Initial Environmental Examination IND:Uttarakhand Emergency

Total Page:16

File Type:pdf, Size:1020Kb

Initial Environmental Examination IND:Uttarakhand Emergency Initial Environmental Examination Project Number: 47229-001 December 2014 IND: Uttarakhand Emergency Assistance Project Submitted by Uttarakhand Emergency Assistance Project (Roads & Bridges), Government of Uttarakhand, Dehardun This report has been submitted to ADB by the Program Implementation Unit, Uttarkhand Emergency Assistance Project (R&B), Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. STATUS OF COMPLIANCE WITH ADB COMMENTS AND SUGGESTIONS (ADB APPROVAL DATE 15-10-2014) SUB-PROJECT: REHABILITATION OF DAMAGED ROADS UNDER CONTRACT PACKAGES C36, C39, C41, C43, C44 and C45 ROAD SUB-PROJECT S.N. Comments/Suggestions Status of Compliance Remarks 1 We refer to the submission of initial environmental examination (lEE) report for the road sub-projects ……………….. ……………….. in Tehri district proposed for financing under UEAP. The scope includes restoration works (repairs and rehabilitation) of the damaged stretches including resurfacing; repair of pavement overlay; patch work; repairs of protection or retaining walls; repairs and restoration of culverts; and providing all necessary road furniture and roadside safety hardware for the following roads: a) Pratapnagar-Tehri Motor Road (Package No: UEAP/PWD/C36); b) Gaza-Nakot road (Package No: UEAP/PWD/C39); c) Kirtinagar-Dangdhari road (Package No: UEAP/PWD/C41); d) Tehri-Ghansali-Tilwara road (Package No: UEAP/PWD/C43); e) Chamba-Mussoorrie road (Package No: UEAP/PWD/C44); and f) Kirtinagar-Sorakhal road (Package No: UEAP/PWD/C45). 2 We note from the lEE report that the proposed works would be strictly confined within the existing ……………….. ……………….. right-of-way belonging to Public Works Department, Government of Uttarakhand; and no widening or realignment works would be undertaken under the proposed scope. 3 The lEE report prepared for the above works has confirmed that although some of the roads are ……………….. ……………….. passing through forest areas; none of the road sections proposed for undertaking restoration works were located inside or near designated core or buffer areas of national parks/sanctuaries/biosphere reserves, protected wetlands, or any other environmentally and/or ecologically sensitive areas. We note that lEE report has further confirmed absence of rare, threatened, and endangered species (flora and fauna) within the corridors of impact for these road sections. The lEE report has also confirmed that no archaeological and/or protected monuments were located in the vicinity of the proposed road sections to be restored. It is also noted that the proposed works are not expected to have any impact on the forests and do not involve any tree cutting. Based on the information furnished in the lEE report, the environment category of the sub-projects is assessed to be "8" in accordance with ADS's Safeguard Policy Statement (SPS) 2009. We observe that the lEE report has generally been prepared in line with SPS 2009 requirements. 4 We would like to reiterate that ADB SPS 2009 requires all ADB-financed activities to comply with ……………….. Will be ensured host country statutory environmental and forest related regulations applicable at national, state and local levels. We request you to ensure (a) compliance with (i) applicable statutory environmental and forest regulations prior to commencing with works including the provisions stipulated under EIA Notification 2006 (as amended) for state highways located at 1000 m above mean sea level; and (ii) the terms and conditions stipulated in the associated clearances and permits; and (b) timely renewal of statutory permissions as required. 5 We observe that the paragraphs 22, 24, 25, 26, 28, 29, 31, 32, 34, 35, 37, and 38 (under section Paragraphs 49, 50, ……………….. "Project description") are repeated again as paragraphs 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59 51, 52, 53, 54, 55, and 60 (under section "Description of environment") without any associated additional 56, 57, 58, 59 and 60 assessment. The repetition of data /information may please be avoided if no additional (under section assessment is being included. We observe that the data provided in some of the sections is more “Description of than 10 years old (e.g. Para. numbers 123, 125, 126, 130, etc.), which may not be relevant for the environment") analysis. We would like to request you to include latest data for appropriate assessment. We also deleted. request you to provide information regarding the source of the data (including dates) for the Old data replaced by tables included in the lEE report. While we request you to suitably modify the respective paragraphs latest data at Para and sections, we would also appreciate it if the documents are submitted to ADB after a thorough No. 85 to 122. check to avoid such instances. Source of data has been provided in the updated report. 6 Kindly ensure that (i) the corrected lEE reports including associated environmental management Being ensured. ……………….. and monitoring plans (EMMP) are disclosed to public in local language immediately; (ii) the EMMPs are made a part of the bid and the contract documents; (iii) the items of work towards the implementation of environmental management and monitoring by the contractor that are not a part of the technical specifications and the bill of quantities, are specified separately in the bill of quantities in the contract document; and (iv) the testing of baseline parameters at agreed locations is carried out by civil works contractor for developing a baseline data for ambient air quality and noise levels; surface and ground water quality; and soil characteristics prior to commencing with the civil works so that these can be monitored during the construction phase. 7 Kindly incorporate the observation under serial number 5 above, and resubmit the corrected lEE ……………….. The report has been report for our records. The corrected lEE report would then be disclosed on ADB website in corrected. All back up accordance with ADB Public Communication Policy, 2011 and SPS 2009. Please retain all back-up documents and documents, and photographs associated with this lEE report to respond to queries received if any. photographs associated with IEE are being maintained. Initial Environmental Examination September, 2014 India: Uttarakhand Emergency Assistance Project August 2014 Reconstruction & Restoration Work of (1) Pratapnagar -Tehri Motor Road (Package No: UEAP/PWD/C36) (2) Gaza-Nakot Motor Road (Package No: UEAP/ PWD/ C39) (3) Kirtinagar –Dangdhari (Package No: UEAP/ PWD/C41) (4)Tehri- Ghansali- Tilwara (Package No: UEAP/ PWD/C43) (5) Chamba- Mussoorrie (Package No: UEAP/ PWD/C44) (6)Kirtinagar- Sorakhal (Package No: UEAP/ PWD/C45) Prepared by State Disaster Management Authority, Government of Uttarakhand, for the Asian Development Bank. i ABBREVIATIONS ADB - Asian Development Bank ASI - Archaeological Survey of India BOQ - Bill of Quantity CTE - Consent to Establish CTO - Consent to Operate DFO - Divisional Forest Officer DSC - Design and Supervision Consultancy DOT - Department of Tourism CPCB - Central Pollution Control Board EA - Executing Agency EAC - Expert Appraisal Committee EARF - Environment Assessment and Review Framework EC - Environmental Clearance EIA - Environmental Impact Assessment EMMP - Environment Management and Monitoring Plan EMP - Environment Management Plan GoI - Government of India GRM - Grievance Redressal Mechanism IA - Implementing Agency IEE - Initial Environmental Examination IST - Indian Standard Time LPG - Liquid Petroleum Gas MDR - Major District Road MoEF - Ministry of Environment and Forests NAAQS - National Ambient Air Quality Standards NDBR - Nanda Devi Biosphere Reserve NDNP - Nanda Devi National Park NH - National Highway ODR - Other District Road OM - Operations Manual PIU - Project Implementation Unit PMU - Project Management Unit PWD - Public Works Department REA - Rapid Environmental Assessment RSPM - Respirable Suspended Particulate Matter SDMA - State Disaster Management Authority SH - State Highway SPCB - State Pollution Control Board SPM - Suspended Particulate Matter SPS - Safeguards Policy Statement SRTC - State Road Transport Corporation UCADA - Uttarakhand Civil Aviation Development Authority UEAP - Uttarakhand Emergency Assistance Project UEPPCB - Uttarakhand Environment Protection and Pollution Control Board UJS - Uttarakhand Jal Sansthan VR - Village Road ii WEIGHTS AND MEASURES cm - centimeter Crore – 100 lakhs = 10,000,000 Lakh – 100 thousand = 100,000 Km – Kilometer Kph - Kilometer per hour Lpd – liters per day M – Meter mg/l – milligrams per liter Mm – Millimeter MSL - Mean sea level - 10-6 meter g/m3 – micrograms per cubic meter S/cm - micro Siemens per centimeter NTU - Nephalo turbidity unit Ppm – parts per million iii TABLE OF CONTENTS Chapters Contents Page No. EXECUTIVE SUMMARY 1 I INTRODUCTION 4 A. Project background/rationale 4 B. Uttarakhand Emergency Assistance Project (UEAP) 4 C. Purpose of the environmental assessment 5 D. Extent of IEE 5 E. IEE contents 5 F. Methodology 6 G. Public consultation 6 II POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 7 III DESCRIPTION OF THE PROJECT 11 A. Project location 11 B. Proposed category of the project 12 C. Key rehabilitation and reconstruction activities 13 D. Project implementation schedule 13 IV DESCRIPTION OF THE ENVIRONMENT 16 A. Physical environment 16 1. Geography 16 2. Geology 16 3. Physiography 17 B. Pedology 17 C. Climate and meteorology 18 D. Air and noise
Recommended publications
  • Dhanaulti Travel Guide - Page 1
    Dhanaulti Travel Guide - http://www.ixigo.com/travel-guide/dhanaulti page 1 Pleasant weather. Carry Light woollen, umbrella. Dhanaulti When To Max: 30.4°C Min: 23.1°C Rain: 613.7mm Tranquil silences, towering alpines Sep VISIT Pleasant weather. Carry Light woollen, and fresh mountain air define the umbrella. hill station of Dhanaulti. Max: 30.3°C Min: 21.3°C Rain: 242.3mm http://www.ixigo.com/weather-in-dhanaulti-lp-1143863 Frequented by photographers for Oct the eco-park and religious Jan Pleasant weather. Carry Light woollen. devotees for the Sarkanda Devi Famous For : Hill StatioCity Cold weather. Carry Heavy woollen. Max: 29.1°C Min: 16.6°C Rain: 41.4mm Temple, this place gives you the Max: 20.2°C Min: 6.8°C Rain: 43.6mm Nov opportunity to spend some 'me- A stone's throw away from Mussoorie, the Feb Cold weather. Carry Heavy woollen. time' away from the hustle bustle small hill station of Dhanaulti is famous for Cold weather. Carry Heavy woollen, Max: 25.8°C Min: 11.7°C Rain: 6.3mm of city life. its twin Eco-parks, Ambar and Dhara. The umbrella. most interesting fact about this eco-park is Max: 22.8°C Min: 9.4°C Rain: 56.3mm Dec that it is a joint initiative of the local youth Cold weather. Carry Heavy woollen. and the Forest Department in an attempt to Mar Max: 22.3°C Min: 7.9°C Rain: 7.6mm bring about more greenery on the barren Cold weather. Carry Heavy woollen.
    [Show full text]
  • “I Love This Country”
    Country Inn & Suites By Carlson Mussoorie More reasons to say, “I LOVE THIS COUNTRY” Location Country Inns & Suites by Carlson, Mussoorie, located on Convent Road, Near Library Chowk, is an idyllic detour from the hustle=-bustle of the city. With breathtaking view of the Mussoorie Ridge and the snow-capped Himalayan range, the hotel brings out an innate sense of well being to its guests. Accommodation 49 well-appointed rooms and suites, with state-of-the-art modern amenities and functional aesthetics in place, guarantee a warm, comfortable, and homely stay. Guest Rooom Facilities Wi-Fi Internet Access Complimentary Buffet Breakfast 32” LCD Satellite Television Electronic Safe Tea/Coffee Maker 24 hours In-room Dining Travel Desk Services Complimentary Newspaper Banquets & Conferencing Facilities Expansive space of 2600 sq. ft. that can accommodate upto 200 guests. Area Sit Sound Venue AC Lighting (sq. ft.) Down System Class Board Theatre U Shape Blackout Natural Room Room The Ball Room I 2600 200 100 80 90 80 The Ball Room II 1400 100 50 40 50 50 Wellness & Recreation Revive-Steeped in Bliss A sensuous harmony of time-tested wellness wisdom and skilled experts ensures that you leave the spa rejuvenated. Library-Oasis of Leisurely Reading Take a nostalgic walk down the memory lane or a racy jog down the fictional street at the hotel’s well stocked library. I N N & S U I TE S BY CARLSON® Kids’ Zone M U S S O O R I E Secure play zone for kids to channelize the energy while you enjoy a quiet coffee at the balcony overlooking it.
    [Show full text]
  • Conceptual Model for the Vulnerability Assessment of Springs in the Indian Himalayas
    climate Article Conceptual Model for the Vulnerability Assessment of Springs in the Indian Himalayas Denzil Daniel 1 , Aavudai Anandhi 2 and Sumit Sen 1,3,* 1 Centre of Excellence in Disaster Mitigation and Management, Indian Institute of Technology Roorkee, Roorkee 247667, India; [email protected] 2 Biological Systems Engineering Program, College of Agriculture and Food Sciences, Florida A&M University, Tallahassee, FL 32307, USA; [email protected] 3 Department of Hydrology, Indian Institute of Technology Roorkee, Roorkee 247667, India * Correspondence: [email protected]; Tel.: +91-1332-284754 Abstract: The Indian Himalayan Region is home to nearly 50 million people, more than 50% of whom are dependent on springs for their sustenance. Sustainable management of the nearly 3 million springs in the region requires a framework to identify the springs most vulnerable to change agents which can be biophysical or socio-economic, internal or external. In this study, we conceptualize vulnerability in the Indian Himalayan springs. By way of a systematic review of the published literature and synthesis of research findings, a scheme of identifying and quantifying these change agents (stressors) is presented. The stressors are then causally linked to the characteristics of the springs using indicators, and the resulting impact and responses are discussed. These components, viz., stressors, state, impact, and response, and the linkages are used in the conceptual framework to assess the vulnerability of springs. A case study adopting the proposed conceptual model is discussed Citation: Daniel, D.; Anandhi, A.; for Mathamali spring in the Western Himalayas. The conceptual model encourages quantification Sen, S.
    [Show full text]
  • Tehri Garhwal-CSC VLE Details
    VLEs Details -Common Service Center, District-Tehri Garhwal SN District Tehsil Block VLE Name Contact Number Panchayat Address 1 TEHRI GARHWAL Ghansali bhilangana Praveen Singh Panwar 9927863108 Kontibangaon Konti Bangaon CHAMIYALA 2 TEHRI GARHWAL Narendra Nagar narendra nagar Bijendra Kumar 9927183532 \N Gaushala Road 14 Bigha 3 TEHRI GARHWAL Narendra Nagar narendra nagar Jaypal Singh 9756011442 Dhaluwalaa Rajeev Gram Dhalwala 4 TEHRI GARHWAL Narendra Nagar narendra nagar Sushil Chauhan 9627982805 Gaunsari CHAKA ROAD GAJA GAJA 5 TEHRI GARHWAL Dhanaulti jonpur Dheeraj kavi 9917138201 Myani mayani mayani 6 TEHRI GARHWAL Narendra Nagar narendra nagar Narendra Kumar 9634268366 \N KUMAR KHERA NARENDRA NAGAR 7 TEHRI GARHWAL Narendra Nagar narendra nagar Shiv Shankar 8859030746 Bugala Bugala Pawki Devi 8 TEHRI GARHWAL Devprayag kritinagar Pankaj Singh 7579041417 Khola (Kadakot) UTTARAKHAND KIRTINAGAR 9 TEHRI GARHWAL Dhanaulti jonpur ANAND SINGH 9639862245 Dhanchula village Dhanchula anand chock jaunpur 10 TEHRI GARHWAL Dhanaulti jonpur Guroovachan 9675879616 Fidogi village phidogi bhawan thatyur 11 TEHRI GARHWAL Pratapnagar jakhnidhar Devraj Singh 9410545732 Myunda 12 TEHRI GARHWAL Tehri chamba Rohit Sajwan 9557291667 Kot- KOT 13 TEHRI GARHWAL Pratapnagar pratap nagar Dinesh Singh Panwar 8394082560 Dangi Dangi Lambgaon 14 TEHRI GARHWAL Pratapnagar pratap nagar RANJAN PRASAD 9837456238 Manjaf PRATAPNAGAR ROAD THOULDHAR MANJAF 15 TEHRI GARHWAL Pratapnagar pratap nagar Arvind 8171766071 Chaundhar Main Road Vill- Chaundhar 16 TEHRI GARHWAL Pratapnagar pratap nagar Jayprakash Joshi 9760880055 Sujargaon Main Market lambgaon 17 TEHRI GARHWAL Pratapnagar pratap nagar Purushottam Joshi 8126166575 Manjaf MANJAF MANJAF 18 TEHRI GARHWAL Devprayag devprayag Munendra 8126259144 Rumdhar ROOMDHAR ROOMDHAR 19 TEHRI GARHWAL Tehri chamba KEDAR SINGH 9456334277 Chhati Gaza Road Nakot 20 TEHRI GARHWAL Pratapnagar pratap nagar Rahul Kaintura 8006776224 Deengaon DeengaonDeen Gaon Villega Lambgaon Deengaon Posta Mukhem .T.
    [Show full text]
  • Garhwal Zone Name of Sub Substation Ph
    Garhwal Zone Name of Sub SubStation Ph. Division name Name of Sub Station Name of Feeder JE NO SDO NO EE NO Division No. V.I.P 9412075900 Haridwar Road PPCL Ajabpur 9412079519 Nahru Colony Araghar Araghar 1352673620 Nehru Colony 9412075901 Paradeground 9412075925 Raphel Home Ordinance Factory Raipur 9412075953 Vidhan Sabha VVIP Tilak Road 9412075914 Vijay Colony Bindal 1352716105 Bindal Dastana Factory 9412056089 Doon School Bindal 9412075907 V.I.P DEHRADUN (CENTER) 9412075974 Yamuna 9412075917 Chakrata Road Govindgarh 1352530137 Kanwali Road Govindgarh Vijay Park 9412075929 Survey Patel Road 9412075912 Ghanta Ghar Nashvilla Road Parade Ground Parade Ground 1352716145 9412075906 Yojna Bhawan Rajpur Road 9412056089 Substation Sachivalaya Tyagi Road Race Course(01352101123) Patel Road Patel Road 0135-2716143 9412075926 9412057016 Lakhi Bagh Dhamawala Kaulagarh Jaspur CCL Anarwala 1352735538 Dehra 9412075918 Bijapur Pump House Jakhan Anarwala 9412075908 VIP Max Hospital Old Mussoorie Dakpatti 0135-2734211 Malsi 9412075915 Doon Vihar VIP K.P.L L.B.S Kunjbhawan 1352632024 Pump Feeder L.C.H Strawferry Bank Kingrange ITBP DEHRADUN (NORTH) Kyarkuli 1352632859 9412075777 Mussoorie Thatyur 9412075923 9412075910 Murray Pump Survey Landore A.I.R (I/F) Landour 1352632017 PPCL Kirkland D.I.W.S Amity Dilaram Bazar NHO Rajpur Road Hathibarakala 1352741327 9412075919 9412075909 Doon Vihar Bari Ghat Hathibarkala Nadi Rispana 9412075920 Chidyamandi 9412075920 Sahastradhara Sahastradhara 1352787262 Ordinance Factory 9412075911 Sahastradhara 9412075913 MDDA
    [Show full text]
  • Stlist-10202016124752PM.Pdf
    Annexure 12011/34/2010 INSPIRE (Uttarakhand) Dated: 20-Oct-2016 Government of India Ministry of Science & Technology, Department of Science & Technology List of Selected Students under the INSPIRE Award Scheme for the Year 2016-17 Name of the State :Uttarakhand No. of Sanctioned :190 Sr. Name of Name of Name of Sub Name of the School Name of the selected Class Sex Category Name of Father UID No Ref Code No. Revenue Education District Student or Mother District District (Block/Tehsil/Zone etc.) 1 Almora ALMORA Almora G.H.S.S.DHAURA PRIYA ARYA 9 F SC BAHADUR RAM 84852923 16UT1393218 1054 2 Almora ALMORA Almora G.H.S.S.DHAURA ARTI ADHIKARI 10 F Gen PAN SINGH 69151516 16UT1393219 2252 3 Almora Almora Almora G.I.C. BHAKUNA CHANDAN SINGH 8 M Gen HEERA SINGH 16UT1393220 4 Almora Almora Almora G.I.C. BHAKUNA SNEHA BARAKOTI 9 F SC CHANDAN LAL 16UT1393221 5 Almora Almora Almora Holy Angel Public Tanmay Joshi 8 M Gen Anil Kumar Joshi 16UT1393222 School 6 Almora Almora Almora Holy Angel Public Pankaj Pant 10 M Gen M.C.Pant 16UT1393223 School 7 Almora almora Bhikiasain G.I.C. GUMATI DEEPAK SANWAL 9 M Gen MR.RAMESH 85541924 16UT1393224 CHANDRA 5737 SANWAL 8 Almora almora Bhikiasain G.I.C. GUMATI NITYANAND 10 M Gen MR.GOPAL DUTT 73988926 16UT1393225 4677 Page 1 of 14 Sr. Name of Name of Name of Sub Name of the School Name of the selected Class Sex Category Name of Father UID No Ref Code No. Revenue Education District Student or Mother District District (Block/Tehsil/Zone etc.) 9 Almora Almora Dwarahat G.I.C.
    [Show full text]
  • Copy of Uttarakhand Backpacking
    2019 UTTARAKHAND BACKPACKING DELHI-RISHIKESH-AULI-KANATAL-DELHI www.justwravel.com | 9667051161 U T T A R A K H A N D B A C K P A C K I N G UTTARAKHAND: THE LAND OF GODS Uttarakhand is one of those northern states of India whose glory and beauty cannot be described into words. A state Lord Shiva chose to be his home, and gods gave the blessings to be home of the origin of River Ganga, the holiest of all. Uttarakhand, as the name suggests was previously a northern part of another state (Uttar Pradesh) and now has its boundaries with China (Tibet), Nepal, Uttarakhand and Himachal. This year, pack your bags nad see the side of Uttarakhand that you’d have never seen or heard of, The Wraveler Side! Covering some of the most beautiful and famous destinations accessible by road, this backpacking trip to Uttarakhand is going to be a treat for the shutterbug in you. I T I N E R A R Y 6 N / 7 D Day 1 OVERNIGHT TRAVEL FROM DELHI TO RISHIKESH VIA HARIDWAR Approximately 230 kms away from Delhi, Rishikesh is our first pit stop and will be the kick off point of an incredible adventure! The overnight journey would be around 5-6 hours long and you’ll reach Rishikesh in the morning the next day, crossing Haridwar on the way which is a famous tourist spot for its artistic feels and is also a humble city, famous being one of the holiest in our country. Day 2 RISHIKESH LOCAL SIGHTSEEING.
    [Show full text]
  • 47229-001: Uttarakhand Emergency Assistance Project
    Initial Environmental Examination Project Number: 47229-001 November 2015 IND: Uttarakhand Emergency Assistance Project Subproject : UEAP/PWD/C-79 & UEAP/PWD/C-80, Tehri District, Uttarakhand Submitted by Uttarakhand Emergency Assistance Project (Roads & Bridges), Government of Uttarakhand, Dehardun This report has been submitted to ADB by the Program Implementation Unit, Uttarkhand Emergency Assistance Project (R&B), Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. This Initial Environment Examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area Initial Environmental Examination October 2015 India: Uttarakhand Emergency Assistance Project Restoration & Reconstruction of: 1. Internal Motor Roads of Muni-Ki-Reti & Tapowan area (UEAP/PWD/C- 79)District Tehri, Uttarakhand 2. Internal Motor Roads of Nagar Palika Tehri (Tehri to Baurari) by BM & SDBC (3 Km. portion of SH-8 & 7.50 Km. portion urban road (UEAP/PWD/C-80) under Nagar Palika Tehri, Uttarakhand Prepared by State Disaster
    [Show full text]
  • Forest Structure, Diversity and Regeneration Potential Along Altitudinal Gradient in Dhanaulti of Garhwal Himalaya
    Forest Systems 25(2), e058, 15 pages (2016) eISSN: 2171-9845 http://dx.doi.org/10.5424/fs/2016252-07432 Instituto Nacional de Investigación y Tecnología Agraria y Alimentaria (INIA) RESEARCH ARTICLE OPEN ACCESS Forest structure, diversity and regeneration potential along altitudinal gradient in Dhanaulti of Garhwal Himalaya Sushil Saha1, Govind-Singh Rajwar1 and Munesh Kumar2* 1Department of Botany Govt. Post Graduate College, Rishikesh 249201, Uttarakhand, India. 2Department of Forestry, HNB Garhwal University, Srinagar-Garhwal, Uttarakhand, India Abstract Aim of the study: The aim of the present study was to understatnd the forest composition, structure, diversity and regeneration potential along altitudinal gradient. Area of study: The study was carried out in Dhanaulti forest which falls under temperate region of Garhwal Himalaya in Uttarakhand state, India. Material and methods: Vegetation analysis was carried out using 10 quadrats at each altitude using a quadrat size of 10×10 m2. In each quadrat, categories of trees >30 cm cbh were considered as trees, 10-30 cm cbh as saplings and <10 cm cbh as seedlings. The data were quantitatively analyzed. Main results: In upper and middle altitudes, Cedrus deodara was reported dominant tree whereas, in lower altitude Quercus leucotrichophora was reported dominant. Tree density was highest in lower altitude which reduced middle and upper altitudes whereas, total basal cover increased with increasing altitude. The increasing total basal cover with altitude could be because of the presence of Cedrus deodara trees having higher girth classes. In tree, sapling and seedling layers, diversity (H) and equitabiltiy (EC) decreased with increasing altitude. However, concentrations of dominace (CD) and beta diversity (BD have shown reverse trend with H and EC which increased with increasing altitudes, in each layer of tree, sapling and seedling.
    [Show full text]
  • Annual Progress Report-ILSP 2018-2019
    Annual Progress Report-ILSP 2018-2019 Integrated Livelihood Support Project (ILSP) IFAD Loan no.: #856-IN Annual Progress Report Financial Year 2018-19 (1stApril 2018 – 31st March 2019) Central Project Coordination Unit (CPCU) Uttarakhand Gramya Vikas Samiti (UGVS) Project Society Watershed Management Directorate (PSWMD) Uttarakhand Parvatiya Aajeevika Sanvardhan Company (UPASaC) 216, Panditwari, Phase 2, Dehradun Phone & Fax: 0135-2773800/2774800 Email: [email protected] Page 1 of 183 Annual Progress Report-ILSP 2018-2019 Project At a Glance Background of the Project Government of Uttarakhand, with support from the International Fund for Agriculture Development (IFAD), is implementing Integrated Livelihood Support Project (ILSP) since July 2013. ILSP was scheduled to be completed on 31st March 2019 with loan closing on 31st March 2021. The project is being implemented in 44 blocks of 11 hill districts of Uttarakhand i.e. Almora, Bageshwar, Nainital, Champawat, Pithoragarh, Chamoli, Tehri, Uttarkashi, Pauri, Dehradun, and Rudraprayag. Figure 1 Project Area Objectives The overall objective (goal) of ILSP is to reduce poverty in hill districts of Uttarakhand. This is being achieved via more immediate development objective to “enable rural households to take up sustainable livelihood opportunities integrated with the wider economy”. The strategy behind ILSP is to adopt a two-pronged approach to build livelihoods in hill districts. The first of these is to support and develop the Page 2 of 183 Annual Progress Report-ILSP 2018-2019 food production systems, which remain the main means of support for most households. The second main thrust of the project is to generate cash incomes by supporting non-farm livelihoods, especially community involvement in rural tourism, and vocational training.
    [Show full text]
  • A Private Heaven Imaging Living in a Farm Surrounded by a Garden Full of Colourful Flowers and Beautiful Trees
    Conceived and Developed By :- Developing and Marketing partner ABS Channel Partner ABS Promoters & Developers Head Office :- 09A-2, Dilshad Garden, Delhi-110092 Pacific Constructions & Management Futuresecure Invests Farm Site Office :- 30 KM Milestone, Dehradun, Saharapur Road, D-64, Ist Floor, Vikas Marg, Shakarpur, Delhi-110092 Village Ganeshpur, Distt Saharanpur A private heaven Imaging living in a farm surrounded by a garden full of colourful flowers and beautiful trees. Imagine staring at calm long stretches of nothingness. Wilderness of the jungle Imagine waking up to the sweet chirping of birds every morning. Classical yet contemporary It" be a place you"ll fall in love... Nature knocking on your front door Farms at Sukoon will be an awesome experience with wide variety of lifestyle. Facilities to suit your lifestyle Discover Yourself ?Hi-tech security arrangements. ?Esthetically and lavishly furnished cottage ? ?Beautiful landscaped garden Security guards. ? ?Fully secure boundary wall with entrance gate 24 hour water supply. ?Barbeque place ?100 % power backup for common facilities. ?Bonfire place ?Fully equiped beautifully landscaped club with ?Open area 90% and construction - 10% (Maximum) swimming pool. ?Serene surroundings admist wilderness of jungle ?In house grocery shop to meet your daily needs. ?In house maintenance services. Magical by Night Beautiful by Day Site map with local distances Mussoorie Kanatal Paonta Sahib Dhanaulti 19 Dehradun Sukoon – Dehradun Kms Mohand Rishikesh Rajaji National 47 Farm park Sukoon – Mussoorie Kms Haridwar Roorkee 71 Sukoon – Haridwar Kms 61 Sukoon – Rishikesh Kms Muzaffarnagar 71 Sukoon – Dhanaulti Kms 95 I am at peace Sukoon – Kanatal Kms 63 I am at rest Meerut Sukoon – Paonta Sahib Kms Modinagar I am home....
    [Show full text]
  • List of Provisionally Accepted Applications for the Post of Peon
    REGIONAL OFFICE Phone: EMPLOYEES’ STATE INSURANCE CORPORATION 0135 – 2774762 / 63 PANCHDEEP BHAWAN, WING NO. 4, SHIVPURI, PREMNAGAR, DEHRADUN, UTTARAKHAND Fax Beat Code : I PIN Code : 248007 0135-2771542 ISO 9001 : 2000 CERTIFIED CHINTA SE MUKTI LIST OF PROVISIONALLY ACCEPTED APPLICATIONS FOR THE POST OF PEON EXAM DATE : 20.12.2009 (10:00 AM TO 01:00 PM) Sl. No. Ref. No. Name of the Father’s / Date of Categor Mailing address Permanent address candidate Husband’s Birth y name 1. 1859 A. C. Ayyaswamy 06.07.82 SC ESIC, Staff Complex Type-3, Ranganathan No-7, O-Block, Mangolpuri, New Delhi-110083 2. 1375 A.D.Narayan Shyam Kumar 01.06.83 GEN. C/o-Hetram Naik, AT- DO Patel Patel jhanakpur, Po-Baramkela, Dist-Raigarh, Chhattisgarh- 496551 3. 323 Aadhin Kumar Bhagwat Singh 20.07.86 SC C/o Shri Dharmendra Nath Pradeep Vihar, Dubey, Near Gavlira Chowk, Jai Prabha Nagar, Saharanpur, Near Labour Colony, UP – 247 001 Saharanpur (UP), PIN – 247 001 4. 1995 Aashu Kumar Gurdas 08-10-84 SC V.P.O. Ambadi Via -do- Dakpaththa Distt Dehradun 248125 5. 2072 Abdul Hamid Abdul shukur 08/07/90 GEN Abdul Hamid Marfhan Havi Vill-Barkanpur, Deve Camuli, Dist-Karemganj H.N.-97, Saken Colony, Assam-788810 Dehradun Pin-248121 6. 1104 Abdul Majid Sri Kalimullah 05.08.89 GEN Abdul Majid Ansari, Vill- Ansari Ansari Kurkawala, Po.-Doiwala, Dist-Dehradun, Pin-248140 7. 1297 Abhijit Kumar Late Babu Ram 31.03.78 SC Qtr.No-Reena F 7N.C, Jindal Hospital Colony Model Town Hisar-125005(H.R) 8.
    [Show full text]