VISITORS MAP and Guide

Total Page:16

File Type:pdf, Size:1020Kb

VISITORS MAP and Guide VISITORS MAP and Guide MARTIN LUTHER KING BLVD. E.55 E.87 E.90 E.93 E.97 Welcome to the Cleveland CHESTER Clinic Heart Center. E.105 EUCLID Specialists in The Cleveland Clinic CARNEGIE Heart Center are committed to E.96 THE CLEVELAND E.100 understanding, controlling and CLINIC FOUNDATION preventing diseases of the heart and circulatory system. The Center’s experienced staff accommodates nearly 200,000 patient visits each year, providing top-quality diagnosis and management in state-of-the-art facilities. Their efforts in specialized THE CLEVELAND CLINIC HealthSpace Cleveland patient care are supported by research, education and responsibly HEART CENTER applied technology. Preventive Cardiology and Rehabilitation and Research The Cleveland 9500 Euclid Avenue Clinic Heart Center Cleveland, OH 44195 is rated the number Directions one Heart Center 216/444-9500 in America by Information U.S. News & 216/444-2000 182492 6/04 World Report. 800/CCF-CARE www.clevelandclinic.org/heartcenter Welcome to the Cleveland Clinic Heart Center P29/TCI LEGEND L and Key Surgical Center Pharmacy Garden P Café G2 2nd Floor SurgicalSecond Center Floor P < Second Floor P20 Exit / Cleveland Clinic Heart Center Areas To L Building Entrance F12 Cleveland Clinic Heart Center Welcome Desk L G20B G20A F14 Cardiovascular Medicine Appointment Office L F15 Cardiology Examinations/Outpatient Cardiology H Elevators L > M20A F16 Cardiology Testing F17 Cardiovascular Imaging Lab G Elevators < Exit to PP Garage L < ATRIUM H22 H21 < F18 Cardiology Stress Laboratory Lockers Family Cardiac F24 Thoracic & Cardiovascular Surgery Reception Desk ICU Classroom F25 Cardiology Reception Desk H2-210 for Diagnostic, Interventional, Heart Failure, and Heart Transplant Appointments E. 89th F25 F24 H2-201 E. 90th PP < Cath F26 Cardiology Reception Desk Elevators GARAGE for Cardiac Catheterization Lab, Electrophysiology Lab F26 Ground F30 Cardiac Electrophysiology and Pacing Level Device Checks, Arrhythmia Monitor Lab, Syncope Lab Gb3 Nuclear Medicine G20 Cardiac Intensive Care Unit (CICU) G50-54 Cardiothoracic ICUs and Family Lounge G80 Nursing Floors/Patient Rooms F1 G1 1st Floor G90-91 Nursing Floors/Patient Rooms G100-101 Nursing Floors/Patient Rooms G110-111 Nursing Floors/Patient Rooms/Transplant H Elevators G50-54 L > F18 G Elevators L International Café G5 5th Floor H10 Hospital Admitting M-F 6 a.m.-7:30 p.m. ATRIUM S-S 6:30 a.m.-7:30 p.m. H11 Cashier McDonald's Pizza Hut H21 Cardiac Preparation for Surgery F15 > To Gb3 L Starbucks H22 Heart Failure ICU F17 F16 M20A General Surgery H11 < G Elevators Welcome P20 Surgery Center Information Desk F12 P29 TCI (Surgery Pre-Op Clearance) F14 1st Floor C51 Preventive Cardiology and Rehabilitation and Research Cath > FOUNDERS H10 L L L Elevators CHAPEL (See campus map for location) Admitting G Elevators GIFT H1 < SHOP Main Hospital Entrance Nursing Elevator Dining > > Station Doctor's Men’s Restroom Vending Machines Skyway Elevators to F30, 3rd floor > Dining > Room 8th, 9th,10th,11th Floors Women’s Restroom ATM/Bank Machine Nursing Water Fountain Clinic Drive G90 G100 G110 ient Rooms Clinic Drive G80 Station Valet Parking, 6 a.m. – 7 p.m. -101 -111 Pat -91 < Telephone V E. 96th Parking VV GARAGE Pharmacy < To M and S Buildings < Patient Rooms > L Family Lounge and Discharge Lounge L Information Shuttle Bus Pick-up/Drop-off Station Kiosk 5:15 a.m. – 2 a.m..
Recommended publications
  • Community Profile November 2017
    COMMUNITY PROFILE NOVEMBER 2017 Acknowledgements Coming soon..... Table of Contents 1. Introduction..............................................1 2. The People of the Alisal..........................7 3. Land Use and Housing.........................15 4. Community Character.........................25 5. Quality of Life........................................51 6. Health......................................................57 7. Economic Development.......................71 8. Infrastructure and Mobility.................81 This page was intentionally left blank. CHAPTER 1: INTRODUCTION chapter one INTRODUCTION ALISAL VIBRANCY PLAN: COMMUNITY PROFILE 1 The Alisal Vibrancy Plan Plan Overview City was drafting its Downtown Vibrancy Plan What We Want to and Economic Development Element in 2013. The Alisal community and the City of Salinas are Through relationship building and partnerships Achieve undertaking an exciting planning process. Since with residents, other community groups, City 2013, residents and community organizers have staff, and elected officials, City Council allocated • Create a road map to a healthy and advocated for a community-driven plan to ensure the initial funding for a plan for the Alisal. environmentally sustainable Salinas for all residents a bright future for East Salinas. Through the Plan, the Alisal community will generate their vision for a thriving, safe, and • Confirm the community’s vision for the The Alisal is an eastern neighborhood in the future City of Salinas, generally bounded by Highway sustainable future, and strategies for getting 101 to the southwest, Madeira Avenue and St there. • Commit additional resources in areas of historic disinvestment that are in alignment Augustine Drive to the northwest, E Alisal Street Community participation and empowerment to the southeast, and Freedom Parkway to the with the community’s goals to ensure social are critical to ensure the Plan is responsive to equity northeast.
    [Show full text]
  • Environmental Design of Atrium Buildings in the U.K
    3300 ENVIRONMENTAL DESIGN OF ATRIUM BUILDINGS IN THE U.K. F. Mills Member ASHRAE INTRODUCTION The innovative architects of this period were applying Atrium buildings were first prominent in the U.K. in technology made available by the Industrial Revolution. Victorian times when glazed features were incorporated Iron and glass could provide well lit, comfortable interiors. into building designs to improve daylight quality while pro­ An early example is the gallery at Attingham Park, Shrop­ viding shelter. Many fine examples of this forrn of archi­ shire, by John Nash in 1806. Many more examples follow­ tecture still exist, the most popularly known types being ed in both the U.K. and North America. with perhaps the shopping arcades and main li ne railway terminals. most ambitious project of the period being Paxton's Crystal U.K. developers and their architects, impressed with Palace near London , erected in 1850 but sadly destroyed the success of atria in North America, have adopted this by fire shortly thereafter. approach to U.K. developments and, since 1980, more Despite the obvious success of these early atria, many than 200 examples of various types have been constructed. of which still stand and are considered prestigious build­ The approach to the servicing of these atria has been ings, atria buildings lost favor with architects after 1900. This cautious, with little definitive design guidance in existenca may have resulted from the development of electric light Some early schemes followed the North American ap­ technology, which allowed architects to design buildings proach of heating, ventilating and, in some cases, air without seeking to achieve good daylighting.
    [Show full text]
  • Case Study Skyway Mont Blanc, Courmayeur (IT)
    Skyway Mont Blanc Case study Skyway Mont Blanc, Courmayeur (IT) Client: Funivie Monte Bianco AG, Courmayeur (IT) Architect: STUDIO PROGETTI Architect Carlo Cillara Rossi, Genua (IT) General contractor: Doppelmayr Italia GmbH, Lana Project completion: 2015 Products: FalZinc®, foldable Aluminium with a pre-weathered zinc surface Skyway Mont Blanc Mont Blanc, or ‘Monte Bianco’ in Italian, is situated between France and Italy and stands proud within The Graian Alps mountain range. Truly captivating, this majestic ‘White Mountain’ reaches 4,810 metres in height making it the highest peak in Europe. Mont Blanc has been casting a spell over people for hundreds of years with the first courageous mountaineers attempting to climb and conquer her as early as 1740. Today, cable cars can take you almost all of the way to the summit and Skyway Mont Blanc provides the latest and most innovative means of transport. Located above the village of Courmayeur in the independent region of Valle d‘Aosta in the Italian Alps Skyway Mont Blanc is as equally futuristic looking as the name suggests. Stunning architectural design combined with the unique flexibility and understated elegance of the application of FalZinc® foldable aluminium from Kalzip® harmonises and brings this design to reality. Fassade und Dach harmonieren in Aluminium Projekt der Superlative commences at the Pontal d‘Entrèves valley Skyway Mont Blanc was officially opened mid- station at 1,300 metres above sea level. From cabins have panoramic glazing and rotate 2015, after taking some five years to construct. here visitors are further transported up to 360° degrees whilst travelling and with a The project was developed, designed and 2,200 metres to the second station, Mont speed of 9 metres per second the cable car constructed by South Tyrolean company Fréty Pavilion, and then again to reach, to the journey takes just 19 minutes from start to Doppelmayr Italia GmbH and is operated highest station of Punta Helbronner at 3,500 finish.
    [Show full text]
  • 1 K P and Company 2 Dignity Enterprises Private Limited 3 Dorupo Financial Services Private Limited 4 Ram Bonde & Co 5 Argus
    Active list of Outsourcing Vendors as on 30 June 2021: S NO. NAME OF VENDOR 1 K P AND COMPANY 2 DIGNITY ENTERPRISES PRIVATE LIMITED 3 DORUPO FINANCIAL SERVICES PRIVATE LIMITED 4 RAM BONDE & CO 5 ARGUS INC 6 VEGA CORPORATE SERVICES PVT LTD 7 EAGLE EYE ASSOCIATES 8 V D DADINATH & ASSOCIATES 9 AKEBONO CREDIT SERVICES PRIVATE LIMITED 10 N S ADVISORY SERVICES PRIVATE LIMITED 11 LOGIC ENTERPRISES 12 ALPHA RISK CONTROL SERVICES 13 HI - TEK SYNDICATE 14 KATIYAL AND ASSOCIATES 15 DEEPAK BATRA AND ASSOCIATES 16 COGENT 17 COMPETENT SYNERGIES PRIVATE LIMITED 18 CROSS CHECK ASSOCIATES - AAKFC1867B 19 MAHESHWARI MANTRY AND CO 20 FINMARC CORPORATE SOLUTION 21 NORTHERN CREDIT AND COLLECTION BUSI 22 3G FIELD BASE MANAGEMENT 23 GKC MANAGEMENT SERVICES PRIVATE LIMITED 24 HIRANANDANI AND ASSOCIATES 25 MANOJ KUMAR ROUT 26 KAPIL KAJLA ASSOCIATES 27 MAYAS CORPORATE MANAGEMENT 28 GLOBAL RISK MANAGEMENT SERVICES 29 SYMBIOSIS ENTERPRISE 30 RATNADEEP SETHI AND ASSOCIATES 31 JRSCA CONSULTING AND ADVISORY PRIVA 32 GOPALAIYER AND SUBRAMANIAN 33 CREDIT ALLIANCE SERVICES PRIVATE LIMITED 34 LANDMARK CREDIT 35 SUNNY JOSEPH AND ASSOCIATES 36 WRANGLER ENTERPRISE - GAXPS0212K 37 J MITTAL AND ASSOCIATES 38 AGARWAL PODDAR AND ASSOCIATES 39 ARTHOR SERVICES PRIVATE LIMITED 40 AKR AND ASSOCIATES 41 SARVOTTAM CONSULTANT 42 NEERAJ MEHAN AND ASSOCIATES 43 SHAILENDRA AGARWAL 44 PERFECT INVESTIGATION 45 CHHAJED ENTERPRISES PRIVATE LIMITED 46 S MALHOTRA & CO PRIVATE LIMITED 47 INDEPTH SCREENING SOLUTIONS 48 PRECISE SERVICES 49 AIRAN AND COMPANY 50 MOHIT BAID AND ASSOCIATES 51 RAJESH
    [Show full text]
  • Cleveland Clinic Main Campus
    2013 Community Health Needs Assessment – Cleveland Clinic Main Campus Founded in 1921, Cleveland Clinic is an academic medical center offering patient care services supported by research and education in a nonprofit group practice setting. More than 3,000 Cleveland Clinic staff physicians and scientists in 120 medical specialties care for more than 5 million patients across the system. Patients come to Cleveland Clinic locally, from all 50 states and from more than 132 nations around the world. Cleveland Clinic’s main campus, located in midtown Cleveland, includes a hospital with 1,288 staffed beds; an outpatient clinic; a medical school; a research institute; 26 specialty institutes; and supporting labs and facilities in 46 buildings on 167 acres. Cleveland Clinic patients represent the highest CMS case-mix index in the nation. Comprehensive services include heart care, digestive disease, nephrology and urology, cancer, neurology, diabetes and endocrinology, otolaryngology (ENT), rheumatology, gynecology, orthopaedics and pulmonology. Cleveland Clinic’s health system in Northeast Ohio consists of an academic medical center, two children’s hospitals and eight community hospitals. Each hospital is dedicated to the communi- ties it serves. We verify the health needs of our communities by performing periodic community health needs assessments (CHNAs). These formal assessments are analyzed using widely accepted criteria to determine and measure the health needs of a specific community. In accordance with Internal Revenue Code Section 501(r)(3), each hospital has conducted its own community health needs assessment. Upon review of all of the community health needs assessments for all of our Northeast Ohio facilities, Cleveland Clinic has identified five community health needs that are present in the ma- jority of hospital communities we serve.
    [Show full text]
  • Coping During COVID 19
    Coping During COVID 19 Your Cleveland Clinic social work team wishes the best for you and your family. COVID 19 has impacted all of our lives in one way or another. Here are some resources to ease your mind during this time. FINANCIAL Fortunately, there are available financial resources at this time. These links provide more information regarding the qualifications. Child Care Resources Cuyahoga County-ONLINE ONLY: https://docs.google.com/forms/d/e/1FAIpQLSd8-xY8s9lMQL09fdWsmWy6jeWMmv0FC- tnvVGer0Hn5Pmoug/viewform The USBG financial assistance for those employed through the hospitality industry link: https://www.usbgfoundation.org/beap USBG National Charity Foundation 2654 W Horizon Ridge Parkway Suite B5 PMB 252 Henderson, NV 89052-2803 855.655.8724 General information about Mayor Frank Jackson’s decision to maintain utilities in Cleveland-ONLINE ONLY: https://www.clevescene.com/scene-and-heard/archives/2020/03/13/city-of-cleveland-to-halt-water- and-power-shutoffs-restore- connections?fbclid=IwAR2puC3YNkx2KImyFbDZzA3HllAZpAyS885TOQ4u2zIcfENL4JSO5LPgF_8 Utility information by service provider: Dominion https://www.dominionenergy.com/company/coronavirus First Energy https://www.firstenergycorp.com/newsroom/news_articles/firstenergy-committed-to-maintaining-24- 7-service-to-customers-t.html Cleveland water http://www.clevelandwater.com/blog/how-were-addressing-covid-19-cleveland-water Interest Free loan for businesses through HMLA. Their mission statement and link for the application: https://interestfree.org/coronavirus-covid-19-emergency-fund-press-
    [Show full text]
  • Cleveland Clinic Regional Hospitals EMS Protocols
    VERSION: 5.0.2018 : JULY 2018 DOCUMENT NAVIGATION If viewing this document as a printed hard copy The Header color of each section defines the protocol type Introduction Blue – Adult Protocols Pink – Pediatric Purple – OB Emergencies Gray – Reference or Policy If viewing this document as portable document file (PDF with Adobe Reader) This document is hyperlinked for easy navigation in Adobe Reader. The colored boxes in each protocol tree are linked to the respective pages with further information on the specific procedure, medication, or protocol page. There is an active link when hovering over the text within the colored box and the cursor changes from a bar to a pointer finger. Left clicking will jump to the linked page containing further information. Right clicking and selecting “Previous View” will return you to the page you started at. This document is also bookmarked with respect to the individual sections. Use the book mark feature of Adobe Acrobat to display pre-designated bookmarks and click on each to jump between sections. PROTOCOL REVISION CHANGE LOG PROTOCOL VERSION CHANGE LOG Complete revision and reformatting of current 1.0.2017: January 2017 2014 Cleveland Clinic EMS Protocols and other DRAFT supportive documentation. Draft Revision Draft edits completed on content up to and 2.0.2017: January 2017 including Adult Medical Protocol section. DRAFT EDITS Completed Edits completed and reviewed by committee. All 3.0.2017: March 2017 sections compiled and combined into one (1) FINAL COPY PDF document. Hyperlinks to be completed. Finals last minute edits made. Protocol finalized 4.0.2017: April 2017 and approved.
    [Show full text]
  • ASSESSMENT of the POTENTIAL ROLE of LIVE/WORK DEVELOPMENT in CENTERS
    JULY 2004 ASSESSMENT of the POTENTIAL ROLE of LIVE/WORK DEVELOPMENT in CENTERS JULY 2004 ASSESSMENT of the POTENTIAL ROLE of LIVE/WORK DEVELOPMENT in CENTERS Delaware Valley Regional Planning Commission Created in 1965, the Delaware Valley Regional Planning Commission (DVRPC) is an interstate, intercounty and intercity agency that provides continuing, comprehensive and coordinated planning to shape a vision for the future growth of the Delaware Valley region. The region includes Bucks, Chester, Delaware and Montgomery counties, as well as the City of Philadelphia in Pennsylvania and Burlington, Camden, Gloucester and Mercer counties in New Jersey. DVRPC provides technical assistance and services; conducts high priority studies that respond to the requests and demands of member state and local governments; fosters cooperation among various constituents to forge a consensus on diverse regional issues; determines and meets the needs of the private sector; and practices public outreach efforts to promote two-way communication and public awareness of regional issues and the Commission. Our logo is adapted from the official DVRPC seal and is designed as a stylized image of the Delaware Valley. The outer ring symbolizes the region as a whole, while the diagonal bar signifies the Delaware River. The two adjoining crescents represent the Commonwealth of Pennsylvania and the State of New Jersey. DVRPC is funded by a variety of funding sources including federal grants from the U.S. Department of Transportation’s Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), the Pennsylvania and New Jersey departments of transportation, as well as by DVRPC’s state and local member governments.
    [Show full text]
  • V0012775-026 VMS Datasheet Sub-Construction Atrium Ridgelight
    VELUX modular skylights Sub-construction for Atrium Ridgelight Ny Ny Sub-construction for Atrium Ridgelight at 25-45° pitch VELUX modular skylights in an atrium ridgelight solution can be The sub-construction is not included in the VELUX delivery. The installed on a sub-construction made of steel or concrete finished sub-construction as shown in the drawing only represents general with a steel profile. The sub-construction raises the modules above principles and must be designed and dimensioned to fit the specific the roof surface, protecting the construction against water and building project, local architectural style and practice, and the di- drifting snow, and provides the supporting base for the modular rections of other building suppliers. skylights. 2 VELUX Sub-construction for Atrium Ridgelight D: Sub-construction length Axonometric O: Difference in height of sub-construction A: Opening width B: Opening lenght C: Sub-construction width 210 ± 5mm B 210 ± 5mm O min 200mm 210 ± 5mm A C ± 5 210 ± 5mm 210 ± 5mm min 400mm A C ± 5 210 ± 5mm 68mm B 68mm D ± 5 Sub-construction for Atrium Ridgelight VELUX 3 A: Opening width D: Sub-construction length B: Opening lenght O: Difference in height of sub-construction C: Sub-construction width min 200mm 210 ± 5 B 210 ± 5 D ± 5mm 5 ± 210 5 A ± A 5mm C ± C 400 mm 400 mm 5 A A ± 5mm ± C C 5 ± 210 68mm B 68mm O D ± 5mm min 200mm Sub-construction for Atrium Ridgelight VELUX 4 Connecting to the roof The surface on which roofing felt is laid must be prepared according The roofing felt must be applied to the outside of the sub-construc- to applicable standards for roofing materials and best building tion before mounting the skylight modules.
    [Show full text]
  • Download Press Release
    CONGRATULATIONS DavidAasefEmilyRobertMetroHealth’s Cunningham, Shaikh, Graczyk, Kirsch, MD, PhD PhD PhD PhD LeadsResearchOld InternationalAssistant BrooklynFeatured Assistant Professor Team Campus In Professor to of Create DepartmentPhysicalGuidelines Medicine$9M of on Biomedical RenovationsHow and to BestRehabilitation Engineering Virtually Assess Dizziness Case WesternMetroHealth Reserve System University Case Western Reserve School of Medicine “Miracles happen every day with our rehabilitation patients, who re-learn how to walk, Thetalk and Brain live their Implants lives The Cleveland FES Center congratulates David after traumatic events. This Cunningham, PhD on the appointment of Assistant investmentThat in our Old Could Brooklyn Change Professor in the Department of Physical Medicine & Campus will allow us to strengthen Rehabilitation (PM&R) at the MetroHealth System and these rehabilitation Humanity.programs and Case Western Reserve University School of Medicine. better serve our patients.” Brains are talking to computers,Dr. andCunningham’s research is focused on improving Akramcomputers Boutros, MD to brains. Are ourrehabilitative outcomes for patients with chronic MetroHealth Presidentdaydreams and CEO safe? post-stroke hemiplegia by employing methods of non-invasive brain stimulation (repetitive transcranial magnetic stimulation and transcranial direct current The Cleveland FES Center congratulatesstimulation). Emily Graczyk, PhD on her recent appointment of AasefResearch Shaikh, Assistant MD, PhD, Professor the Penni in the
    [Show full text]
  • Skyway-West Hill Action Plan SWAP
    Attachment J January 22, 2016 The Skyway-West Hill neighborhood and community business center will grow into a vibrant, walkable, ethnically diverse and civically engaged community that involves the collective voice, wisdom and expertise of its resident and business owners in ongoing civic decision-making. Table of Contents I. Executive Summary ...................................................................................................................................... 7 II. Purpose, Vision and Planning Principles .................................................................................................... 12 Plan Purpose ............................................................................................................................................... 12 How We Got to the SWAP ........................................................................................................................... 12 Vision ........................................................................................................................................................... 13 Guiding Principles of the SWAP ................................................................................................................... 13 Planning Process in King County Government ............................................................................................ 14 King County Capital Facilities Planning........................................................................................................ 16 III. Community Profile
    [Show full text]
  • Skyway Flipbook
    GREATER BUFFALO The Campaign for Greater Buffalo History, Architecture & Culture • 403 Main Street, Suite 705, Buffalo, NY 14203 • 716-854-3749 • [email protected]. • January 2021 FOLIO Half a Skyway is Far Better Than None Deconstructing part of the Buffalo Skyway, and reconceiving the rest, would southern section of the Skyway as walking and biking transportation and rec- have a transformative effect.Properties from former DL&W train shed to Urban reation asset. Problem: NYS DOT wants to demolish every bit of the three-mile Renewal superblocks would be enhanced if viaducts, ramps, and interchange long Skyway complex and its approaches, at a cost of over $37 million, and build with New York Thruway were removed. Downtown would be quieter, cleaner, a new inland highway, while widening the Thruway, for $500 million more. safer, and more attractive. The Outer Harbor would be a five-minute walk away. Saving the crossing and its path to Outer Harbor gives us vantages (above, Mobility, access, and equity would advance. Central to the idea is reconceiving downtown overlook) and opportunities, at less than the cost of demolition. GREATER BUFFALO FOLIO SHEET 2 Useful, inspiring, iconic The most interesting alternatives from state competition to reimagine Skyway retained sections over Buffalo River and south toward Buffalo Harbor State Park. The idea has been in around for as long as discussions of tearing down Skyway have been. The Campaign for Greater Buffalo made such a pro- posal in 2007. This is a refinement of that, which at the outset would make it possible to reconstruct the historic streets, waterways, and buildings of the Canal District.
    [Show full text]