<<

Jet MARCH Propulsion 2010 Laboratory volume 40

number 3

Renewing our reach to the heavens By Mark Whalen New tracking station in Australia begins upgrades throughout the Deep

The Canberra, Australia, Deep Space Communications Complex.

Officials gathered near Canberra, Australia, Feb. 25 for a groundbreaking ceremony to begin construction of a new Deep Space Network antenna. From left are Miguel Marina, JPL’s 34-meter implementation manager; Peter Vrotsos, NASA director of network services; Badri Younes, NASA deputy associate administrator for space communications and navigation; Megan Clark, CEO of the Australian Com- monwealth Scientific and Industrial Research Organization (CSIRO); Alex Zelinsky, group executive for information services at CSIRO; Miriam Baltuck, director of the Canberra Deep Space Communications Complex; U.S. Ambassador Jeffrey Bleich; William Gerstenmaier, NASA associate admin- istrator for space operations; Charles Elachi, director of JPL.

With a groundbreaking ceremony near Bhanji, manager of the Deep Space Net- Although more than 40 years old, the it, put people up in the cone of the an- Canberra, Australia, in late February, work Project Office (920). 70-meter antennas aren’t going away just tenna to do the work,” Sible said. “Now construction is now underway to replace JPL acting task manager Miguel Ma- yet. Sible noted that their large aperture we will have a more robust system, with the aging 70-meter-wide (230-foot) com- rina is on site in Canberra to work with size makes them unique, for example, in the ability to add additional frequencies munication antennas of the JPL-managed the Lab’s Australian partners in getting supporting radar science at Goldstone, within the pedestal when they’re needed. Deep Space Network. the initial infrastructure work started. which is the largest movable aperture From a return on investment standpoint, Each of the Deep Space Network The job includes building the infrastruc- that can be used for near-Earth object the beam-waveguides give us more bang complexes—Canberra; Madrid, Spain; ture to support the antennas, their me- tracking with radar. for the buck.” and Goldstone, Calif., near Barstow— chanical structures and electronics, and The beam-waveguide antennas provide Besides JPL’s missions in flight, the will have four 34-meter beam-waveguide additional subsystem resources at the the flexibility needed to operate on mul- DSN currently supports more than 36 antennas when the project is completed signal processing center. tiple frequencies, including the wider- missions in deep space, Earth and lunar by 2024. During the construction period, no bandwidth Ka-band signal, required for orbit for other NASA centers as well as In all, six new antennas will be in- disruptions to power and capabilities are new missions approved after 2009. An for the European, Japanese and Indian stalled throughout the network. expected at the site, said Wayne Sible, array of four of 34-meter (112-foot) space agencies. The network also sup- The task begins at the Canberra facil- acting manager of the 70M Replacement antennas can supply downlink capabili- ports six ground-based science missions. ity, which currently houses the fewest Task Office (926). ties similar to a 70-meter antenna, Sible On-Lab, JPL manages an operations antennas in the network, where three Once the Canberra antennas are suc- said, adding that arrays are scalable, control center that coordinates activities of the new antennas will be added by cessfully installed, the task will move to freeing assets when the 70-meter capa- between the network stations, as well as 2018. Plans call for the first of those to Madrid, where the two new structures bility is not needed. the project’s mission support area, which be completed by 2014 and operational are scheduled for completion in 2020 “The design of the 34-meter beam- is contracted to ITT Industries, Systems by 2015, a challenging timeline due and 2022. Goldstone will have its new waveguides allows us during mainte- Division. ITT also manages an operations to a much greater percentage of flight 34-meter beam-waveguide antenna in nance and upgrades to do work in the and maintenance facility in Monrovia for projects being viewable in the Southern 2024. pedestal, where with the 70-meter we JPL. Hemisphere that year, noted Alaudin have to stop operating the antenna, stow 2 A new way n i v e r s e U of keeping time

Online Users will see an easy-to-use, intuitive timecard with timecards simple interface screens and clearly identified items. receive an upgrade SPECIAL FEATURES

• Project/task numbers can be selected to By Mark Whalen automatically display on log-in. Users can select accounts using an insert feature or make manual entries, and can add their own descriptions and

Dutch Slager / JPL Photo Lab comments. Alicia Bojko of the Institutional Business Systems Division points out features of the new timekeeping system. • Methods of making certain entries for those on a 9/80 schedule (such as adding the 9th hour for a holiday that displays as 8 hours) have been made A number of new features await JPLers when the Lab’s new timekeeping system is rolled out in simple and clear. late April.

Driven by the critical relationship between the timekeeping system and JPL end users, the rede- “Everything on One Tab” sign project will produce a more streamlined and easier-to-use online timecard with more embedded business rules to reduce errors. • Everything you need to complete your timecard The implementation of the current Kronos timekeeping application provided JPL with the capabil- appears on one tab including week ending date, pay ity to accommodate the 9/80 alternate work schedule as well as the unique requirement for both a period, and accruals (vacation, sick leave, personal timekeeping and labor distribution system within the same application, noted project manager Alicia holiday). Bojko of the Institutional Business Systems Division. “However, employees voiced legitimate com- plaints about Kronos’ usability,” she said. “It wasn’t as intuitive as we’d like, and the custom labor- For weekly employees: distribution area proved problematic for users who had numerous charge codes.” • An allocation worksheet calculates percentage of Now, Bojko said, everything employees need to complete their timecard will be on one tab, includ- effort for tasks from hour entries and percentages ing projects and tasks with names and numbers; accruals of personal, sick and vacation time; pay are automatically transferred to the timecard. period and workweek period; and percent of allocation for weekly employees for productive effort. Employees will also be able to select specific work authorization memo (WAM) numbers for display. • Nonproductive effort can be selected from a drop- Other improvements include a more user-friendly interface and the ability to add free-form com- down menu for hour entries, and comments can be ments. Also, to reduce errors on Monday mornings, weekly and hourly timecards will default to the added. prior week until the system locks down at 10 a.m. Mondays. Different messages will appear onscreen depending on employee type (supervisors, overtime-eligible employees, etc.). For hourly employees: In addition, Bojko said, supervisors will now be able to review timecards of their employees via a link on the supervisor’s own timecard. • A daily in/out entry screen for the current day pops Another key savings for JPL comes in managing labor charging for work in process in the Lab’s up on log-in. fabrication organizations. For example, the Enterprise Engineering Division 37 employs numerous • Daily totals are automatically calculated. cleanroom and shop technicians who don’t have their own computers. For them, the timekeeping

application also serves as a tracking system for work orders. But when the Kronos system came

onboard, it couldn’t accommodate both functions together, creating the need for separate entries. TIMELINE But no longer, said Lew Soloway, the Division 37 manager, who noted an additional benefit. “We will be able to have remote reporting when our technicians go to the Cape, where they can use a • User acceptance testing during March/April. PDA to accurately track their work,” he said. “This will be significant when • Operational readiness review in April. goes to Florida.” “We have hundreds of jobs every week, and the ability to keep track of that is very important,” • Labwide training in April includes briefings, hands-on Soloway said. “My concern is our ability to be able to report to our customers what a job costs as and computer-based training; a quick reference aid quickly and as accurately as possible.” will be provided. Bojko said Labwide training for the new timekeeping system will begin in April. E-mail announce- ments of briefings, online tutorials and hands-on training opportunities will commence in March. “The project team has been working diligently to bring the new timecard to the JPL community,” she said. “We have heard the primary challenges and believe that the new user interface will be of great value to employees.” 3 NASA’s proposed fiscal

year 2011 budget includes n i v e r s e U an increase of about Helping $1 billion in funding for Earth science studies over save the the next five years. JPL Earth Science and Technol- Earth ogy Director Diane Evans discusses the ramifications By Mark Whalen for the Laboratory. Dutch Slager / JPL Photo Lab

Once Congress approves it, how will the budget Program. We will also have expanded opportunities in the In addition to the survey, has there been higher play out in terms of current and new missions annual solicitation for Venture-class flight instruments. recognition by the Obama administration, as in Earth science? In the NOAA budget we have funding for Jason 3, which well as Congress and the public? First, the budget includes the reflight of the Orbit- continues measurements of sea level rise, ocean surface Exactly. People really appreciate that we need to have ing Carbon Observatory, with a launch date of Febru- currents and heat transport. views and observations of the Earth even if some of them ary 2013. Since the team that originally implemented Overall, we have a healthier program. I think JPL, our want to debate whether climate change is caused by hu- this mission did such a fantastic job of getting us to the colleagues at the NASA centers and in the university mans. With the current capabilities getting older and no launch pad, everyone has been supportive of a reflight. community all benefit from this. We were all working new capabilities coming on line, we were actually losing We’re also going to see the acceleration of the devel- toward the decadal survey, so anything that’s good for our capacity to monitor the Earth at a really critical time. opment of missions recommended by the 2007 National the survey is good for all of us. It means we have a plan That was really a wakeup call to many people. Academy of Sciences’ decadal survey. This report de- and we get to execute the plan. We’re in a really good position. scribes the Earth science measurement priorities for How might the new opportunities affect staffing both NASA and the National Oceanic and Atmospheric at JPL? Could this mean you can hire more sci- Administration, which is the federal agency that focuses People really appreciate that we need to entists? on the condition of the oceans and the atmosphere. Yes. We are definitely planning to hire people who are The Academy also develops decadal surveys for as- have views and observations of the Earth experts at comparing observations with climate models. tronomy, planetary science, astrophysics and other areas. There’s a lot of uncertainty in future climate because of The 2007 decadal survey was the first one ever for Earth even if some of them want to debate wheth- uncertainty in the models. So we have been working with science. er climate change is caused by humans. the modeling community to make our observations more NASA’s plan includes launching four high-priority, or accessible to them. tier 1, decadal survey missions through 2017. With the current capabilities getting older There have traditionally been pure modeling experts and pure instrument experts—and there is a real need for and no new capabilities coming on line, we Which of those is JPL responsible for? a bridge between these two communities. That’s an area JPL is developing the Soil Moisture Active and Passive were actually losing our capacity to monitor that’s going to grow for us. mission, which is targeted for launch in November 2014, the Earth at a really critical time. That was and Deformation, Ecosystem Structure and Dynamics of How many will be hired? Ice (DESDynI), to launch in 2017. Both of these are part- really a wakeup call to many people. It could be up to 10, at all levels from very experienced nerships with Goddard Space Flight Center. to fresh-outs. We’ll also focus on attracting post-docs in The new budget plan also calls for the development of this area. a class of climate continuity missions, which will include Are you excited about these developments, or a follow-on to our Gravity Recovery and Climate Experi- is it something you knew was coming anyway? ment (GRACE) mission that helps us better understand In addition to the Aquarius mission launching I’ve been expecting great things since the decadal how much ice is being lost from Antarctica and Green- in the coming months, you’ve outlined plans for survey came out in 2007, because it so clearly laid out land, and how much water is being removed from under- launching four more Earth science missions in important things to do. I’m very excited that there is now the next eight years. Is JPL up to the challenge? ground reservoirs. This new mission is scheduled for a not only recognition that this is the right roadmap of what 2015 launch. Definitely. However, there may need to be a change in is needed, but that additional resources are being made Also in the climate continuity missions there may be the mix of expertise and some targeted hiring. This is an available to get us moving down that path. potential additional measurements identified for develop- area we’ll be working on with the other directorates over ment in concert with the U.S. Global Change Research the next few months. Un i v e r s e 4 Pasadena, CA 91109. CA Pasadena, Drive, Grove Oak 4800 Laboratory,Propulsion Jet the of Education and Communications of Office the by published is Universe READ AND SUBMIT CLASSIFIED ADS ADS CLASSIFIED SUBMIT AND READ ATJPL’ online s universe@jpl..gov David Hinkle David Audrey Steffan Audrey JPL Photo Lab Photo JPL Photography Production Design Whalen Mark Editor B N http://jplspace E-mail

Karl Stapelfeldt Karl rief

news ews

John Krist John source us s at

P published images of three planets or threeplanets of images published simultaneously team That Canada. Victoria,Astrophysicsin of Institute Herzbergthe Maroisof Christian by led team a awardedto jointly was belt. the of edge inner the sculpts and years 872 every it orbits that Jupiter-sizedplanet a and star surroundingthe debris and dust of belt a show 2006, and 2004 in obtained images, optical The Earth. fromyears light 25 is which haut, Fomal- star aroundthe belt dust the image to Surveys for Camera vanced Telescope’sSpace Hubble the Ad- team’sreflectedthe with Earth,” work Light-Years25 Planet fromExosolar Kalas. Paul astronomerBerkeley UC by led was team The 2009. 31, May and 2008, 1, June between magazine Science in published paper outstanding most the for Prize Cleveland Newcomb association’sawardedthe paper 2009 a of areco-authors Section, ences Sci- Space Astrophysicsand the in GroupPlanets and Stars of Origins Science. of vancement Ad- the for Association American awardfromthe major a won has that team a of arepart Stapelfeldt Karl maintenance supervisor, died Dec. 1. Dec. supervisor,died maintenance Johnson. Ann and Chamberlain Sue Jones, childrenSteven by vived sur is He 1988. to from1971 JPL Voyagerat and projects,worked ner Nov.14. Glendale. in ForestLawn at held were Brent. Services son and Alane, achievement. of medal NASA a earned also He Club. Management JPL/Caltech the and RecreationClub Industrial Associated the Club, ation RecreEmployees - the presidentof as served He Section. Assurance ity Qual- the to moved then Network, Space Deep the in worked he JPL at years 20 first the For 1996. to 1962 Nov.14. stepgrandchildren.six Richard,threegrandchildrenand son retirement. his until Network Space Deep the for manager facilities overall as served then He Austrailia. and Spain in stations tracking oversaw and Calif., Goldstone, at station tracking space deep- first the for pedestal 83-foot an of construction and design the for responsiblewas He retired1988. in 19. Oct. ager,died man- facilities Network Space Deep earn honors earn Hubble paper and images , 77, a retireda 77, Fehlings, William Mari- the to contributed who Jones, Retiree wife, his by survived Vinsonis fromLab the at Vinsonworked Retiree Dorothy,wife, his by survived is He and 1960 in JPL joined Casperson retireda 86, Casperson, Ronald The Newcomb Cleveland Prize Cleveland Newcomb The an of Images paper,“Optical The fromthe both Stapelfeldt, and Krist and researchersKrist JPL John

assings Leroy Jones, Leroy Vinson,Brooks 89, died 89, 79, died 79, - -

to 1988. He is survived by his wife, his by survived is He 1988. to 14. Jan. PropertyControlGroup,died propertyrepresentativethe senior in 1975. to from1964 Lab the at worked Duryea 30. Dec. Cemetery.National Riverside at was Burial great-grandsonEthan. and Gary,brotherWilbur, Bryan grandson son-in-law and SharonHess daughter Jean; wife, his by survived is He retirement1988. his in until facilities off-site for administrator an also 25. Dec. ter,died Whittier. great-grandchildren.four grandchildrenJr.,and six John and Robert Ronald, sons Janet, rettaand team). flight and test control, articulation and Voyagerand (attitude teams) flight and development and design (orbiter Vikingteam), sailing solar anomaly control,rollaxis mission and tions opera- (flight Surveyor,,Ranger,Sergeantmissile the numerousprojectsincluding to contributed He retired1988. in 17. Dec. grandchildren. great-numerousgrandchildrenand and Susan, and Natalie stepdaughters Vicky,daughter Michael, and Billy sons by survived is He 1991. tiredin appeared online Nov. 13, 2008. Nov.appeared13, online papers Both 8799. HR star the biting presented Jan. 22 at the American the at 22 presentedJan. awardwas The hydrologicsciences. and relatedoceanic or atmospheric the in achievement technological significant highly recognitionof in als individu- to Awardgiven Suomi is The leadership.” team science disciplinary for inspiring progressinspiring throughinter for and cycle, water the and interactions air–sea measurementsof spaceborne sciences. relatedand atmospheric in scientists for professionalsociety leading Meteorologicalnation’sSociety,the AwardAmerican Suomi fromthe E. Verner2010 receivedthe has Liu Liu achievements noted achievements Liu Sothan worked at JPL from1968 JPL at worked Sothan retireda 86, Sothan , Robert Retiree was 1956, in JPL joined who Ingle, retireda carpen- 88, Ingle, Gerald in Hills Rose at wereheld Services Lor daughters by survived is He and 1967 in Lab the joined Kent Retiree reand - 1962 in JPL joined Fehlings Liu was recognized for “researchrecognizedfor in was Liu researchTimsenior scientist JPL WesleyDuryea, Sr.,Kent John TimLiu 84, died 84, 92, died 92, - - L Feb. 6. Feb. held was life of celebration A gal. CarolDou- stepdaughter and Marian, Madre. Sierra in Cemetery,both Pioneer at was burial Churchand Rita St. at held were Services Katherine. daughter EdwardJr.retiredson and (also JPL), Rovers. Exploration Mars Telescopethe Space and Hubble the repairof the as well as nauts; astroApollo - the for way the paved which moon, the programto Surveyor the to contributed He 2004. to 1991 16. Jan. engineer,died Peter C. Theisinger.C. Peter Squyresand Steven Matijevic, Jacob Hurley,SharonDaniel Laubach, son, Erick- James RichardCook, Compton, Bradley Callas, Alexander,John lass Doug- members team providedfor be will certificate a addition, In Ala. Huntsville, in Center Braun Vonthe at April late Conferencein 2010 SpaceOps the during bestowed trophy. be crystal will engraved years. two every team operations one only to presentedawardis The operations.” situ futurein for model a tablishing es- and Mars roveron a operating of challenges varied and unique the meeting in remarkablesuccess missions. space moreor one of success the to critical werecontributions exceptional whose recognizesteams and challenges, support and/or operations space ing overcomin - efforts outstanding for presentedawardis The 2010. for Achievement AwardOutstanding for Ops Space International receivethe to selected Teambeen erations has meeting in Atlanta. in meeting MeteorologicalSociety’s annual 90th outpouring of support on the news the on support of outpouring their for 335 Section in coworkers Thank you! Thank us. aretherefor who people many thereareso that knowing helps it but missed hugely be will He plants. beautiful the for JPL and leagues col- my thank to like also would Wepassed. dad my wordswhen kind and support their for everyone memorial. living lovely a is plant The passing. father’sher following colleagues JPL my of kindnesses thoughtful the for wins international honor international wins team operations Rover Ed Hagerott, Ed He is survived by his wife, Rosemary Rosemary wife, his by survived is He fromLab the at Hagerottworked Thank you to JPL and all of my of all and JPL to you Thank My family and I would like to thank to like would I and family My aregrateful I and Katie, wife, My The honor, which consists of an of consists honor,which The honored“for being is team The Op- Rover Exploration Mars The etters 71, a retireda optical 71, Carla Bagdasaryan Carla Guy WebsterGuy

R spacefaring nations. spacefaring the representativesof of frommost consisting association international operations–oriented spacecraft a is Committee) SpaceOps the as known (also Systems GroundData and Operations Mission Space for Technicalon InterchangeCommittee ment,” she said. she ment,” environthe - caresabout JPL that statewide but NASA with only not tion shops. fromfabrication metals scrap of number a as well as coats, lab and cartridges toner to bottles and fromcans everything includes paper,fiber-basedthis printer of tons 200 about Besides applications. recyclingto fromlandfills diverted percentis 84 Lab, the at annually producedwaste of pounds million 3.5 approximatelythe of that tor,noted recycling/landfillreductioncoordina - JPL’sProgramOffice, Affairs mental Recovery.and Recycling Resourcesof Department California waste. ing reducenvironmentby - improvingthe WasteAwardsReduction Programfor California’shonoredby been has recycling honor recycling Lab captures California of my mom. my of memory in plant lovely the for ERC the to thanks Dergarabedian.And mother,Hripsime my of passing the following and to up leading time the during kindness their for through.get us helped time difficult very this during support your and comforting very been has sympathy Yourplants. lovely and cards, notes the for you of all father.Thank my of passing and recentillness during wordskind and support their for friends our of all sincerelythank card. and plant beautiful appreciatesthe mother’sfamily my My of passing. 25 years, Section 315F; Section years, 25 tion 2731; tion 333D; tion tion 252C; tion 37 years, Section 389F; Section years, 37 31 years, Section 316H; Section years, 31 Argenio 740; WarrenMartin retiredFebruary: in employees JPL following The Garrison Breckinridge years, Section 388L; Section years, years, Section 173E; Section years, My family and I thank everyone everyone thank I and family My to like would I and family My Bruce Conroy Bruce Founded in 1990, the International the 1990, in Founded “This award again gives us recognius - gives awardagain “This EnvironTaenhathe - of Goodrich the administeredby awardis The row,a in JPL year sixth the For Eric Hines Eric etirees , 27 years, Section 2722; Section years, 27 , Thomas WolfeThomas , 25 years, Section 300. Section years, 25 , Alan Stevenson Alan Robert Irigoyen Robert Julie and Martin Ispirian Martin and Julie , 34 years, Section years, 34 , , 26 years, Sec- years, 26 , , 32 years, Sec- years, 32 , , 42 years, Sec- years, 42 , Dung Doan, Dung Eric Tailor,Eric Philip Philip James Susan Susan Lloyd Keith Lloyd Eric Clark Eric , 32 , , 26 , ,

WINTER 02/10 jplSafety Awareness news A PUBLICATION OF THE OCCUPATIONAL SAFETY PROGRAM OFFICE

JPL Human Factors ONLINE SAFETY SAFETY Management NEW TRAINING & CHEMICAL &program SAFETY RESOURCES New Hazard Communication/Chemical Safety Refresher Class Available Online Do you work a prolonged or unusual schedule that extends greater than 60 hours per week? The OSPO office is happy to announce that the JPL Hazard Communication/Chemical Safety Refresher Do you work this schedule for two or more consecutive weeks? class is now available online and can be taken 24/7, Are you experiencing any of the following symptoms: irritability, continuous 365 days of the year. drowsiness, morning drowsiness, mental wander, performance error, attention The JPL Hazard Communication/Chemical Safety Refresher class is required deficit or diminished concentration? to be completed every two years for all personnel who order chemicals, use If so, then the new JPL Human Factors Health and Safety Management Program chemicals or work in areas where chemicals are used or stored. The link can in JPL Rules! (Doc ID 67772) may apply to you. be found on the Occupational Safety Program Office’s Web page, Chemical Safety Corner, at http://safety/ChemicalCorner/. Human Factors (HF) is a multidisciplinary effort to acquire and categorize knowledge about people at work. HF examines the functional relationships OSPO’s Chemical Safety Corner also contains several other chemical safety between people, tasks, technologies and the environment with the goal of resources, such as: promoting safe and efficient human performance. In particular, HF addresses • Hazard Communication/Chemical Safety initial training occupations requiring time and work commitments that may impact employees’ • MSDS Database (Chemwatch) health, safety and work quality. • Chemical Incompatibility Chart The new JPL Human Factors Health and Safety Management Program is a • Abbreviated Laboratory Safety Inspection List for Managers joint venture of the Employee Assistance Program (EAP) and the Occupational • Gas Cylinder Safety Guidelines Safety Program Office (OSPO). Both offices participated in the development of • NFPA Hazard Ratings for Common Chemicals Used at JPL the guidelines on Human Factors, a process owned by OSPO. The guidelines • How to Complete NFPA Door Sign support programs and project managers that deal with special or unique cir- • NFPA Door Sign Example cumstances that could contribute to an environment where personnel may be subjected to Human Factors issues and concerns. • NFPA Sign JPL gives high priority to addressing the potentially detrimental impacts of unusual or varying work times. The goal is to create a safe and healthy work environment and minimize undesirable outcomes. The JPL Human Factors Barbara Cruz’s Corner Health and Safety Program applies to all employees involved in a project or a My name is Barbara Cruz and I am the new section manager task-critical phase where workload circumstances may contribute to an envi- for the Occupational Safety Program Office. I come to JPL with ronment in which personnel may be working extended hours (e.g., assembly, many years of Safety experience, including 9 years at Caltech test and launch operations [ATLO], operational ready test [ORT], and fabrica- as the Environmental, Health and Safety Manager. tion, landing/return, Mars time).

OSPO and other involved departments are available to assist project managers My goals at JPL are in the assessment of HF needs and provide recommendations for appropri- • Continue to develop JPL’s excellent safety agenda into a world-class ate interventions. The assessment includes such topics as stress management, early signs of fatigue impairment and evaluation of work demands. Emphasis program. is given to promoting vacation time as a means of recharging the mind, body • Work to ensure safety is integrated into all aspects of the Laboratory. and spirit after consecutive weeks of extended work shifts. Taking time off also • Provide stellar customer service to everyone at JPL. serves as a way to reduce your accumulated vacation time below 280 hours. I have hit the ground running and am excited to face the challenges For information on guidelines on how to manage fatigue and sleepiness, that only JPL can provide. please visit the EAP website at http://hr/eap/fatigue.cfm. For assistance with this program, please call Anthony Lopez at 354-4867 or I look forward to working with everyone here at JPL. Come by and say visit the OSPO Human Factors home page at http://safety.jpl.nasa.gov/ hello, my door is always open. Programs/HumanFactors. jplS a f e t y A w a r e n e s s news

NOTE: Only one extension request is allowed per experiment/operation. pre-osr process Extensions are not to exceed two months. Use one email per extension Addition to request. modification JPL Rules! Subject Matter Expert Concurrence PRE-OSR EXTENSION REQUEST FORMAT

As a result of the NASA Operations and Engineering Panel (OEP) audit in November To: OSPO Representative 2009, we received an observation stating, “Pre-Operational Safety Review (Pre-OSR) documentation involving pressure systems are not concurred on by the Pressure Cc: [email protected], [email protected], System Manager (PSM) as stated by the PSM. The OEP suggests PSM concurrence [email protected] (for laser Pre-OSRs only), and whomever should become part of the Pre-OSR process now.” else is applicable In response to this observation, the concurrence is being extended to include ad- ditional subject matter experts (SMEs) in areas such as lasers, high voltage, radio SUBJECT: Extension Request for Pre-OSR # frequency, ultraviolet, noise, hydrogen, etc. The process modification is the Pre-OSR must receive the SME’s initial and date beside each hazard listed on page 1 of the BODY: We request the expiration(Bldg. date – ofRoom) Pre-OSR No. , (experiment name) Pre-OSR that necessitates the SME’s expertise prior to approving a Pre-OSR. The , in (state , reason) to be extended to current Pre-OSR form will not be modified to include additional lines for concur- (date) for the purpose of . The current rence from the PSM or any additional SMEs. The current Pre-OSR form will continue expiration date of this Pre-OSR is . to be used. No new hazards are introduced in this operation. Extension Requests It is understandable that there may be specific situations in which the expira- tion date of an existing Pre-OSR may need an extension. The justification may be spreading out the Pre-OSRs so 20 are not due in one month, or an experiment will If the OSPO Representative approves the extension request, they are to “Reply be terminating but has a couple more months of testing. However the case, if re- All” so the Pre-OSR database and hard-copy files can be properly updated to questing an extension, please use the specific format found at right. reflect this change.

Your safety does not depend on luck!!!

IT DEPENDS ON YOU!

The answers to this

puzzle can be found on

the JPL Safety Web site

at: http://Safety

Across 20. New employees and employees who are relocated 10. Electricity and _____ don’t mix ! 3. Before starting a hazardous task, always ensure must have an _____ evaluation 11. To operate machinery, you must be _____ there is a Pre-_____ Safety Review 22. Use eye protection with all _____ 12. Report safety hazards to the “Safety _____” 818-393-6483 7. Energy of pressurized fluids 13. Taking _____ is not following procedures 8. Clean up ____ immediately; they cause slip hazards 14. Emergency _____ must never be blocked Down 9. An “almost” accident: a _____ miss 16. If a ladder is too short, get a _____ one 1. Used for face protection 15. How chemicals get through the skin 17. ______glasses protect your eyes from flying chips 2. The color on an NFPA label that signifies Health 18. Employees who are trained and are allowed to 21. Report these to your supervisor 4. Energy that can cause a shock work on electrical equipment 23. Use your _____ when lifting, not your back 19. Always use a ladder on a _____ surface 5. Always _____ a ladder before use 6. Never touch and always report exposed _____