PROTECTING URBAN WATERWAYS a Guide to Victoria's Planning System
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Rivers Monitoring and Evaluation Plan V1.0 2020
i Rivers Monitoring and Evaluation Plan V1.0 2020 Contents Acknowledgement to Country ................................................................................................ 1 Contributors ........................................................................................................................... 1 Abbreviations and acronyms .................................................................................................. 2 Introduction ........................................................................................................................... 3 Background and context ........................................................................................................ 3 About the Rivers MEP ............................................................................................................. 7 Part A: PERFORMANCE OBJECTIVES ..................................................................................... 18 Habitat ................................................................................................................................. 24 Vegetation ............................................................................................................................ 29 Engaged communities .......................................................................................................... 45 Community places ................................................................................................................ 54 Water for the environment .................................................................................................. -
THE MARIBYRNONG RIVER UPSTREAM of the DESIGNATED PORT of PORT PHILLIP Waterway Manager - Parks Victoria (Ph: 131 963)
KEILOR EAST Exclusive Use & Special Purpose Areas for the Purpose of Clause 13. Allan Reserve Rosehill Maribyrnong ROAD Park a) Maribyrnong River- special light provisions N Creek A Recreational Vessel- (i) used for training or competition;ESSENDON and (ii) is not powered but is propelled by using oars or paddles; on the waters of the Maribyrnong River upstream of the Designated Port of Port Phillip to the Canning Street Moonee Monte Carlo Bridge shall exhibit between sunset and sunrise - Reserve (i) a light in accordance with Rule 25 of the MILLEARA Steele Clifton International Rules for Preventing Collisions at Sea, Park SUNSHINE NORTH LOWER MARIBYRNONG 1972; or RIVER LAND (ii) a fixed 180 degree white light located on the bow MILITARY of the vessel and a flashing 180 degree light on the Ponds AVONDALE HEIGHTS stern of the vessel. LOWER MARIBYRNONG RIVER LAND ABERFELDIE MOONEE PONDS CITYLINK See Inset A ROAD CANNING STREET BRIDGE CORDITE ROAD Creek RALEIGH AVENUE MARIBYRNONG STREET MARIBYRNONG ROAD ORMOND ROAD CANNING River Highpoint River Shopping Centre EPSOM Medway Golf Club ROAD Pipemakers Park ASCOT VALE BALLARAT ROAD HAMPSTEAD MAIDSTONE LANGS ROAD Thompson Reserve STREET BALLARAT LOWER MARIBYRNONG RIVER LAND FLEMINGTON AVENUE RACECOURSE ROAD ROAD BRAYBROOK ROAD Flemington FARNSWORTH Racecourse Creek SMITHFIELD KENSINGTON ROAD MACAULAY ROAD ASHLEY WEST FOOTSCRAY J J Holland Park SUNSHINE ROAD Stony FOOTSCRAY DYNON ROAD ROAD STREET DEMPSTER GEELONG TOTTENHAM ROAD Creek STREET SEDDON FOOTSCRAY Ponds KINGSVILLE CITYLINK ROAD ROAD -
Stormwater Management Plan 2012-17
Stormwater Management Plan 2012-17 City of Whittlesea Stormwater Management Plan: 2012-2017 Copyright © 2012 City of Whittlesea Copyright of materials within this report is owned by or licensed to the City of Whittlesea. Apart from fair dealing for the purposes of private study, research, criticism or review, as permitted under copyright legislation, no part may be reproduced or reused for any commercial purposes whatsoever. Contact [email protected] phone (03) 9217 2170 postal address | Locked Bag 1, Bundoora MDC, 3083 Responsible Council Department Infrastructure Department | Environmental Operations Unit Council Endorsement Council Meeting: 17 Apr 2012 Table of Contents Abbreviations & Acronyms .............................................................................................................. 3 Executive Summary ........................................................................................................................ 4 Introduction ..................................................................................................................................... 5 Background ..................................................................................................................................... 6 Stormwater Management Plan 2003 ............................................................................................ 6 Stormwater Management Plan 2007-10 ....................................................................................... 6 Policy and Strategy Context ........................................................................................................... -
Victorian Environmental Flows Monitoring and Assessment Program (VEFMAP) Stage 6
Victorian Environmental Flows Monitoring and Assessment Program (VEFMAP) Stage 6 Project Update – 2018 Southern Victorian Rivers - Fish Background 2017/18 Survey Sites and Timing The Victorian Environmental Flows Monitoring and In 2017/18, surveys were undertaken to investigate Assessment Program (VEFMAP) was established by processes associated with KEQ 1 and 2 in the following the Victorian Government in 2005 to monitor and sites: assess ecosystem responses to environmental watering in priority rivers across Victoria. The program’s results • Immigration - the lower reaches of the Barwon, help inform decisions for environmental watering by Bunyip, Glenelg, Tarwin and Werribee rivers and Victoria’s Catchment Management Authorities (CMAs), Cardinia Creek (Sept-Dec 2017). Melbourne Water and the Victorian Environmental • Dispersal - the Glenelg and Moorabool rivers Water Holder (VEWH). Over the past 12 years, the (Jan-Feb 2018). information collected through VEFMAP has provided valuable data and informed significant changes to the • Distribution and recruitment - the Glenelg and program. VEFMAP is now in its sixth stage of delivery Thomson rivers (Feb-Mar 2018). and includes a strong focus on “intervention” or “flow event” type questions, for vegetation and fish. Fish Monitoring - Southern Victorian Rivers The core objective for fish monitoring in VEFMAP Stage 6 for coastal rivers is to examine the importance of environmental flows in promoting immigration, dispersal and subsequent recruitment of diadromous fish. There are two key evaluation questions for fish in coastal Victorian rivers, which were developed in collaboration with CMAs. KEQ 1 Do environmental flows enhance immigration of diadromous fishes in coastal streams? Figure 1: A juvenile (top) and adult (bottom) Tupong KEQ 2 Do environmental flows enhance dispersal, (Photo: ARI) distribution and recruitment of diadromous fishes in coastal streams? delwp.vic.gov.au VEFMAP Stage 6 Southern Victorian Rivers - Fish Methods January following a rain event in late December. -
Assessment of Transport Corridors 9
PaRt 3: assessment of tRansPoRt CoRRiDoRs 9. Regional Rail link (west of weRRibee to DeeR PaRk) The proposal for the Regional Rail Link – west of Werribee to Deer Park is being planned in an integrated manner with the changes to Melbourne’s Urban Growth Boundary, the Outer Metropolitan Ring / E6 Transport Corridor and the preservation of grasslands areas in Melbourne’s west. The Regional Rail Link can allow urban growth areas in Melbourne’s west to be served by high-quality public transport infrastructure early on in their development. It is of strategic importance to Victoria in achieving its wider transport planning vision as outlined in The Victorian Transport Plan and urban growth planning as outlined in Melbourne 2030 and Melbourne @ 5 million. 9.1 Understanding the Corridor The Regional Rail Link – west of Werribee to Deer Park is a 30 kilometre long section of up to 50 kilometres of the rail project linking the Melbourne-Geelong railway west of Werribee to Southern Cross Station via the Melbourne-Ballarat railway, connecting at Deer Park. The other section of the Regional Rail Link uses the existing rail corridors between Southern Cross Station and Deer Park. Both sections of the overall Regional Rail Link can be developed independently of each other, although both are proposed to be developed together to reduce construction times and ensure overall project benefits are realised as early as possible. 9.2 assessment The selection and assessment process to determine the alignment for the Regional Rail Link – west of Werribee to Deer Park involved: > Preparing route concepts to identify a broad range of options considering engineering constraints and benefits. -
Rivers and Streams Special Investigation Final Recommendations
LAND CONSERVATION COUNCIL RIVERS AND STREAMS SPECIAL INVESTIGATION FINAL RECOMMENDATIONS June 1991 This text is a facsimile of the former Land Conservation Council’s Rivers and Streams Special Investigation Final Recommendations. It has been edited to incorporate Government decisions on the recommendations made by Order in Council dated 7 July 1992, and subsequent formal amendments. Added text is shown underlined; deleted text is shown struck through. Annotations [in brackets] explain the origins of the changes. MEMBERS OF THE LAND CONSERVATION COUNCIL D.H.F. Scott, B.A. (Chairman) R.W. Campbell, B.Vet.Sc., M.B.A.; Director - Natural Resource Systems, Department of Conservation and Environment (Deputy Chairman) D.M. Calder, M.Sc., Ph.D., M.I.Biol. W.A. Chamley, B.Sc., D.Phil.; Director - Fisheries Management, Department of Conservation and Environment S.M. Ferguson, M.B.E. M.D.A. Gregson, E.D., M.A.F., Aus.I.M.M.; General Manager - Minerals, Department of Manufacturing and Industry Development A.E.K. Hingston, B.Behav.Sc., M.Env.Stud., Cert.Hort. P. Jerome, B.A., Dip.T.R.P., M.A.; Director - Regional Planning, Department of Planning and Housing M.N. Kinsella, B.Ag.Sc., M.Sci., F.A.I.A.S.; Manager - Quarantine and Inspection Services, Department of Agriculture K.J. Langford, B.Eng.(Ag)., Ph.D , General Manager - Rural Water Commission R.D. Malcolmson, M.B.E., B.Sc., F.A.I.M., M.I.P.M.A., M.Inst.P., M.A.I.P. D.S. Saunders, B.Agr.Sc., M.A.I.A.S.; Director - National Parks and Public Land, Department of Conservation and Environment K.J. -
Adopted by Wyndham City Council on 26 October 2015
Adopted by Wyndham City Council on 26 October 2015. SUMMARY Indicators suggest that the health of the Werribee River is poor, particularly in its lower reaches. This is primarily due to low flow rates downstream of the Werribee Diversion Weir and large amounts of litter entering the River from stormwater drains between Shaws Roads and the Maltby Bypass. Although some research is occurring at the river estuary, there is currently no water quality monitoring points downstream of the Werribee Diversion Weir. This is a concern as the lower reaches of river are in the worst condition and suffer from blue-green algal blooms due to high nutrients and low water flow. Council is not directly responsible for the health of the river. This responsibility lies with the Department of Environment, Land, Water and Planning (DELWP), Melbourne Water and regional water utility companies. There are however still opportunities for Council to promote and address some of the health challenges facing the river. Recommendations to Council made in this report include: 1. Advocate to the Minister for Environment, Climate Change and Water, and/or the Victorian Environmental Water Holder to increase environmental flows using yet-to-be-allocated water at Lake Merrimu. 2. Advocate to the Minister for Environment, Climate Change and Water, DELWP, the Victoria Environmental Water Holder and Melbourne Water to increase the percentage of water allocations for environmental flows and/or fund water recovery purchases. 3. Advocate to Melbourne Water to create additional water quality monitoring points downstream of the Werribee Diversion Weir. 4. Advocate to DELWP and the relevant waterway management authorities to facilitate a forum focusing on the future of the Werribee River with the aim of enhancing partnerships and identifying opportunities to work together to improve the health of the River. -
Maribyrnong STRATEGIC DIRECTIONS STATEMENT SEPTEMBER 2018
Maribyrnong STRATEGIC DIRECTIONS STATEMENT SEPTEMBER 2018 Integrated Water Management Forums Acknowledgement of Victoria’s Aboriginal communities The Victorian Government proudly acknowledges Victoria's Aboriginal communities and their rich culture and pays its respects to their Elders past and present. The government also recognises the intrinsic connection of Traditional Owners to Country and acknowledges their contribution to the management of land, water and resources. We acknowledge Aboriginal people as Australia’s fi rst peoples and as the Traditional Owners and custodians of the land and water on which we rely. We recognise and value the ongoing contribution of Aboriginal people and communities to Victorian life and how this enriches us. We embrace the spirit of reconciliation, working towards the equality of outcomes and ensuring an equal voice. © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by Finsbury Green, Melbourne ISSN 2209-8216 – Print format ISSN 2209-8224 – Online (pdf/word) format Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without fl aw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. -
Central Region
Section 3 Central Region 49 3.1 Central Region overview .................................................................................................... 51 3.2 Yarra system ....................................................................................................................... 53 3.3 Tarago system .................................................................................................................... 58 3.4 Maribyrnong system .......................................................................................................... 62 3.5 Werribee system ................................................................................................................. 66 3.6 Moorabool system .............................................................................................................. 72 3.7 Barwon system ................................................................................................................... 77 3.7.1 Upper Barwon River ............................................................................................... 77 3.7.2 Lower Barwon wetlands ........................................................................................ 77 50 3.1 Central Region overview 3.1 Central Region overview There are six systems that can receive environmental water in the Central Region: the Yarra and Tarago systems in the east and the Werribee, Maribyrnong, Moorabool and Barwon systems in the west. The landscape Community considerations The Yarra River flows west from the Yarra Ranges -
Moreland Pre-Contact Aboriginal Heritage Study (The Study)
THE CITY OF MORELAND Pre-ContactP AboriginalRECONTA HeritageCT Study 2010 ABORIGINAL HERITAGE STUDY THE CITY OF MORELAND PRECONTACT ABORIGINAL HERITAGE STUDY Prepared for The City of Moreland ������������������ February 2005 Prepared for The City of Moreland ������������������ February 2005 Suite 3, 83 Station Street FAIRFIELD MELBOURNE 3078 Phone: (03) 9486 4524 1243 Fax: (03) 9481 2078 Suite 3, 83 Station Street FAIRFIELD MELBOURNE 3078 Phone: (03) 9486 4524 1243 Fax: (03) 9481 2078 Acknowledgement Acknowledgement of traditional owners Moreland City Council acknowledges Moreland as being on the traditional lands of the Wurundjeri people. Council pays its respects to the Wurundjeri people and their Elders, past and present. The Wurundjeri Tribe Land Council, as the Registered Aboriginal Party (RAP) and the Traditional Owners for the whole of the Moreland City Council area, should be the first point of contact for any future enquiries, reports, events or similar that include any Pre-contact Aboriginal information. Statement of committment (Taken from the Moreland Reconciliation Policy and Action Plan 2008-2012) Moreland City Council gives its support to the Australian Declaration Towards Reconciliation 2000 and the National Apology to the Stolen Generations by the Australian Parliament 13 February 2008. It makes the following Statement of Commitment to Indigenous People. Council recognises • That Indigenous Australians were the first people of this land. • That the Wurundjeri are the traditional owners of country now called Moreland. • The centrality of Indigenous issues to Australian identity. • That social and cultural dispossession has caused the current disadvantages experienced by Aboriginal and Torres Strait Islander Australians. • That Indigenous people have lost their land, their children, their health and their lives and regrets these losses. -
Flood Management and Drainage Strategy
Port Phillip and Westernport Region Flood Management and Drainage Strategy i “Ideallysocietywouldliketobefreeoftheriskofflooding, butthisisneitherpracticallynoreconomicallyfeasible. Whatconstitutesanacceptableleveloffloodriskhowever isavexedquestion.Theimmediateriskisbornebythe community,whichmusthaveasignificantinputintodefining theacceptablelevel.Tothisend,publicconsultationandrisk communicationisveryimportant.” Floodplain Management In Australia Best Practice Principles and Guidelines, (SCARM 2000) Development of this strategy has been guided by a steering committee headed by an independent chair, Rob Joy, with representatives from the following organisations: • Department of Sustainability and Environment • Office of the Emergency Services Commissioner • Shire of Macedon Ranges • Insurance industry • Department of Human Services • Municipal Association of Victoria • Stormwater Industry Association of Victoria • Institute of Public Works Engineers Victoria • Port Phillip and Westernport Catchment Management Authority • Melbourne Water. The strategy has been prepared following extensive consultation with flood management agencies and local government authorities in the Port Phillip and Westernport region. Stakeholder workshops were undertaken to identify issues of concern and submissions received in relation to a circulated discussion paper assisted in the formulation of future strategic actions. iii LollipopCreek,Werribee,February2005 iv FloodManagementandDrainageStrategy Contents 2 Introduction 6 Background 6 What is flooding? 8 Types -
5. South East Coast (Victoria)
5. South East Coast (Victoria) 5.1 Introduction ................................................... 2 5.5 Rivers, wetlands and groundwater ............... 19 5.2 Key data and information ............................... 3 5.6 Water for cities and towns............................ 28 5.3 Description of region ...................................... 5 5.7 Water for agriculture .................................... 37 5.4 Recent patterns in landscape water flows ...... 9 5. South East Coast (Vic) 5.1 Introduction This chapter examines water resources in the Surface water quality, which is important in any water South East Coast (Victoria) region in 2009–10 and resources assessment, is not addressed. At the time over recent decades. Seasonal variability and trends in of writing, suitable quality controlled and assured modelled water flows, stores and levels are considered surface water quality data from the Australian Water at the regional level and also in more detail at sites for Resources Information System (Bureau of Meteorology selected rivers, wetlands and aquifers. Information on 2011a) were not available. Groundwater and water water use is also provided for selected urban centres use are only partially addressed for the same reason. and irrigation areas. The chapter begins with an In future reports, these aspects will be dealt with overview of key data and information on water flows, more thoroughly as suitable data become stores and use in the region in recent times followed operationally available. by a brief description of the region.