"Engineering Evaluation of Hesco Barriers Performance at Fargo, ND 2009," May 2009 •'•Transportationtexas S!9Institute

Total Page:16

File Type:pdf, Size:1020Kb

ENCLOSURE 2 Wenck Associates, Inc., "Engineering Evaluation of Hesco Barriers Performance at Fargo, ND 2009," May 2009 •'•TransportationTexas S!9Institute DOS K12 CRASH TEST AND EVALUATION OF THE HESCO C-3315 FLOOD BARRIER by Dean C. Alberson, P.E. Associate Research Engineer Wanda L. Menges Associate Research Specialist and Rebecca R. Haug Assistant Research Specialist Contract No.: P2005003 Project/Test No.: 400001-HBL2 Test Date: 12-17-2004 Sponsored by HESCO Bastion Ltd. April 2005 TH EA A UNVRST SYTE DISCLAIMER The contents of this report reflect the views of the authors who are solely responsible for the facts and accuracy of the data, and the opinions, findings and conclusions presented herein. The contents do not necessarily reflect the official views or policies of the HESCO Bastion Ltd., The Texas A&M University System, or Texas Transportation Institute. This report does not constitute a standard, specification, or regulation. In addition, the above listed agencies assume no liability for its contents or use thereof. The names of specific products or manufacturers listed herein does not imply endorsement of those products or manufacturers. KEY WORDS Anti-ram; perimeter; crash testing; barriers; gates; bollards; walls; fences; homeland security. Technical Renort Documentation Paee 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle 5. Report Date DOS K12 Crash Test and Evaluation of the HESCO C-3315 Flood April 2005 Barrier 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Dean C. Alberson, Wanda L. Menges, and Rebecca R. Haug 400001-HBL2 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 P2005003 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered HESCO Bastion Ltd. Test Report: 47152 Conrad E. Anderson Drive November 2004 - January 2005 Hammond, LA 70401 14. Sponsoring Agency Code 15. Supplementary Notes Research Study Title: Crash Testing HESCO Bastion Ltd Concertainers (HBLC) to U.S. State Department K-12 Name of Contacting Representative: Col. (ret) Jere Cook 16. Abstract The objective of this test is to determine if the HESCO Bastion Ltd. C-3315 flood barrier is capable of arresting a 6810 kg (15,000 lb) truck traveling at 80 km/h (50 mi/h) with 1.0 m (3.3 ft) of vehicle partial penetration and/or deflection. This criterion is based on Condition Designation K12 as stated in ST-STD-02.01, Revision A. This condition designation requires the HESCO Bastion Ltd. C-3315 flood barrier to withstand kinetic energy of 1,695,000 J (1,250,000 ft-lb). This report presents the construction details of the HESCO Bastion Ltd. C-3315 flood barrier, details of the vehicle used in the test, details of the test, and the assessment of the test results. Target impact speed was 75.0 km/h or above (47.0 to 56.9 mi/h), and the actual impact speed was 81.0 km/h (50.3 mi/h). The 1995 International 4700 single-unit flatbed truck impacted the barrier at 90 degrees, with the centerline of the vehicle aligned with the centerline of the barrier. The HESCO C-3315 barrier brought the vehicle to a complete stop with minimal penetration of the vehicle. The front of the cargo bed did not penetrate the inside edge of the barrier and came to rest 0.85 m (2.8 ft) from the inside edge of the barrier. ST-STD-02. 01, Revision A performance criteria limits penetration of the leading edge of the cargo bed to 1 m beyond the pre-impact, inside edge of the barrier. As stated above, the cargo bed did not penetrate the inside edge of the barrier. The actual impact speed was within the permissible range to receive the designated K12 condition level. According to the results of the full-scale crash test, the HESCO Bastion C-3315 flood barrier, as constructed in this test configuration, met the requirements for Condition Designation K12. 17. Key Words 18. Distribution Statement anti-ram; perimeter; crash testing; barriers; gates; Copyrighted. Not to be copied or reprinted without bollards; walls; fences; homeland security consent from HESCO Bastion Ltd. 19. Security Classif.(ofthis report) 20. Security Classif.(ofthis page) 21. No. of Pages 22. Price Unclassified Unclassified 42 Form DOT F 1700.7 (8-72) Reproduction of completed page authorized PV Fr11- Symbol When You Know Multiply By I0 ilna Symbol LENGTH in inches 25.4 millimeters mm ft feet 0.305 meters m yd yards 0.914 meters m mi miles 1.61 kilometers km AREA in2 2 square inches 645.2 square millimeters mm ft2 2 square feet 0.093 square meters m2 yd square yard 0.836 square meters M2 ac acres 0.405 hectares ha 2 2 mi square miles 2.59 square kilometers km VOLUME fl oz fluid ounces 29.57 milliliters mL gal gallons 3.785 liters L 3 cubic feet 3 0.028 cubic meters m3 yd cubic yards 0.765 cubic meters3 m NOTE: volumes greater than 1000 L shall be shown in m MASS oz ounces 28.35 grams 9 lb pounds 0.454 kilograms kg T short tons (2000 Ib) 0.907 megagrams (or "metric ton") Mg (or "t") TEMPERATURE (exact degrees) Fahrenheit 5 (F-32)/9 Celsius °C or (F-32)/1.8 ILLUMINATION fc foot-candles 10.76 lux 2 Ix 2 fi foot-Lamberts 3.426 candela/m cd/m FORCE and PRESSURE or STRESS lbf 2 poundforce 4.45 newtons N lbf/in poundforce per square inch 6.89 kilopascals kPa APPROXIMATE CONVERSIONS FROM SI UNITS Symbol When You Know Multiply By To Find Symbol LENGTH mm millimeters 0.039 inches in m meters 3.28 feet ft m meters 1.09 yards yd km kilometers 0.621 miles mi AREA 2 inches in2 mm square millimeters 0.0016 square 2 2 feet ft m square meters 10.764 square 2 M2 square meters 1.195 square yards yd ha hectares 2,47 acres ac km2 square kilometers 0.386 square miles mi2 VOLUME mL milliliters 0.034 fluid ounces fl oz L liters 0.264 gallons gal3 m3 cubic meters 35.314 cubic feet ft m3 cubic meters 1.307 cubic yards yd 3 MASS g grams 0.035 ounces oz kg kilograms 2.202 pounds lb Mg (or "t") megagrams (or "metric ton") 1.103 short tons (2000 Ib) T TEMPERATURE (exact degrees) 1C Celsius 1.8C+32 Fahrenheit °F ILLUMINATION Ix lux 0.0929 foot-candles fc cd/m 2 candela/m2 0.2919 foot-Lamberts fl FORCE and PRESSURE or STRESS N newtons 0.225 poundforce lbf 2 kPa kilopascals 0.145 poundforce per square inch lbf/in *SI is the symbol for the International System of Units. Appropriate rounding should be made to comply with Section 4 of ASTM E380. (Revised March 2003) ii TABLE OF CONTENTS Section Page IN T R O D U C T IO N .......................................................................................................................... 1 P R O B L E M .................................................................................................................................. 1 B A CK G R O UN D ........................................................................................................................ 1 OBJECTIVES/SCOPE OF RESEARCH ................................................................................... 1 TECHNICAL DISCUSSION .................................................................................................... 3 TE ST PA R A M ETER S ............................................................................................................ 3 T est F acility ............................................................................................................................ 3 Test Article - Design and Construction ............................................................................. 3 Test Conditions and Evaluation Criteria ............................................................................. 7 CRASH TEST 400001-HBL2 (SD-STD-02.01 CONDITION DESIGNATION K12) .......... 9 T est V eh icle ............................................................................................................................ 9 Soil and Weather Conditions ............................................................................................. 9 Im pact D escription ........................................................................................................... 9 D am age to T est A rticle ..................................................................................................... 12 V eh icle D am age .................................................................................................................... 12 O ccupant R isk Factors ....................................................................................................... 12 SUMMARY AND CONCLUSIONS ...................................................................................... 19 ASSESSMENT OF TEST RESULTS .................................................................................. 19 C O N CL U SIO N S ....................................................................................................................... 19 RE F E RE N C E S ............................................................................................................................. 2 1 APPENDIX A. CRASH TEST PROCEDURES AND DATA ANALYSIS .......................... 23 ELECTRONIC INSTRUMENTATION AND DATA PROCESSING ............................... 23 PHOTOGRAPHIC INSTRUMENTATION AND DATA PROCESSING ......................... 24 TEST VEHICLE PROPULSION AND GUIDANCE ........................................................... 24 APPENDIX B. TEST VEHICLE PROPERTIES AND INFORMATION ............................. 25 APPENDIX C. SEQUENTIAL PHOTOGRAPHS ................................................................
Recommended publications
  • Resilient Cambridge Summary Report
    Resilient City ↓ Resilient People This a public summary for Resilient Cambridge. 6 What is climate change? 8 What we’re doing about climate change. ↳ Closer Neighborhoods ↳ Better Buildings ↳ Stronger Infrastructure ↳ Greener City 22 How Cambridge is adapting for a resilient future. 30 Your role in our future: What you can do to help. 32 A broad view of a serious issue. 34 Let’s work together to build a Resilient Cambridge. Resilient City → Resilient People City → Resilient Resilient City of Cambridge Cambridge City of 5 While climate change poses a growing threat to our City, there are many things we can do to reduce the risk and severity of its effects. Among them: → Strengthen community → Plant more trees and organizations that provide create additional green essential services to spaces on public and residents and businesses private property to combat rising temperatures and → Make our buildings flood- energy demand and heat-resilient, and require climate-resilience → Work together with design standards on new neighboring cities and the developments state to minimize flooding What is climate change? Climate change refers to long-term changes in weather patterns that impact our environment and way of life. The science is clear: Our climate is not the same as the one that our cities were built to accommodate, and the pace of change is accelerating. Climate change will The City of Cambridge bring extreme heat, is ready to meet these severe storms, and challenges. extensive flooding. In this document, you’ll learn All three may affect our health about what needs to be done, what and comfort, cause damage to our Cambridge is already doing, and the homes and schools, and threaten our important role that you can play in access to reliable energy and safe making our City more resilient in the drinking water.
    [Show full text]
  • Kopeopeo Canal Remediation Project Flood Management Plan Condition 7.1 Resource Consent 67173
    Kopeopeo Canal Remediation Project Flood Management Plan Condition 7.1 Resource Consent 67173 BOPRC ID: A2708898 MEMORANDUM To: Brendon Love Project Manager - Kopeopeo Canal Remediation From: Peter West B.E. (Hons), CPEng, MIPENZ Date: 28 September 2017 Contract Engineer File Ref: Objective Id: Subject: Kopeopeo East Canal Remediation Project; Flood Management Plan 1 Executive Summary Bay of Plenty Regional Council has received resource consent to remove and treat contaminated sediment from within the Kopeopeo East Canal (the Canal) by a wet-dredging method. This report primarily addresses the detailed conceptual flood-management and drainage aspects of the project specific to the proposed dredging method. It is intended that this report should provide a complete treatment of the relevant material, but in places to improve readability, reference has been made to our previous and/or supporting memoranda (references at the end). This report is in two parts: Part 1 discusses relevant aspects of flood management that form necessary background material, or that have not been previously addressed – either from changes in the proposed method; or from developments in supporting information as the project has unfolded. Part 2 forms the Flood Management Plan proper, with the necessary matrix of preparation, monitoring and response procedures and actions. This flood management plan and its supporting documents (see references below) fulfil the requirements of consent condition 7.1 including all items from 7.1a through 7.1g (Resource Consent 67173; 28 September 2016). This flood management plan is consistent with the Site Management Principles and the Flood Management Principles (reproduced below) that were identified in our January 2016 memo that now form the basis of the resource consent conditions relating to flood management.
    [Show full text]
  • Baseline, Historic and Background Rates of Deposition of Lead-Rich Sediments on the Floodplain of the Coeur D’Alene River, Idaho
    In cooperation with the Coeur d’Alene Tribe Baseline, Historic and Background Rates of Deposition of Lead-Rich Sediments on the Floodplain of the Coeur d’Alene River, Idaho By Arthur A. Bookstrom1, Stephen E. Box1, Robert S. Fouseck2, John C. Wallis1, Helen Z. Kayser1 and Berne L. Jackson3 2004, revised 2013 1 USGS, 904 West Riverside Avenue, Room 202, Spokane, WA 99201 2 PO Box 2756, Auburn, AL 36831 3 Coeur d’Alene Tribe, Plummer, ID 83851 Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government Open-File Report 2004-1211, Version 1.1 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior Gale A. Norton, Secretary U.S. Geological Survey Charles G. Groat, Director U.S. Geological Survey, Reston, Virginia 2006 For product and ordering information: World Wide Web: http://www.usgs.gov/pubprod Telephone: 1-888-ASK-USGS For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment: World Wide Web: http://www.usgs.gov Telephone: 1-888-ASK-USGS Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted material contained within this report. 2 Contents Contents .......................................................................................................................................................................................... 3 Abstract ..........................................................................................................................................................................................
    [Show full text]
  • Stop Log Flood Barriers
    PRODUCT STOP LOG FLOOD BARRIERS Flood Control International Incorporated offers removable stop log barriers that are engineered to provide similar levels of protection to permanent flood defenses, but with the distinct advantage of being fully removable when not required. They comprise aluminum panels that are inserted into steel channels. Custom made clamps compress specialist gaskets to create a reliable barrier against flood water. These stop log barriers can be supplied for virtually any configuration including arcs, closed rectangles or circles and straight runs of any length. The system can be used on slopes up to 20° and can be stepped for steeper gradients. USES Each system is load calculated based on application and the prevailing flood • Single building openings. conditions and can be configured for flood depths up to 13 feet. A four-sided • Openings in flood walls. detail is available for openings that may become fully submerged. • Stainless / aluminum system for marine environments. To facilitate installation in new builds, we can supply preformed ground plates • Fully removable perimeter defense to with integral anchors for the demountable supports. The systems can be buildings. also retrospectively fitted to suitable existing foundations in which case load • A ‘usually stored’ system for erection certified, chemically fixed sleeve anchors are used to attach the demountable when flood warnings received. supports. This leaves only stainless steel bolt blanks at each post BENEFITS location. Due to the strength of our beams, this can • Low cost system. be at 10 feet spacing. • Lightweight - sections allow safe lifting of 10ft beams by one person for rapid Purpose designed gaskets that resist silt clogging and reform even after deployment.
    [Show full text]
  • Protecting Building Utilities from Flood Damage
    FirstEdition FEMA348 November1999 Protecting BuildingUtilities HVAC FromFloodDamage PrinciplesandPracticesfortheDesign andConstructionofFloodResistant BuildingUtilitySystems FUEL ELECTRICAL SEWAGE WATER FEDERALEMERGENCYMANAGEMENTA GENCY MitigationDirectorate 500CStreet,SW Washington,DC20472 IMPORTANT If you ordered and received your copy of Protecting Building Utilites From Flood Damage directly from the FEMA Publications Center, you will automatically receive future updates. If you received your copy of Protecting Building Utilities From Flood Damage through a source other than directly from the FEMA Publications Center, you must complete the coupon below and mail it to the Center or you will not receive future updates. ............................................................................................................ Please add my name to the FEMA Mailing List FE 30 and send me updates of Protecting Building Utilities From Flood Damage Name Address City State Zip Code Fold ........................................................................................................... Place Postage Here Federal Emergency Management Agency P.O. Box 2012 Jessup, MD 20794-2012 Table of Contents CONTENTS Page CHAPTER 1 - Introduction/Overview 1.0 Introduction 1-2 1.1 How to Use this Manual 1-3 1.2 Introduction to Hazards 1-8 1.3 Basic Protection Methods 1-13 CHAPTER 2 - Regulatory Framework 2.0 Introduction 2-2 2.1 Background of the National Flood Insurance Program (NFIP) 2-2 2.2 Community Floodplain Management Permitting Process 2-5
    [Show full text]
  • Water Control Just Got Easier
    Protect Against: THE NEXT GENERATION IN FLOOD PROTECTION TM Water Control Just Got Easier Prevent Water Damage Stop Flowing Water Contain the Mess Prevent Slip & Falls Finally, a solution to these situations: Protect Against: What is the cost? • Storm preparedness • Pipe, roof & equipment leaks Property & Equipment Damage $$$ • Overflowing appliances Downtime Cost $$$ • Cafeteria accidents & spills Price of Restoration $$$ • Water runoff • A/C & refrigeration condensate control Preventing Costly • Water main breaks & sewage back up • Parking garage & elevator shaft Flood Damage PRICELESS protection & more 1 | www.quickdams.com WHY BE PREPARED? Floods are the # natural1 disaster in the United States Gate % d 2 o Feet 25 lo Absorbs Percentage of s F at ts reported work M Absorbs a 1.5 ip Quarts accidents caused r 1 M D Quart from slip and fall iverter D k a e L Pads r Absorbs A 1/8-in. pipe crack m o Da lo can result in a leak - 2 F 1.5 ta Glns rate of s Inches 250 gal/day n I ms ags Da B r 2.5 iers d te rr o 31 a Inches a B o Average number of 3.5 l W d Inches F days of missed work o o from slip and fall l F te Ga r- e 5 t Feet a W 46% of business production loss is due to water damage 2 3 CONTROL PREVENT SLIP & FALL ACCIDENTS FLUIDS Hi-Vis Gray Water Dams Activates • Absorbs water on contact & swells to create a dam when wet! • Compact & lays flat until activated & grows 2.5in high in just 5 minutes • Contain & control the flow of problem water Drip Mats Ideal for: • Absorbent Mats catch leaks, drips & spills • Condensation build up •
    [Show full text]
  • Design of Movable Weirs and Storm Surge Barriers
    InCom Working Group 26 Design of Movable Weirs and Storm Surge Barriers ----- Final Report Version 6.7 1st August 2005 Design of Movable Weirs and Storm Surge Barriers – WG26 –PIANC p. 2 SUMMARY The PIANC InCom-WG26 (Working Group) performed a - Interactions between the technical aspects of a comprehensive review (state-of-the-art) of the modern weir/barrier design with environmental and aesthetic technologies, design tools, and recent researches used to considerations (Section 5.7) design and build structures controlling water level and flow in rivers, waterways, and ports (for navigation and flood - Procedure to assess the global construction cost of a protection). weir at the design stage (Section 5.8) - Design assessment tools for preliminary and detailed The WG considered regulatory structures of river control design stages (Section 6 and Annex A) weirs and storm surge barriers, focussing on the gate design. This includes: - Prefabrication techniques (Section 7) - Gates controlling water level and flow in rivers (even - Codes, rules and standards: at national and international those not navigable) and waterways (lifting gate, tilting level; including the use of the semi-probabilistic gate, radial gate, sector, etc.; designed in one piece or Eurocode format (Section 8) with an upper flap). These are MOVABLE WEIRS. - An extensive list of relevant technical books, web sites, - Gates controlling water level and flow in estuaries with and guidelines (Section 10). regard to high tides and storms (lifting gate, articulated, tilting, rolling, floating, sliding, etc.). These are flood BARRIERS. The present hardcopy WG-26 report is a reduced version of the full report, which is available on the companion CD- The WG Report focuses on the following aspects: ROM, attached to this PIANC hardcopy report (Directory /A2- REPORT WG-26 (Extended Version)/.
    [Show full text]
  • Minor Flood Mitigation Works & Studies Scheme (Non-Coastal )
    Minor Flood Mitigation Works & Coastal Protection Scheme Approved Projects 2016 Local Authority Project Project Approved Locations Details Funding Construction of chambers, installation of gates and non-return €49,500 Carlow Paupish Lane, valves (additional funding) Carlow County Council Associated works Installation of flood gates at key loc- ations, place new concrete floor & Tinnahinch Loch up stand wall in garage €17,280 Raise level by 350mm for a distance of 80m downstream of Graignaman- agh Bridge, provide demountable flood gate to isolate area from flood- ing from Mill Race, provide de- Tinnahinch Quay mountable flood gates to each of the €31,050 properties and provide 350mm up (additional funding) stand to existing wall along Mill Race for 20m Install flood gates at pedestrian, vehicular & field gate entrances and openings on opposite side of public Fonthill, road. Provide sump to facilitate over Ballinabrannagh pumping of surface waters & con- €14,760 struct buttress wall to rear of wall of property Construct reinforced concrete flood Cassidy's House, wall & provide demountable flood Gotham gates €6,030 Construct new wall on the car park €17,985 side of existing wall & carry out Kennedy Car Park works to include drainage and sumps Removal of trees Clare Reconstruction of embankment- set back from channel edge, graded at County Council Mountcatherine €49,500 approximately 1:3 on both sides and flat on top (width of 1.5 to 2m) Associated works Tree & shrub removal from Inchinossig Bridge to the Bunsheelin River, on Bunsheelin River
    [Show full text]
  • Mosquito Creek Debris Flood Barrier – the First Line of Defence in Protecting the Public from Geohazards
    Mosquito Creek Debris Flood Barrier – The First Line of Defence in Protecting the Public from Geohazards Charles Hunt, M.Sc., P.Eng., ACSM., Jamie Stirling, M.Sc., P.Geo., Jack Price, EIT., ACSM Tetra Tech EBA, Vancouver, BC, Canada Fiona Dercole, Michelle Weston District of North Vancouver, North Vancouver, BC, Canada ABSTRACT In the District of North Vancouver, the Mosquito Creek watershed drains water from Grouse and Fromme Mountains through a densely populated residential area down to Burrard Inlet. The upper part of the watershed has had a number of landslides which have the potential to create debris floods, a significant geohazard to the residents of North Vancouver. The District of North Vancouver (DNV) requested the design and installation of a debris flood barrier at an optimal point on Mosquito Creek. Critical to this installation was careful sizing of the barrier for a 200-year debris flood event, locating the barrier within a fish bearing creek containing rare long tailed frogs and providing the most cost effective solution to the DNV. This paper presents the investigation of the mainstem of Mosquito Creek, including a detailed geohazard inventory map documenting notable features such as; significant sediment sources, natural barriers, landslides, bedrock canyons, waterfalls and debris jams. The paper also details some of the engineering design undertaken to construct the debris net within a bedrock canyon. The flexible net debris barrier at Mosquito Creek is only the second barrier of this type to be installed in British Columbia and when compared to alternatives is more cost effective, less intrusive and more easily repaired, making it a more sustainable solution.
    [Show full text]
  • Joint Emergency Action Plan for Severe Storm and Flood Response in City of San José
    Joint Emergency Action Plan for Severe Storm and Flood Response in City of San José Last Revised: December 2018 (THIS PAGE INTENTIONALLY LEFT BLANK) Joint Emergency Action Plan for Severe Storm and Flood Response in City of San José MC14104 December 2018 EXECUTIVE SUMMARY—JOINT EMERGENCY ACTION PLAN The first version of the Joint Emergency Action Plan for Severe Storm and Flood Response in City of San Jose (EAP) was approved by the Santa Clara Valley Water District (District) Board of Directors and San Jose City (City) Council at a joint meeting held on November 3, 2017. The EAP provided guidance on how the District and City would coordinate, communicate, and make decisions during storm and flood events and established a new method of classifying Flood Emergency Operational and Severity Levels. Since there was flooding on Coyote Creek in February of 2017, the EAP included an appendix of specific guidance related to Coyote Creek. The EAP is to be reviewed and/or exercised annually and updated/revised as appropriate. The District Board of Directors and San Jose City Council delegated approval authority for updates and revisions of the EAP to the City Manager and District Chief Executive Officer (CEO) or their designee. In addition to an annual review and revision of the EAP in 2018, three new appendices are being added to provide specific guidance related to flood risks on Guadalupe River, Canoas Creek and Ross Creek. The 2018 review and update to the EAP was initiated in April under the direction of a Joint Management Team and continues to be based on the concept of a Multi-Agency Coordination (MAC) Group.
    [Show full text]
  • Smartest Report on Design of Basic Flood Barrier Prepared For: Project Officer European Commission DRAFT May 2012
    SMARTeST Report on Design of Basic Flood Barrier Prepared for: Project Officer European Commission DRAFT May 2012 D… Flood Barrier Design Prepared by Name Cyprus Partner, under co-ordination of Antonis Toumazis, Position Cyprus Partner Signature D3.2 FReS design List of content 1 Introduction ________________________________________________________________ 4 2 The structure _______________________________________________________________ 5 3 River and Rainwater Floods ____________________________________________________ 7 3.1 Problem Definition ______________________________________________________________ 7 3.2 Hydrostatic Loading _____________________________________________________________ 7 3.3 Wind Loading __________________________________________________________________ 8 3.4 Wave Loading __________________________________________________________________ 8 3.5 Debris Impact Loading ___________________________________________________________ 9 3.6 Hydrodynamic Loading __________________________________________________________11 4 Coastal and Wave Overtopping Floods __________________________________________ 12 4.1 Problem Definition _____________________________________________________________12 4.2 Broken wave __________________________________________________________________12 5 Stress Analysis _____________________________________________________________ 14 5.1 Load Path ____________________________________________________________________14 5.2 Secondary members ____________________________________________________________14 6
    [Show full text]
  • The Impact of Flooding on Aquatic Ecosystem Services
    Biogeochemistry https://doi.org/10.1007/s10533-018-0449-7 The impact of flooding on aquatic ecosystem services Ceara J. Talbot . Elena M. Bennett . Kelsie Cassell . Daniel M. Hanes . Elizabeth C. Minor . Hans Paerl . Peter A. Raymond . Rodrigo Vargas . Philippe G. Vidon . Wilfred Wollheim . Marguerite A. Xenopoulos Received: 20 October 2017 / Accepted: 27 April 2018 Ó The Author(s) 2018 Abstract Flooding is a major disturbance that people through freshwater aquatic ecosystem services, impacts aquatic ecosystems and the ecosystem ser- which often go unrecognized because they are less vices that they provide. Predicted increases in global evident and can be difficult to evaluate. Here, we flood risk due to land use change and water cycle identify the effects that small magnitude frequently intensification will likely only increase the frequency occurring floods (\ 10-year recurrence interval) and and severity of these impacts. Extreme flooding events extreme floods ([ 100-year recurrence interval) have can cause loss of life and significant destruction to on ten aquatic ecosystem services through a system- property and infrastructure, effects that are easily atic literature review. We focused on ecosystem recognized and frequently reported in the media. services considered by the Millennium Ecosystem However, flooding also has many other effects on Assessment including: (1) supporting services (pri- mary production, soil formation), (2) regulating ser- vices (water regulation, water quality, disease Responsible Editor: Sujay Kaushal. regulation, climate regulation), (3) provisioning ser- Electronic supplementary material The online version of vices (drinking water, food supply), and (4) cultural this article (https://doi.org/10.1007/s10533-018-0449-7) con- services (aesthetic value, recreation and tourism).
    [Show full text]