KOZK(TV) – Request for Extension of Time to Construct LMS File No

Total Page:16

File Type:pdf, Size:1020Kb

Load more

KOZK(TV) – Request for Extension of Time to Construct LMS File No. 0000034615 The Board of Governors of Missouri State University, licensee of noncommercial educational TV station KOZK(TV), Springfield, Missouri (“KOZK”), hereby requests an extension of time to complete construction of its post-auction channel facilities. See 47 C.F.R. Section 73.3700(b)(5)(iv).1 KOZK requests an additional 180 days to construct, i.e., until May 29, 2019. As the FCC is aware, KOZK suffered a total collapse of its broadcast tower on April 19, 2018, while a crew was on the tower performing necessary repack work in preparation for the station’s transition. KOZK’s existing equipment for its pre-transition channel was rendered inoperable because of the tower collapse. In the months since the tower collapse, the station has worked diligently to restore service to its viewers. KOZK was off-air for a period and operated with extremely limited coverage with a very low power facility for many months until it was finally able to return to service on its pre-transition channel under STA using a temporarily leased tower location. The tower collapse and related issues required KOZK to focus immediately on returning sole public TV service to its rural communities as well as to expedite a brand-new transition plan for its repack – with different equipment on someone else’s tower – to meet its Phase 1 transition date. KOZK investigated many tower and tower site options, all of which required time, effort, tower studies, structural studies, equipment studies, and engineering studies, to develop appropriate plans to return its service to the public and to make arrangements for operation on its post-transition channel. Once the plans were developed, KOZK had to work with its chosen tower landlord, Station KYTV, another local broadcaster being repacked (and also assigned to Phase 1), to coordinate work on the tower and related equipment installation without jeopardizing the tower’s owner own Phase 1 transition plans. In early July, once KOZK’s plans and tower lease arrangements with KYTV were sufficiently advanced, KOZK determined that the best way to meet its Phase 1 deadline and to minimize consumer confusion regarding its rescan was to coordinate its transition date with KYTV’s transition date, which KYTV had already set for September 17, 2018. To accommodate this date, KOZK will construct interim facilities on its post-auction channel at the KYTV tower site. It will then operate with interim facilities on its post- auction channel at the KYTV tower site while it determines whether it would be wiser for the public TV station to rebuild the collapsed tower using FCC reimbursement funds or to build out and operate its permanent facilities from the KYTV site, assuming the necessary tower work at the KYTV site is completed. Although KOZK will be ceasing operations on its pre-repack channel (and commencing operations on its new channel) well in advance of the end of its assigned phase, given its unique situation with a collapsed tower requiring a new, expedited and evolving transition plan to meet its Phase 1 deadline KOZK needs more time to finalize its plans and to construct its permanent post-repack facilities. The series of events KOZK encountered was both unforeseeable and beyond the station’s control and has presented unique technical (and logistical) challenges to construction. 1 KOZK acknowledges that this request has not been filed 90 days before its current construction deadline. The station’s plans have been evolving rapidly and the focus has been on returning KOZK to service and transitioning KOZK’s sister station (KOZJ in Joplin) on September 1, 2018. Accordingly, to the extent necessary, KOZK requests waiver of the 90-day requirement found in 47 C.F.R. Section 3700(b)(5)(iv) for filing this extension request. Thus, KOZK respectfully requests that its construction permit for post-repack facilities (LMS File No. 0000034615) be extended for 180 days, or until May 29, 2019. KOZK will seek temporary authority as required for interim operations on its post-repack channel. 4845-5087-0898, v. 1 .
Recommended publications
  • Federal Register/Vol. 85, No. 103/Thursday, May 28, 2020

    Federal Register/Vol. 85, No. 103/Thursday, May 28, 2020

    32256 Federal Register / Vol. 85, No. 103 / Thursday, May 28, 2020 / Proposed Rules FEDERAL COMMUNICATIONS closes-headquarters-open-window-and- presentation of data or arguments COMMISSION changes-hand-delivery-policy. already reflected in the presenter’s 7. During the time the Commission’s written comments, memoranda, or other 47 CFR Part 1 building is closed to the general public filings in the proceeding, the presenter [MD Docket Nos. 19–105; MD Docket Nos. and until further notice, if more than may provide citations to such data or 20–105; FCC 20–64; FRS 16780] one docket or rulemaking number arguments in his or her prior comments, appears in the caption of a proceeding, memoranda, or other filings (specifying Assessment and Collection of paper filers need not submit two the relevant page and/or paragraph Regulatory Fees for Fiscal Year 2020. additional copies for each additional numbers where such data or arguments docket or rulemaking number; an can be found) in lieu of summarizing AGENCY: Federal Communications original and one copy are sufficient. them in the memorandum. Documents Commission. For detailed instructions for shown or given to Commission staff ACTION: Notice of proposed rulemaking. submitting comments and additional during ex parte meetings are deemed to be written ex parte presentations and SUMMARY: In this document, the Federal information on the rulemaking process, must be filed consistent with section Communications Commission see the SUPPLEMENTARY INFORMATION 1.1206(b) of the Commission’s rules. In (Commission) seeks comment on several section of this document. proceedings governed by section 1.49(f) proposals that will impact FY 2020 FOR FURTHER INFORMATION CONTACT: of the Commission’s rules or for which regulatory fees.
  • Minutes of the March Session of the Faculty Senate Southwest Missouri State University

    Minutes of the March Session of the Faculty Senate Southwest Missouri State University

    Minutes of the March Session of the Faculty Senate Southwest Missouri State University The Faculty Senate held its regularly scheduled meeting on Thursday, March 11, 2004, in Plaster Student Union 313. Chair Jim Giglio called the session to order at 3:31 p.m. Dr. Ralph Smith served as parliamentarian. Substitutes: John Satzinger for Richard Johnson, CIS; George Connor for Frank Mazzella, PLS; and Art Spisak for Pauline Nugent, Associate Professor rank representative. Absences: Holly Baggett, HST; Scott Cameron, MUS; Dan Crafts, Faculty Concerns Committee chair; Nancy Dion, PAS; Charles Facer, LAB; Henry Gabriel, GSC representative; Mark Given, REL; Norm Griffith, Staff Senate representative; Mary Ann Jennings, SWK; Laszlo Kovacs, FRS; Joel Persky, MJF; Douglas Stehle, LIS; Pat Van Velsor, COU; Gary Ward, SMAT; Rafiel Warfield, SGA; and Rod Williams, MIL. Guests: Kim Bell, Records & Registration; Bruno Schmidt, Academic Affairs; Kathy Pulley, Academic Affairs; Skip Phelps, Academic Affairs; Arlen Diamond, Broadcast Services; and Janet Nazeri, STE. Approval of Minutes The minutes of the February 12 meeting were approved as distributed. Announcements 1. This is an update on the presidential search process. As you might remember, Chair Giglio suggested at the January meeting of the Faculty Senate that he had every reason to believe that we would have an open search. He could not say at the time that Governor Mike Franks, chair of the search committee, had approached him about the matter. They had lunch on January 5 and agreed to certain stipulations relating to faculty involvement that he could not share at that time. Two weeks ago he had an additional conversation with him about it.
  • All Full-Power Television Stations by Dma, Indicating Those Terminating Analog Service Before Or on February 17, 2009

    All Full-Power Television Stations by Dma, Indicating Those Terminating Analog Service Before Or on February 17, 2009

    ALL FULL-POWER TELEVISION STATIONS BY DMA, INDICATING THOSE TERMINATING ANALOG SERVICE BEFORE OR ON FEBRUARY 17, 2009. (As of 2/20/09) NITE HARD NITE LITE SHIP PRE ON DMA CITY ST NETWORK CALLSIGN LITE PLUS WVR 2/17 2/17 LICENSEE ABILENE-SWEETWATER ABILENE TX NBC KRBC-TV MISSION BROADCASTING, INC. ABILENE-SWEETWATER ABILENE TX CBS KTAB-TV NEXSTAR BROADCASTING, INC. ABILENE-SWEETWATER ABILENE TX FOX KXVA X SAGE BROADCASTING CORPORATION ABILENE-SWEETWATER SNYDER TX N/A KPCB X PRIME TIME CHRISTIAN BROADCASTING, INC ABILENE-SWEETWATER SWEETWATER TX ABC/CW (DIGITALKTXS-TV ONLY) BLUESTONE LICENSE HOLDINGS INC. ALBANY ALBANY GA NBC WALB WALB LICENSE SUBSIDIARY, LLC ALBANY ALBANY GA FOX WFXL BARRINGTON ALBANY LICENSE LLC ALBANY CORDELE GA IND WSST-TV SUNBELT-SOUTH TELECOMMUNICATIONS LTD ALBANY DAWSON GA PBS WACS-TV X GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION ALBANY PELHAM GA PBS WABW-TV X GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION ALBANY VALDOSTA GA CBS WSWG X GRAY TELEVISION LICENSEE, LLC ALBANY-SCHENECTADY-TROY ADAMS MA ABC WCDC-TV YOUNG BROADCASTING OF ALBANY, INC. ALBANY-SCHENECTADY-TROY ALBANY NY NBC WNYT WNYT-TV, LLC ALBANY-SCHENECTADY-TROY ALBANY NY ABC WTEN YOUNG BROADCASTING OF ALBANY, INC. ALBANY-SCHENECTADY-TROY ALBANY NY FOX WXXA-TV NEWPORT TELEVISION LICENSE LLC ALBANY-SCHENECTADY-TROY AMSTERDAM NY N/A WYPX PAXSON ALBANY LICENSE, INC. ALBANY-SCHENECTADY-TROY PITTSFIELD MA MYTV WNYA VENTURE TECHNOLOGIES GROUP, LLC ALBANY-SCHENECTADY-TROY SCHENECTADY NY CW WCWN FREEDOM BROADCASTING OF NEW YORK LICENSEE, L.L.C. ALBANY-SCHENECTADY-TROY SCHENECTADY NY PBS WMHT WMHT EDUCATIONAL TELECOMMUNICATIONS ALBANY-SCHENECTADY-TROY SCHENECTADY NY CBS WRGB FREEDOM BROADCASTING OF NEW YORK LICENSEE, L.L.C.
  • Federal Register/Vol. 86, No. 91/Thursday, May 13, 2021/Proposed Rules

    Federal Register/Vol. 86, No. 91/Thursday, May 13, 2021/Proposed Rules

    26262 Federal Register / Vol. 86, No. 91 / Thursday, May 13, 2021 / Proposed Rules FEDERAL COMMUNICATIONS BCPI, Inc., 45 L Street NE, Washington, shown or given to Commission staff COMMISSION DC 20554. Customers may contact BCPI, during ex parte meetings are deemed to Inc. via their website, http:// be written ex parte presentations and 47 CFR Part 1 www.bcpi.com, or call 1–800–378–3160. must be filed consistent with section [MD Docket Nos. 20–105; MD Docket Nos. This document is available in 1.1206(b) of the Commission’s rules. In 21–190; FCC 21–49; FRS 26021] alternative formats (computer diskette, proceedings governed by section 1.49(f) large print, audio record, and braille). of the Commission’s rules or for which Assessment and Collection of Persons with disabilities who need the Commission has made available a Regulatory Fees for Fiscal Year 2021 documents in these formats may contact method of electronic filing, written ex the FCC by email: [email protected] or parte presentations and memoranda AGENCY: Federal Communications phone: 202–418–0530 or TTY: 202–418– summarizing oral ex parte Commission. 0432. Effective March 19, 2020, and presentations, and all attachments ACTION: Notice of proposed rulemaking. until further notice, the Commission no thereto, must be filed through the longer accepts any hand or messenger electronic comment filing system SUMMARY: In this document, the Federal delivered filings. This is a temporary available for that proceeding, and must Communications Commission measure taken to help protect the health be filed in their native format (e.g., .doc, (Commission) seeks comment on and safety of individuals, and to .xml, .ppt, searchable .pdf).
  • List of Directv Channels (United States)

    List of Directv Channels (United States)

    List of DirecTV channels (United States) Below is a numerical representation of the current DirecTV national channel lineup in the United States. Some channels have both east and west feeds, airing the same programming with a three-hour delay on the latter feed, creating a backup for those who missed their shows. The three-hour delay also represents the time zone difference between Eastern (UTC -5/-4) and Pacific (UTC -8/-7). All channels are the East Coast feed if not specified. High definition Most high-definition (HDTV) and foreign-language channels may require a certain satellite dish or set-top box. Additionally, the same channel number is listed for both the standard-definition (SD) channel and the high-definition (HD) channel, such as 202 for both CNN and CNN HD. DirecTV HD receivers can tune to each channel separately. This is required since programming may be different on the SD and HD versions of the channels; while at times the programming may be simulcast with the same programming on both SD and HD channels. Part time regional sports networks and out of market sports packages will be listed as ###-1. Older MPEG-2 HD receivers will no longer receive the HD programming. Special channels In addition to the channels listed below, DirecTV occasionally uses temporary channels for various purposes, such as emergency updates (e.g. Hurricane Gustav and Hurricane Ike information in September 2008, and Hurricane Irene in August 2011), and news of legislation that could affect subscribers. The News Mix channels (102 and 352) have special versions during special events such as the 2008 United States Presidential Election night coverage and during the Inauguration of Barack Obama.
  • In P.O.V.'S “Made in L.A.,” Three Immigrant Women Build New Lives

    In P.O.V.'S “Made in L.A.,” Three Immigrant Women Build New Lives

    For Immediate Release Contact: Tracy Fleischman – 310.916.7977 In P.O.V.’s “Made in L.A.,” Three Immigrant Women Build New Lives While Fighting for Justice Emmy Award-Winning Film Puts a Human Face on the Issue of Immigration as Leaders Work Towards Comprehensive Reform; Film Continues to Screen in Local Settings Around the Country A co-production of the Independent Television Service (ITVS). A Diverse Voices Project Co-production. A co-presentation with Latino Public Broadcasting. "Made in L.A. is a breathtaking and deeply touching depiction of the human cost of our immigration crisis. I'm thrilled my colleagues and I had the opportunity to screen this movie on Capitol Hill. I urge anyone who is uncertain about the need for humane reform to see this movie." – Congressman Luis Gutierrez (D - IL) LOS ANGELES – An encore presentation of the Emmy Award-winning feature documentary Made in L.A. will air on the PBS “POV” series this August (check local listings). At a time when leaders are working on a major overhaul of the immigration system, Made in L.A. offers a revealing look at the human side of the immigration debate. Made in L.A., bilingual in English and Spanish, follows the remarkable story of three Latina immigrants working in Los Angeles garment sweatshops as they embark on a three-year odyssey to win basic labor protections from a trendy clothing retailer. “When we started this film, we did not anticipate that the garment workers’ campaign would take three years and that the story would take a deeper turn,” says director Almudena Carracedo.
  • FCC-21-98A1.Pdf

    FCC-21-98A1.Pdf

    Federal Communications Commission FCC 21-98 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of ) ) Assessment and Collection of Regulatory Fees for ) MD Docket No. 21-190 Fiscal Year 2021 ) ) REPORT AND ORDER AND NOTICE OF PROPOSED RULEMAKING Adopted: August 25, 2021 Released: August 26, 2021 Comment Date: [30 days after date of publication in the Federal Register] Reply Comment Date: [45 days after date of publication in the Federal Register] By the Commission: Acting Chairwoman Rosenworcel and Commissioners Carr and Simington issuing separate statements. TABLE OF CONTENTS Heading Paragraph # I. INTRODUCTION...................................................................................................................................1 II. BACKGROUND.....................................................................................................................................2 III. REPORT AND ORDER..........................................................................................................................6 A. Allocating Full-time Equivalents......................................................................................................7 B. Commercial Mobile Radio Service Regulatory Fees Calculation ..................................................27 C. Direct Broadcast Satellite Fees .......................................................................................................28 D. Full-Service Television Broadcaster Fees ......................................................................................36
  • MF01/N06 Plus Postage

    MF01/N06 Plus Postage

    DOCUMENT RESUME ED 292 440 IR 013 191 TITLE A Report to the People. 20Years of Your National Commitment to Public Broadcasting, 1967-1987. 1986 Annual Report. INSTITUTION Corporation for Public Broadcasting, Washington, D.C. REPORT NO ISBN-0-89776-100-6 PUB DATE [15 May 87] NOTE 129p.; Photographs will not reproduce well. PUB TYPE Reports Descriptive (141) EDRS PRICE MF01/n06 Plus Postage. DESCRIPTORS Annual Reports; Cultural Enrichment; Educational Radio; *Educational Television; *Financial Support; *Programing (Broadcast); *Public Television; *Television Viewing IDENTIFIERS *Annenberg CPB Project; *Corporation for Public Broadcasting ABSTRACT This annual report for the Corporation for Public Broadcasting (CPB) for fiscal year 1986 also summarizes the CPB's activities over the last 20 years. The front inside cover folds out to three pages and provides a chronology of the important events in CPB history from its inception in 1967 to 1987. A narrative report on the CPB's 20 years of operation highlights its beginnings, milestones, programming, and audiences; the broadcasting system; and funding. Comments in support of public television by a wide variety of public figures concludes this portion of the report. The 1986 annual report provides information on television programming, radio programming, community outreach, adult learning, program support activities, and system support activities for that fiscal year. The CPB Board of Directors and officers are also listed, and a financial accounting by the firm of Peat, Marwick, Mitchell & Co. is provided. The text is supplemented by a number of graphs, figures, and photographs. (EW) ********************************************************************** Reproductions supplied by EDRS are the best that can be made from the original document.
  • Community Profile

    Community Profile

    Hazard Mitigation Plan Community Profile Community Profile: Introduction Jurisdiction Community Profiles Each participating jurisdiction was asked to write or update a profile that includes information like the history of their jurisdiction, demographics, future development plans and significant historic disasters. Those profiles were integrated by the Office or Emergency Management and transferred into proper format. Because of the various types and sized of jurisdictions (school districts, fire districts, and municipalities), the profiles may not include the same information. For example, smaller fire districts that are ran by volunteers may not have expansion or development plans at this time compared to larger districts with paid fire-fighters. Nevertheless, the profiles provide a basic understanding from staffing figures to a brief history of each jurisdiction. Additionally, it should be noted that a great deal of historical and demographic data is derived from Census reports. Evangel and Drury University Evangel University and Drury University are private Universities and therefore do not qualify as participants of the 2015 Mitigation Plan. Capturing their demographics was included to more accurately represent the student populations present in Greene County. April 2015 2-1.1 Introduction Hazard Mitigation Plan Community Profile Community Profile: Greene County History and Geography Greene County was named for the War of Independence hero, Nathanael Greene who was a general in the colonial army and led patriots in the south. The county is situated on the great Ozark Plateau, in the southwestern part of the State of Missouri. Greene County was originally founded in 1833 by an act of the Legislature in session at St.
  • Federal Register/Vol. 64, No. 78/Friday, April 23, 1999/Notices

    Federal Register/Vol. 64, No. 78/Friday, April 23, 1999/Notices

    20066 Federal Register / Vol. 64, No. 78 / Friday, April 23, 1999 / Notices DEPARTMENT OF COMMERCE PTFP, Room 4625, 1401 Constitution KCAW(FM), Sitka; KRBD(FM), Ave., N.W., Washington, D.C. 20230. Ketchikan; and KSTK(FM), Wrangell. National Telecommunications and The Agency will incorporate all File No. 99098CRB, Raven Radio Information Administration comments from the public and any Foundation, Inc., 2B Lincoln St., Sitka, replies from the applicant in the AK 99835. Contact: Ms. Lisa Herwald, [Docket Number: 981028269±9093±02] applicant's official file. Chief Operating Officer, (907) 747±5877. RIN 0660±ZA05 Alaska Funds Requested: $32,744. Total Project Cost: $43,659. To replace an obsolete, File No. 99069CRB, Rainbird failing 18-year-old transmitter at public Public Telecommunications Facilities Community Broadcasting Corporation, Program (PTFP) radio station KCAW(FM), which 123 Stedman Street, Ketchikan, AK operates on 104.7 MHz in Sitka, AK. AGENCY: National Telecommunications 99901. Contact: Ms. Mary White, File No. 99129CRB, Koahnic General Manager, (907) 225±9655. and Information Administration, Broadcast Corporation, 818 E 9th Funds Requested: $42,494. Total Project Commerce. Avenue, Anchorage, AK 99501. Contact: Cost: $56,659. To replace the obsolete ACTION: Notice of applications received. Ms. Jaclyn Sallee, President & CEO, 23-year-old transmitter at public radio (907) 258±8880. Funds Requested: station KRBD(FM), which operates on SUMMARY: The National $103,555. Total Project Cost: $138,073. 105.9 MHz in Ketchikan, AK. Telecommunications and Information To improve the studio production Administration (NTIA) previously File No. 99070CRB, Wrangell Radio Group, Inc., 202 St. Michael St., capabilities of public radio station announced the solicitation of grant KNBA(FM), which operates on 90.3 applications for the Public Wrangell, AK 99929.
  • Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri

    Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri

    Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri. U.S. Department of Labor Occupational Safety and Health Administration Directorate of Construction October 2018 Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri Report Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri. October 2018 Report Prepared by Bryan D. Ewing, Ph.D., P.E. Mohammad Ayub, P.E., S.E. Office of Engineering Services Directorate of Construction – 2 – Investigation of the April 19, 2018, Communication Tower Collapse in Fordland, Missouri TABLE OF CONTENTS Executive Summary ......................................................................................................5 Introduction ...................................................................................................................7 Incident Description ....................................................................................................10 Observations of Collapsed Tower ..............................................................................11 Structural Analysis and Discussion ............................................................................14 Conclusion ..................................................................................................................19 Appendix A – Erection Drawings ...............................................................................20 Appendix B – Fabrication Drawings ..........................................................................34
  • **4**********************************#************************** Ileprodutionsvpplied By'edes..Are the Best That Can Be Made * Frotrihe Original,Document

    **4**********************************#************************** Ileprodutionsvpplied By'edes..Are the Best That Can Be Made * Frotrihe Original,Document

    DOCUMENT RESUME D 192 737 IR 008 802 TITLE 1979 Annual Report. INSTITUTION Corporation for Public Broadcasting, Washington, D.C. REPORT NO ISBN-0-89776-34-4 PUP DATE 80 NOTE 38p.: For related document, see ED 157 544. AVAILABLE FROM Corporation for Public Broadcasting, 1111 16th Street, N.W., Washington, DC 20036 (free). ''-EDpS PRICE MF01/PCO2 Plus Postage. )EXRIPTORS Broadcast Industry: Educational Radio; Educational Television: *Programing (Broadcast); *Public Television ABSTRACT Activities of the Corporation for Public Broadcasting (CPB) in its fiscal year ending September 30, 1979,are described in terms of telecommunications activities, planningand research, human resources development, satellite technology, and general financing of public broadcasting. Other information includesa CPB assessment of its-goals and policy, services for public broadcastingand the general public, activities of the board of directors andofficers, and detailed financial accounting for the fiscalyear. (MER) **4**********************************#************************** IlePrOdutionsvPplied bY'EDES..are the best that can be made * frotrihe original,document. * -4*0*****,*,***************.*********************************4!******Tic*** U.S. DEPARTMENT OF HEALTH. EDUCATION & WELFARE NATIONAL INSTITUTE OF EDUCATION THIS DOCUMENT 1-iASBEEN REPRO.. DUCE D EXACTLY AS RECEIVED FROM THE PERSON OR ORGANIZATION ORIGIN- ATING IT POINTS OFIEW OR OPINIONS STATED DO NOT NECESSARILY REPRE SENT OF F!CIAL NATIONAL INSTITUTE OF EDUCATION POSITION OR POLICY 1979 Annual Report