 200910 Pangyo Samsung techwin WDL 675RT 3 42 200911 Pangyo Yura Corporation WDL 420RT 2

18 201303 Cha group Research Institute WDL 675RT 3 43 200905 Pangyo NH Homeshopping WDL 340RT 3 Jinju Defense Agency for 44 201309 WDL 340RT 2 19 201406 Yongin Everland WDL 400*2,210,110*3 6 technology and Quality 20 201312 Kepco KDN/Naju WDL 340*2,180*2 4 45 200811 Pangyo Public library WDL 340RT 2 Cheonan Senter for social 21 201404 Songdo OK center WDL 300*3,90*2 5 46 200811 WDL 340RT 2 economy in Chungnam kwanggyo Hoban complex 22 201406 WDL 675RT*2, 525RT*2 4 building 47 201209 Costco Gwangmyeong WDL 300RT 2 Kwanggyo Seagate Design 23 201209 WDL 675RT 2 48 201105 Songdo Iljin semiconductor WDL 300RT 2 center 24 200905 Incheon nonhyun Homplus WDL 675RT 2 49 201208 Daegu MMA WDL 270RT 2 Asan Institute for Special 50 200912 WDL 270/135RT 2 25 201211 Pangyo NHN Office WDL 675RT 2 Education

47 6. Reference

No Date Customer Product Quantity No Date Customer Product Quantity

51 201201 Nonhyeon Reason Tel WDL 240RT 2 76 201011 Gimpo Airport Sky Park WDA 330~700RT 12

52 200906 Asan Paenta Indianapolis WDL 240RT 2 77 201307 Suwon Lotte mall WDAE 700RT 6

53 200905 Pangyo cogeneration plant WDL 210/180RT 3 78 201504 Homeplus WDAH 560~650 5 54 200902 Paju cogeneration plant WDL 180/135RT 2 Chungla Lotte complex 79 201204 WDA 500RT 2 building 55 201307 Sejong Hanshin Officetel WDL 525RT, 300RT 2 80 201106 Pohang Hanaro mart WDA 400RT 2 Songdo Glonal university 56 201507 WDL 525RT 3 campus 81 201501 Iran/TNP WDA 400RT 1 Goyang Samsong agricultural 57 201401 WDL 525RT 3 and marine center 82 201512 Lotte mart Yangpyeong WDAE 360RT 2 58 201511 Moonjung office builidng WDL 525RT 2 83 201510 Busan university hospital WDAH 320RT*3,270RT 4 59 201307 KEPCO KPS Naju WDL 525RT 2 Bupyeong-gu government 84 201305 WDA 280RT 2 60 201501 Sejong 1-5 WDL 470RT 2 office building

61 201510 Sheonan buldangdong office WDL 420RT*2, 180RT*1 3 85 201506 Iran/TNP WDA 240RT 2 Wonju National Forensic 62 201404 Sejong 3stage 2nd distruct WDL 420RT 2 86 201303 WDAE 150RT 2 service building Incheon International Airport 63 201301 Pangyo welltz tower WDL 375RT 2 87 201204 WSL 975RT 8 engines room 64 201301 Daegu Cumunication center WDL 420RT 2 88 201308 Yeongjongdo Carl hotel WSL 750RT 2 65 201405 Naepo Sanglee Zenaus WDL 375RT, 180RT 2 89 201503 KOEM WSL 420RT 1 66 201507 pyungchon ryudo R&D center WDL 375RT 2 90 201012 Gimpo Sky park WSL 270RT 1 67 201406 Kwanggyo Venture direct facility WDL 375RT 2 91 200808 ncheon duty-free warehouse WSL 270RT 1 68 201408 Korea ceramic laboratory WDL 360RT 3 92 200904 Inchoen city planing hall WSL 270RT 1 69 201404 Sejong 3stage 2nd district WDL 340RT 2

70 201305 Korea development Institute WDL 300RT 4 93 201506 Iran/HORM WSA 500RT 2 Korea rural community 71 201401 WDL 300RT 3 94 201007 Guangzhou Holiday Inn Hotel WSA 400RT 2 corporation Gyeongsang university 95 201405 WSA 300RT 2 72 201509 Batec R&D center WDL 300RT 2 hospital 73 201312 Costo Uijeongbu WDL 300RT 2 96 201410 Seoul brain vessel Hospital WSA 280RT 2 Agency for defense 74 201405 Hankook tire Gumsan factory WDL 375RT 1 97 201505 WSA 240RT 1 development Credit Guarantee Fund office in 75 201310 WDL 240RT 3 Daegu 48 구분 납품일 현장명 제품 수량 구분 납품일 현장명 제품 수량

99 2015-09-21 D-square WDL210 1 124 2015-10-09 Hwasung Jungmil second place WDL110 2 100 2015-10-15 ACE Plaza WDL135 1 Jeungheung construct_Chunan Multi 2015-10-15 WDL420 1 125 building 101 2015-10-17 BUSAN UNIVERSITY HOSPITAL WDA-H032 1 Jeungheung construct_Chunan Multi 2015-10-15 WDL180 2 126 building 102 2015-10-20 BUSAN UNIVERSITY HOSPITAL WDA-H032 1 127 2015-09-06 Batech RnD Center WDL300 2 103 2015-10-20 BUSAN UNIVERSITY HOSPITAL WDA-H032 1 128 2016-03-31 Liium Medi WDL180 2 104 2015-07-28 BUSAN UNIVERSITY HOSPITAL WDA-H027 1

105 2015-10-15 GwangGyo M3(Lake-park) WDL525 3 129 2015-11-03 Osan Segyou Welfare center WDL090 2

106 2015-10-15 GwangGyo M3(Lake-park) WDL135 2 130 2015-10-01 Dongtan Centerm Plaza WDL300 1

107 2015-08-23 Magok District 18BL parking building WDL155 2 131 2015-10-19 Uddem Plaza WDL155 1 Magok Industrial D23-5 Research 108 2015-11-19 WDL300 1 Facility 132 2016-02-17 Mungjungdong Judical building WDL525 2 109 2015-07-22 Soosung Plaza WDL135 1 133 2015-10-30 Magok Science Park view B8-4 WDL135 2 110 2015-07-22 Garden Plaza WDL155 1 134 2015-10-28 Magok City C1-1 Office building WDL300 1 111 2015-08-24 Magok Tower WDLE470 1 135 2015-11-29 Munjungdong knowledge center WDL825 5 Moonjung city devloped district 112 2015-09-15 WDLE180 1 5-1BL 136 2015-11-09 West Incheon Nonghyup WDL110 1 113 2015-08-21 Dongtan Days Hotel WDL110 1 137 2015-11-24 Jungwangdong office building WDL240 2 114 2015-08-22 Magok distric C1-4 Harium WDL180 2 Magok district B8-1BL Joongwo office 2015-11-30 WDL240 1 115 2015-08-10 Daejun Job promoted center WDL090 2 138 builidng

116 2015-08-19 Dongtan MediPia plaza WDL180 1 139 2015-11-18 Daejsun Ministry research center WDA-E006 1

117 2015-08-19 Dongtan Samsung Medical Plaza WDL180 1 140 2015-12-16 Asan indoor pool WSA012 2 Korean district heating companyi n 118 2015-08-27 Nonghyup Chun an WDL210 2 2015-12-21 WSL090 1 141 Soo won 119 2015-09-11 Everland Panda breeding ground WDL090 1 142 2016-01-18 Weerae earth tower trum WDL900 1 120 2015-09-08 Werae Medi Plaza WDL340 1 143 2016-03-17 Munjungdong Parking building WDL180 2 121 2015-09-10 Dongtan Edu Plaza 1 building WDL210 1 144 2016-02-02 Balsan Park plaza WDLE340 1 122 2015-09-10 Dongtan Edu Plaza 2 building WDL210 1 145 2015-12-29 Suchangdong 705 Neighbor facility WDL110 2 123 2015-07-25 Pyungchon Judo R&D Center WDL340 3

49 구분 납품일 현장명 제품 수량 구분 납품일 현장명 제품 수량

146 2015-12-29 Lottemark in Yangpyung WDA-E036 2 171 2016-04-12 Hyungnam City Plaza WDLE210 1 147 2016-03-22 Business Center WDL420 4 172 2016-06-02 Robot Land WDL270 3 148 2016-05-20 AvenueHillC53 WDL210 2 173 2016-04-29 Inchen Nonhyundong office building WDL180 1 149 2016-05-20 AvenueHillC53 WDL135 2 174 2016-05-02 Dongtan WDL180 1 150 2016-05-23 AvenueHillC54 WDL270 2 175 2016-05-09 Sejong cityc13-2 WDL075 1 151 2016-05-23 AvenueHillC54 WDL180 2

152 2016-04-14 Magok MaybeOne WDL155 1 176 2016-06-28 Makgo Empelache WDL240 1

153 2015-12-30 Hans Bio Med WDL270 2 177 2016-06-28 Makgo Empelache WDL180 1

154 2015-12-30 Hans Bio Med WDL210 1 178 2016-05-25 Suchangdong dongseungyun Plaza WDL210 1 155 2015-12-18 Dongtan Arnus international Hotel WDL210 1 179 2016-07-31 Bansongdong The MS Plaza 91-5 WDL155 1 156 2016-01-11 Dongtan Star Plaza WDL155 1 180 2016-07-31 Bansongdong The MS Plaza 91-5 WDL135 1 157 2016-01-22 Dongtan Clean energy WSA010 1 181 2016-05-20 Suchang Vision Plaza WDL470 1 158 2016-01-28 Dongtan Woosung KTX Tower WDL600 1 182 2016-07-07 Dongik Deumilabel WDL300 2 159 2016-01-15 Sejong SJ Building WDL110 1 Korean education development 2016-07-19 WDA-H100 2 160 2016-02-18 Magok 11,12 districts WDL110 2 183 association

161 2016-02-26 Inha University Hospital WDA-H80 1 184 2016-07-22 Lotte Chemical DEAO PROJECT WDL300 1

162 2016-02-19 Weerae Gunah Tower WDL270 2 185 2016-06-09 HyungNam34-3.4.5Lotte Cinema WDL375 1

163 2016-04-27 IRAN TNP WDA036 2 186 2016-06-09 HyungNam34-3.4.5Lotte Cinema WDL470 1 164 2016-05-21 Gyunggyo Terrace Hill WDL240 1 187 2016-07-04 IRAN TNP WDA021 1 165 2016-05-21 Gyunggyo Terrace Hill WDL240 1 188 2016-06-30 Dongtan New Medi Plaza WDL340 1 166 2016-04-07 Gyunggyo Star In WDL210 1 189 2016-07-13 Daegoo Lottel Plaza WDA-E032 2 167 2016-03-24 Goyang Eastern KFFC WDL090 2 190 2016-07-20 Gyunggyo 3 Blocks WDLE210 2 168 2016-04-20 Suchangdong Daedon Plaza WDL210 1

169 2016-04-04 Saegokdong 538 WDL090 1 191 2016-07-30 KT CINEMA 3 WDL375 1

170 2016-05-13 Genersam Songdo Company WDL270 2 192 2016-08-10 SONGDO DSE WDL180 1

50 구분 납품일 현장명 제품 수량 구분 납품일 현장명 제품 수량

193 2017-02-08 Super Star Tower WDLE270 1 218 2017-07-14 Residence enhancement center WDLE075 1 194 2017-02-03 GwangJang Plaza WDLE300 1 219 2017-06-25 Office bldg Baegot 6 1-1BL WDL340 2 195 2017-02-20 Gwyangyo the shop WDL420 2 220 2017-07-08 Homaesilsang 2-4-1 WDL300 4 196 2017-02-16 Seungmin Plaza WDL155 1 221 2017-05-18 Magok C4-3 WDL135 2 197 2017-02-15 Happy residence Osan WDL075 1 222 2017-05-16 Sejong city post office WDL075 2 198 2017-02-23 E-land yaTop WSL675 1

199 2017-03-07 Main Plaza Seotop WDL155 1 223 2017-03-28 Good Prime WDL180 1

200 2017-02-24 Inha Univ. hospital #3 WDA-H80 1 224 2017-05-11 Haewoondae post office WDA-H007 2

201 2017-03-29 The good mate WDL135,240 2 225 2017-05-29 Chuncheon Post Office WDA-E005 2

202 2017-03-02 Busan Korea sea tech insitituion WDA-H032 1 226 2017-05-15 Gasoowon Library WDA-E016 1 203 2017-03-10 Gimpon Grand Tower WDL155 1 227 2017-06-08 Yungduk Community Cneter WDLE110 1 204 2017-04-03 Hanam Knowledge Center WDLE180,470 5 228 2017-05-20 Daejeon Police station WDA-H020 1 205 2017-05-22 Songdo 206 WDL180 1 Daegoo Bank of animal 229 2017-05-30 WDLE180 2 experiment 206 2017-05-15 Hanam Best Plaza WDL210 1 230 2017-10-30 Misa gangbyeon office bldg WDL155,135 2 207 2017-03-21 Sejong Financial Center 48 B WDL675 2 231 2017-07-21 Pangyo Economic Valley WDLE240 4 208 2017-05-24 SkyPlus Seochang 686-1 WDL180 1

209 2017-07-17 Songpa NongHyup WDL420 3 232 2017-06-15 Gimpo Education center WDLE155 1

210 2017-05-17 Complex Community Center WDLE135 2 233 2017-04-29 Postmate Chiller overhall WSL470상동 1

211 2017-04-11 Busan prosecution office WDL240,135 3 234 2017-08-23 Hanam 14-1Top Plaza WDL240 1 Magok Dooeol electronic 212 2017-04-10 Dongtan 33-1BL WDLE600 2 235 2017-07-12 WDLE180 1 residence 213 2017-04-25 Samgsong City E-Apart WDL270 6 236 2017-08-30 Campus town Gwyang gyo WDL180 2 214 2017-04-29 Bucheon Ace Towe WDL180 1 237 2017-12-06 Sejong Central Plaza WDL210 1 215 2017-06-07 Sinheung telecom center WDLE210 1 238 2017-05-30 Hanam station Tower WDLE155 2 216 2017-05-10 Samchuck glass Theme park WDA-E024 1 239 2017-06-08 Jesus nursing home WDA012 1 217 2017-05-04 Meditox Gwanggyo WDLE180,270 2

51 구분 납품일 현장명 제품 수량 구분 납품일 현장명 제품 수량

240 2017-06-11 Incheon East Education center WDA-E024 1 263 2017-09-29 Boosan CJ Facilities WDLE180 1 241 2017-06-19 Makgok SB Tower2 WDLE420 1 264 2017-10-22 Sejong 3-1,C2-4 Medical Center WDL470 1 Pyungtaek women community 242 2017-06-17 WDA-H015 1 Cnenter 265 2017-10-24 Dongtan Private Edu WDLE090 1 243 2017-06-17 Incheon Police Station WDA-E024 2 266 2017-11-16 Sejong Petit terrace WDLE300 1 244 2017-07-26 DaeWoo Dongtan 2first tower WDL600,375,300 3 267 2017-10-31 Sejong sodam Plaza WDLE300 1 245 2017-07-01 Bucheon Motor Factory WDA-E036 1 268 2017-10-27 Daejeon Bud internal hospital WDA-H036 1 246 2017-06-20 Siheung Vennis WDLE180,135 4

247 2017-08-25 Songdo the Argon WDLE135 1 269 2017-11-05 Gyunggi curtural foundation bldg WDA-E021 2 National Health Insurance The Saemaeul finance firm IT 248 2017-07-23 WSAH900 2 270 2017-12-22 WDA-E036 2 Corporation Ilsan Hospital center Naepo new city group energy 271 2017-10-31 WDL180 1 249 2017-08-15 Hanam Sinsung Plaza WDL300 2 facilities 250 2017-08-17 Gimpo Noble Palace WDLE240 1 272 2017-11-26 Hanam House Weldi Tower WDLE240,600 3

251 2017-09-07 Busan Cultural Center 1 WDA-H021 273 2017-11-25 Sejong City c3-1 WDLE270 2 252 2017-08-22 Han River new city E-Apart WDLE340 2 274 2017-11-10 Songdo community Center WDLE180 1 253 2017-08-29 Magok Lcomteck company WDLE155 1 Choongbook univeristy 254 2017-08-19 Hwasung CnC factory WDLE180 2 275 2017-11-21 Educational Research & Science WDLE300 1 Institute 255 2017-09-27 Dongtan Dream Plaza WDL210 1 276 2017-11-18 Gimpo Lux 9 WDLE210 2

256 2017-12-04 Suwoon distric court WDL525,240 5 277 2017-12-29 Hanam Misa c-3 Block WDLE155 2 257 2017-09-26 Namyang Medical Plaza WDL180 1 Public Prosecutors' Office at 278 2017-12-03 WDA-H013 1 Seosan 258 2017-10-23 Sejong 1-2,C7-2Mardird WDLE340,270 2 279 2017-12-18 Capital Hosipital WSA080 1 259 2017-10-16 Physical training facilities WDA-E012 1 280 2017-12-10 Seoul a probation office WDA-H015 1 Korea institute for defense 260 2017-10-25 WDA-E040 1 analysis 281 2017-12-18 ChoongBook Univ. central Library WDA-E024 1 261 2017-12-24 Incheon Nonhyun Office bldg WDLE155 2 282 2017-12-28 Misa I joeum WDL180 1 262 2017-10-14 Sejong finance center #3 WDL675 2 283

284

52 Main customer

Sejong multifunctional administrative city Incheon International Airport Gimpo Airport Sky Park Lotte Chemical Daesan Factory Double lift Absorption chiller 600USRT 8units Hot water absorption chiller 975USRT 4units Direct filed absorption chiller 700USRT 13units Double lift Absorption chiller 1,300RT 3units, 975RT 1units

Heungdeok IT valley Pangyo Mtekvision office Suwon Lotte Mart Dongtan Hallym university hospital Double lift Absorption chiller 825USRT 5units, Double lift Absorption chiller 600USRT 3units, Absorption chiller and heater 700RT 6units -Double lift Absorption chiller 900USRT 2units 270USRT 2units, 155USRT 1 unit 340USRT 10units

53 Main customer (Commercial building )

Gwangmyeong Lotte outlet Sosa Homeplus Suwon Homaesil Home-plus E-Mart (Paju woonjung/ Asan baebang) Double lift Absorption chiller 600USRT 7units, Double lift Absorption chiller 600USRT 5units Double lift Absorption chiller 600USRT 2units Double lift Absorption chiller 575RT 2units, 135RT 2units 525RT 2units

Kwanggyo Berdiumcomplex building Songdo Lotte complex building Cheongla Lotte complex building kwanggyo POSCO complex building Double lift Absorption chiller 675RT 2units, Double lift Absorption chiller 470RT 2units, Direct fired absorption chiller 500RT 2units Double lift Absorption chiller 525RT 3units, 525RT 2units 340RT 4units 135RT 2units

54 Main customer (Cogeneration plant)

SAMSUNG Sacheon Training Institute Daegu local muti-office Cogeneration plant(Pangyo/Paju) Songdo Global Campus Double lift Absorption chiller 600RT*5 Double lift Absorption chiller 420RT*2 Double lift Absorption chiller 210RT*4, 180RT*3 Double lift Absorption chiller 525RT*3

Busan university hospital Daegu Korea Hyoseong Suseo Office Songdo I Tower Direct fired absorption chiller 320RT*3, 270RT*1 Institute of Brain Research Double lift Absorption chiller 675RT*3 Double lift Absorption chiller 525RT*3 Double lift Absorption chiller 825RT*2

55 Main customer(Office building)

Pangyo NC Soft R&D Center Pangyo CHA hospital multi institute Pangyo Nsquare building Pangyo Bio center Double lift Absorption chiller 600RT*4 Double lift Absorption chiller 675RT*3 Double lift Absorption chiller 520RT*3, 370RT*2 Double lift Absorption chiller 340RT*8

Pangyo LIG Nexone Pangyo Samsung Techwin Pangyo Venture valley Pangyo NHN Double lift Absorption chiller 825RT*2 Double lift Absorption chiller 675RT*3 Double lift Absorption chiller 600RT*3 Double lift Absorption chiller 675RT*2

56 Thank you