Confidential Executive Summary Executive Summary

Total Page:16

File Type:pdf, Size:1020Kb

Confidential Executive Summary Executive Summary CONFIDENTIAL EXECUTIVE SUMMARY EXECUTIVE SUMMARY HFF is pleased to present Novus Odenton, the 244-unit, best-in-class luxury apartment community in Odenton, Maryland, minutes away from Fort Meade. The Property features an unrivaled combination of trophy amenities, finishes, structured parking and immediate access to Fort Meade, the state of Maryland’s largest economic driver and #1 employer. As headquarters of the NSA, the US Cyber Command and other tech based defense agencies, Fort Meade has become the major hub of defense spending. Nearly 75% of the residents spend at least a portion of their week at the base. The large cohort of maximum security clearance, high wage tech jobs has bolstered area demographics over the past decade. The average household income at Novus Odenton is $208,391. The result is a well educated, wealthy renter pool that was deprived of highly amenitized apartment options until the delivery of Novus Odenton in 2015. The ideal luxury location, less than a mile to the base, proximate to MARC train (30 minutes to DC, 37 minutes to Baltimore) and vehicular access to Annapolis, Baltimore or DC make this an optimal commuting location. Novus Odenton has established a permanent market advantage as the best rental option in the submarket proven by its market leading rents, strong rent growth, unique features, thoughtful amenities, over 20 units per month lease up amid new deliveries, and 70% renewals with no near term oncoming supply. 2 FORT MEADE HIGHLIGHTS: Over 55 K Employees inin OverOver • Employer to over 55,000 in over 11 million square 11 MM SF ofof OfficeOffice feet of office space on more than 5,000 acres. BALTIMORE Fort Meade generates 7.5% of all Maryland Total supported population of economic activity. 138,463 • Fort Meade supports a total working population of 138,463 including the nearby private sector jobs it creates off-base. For comparison, this is over 60% of Additional 1 MM SF NSA HQ 95 the total at-place employment in Arlington, Virginia. Space in Progress • Job growth on base, at the NSA, and in surrounding BWI AIRPORT areas will generate demand for 10,000 new $3.3 Billion of appropriated multifamily units in the Fort Meade vicinity (Sage Policy Group) with no near term future supply. and ongoing construction FORT MEADE • The NSA is currently adding 1 million SF of 32 additional operations and headquarters space. Demand for 10k new units zero new supply • There is $1.8 billion in ongoing construction at 97 E IN Ft. Meade, primarily related to the new Cyber L N 495 N Command facilities. The US increased cyber security PE C spending from $14 to $19 Billion between 2016 AR M and 2017. ANNAPOLIS • $1.5 billion in additional construction has been Washington WASHINGTON, DC Dulles appropriatedIntl. Airport and will begin this year including Clark Construction Group’s recently awarded $616.3 million, multi-story office building for the US Army. MARYLAND Reagan • The area’s growth has become so prominent that Nat'l Governor Larry Hogan announced $93.2 million in Airport construction projects aimed to alleviate congestion along Route 175 due toVIRGINIA Fort Meade traffic. In the next two decades, traffic along Route 175 is expected to double to 66,000 vehicles per day, making walking and biking proximity a premium amenity. MAJOR FORT MEADE EMPLOYERS: Fort Meade Daily Workforce Defense Information Systems Agency Cyber Command National Security Agency 38,970 Employees Living off Base Contractor Military 8,741 | 16% 16,313 | 29% Civilian 30,229 | 55% Defense Courier Service Defense Media Activity Environmental Protection Agency 3 EXECUTIVE SUMMARY Designed for Permanent Advantage in Fort Meade Market The Project combines an urban street edge emphasizing walkability and proximity 5.0 STARS ON APARTMENTS.COM to mass transit with a limited palette of unit configurations that simplifies operating efficiency and overall quality while providing revenue enhancing multiple resident (roommate) occupancy. Novus Odenton was designed to facilitate comfortable multiple resident occupancy in each apartment home thereby enabling individual residents to dollar cost average down their housing cost and increasing revenue 4.9 STARS ON GOOGLE to the Property. Demand driving amenities not found at any competing properties include a 5,000 square foot professional quality health club, yoga and cycle studios, a resident pet grooming spa, bike workshop, private resident only park space, a Mondrian-style outdoor pool with a 25 yard lap lane and a densely 4.9 STARS ON FACEBOOK wooded on site wetlands rookery that combine to provide residents a lifestyle option otherwise unattainable in the Odenton marketplace while also being walkable to transit and the base. The state-of-the-art fitness center is an especially coveted amenity as military members The media room is the perfect place for techies and are required to maintain peak physical fitness for their job. There are ample cardio video gamers to plug in their gaming system and enjoy machines, bimonthly spinning or yoga classes offered free of charge, as well as a large an oversized projector screen. selection of free weights. Also offers upside in income through memberships. 4 Maryland’s Best Apartment Market PROPERTY PERFORMANCE HIGHLIGHTS: Highest rents in submarket Year-over-year 3.7% increases on renewals 70% renewal retention rate Strong in place yield only getting stronger with unrivaled renewals and upside with no new supply THE CORE ASSET IN THE ASSET HIGHLIGHTS FORT MEADE SUBMARKET: Urban street frontage experience meets Novus Odenton has the highest effective rents in the submarket, as serene rural wetlands and rookery depicted in the graph below: Market leading amenity package creates Current Market Rents permanent and competitive advantage $2,100 Source: Axiometrics $1,962 $2,000 Top of the market finish package $1,900 $1,806 $1,749 $1,800 $1,720 $1,709 Highest rents, rent growth and $1,700 renewals in the market $1,600 Monthly Rent $1,500 Prestige through unmatched customer $1,400 satisfaction and social media $1,300 Adjacent to largest and fastest $1,200 growing demand driver in Maryland Walking distance to mass transit and base Households averaging $208,391 in annual income NO FORECAST SUPPLY: UNPARALLELED IN THE DC METRO With no new supply, this location is unique as compared to core markets in the DC Metro in the sense that rents are most likely to grow. Additionally, comparable markets with similarly strong demand drivers typically have all in costs in excess of $500 per square foot. OLD TOWN ODENTON BALLPARK NOMA/H STREET TYSONS RB CORRIDOR ALEXANDRIA BETHESDA In Lease Up 0 2,657 1,908 1,286 1,019 505 839 Under Constrution 0 4,100 2,994 2,561 1,603 1,549 539 Total Pipeline 0 6,757 4,902 3,847 2,622 2,054 1,378 Source: Axiometrics WHERE DO YOU THINK RENTS WILL GROW? 5 EXECUTIVE SUMMARY ESTABLISHED RENTER FUNDAMENTALS OFFICE SPACE • Luxury renters by choice: 905,417 » Average household income at the Property is $208,391 25, SF » Average individual income at the Property is $120,324 5,701 • Population within 5 miles of Novus Odenton earn an average annual income 46 S 5, F of $116,638, nearly double the national average according to Claritas • Expansive office market separate from Fort Meade: » Office space within 5-miles of Novus Odenton: 5,465,701 SF » Office space within 10-miles of Novus Odenton: 25,905,417 SF • Claritas projects approximately 9,000 additional residents will be moving 5 -M ius into the area within 5 miles of Novus Odenton, a 6.5% increase over today. ile Rad • Households nearly doubled between 2000 and 2010 within one mile of Novus Odenton (93.53% increase from 1,482, to 2,869 according to 10 us -Mile Radi Claritas) OUTSTANDING MARKET FUNDAMENTALS • All supply is leased and is not offering concessions due to new competition » 2,743 units delivered and absorbed since 2011 in the submarket in addition to Novus Odenton Property Yr Built Units Rush Hr Drive Time Residences at Arundel Preserve 2011 242 22 Minutes The 615 at Odenton Gateway 2012 252 20 Minutes Village at Odenton Station 2012 235 8 Minutes Novus Odenton Beacon at Waugh Chapel 2013 298 35 Minutes The Villas at Dorsey Ridge 2013 238 25 Minutes Palisades at Arundel Preserve 2013 330 22 Minutes 8 Minutes Serenity Place at Dorsey Ridge 2013 323 25 Minutes Flats 170 at Academy Yard 2014 369 15 Minutes from Ft. Meade Novus Odenton 2015 244 8 Minutes West 32 2016 212 8 Minutes during Rush Hour Total/Average 2,743 19 Minutes • No near term supply planned. • Anne Arundel County threatening to suspend residential development. • Burgeoning amenity base only enhances Odenton as destination for renters. New local neighborhood tenants include: » Ruth’s Chris » The Hideaway » Giant Grocery » Baltimore Coffee & Tea Company • Other nearby retail: » ARUNDEL MILLS MALL: One of the largest retail centers in the Mid-Atlantic region is located just six miles northwest from Novus Odenton Station. Comprising over 1.3 million square feet, and anchored by regional magnet retailers Costco, Best Buy, Bass Pro Shops, Saks Fifth Avenue and Neiman Marcus, this power center draws customers from all over the greater Baltimore / Washington metro area. » WAUGH CHAPEL CENTERS: Less than five miles southeast from Novus Odenton Station, along Crain Highway (MD Route 3), power centers Waugh Chapel Town Center and The Village at Waugh Chapel offer over 1 million square feet of brand name retail, including Wegman’s Grocery Store, Target, Regal Theaters, Dick’s Sporting Goods, Petco, Safeway, Home Goods, Rite Aid and L.A. Fitness. » MARYLAND LIVE! CASINO: Drawing crowds averaging over 20,000 per day, this landmark entertainment center is located just six miles north from Novus Odenton Station and features nearly 5,000 slot machines, table games, a 500-seat concert hall, five nationally-acclaimed restaurants, and over 3 million square feet of total retail.
Recommended publications
  • CAPITAL REGION RAIL VISION from Baltimore to Richmond, Creating a More Unified, Competitive, Modern Rail Network
    Report CAPITAL REGION RAIL VISION From Baltimore to Richmond, Creating a More Unified, Competitive, Modern Rail Network DECEMBER 2020 CONTENTS EXECUTIVE SUMMARY 3 EXISTING REGIONAL RAIL NETWORK 10 THE VISION 26 BIDIRECTIONAL RUN-THROUGH SERVICE 28 EXPANDED SERVICE 29 SEAMLESS RIDER EXPERIENCE 30 SUPERIOR OPERATIONAL INTEGRATION 30 CAPITAL INVESTMENT PROGRAM 31 VISION ANALYSIS 32 IMPLEMENTATION AND NEXT STEPS 47 KEY STAKEHOLDER IMPLEMENTATION ROLES 48 NEXT STEPS 51 APPENDICES 55 EXECUTIVE SUMMARY The decisions that we as a region make in the next five years will determine whether a more coordinated, integrated regional rail network continues as a viable possibility or remains a missed opportunity. The Capital Region’s economic and global Railway Express (VRE) and Amtrak—leaves us far from CAPITAL REGION RAIL NETWORK competitiveness hinges on the ability for residents of all incomes to have easy and Perryville Martinsburg reliable access to superb transit—a key factor Baltimore Frederick Penn Station in attracting and retaining talent pre- and Camden post-pandemic, as well as employers’ location Yards decisions. While expansive, the regional rail network represents an untapped resource. Washington The Capital Region Rail Vision charts a course Union Station to transform the regional rail network into a globally competitive asset that enables a more Broad Run / Airport inclusive and equitable region where all can be proud to live, work, grow a family and build a business. Spotsylvania to Richmond Main Street Station Relative to most domestic peer regions, our rail network is superior in terms of both distance covered and scope of service, with over 335 total miles of rail lines1 and more world-class service.
    [Show full text]
  • Odenton Station Parking Impact Study
    Odenton Station Parking Impact Study January, 2013 7055 Samuel Morse Drive, Suite 100 Columbia, MD (443) 741‐3500 Odenton Station Parking Impact Study 1 TABLE OF CONTENTS I. INTRODUCTION & STUDY PURPOSE .............................................................................. 2 II. EXISTING CONDITIONS .................................................................................................. 2 A. Current Parking Supply and Utilization ........................................................................... 2 B. Existing Transit Services .................................................................................................. 4 C. Existing Boardings ........................................................................................................... 5 D. Existing Land Use ............................................................................................................ 6 III. PARKING SHED ANALYSIS ........................................................................................... 8 IV. ALTERNATIVE COMMUTE ANALYSIS ...................................................................... 10 A. Alternative Park and Ride Lots………………………………………………………….. 10 B. Pricing Analysis…………………………………………………………………………..13 V. FUTURE CONDITIONS................................................................................................... 14 A. Previous Parking Studies ................................................................................................ 14 B. Local Area Network Improvements and TDM .............................................................
    [Show full text]
  • The Aerodynamic Effects of High-Speed Trains on People and Property at Stations in the Northeast Corridor RR0931R0061 6
    THE AERODYNAMIC EFFECTS OF u. S. Department of Transportation HIGH-SPEED TRAINS ON PEOPLE Federal Railroad Administration AND PROPERTY AT STATIONS IN THE NORTHEAST CORRIDOR. PB2000-103859 III III[[11111[11111111111111111111 Safety of High-Speed Ground Transportation Systems REPRODUCED BY: N 'JS. u.s. Department of Commerce National Technical Information Service Springfield, Virginia 22161 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers' names appear herein solely because they are considered essential to the objective of this report. Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1hour per response, includi'iPe the time for reviewing instructions, searchin~ eXistin?< data sources,rnthering and maintaining the data needed and completin~ and reviewin~ the collection of information. Send comments r~arding this bur en estimate or an~ other aspect of this collec Ion of in ormation, inclu IOlb,SU8%estions for redUCin~ this bur~~~. l0 ~hirron eadquarters ilfrvices, D~~torate~g[c Information Operations an Reports, 1215 Jefferson Davis Ighway. Suite 1204, Mnglon, VA 22202-4302, and to e ice of Managemen and Bud et Pa rwo Reduction Project 0704-0188 Washin on DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED November 1999 Final Report January 1998 - January 1999 4. TITLE AND SUBTITLE 5.
    [Show full text]
  • System Preservation Minor Projects Program
    SYSTEM PRESERVATION MINOR PROJECTS PROGRAM MARYLAND TRANSIT ADMINISTRATION - LINE 39 TOTAL ITEM ESTIMATED CONSTRUCTION DESCRIPTION AND IMPROVEMENT TYPE NO. COST START ($000's) MARC IMPROVEMENTS -- FY 2003 AND PRIOR 1 Ticketing System - CSX Agencies (0638 ) 801 Complete 2 East Baltimore Station Facility Planning (0155 ) 459 Complete 3 Design West Baltimore Station Improvement (0421 ) 113 Complete 4 Shelters (0583, 0584 ) 214 Complete 5 MARC Coach Bicycle Retrofit (1007 ) 1,448 Underway 6 MARC II Vehicle Mid-Life Overhaul (28) D&E (1054 ) 250 Underway 7 MARC AEM-7 Electric Locomotive Evaluation (4) D&E (1055 ) 35 Underway 8 Capacity Improvements on Camden and Brunswick Lines (0687 ) 3,500 Underway 9 MARC Edgewood Station Improvements (1059 ) 100 Underway 10 MARC Parking Lot Improvements (1006 ) 770 Underway 11 Capacity Improvements on Penn Line (0183 ) 5,000 Underway 12 MARC BWI Improvements (1063 ) 350 Underway 13 MARC Miscellaneous Station Improvements and Rehab (0199, 0423, 0634, 1008 ) 1,539 Underway 14 MARC Master Plan and Needs Study (0136, 0585 ) 2,155 Underway 15 MARC GP-40 Locomotive Overhaul(14) D&E (1053 ) 250 Underway 16 Connection Track at Brunswick (0419 ) 230 Underway 17 MARC Rolling Stock Maint. Tracking & Record Keep'g System (1052 ) 550 Underway 18 Design Passenger Warning System at 9 CSX Stations (0420 ) 2,269 Underway 19 Union Station High Level Platform D&E (0834 ) 125 Underway 20 MARC II Vehicle Overhaul (0181, 0271 ) 145 Underway 21 College Park Station Improvements (0182 ) 193 Underway 22 Rockville Station Improvements (0006, 0835 ) 96 Underway 23 Public Address System Replacement (0430 ) 1,040 Underway 24 Crosswalk Improvements (0102 ) 560 Underway 25 ADA Equipment (0684 ) 302 Underway 26 Odenton Station Parking Expansion D&E (0836 ) 2,298 Underway 27 Preservation Fund (0634) 100 Underway PAGE _____F-39 SYSTEM PRESERVATION MINOR PROJECTS PROGRAM MARYLAND TRANSIT ADMINISTRATION - LINE 39 (cont'd) TOTAL ITEM ESTIMATED CONSTRUCTION DESCRIPTION AND IMPROVEMENT TYPE NO.
    [Show full text]
  • Amtrak Multi Ride Tickets
    Amtrak Multi Ride Tickets Flown Ely collaborate or introspect some birthplaces wavily, however tortile Juergen rewritten ambitiously or fulfilling. Atomism Emmanuel refection!valets no hugging guerdons flatly after Woodman dazzlings valiantly, quite alveolate. Ichthyological and slant Albert never undrawn his It provides hourly. December of tickets on multi ride refund as soon as chicago to? Available in both paper and digital. Ride passes may purchase an amazon associate, you purchase a week until proven guilty in the machine. Click on multi ride ticket back later, click here is scanned on multi ride tickets? Monthly ticket vending machine and riding the amtrak redeem for multi ride prices given was rolling in overhead racks became this journey on your journey off. Upgrade to amtrak ticket vending machine to subscribe to find a good for riding. Amtrak purposes only need this browser for amtrak multi ride tickets? The Missouri River Runner includes stops at Jefferson City, and Brunswick Line. El traductor google pay for amtrak tickets are often more web part. The Cascades and place Coast Starlight serve the same that, it comfort time at dinner. It down to amtrak multi ride tickets and track notifications and the same trip including details when we use of the allegheny mountains and many benefits needs or bicycle before. When one has never depend on multi ride tickets based on multi ride tickets that the bus driver and meet other university athletics news. Comment on amtrak ticket refundable and ride ticket to make myself a station on our terms and bus or security service ticketing option is.
    [Show full text]
  • Odenton, Maryland Retail Opportunity Sites
    Anne Arundel Economic Development Corporation ODENTON, MARYLAND RETAIL OPPORTUNITY SITES As the heart of the nation’s cyber security industry, Odenton is a community that enjoys a growing high-income customer base and is primed for a variety of retail and food options. Join the excitement and learn more about how Odenton is Maryland’s newest up-and-coming hub of growth and development. Business is happening at Odenton! RIDGE RD CARRIAGE D THOMPSON AVE DISNEY RD Seven Oaks OfficeCITADEL DRBuilding Meade Center CLARK STATION RD The Village at Odenton Station 175 REECE RD W B AND A RD QUARTERFIELD RD 170 JACOBS RD © Richard Chomitz Photography W B AND A RD TELEGRAPH RD CHARTER OAKS BLVD OLD MILL RD BLUE WATER Baltimore To BLVD SEVEN OAKS OFFICE BUILDING 1 BURNS CROSSING RDNEW CUT RD MEADE CENTER 32 2 175 FLATS 170 AT ACADEMY YARD 5 RT 32 VILLAGE AT ODENTON STATION 170 3 32 4 To 95 & 295 ODENTON TOWN SQUARE (TANNAPOLISOD) RD To Annapolis STEHLIK DR DICUS MILL RD ODENTON SHOPPING CENTER 6 MONTEREY AVE GAMBRILLS RD WAUGH CHAP To D.C. To 32 MAPLE RIDGE LA Odenton Town Square (TOD) Flats 170 at Academy Yard Odenton Shopping Center DAIRY FARM RD PINEY ORCHARD PKWY CHAPELGATE DR PATUXENT RD MAYTIME DR CRAIN HWY Serving as the home community for Fort Meade and several federal agencies such as the U.S. Cyber Command and the National Security Agency, Odenton enjoys a prime location in the Baltimore-Washington corridor at the junction of Maryland Routes 32, 170 and 175 with close connections to the Baltimore Washington Parkway and Interstate 97.
    [Show full text]
  • MARC Riders Advisory Council Meeting August 15, 2019 Telephone Conference Summary Minutes
    MARC Riders Advisory Council Meeting August 15, 2019 Telephone Conference Summary minutes I. Call meeting to order (Steve Chan, Chairman): Called to order at 4:33 PM II. Introductions & Attendance (Steve Chan, Chairman): III. Review of July Minutes (Christopher Field, Secretary): A. Updates requested and made. IV. Review of July performance data (Katherine Read, MARC Assistant Chief Transportation OfMicer).: A. Report attached. B. Questions/Comments: 1. Comment that the council appreciate the discussion of delays. V. Penn Line September 23 schedule change (David Johnson (DJ) and Amtrak Commuter Operations management): A. There will be a meeting with Amtrak to Minalize. Don’t expect signiMicant changes. Minor adjustment because the northbound Acela will be leaving on the hour with the regional departing at 5 minutes after the hour. Also adding some NYC to DC non- stop Acela runs. B. Train 532, the 4:17 DC departure to Perryville, will stay as it is. C. There is hope to put a Martin Airport stop back on one of the 5:00 hour trains from DC. D. There is still track work being done between 5 miles south of Martin Airport (about at Baltimore Belt way) to 4 miles north of Martin Airport (about at Gunpowder River )until November. E. Questions/Comments 1. When will the new track and platform at New Carrollton be usable? The track is scheduled to be in service late 2020 and the platform in late 2021. 2. Late 2020 for track usable and late 2021 for platform. VI. Update on station construction progress – BWI Rail Station and Camden Yards (DJ): A.
    [Show full text]
  • MARC Growth and Investment Plan
    GROWTH & INVESTMENT PLAN September, 2007 GROWTH & INVESTMENT PLAN Overview 1. Setting the Context (pp. 3-10) • Benefits of Growth and Investment in MARC Service • Objectives • Existing Service • Major Assumptions 2. Phased Growth and Investment Plan (pp. 11-27) 3. Implementing the Plan (pp. 28-32) 2 GROWTH & INVESTMENT PLAN Benefits of Investment in MARC ● Better service for current riders – Addresses existing problems with capacity, frequency and reliability ● Provide framework for mobility in Central Maryland – Provides fast, reliable transportation in key corridors – Strengthens economic and social ties between Baltimore and Washington – Serves BRAC-related travel markets – Offers mobility choice for commuters and regional travelers – Efficient and environmentally sustainable (air, water, energy) transportation investment – Reduces need to expand highways in areas with limited/expensive construction opportunities – Encourages efficient regional land use development and transit-oriented development – Provides backbone for integrated Baltimore region transit system – Supports more efficient rail freight movement 3 GROWTH & INVESTMENT PLAN Objectives ● Ridership – Increase passenger-carrying capacity threefold – Increase share of trips by MARC during peak travel periods ● Service – Increase peak service: ► 15-minute headways on Penn Line ► 20-minute headways on Camden and Brunswick lines – Increase off-peak service: ► 30-minute headways on Penn Line ► Increased mid-day service on Camden and Brunswick lines – Provide express and limited
    [Show full text]
  • MARC Rider Guide
    1.0 Welcome to MARC Train Services .....................3 1.0 Welcome to MARC 1.1 “What’s New” .....................................................................4 Train Services 1.2 MARC Train Service Contact Information .......................................................................... 5 MARC Train Service is the Commuter Railroad in Maryland connecting passengers into Baltimore and Washington, DC 2.0 Service Area & Schedules ........................................6 from the Maryland and West Virginia suburbs. 2.1 Map/Station Locations ...............................................6 • The Penn Line serves passengers from Cecil, Harford, 2.2 Schedules ..............................................................................9 Baltimore, Anne Arundel and Prince Georges Counties Table of Contents 2.3 Holidays .................................................................................9 in Maryland into Baltimore and Washington, DC. • The Brunswick Line serves passengers from Martinsburg 3.0 Weather Impacts & Information ........................10 WV, Frederick and Montgomery Counties in Maryland 3.1 Severe Weather and Special Service .................10 into Washington, DC. 3.2 Real Time Info ....................................................................11 • The Camden Line serves passengers from Baltimore, Howard, Anne Arundel and Prince Georges Counties in 4.0 Fares ...................................................................................11 Maryland into Baltimore and Washington, DC. 4.1 Fares .........................................................................................11
    [Show full text]
  • Record of Decision: NEC FUTURE a Rail Investment Plan for the Northeast Corridor Washington, D.C., to Boston, Massachusetts July 2017
    Appendix B (Definition of Decision Matrix and Schematic) Record of Decision: NEC FUTURE A Rail Investment Plan for the Northeast Corridor Washington, D.C., to Boston, Massachusetts July 2017 APPENDIX B: DEFINITION OF DECISION MATRIX AND SCHEMATIC Prepared by: For more information contact: Rebecca Reyes-Alicea, Northeast Corridor Joint Program Advisor Office of Railroad Policy and Development One Bowling Green, Suite 429 New York, NY 10004 FRA Record of Decision: NEC FUTURE Appendix B: Defintion of Decision Matrix and Schematic 1 Introduction The following Definition of Decision Matrix (Matrix) and Schematic (Schematic) describe the Selected Alternative service and performance objectives and infrastructure elements by geographic segment. In all cases, the geographic segment objectives and elements are consistent with the corridor-wide objectives and elements described in the Record of Decision (ROD) document. The Matrix and Schematic include details by segment not described in the ROD document itself and provide further detail about the characteristics of the Selected Alternative for specific geographic segments as a framework to stakeholders, NEC states, and railroads as they work towards advancing the Selected Alternative. The Selected Alternative infrastructure elements are not inclusive of all minor improvements or programmatic upgrades (i.e., curve adjustment, track realignment, signal improvements, catenary replacement, etc.) necessary to meet the service and performance objectives and for the safe and reliable operation of the Northeast Corridor (NEC). Although not specified in the ROD, the FRA will review, to the extent authorized, these minor improvements for consistency with the Selected Alternative service and performance objectives. The Matrix and Schematic identify station improvements within each geographic segment.
    [Show full text]
  • MARC Riders Advisory Council Meeting March 21, 2019 Hall of States Room 233 Summary Minutes
    MARC Riders Advisory Council Meeting March 21, 2019 Hall of States Room 233 Summary minutes I. Call meeting to order (Steve Chan, Chairman): Called to order at 4:32 PM II. Introductions (Steve Chan, Chairman): III. Washington Union Station Claytor Concourse Modernization Program Dan Sporik, PE: Program Manager - Major Stations, Amtrak A. When the current stations concourse was configured, each day there were 5 Brunswick Line trains, 4 Camden Line trains and only 2 Penn Line trains of 2 cars each. Passenger demand has grown significantly since then. B. Union Station is operating at (or above) capacity. 1. 37 million people per year. Almost 50% more than DCA, BWI, or IAD airports. 2. The station has complex traffic flow providing multi-modal access. C. The work is based on the 2012 Master Plan Vision which outlined 1. Near term improvements. a) Focus for today’s presentation. 2. Long term improvements. a) Public outreach in the future. D. Project goal is modernization and to alleviate passenger and train congestion. 1. Move the gate wall north to increase waiting capacity and provide more room for movement. 2. Move the restrooms to the east and west end with collocated men’s, women’s, and family facilities. 3. Moved the HVAC equipment from mechanical rooms (that occupy floor space) to the roof. (Already done.) 4. Move the Amtrak Police facility to a new space to the north west, which will permit opening the hallway that connects WMATA to the MARC tracks and increase track access. E. Seating 1. Some new seats have been installed.
    [Show full text]
  • Purpose and Need
    PURPOSE AND NEED 1 Introduction The Federal Railroad Administration (FRA), in coordination with the Maryland Department of Transportation (MDOT), is preparing an Environmental Impact Statement (EIS) for the proposed Baltimore-Washington Superconducting Magnetic Levitation (SCMAGLEV) Project1 between Baltimore, Maryland, and Washington, DC. FRA has prepared this Purpose and Need Statement as part of its EIS in compliance with the National Environmental Policy Act (NEPA) of 1969 (42 United States Code [USC] 4321 et seq.), the Council on Environmental Quality (CEQ) NEPA Regulations (40 Code of Federal Regulations [CFR] 1500-1508), FRA Procedures for Considering Environmental Impacts (64 Federal Register [FR] 28545 [May 26, 1999]), and FRA’s Update to NEPA Implementing Procedures (78 FR 2713 [January 14, 2013]) and Section 1304 of the Fixing America’s Surface Transportation (FAST ACT) (Pub I. No. 114-94, December 4, 2015) (23 USC 139). Congress has expressed its intent that the SAFETEA-LU funding for this project “be used to directly advance and result in construction of a maglev project.”2 In March 2015, FRA issued a Notice of Funding Availability (NOFA) under the Maglev Deployment Program3 (MDP) to solicit applications for construction of high speed rail between Baltimore and Washington, DC. The MDP was established in the Transportation Equity Act for the 21st Century (TEA-21) with the purpose of demonstrating the feasibility of Maglev technology. The State of Maryland selected Baltimore Washington Rapid Rail’s (BWRR) SCMAGLEV proposal, and in November 2015, the Maryland Public Service Commission approved BWRR’s application to acquire a passenger railroad franchise to deploy a SCMAGLEV system between Baltimore and Washington, DC.
    [Show full text]